CN205036074U CN201520521111.7U CN201520521111U CN205036074U CN 205036074 U CN205036074 U CN 205036074U CN 201520521111 U CN201520521111 U CN 201520521111U CN 205036074 U CN205036074 U CN 205036074U
Authority
CN
China
Prior art keywords
supporting seat
high stable
sleeve pipe
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520521111.7U
Other languages
Chinese (zh)
Inventor
王亚南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520521111.7U priority Critical patent/CN205036074U/en
Application granted granted Critical
Publication of CN205036074U publication Critical patent/CN205036074U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a high stable scaffold convenient to cooperation installation, includes the support column, sets up the supporting seat on the support column, coordinates mounting sleeve on the supporting seat, and the sleeve pipe passes through the snap ring to be fixed on the supporting seat, overlaps the intraductal horizontal pole that sets up, and the sheathed tube both ends are several pressing blade, and pressing blade sets up the clamp outward. The utility model discloses during the installation insert the horizontal pole to the cover intraductally, because both ends be comparatively not hard up pressing blade, so conveniently insert, behind the determination of position, tighten pressing blade with the horizontal pole through the clamp, guarantee stability.

Description

A kind of being convenient to coordinates the high stable scaffold installed
Technical field
The utility model belongs to scaffold field, and specifically a kind of being convenient to coordinates the high stable scaffold installed.
Background technology
Scaffold is instrument conventional in construction.At present, scaffold is in cooperation installation process, and the cooperation between support column and cross bar, easily produces each other and loosen; Although the fit connection stability of tension is high, inconvenient when installing.
Utility model content
The utility model provides a kind of being convenient to coordinate the high stable scaffold installed, in order to solve defect of the prior art.
The utility model is achieved by the following technical programs:
Be convenient to coordinate the high stable scaffold installed, comprise support column, support column arranges supporting seat, supporting seat coordinates mounting sleeve, and sleeve pipe is fixed on supporting seat by snap ring, arranges cross bar in sleeve pipe, the two ends of sleeve pipe are several clamping piece, arrange clip outside clamping piece.
Be convenient to as above coordinate the high stable scaffold installed, arrange the inner ring of rubber in described sleeve pipe, inner ring and cross bar are adjacent to.
Be convenient to as above coordinate the high stable scaffold installed, in described inner ring, several bulge loop is set.
The utility model has the advantages that: when the utility model is installed, cross bar is inserted in sleeve pipe, because two ends are the clamping piece comparatively loosened, therefore convenient insertion; After position is determined, by clip, clamping piece and cross bar are tightened, ensure stability.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Reference numeral: 1 support column, 2 cross bars, 3 supporting seats, 4 snap rings, 5 pipe boxes, 6 clamping pieces, 7 clips, 8 inner rings, 9 bulge loops.
Detailed description of the invention
For making the object of the utility model embodiment, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
A kind of being convenient to coordinates the high stable scaffold installed, as shown in the figure, comprise support column 1, support column 1 is arranged supporting seat 3, supporting seat 3 coordinates mounting sleeve 5, sleeve pipe 5 is fixed on supporting seat 3 by snap ring 4, arranges cross bar 2 in sleeve pipe 5, the two ends of sleeve pipe 5 are several clamping pieces 6, arrange clip 7 outside clamping piece 6.Be convenient to coordinate the high stable scaffold installed, comprise support column, support column arranges supporting seat, supporting seat coordinates mounting sleeve, and sleeve pipe is fixed on supporting seat by snap ring, arranges cross bar in sleeve pipe, the two ends of sleeve pipe are several clamping piece, arrange clip outside clamping piece.
Specifically, in order to improve stability, arrange the inner ring 8 of rubber in the sleeve pipe 5 described in the present embodiment, inner ring 8 and cross bar 2 are adjacent to.Cross bar 2 coordinates with inner ring 8, and frictional force increases, and avoids moving horizontally.
Concrete, in order to increase stability further ,in inner ring 8 described in the present embodiment, several bulge loop 9 is set.Bulge loop 9 increases frictional force further.
Last it is noted that above embodiment is only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to previous embodiment, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of each embodiment technical scheme of the utility model.

Claims (3)

1. be convenient to coordinate the high stable scaffold installed for one kind, it is characterized in that: comprise support column (1), support column (1) is arranged supporting seat (3), supporting seat (3) coordinates mounting sleeve (5), sleeve pipe (5) is fixed on supporting seat (3) by snap ring (4), arrange cross bar (2) in sleeve pipe (5), the two ends of sleeve pipe (5) are several clamping piece (6), arrange clip (7) outside clamping piece (6).
2. a kind of being convenient to according to claim 1 coordinates the high stable scaffold installed, and it is characterized in that: the inner ring (8) arranging rubber in described sleeve pipe (5), inner ring (8) and cross bar (2) are adjacent to.
3. a kind of being convenient to according to claim 2 coordinates the high stable scaffold installed, and it is characterized in that: arrange several bulge loop (9) in described inner ring (8).
CN201520521111.7U 2015-07-18 2015-07-18 High stable scaffold convenient to cooperation installation Expired - Fee Related CN205036074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520521111.7U CN205036074U (en) 2015-07-18 2015-07-18 High stable scaffold convenient to cooperation installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520521111.7U CN205036074U (en) 2015-07-18 2015-07-18 High stable scaffold convenient to cooperation installation

Publications (1)

Publication Number Publication Date
CN205036074U true CN205036074U (en) 2016-02-17

Family

ID=55294983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520521111.7U Expired - Fee Related CN205036074U (en) 2015-07-18 2015-07-18 High stable scaffold convenient to cooperation installation

Country Status (1)

Country Link
CN (1) CN205036074U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708537A (en) * 2018-07-18 2018-10-26 四川省腾达电力器材制造有限公司 A kind of fast scaffolding and its installation method of insulating

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708537A (en) * 2018-07-18 2018-10-26 四川省腾达电力器材制造有限公司 A kind of fast scaffolding and its installation method of insulating

Similar Documents

Publication Publication Date Title
CN103711991A (en) Steel tube pipeline supporting frame
CN203641690U (en) Steel pipeline supporting rack
CN205842555U (en) Lamp tube mounting structure
CN205036074U (en) High stable scaffold convenient to cooperation installation
CN103423515A (en) Circular tube clamping sleeve
CN204053843U (en) A kind of Novel clamp gripping member
CN203098491U (en) Filter screen clip spring
CN205877428U (en) Support connecting piece
CN203549122U (en) Clamping groove type supporting pipe
CN202484011U (en) Detachable pipe clip
CN205350646U (en) Pipe joint
CN204628811U (en) Hook type cable clamp
CN203257819U (en) Installation connecting base
CN209398682U (en) A kind of fastening assembly
CN203463798U (en) Drain pipe clamp spring
CN204895678U (en) Scooter headlight device
CN204149069U (en) A kind of HID lamp bubble frock clamp
CN204171233U (en) A kind of wire rod bar folder
CN204357136U (en) Building operations central authorities extend out clamped-in style threading termination erecting device
CN204986314U (en) A support for installing new line display
CN105002844A (en) Railing base
CN204554074U (en) Easy dismountable pipe clamp
CN203517191U (en) Clamping structure for television
CN205171096U (en) Two reverse side jacquard yarn mouth structures
CN204098461U (en) A kind of steel structure construction scaffolding

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

Termination date: 20160718