CN201266809Y - Transmission line sustained center chucking tool - Google Patents
Transmission line sustained center chucking tool Download PDFInfo
- Publication number
- CN201266809Y CN201266809Y CNU2008201854428U CN200820185442U CN201266809Y CN 201266809 Y CN201266809 Y CN 201266809Y CN U2008201854428 U CNU2008201854428 U CN U2008201854428U CN 200820185442 U CN200820185442 U CN 200820185442U CN 201266809 Y CN201266809 Y CN 201266809Y
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- cross arm
- threaded rod
- transmission line
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Insulators (AREA)
Abstract
本实用新型公开了一种输电线路吊点卡具,所述卡具由可与杆塔横担形成固定连接的立杆和固联在立杆上端的悬臂构成,悬臂的另一端设有供挂钩悬挂的吊环。当立杆固定在杆塔横担上时,吊环吊点位于横担的上方,也就使吊葫芦的定滑轮位于横担上方,可方便快捷地将瓷瓶、绝缘子等器具输送至横担上;立杆为可相对旋转的两段式结构,当上段立杆绕下段立杆旋转时,可调整吊点在横担上的水平位置,具有很大的水平跨度,可以有效解决吊点不稳定,挂线准确度差,工作效率低,劳动强度大等问题。
The utility model discloses a lifting point fixture for transmission lines, the fixture is composed of a vertical pole which can be fixedly connected with the cross arm of a pole tower and a cantilever fixedly connected to the upper end of the vertical pole, and the other end of the cantilever is provided with a hook for hanging rings. When the pole is fixed on the cross arm of the pole tower, the lifting point of the lifting ring is located above the cross arm, so that the fixed pulley of the hoist is located above the cross arm, which can conveniently and quickly transport porcelain bottles, insulators and other appliances to the cross arm; The rod is a two-stage structure that can be rotated relatively. When the upper vertical rod rotates around the lower vertical rod, the horizontal position of the lifting point on the cross arm can be adjusted. It has a large horizontal span, which can effectively solve the problem of unstable lifting points. The line accuracy is poor, the work efficiency is low, and the labor intensity is high.
Description
技术领域: Technical field:
本实用新型涉及一种卡具,具体地说是一种应用在输电线路中、可更科学地为吊葫芦等设施提供吊点的卡具。The utility model relates to a jig, in particular to a jig which is applied in a power transmission line and can more scientifically provide lifting points for hoists and other facilities.
背景技术: Background technique:
架设输电线路或在对输电线路进行检修时,吊葫芦是一种很常用的工具,例如在杆塔横担上拉紧输电线时,可将输电线从吊葫芦上的定滑轮穿过,工作人员站在地面拉扯输电线即可完成紧线工作,在更换横担上的瓷瓶、绝缘子时,可通过吊葫芦上的定滑轮将瓷瓶或绝缘子输送至横担上,但是存在的问题是,因在横担上没有用于悬挂吊葫芦的吊点,只能在横担上设一绳套作为吊点,其存在的缺陷是,因绳套位于横担的下方,加上吊葫芦本身的高度,使得定滑轮距离横担还有相当大的距离,如此一来,诸如瓷瓶、绝缘子等一类的器具就无法输送到位,致使工作不能顺利完成,导致工作效率低,作业人员劳动强度大;再者,用绳套作为吊点稳定性差,准确度差,施工质量难以保证。The hoist is a very commonly used tool when erecting or overhauling the transmission line. For example, when tensioning the transmission line on the cross arm of the tower, the transmission line can pass through the fixed pulley on the hoist, and the staff can Standing on the ground and pulling the transmission line can complete the line tightening work. When replacing the porcelain bottle and insulator on the cross arm, the porcelain bottle or insulator can be transported to the cross arm through the fixed pulley on the hoist. There is no lifting point for hanging the gourd on the cross arm, and only a rope sleeve can be set on the cross arm as the hanging point. There is still a considerable distance between the fixed pulley and the crossarm, so that appliances such as porcelain bottles and insulators cannot be transported in place, resulting in the work not being completed smoothly, resulting in low work efficiency and high labor intensity for operators; moreover, Using the rope sleeve as the hanging point has poor stability and poor accuracy, and the construction quality is difficult to guarantee.
实用新型内容: Utility model content:
为克服现有技术的缺陷,本实用新型的目的在于提供一种输电线路吊点卡具,可提高吊点的垂直高度和水平跨度,且吊点稳定性好,吊线的准确度高。In order to overcome the defects of the prior art, the purpose of this utility model is to provide a suspension point clamp for transmission lines, which can increase the vertical height and horizontal span of the suspension point, and the stability of the suspension point is good, and the accuracy of the suspension line is high.
本实用新型解决技术问题采用如下技术方案:The utility model solves the technical problem and adopts the following technical solutions:
输电线路吊点卡具,所述卡具由可与杆塔横担形成固定连接的立杆和固联在立杆上端的悬臂构成,悬臂的另一端设有供挂钩悬挂的吊环。Transmission line lifting point fixture, the fixture is composed of a vertical pole that can be fixedly connected with the cross arm of the tower and a cantilever fixedly connected to the upper end of the vertical pole, and the other end of the cantilever is provided with a ring for hanging by a hook.
本实用新型的结构特点也在于:Structural features of the present utility model also are:
所述立杆为可相对转动的两段式结构,下段立杆的顶部设有纵向向上延伸的第一螺纹杆,上段立杆套接在第一螺纹杆上,所述第一螺纹杆的顶部设有可将上段立杆固定的螺母。The vertical rod is a relatively rotatable two-stage structure, the top of the lower vertical rod is provided with a first threaded rod extending longitudinally upwards, the upper vertical rod is sleeved on the first threaded rod, and the top of the first threaded rod There are nuts that can fix the upper pole.
在下段立杆上固设有一根纵向向下延伸的第二螺纹杆以及一根水平延伸的第三螺纹杆,第二及第三螺纹杆上分别穿设有可旋转的瓦片型紧固件,并在第二及第三螺纹杆上分别设有可将所述紧固件分别卡紧在杆塔横担上的蝶形螺母。A second threaded rod extending longitudinally downward and a third threaded rod extending horizontally are fixed on the lower vertical rod, and rotatable tile-type fasteners are respectively pierced on the second and third threaded rods , and the second and third threaded rods are respectively provided with wing nuts that can clamp the fasteners on the cross arms of the tower respectively.
与已有技术相比,本实用新型的有益效果体现在:Compared with the prior art, the beneficial effects of the utility model are reflected in:
1、本实用新型的吊点卡具由可与横担形成固定连接的立杆和固联在立杆上端的悬臂构成,当立杆固定在横担上时,其悬臂的高度高于横担,因此当吊葫芦的挂钩悬挂在悬臂上的吊环上时,吊葫芦的定滑轮处于横担的上方,可方便地将瓷瓶、绝缘子等器具输送至横担上,且吊点稳定性高。1. The lifting point fixture of the utility model is composed of a vertical rod that can be fixedly connected with the cross arm and a cantilever fixedly connected to the upper end of the vertical rod. When the vertical rod is fixed on the cross arm, the height of the cantilever is higher than that of the cross arm Therefore, when the hook of the hoist is hung on the ring on the cantilever, the fixed pulley of the hoist is above the cross arm, which can conveniently transport porcelain bottles, insulators and other appliances to the cross arm, and the hanging point has high stability.
2、本实用新型的立杆为可相对旋转的两段式结构,通过调整第一螺纹杆上螺母的松紧度,可将上段立杆固定在下段立杆上,也可使上段立杆相对于下段立杆旋转,以此来调整吊点在横担上的水平跨度,可方便地将瓷瓶、绝缘子等器具输送至所需的位置。2. The vertical rod of the utility model is a two-stage structure that can rotate relatively. By adjusting the tightness of the nut on the first threaded rod, the upper vertical rod can be fixed on the lower vertical rod, and the upper vertical rod can be fixed relative to the lower vertical rod. The lower vertical rod is rotated to adjust the horizontal span of the lifting point on the cross arm, which can conveniently transport porcelain bottles, insulators and other appliances to the desired position.
3、本实用新型在下段立杆上固设有相互垂直的第二及第三螺纹杆,并在这两根螺纹杆上分别穿设有瓦片型紧固件,用蝶形螺母可将瓦片型紧固件分别卡紧在横担角钢上,这种结构既方便安装,也便于拆卸,且可将立杆牢牢地紧固在横担角钢上,提高吊点的稳定性。3. In the utility model, the second and third threaded rods perpendicular to each other are fixed on the lower vertical rod, and tile-type fasteners are respectively pierced on the two threaded rods, and the tiles can be fixed with butterfly nuts. The sheet-type fasteners are respectively clamped on the cross-arm angle steel. This structure is convenient for installation and disassembly, and can firmly fasten the pole on the cross-arm angle steel to improve the stability of the lifting point.
4、本实用新型的瓦片型紧固件可用C32型的螺丝帽从中间切开制成,立杆可采用C24型的花篮螺栓制成,因此做到了废物重新利用,成本低廉。4. The tile-shaped fasteners of the utility model can be made by cutting from the middle with a C32-type screw cap, and the vertical pole can be made with a C24-type turnbuckle bolt, so that waste can be reused and the cost is low.
附图说明: Description of drawings:
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图2为本实用新型的使用状态图。Fig. 2 is the use status diagram of the utility model.
以下通过具体实施方式,并结合附图对本实用新型作进一步说明。The utility model will be further described below through specific embodiments in conjunction with the accompanying drawings.
具体实施方式: Detailed ways:
实施例:参见图1、2,本实施例的输电线路吊点卡具,由可与杆塔横担形成固定连接的立杆1和固联在立杆上端的悬臂2构成,悬臂的另一端设有供挂钩悬挂的吊环3,立杆为可相对转动的两段式结构,包括上段立杆1-1和下段立杆1-2,下段立杆的顶部设有纵向向上延伸的第一螺纹杆4-1,上段立杆套接在第一螺纹杆上,第一螺纹杆的顶部设有可将上段立杆固定的螺母5。Embodiment: Referring to Figures 1 and 2, the power transmission line suspension point fixture of this embodiment is composed of a vertical pole 1 that can be fixedly connected with the cross arm of the tower and a
为了能将立杆固定在杆塔横担6(角钢)上,在下段立杆1-2上固设有一根纵向向下延伸的第二螺纹杆4-2以及一根水平延伸的第三螺纹杆4-3,第二及第三螺纹杆上分别穿设有可旋转的瓦片型紧固件7,并在第二及第三螺纹杆上分别设有可将所述紧固件卡紧在杆塔横担上的蝶形螺母8。In order to fix the vertical rod on the pole tower cross arm 6 (angle steel), a second threaded rod 4-2 extending longitudinally downward and a third threaded rod extending horizontally are fixed on the lower vertical rod 1-2. 4-3, the second and third threaded rods are respectively pierced with rotatable tile-
具体实施时,图2所示,分别转动紧固件7并调整好角度,将它们卡在横担6的两侧边缘上,分别拧紧蝶形螺母8,即可将立杆固定在横担上,使用时,将吊葫芦9的挂钩挂在悬臂2的吊环3上,此时吊葫芦的定滑轮处于横担上方,因此通过拉索便可轻松地将瓷瓶、绝缘子、导线等输电器材悬吊至横担之上,更方便、快捷、稳固,提高了工作效率,降低了工人的劳动强度。此外,吊环吊点在横担上的水平还可调整,具有很大的水平跨度,当需要将上拉杆1-1固定在下立杆1-2上时,拧紧第一螺纹杆4上的螺母5即可实现,在需要调整吊点的水平位置时,松开螺母4,旋转上立杆1-1直至到需要的位置,再用螺母固定即可。During specific implementation, as shown in Figure 2, rotate the
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008201854428U CN201266809Y (en) | 2008-09-05 | 2008-09-05 | Transmission line sustained center chucking tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008201854428U CN201266809Y (en) | 2008-09-05 | 2008-09-05 | Transmission line sustained center chucking tool |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201266809Y true CN201266809Y (en) | 2009-07-01 |
Family
ID=40833178
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008201854428U Expired - Lifetime CN201266809Y (en) | 2008-09-05 | 2008-09-05 | Transmission line sustained center chucking tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201266809Y (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105398990A (en) * | 2015-12-14 | 2016-03-16 | 安徽理工大学 | Auxiliary lifting device for electric angle iron tower |
| CN107069565A (en) * | 2017-06-12 | 2017-08-18 | 国网辽宁省电力有限公司辽阳供电公司 | It is a kind of can adjust automatically Impact direction stringing coaster and wire tensioning device |
| CN107086487A (en) * | 2017-04-20 | 2017-08-22 | 国网河南省电力公司检修公司 | One kind transmission coaster hanging point device |
| CN108666932A (en) * | 2018-05-23 | 2018-10-16 | 蒋晓进 | A cable tensioning device for high-altitude electric power construction |
-
2008
- 2008-09-05 CN CNU2008201854428U patent/CN201266809Y/en not_active Expired - Lifetime
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105398990A (en) * | 2015-12-14 | 2016-03-16 | 安徽理工大学 | Auxiliary lifting device for electric angle iron tower |
| CN105398990B (en) * | 2015-12-14 | 2017-11-14 | 安徽理工大学 | Electric power angle steel tower auxiliary lifting apparatus |
| CN107086487A (en) * | 2017-04-20 | 2017-08-22 | 国网河南省电力公司检修公司 | One kind transmission coaster hanging point device |
| CN107069565A (en) * | 2017-06-12 | 2017-08-18 | 国网辽宁省电力有限公司辽阳供电公司 | It is a kind of can adjust automatically Impact direction stringing coaster and wire tensioning device |
| CN108666932A (en) * | 2018-05-23 | 2018-10-16 | 蒋晓进 | A cable tensioning device for high-altitude electric power construction |
| CN108666932B (en) * | 2018-05-23 | 2020-01-10 | 永久电力金具有限公司 | Cable tensioning device for high-altitude power construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201398032Y (en) | Hanging ring fixing device for iron tower angle steel pulley suspension | |
| CN201315445Y (en) | Slinger fixing device for hanging iron tower angle steel pulley | |
| CN205543953U (en) | Multi -functional fixed hoisting point anchor clamps | |
| CN101409434A (en) | Ground wire raiser | |
| CN201266809Y (en) | Transmission line sustained center chucking tool | |
| CN103579961B (en) | The cable joint implementation method of adjustable lifting type fixture | |
| CN102661057B (en) | Power angle tower pull leg main material changing method and special main material clamp | |
| CN204391613U (en) | A kind of wire support device of auxiliary replacement porcelain pole arm | |
| CN203895908U (en) | Balance cross-arm | |
| CN203754331U (en) | Hoisting device applied to telegraph pole top end | |
| CN203481723U (en) | Adjustable lifting type fixing device applied for manufacturing cable joint | |
| CN102664377A (en) | Double-cross arm assembler for single lever and double-cross arm mounting method | |
| CN202190019U (en) | Aerial earth wire ratchet wrench type two-point lifting tool | |
| CN205911667U (en) | Distribution lines cross arm hoisting support | |
| CN201312084Y (en) | Ground wire raiser | |
| CN204802882U (en) | Transformer on -load voltage regulating switch lifts by crane instrument | |
| CN208062281U (en) | A kind of clamp for ground wire in adjustable direction | |
| CN203536865U (en) | Combined wire-tightening tool for tightening line wire | |
| CN106992474A (en) | 10kV ends dismount aid | |
| CN202373939U (en) | Live-working double-conductor lifting device | |
| CN206685815U (en) | 10kV ends dismount aid | |
| CN202578116U (en) | Single-person on-pole assembler for dual-fan cross arm | |
| CN209316872U (en) | A kind of single rod anti-falling device for steel pipe pole | |
| CN203787862U (en) | 66KV-220KV tip beam universal suspension wire clamping apparatus | |
| CN204793836U (en) | A fixed fixture for changing insulator chain operation coaster |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121211 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20121211 Address after: 234000 No. 118 Huaihai Middle Road, Anhui, Suzhou Patentee after: Anhui Power Co., Ltd. Suzhou Power Supply Company Patentee after: State Grid Corporation of China Address before: 234000 No. 118 Huaihai Middle Road, Anhui, Suzhou Patentee before: Anhui Power Co., Ltd. Suzhou Power Supply Company |
|
| CX01 | Expiry of patent term |
Granted publication date: 20090701 |
|
| CX01 | Expiry of patent term |
