CN201266809Y - Transmission line sustained center chucking tool - Google Patents

Transmission line sustained center chucking tool Download PDF

Info

Publication number
CN201266809Y
CN201266809Y CNU2008201854428U CN200820185442U CN201266809Y CN 201266809 Y CN201266809 Y CN 201266809Y CN U2008201854428 U CNU2008201854428 U CN U2008201854428U CN 200820185442 U CN200820185442 U CN 200820185442U CN 201266809 Y CN201266809 Y CN 201266809Y
Authority
CN
China
Prior art keywords
vertical rod
cross arm
threaded rod
transmission line
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201854428U
Other languages
Chinese (zh)
Inventor
张永
许启金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Suzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Suzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CNU2008201854428U priority Critical patent/CN201266809Y/en
Application granted granted Critical
Publication of CN201266809Y publication Critical patent/CN201266809Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Insulators (AREA)

Abstract

本实用新型公开了一种输电线路吊点卡具,所述卡具由可与杆塔横担形成固定连接的立杆和固联在立杆上端的悬臂构成,悬臂的另一端设有供挂钩悬挂的吊环。当立杆固定在杆塔横担上时,吊环吊点位于横担的上方,也就使吊葫芦的定滑轮位于横担上方,可方便快捷地将瓷瓶、绝缘子等器具输送至横担上;立杆为可相对旋转的两段式结构,当上段立杆绕下段立杆旋转时,可调整吊点在横担上的水平位置,具有很大的水平跨度,可以有效解决吊点不稳定,挂线准确度差,工作效率低,劳动强度大等问题。

Figure 200820185442

The utility model discloses a lifting point fixture for transmission lines, the fixture is composed of a vertical pole which can be fixedly connected with the cross arm of a pole tower and a cantilever fixedly connected to the upper end of the vertical pole, and the other end of the cantilever is provided with a hook for hanging rings. When the pole is fixed on the cross arm of the pole tower, the lifting point of the lifting ring is located above the cross arm, so that the fixed pulley of the hoist is located above the cross arm, which can conveniently and quickly transport porcelain bottles, insulators and other appliances to the cross arm; The rod is a two-stage structure that can be rotated relatively. When the upper vertical rod rotates around the lower vertical rod, the horizontal position of the lifting point on the cross arm can be adjusted. It has a large horizontal span, which can effectively solve the problem of unstable lifting points. The line accuracy is poor, the work efficiency is low, and the labor intensity is high.

Figure 200820185442

Description

输电线路吊点卡具 Transmission line lifting point fixture

技术领域: Technical field:

本实用新型涉及一种卡具,具体地说是一种应用在输电线路中、可更科学地为吊葫芦等设施提供吊点的卡具。The utility model relates to a jig, in particular to a jig which is applied in a power transmission line and can more scientifically provide lifting points for hoists and other facilities.

背景技术: Background technique:

架设输电线路或在对输电线路进行检修时,吊葫芦是一种很常用的工具,例如在杆塔横担上拉紧输电线时,可将输电线从吊葫芦上的定滑轮穿过,工作人员站在地面拉扯输电线即可完成紧线工作,在更换横担上的瓷瓶、绝缘子时,可通过吊葫芦上的定滑轮将瓷瓶或绝缘子输送至横担上,但是存在的问题是,因在横担上没有用于悬挂吊葫芦的吊点,只能在横担上设一绳套作为吊点,其存在的缺陷是,因绳套位于横担的下方,加上吊葫芦本身的高度,使得定滑轮距离横担还有相当大的距离,如此一来,诸如瓷瓶、绝缘子等一类的器具就无法输送到位,致使工作不能顺利完成,导致工作效率低,作业人员劳动强度大;再者,用绳套作为吊点稳定性差,准确度差,施工质量难以保证。The hoist is a very commonly used tool when erecting or overhauling the transmission line. For example, when tensioning the transmission line on the cross arm of the tower, the transmission line can pass through the fixed pulley on the hoist, and the staff can Standing on the ground and pulling the transmission line can complete the line tightening work. When replacing the porcelain bottle and insulator on the cross arm, the porcelain bottle or insulator can be transported to the cross arm through the fixed pulley on the hoist. There is no lifting point for hanging the gourd on the cross arm, and only a rope sleeve can be set on the cross arm as the hanging point. There is still a considerable distance between the fixed pulley and the crossarm, so that appliances such as porcelain bottles and insulators cannot be transported in place, resulting in the work not being completed smoothly, resulting in low work efficiency and high labor intensity for operators; moreover, Using the rope sleeve as the hanging point has poor stability and poor accuracy, and the construction quality is difficult to guarantee.

实用新型内容: Utility model content:

为克服现有技术的缺陷,本实用新型的目的在于提供一种输电线路吊点卡具,可提高吊点的垂直高度和水平跨度,且吊点稳定性好,吊线的准确度高。In order to overcome the defects of the prior art, the purpose of this utility model is to provide a suspension point clamp for transmission lines, which can increase the vertical height and horizontal span of the suspension point, and the stability of the suspension point is good, and the accuracy of the suspension line is high.

本实用新型解决技术问题采用如下技术方案:The utility model solves the technical problem and adopts the following technical solutions:

输电线路吊点卡具,所述卡具由可与杆塔横担形成固定连接的立杆和固联在立杆上端的悬臂构成,悬臂的另一端设有供挂钩悬挂的吊环。Transmission line lifting point fixture, the fixture is composed of a vertical pole that can be fixedly connected with the cross arm of the tower and a cantilever fixedly connected to the upper end of the vertical pole, and the other end of the cantilever is provided with a ring for hanging by a hook.

本实用新型的结构特点也在于:Structural features of the present utility model also are:

所述立杆为可相对转动的两段式结构,下段立杆的顶部设有纵向向上延伸的第一螺纹杆,上段立杆套接在第一螺纹杆上,所述第一螺纹杆的顶部设有可将上段立杆固定的螺母。The vertical rod is a relatively rotatable two-stage structure, the top of the lower vertical rod is provided with a first threaded rod extending longitudinally upwards, the upper vertical rod is sleeved on the first threaded rod, and the top of the first threaded rod There are nuts that can fix the upper pole.

在下段立杆上固设有一根纵向向下延伸的第二螺纹杆以及一根水平延伸的第三螺纹杆,第二及第三螺纹杆上分别穿设有可旋转的瓦片型紧固件,并在第二及第三螺纹杆上分别设有可将所述紧固件分别卡紧在杆塔横担上的蝶形螺母。A second threaded rod extending longitudinally downward and a third threaded rod extending horizontally are fixed on the lower vertical rod, and rotatable tile-type fasteners are respectively pierced on the second and third threaded rods , and the second and third threaded rods are respectively provided with wing nuts that can clamp the fasteners on the cross arms of the tower respectively.

与已有技术相比,本实用新型的有益效果体现在:Compared with the prior art, the beneficial effects of the utility model are reflected in:

1、本实用新型的吊点卡具由可与横担形成固定连接的立杆和固联在立杆上端的悬臂构成,当立杆固定在横担上时,其悬臂的高度高于横担,因此当吊葫芦的挂钩悬挂在悬臂上的吊环上时,吊葫芦的定滑轮处于横担的上方,可方便地将瓷瓶、绝缘子等器具输送至横担上,且吊点稳定性高。1. The lifting point fixture of the utility model is composed of a vertical rod that can be fixedly connected with the cross arm and a cantilever fixedly connected to the upper end of the vertical rod. When the vertical rod is fixed on the cross arm, the height of the cantilever is higher than that of the cross arm Therefore, when the hook of the hoist is hung on the ring on the cantilever, the fixed pulley of the hoist is above the cross arm, which can conveniently transport porcelain bottles, insulators and other appliances to the cross arm, and the hanging point has high stability.

2、本实用新型的立杆为可相对旋转的两段式结构,通过调整第一螺纹杆上螺母的松紧度,可将上段立杆固定在下段立杆上,也可使上段立杆相对于下段立杆旋转,以此来调整吊点在横担上的水平跨度,可方便地将瓷瓶、绝缘子等器具输送至所需的位置。2. The vertical rod of the utility model is a two-stage structure that can rotate relatively. By adjusting the tightness of the nut on the first threaded rod, the upper vertical rod can be fixed on the lower vertical rod, and the upper vertical rod can be fixed relative to the lower vertical rod. The lower vertical rod is rotated to adjust the horizontal span of the lifting point on the cross arm, which can conveniently transport porcelain bottles, insulators and other appliances to the desired position.

3、本实用新型在下段立杆上固设有相互垂直的第二及第三螺纹杆,并在这两根螺纹杆上分别穿设有瓦片型紧固件,用蝶形螺母可将瓦片型紧固件分别卡紧在横担角钢上,这种结构既方便安装,也便于拆卸,且可将立杆牢牢地紧固在横担角钢上,提高吊点的稳定性。3. In the utility model, the second and third threaded rods perpendicular to each other are fixed on the lower vertical rod, and tile-type fasteners are respectively pierced on the two threaded rods, and the tiles can be fixed with butterfly nuts. The sheet-type fasteners are respectively clamped on the cross-arm angle steel. This structure is convenient for installation and disassembly, and can firmly fasten the pole on the cross-arm angle steel to improve the stability of the lifting point.

4、本实用新型的瓦片型紧固件可用C32型的螺丝帽从中间切开制成,立杆可采用C24型的花篮螺栓制成,因此做到了废物重新利用,成本低廉。4. The tile-shaped fasteners of the utility model can be made by cutting from the middle with a C32-type screw cap, and the vertical pole can be made with a C24-type turnbuckle bolt, so that waste can be reused and the cost is low.

附图说明: Description of drawings:

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为本实用新型的使用状态图。Fig. 2 is the use status diagram of the utility model.

以下通过具体实施方式,并结合附图对本实用新型作进一步说明。The utility model will be further described below through specific embodiments in conjunction with the accompanying drawings.

具体实施方式: Detailed ways:

实施例:参见图1、2,本实施例的输电线路吊点卡具,由可与杆塔横担形成固定连接的立杆1和固联在立杆上端的悬臂2构成,悬臂的另一端设有供挂钩悬挂的吊环3,立杆为可相对转动的两段式结构,包括上段立杆1-1和下段立杆1-2,下段立杆的顶部设有纵向向上延伸的第一螺纹杆4-1,上段立杆套接在第一螺纹杆上,第一螺纹杆的顶部设有可将上段立杆固定的螺母5。Embodiment: Referring to Figures 1 and 2, the power transmission line suspension point fixture of this embodiment is composed of a vertical pole 1 that can be fixedly connected with the cross arm of the tower and a cantilever 2 that is fixedly connected to the upper end of the vertical pole. The other end of the cantilever is set There is a suspension ring 3 for hook suspension, and the vertical rod is a two-stage structure that can rotate relatively, including an upper vertical rod 1-1 and a lower vertical rod 1-2, and the top of the lower vertical rod is provided with a first threaded rod extending longitudinally upwards 4-1, the upper vertical rod is sleeved on the first threaded rod, and the top of the first threaded rod is provided with a nut 5 that can fix the upper vertical rod.

为了能将立杆固定在杆塔横担6(角钢)上,在下段立杆1-2上固设有一根纵向向下延伸的第二螺纹杆4-2以及一根水平延伸的第三螺纹杆4-3,第二及第三螺纹杆上分别穿设有可旋转的瓦片型紧固件7,并在第二及第三螺纹杆上分别设有可将所述紧固件卡紧在杆塔横担上的蝶形螺母8。In order to fix the vertical rod on the pole tower cross arm 6 (angle steel), a second threaded rod 4-2 extending longitudinally downward and a third threaded rod extending horizontally are fixed on the lower vertical rod 1-2. 4-3, the second and third threaded rods are respectively pierced with rotatable tile-type fasteners 7, and the second and third threaded rods are respectively provided with Wing nut 8 on the pole tower cross arm.

具体实施时,图2所示,分别转动紧固件7并调整好角度,将它们卡在横担6的两侧边缘上,分别拧紧蝶形螺母8,即可将立杆固定在横担上,使用时,将吊葫芦9的挂钩挂在悬臂2的吊环3上,此时吊葫芦的定滑轮处于横担上方,因此通过拉索便可轻松地将瓷瓶、绝缘子、导线等输电器材悬吊至横担之上,更方便、快捷、稳固,提高了工作效率,降低了工人的劳动强度。此外,吊环吊点在横担上的水平还可调整,具有很大的水平跨度,当需要将上拉杆1-1固定在下立杆1-2上时,拧紧第一螺纹杆4上的螺母5即可实现,在需要调整吊点的水平位置时,松开螺母4,旋转上立杆1-1直至到需要的位置,再用螺母固定即可。During specific implementation, as shown in Figure 2, rotate the fasteners 7 and adjust the angles respectively, clamp them on the two side edges of the cross arm 6, tighten the wing nuts 8 respectively, and then the vertical rod can be fixed on the cross arm , when in use, the hook of the hoist 9 is hung on the suspension ring 3 of the cantilever 2. At this time, the fixed pulley of the hoist is above the cross arm, so the power transmission equipment such as porcelain bottles, insulators, and wires can be easily suspended by cables. It is more convenient, faster and more stable to be placed on the cross arm, which improves the work efficiency and reduces the labor intensity of the workers. In addition, the level of the lifting point of the lifting ring on the cross arm can also be adjusted, and has a large horizontal span. When it is necessary to fix the upper tie rod 1-1 on the lower vertical rod 1-2, tighten the nut 5 on the first threaded rod 4 It can be realized that when the horizontal position of the lifting point needs to be adjusted, the nut 4 is loosened, and the upper vertical rod 1-1 is rotated until the desired position is reached, and then fixed with a nut.

Claims (3)

1, transmission line suspension centre jig is characterized in that, described jig is made of vertical rod (1) that can form a fixed connection with the shaft tower cross-arm and the cantilever (2) that connects firmly in the vertical rod upper end, and the other end of cantilever is provided with the suspension ring (3) that hang for hook.
2, transmission line suspension centre jig according to claim 1, it is characterized in that, described vertical rod (1) is relatively turnable two-part structure, the top of hypomere vertical rod (1-2) is provided with vertically upwardly extending first threaded rod (4-1), epimere vertical rod (1-1) is socketed on first threaded rod, and the top of described first threaded rod (4-1) is provided with the nut (5) that the epimere vertical rod can be fixed.
3, transmission line suspension centre jig according to claim 1, it is characterized in that, in hypomere vertical rod (1-2), be installed with second threaded rod (4-2) and horizontally extending the 3rd threaded rod (4-3) that vertically extends downwards, be equipped with rotatable tile type securing member (7) on second and third threaded rod respectively, and be respectively equipped with the wing nut (8) that described securing member can be clamped on respectively on the shaft tower cross-arm on second and third threaded rod.
CNU2008201854428U 2008-09-05 2008-09-05 Transmission line sustained center chucking tool Expired - Lifetime CN201266809Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201854428U CN201266809Y (en) 2008-09-05 2008-09-05 Transmission line sustained center chucking tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201854428U CN201266809Y (en) 2008-09-05 2008-09-05 Transmission line sustained center chucking tool

Publications (1)

Publication Number Publication Date
CN201266809Y true CN201266809Y (en) 2009-07-01

Family

ID=40833178

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201854428U Expired - Lifetime CN201266809Y (en) 2008-09-05 2008-09-05 Transmission line sustained center chucking tool

Country Status (1)

Country Link
CN (1) CN201266809Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105398990A (en) * 2015-12-14 2016-03-16 安徽理工大学 Auxiliary lifting device for electric angle iron tower
CN107069565A (en) * 2017-06-12 2017-08-18 国网辽宁省电力有限公司辽阳供电公司 It is a kind of can adjust automatically Impact direction stringing coaster and wire tensioning device
CN107086487A (en) * 2017-04-20 2017-08-22 国网河南省电力公司检修公司 One kind transmission coaster hanging point device
CN108666932A (en) * 2018-05-23 2018-10-16 蒋晓进 A cable tensioning device for high-altitude electric power construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105398990A (en) * 2015-12-14 2016-03-16 安徽理工大学 Auxiliary lifting device for electric angle iron tower
CN105398990B (en) * 2015-12-14 2017-11-14 安徽理工大学 Electric power angle steel tower auxiliary lifting apparatus
CN107086487A (en) * 2017-04-20 2017-08-22 国网河南省电力公司检修公司 One kind transmission coaster hanging point device
CN107069565A (en) * 2017-06-12 2017-08-18 国网辽宁省电力有限公司辽阳供电公司 It is a kind of can adjust automatically Impact direction stringing coaster and wire tensioning device
CN108666932A (en) * 2018-05-23 2018-10-16 蒋晓进 A cable tensioning device for high-altitude electric power construction
CN108666932B (en) * 2018-05-23 2020-01-10 永久电力金具有限公司 Cable tensioning device for high-altitude power construction

Similar Documents

Publication Publication Date Title
CN201398032Y (en) Hanging ring fixing device for iron tower angle steel pulley suspension
CN201315445Y (en) Slinger fixing device for hanging iron tower angle steel pulley
CN205543953U (en) Multi -functional fixed hoisting point anchor clamps
CN101409434A (en) Ground wire raiser
CN201266809Y (en) Transmission line sustained center chucking tool
CN103579961B (en) The cable joint implementation method of adjustable lifting type fixture
CN102661057B (en) Power angle tower pull leg main material changing method and special main material clamp
CN204391613U (en) A kind of wire support device of auxiliary replacement porcelain pole arm
CN203895908U (en) Balance cross-arm
CN203754331U (en) Hoisting device applied to telegraph pole top end
CN203481723U (en) Adjustable lifting type fixing device applied for manufacturing cable joint
CN102664377A (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN202190019U (en) Aerial earth wire ratchet wrench type two-point lifting tool
CN205911667U (en) Distribution lines cross arm hoisting support
CN201312084Y (en) Ground wire raiser
CN204802882U (en) Transformer on -load voltage regulating switch lifts by crane instrument
CN208062281U (en) A kind of clamp for ground wire in adjustable direction
CN203536865U (en) Combined wire-tightening tool for tightening line wire
CN106992474A (en) 10kV ends dismount aid
CN202373939U (en) Live-working double-conductor lifting device
CN206685815U (en) 10kV ends dismount aid
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN209316872U (en) A kind of single rod anti-falling device for steel pipe pole
CN203787862U (en) 66KV-220KV tip beam universal suspension wire clamping apparatus
CN204793836U (en) A fixed fixture for changing insulator chain operation coaster

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121211

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121211

Address after: 234000 No. 118 Huaihai Middle Road, Anhui, Suzhou

Patentee after: Anhui Power Co., Ltd. Suzhou Power Supply Company

Patentee after: State Grid Corporation of China

Address before: 234000 No. 118 Huaihai Middle Road, Anhui, Suzhou

Patentee before: Anhui Power Co., Ltd. Suzhou Power Supply Company

CX01 Expiry of patent term

Granted publication date: 20090701

CX01 Expiry of patent term