CN108689243A CN201810288976.1A CN201810288976A CN108689243A CN 108689243 A CN108689243 A CN 108689243A CN 201810288976 A CN201810288976 A CN 201810288976A CN 108689243 A CN108689243 A CN 108689243A
Authority
CN
China
Prior art keywords
spool
processing unit
yarn
attracting mechanism
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810288976.1A
Other languages
Chinese (zh)
Other versions
CN108689243B (en
Inventor
中川隆
平尾修
高桥彰
日高郎
日高一郎
久保田安彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Publication of CN108689243A publication Critical patent/CN108689243A/en
Application granted granted Critical
Publication of CN108689243B publication Critical patent/CN108689243B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/08Automatic end-finding and material-interconnecting arrangements
    • B65H67/086Preparing supply packages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments

Landscapes

  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

The present invention provides spool processing unit and Yarn-processing system.Spool processing unit (103) is for supplying yarn feeding spool to the device of yarn take-up device (102).Spool processing unit (103) has multiple attracting mechanism (such as the 1st attracting mechanism (51), the 2nd attracting mechanism (53)), spool processing unit air blower (45), spool processing unit attraction pipeline (47) and the 1st valve system (52) etc..Multiple attracting mechanism carry out the processing of the yarn of yarn feeding spool by attracting air.Spool processing unit is generated with air blower (45) attracts air stream.Spool processing unit is with attraction pipeline (47) between spool processing unit air blower (45) and multiple attracting mechanism.1st valve system (52) switches over spool processing unit with the conducting of the air of attraction pipeline (47).

Description

Spool processing unit and Yarn-processing system
Technical field
The present invention relates to for supplying yarn feeding spool to the spool processing unit of yarn take-up device.
Background technology
In the past, board was constituted by automatic bobbin winder with multiple units and spool processing unit.Spool processing dress It sets and the spool for being wound with yarn is installed on pallet, then carry out various yarn treatments, finally supply yarn feeding spool to certainly Dynamic winder.There is board an air blower, air blower to make the unit of automatic bobbin winder and multiple yarns of spool processing unit The attracting mechanism of processing unit acts.
In this case, even if in the state that each unit of automatic bobbin winder can be operated with low static pressure, for spool It is also required to high static pressure for multiple Yarn processing devices of processing unit.For this purpose, air blower is combined with fortune with spool processing unit Turn, therefore, wastes electric power.In the past, it is known that such as lower structure, i.e., be arranged one relative to a change device of spool processing unit Platform attracts source, and is realized energy saving (referring for example to No. 2322460 specifications of European Patent No.) with high pressure by switching low pressure.
Invention content
Spool processing unit is multiple such as also there is residual yarn suction device, yarn to release device other than change device Yarn processing device.Therefore, it is being only that one is equipped with to a change device as No. 2322460 specifications of European Patent No. Platform attracts in the structure in source, can not implement the energy saving of multiple attracting mechanism.It is an object of the present invention to automatic network Inhibit power consumption in yarn machine and the board of spool processing unit.
Hereinafter, being illustrated to multiple modes as the method used for solving the problem.These modes can be as needed And it arbitrarily combines.
The spool processing unit of the viewpoint of the present invention is for supplying yarn feeding spool to the yarn of yarn take-up device Pipe processing unit, has:Multiple attracting mechanism, multiple attracting mechanism carry out the yarn of the yarn feeding spool by attracting air The processing of line;Spool processing unit air blower, the spool processing unit are for generating the suction for attracting air stream with air blower Draw source;A plurality of air distribution channel, a plurality of air distribution channel between the spool processing unit air blower with it is described more Between a attracting mechanism;Switching mechanism is connected with air, which is connected switching mechanism to a plurality of air distribution channel The conducting of air switches over.
In the apparatus, the attraction source equipped with spool processing unit, the attraction source generate attraction to multiple attracting mechanism Air stream, to make multiple attracting mechanism act.Attraction in each attracting mechanism by air by being connected switching mechanism to a plurality of The conducting of air distribution channel is switched over and is controlled.It is, for example, valve system that switching mechanism, which is connected, in air.
Through the above structure, in a period of so that attracting mechanism is acted in spool processing unit, yarn winding can be stopped The attraction of the attracting mechanism of device acts.In addition, in a period of attraction in yarn take-up device, can stop at spool Manage the action of the attracting mechanism of device.Thereby, it is possible to reduce power consumption.As an example, it is installed around from spinning frame to reel for yarn In the scene that winding condition changes and (changes in batches) when setting supply yarn feeding spool, prepare feeding for new number to yarn take-up device The very long stand-by period is produced until yarn spool.At this moment, the attracting mechanism action of the spool processing unit of the present invention can be made, And make the attraction of the attracting mechanism of yarn take-up device act to stop.As another example, when as waiting for from spinning frame When the spinning state of spool, the attracting mechanism of the spool processing unit of the present invention can also stopped, and only continue reel for yarn and install around The attraction for the attracting mechanism set acts.
Can also be that multiple attracting mechanism are arranged in multiple changes that the yarn ends of yarn feeding spool are positioned to specified position On device.
Can also be that multiple attracting mechanism are arranged in the change dress that the yarn ends of yarn feeding spool are positioned to specified position Set and from side attract yarn feeding spool yarn ends side suction inlet on.
Can also be that multiple attracting mechanism are arranged in the change dress that the yarn ends of yarn feeding spool are positioned to specified position It sets and is supplied to the packet header yarn removing device on the spool feedway of pallet set on by yarn feeding spool.
Can also be that multiple attracting mechanism are arranged in the change dress that the yarn ends of yarn feeding spool are positioned to specified position It sets and attracts the residual yarn of yarn feeding spool on the residual Yarn processing device removed.
Can also be that multiple attracting mechanism are arranged in the change dress that the yarn ends of yarn feeding spool are positioned to specified position It sets, yarn feeding spool is supplied to the tip bunch weft end remover of the spool feedway of pallet and removes the residual yarn attraction of yarn feeding spool On the spool extracting apparatus gone.
Can also be the 1st control being also equipped with for switching mechanism to be connected to air and the action in source is attracted to be controlled Portion.Can also be that the 1st control unit is in such a way that attraction when some in multiple attracting mechanism carries out attraction action is constant It is controlled.
Can also be that it includes multiple valve systems corresponding with multiple attracting mechanism that switching mechanism, which is connected, in air.
Can also be that control unit can control multiple valve systems.Can also be that control unit keeps multiple valve systems dynamic Stop the attraction action of the low attracting mechanism of priority when making.Therefore, because the suction for only needing the priority for attracting or attracting high Draw mechanism to be attracted, so inspiratory force that is energy saving, and can maintaining these attracting mechanism higher can be realized.
Can also be that the multiple attracting mechanism is respectively set in multiple valve systems.Can also be multiple gate dresses It sets and is respectively arranged at a plurality of air distribution channel.It can be opened and closed multiple attracting mechanism respectively.
The Yarn-processing system of the present invention, has:Has the yarn constituted comprising motor, fan and the end of a thread recycling bins The yarn take-up device of winding device air blower;With spool processing unit, the air distribution channel has from described The connection access that multiple attracting mechanism extend to yarn take-up device air blower is also set in the midway of the connection access There are connection valve system, spool processing unit air blower that there is spool processing unit filter, and logical with the connection The connection valve system on road is compared to setting in the multiple attracting mechanism side.In the apparatus, due to being not necessarily to that spool is arranged The end of a thread recycling bins of processing unit, so the quantity of the end of a thread recycling bins can be reduced.
1st control unit is able to carry out following process:By the connection valve system by the connection path blockade In the state of, so that the multiple attracting mechanism is attracted with air blower by the spool processing unit, to which the end of a thread is accumulated Process near the connection valve system or the spool processing unit filter;And passing through the connection gate In the state that device opens the connection access, the attraction of the spool processing unit air blower is set to reduce, and lead to Cross the yarn take-up device makes the multiple attracting mechanism be attracted with air blower, to which described the end of a thread is received into the line Process in head recycling bins.In the apparatus, the end of a thread of spool processing unit side temporarily accumulation and can be returned finally in pipeline It receives in the yarn recycling bins of yarn take-up device side.It is therefore not necessary to which dedicated the end of a thread recycling is arranged in spool processing unit Case, so as to reduce the quantity of the end of a thread recycling bins.
Can also be that air conducting switching mechanism includes can be between multiple attracting mechanism to a plurality of air distribution channel The single valve system switched over.
Spool processing unit through the invention, can inhibit the consumption of electric power.
Description of the drawings
Fig. 1 is the schematic plan of the automatic bobbin winder system of the 1st embodiment.
Fig. 2 is the block diagram for the attraction control structure for indicating spool processing unit.
Fig. 3 is the schematic diagram for the attraction construction for indicating two change devices.
Fig. 4 is the block diagram for the attraction control structure for indicating automatic bobbin winder.
Fig. 5 is the schematic diagram for the attraction construction for indicating two change devices in the 2nd embodiment.
Fig. 6 is the schematic diagram for the attraction construction for indicating two change devices in the 2nd embodiment.
Fig. 7 is the schematic diagram for the attraction construction for indicating two change devices in the 3rd embodiment.
Specific implementation mode
1. the 1st embodiment
(1) automatic bobbin winder system
Using Fig. 1 to as the automatic bobbin winder system of the spool processing unit 103 of the 1st embodiment of the present invention 101 illustrate.Fig. 1 is the schematic plan of the automatic bobbin winder system of the 1st embodiment.Automatic bobbin winder system 101 Have automatic bobbin winder (yarn take-up device) 102, spool processing unit 103 and spool feedway 104.Automatic bobbin winder 102 are arranged on the left of the figure of spool processing unit 103.Spool processing unit 103 is configured in spool feedway 104 and automatic network Between yarn machine 102.
Automatic bobbin winder 102 has multiple winder units 105.Winder unit 105 is will to be wrapped in yarn spool 5B (yarn feedings Spool) on textile yarn recoil on rolling tube come manufacture textile yarn package product device.Spool processing unit 103 It is that will extract from the empty spool 5A that automatic bobbin winder 102 is discharged from pallet 3 and yarn spool 5B will be twined to be installed on pallet 3 simultaneously The device that it is supplied to automatic bobbin winder 102.
Spool feedway 104 is will to twine yarn spool 5B to supply to the device of spool processing unit 103.In addition, so-called sky Spool 5A refers to the cylinder itself for not winding textile yarn.The so-called yarn spool 5B that twines refers to being generated in spinning frame (not shown) Textile yarn is wound into around cylinder and the spool of composition.
(2) automatic bobbin winder
As shown in Figure 1, being equipped in automatic bobbin winder 102 each winder unit 105 is transported to for yarn spool 5B will to be twined Supply road 106.In addition, being formed in automatic bobbin winder 102 for conveying the empty spool 5A's being discharged from each winder unit 105 Recycle road 107.Supply road 106 and recycling road 107 are made of conveyer belt etc., and twine yarn spool 5B and empty yarn using the conveying of pallet 3 Pipe 5A.
(3) spool processing unit
Spool processing unit 103 has them as the conveying mechanism for twining yarn spool 5B and empty spool 5A to be placed on The pallet conveying circuit 108 that state on pallet 3 is conveyed.The supply road of pallet conveying circuit 108 and automatic bobbin winder 102 106 connect with recycling road 107.Be equipped with twine the pallet 3 of yarn spool 5B by pallet conveying circuit 108 and by supply road 106 from Spool processing unit 103 is supplied to winder unit 105.The pallet 3 of empty spool 5A is installed from winder unit 105 along recycling road 107 and pallet conveying circuit 108 convey.
Pallet conveying circuit 108 has main delivery line 121 and the 2nd tip bunch weft end process circuit 122.Main delivery line 121 It is to convey the empty spool 5A being discharged from automatic bobbin winder 102 and be replaced as the empty spool 5A to twine yarn spool 5B in midway and should Twine the path that yarn spool 5B is conveyed towards automatic bobbin winder 102.Main delivery line 121 is probably formed in U-shaped.Here, master is defeated The top portion on line sending road 121 is connect with the terminal part on recycling road 107, the beginning of the terminal part and supply road 106 of main delivery line 121 End connects.Spool extracting apparatus 11 is differentiated in the case where returning the empty spool 5A with residual yarn from automatic bobbin winder 102 The device that the yarn of the spool can be wound and the spool is extracted and recycled from pallet 3 in the case where that can not wind.Spool Extracting apparatus 11 has the 4th attracting mechanism 57 (Fig. 2) for attracting removing from empty spool 5A for will be unable to the residual yarn of winding.
It is to be installed to the yarn spool 5B that twines manufactured by spinning frame with generally upstanding state to twine yarn spool feedway 13 Device on pallet 3.Yarn spool 5B is twined from spool feedway 104 to the supply of yarn spool feedway 13 is twined.Although not shown, but Yarn spool feedway 13 is twined to have spool input device, spool individually makeup is set, spool distributor and a pair of of spool are slided Slot.Yarn spool feedway 13 is twined by spool distributor and at two while can will twine yarn spool by a pair of of spool sliding slot 5B is supplied to pallet 3.Each spool sliding slot is placed in a manner of by the mounting portion for twining yarn spool 5B and being inserted into pallet 3 and twines yarn spool 5B.Spool sliding slot is for example made of each cutting plate obtained after tapered cylinder body is divided into two in an axial direction.Twine the supply of yarn spool Device 13 has tip bunch weft end remover 14 (packet header yarn removing device) as shown in Figure 2.Tip bunch weft end remover 14, which has, to be attracted and removes Go the 3rd attracting mechanism 55 (Fig. 2) of lower part tip bunch weft end (winding ending portion when spool is formed by spinning frame).
In main delivery line 121, the 1st packet header is configured in order in the conveying direction downstream for twining yarn spool feedway 13 Yarn unwinding device 15A, the 1st yarn ends processing unit 17A and the 1st change device 19A.1st tip bunch weft end unwinding device 15A is to use In the device for the 14 same function of tip bunch weft end remover of realizing and twine yarn spool feedway 13, removed by tip bunch weft end for that will fail The lower part tip bunch weft end that device 14 removes is gone to remove.1st tip bunch weft end unwinding device 15A has attracting mechanism (not shown).
1st yarn ends processing unit 17A is by the after-combustion yarn cut-out in the yarn layer surface for twining yarn spool 5B And make it easy to the device for drawing yarn ends.1st yarn ends processing unit 17A has attracting mechanism (not shown).1st change Device 19A is so that yarn ends is carried out change from the surface dissociation for twining yarn spool 5B and the yarn after change is being wound into cylinder The device being inserted into the end of yarn behind the top of body in the apical pore of cylinder.1st change device 19A has to be inhaled for change Draw the 1st attracting mechanism 51 (Fig. 2) of yarn ends.In addition, between the 1st yarn ends processing unit 17A and the 1st change device 19A, It can also be equipped with the 1st side as optional attachment and inhale part (side suction) 18A.1st side inhale part 18A be by by yarn ends to The device that side attracts that the change of later stage is assisted to handle.Part 18A is inhaled in 1st side to be had for attracting the conduct of yarn ends the The side suction inlet (not shown) of 5 attracting mechanism 59.
2nd tip bunch weft end process circuit 122 is, for example, for making the change processing failure in the 1st tip bunch weft end unwinding device 15A The path for twining yarn spool 5B reprocessing.2nd tip bunch weft end process circuit 122 becomes for the terminal part from main delivery line 121 The circuitous path returned to top portion.It is configured in order the 2nd tip bunch weft end unwinding device in the 2nd tip bunch weft end process circuit 122 15B, the 2nd yarn ends processing unit 17B and the 2nd change device 19B.In addition, the 2nd side can also be configured with as optional attachment Inhale part 18B.These devices are same as mentioned above.
(4) flowing of pallet
The flowing of pallet 3 is described below.In twining yarn spool feedway 13, removed by tip bunch weft end remover 14 It goes to be formed in the lower part tip bunch weft end twined on yarn spool 5B.Then, when the empty arrival of pallet 3 twines the spool of yarn spool feedway 13 When the following position directly of sliding slot (not shown), yarn spool 5B will be twined and be placed on empty pallet 3 with generally upstanding state.
Then, pallet 3 downstream towards side the 1st tip bunch weft end unwinding device 15A along main delivery line 121 convey.In the 1st packet In gauze kerchief worn on a woman's head unwinding device 15A, executes be formed in the removing for twining the lower part tip bunch weft end on yarn spool 5B again.This is to fail The lower part tip bunch weft end removed in tip bunch weft end remover 14 certainly removes.Then, yarn spool 5B is twined to handle towards the 1st yarn ends Device 17A is conveyed in main delivery line 121.In the 1st yarn ends processing unit 17A, the yarn of yarn spool 5B will be wrapped in After-combustion yarn cut-out in line layer surface, to form the tip side wound portion of yarn.
Then, yarn spool 5B is twined to convey along main delivery line 121 towards the 1st change device 19A.In the 1st change device 19A In, the tip side wound portion of yarn is attracted upward, and be inserted into the inside for the cylinder for twining yarn spool 5B.Then, yarn yarn is twined Pipe 5B further downstream transports in main delivery line 121 are supplied to the supply road 106 of automatic bobbin winder 102.Twine yarn spool 5B is conveyed on supply road 106, and is supplied to a certain winder unit 105.
In winder unit 105, from the unwinding for twining yarn spool 5B progress yarns, and by the yarn winding of unwinding at package. The pallet 3 of empty spool 5A after the yarn for being placed with surrounding all unwinding is discharged from winder unit 105, and via recycling road 107 return again to the main delivery line 121 of spool processing unit 103.In main delivery line 121, spool extracting apparatus 11 The empty spool 5A being placed on pallet 3 is extracted.
(5) the attraction control structure of spool processing unit
The attraction control structure of spool processing unit 103 is illustrated using Fig. 2.Fig. 2 is to indicate spool processing unit The block diagram of 103 attraction control structure.There is spool processing unit 103 spool processing unit (to attract the one of source with air blower 45 Example).Spool processing unit air blower 45 is the dress for supplying attraction to multiple attracting mechanism of spool processing unit 103 It sets.So-called attracting mechanism refers to carrying out the mechanism of the processing of the yarn of yarn feeding spool by attracting air.Spool processing unit 103 have spool processing unit with attraction pipeline 47 (an example of air distribution channel).Spool processing unit attraction pipeline 47 Have:The main pipeline 47a that extends from spool processing unit air blower 45 and from main pipeline 47a branches and with multiple attractors The a plurality of lateral 47b of structure connection.
1st change device 19A has the 1st attracting mechanism 51 that the yarn ends for twining yarn spool 5B are positioned to specified position. 1st change device 19A has the 1st valve system 52 (an example of switching mechanism is connected in air).1st valve system 52 configuration with It, can on air flue (an example of air distribution channel, not shown) in 1st change device 19A of lateral 47b connections In spool processing unit switching air access between air blower 45 and the 1st attracting mechanism 51.1st valve system 52 for example with Gate and cylinder (similarly hereinafter).1st valve system 52 is, for example, gate cutter (shutter cutter).2nd change device 19B With the 2nd attracting mechanism 53 that the yarn ends of spool are positioned to specified position.2nd change device 19B has the 2nd valve system 54.(air distributes air flue of 2nd valve system 54 configuration in the 2nd change device 19B being connect with lateral 47b It is an example of access, not shown) on, can between spool processing unit air blower 45 and the 2nd attracting mechanism 53 switching air Access.2nd valve system 54 is, for example, gate cutter.
As shown in figure 3, spool processing unit air blower 45 has motor 68, the fan being accommodated in air blast chassis 66 69 and the end of a thread recycling bins 70.Fig. 3 is the schematic diagram for the attraction construction for indicating two change devices.The end of a thread recycling bins 70 are to be used for The device of the end of a thread removed and flyings recycling will be attracted, there is air filter (spool processing unit filter) 71.By this Construction, the end of a thread recycling bins 70 can will attract air stream to be detached with the end of a thread and flyings to fly here with attraction air stream.
Tip bunch weft end remover 14 has the 3rd attracting mechanism 55 for unwinding lower part tip bunch weft end.Tip bunch weft end remover 14 has There is the 3rd valve system 56.3rd valve system 56 configures the air in the tip bunch weft end remover 14 being connect with lateral 47b It, can be in spool processing unit air blower 45 and the 3rd attracting mechanism 55 on access (an example of air distribution channel, not shown) Between switching air access.3rd valve system 56 is, for example, gate cutter.Spool extracting apparatus 11, which has, attracts the residual of spool The residual Yarn processing device as the 4th attracting mechanism 57 of yarn.Spool extracting apparatus 11 has the 4th valve system 58.4th gate fills Set the air flue (an example of air distribution channel, not of 58 configurations in the spool extracting apparatus 11 being connect with lateral 47b Diagram) on, can between spool processing unit air blower 45 and the 4th attracting mechanism 57 switching air access.
Part 18A is inhaled in 1st side has the 5th attracting mechanism 59 for attracting yarn ends to side.Part 18A is inhaled in 1st side has the 5th Valve system 60.The configuration of 5th valve system 60 inhales the air flue (sky in part 18A in the 1st side being connect with lateral 47b It is an example of gas distribution circuit, not shown) on, it can be opened between air blower 45 and the 5th attracting mechanism 59 in spool processing unit Close air flue.5th valve system 60 is, for example, gate cutter.2nd side, which is inhaled part 18B and had, attracts yarn ends to side 6th attracting mechanism 61.Part 18B is inhaled in 2nd side has the 6th valve system 62.6th valve system 62 configuration with lateral 47b 2nd side of connection is inhaled on the air flue (an example of air distribution channel, not shown) in part 18B, can be filled in spool processing It sets with switching air access between air blower 45 and the 6th attracting mechanism 61.6th valve system 62 is, for example, gate cutter.
Spool processing unit 103 has the 1st control unit 73.1st control unit 73 is accommodated in control cabinet 81 shown in Fig. 3. 1st control unit 73 is with processor (such as CPU), storage device (such as ROM, RAM, HDD, SSD etc.) and various interfaces The computer system of (such as A/D converter, D/A converter, communication interface etc.).1st control unit 73 is deposited by executing to be stored in Program in storage portion (corresponding with part or all of the storage region of storage device) carries out various control actions.1st control Portion 73 processed can be made of individual processor, but can also be made of independent multiple processors to carry out each control.
Part or all of function of each element of 1st control unit 73 can also be used as can be by constituting the calculating of control unit The program that machine system executes is realized.Specifically, being stored in the ROM possessed by the 1st control unit 73 for making the hairs such as CPU Wave the control software for the function of attracting control mechanism 73a (aftermentioned) as the 1st.In addition to this, one of each element of control unit Point function can also be made of special IC.Although not shown, but on the 1st control unit 73 size, the shape of detection object are connected with Shape and the sensor of position, the sensor of state for detecting each device and switch and message input device.1st control Portion 73 has for being controlled the action of attracting mechanism and air blower the 1st to attract control mechanism 73a as previously described.1st Control mechanism 73a is attracted to pass through to spool processing unit air blower 45, the 1st valve system 52, the 2nd valve system 54, the 3rd lock Door gear 56, the 4th valve system 58, the 5th valve system 60 and the 6th valve system 62 are driven, to change each attracting mechanism In suction pressure.In addition, the means of communication for attracting control mechanism 73a and each attracting mechanism as the 1st, it is logical to may be used bus A certain kind in the serial communications such as letter and parallel communications configured with a plurality of wiring.It is carried out alternatively, it is also possible to which transceiver is arranged Wireless communication.
(6) the attraction control structure of automatic bobbin winder
The attraction control structure of automatic bobbin winder 102 is illustrated using Fig. 4.Fig. 4 indicates automatic bobbin winder 102 Attract the block diagram of control structure.Automatic bobbin winder 102 has automatic bobbin winder with air blower (yarn take-up device air blower) 65.Automatic bobbin winder air blower 65 is the device for supplying attraction to multiple attracting mechanism of automatic bobbin winder 102.From Dynamic winder 102 has automatic bobbin winder attraction pipeline 67.Automatic bobbin winder attraction pipeline 67 has:From automatic bobbin winder The main pipeline 67a that is extended with air blower 65 and from a plurality of lateral 67b of main pipeline 67a branches.
Each winder unit 105 has attracting mechanism 77 and unit valve system 79.Unit valve system 79 for example configures On lateral 67b, can between automatic bobbin winder air blower 65 and attracting mechanism 77 switching air access.Automatic winding Machine 102 has the 2nd control unit 75.2nd control unit 75 is arranged for each winder unit 105.2nd control unit 75 can be with 1 control unit 73 directly or indirectly communicates.2nd control unit 75 has for being controlled to the attraction action of attracting mechanism 77 The 2nd of system attracts control mechanism 75a.2nd attraction control mechanism 75a changes each attractor by driving unit valve system 79 Suction pressure in structure 77.
(7) effect of embodiment
As described above, being equipped with spool processing unit air blower 45, the spool processing unit in spool processing unit 103 Multiple attracting mechanism are generated with air blower 45 and attract air stream, to make multiple attracting mechanism act.Through the above structure, exist In a period of acting spool processing unit air blower 45 in spool processing unit 103, automatic bobbin winder 102 can be stopped The attraction of automatic bobbin winder air blower 65 acts.In addition, in a period of attraction in automatic bobbin winder 102, Neng Gouting The only attraction action of spool processing unit air blower 45.In addition, the stopping of above-mentioned attraction action refers to stopping motor or passing through Gate (not shown) is by the inlet close of air blower.Thereby, it is possible to inhibit the consumption of electric power.
Specifically, winding condition change (changes in batches when twining yarn spool 5B to the supply of automatic bobbin winder 102 from spinning frame Become) scene in, to supplied to automatic bobbin winder 102 new number twine yarn spool 5B until produce the very long stand-by period. At this moment, so that the attracting mechanism of spool processing unit 103 is acted, and make the automatic bobbin winder air blower of automatic bobbin winder 102 65 attraction action stops.In addition, working as, the spool delivery from spinning frame finishes and automatic bobbin winder 102 becomes spinning waiting shape When state, the attracting mechanism of spool processing unit 103 is set to act, and make the automatic bobbin winder air blower of automatic bobbin winder 102 65 attraction action stops.In addition, if the whole in spool processing unit 103, which twines yarn spool 5B, has all been sent to automatic bobbin winder If 102, then so that the attraction of the spool processing unit air blower 45 of spool processing unit 103 is acted and stop.
It is acted as one, the 1st of the 1st control unit 73 attracts control mechanism 73a in spool processing unit air blower 45 It is constant by the attraction control of spool processing unit air blower 45 when carrying out attraction action.In addition, the 1st control unit 73 1st attracts control mechanism 73a by the corresponding valve system of low with the priority without attracting or attracting attracting mechanism, by phase The air of the attracting mechanism is connected and is closed.Therefore, because only need the high attracting mechanism of priority for attracting or attracting into Row attracts, so inspiratory force that is energy saving, and can maintaining these attracting mechanism higher can be realized.As the above-mentioned the 1st Example, Ke Yishi usually make the 2nd change device 19B stop attraction action in advance, only more than the place in the 1st change device 19A The attraction action of the 2nd change device 19B is carried out in the case of reason ability.It as above-mentioned the 2nd, can also be, looked for making the 1st In the case that head device 19A and the 2nd change device 19B is acted for different yarn varieties, as the 1st change device 19A Carrying out acts the attraction of the 2nd change device 19B when attraction action stops, and makes when the 2nd change device 19B carries out attraction action The attraction action of 1st change device 19A stops.
2. the 2nd embodiment
It is illustrated using Fig. 5 and Fig. 6 embodiments for not having the end of a thread recycling bins to spool processing unit.Fig. 5 and Fig. 6 It is the schematic diagram for the attraction construction for indicating two change devices in the 2nd embodiment.
Automatic bobbin winder air blower 65 has motor 88, fan 89 and the end of a thread recycling being accommodated in air blast chassis 87 Case 80.The end of a thread recycling bins 80 are the devices for that will attract the end of a thread removed and flyings recycling, have air filter 90.Spool The automatic bobbin winder attraction pipeline 67 of the spool processing unit of processing unit 103 attraction pipeline 47 and automatic bobbin winder 102 Connection.That is, spool processing unit attraction pipeline 47 has and the end of a thread recycling bins for being arranged in automatic bobbin winder 102 The access (an example of connection access) of 80 connections.
Connection lock is equipped on the boundary of spool processing unit attraction pipeline 47 and automatic bobbin winder attraction pipeline 67 Door gear 91.Linking valve system 91 has gate 92 and cylinder 93.Gate 92 can be opened and closed spool processing unit suction tube The boundary in road 47 and automatic bobbin winder attraction pipeline 67.The spool processing unit of spool processing unit 103 is existed with air blower 45A Spool processing unit is with being configured at spool processing unit with attraction pipeline 47 and automatic bobbin winder suction tube in attraction pipeline 47 The near border in road 67 has motor 68A, fan 69A and filter (spool processing unit filter) 71A.More specifically, Spool processing unit air blower 45A is being inhaled relative to the configuration of connection valve system 91 of spool processing unit attraction pipeline 47 Draw mechanism side.
When carrying out common action, as shown in figure 5, by linking valve system 91 by spool processing unit suction tube The closing of border in road 47 and automatic bobbin winder attraction pipeline 67, and attract the 1st to look for by spool processing unit air blower 45A Head device 19A and the 2nd change device 19B.Therefore, the end of a thread is deposited near gate 92 or filter 71A.It is dynamic carrying out cleaning When making, as shown in fig. 6, spool processing unit attraction pipeline 47 and automatic bobbin winder are attracted by linking valve system 91 The boundary of pipeline 67 is opened, and the attraction of spool processing unit air blower 45A is made to reduce.Therefore, the end of a thread is by automatic network The automatic bobbin winder air blower 65 of yarn machine 102 attracts and is received into the end of a thread recycling bins 80 of automatic bobbin winder 102.By upper Structure is stated, it is not necessary that the end of a thread recycling bins of spool processing unit are arranged, therefore the quantity of the end of a thread recycling bins can be reduced.
3. the 3rd embodiment
In being equipped with valve system in each attracting mechanism in the 1st embodiment, but spool processing unit can also include It can be to single valve system that multiple air distribution channels switch over.Such embodiment is said using Fig. 7 It is bright.Fig. 7 is the schematic diagram for the attraction construction for indicating two change devices in the 3rd embodiment.
As shown in fig. 7, the 1st attracting mechanism (not shown) of the 1st change device 19A and the 2nd of the 2nd change device 19B are inhaled Draw mechanism (not shown) to connect with single valve system 95.Valve system 95 is configured in spool processing unit attraction pipeline 47 It, can be in spool processing unit air blower 45 and the 1st change device 19A and the 2nd change in (an example of air distribution channel) Switching air access between device 19B.Valve system 95 can realize multiple switch modes.Valve system 95 for example can with At least two patterns in lower four patterns switch over each other:The 1st pattern for only attracting the 1st change device 19A;Only The 2nd pattern for making the 2nd change device 19B attract;The attraction of the 1st change device 19A and the 2nd change device 19B both sides is set to stop The 3rd pattern;With the 4th pattern for making the 1st change device 19A and the 2nd change device 19B attract.The embodiment is in addition to change Other attracting mechanism combination with one another are also can be suitably used for other than device combination with one another.
4. other embodiment
More than, multiple embodiments of the present invention are illustrated, but the present invention is not limited to the above embodiment, It can make various changes without departing from the spirit of the invention.Especially, multiple embodiments described in this specification And variation can combine as needed and arbitrarily.
The quantity and type of attracting mechanism in spool processing unit are not limited to the embodiment.For example, change Device can also be one.As multiple attracting mechanism in spool processing unit, being not necessarily to will be complete recorded in the 1st embodiment Portion's attracting mechanism is as object.For example, the example as multiple attracting mechanism, can enumerate change device combination with one another, look for The combination of head device and tip bunch weft end remover, change device and the combination of side suction inlet, the group of change device and residual Yarn processing device Conjunction and any of the combination of change device and tip bunch weft end remover and residual Yarn processing device.In addition, though to spool Embodiment of the reason configuration of device 103 between spool feedway 104 and automatic bobbin winder 102 is illustrated, but also can The mode between ring spinning frame and automatic bobbin winder 102 is configured suitable for spool processing unit 103.
Spool processing unit can also include the attracting mechanism that valve system is not arranged.The control unit of spool processing unit Converter can be utilized into the switching of horizontal high voltage and low pressure.Each air blower can also by multiple Blast mechanisms at.
Industrial applicibility
The present invention is widely used in for supplying yarn feeding spool to the spool processing unit of yarn take-up device.

Claims (14)

1. a kind of spool processing unit is used to supply yarn feeding spool to yarn take-up device, the spy of the spool processing unit Sign is have:
Multiple attracting mechanism, multiple attracting mechanism carry out the processing of the yarn of the yarn feeding spool by attracting air;
Spool processing unit air blower, the spool processing unit are for generating the attraction source for attracting air stream with air blower;
A plurality of air distribution channel, a plurality of air distribution channel between the spool processing unit air blower with it is the multiple Between attracting mechanism;With
Switching mechanism is connected in air, which is connected switching mechanism and is carried out to the conducting of the air of a plurality of air distribution channel Switching.
2. spool processing unit according to claim 1, which is characterized in that the setting of the multiple attracting mechanism will be will be described The yarn ends of yarn feeding spool are positioned on multiple change devices of specified position.
3. spool processing unit according to claim 1, which is characterized in that the setting of the multiple attracting mechanism will be will be described The yarn ends of yarn feeding spool are positioned at the change device of specified position and attract the side of the yarn ends of the yarn feeding spool from side It inhales on part.
4. spool processing unit according to claim 1, which is characterized in that the setting of the multiple attracting mechanism will be will be described The yarn ends of yarn feeding spool are positioned at the change device of specified position and supply the yarn feeding spool to the spool supply of pallet On the tip bunch weft end remover of device.
5. spool processing unit according to claim 1, which is characterized in that the setting of the multiple attracting mechanism will be will be described The yarn ends of yarn feeding spool are positioned at the change device of specified position and the residual yarn of the yarn feeding spool are attracted to the spool removed On extracting apparatus.
6. spool processing unit according to claim 1, which is characterized in that the setting of the multiple attracting mechanism will be will be described The yarn ends of yarn feeding spool are positioned at the change device of specified position, are supplied to the spool confession of pallet set on by the yarn feeding spool To on device tip bunch weft end remover and will the yarn feeding spool residual yarn attract remove spool extracting apparatus on.
7. according to spool processing unit according to any one of claims 1 to 6, which is characterized in that be also equipped with for described The 1st control unit that the action in air conducting switching mechanism and the attraction source is controlled,
The attraction in the 1st control unit attraction source when carrying out attraction action with some in the multiple attracting mechanism The constant mode of power is controlled.
8. spool processing unit according to any one of claims 1 to 7, which is characterized in that the air conducting switching Mechanism includes multiple valve systems corresponding with the multiple attracting mechanism.
9. spool processing unit according to claim 8, which is characterized in that the multiple valve system is for the multiple Attracting mechanism is respectively set.
10. spool processing unit according to claim 8, which is characterized in that the multiple valve system is respectively arranged at The a plurality of air distribution channel.
11. according to spool processing unit according to any one of claims 1 to 6, which is characterized in that the air conducting switching Mechanism includes the single gate that can be switched over to a plurality of air distribution channel between the multiple attracting mechanism Device.
12. according to the spool processing unit described in claim 8~10, which is characterized in that the 1st control unit can control institute Multiple valve systems are stated,
The attraction action for the attracting mechanism that 1st control unit keeps priority low when making the multiple attracting mechanism act stops Only.
13. a kind of Yarn-processing system, which is characterized in that have:
Spool processing unit described in any one of claim 7~12;With
The reel for yarn for having the yarn take-up device air blower constituted comprising motor, fan and the end of a thread recycling bins installs around It sets,
The air distribution channel has the company extended with air blower from the multiple attracting mechanism to the yarn take-up device Access is tied,
It is additionally provided with connection valve system in the midway of the connection access,
The spool processing unit with air blower have spool processing unit filter, and with it is described connection access the connection Valve system is compared to setting in the multiple attracting mechanism side.
14. Yarn-processing system according to claim 13, which is characterized in that the 1st control unit is able to carry out following Process:
In the state of by the connection valve system by the connection path blockade, roused by the spool processing unit Wind turbine makes the multiple attracting mechanism be attracted, to which the end of a thread is deposited in the connection valve system or spool processing dress Set the process near filter;And
In the state of opening the connection access by the connection valve system, make the spool processing unit air blast The attraction of machine reduces, and so that the multiple attracting mechanism is attracted with air blower by the yarn take-up device, from And described the end of a thread is received into the process in the end of a thread recycling bins.
CN201810288976.1A 2017-04-07 2018-04-03 Bobbin processing device and yarn processing system Active CN108689243B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017076707A JP2018177419A (en) 2017-04-07 2017-04-07 Bobbin process apparatus
JP2017-076707 2017-04-07

Publications (2)

Publication Number Publication Date
CN108689243A true CN108689243A (en) 2018-10-23
CN108689243B CN108689243B (en) 2022-02-01

Family

ID=61906650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810288976.1A Active CN108689243B (en) 2017-04-07 2018-04-03 Bobbin processing device and yarn processing system

Country Status (3)

Country Link
EP (1) EP3385206B1 (en)
JP (1) JP2018177419A (en)
CN (1) CN108689243B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112210853A (en) * 2019-07-09 2021-01-12 村田机械株式会社 Flying waste discharge device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020059584A (en) * 2018-10-11 2020-04-16 村田機械株式会社 Yarn winding facility
JP2020117368A (en) * 2019-01-25 2020-08-06 村田機械株式会社 Bobbin supply device

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4576341A (en) * 1982-03-08 1986-03-18 Murata Kikai Kabushiki Kaisha Cop transporting systems for an automatic winder
JPS63288871A (en) * 1987-05-20 1988-11-25 Murata Mach Ltd Pick finding device for yarn end
JPH02149665U (en) * 1989-05-22 1990-12-20
US5590845A (en) * 1993-09-24 1997-01-07 Murata Kikai Kabushiki Kaisha Yarn end finding apparatus and method
CN1154336A (en) * 1995-10-02 1997-07-16 W·施拉夫霍斯特公司 Cylinder yarn prepn. device
JP2003321162A (en) * 2002-05-08 2003-11-11 Murata Mach Ltd System for processing bobbin
CN1840458A (en) * 2005-04-01 2006-10-04 索若两合股份有限公司 Spinning machine for producing cross winding bobbin
JP2006298647A (en) * 2005-04-21 2006-11-02 Saurer Gmbh & Co Kg Winding part of textile machinery for manufacturing twill winding bobbin
CN101544326A (en) * 2008-03-28 2009-09-30 村田机械株式会社 Yarn end retrieving apparatus
JP2010236102A (en) * 2009-03-30 2010-10-21 Murata Machinery Ltd Fiber machine and removable material-sucking and separating device for fiber machine
CN102060216A (en) * 2009-11-16 2011-05-18 Savio纺织机械股份有限公司 Device for capturing the skein-end during the preparation of the spools to be fed to the automatic winding
CN102861740A (en) * 2011-04-08 2013-01-09 Savio纺织机械股份有限公司 System for collecting and recovering spooling scraps
CN103373641A (en) * 2012-04-18 2013-10-30 塞维欧纺织机械股份公司 Winding machine and double cyclone device
CN104003253A (en) * 2014-06-19 2014-08-27 山东魏桥创业集团有限公司 Thrum finding device of automatic winding CBF thrum picker

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1249471B (en) * 1990-11-17 1995-02-23 Murata Machinery Ltd CONNECTION SYSTEM OF A WINDER TO A DOUBLE TORSION TWISTING MACHINE.
JP2009091671A (en) * 2007-10-04 2009-04-30 Murata Mach Ltd Dust collecting and processing system in fiber machine
JP2016160010A (en) * 2015-02-27 2016-09-05 村田機械株式会社 Suction type yarn end drawer device and bobbin preparation system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4576341A (en) * 1982-03-08 1986-03-18 Murata Kikai Kabushiki Kaisha Cop transporting systems for an automatic winder
JPS63288871A (en) * 1987-05-20 1988-11-25 Murata Mach Ltd Pick finding device for yarn end
JPH02149665U (en) * 1989-05-22 1990-12-20
US5590845A (en) * 1993-09-24 1997-01-07 Murata Kikai Kabushiki Kaisha Yarn end finding apparatus and method
CN1154336A (en) * 1995-10-02 1997-07-16 W·施拉夫霍斯特公司 Cylinder yarn prepn. device
JP2003321162A (en) * 2002-05-08 2003-11-11 Murata Mach Ltd System for processing bobbin
CN1840458A (en) * 2005-04-01 2006-10-04 索若两合股份有限公司 Spinning machine for producing cross winding bobbin
JP2006298647A (en) * 2005-04-21 2006-11-02 Saurer Gmbh & Co Kg Winding part of textile machinery for manufacturing twill winding bobbin
CN101544326A (en) * 2008-03-28 2009-09-30 村田机械株式会社 Yarn end retrieving apparatus
JP2010236102A (en) * 2009-03-30 2010-10-21 Murata Machinery Ltd Fiber machine and removable material-sucking and separating device for fiber machine
CN102060216A (en) * 2009-11-16 2011-05-18 Savio纺织机械股份有限公司 Device for capturing the skein-end during the preparation of the spools to be fed to the automatic winding
CN102861740A (en) * 2011-04-08 2013-01-09 Savio纺织机械股份有限公司 System for collecting and recovering spooling scraps
CN103373641A (en) * 2012-04-18 2013-10-30 塞维欧纺织机械股份公司 Winding machine and double cyclone device
CN104003253A (en) * 2014-06-19 2014-08-27 山东魏桥创业集团有限公司 Thrum finding device of automatic winding CBF thrum picker

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112210853A (en) * 2019-07-09 2021-01-12 村田机械株式会社 Flying waste discharge device

Also Published As

Publication number Publication date
CN108689243B (en) 2022-02-01
EP3385206B1 (en) 2019-05-22
EP3385206A1 (en) 2018-10-10
JP2018177419A (en) 2018-11-15

Similar Documents

Publication Publication Date Title
CN108689243A (en) Spool processing unit and Yarn-processing system
CN103510200B (en) Jet-propelled weaving loom and its operation method
CN102021688B (en) Spinning machinery
US4893461A (en) Process and device for piecing with a spinning device operating with a pneumatic twisting unit
CN101994172B (en) Airflow spinning device and spinning machine comprising same
CN103014946B (en) Spinning machine and the method for interrupting the manufacture of the yarn on spinning machine
CN101910486B (en) Method and knitting machine for producing a knitted fabric from a non-twisted fiber material
CN101796232B (en) Method and knitting machine for producing knitted goods from a fiber material, which is essentially not twisted
ITMI20092013A1 (en) INDIVIDUAL ASPIRATION SYSTEM FOR ROCKING UNIT
CN109385703A (en) Open-end spinning frame
CN110494380A (en) Spinning unit and winding prevention method
CN103014931A (en) Pneumatic spinning device, spinning unit, spinning machine, and pneumatic spinning method
CN104562328A (en) Spinning machine and method for operating the same in case of failure of an external power supply
CN101528574B (en) Method and apparatus for operating a textile machine which produces crosswound bobbins
EP2530193B1 (en) Suction device for service trolleys for open-end spinning machines
CN107447308A (en) Fibre machinery
CS9000652A2 (en) Method and device for spinning mechanism spinning-in for break spinning
CN206232001U (en) Automatic winder cop processes conveying device
ITMI951034A1 (en) PROCEDURE AND DEVICE FOR STOPPING AN OPEN END ROTOR SPINNING DEVICE
CN107304013A (en) Yarn processing device
TW583359B (en) Method of restarting the spinning of a component yarn on a rotor spinning machine and a device for carrying out the method
CN110475733A (en) Spool processing unit
CN111661707B (en) Compressed air consumption output device and automatic winder
CN105297205B (en) Automatic bar breaking apparatus of drawing frame and the broken strip method using the device
CN108130639A (en) Weaving loom and Weaving method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant