CN108686421A - A kind of double filter plants of double refrigeration - Google Patents
A kind of double filter plants of double refrigeration Download PDFInfo
- Publication number
- CN108686421A CN108686421A CN201810780145.6A CN201810780145A CN108686421A CN 108686421 A CN108686421 A CN 108686421A CN 201810780145 A CN201810780145 A CN 201810780145A CN 108686421 A CN108686421 A CN 108686421A
- Authority
- CN
- China
- Prior art keywords
- valves
- filters
- pumps
- systems
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005057 refrigeration Methods 0.000 title claims abstract description 87
- 238000001914 filtration Methods 0.000 claims abstract description 286
- 238000007710 freezing Methods 0.000 claims abstract description 110
- 230000008014 freezing Effects 0.000 claims abstract description 110
- 239000007788 liquid Substances 0.000 claims description 242
- 238000001816 cooling Methods 0.000 claims description 172
- 239000000498 cooling water Substances 0.000 claims description 107
- 230000001839 systemic circulation Effects 0.000 claims description 99
- 238000000605 extraction Methods 0.000 claims description 96
- 239000002689 soil Substances 0.000 claims description 88
- 230000004087 circulation Effects 0.000 claims description 83
- 239000002826 coolant Substances 0.000 claims description 67
- 239000003507 refrigerant Substances 0.000 claims description 67
- 238000000926 separation method Methods 0.000 claims description 63
- 239000000284 extract Substances 0.000 claims description 60
- 238000007792 addition Methods 0.000 claims description 21
- 239000007787 solid Substances 0.000 claims description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 9
- 235000019628 coolness Nutrition 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000004146 energy storage Methods 0.000 description 48
- 238000000034 method Methods 0.000 description 17
- 238000011017 operating method Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 238000005119 centrifugation Methods 0.000 description 2
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000013329 compounding Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000706 filtrate Substances 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D35/00—Filtering devices having features not specifically covered by groups B01D24/00 - B01D33/00, or for applications not specifically covered by groups B01D24/00 - B01D33/00; Auxiliary devices for filtration; Filter housing constructions
- B01D35/12—Devices for taking out of action one or more units of multi- unit filters, e.g. for regeneration
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D36/00—Filter circuits or combinations of filters with other separating devices
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Other Air-Conditioning Systems (AREA)
Abstract
The present invention is to provide a kind of double filter plants of double refrigeration, which improves work efficiency, reduces production cost, realizes the double-purpose of freezing filtration device, and part homotype element can be replaced and be used, and realize the value that 1+1 is more than 2.
Description
Technical field
The present invention relates to a kind of filter plants in filtering flow field, and in particular to a kind of double double filter plants of refrigeration.
Technical background
Currently, in the filtering of the industries liquid such as medicine, chemical industry, light industry, drink, the single work(of freezing and filtering unit in the market
It can freeze and filter disjunctor realization to be completed to filter at low temperature by filtrate body, Multifunctional resource, which can not achieve, to be caused to waste;Due to
Freezing and filtering unit equipment is multicomponent combination, is not that the equipment component seller of vulnerable part is not usually spare with buyer, is producing
Occur equipment single element failure in the process and will result in a whole set of compressor emergency shutdown, it is necessary to until that could be produced after troubleshooting, have
Equipment component need repairing or replace, but repair or procurement cycle will be 1 week~3 months, thus delay and produce, such as carry
High efficiency performance is more multi-functional to have much room for improvement.
Invention content
In view of the above-mentioned problems, it is an object of the invention to provide a kind of double double filter plants of refrigeration, which improves work effect
Rate reduces production cost, realizes the double-purpose of freezing and filtering equipment, and part homotype element can be replaced and be used, and realize that 1+1 is more than 2
Value.
A kind of double double filter plants of refrigeration, including:Z8 refrigeration systems, Z8Z refrigeration systems, A cooling water recirculation systems,
AA cooling water recirculation systems, B cooling water recirculation systems, BB cooling water recirculation systems, C cooling water recirculation systems, CC cooling waters follow
Loop system, A coolant circulating systems, AA coolant circulating systems, B coolant circulating systems, BB coolant circulating systems, C refrigerant circulations system
System, CC coolant circulating systems, the cold feed liquor systems of A, the cold feed liquor systems of AA, the cold feed liquor systems of B, the cold feed liquor systems of BB, the cold feed liquor systems of C
System, the cold feed liquor systems of CC, A filter hang soil series system, soil series system is hung in AA filters, soil series system is hung in B filters, soil series system is hung in BB filters, the soil series is hung in C filters
System, CC filters hang soil series system, A systemic circulations cooling system, AA systemic circulations cooling system, B systemic circulations cooling system, BB systemic circulations cooling
System, C systemic circulations cooling system, CC systemic circulations cooling system, A freezing and filtering systems, AA freezing and filtering systems, B freezing and filterings
The normal feed liquor system of system, BB freezing and filtering systems, C freezing and filtering systems, CC freezing and filtering systems, D, the normal feed liquor systems of DD, E are normal
The normal feed liquor system of feed liquor system, EE, the normal feed liquor systems of F, the normal feed liquor systems of FF, the normal feed liquor systems of G, the normal feed liquor systems of GG, D room temperature
Filtration system, DD room temperature filtration system, E room temperature filtration system, EE room temperature filtration system, F room temperature filtration system, the filtering of FF room temperature
System, G room temperature filtration system, GG room temperature filtration system, A add-on systems, AA add-on systems, B add-on systems, BB add-on systems, A
Solid-liquid separation system, AA solid-liquid separation systems, B solid-liquid separation systems, BB solid-liquid separation systems, C solid-liquid separation systems, CC solid-liquids
The cold liquid extraction system of piece-rate system, A, the cold liquid extraction systems of AA, the cold liquid extraction systems of B, the cold liquid extraction systems of BB, C
Cold liquid extraction system, the cold liquid extraction systems of CC, the normal liquid extraction systems of D, the normal liquid extraction systems of DD, the normal liquid extractions of E
The normal liquid extraction system of system, EE, the normal liquid extraction systems of F, the normal liquid extraction systems of FF, the normal liquid extraction systems of G, the normal liquid of GG
Body extracts system out.
The A cooling water recirculation systems include:B2 valves, B4 valves, Z12 cooling towers, B1 valves, G6 cooling pumps pass through pipeline and institute
The condenser inlet and outlet connection for stating Z8 refrigeration systems forms A cooling water circulation loops;
The AA cooling water recirculation systems include:B2B valves, B4B valves, Z12Z cooling towers, B1B valves, G6G cooling pumps by pipeline with
The condenser inlet and outlet connection of the Z8Z refrigeration systems forms AA cooling water circulation loops;
The B cooling water recirculation systems include:B6 valves, B3 valves, Z11 exchangers, E6 valves, the B4 valves, the Z12 cooling towers,
The B1 valves, the G6 cooling pumps form B cooling waters by the condenser inlet and outlet connection of pipeline and the Z8 refrigeration systems and follow
Loop back path;
The BB cooling water recirculation systems include:B6B valves, B3B valves, Z11Z exchangers, E6E valves, the B4B valves, the Z12Z
Cooling tower, the B1B valves, the G6G cooling pumps are formed by pipeline and the inlet and outlet connection of the condenser of the Z8Z refrigeration systems
BB cooling water circulation loops;
The C cooling water recirculation systems include:The B6 valves, B7 valves, the B3B valves, the Z11Z exchangers, the E6E valves,
B5 valves, the B4 valves, the Z12 cooling towers, the B1 valves, the G6 cooling pumps are cold by pipeline and the Z8 refrigeration systems
Condenser inlet and outlet connection forms C cooling water circulation loops;
The CC cooling water recirculation systems include:The B6B valves, the B7 valves, the B3 valves, the Z11 exchangers, the E6
Valve, the B5 valves, the B4B valves, the Z12Z cooling towers, the B1B valves, the G6G cooling pumps pass through pipeline and the Z8Z
The condenser inlet and outlet connection of refrigeration system forms CC cooling water circulation loops;
The A coolant circulating systems include:A1 valves, Z9 refrigerant tanks, A2 valves, G7 refrigerant pumps, A3 valves, Z3 exchangers, A4 valves, A7 valves
It connect to form A refrigerant circulation circuits with the evaporator inlet-outlet of the Z8 refrigeration systems by pipeline;
The AA coolant circulating systems include:A1A valves, Z9Z refrigerant tanks, A2A valves, G7G refrigerant pumps, Z3Z exchangers, A4A valves,
A7A valves connect to form AA refrigerant circulation circuits by pipeline with the evaporator inlet-outlet of the Z8Z refrigeration systems;
The B coolant circulating systems include:The A1 valves, the Z9 refrigerant tanks, the A2 valves, the G7 refrigerant pumps, A5 valves,
Z10 exchangers, A6 valves, the A7 valves, which are connect by pipeline with the evaporator inlet-outlet of the Z8 refrigeration systems, to be formed B refrigerants and follows
Loop back path;
The BB coolant circulating systems include:The A1A valves, the Z9Z refrigerant tanks, the A2A valves, the G7G refrigerant pumps, A8
Valve, the A5 valves, the Z10 exchangers, the A6 valves, B8 valves, the A7A valves pass through pipeline and the Z8Z refrigeration systems
Evaporator inlet-outlet connects to form BB refrigerant circulation circuits;
The C coolant circulating systems include:The A1 valves, the Z9 refrigerant tanks, the A2 valves, the G7 refrigerant pumps, the A8
The evaporator that valve, the Z3Z exchangers, the A4A valves, the B8 valves, the A7 valves pass through pipeline and the Z8 refrigeration systems
Inlet and outlet connection forms C refrigerant circulation circuits;
The CC coolant circulating systems include:The A1A valves, the Z9Z refrigerant tanks, the A2A valves, the G7G refrigerant pumps, institute
A8 valves, the A3 valves, the Z3 exchangers, the A4 valves, the B8 valves, the A7A valves is stated by pipeline and the Z8Z to freeze
The evaporator inlet-outlet of system connects to form CC refrigerant circulation circuits;
The cold feed liquor systems of A include:Z1 protects filter, C1 valves, G1 pumps, Z2 exchangers, the Z3 exchangers, C2 valves, A9 valves, G2
Pump, Z4 filters, C3 valves, E5 valves, Z5 agitator tanks, C4 valves, G3 pump, Z6 filters connect to form the cold feed liquor circuits A by pipeline;
The cold feed liquor systems of AA include:Z1Z protect filter, C1C valves, G1G pumps, Z2Z exchangers, the Z3Z exchangers, C2C valves,
A9A valves, G2G pumps, Z4Z filters, C3C valves, E5E valves, Z5Z agitator tanks, C4C valves, G3G pump, Z6Z filters are connected by pipeline
Form the cold feed liquor circuits AA;
The cold feed liquor systems of B include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3 are handed over
Parallel operation, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the E5 valves, the Z5 agitator tanks are logical
Piping connects to form the cold feed liquor circuits B;
The cold feed liquor systems of BB include:It is Z1Z shield filter, the C1C valves, G1G pumps, the Z2Z exchangers, described
Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the E5E valves, institute
Z5Z agitator tanks are stated to connect to form the cold feed liquor circuits BB by pipeline;
The cold feed liquor systems of C include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3 are handed over
Parallel operation, the C2 valves, D2 valves, M7 valves, G3 pumps, the Z6 filters, D5 valves, the E5 valves, the Z5 agitator tanks pass through
Pipeline connects to form the cold feed liquor circuits C;
The cold feed liquor systems of CC include:It is Z1Z shield filter, the C1C valves, G1G pumps, the Z2Z exchangers, described
It is Z3Z exchangers, the C2C valves, D2D valves, M7M valves, G3G pumps, the Z6Z filters, D5D valves, the E5E valves, described
Z5Z agitator tanks connect to form the cold feed liquor circuits CC by pipeline;
Soil series system is hung in the A filters:C8 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the E5
Valve, the Z5 agitator tanks connect to form the Z4 filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the AA filters:C8C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, institute
State E5E valves, the Z5Z agitator tanks connect to form the Z4Z filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the B filters:D8 valves, G3 pumps, the Z6 filters, the D5 valves, the E5 valves, the Z5 are stirred
Tank is mixed to connect to form the Z6 filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the BB filters:D8D valves, G3G pumps, the Z6Z filters, the D5D valves, the E5E valves, institute
Z5Z agitator tanks are stated to connect to form the Z6Z filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the C filters:C7 valves, G4 pumps, Z7 filters, E4 valves, the E5 valves, the Z5 agitator tanks pass through pipeline
Connection forms the Z7 filters precoating filter aid circulation loop;
Soil series system is hung in the CC filters:C7C valves, G4G pumps, Z7Z filters, E4E valves, the E5E valves, the Z5Z agitator tanks
It connects to form the Z7Z filters precoating filter aid circulation loop by pipeline;
The A systemic circulations cooling system includes:E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, the A9 valves,
The G2 pumps, the Z4 filters, the C3 valves, the C4 valves, the G3 pump, the Z6 filters, C5 valves, the Z2 are exchanged
Device connects to form A systemic circulations cooling circuit by pipeline;
The AA systemic circulations cooling system includes:It is E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves, described
A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the C4C valves, the G3G pump, the Z6Z filters, C5C
Valve, the Z2Z exchangers connect to form AA systemic circulations cooling circuit by pipeline;
The B systemic circulations cooling system includes:It is the E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, described
A9 valves, G2 pumps, the Z4 filters, the C3 valves, F1 valves, the Z2 exchangers connect to form B systemic circulations by pipeline
Cool down circuit;
The BB systemic circulations cooling system includes:The E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves,
The A9A valves, G2G pumps, the Z4Z filters, the C3C valves, F1F valves, the Z2Z exchangers connect shape by pipeline
At BB systemic circulations cooling circuit;
The C systemic circulations cooling system includes:It is the E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, described
D2 valves, the M7 valves, G3 pumps, the Z6 filters, the C5 valves, the Z2 exchangers connect that form C big by pipeline
Circulation temperature lowering circuit;
The CC systemic circulations cooling system includes:The E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves,
The D2D valves, the M7M valves, G3G pumps, the Z6Z filters, the C5C valves, the Z2Z exchangers are connected by pipeline
It connects to form CC systemic circulations cooling circuit;
The A freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the C4 valves, the G3 pump, institute
State Z6 filters, the C5 valves, the Z2 exchangers, G4 pumps, the Z7 filters, C6 valves connect to form A by pipeline
Freezing and filtering circuit;
The AA freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the C4C valves,
The G3G pumps, the Z6Z filters, the C5C valves, the Z2Z exchangers, the G4G pump, the Z7Z filters, C6C valves
It connects to form AA freezing and filterings circuit by pipeline;
The B freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the F1 valves, the Z2 are exchanged
Device, G4 pumps, the Z7 filters, the C6 valves connect to form B freezing and filterings circuit by pipeline;
The BB freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the F1F valves,
The Z2Z exchangers, G4G pumps, the Z7Z filters, the C6C valves connect to form BB freezing and filterings time by pipeline
Road;
The C freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the D2 valves, the M7 valves, G3 pumps, the Z6 filters, the C5 valves, the Z2 are exchanged
Device, G4 pumps, the Z7 filters, the C6 valves connect to form C freezing and filterings circuit by pipeline;
The CC freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the D2D valves, the M7M valves, G3G pumps, the Z6Z filters, the C5C valves,
The Z2Z exchangers, G4G pumps, the Z7Z filters, the C6C valves connect to form CC freezing and filterings time by pipeline
Road;
The normal feed liquor systems of D include:The Z1 shields filter, D1 valves, the D2 valves, the A9 valves, G2 pumps, the Z4 mistakes
Filter, the C3 valves, the E5 valves, the Z5 agitator tanks, the C4 valves, G3 pumps, the Z6 filters are connected by pipeline
It connects to form the normal feed liquor circuits D;
The normal feed liquor systems of DD include:The Z1Z shields filter, D1D valves, the D2D valves, the A9A valves, G2G pumps, institute
State Z4Z filters, the C3C valves, the E5E valves, the Z5Z agitator tanks, the C4C valves, G3G pumps, Z6Z filterings
Machine connects to form the normal feed liquor circuits DD by pipeline;
The normal feed liquor systems of E include:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, the G2 are pumped, are described
Z4 filters, the C3 valves, the E5 valves, the Z5 agitator tanks piping connect to form the normal feed liquor circuits E;
The normal feed liquor systems of EE include:The Z1Z shields filter, the D1D valves, the D2D valves, the A9A valves, the G2G
Pump, the Z4Z filters, the C3C valves, the E5E valves, the Z5Z agitator tanks piping connect to form the normal feed liquor circuits EE;
The normal feed liquor systems of F include:Z1 shield filter, the D1 valves, the M7 valves, G3 pumps, the Z6 filters,
The D5 valves, the E5 valves, the Z5 agitator tanks connect to form the normal feed liquor circuits F by pipeline;
The normal feed liquor systems of FF include:The Z1Z shields filter, the D1D valves, the M7M valves, G3G pumps, the Z6Z
Filter, the D5D valves, the E5E valves, the Z5Z agitator tanks connect to form the normal feed liquor circuits FF by pipeline;
The normal feed liquor systems of G include:It is Z1 shield filter, the D1 valves, F2 valves, G4 pumps, the Z7 filters, described
E4 valves, the E5 valves, the Z5 agitator tanks connect to form the normal feed liquor circuits G by pipeline;
The normal feed liquor systems of GG include:The Z1Z shields filter, the D1D valves, F2F valves, G4G pumps, Z7Z filterings
Machine, the E4E valves, the E5E valves, the Z5Z agitator tanks connect to form the normal feed liquor circuits GG by pipeline;
The D room temperature filtration system includes:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, G2 pumps, institute
State Z4 filters, the C3 valves, the C4 valves, G3 pumps, the Z6 filters, D4 valves connect to form D room temperature by pipeline
Filtration circuit;
The DD room temperature filtration system includes:It is Z1Z shield filter, the D1D valves, the D2D valves, the A9A valves, described
G2G pumps, the Z4Z filters, the C3C valves, the C4C valves, the G3G pump, the Z6Z filters, D4D valves pass through pipeline
Connection forms DD room temperature filtration circuits;
The E room temperature filtration system includes:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, G2 pumps, institute
State Z4 filters, D3 valves connect to form E room temperature filtration circuits by pipeline;
The EE room temperature filtration system includes:It is Z1Z shield filter, the D1D valves, the D2D valves, the A9A valves, described
G2G pumps, the Z4Z filters, D3D valves connect to form EE room temperature filtration circuits by pipeline;
The F room temperature filtration system includes:The Z1 shields filter, the D1 valves, the M7 valves, G3 pumps, Z6 filterings
Machine, the D4 valves connect to form F room temperature filtration circuits by pipeline;
The FF room temperature filtration system includes:The Z1Z shields filter, the D1D valves, the M7M valves, the G3G are pumped, are described
Z6Z filters, the D4D valves connect to form FF room temperature filtration circuits by pipeline;
The G room temperature filtration system includes:The Z1 shields filter, the D1 valves, the F2 valves, G4 pumps, Z7 filterings
Machine, the C6 valves connect to form G room temperature filtration circuits by pipeline;
The GG room temperature filtration system includes:The Z1Z shields filter, the D1D valves, the F2F valves, the G4G are pumped, are described
Z7Z filters, the C6C valves connect to form GG room temperature filtration circuits by pipeline;
The A add-on systems include:The Z5 agitator tanks, G5 additions pump, D6 valves, the Z4 filters connect to be formed by pipeline
A adds circuit;
The AA add-on systems include:The Z5Z agitator tanks, G5G additions pump, D6D valves, the Z4Z filters are connected by pipeline
It connects to form AA additions circuit;
The B add-on systems include:The Z5 agitator tanks, G5 additions pump, D7 valves, the Z6 filters are connected by pipeline
It forms B and adds circuit.
The BB add-on systems include:The Z5Z agitator tanks, G5G additions pump, D7D valves, the Z6Z filters are logical
Piping connects to form BB additions circuit;
The A solid-liquid separation systems include:M1 valves, G11 pumps, Z14 centrifuges, G12 pump, M6 valves, the D2 valves, the A9 valves,
The G2 pumps, the Z4 filters connect to form A separation of solid and liquid circulation loops by pipeline;
The AA solid-liquid separation systems include:M1M valves, G11G pumps, Z14Z centrifuges, G12G pump, M6M valves, the D2D valves, institute
A9A valves, G2G pumps, the Z4Z filters is stated to connect to form AA separation of solid and liquid circulation loops by pipeline;
The B solid-liquid separation systems include:M2 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M6 valves, institute
M7 valves, G3 pumps, the Z6 filters is stated to connect to form B separation of solid and liquid circulation loops by pipeline;
The BB solid-liquid separation systems include:M2M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M6M
Valve, the M7M valves, G3G pumps, the Z6Z filters connect to form BB separation of solid and liquid circulation loops by pipeline;
The C solid-liquid separation systems include:F3 valves, the E4 valves, M3 valves, G11 pumps, the Z14 centrifuges, the G12
Pump, the M6 valves, the F2 valves, the G4 pump, the Z7 filters connect to form C separation of solid and liquid circulation loops by pipeline.
The CC solid-liquid separation systems include:F3F valves, the E4E valves, M3M valves, G11G pumps, Z14Z centrifugations
Machine, G12G pumps, the M6M valves, the F2F valves, the G4G pump, the Z7Z filters connect that form CC solid by pipeline
Liquid detaches circulation loop;
The cold liquid of A extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the D5 valves, the Z6 mistakes
It is filter, the M2 valves, the C4 valves, the M7 valves, the D2 valves, the C2 valves, the A9 valves, the Z3 exchangers, described
It is Z2 exchangers, the F2 valves, the E1 valves, the D1 valves, the C1 valves, the Z7 filters, the F3 valves, F4 valves, described
E4 valves, the F1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, M5 valves connect to be formed by pipeline
The cold liquid of A extracts circuit out;
The cold liquid of AA extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the D5D valves, described
Z6Z filters, the M2M valves, the C4C valves, the M7M valves, the D2D valves, the C2C valves, the A9A valves, the Z3Z
Exchanger, the Z2Z exchangers, the F2F valves, the E1E valves, the D1D valves, the C1C valves, the Z7Z filters, institute
State F3F valves, F4F valves, the E4E valves, the F1F valves, the M3M valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, M5M valves connect to form AA cold liquid extractions circuit by pipeline;
The cold liquid of B extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the C2 valves, the A9 valves, the Z3 exchangers, the Z2 exchangers, the F2 valves, the E1 valves, the D1
Valve, the C1 valves, the F3 valves, the F4 valves, the E4 valves, the F1 valves, the M3 valves, the G11 pump, the Z14 from
Scheming, G12 pumps, the M5 valves connect to form B cold liquid extractions circuit by pipeline;
The cold liquid of BB extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
M7M valves, the D2D valves, the C2C valves, the A9A valves, the Z3Z exchangers, the Z2Z exchangers, the F2F valves, institute
State E1E valves, the D1D valves, the C1C valves, the F3F valves, the F4F valves, the E4E valves, the F1F valves, the M3M
Valve, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the cold liquid extractions of BB by pipeline
Circuit;
The cold liquid of C extracts system out and includes:The D5 valves, the Z6 filters, the M2 valves, the C4 valves, the M7 valves,
The D2 valves, the C2 valves, the Z3 exchangers, the Z2 exchangers, the F2 valves, the E1 valves, the D1 valves, the C1
Valve, the Z7 filters, the F3 valves, the F4 valves, the E4 valves, the F1 valves, the M3 valves, the G11 are pumped, are described
Z14 centrifuges, G12 pumps, the M5 valves connect to form C cold liquid extractions circuit by pipeline;
The cold liquid of CC extracts system out and includes:It is the D5D valves, the Z6Z filters, the M2M valves, the C4C valves, described
M7M valves, the D2D valves, the C2C valves, the Z3Z exchangers, the Z2Z exchangers, the F2F valves, the E1E valves, institute
State D1D valves, the C1C valves, the Z7Z filters, the F3F valves, the F4F valves, the E4E valves, the F1F valves, described
M3M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the cold liquid of CC by pipeline
Extract circuit out;
The normal liquid of D extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the A9 valves, the D1 valves, the Z6 filters, the D5 valves, the M2 valves, the M3 valves, the G11 pump,
The Z14 centrifuges, G12 pumps, the M5 valves connect to form B cold liquid extractions circuit by pipeline;
The normal liquid of DD extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
M7M valves, the D2D valves, the A9A valves, the D1D valves, the Z6Z filters, the D5D valves, the M2M valves, the M3M
Valve, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the normal liquid extractions of DD by pipeline
Circuit;
The normal liquid of E extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the A9 valves, the D1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5
Valve connects to form E normal liquid extractions circuit by pipeline;
The normal liquid of EE extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
It is M7M valves, the D2D valves, the A9A valves, the D1D valves, the M3M valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, the M5M valves connect to form EE normal liquid extractions circuit by pipeline;
The normal liquid of F extracts system out and includes:The Z6 filters, the M2 valves, the D5 valves, the C4 valves, the M7 valves,
The D1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5 valves connect to form F by pipeline
Normal liquid extracts circuit out;
The FF liquid extracts system out:It is the Z6Z filters, the M2M valves, the D5D valves, the C4C valves, described
M7M valves, the D1D valves, the M3M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves pass through
Pipeline connects to form FF normal liquid extractions circuit;
The normal liquid of G extracts system out and includes:The Z7 filters, the F3 valves, the F4 valves, the E4 valves, the M3 valves,
The C4 valves, the M7 valves, the D1 valves, the F2 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5
Valve connects to form G normal liquid extractions circuit by pipeline;
The normal liquid of GG extracts system out and includes:It is the Z7Z filters, the F3F valves, the F4F valves, the E4E valves, described
It is M3M valves, the C4C valves, the M7M valves, the D1D valves, the F2F valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, the M5M valves connect to form GG normal liquid extractions circuit by pipeline.
Above system is not put into if any valve, is added according to demand in actual fabrication and operation, can not achieve unification
The valve of instruction is realized using manual opening-closing cooperation.
The present invention can realize that freezing and filtering, room temperature filtering, quickly cooling are handed over automated and semi-automatic operating procedure respectively
Change, speed heat exchange etc. processes use be to select according to demand, operating procedure is described below, before executing each single item system, own
System is all that closed state has reached and waits for service requirement, and the pump element in execution system is opened and closed according to designer's design requirement
(Pump belongs to closed state into pipe path individually in some execution systems), all elements, which have not represented, opens and closes function as exchanged
Device, filter etc..Because equipment operating procedures is more, is not written in patent if any individual links known technology, is solved by designer
It releases, example exhaust valve pipeline gets rid of native device etc..
Execute the Z11 exchangers speed heat swap operation:Start the B cooling water recirculation systems, A refrigerant circulations system
System (or the B coolant circulating systems), start the Z8 refrigeration systems later, the liquid exchanged later is started by pipeline
G10 is pumped into the Z11 exchangers and swaps, and realizes the Z11 exchangers speed heat exchange process;Or start the CC coolings
Water circulation system, the AA coolant circulating systems, start the Z8Z refrigeration systems later, and the liquid exchanged later passes through pipe
The road startup G10 is pumped into the Z11 exchangers and swaps, and realizes the Z11 exchangers speed heat exchange process.
Execute the Z11Z exchangers speed heat swap operation:Start the BB cooling water recirculation systems, the AA refrigerants follow
Loop system (or the BB coolant circulating systems or the CC coolant circulating systems), start the Z8Z refrigeration systems later, it
The liquid exchanged afterwards is pumped into the Z11Z exchangers by pipeline startup G10G and swaps, and realizes the Z11Z exchangers
Speed heat exchange process;Or start the C cooling water recirculation systems, the A coolant circulating systems (or B refrigerant circulations system
System), start the Z8 refrigeration systems later, the liquid exchanged later starts the G10G by pipeline and is pumped into the Z11Z
Exchanger swaps, and realizes the Z11Z exchangers speed heat exchange process.
Execute the Z10 exchangers quickly cooling swap operation:Start the A cooling water recirculation systems(Or the B cooling waters follow
Loop system)With the B coolant circulating systems, start the Z8 refrigeration systems later, the liquid exchanged later is opened by pipeline
Dynamic G8 is pumped into the Z10 exchangers and swaps, and realizes the Z10 exchangers quickly cooling exchange process;Or the startup AA is cold
But water circulation system(Or the BB cooling water recirculation systems)With the BB coolant circulating systems, start the Z8Z refrigeration later
System, the liquid exchanged later, which by pipeline starts the G8 and is pumped into the Z10 exchangers, to be swapped, described in realization
Z10 exchanger quickly cooling exchange process.
Execute the A freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the A to be turned off, Zhi Houqi
The dynamic A filters extension soil series system carries out precoating drainage to the Z4 filters and is situated between, completes and closes, and starts the B filters extension soil later
System carries out precoating drainage to the Z6 filters and is situated between, completes and closes;Start the A cooling water recirculation systems (or institute simultaneously
State B cooling water recirculation systems) and the A coolant circulating systems, start the Z8 refrigeration systems later and carries out cold energy energy storage;Later
Start the A systemic circulations cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, described in closing
A systemic circulation cooling systems, start the A freezing and filtering systems later and the A add-on systems carry out normal filtration.
Execute the operation of bis- freezing and filtering systems of A:Start the cold feed liquor system completion feed liquors of the A to be turned off, start later
The A filters hang soil series system and carry out precoating drainage Jie to the Z4 filters, complete and close, and start B filters later and hang soil series system pair
The Z6 filters, which carry out precoating drainage, to be situated between, completes and close;Starting the AA cooling water recirculation systems simultaneously, (or the BB is cold
But water circulation system) and the CC coolant circulating systems, start the Z8Z refrigeration systems later and carries out cold energy energy storage;Work as later
Cold energy energy storage starts the A systemic circulations cooling system when reaching requirement, later when cooling reaches filtering requirement, close the A
Systemic circulation cooling system, starts the A freezing and filtering systems later and the A add-on systems carry out normal filtration.
Execute the B freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the B to be turned off, it is right later
The A filters hang soil series system and carry out precoating drainage Jie, complete and close;Start the A cooling water recirculation systems simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration systems and carries out cold energy energy storage later;Start institute when cold energy energy storage reaches requirement later
B systemic circulation cooling systems are stated, later when cooling reaches filtering requirement, the B systemic circulations cooling system is closed, starts institute later
It states B freezing and filtering systems and the A add-on systems carries out normal filtration.
Execute the operation of bis- freezing and filtering systems of B:Start the cold feed liquor system completion feed liquors of the B to be turned off, later to institute
A filter extension soil series systems are stated to carry out precoating drainage Jie, complete and close;Start the AA cooling water recirculation systems (or the BB simultaneously
Cooling water recirculation system) and the CC coolant circulating systems, start the Z8Z refrigeration systems later and carries out cold energy energy storage;Later
Start the B systemic circulations cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, described in closing
B systemic circulation cooling systems, start the B freezing and filtering systems later and the A add-on systems carry out normal filtration.
Execute the C freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the C to be turned off, it is right later
The B filters hang soil series system and carry out precoating drainage Jie, complete and close;Start the A cooling water recirculation systems simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration systems and carries out cold energy energy storage later;Start institute when cold energy energy storage reaches requirement later
C systemic circulation cooling systems are stated, later when cooling reaches filtering requirement, the C systemic circulations cooling system is closed, starts institute later
It states C freezing and filtering systems and the B add-on systems carries out normal filtration.
Execute the operation of bis- freezing and filtering systems of C:Start the cold feed liquor system completion feed liquors of the C to be turned off, later to institute
B filter extension soil series systems are stated to carry out precoating drainage Jie, complete and close;Start the AA cooling water recirculation systems (or the BB simultaneously
Cooling water recirculation system) and the CC coolant circulating systems, start the Z8Z refrigeration systems later and carries out cold energy energy storage;Later
Start the C systemic circulations cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, described in closing
C systemic circulation cooling systems, start the C freezing and filtering systems later and the B add-on systems carry out normal filtration.
Execute the D room temperature filtration system operation:Start the normal feed liquor systems of the D, completion feed liquor is turned off, Zhi Houqi
The dynamic A filters extension soil series system carries out precoating drainage to the Z4 filters and is situated between, completes and closes, and starts the B filters extension soil later
System carries out precoating drainage to the Z6 filters and is situated between, completes and closes, and starts the D room temperature filtration system and the A later
Add-on system, into normal filtration.
Execute the E room temperature filtration system operation:Start the normal feed liquor systems of the E, completion feed liquor is turned off, Zhi Houqi
The dynamic A filters extension soil series system carries out precoating drainage to the Z4 filters and is situated between, completes and closes, and starts the E room temperature mistake later
Filter system and the A add-on systems, into normal filtration.
Execute the F room temperature filtration system operation:Start the normal feed liquor systems of the F, completion feed liquor is turned off, Zhi Houqi
The dynamic B filters extension soil series system carries out precoating drainage to the Z6 filters and is situated between, completes and closes, and starts the F room temperature mistake later
Filter system and the B add-on systems, into normal filtration.
Execute the G room temperature filtration system operation:Start the normal feed liquor systems of the G, completion feed liquor is turned off, Zhi Houqi
The dynamic C filters extension soil series system carries out precoating drainage to the Z7 filters and is situated between, completes and closes, and starts the G room temperature mistake later
Filter system, into normal filtration.
Execute the AA freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the AA to be turned off, later
Start the AA filters extension soil series system to carry out precoating drainage Jie to the Z4Z filters, complete and close, starts the BB filters later
Soil series system is hung to carry out precoating drainage Jie to the Z6Z filters, complete and close;Start the AA cooling water recirculation systems simultaneously
(Or the BB cooling water recirculation systems)With the AA coolant circulating systems, starts the Z8Z refrigeration systems later and carry out cold energy
Energy storage;Start the AA systemic circulations cooling system when cold energy energy storage reaches requirement later, later when cooling reaches filtering requirement
When, the AA systemic circulations cooling system is closed, starts the AA freezing and filtering systems later and the AA add-on systems carries out just
Often filtering.
Execute the operation of bis- freezing and filtering systems of AA:Start the cold feed liquor system completion feed liquors of the AA to be turned off, Zhi Houqi
The dynamic AA filters extension soil series system carries out precoating drainage to the Z4Z filters and is situated between, completes and closes, and starts the BB filters extension later
Soil series system carries out precoating drainage to the Z6Z filters and is situated between, completes and closes;Start the A cooling water recirculation systems simultaneously(Or
The B cooling water recirculation systems)With the C coolant circulating systems, starts the Z8 refrigeration systems later and carry out cold energy energy storage;It
Start the AA systemic circulations cooling system when cold energy energy storage reaches requirement afterwards, later when cooling reaches filtering requirement, closes
The AA systemic circulations cooling system, starts the AA freezing and filtering systems later and the AA add-on systems carry out normal filtration.
Execute the BB freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the BB to be turned off, later
Precoating drainage is carried out to AA filter extension soil series systems to be situated between, complete and close;Start the AA cooling water recirculation systems simultaneously(Or institute
State BB cooling water recirculation systems)With the AA coolant circulating systems, starts the Z8Z refrigeration systems later and carry out cold energy energy storage;
Start the BB systemic circulations cooling system when cold energy energy storage reaches requirement later, later when cooling reaches filtering requirement, closes
The BB systemic circulations cooling system is closed, starts the BB freezing and filtering systems later and the AA add-on systems carries out normal mistake
Filter.
Execute the operation of bis- freezing and filtering systems of BB:Start the cold feed liquor system completion feed liquors of the BB to be turned off, it is right later
The AA filters hang soil series system and carry out precoating drainage Jie, complete and close;The startup A cooling water recirculation systems simultaneously(Or the B
Cooling water recirculation system)With the C coolant circulating systems, starts the Z8 refrigeration systems later and carry out cold energy energy storage;Work as later
Cold energy energy storage starts the BB systemic circulations cooling system when reaching requirement, later when cooling reaches filtering requirement, described in closing
BB systemic circulation cooling systems, start the BB freezing and filtering systems later and the AA add-on systems carry out normal filtration.
Execute the CC freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the CC to be turned off, later
Precoating drainage is carried out to BB filter extension soil series systems to be situated between, complete and close;Start the AA cooling water recirculation systems simultaneously(Or institute
State BB cooling water recirculation systems)With the AA coolant circulating systems, starts the Z8Z refrigeration systems later and carry out cold energy energy storage;
Start the CC systemic circulations cooling system when cold energy energy storage reaches requirement later, later when cooling reaches filtering requirement, closes
The CC systemic circulations cooling system is closed, starts the CC freezing and filtering systems later and the BB add-on systems carries out normal mistake
Filter.
Execute the operation of bis- freezing and filtering systems of CC:Start the cold feed liquor system completion feed liquors of the CC to be turned off, it is right later
The BB filters hang soil series system and carry out precoating drainage Jie, complete and close;Start the A cooling water recirculation systems simultaneously(Or the B
Cooling water recirculation system)With the C coolant circulating systems, starts the Z8 refrigeration systems later and carry out cold energy energy storage;Work as later
Cold energy energy storage starts the CC systemic circulations cooling system when reaching requirement, later when cooling reaches filtering requirement, described in closing
CC systemic circulation cooling systems, start the CC freezing and filtering systems later and the BB add-on systems carry out normal filtration.
Execute the DD room temperature filtration system operation:Start the normal feed liquor systems of the DD, complete feed liquor be turned off, later
Start the AA filters extension soil series system to carry out precoating drainage Jie to the Z4Z filters, complete and close, starts the BB filters later
Hang the soil series system precoating drainage carried out to the Z6Z filters and be situated between, complete and close, start later the DD room temperature filtration system and
The AA add-on systems, into normal filtration.
Execute the EE room temperature filtration system operation:Start the normal feed liquor systems of the EE, complete feed liquor be turned off, later
Start the AA filters extension soil series system to carry out precoating drainage Jie to the Z4Z filters, complete and close, it is normal to start the EE later
Warm filtration system and the AA add-on systems, into normal filtration.
Execute the FF room temperature filtration system operation:Start the normal feed liquor systems of the FF, complete feed liquor be turned off, later
Start the BB filters extension soil series system to carry out precoating drainage Jie to the Z6Z filters, complete and close, it is normal to start the FF later
Warm filtration system and the BB add-on systems, into normal filtration.
Execute the GG room temperature filtration system operation:Start the normal feed liquor systems of the GG, complete feed liquor be turned off, later
Start the CC filters extension soil series system to carry out precoating drainage Jie to the Z7Z filters, complete and close, it is normal to start the GG later
Warm filtration system, into normal filtration.
It after filtering, selects according to demand, adaptation starts the A solid-liquid separation systems, the AA is separated by solid-liquid separation system
System, the B solid-liquid separation systems, the BB solid-liquid separation systems, the C solid-liquid separation systems, the CC solid-liquid separation systems,
The cold liquid of A extracts the cold liquid extraction system of system, the AA, the cold liquid extraction systems of the B, the cold liquid extractions of the BB out
The cold liquid extraction system of system, the C, the cold liquid extraction systems of the CC, the normal liquid extraction systems of the D, the normal liquid of the DD
Body extracts the normal liquid extraction system of system, the E out, the normal liquid of the EE extracts the normal liquid extraction system of system, the F out, described
The normal liquid extraction systems of FF, the normal liquid extraction systems of the G, the normal liquid extraction systems of the GG etc., complete separation of solid and liquid and liquid
The techniques such as body extraction.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention;
B2 valves, B2B valves, B4 valves, B4B valves, Z12 cooling towers, Z12Z cooling towers, B1 valves, B1B valves, G6 cooling pumps, G6G cooling pumps,
B6 valves, B6B valves, B3 valves, B3B valves, Z11 exchangers, Z11Z exchangers, E6 valves, E6E valves, B7 valves, B5 valves, A1 valves, A1A valves, Z9
Refrigerant tank, Z9Z refrigerant tanks, A2 valves, A2A valves, G7 refrigerant pumps, G7G refrigerant pumps, A3 valves, Z3 exchangers, Z3Z exchangers, A4 valves,
A4A valves, A7 valves, A7A valves, A5 valves, Z10 exchangers, A6 valves, A8 valves, B8 valves, Z1 shield filter, Z1Z shield filter, C1 valves, C1C valves,
G1 pumps, G1G pumps, Z2 exchangers, Z2Z exchangers, C2 valves, C2C valves, A9 valves, A9A valves, G2 pump, G2G pumps, Z4 filters, Z4Z mistakes
Filter, C3 valves, C3C valves, E5 valves, E5E valves, Z5 agitator tanks, Z5Z agitator tanks, C4 valves, C4C valves, G3 pumps, G3G pumps, Z6 filters,
Z6Z filters, D2 valves, D2D valves, M7 valves, M7M valves, D5 valves, D5D valves, C8 valves, C8C valves, D8 valves, D8D valves, C7 valves, C7C valves,
G4 pumps, G4G pumps, Z7 filters, Z7Z filters, E4 valves, E4E valves, E1 valves, E1E valves, C5 valves, C5C valves, F1 valves, F1F valves, C6
Valve, C6C valves, D1 valves, D1D valves, F2 valves, F2F valves, D4 valves, D4D valves, D3 valves, D3D valves, G5 addition pump, G5G addition pump, D6 valves,
D6D valves, D7 valves, D7D valves, M1 valves, M1M valves, G11 pumps, G11G pumps, Z14 centrifuges, Z14Z centrifuges, G12 pump, G12G pumps, M6
Valve, M6M valves, M2 valves, M2M valves, F3 valves, F3F valves, M3 valves, M3M valves, F4 valves, F4F valves, M5 valves, M5M valves, G8 are pumped, G10 is pumped,
G10G pumps, Z8 refrigeration systems, Z8Z refrigeration systems.
Specific implementation mode
In conjunction with attached drawing and foregoing invention content, the present invention is described in further detail.Referring to Fig.1, mesh of the invention
A kind of double double filter plants of refrigeration of offer, which improves work efficiency, reduces production cost, realize freezing and filtering and fill
The a preparation and a use set, and part homotype element can be replaced and be used, and realize the value that 1+1 is more than 2.
A kind of double double filter plants of refrigeration, including:Z8 refrigeration systems, Z8Z refrigeration systems, A cooling water recirculation systems,
AA cooling water recirculation systems, B cooling water recirculation systems, BB cooling water recirculation systems, C cooling water recirculation systems, CC cooling waters follow
Loop system, A coolant circulating systems, AA coolant circulating systems, B coolant circulating systems, BB coolant circulating systems, C refrigerant circulations system
System, CC coolant circulating systems, the cold feed liquor systems of A, the cold feed liquor systems of AA, the cold feed liquor systems of B, the cold feed liquor systems of BB, the cold feed liquor systems of C
System, the cold feed liquor systems of CC, A filter hang soil series system, soil series system is hung in AA filters, soil series system is hung in B filters, soil series system is hung in BB filters, the soil series is hung in C filters
System, CC filters hang soil series system, A systemic circulations cooling system, AA systemic circulations cooling system, B systemic circulations cooling system, BB systemic circulations cooling
System, C systemic circulations cooling system, CC systemic circulations cooling system, A freezing and filtering systems, AA freezing and filtering systems, B freezing and filterings
The normal feed liquor system of system, BB freezing and filtering systems, C freezing and filtering systems, CC freezing and filtering systems, D, the normal feed liquor systems of DD, E are normal
The normal feed liquor system of feed liquor system, EE, the normal feed liquor systems of F, the normal feed liquor systems of FF, the normal feed liquor systems of G, the normal feed liquor systems of GG, D room temperature
Filtration system, DD room temperature filtration system, E room temperature filtration system, EE room temperature filtration system, F room temperature filtration system, the filtering of FF room temperature
System, G room temperature filtration system, GG room temperature filtration system, A add-on systems, AA add-on systems, B add-on systems, BB add-on systems, A
Solid-liquid separation system, AA solid-liquid separation systems, B solid-liquid separation systems, BB solid-liquid separation systems, C solid-liquid separation systems, CC solid-liquids
The cold liquid extraction system of piece-rate system, A, the cold liquid extraction systems of AA, the cold liquid extraction systems of B, the cold liquid extraction systems of BB, C
Cold liquid extraction system, the cold liquid extraction systems of CC, the normal liquid extraction systems of D, the normal liquid extraction systems of DD, the normal liquid extractions of E
The normal liquid extraction system of system, EE, the normal liquid extraction systems of F, the normal liquid extraction systems of FF, the normal liquid extraction systems of G, the normal liquid of GG
Body extracts system out.
The A cooling water recirculation systems include:B2 valves, B4 valves, Z12 cooling towers, B1 valves, G6 cooling pumps pass through pipeline and institute
The condenser inlet and outlet connection for stating Z8 refrigeration systems forms A cooling water circulation loops;
The AA cooling water recirculation systems include:B2B valves, B4B valves, Z12Z cooling towers, B1B valves, G6G cooling pumps by pipeline with
The condenser inlet and outlet connection of the Z8Z refrigeration systems forms AA cooling water circulation loops;
The B cooling water recirculation systems include:B6 valves, B3 valves, Z11 exchangers, E6 valves, the B4 valves, the Z12 cooling towers,
The B1 valves, the G6 cooling pumps form B cooling waters by the condenser inlet and outlet connection of pipeline and the Z8 refrigeration systems and follow
Loop back path;
The BB cooling water recirculation systems include:B6B valves, B3B valves, Z11Z exchangers, E6E valves, the B4B valves, the Z12Z
Cooling tower, the B1B valves, the G6G cooling pumps are formed by pipeline and the inlet and outlet connection of the condenser of the Z8Z refrigeration systems
BB cooling water circulation loops;
The C cooling water recirculation systems include:The B6 valves, B7 valves, the B3B valves, the Z11Z exchangers, the E6E valves,
B5 valves, the B4 valves, the Z12 cooling towers, the B1 valves, the G6 cooling pumps are cold by pipeline and the Z8 refrigeration systems
Condenser inlet and outlet connection forms C cooling water circulation loops;
The CC cooling water recirculation systems include:The B6B valves, the B7 valves, the B3 valves, the Z11 exchangers, the E6
Valve, the B5 valves, the B4B valves, the Z12Z cooling towers, the B1B valves, the G6G cooling pumps pass through pipeline and the Z8Z
The condenser inlet and outlet connection of refrigeration system forms CC cooling water circulation loops;
The A coolant circulating systems include:A1 valves, Z9 refrigerant tanks, A2 valves, G7 refrigerant pumps, A3 valves, Z3 exchangers, A4 valves, A7 valves
It connect to form A refrigerant circulation circuits with the evaporator inlet-outlet of the Z8 refrigeration systems by pipeline;
The AA coolant circulating systems include:A1A valves, Z9Z refrigerant tanks, A2A valves, G7G refrigerant pumps, Z3Z exchangers, A4A valves,
A7A valves connect to form AA refrigerant circulation circuits by pipeline with the evaporator inlet-outlet of the Z8Z refrigeration systems;
The B coolant circulating systems include:The A1 valves, the Z9 refrigerant tanks, the A2 valves, the G7 refrigerant pumps, A5 valves,
Z10 exchangers, A6 valves, the A7 valves, which are connect by pipeline with the evaporator inlet-outlet of the Z8 refrigeration systems, to be formed B refrigerants and follows
Loop back path;
The BB coolant circulating systems include:The A1A valves, the Z9Z refrigerant tanks, the A2A valves, the G7G refrigerant pumps, A8
Valve, the A5 valves, the Z10 exchangers, the A6 valves, B8 valves, the A7A valves pass through pipeline and the Z8Z refrigeration systems
Evaporator inlet-outlet connects to form BB refrigerant circulation circuits;
The C coolant circulating systems include:The A1 valves, the Z9 refrigerant tanks, the A2 valves, the G7 refrigerant pumps, the A8
The evaporator that valve, the Z3Z exchangers, the A4A valves, the B8 valves, the A7 valves pass through pipeline and the Z8 refrigeration systems
Inlet and outlet connection forms C refrigerant circulation circuits;
The CC coolant circulating systems include:The A1A valves, the Z9Z refrigerant tanks, the A2A valves, the G7G refrigerant pumps, institute
A8 valves, the A3 valves, the Z3 exchangers, the A4 valves, the B8 valves, the A7A valves is stated by pipeline and the Z8Z to freeze
The evaporator inlet-outlet of system connects to form CC refrigerant circulation circuits;
The cold feed liquor systems of A include:Z1 protects filter, C1 valves, G1 pumps, Z2 exchangers, the Z3 exchangers, C2 valves, A9 valves, G2
Pump, Z4 filters, C3 valves, E5 valves, Z5 agitator tanks, C4 valves, G3 pump, Z6 filters connect to form the cold feed liquor circuits A by pipeline;
The cold feed liquor systems of AA include:Z1Z protect filter, C1C valves, G1G pumps, Z2Z exchangers, the Z3Z exchangers, C2C valves,
A9A valves, G2G pumps, Z4Z filters, C3C valves, E5E valves, Z5Z agitator tanks, C4C valves, G3G pump, Z6Z filters are connected by pipeline
Form the cold feed liquor circuits AA;
The cold feed liquor systems of B include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3 are handed over
Parallel operation, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the E5 valves, the Z5 agitator tanks are logical
Piping connects to form the cold feed liquor circuits B;
The cold feed liquor systems of BB include:It is Z1Z shield filter, the C1C valves, G1G pumps, the Z2Z exchangers, described
Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the E5E valves, institute
Z5Z agitator tanks are stated to connect to form the cold feed liquor circuits BB by pipeline;
The cold feed liquor systems of C include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3 are handed over
Parallel operation, the C2 valves, D2 valves, M7 valves, G3 pumps, the Z6 filters, D5 valves, the E5 valves, the Z5 agitator tanks pass through
Pipeline connects to form the cold feed liquor circuits C;
The cold feed liquor systems of CC include:It is Z1Z shield filter, the C1C valves, G1G pumps, the Z2Z exchangers, described
It is Z3Z exchangers, the C2C valves, D2D valves, M7M valves, G3G pumps, the Z6Z filters, D5D valves, the E5E valves, described
Z5Z agitator tanks connect to form the cold feed liquor circuits CC by pipeline;
Soil series system is hung in the A filters:C8 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the E5
Valve, the Z5 agitator tanks connect to form the Z4 filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the AA filters:C8C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, institute
State E5E valves, the Z5Z agitator tanks connect to form the Z4Z filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the B filters:D8 valves, G3 pumps, the Z6 filters, the D5 valves, the E5 valves, the Z5 are stirred
Tank is mixed to connect to form the Z6 filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the BB filters:D8D valves, G3G pumps, the Z6Z filters, the D5D valves, the E5E valves, institute
Z5Z agitator tanks are stated to connect to form the Z6Z filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the C filters:C7 valves, G4 pumps, Z7 filters, E4 valves, the E5 valves, the Z5 agitator tanks pass through pipeline
Connection forms the Z7 filters precoating filter aid circulation loop;
Soil series system is hung in the CC filters:C7C valves, G4G pumps, Z7Z filters, E4E valves, the E5E valves, the Z5Z agitator tanks
It connects to form the Z7Z filters precoating filter aid circulation loop by pipeline;
The A systemic circulations cooling system includes:E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, the A9 valves,
The G2 pumps, the Z4 filters, the C3 valves, the C4 valves, the G3 pump, the Z6 filters, C5 valves, the Z2 are exchanged
Device connects to form A systemic circulations cooling circuit by pipeline;
The AA systemic circulations cooling system includes:It is E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves, described
A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the C4C valves, the G3G pump, the Z6Z filters, C5C
Valve, the Z2Z exchangers connect to form AA systemic circulations cooling circuit by pipeline;
The B systemic circulations cooling system includes:It is the E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, described
A9 valves, G2 pumps, the Z4 filters, the C3 valves, F1 valves, the Z2 exchangers connect to form B systemic circulations by pipeline
Cool down circuit;
The BB systemic circulations cooling system includes:The E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves,
The A9A valves, G2G pumps, the Z4Z filters, the C3C valves, F1F valves, the Z2Z exchangers connect shape by pipeline
At BB systemic circulations cooling circuit;
The C systemic circulations cooling system includes:It is the E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, described
D2 valves, the M7 valves, G3 pumps, the Z6 filters, the C5 valves, the Z2 exchangers connect that form C big by pipeline
Circulation temperature lowering circuit;
The CC systemic circulations cooling system includes:The E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves,
The D2D valves, the M7M valves, G3G pumps, the Z6Z filters, the C5C valves, the Z2Z exchangers are connected by pipeline
It connects to form CC systemic circulations cooling circuit;
The A freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the C4 valves, the G3 pump, institute
State Z6 filters, the C5 valves, the Z2 exchangers, G4 pumps, the Z7 filters, C6 valves connect to form A by pipeline
Freezing and filtering circuit;
The AA freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the C4C valves,
The G3G pumps, the Z6Z filters, the C5C valves, the Z2Z exchangers, the G4G pump, the Z7Z filters, C6C valves
It connects to form AA freezing and filterings circuit by pipeline;
The B freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the F1 valves, the Z2 are exchanged
Device, G4 pumps, the Z7 filters, the C6 valves connect to form B freezing and filterings circuit by pipeline;
The BB freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the F1F valves,
The Z2Z exchangers, G4G pumps, the Z7Z filters, the C6C valves connect to form BB freezing and filterings time by pipeline
Road;
The C freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the D2 valves, the M7 valves, G3 pumps, the Z6 filters, the C5 valves, the Z2 are exchanged
Device, G4 pumps, the Z7 filters, the C6 valves connect to form C freezing and filterings circuit by pipeline;
The CC freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the D2D valves, the M7M valves, G3G pumps, the Z6Z filters, the C5C valves,
The Z2Z exchangers, G4G pumps, the Z7Z filters, the C6C valves connect to form CC freezing and filterings time by pipeline
Road;
The normal feed liquor systems of D include:The Z1 shields filter, D1 valves, the D2 valves, the A9 valves, G2 pumps, the Z4 mistakes
Filter, the C3 valves, the E5 valves, the Z5 agitator tanks, the C4 valves, G3 pumps, the Z6 filters are connected by pipeline
It connects to form the normal feed liquor circuits D;
The normal feed liquor systems of DD include:The Z1Z shields filter, D1D valves, the D2D valves, the A9A valves, G2G pumps, institute
State Z4Z filters, the C3C valves, the E5E valves, the Z5Z agitator tanks, the C4C valves, G3G pumps, Z6Z filterings
Machine connects to form the normal feed liquor circuits DD by pipeline;
The normal feed liquor systems of E include:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, the G2 are pumped, are described
Z4 filters, the C3 valves, the E5 valves, the Z5 agitator tanks piping connect to form the normal feed liquor circuits E;
The normal feed liquor systems of EE include:The Z1Z shields filter, the D1D valves, the D2D valves, the A9A valves, the G2G
Pump, the Z4Z filters, the C3C valves, the E5E valves, the Z5Z agitator tanks piping connect to form the normal feed liquor circuits EE;
The normal feed liquor systems of F include:Z1 shield filter, the D1 valves, the M7 valves, G3 pumps, the Z6 filters,
The D5 valves, the E5 valves, the Z5 agitator tanks connect to form the normal feed liquor circuits F by pipeline;
The normal feed liquor systems of FF include:The Z1Z shields filter, the D1D valves, the M7M valves, G3G pumps, the Z6Z
Filter, the D5D valves, the E5E valves, the Z5Z agitator tanks connect to form the normal feed liquor circuits FF by pipeline;
The normal feed liquor systems of G include:It is Z1 shield filter, the D1 valves, F2 valves, G4 pumps, the Z7 filters, described
E4 valves, the E5 valves, the Z5 agitator tanks connect to form the normal feed liquor circuits G by pipeline;
The normal feed liquor systems of GG include:The Z1Z shields filter, the D1D valves, F2F valves, G4G pumps, Z7Z filterings
Machine, the E4E valves, the E5E valves, the Z5Z agitator tanks connect to form the normal feed liquor circuits GG by pipeline;
The D room temperature filtration system includes:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, G2 pumps, institute
State Z4 filters, the C3 valves, the C4 valves, G3 pumps, the Z6 filters, D4 valves connect to form D room temperature by pipeline
Filtration circuit;
The DD room temperature filtration system includes:It is Z1Z shield filter, the D1D valves, the D2D valves, the A9A valves, described
G2G pumps, the Z4Z filters, the C3C valves, the C4C valves, the G3G pump, the Z6Z filters, D4D valves pass through pipeline
Connection forms DD room temperature filtration circuits;
The E room temperature filtration system includes:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, G2 pumps, institute
State Z4 filters, D3 valves connect to form E room temperature filtration circuits by pipeline;
The EE room temperature filtration system includes:It is Z1Z shield filter, the D1D valves, the D2D valves, the A9A valves, described
G2G pumps, the Z4Z filters, D3D valves connect to form EE room temperature filtration circuits by pipeline;
The F room temperature filtration system includes:The Z1 shields filter, the D1 valves, the M7 valves, G3 pumps, Z6 filterings
Machine, the D4 valves connect to form F room temperature filtration circuits by pipeline;
The FF room temperature filtration system includes:The Z1Z shields filter, the D1D valves, the M7M valves, the G3G are pumped, are described
Z6Z filters, the D4D valves connect to form FF room temperature filtration circuits by pipeline;
The G room temperature filtration system includes:The Z1 shields filter, the D1 valves, the F2 valves, G4 pumps, Z7 filterings
Machine, the C6 valves connect to form G room temperature filtration circuits by pipeline;
The GG room temperature filtration system includes:The Z1Z shields filter, the D1D valves, the F2F valves, the G4G are pumped, are described
Z7Z filters, the C6C valves connect to form GG room temperature filtration circuits by pipeline;
The A add-on systems include:The Z5 agitator tanks, G5 additions pump, D6 valves, the Z4 filters connect to be formed by pipeline
A adds circuit;
The AA add-on systems include:The Z5Z agitator tanks, G5G additions pump, D6D valves, the Z4Z filters are connected by pipeline
It connects to form AA additions circuit;
The B add-on systems include:The Z5 agitator tanks, G5 additions pump, D7 valves, the Z6 filters are connected by pipeline
It forms B and adds circuit.
The BB add-on systems include:The Z5Z agitator tanks, G5G additions pump, D7D valves, the Z6Z filters are logical
Piping connects to form BB additions circuit;
The A solid-liquid separation systems include:M1 valves, G11 pumps, Z14 centrifuges, G12 pump, M6 valves, the D2 valves, the A9 valves,
The G2 pumps, the Z4 filters connect to form A separation of solid and liquid circulation loops by pipeline;
The AA solid-liquid separation systems include:M1M valves, G11G pumps, Z14Z centrifuges, G12G pump, M6M valves, the D2D valves, institute
A9A valves, G2G pumps, the Z4Z filters is stated to connect to form AA separation of solid and liquid circulation loops by pipeline;
The B solid-liquid separation systems include:M2 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M6 valves, institute
M7 valves, G3 pumps, the Z6 filters is stated to connect to form B separation of solid and liquid circulation loops by pipeline;
The BB solid-liquid separation systems include:M2M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M6M
Valve, the M7M valves, G3G pumps, the Z6Z filters connect to form BB separation of solid and liquid circulation loops by pipeline;
The C solid-liquid separation systems include:F3 valves, the E4 valves, M3 valves, G11 pumps, the Z14 centrifuges, the G12
Pump, the M6 valves, the F2 valves, the G4 pump, the Z7 filters connect to form C separation of solid and liquid circulation loops by pipeline.
The CC solid-liquid separation systems include:F3F valves, the E4E valves, M3M valves, G11G pumps, Z14Z centrifugations
Machine, G12G pumps, the M6M valves, the F2F valves, the G4G pump, the Z7Z filters connect that form CC solid by pipeline
Liquid detaches circulation loop;
The cold liquid of A extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the D5 valves, the Z6 mistakes
It is filter, the M2 valves, the C4 valves, the M7 valves, the D2 valves, the C2 valves, the A9 valves, the Z3 exchangers, described
It is Z2 exchangers, the F2 valves, the E1 valves, the D1 valves, the C1 valves, the Z7 filters, the F3 valves, F4 valves, described
E4 valves, the F1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, M5 valves connect to be formed by pipeline
The cold liquid of A extracts circuit out;
The cold liquid of AA extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the D5D valves, described
Z6Z filters, the M2M valves, the C4C valves, the M7M valves, the D2D valves, the C2C valves, the A9A valves, the Z3Z
Exchanger, the Z2Z exchangers, the F2F valves, the E1E valves, the D1D valves, the C1C valves, the Z7Z filters, institute
State F3F valves, F4F valves, the E4E valves, the F1F valves, the M3M valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, M5M valves connect to form AA cold liquid extractions circuit by pipeline;
The cold liquid of B extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the C2 valves, the A9 valves, the Z3 exchangers, the Z2 exchangers, the F2 valves, the E1 valves, the D1
Valve, the C1 valves, the F3 valves, the F4 valves, the E4 valves, the F1 valves, the M3 valves, the G11 pump, the Z14 from
Scheming, G12 pumps, the M5 valves connect to form B cold liquid extractions circuit by pipeline;
The cold liquid of BB extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
M7M valves, the D2D valves, the C2C valves, the A9A valves, the Z3Z exchangers, the Z2Z exchangers, the F2F valves, institute
State E1E valves, the D1D valves, the C1C valves, the F3F valves, the F4F valves, the E4E valves, the F1F valves, the M3M
Valve, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the cold liquid extractions of BB by pipeline
Circuit;
The cold liquid of C extracts system out and includes:The D5 valves, the Z6 filters, the M2 valves, the C4 valves, the M7 valves,
The D2 valves, the C2 valves, the Z3 exchangers, the Z2 exchangers, the F2 valves, the E1 valves, the D1 valves, the C1
Valve, the Z7 filters, the F3 valves, the F4 valves, the E4 valves, the F1 valves, the M3 valves, the G11 are pumped, are described
Z14 centrifuges, G12 pumps, the M5 valves connect to form C cold liquid extractions circuit by pipeline;
The cold liquid of CC extracts system out and includes:It is the D5D valves, the Z6Z filters, the M2M valves, the C4C valves, described
M7M valves, the D2D valves, the C2C valves, the Z3Z exchangers, the Z2Z exchangers, the F2F valves, the E1E valves, institute
State D1D valves, the C1C valves, the Z7Z filters, the F3F valves, the F4F valves, the E4E valves, the F1F valves, described
M3M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the cold liquid of CC by pipeline
Extract circuit out;
The normal liquid of D extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the A9 valves, the D1 valves, the Z6 filters, the D5 valves, the M2 valves, the M3 valves, the G11 pump,
The Z14 centrifuges, G12 pumps, the M5 valves connect to form B cold liquid extractions circuit by pipeline;
The normal liquid of DD extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
M7M valves, the D2D valves, the A9A valves, the D1D valves, the Z6Z filters, the D5D valves, the M2M valves, the M3M
Valve, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the normal liquid extractions of DD by pipeline
Circuit;
The normal liquid of E extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the A9 valves, the D1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5
Valve connects to form E normal liquid extractions circuit by pipeline;
The normal liquid of EE extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
It is M7M valves, the D2D valves, the A9A valves, the D1D valves, the M3M valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, the M5M valves connect to form EE normal liquid extractions circuit by pipeline;
The normal liquid of F extracts system out and includes:The Z6 filters, the M2 valves, the D5 valves, the C4 valves, the M7 valves,
The D1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5 valves connect to form F by pipeline
Normal liquid extracts circuit out;
The FF liquid extracts system out:It is the Z6Z filters, the M2M valves, the D5D valves, the C4C valves, described
M7M valves, the D1D valves, the M3M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves pass through
Pipeline connects to form FF normal liquid extractions circuit;
The normal liquid of G extracts system out and includes:The Z7 filters, the F3 valves, the F4 valves, the E4 valves, the M3 valves,
The C4 valves, the M7 valves, the D1 valves, the F2 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5
Valve connects to form G normal liquid extractions circuit by pipeline;
The normal liquid of GG extracts system out and includes:It is the Z7Z filters, the F3F valves, the F4F valves, the E4E valves, described
It is M3M valves, the C4C valves, the M7M valves, the D1D valves, the F2F valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, the M5M valves connect to form GG normal liquid extractions circuit by pipeline;
Above system is not put into if any valve, is added according to demand in actual fabrication and operation, can not achieve unified instruction
Valve using manual opening-closing cooperation realize.
The present invention can realize that freezing and filtering, room temperature filtering, quickly cooling are handed over automated and semi-automatic operating procedure respectively
Change, speed heat exchange etc. processes use be to select according to demand, operating procedure is described below, before executing each single item system, own
System is all that closed state has reached and waits for service requirement, and the pump element in execution system is opened and closed according to designer's design requirement
(Pump belongs to closed state into pipe path individually in some execution systems), all elements, which have not represented, opens and closes function as exchanged
Device, filter etc..Because equipment operating procedures is more, is not written in patent if any individual links known technology, is solved by designer
It releases, example exhaust valve pipeline gets rid of native device etc..
Execute the Z11 exchangers speed heat swap operation:Start the B cooling water recirculation systems, A refrigerant circulations system
System (or the B coolant circulating systems), start the Z8 refrigeration systems later, the liquid exchanged later is started by pipeline
G10 is pumped into the Z11 exchangers and swaps, and realizes the Z11 exchangers speed heat exchange process;Or start the CC coolings
Water circulation system, the AA coolant circulating systems, start the Z8Z refrigeration systems later, and the liquid exchanged later passes through pipe
The road startup G10 is pumped into the Z11 exchangers and swaps, and realizes the Z11 exchangers speed heat exchange process.
Execute the Z11Z exchangers speed heat swap operation:Start the BB cooling water recirculation systems, the AA refrigerants follow
Loop system (or the BB coolant circulating systems or the CC coolant circulating systems), start the Z8Z refrigeration systems later, it
The liquid exchanged afterwards is pumped into the Z11Z exchangers by pipeline startup G10G and swaps, and realizes the Z11Z exchangers
Speed heat exchange process;Or start the C cooling water recirculation systems, the A coolant circulating systems (or B refrigerant circulations system
System), start the Z8 refrigeration systems later, the liquid exchanged later starts the G10G by pipeline and is pumped into the Z11Z
Exchanger swaps, and realizes the Z11Z exchangers speed heat exchange process.
Execute the Z10 exchangers quickly cooling swap operation:Start the A cooling water recirculation systems(Or the B cooling waters follow
Loop system)With the B coolant circulating systems, start the Z8 refrigeration systems later, the liquid exchanged later is opened by pipeline
Dynamic G8 is pumped into the Z10 exchangers and swaps, and realizes the Z10 exchangers quickly cooling exchange process;Or the startup AA is cold
But water circulation system(Or the BB cooling water recirculation systems)With the BB coolant circulating systems, start the Z8Z refrigeration later
System, the liquid exchanged later, which by pipeline starts the G8 and is pumped into the Z10 exchangers, to be swapped, described in realization
Z10 exchanger quickly cooling exchange process.
Execute the A freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the A to be turned off, Zhi Houqi
The dynamic A filters extension soil series system carries out precoating drainage to the Z4 filters and is situated between, completes and closes, and starts the B filters extension soil later
System carries out precoating drainage to the Z6 filters and is situated between, completes and closes;Start the A cooling water recirculation systems (or institute simultaneously
State B cooling water recirculation systems) and the A coolant circulating systems, start the Z8 refrigeration systems later and carries out cold energy energy storage;Later
Start the A systemic circulations cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, described in closing
A systemic circulation cooling systems, start the A freezing and filtering systems later and the A add-on systems carry out normal filtration.
Execute the operation of bis- freezing and filtering systems of A:Start the cold feed liquor system completion feed liquors of the A to be turned off, start later
The A filters hang soil series system and carry out precoating drainage Jie to the Z4 filters, complete and close, and start B filters later and hang soil series system pair
The Z6 filters, which carry out precoating drainage, to be situated between, completes and close;Starting the AA cooling water recirculation systems simultaneously, (or the BB is cold
But water circulation system) and the CC coolant circulating systems, start the Z8Z refrigeration systems later and carries out cold energy energy storage;Work as later
Cold energy energy storage starts the A systemic circulations cooling system when reaching requirement, later when cooling reaches filtering requirement, close the A
Systemic circulation cooling system, starts the A freezing and filtering systems later and the A add-on systems carry out normal filtration.
Execute the B freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the B to be turned off, it is right later
The A filters hang soil series system and carry out precoating drainage Jie, complete and close;Start the A cooling water recirculation systems simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration systems and carries out cold energy energy storage later;Start institute when cold energy energy storage reaches requirement later
B systemic circulation cooling systems are stated, later when cooling reaches filtering requirement, the B systemic circulations cooling system is closed, starts institute later
It states B freezing and filtering systems and the A add-on systems carries out normal filtration.
Execute the operation of bis- freezing and filtering systems of B:Start the cold feed liquor system completion feed liquors of the B to be turned off, later to institute
A filter extension soil series systems are stated to carry out precoating drainage Jie, complete and close;Start the AA cooling water recirculation systems (or the BB simultaneously
Cooling water recirculation system) and the CC coolant circulating systems, start the Z8Z refrigeration systems later and carries out cold energy energy storage;Later
Start the B systemic circulations cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, described in closing
B systemic circulation cooling systems, start the B freezing and filtering systems later and the A add-on systems carry out normal filtration.
Execute the C freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the C to be turned off, it is right later
The B filters hang soil series system and carry out precoating drainage Jie, complete and close;Start the A cooling water recirculation systems simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration systems and carries out cold energy energy storage later;Start institute when cold energy energy storage reaches requirement later
C systemic circulation cooling systems are stated, later when cooling reaches filtering requirement, the C systemic circulations cooling system is closed, starts institute later
It states C freezing and filtering systems and the B add-on systems carries out normal filtration.
Execute the operation of bis- freezing and filtering systems of C:Start the cold feed liquor system completion feed liquors of the C to be turned off, later to institute
B filter extension soil series systems are stated to carry out precoating drainage Jie, complete and close;Start the AA cooling water recirculation systems (or the BB simultaneously
Cooling water recirculation system) and the CC coolant circulating systems, start the Z8Z refrigeration systems later and carries out cold energy energy storage;Later
Start the C systemic circulations cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, described in closing
C systemic circulation cooling systems, start the C freezing and filtering systems later and the B add-on systems carry out normal filtration.
Execute the D room temperature filtration system operation:Start the normal feed liquor systems of the D, completion feed liquor is turned off, Zhi Houqi
The dynamic A filters extension soil series system carries out precoating drainage to the Z4 filters and is situated between, completes and closes, and starts the B filters extension soil later
System carries out precoating drainage to the Z6 filters and is situated between, completes and closes, and starts the D room temperature filtration system and the A later
Add-on system, into normal filtration.
Execute the E room temperature filtration system operation:Start the normal feed liquor systems of the E, completion feed liquor is turned off, Zhi Houqi
The dynamic A filters extension soil series system carries out precoating drainage to the Z4 filters and is situated between, completes and closes, and starts the E room temperature mistake later
Filter system and the A add-on systems, into normal filtration.
Execute the F room temperature filtration system operation:Start the normal feed liquor systems of the F, completion feed liquor is turned off, Zhi Houqi
The dynamic B filters extension soil series system carries out precoating drainage to the Z6 filters and is situated between, completes and closes, and starts the F room temperature mistake later
Filter system and the B add-on systems, into normal filtration.
Execute the G room temperature filtration system operation:Start the normal feed liquor systems of the G, completion feed liquor is turned off, Zhi Houqi
The dynamic C filters extension soil series system carries out precoating drainage to the Z7 filters and is situated between, completes and closes, and starts the G room temperature mistake later
Filter system, into normal filtration.
Execute the AA freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the AA to be turned off, later
Start the AA filters extension soil series system to carry out precoating drainage Jie to the Z4Z filters, complete and close, starts the BB filters later
Soil series system is hung to carry out precoating drainage Jie to the Z6Z filters, complete and close;Start the AA cooling water recirculation systems simultaneously
(Or the BB cooling water recirculation systems)With the AA coolant circulating systems, starts the Z8Z refrigeration systems later and carry out cold energy
Energy storage;Start the AA systemic circulations cooling system when cold energy energy storage reaches requirement later, later when cooling reaches filtering requirement
When, the AA systemic circulations cooling system is closed, starts the AA freezing and filtering systems later and the AA add-on systems carries out just
Often filtering.
Execute the operation of bis- freezing and filtering systems of AA:Start the cold feed liquor system completion feed liquors of the AA to be turned off, Zhi Houqi
The dynamic AA filters extension soil series system carries out precoating drainage to the Z4Z filters and is situated between, completes and closes, and starts the BB filters extension later
Soil series system carries out precoating drainage to the Z6Z filters and is situated between, completes and closes;Start the A cooling water recirculation systems simultaneously(Or
The B cooling water recirculation systems)With the C coolant circulating systems, starts the Z8 refrigeration systems later and carry out cold energy energy storage;It
Start the AA systemic circulations cooling system when cold energy energy storage reaches requirement afterwards, later when cooling reaches filtering requirement, closes
The AA systemic circulations cooling system, starts the AA freezing and filtering systems later and the AA add-on systems carry out normal filtration.
Execute the BB freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the BB to be turned off, later
Precoating drainage is carried out to AA filter extension soil series systems to be situated between, complete and close;Start the AA cooling water recirculation systems simultaneously(Or institute
State BB cooling water recirculation systems)With the AA coolant circulating systems, starts the Z8Z refrigeration systems later and carry out cold energy energy storage;
Start the BB systemic circulations cooling system when cold energy energy storage reaches requirement later, later when cooling reaches filtering requirement, closes
The BB systemic circulations cooling system is closed, starts the BB freezing and filtering systems later and the AA add-on systems carries out normal mistake
Filter.
Execute the operation of bis- freezing and filtering systems of BB:Start the cold feed liquor system completion feed liquors of the BB to be turned off, it is right later
The AA filters hang soil series system and carry out precoating drainage Jie, complete and close;The startup A cooling water recirculation systems simultaneously(Or the B
Cooling water recirculation system)With the C coolant circulating systems, starts the Z8 refrigeration systems later and carry out cold energy energy storage;Work as later
Cold energy energy storage starts the BB systemic circulations cooling system when reaching requirement, later when cooling reaches filtering requirement, described in closing
BB systemic circulation cooling systems, start the BB freezing and filtering systems later and the AA add-on systems carry out normal filtration.
Execute the CC freezing and filtering systems operation:Start the cold feed liquor system completion feed liquors of the CC to be turned off, later
Precoating drainage is carried out to BB filter extension soil series systems to be situated between, complete and close;Start the AA cooling water recirculation systems simultaneously(Or institute
State BB cooling water recirculation systems)With the AA coolant circulating systems, starts the Z8Z refrigeration systems later and carry out cold energy energy storage;
Start the CC systemic circulations cooling system when cold energy energy storage reaches requirement later, later when cooling reaches filtering requirement, closes
The CC systemic circulations cooling system is closed, starts the CC freezing and filtering systems later and the BB add-on systems carries out normal mistake
Filter.
Execute the operation of bis- freezing and filtering systems of CC:Start the cold feed liquor system completion feed liquors of the CC to be turned off, it is right later
The BB filters hang soil series system and carry out precoating drainage Jie, complete and close;Start the A cooling water recirculation systems simultaneously(Or the B
Cooling water recirculation system)With the C coolant circulating systems, starts the Z8 refrigeration systems later and carry out cold energy energy storage;Work as later
Cold energy energy storage starts the CC systemic circulations cooling system when reaching requirement, later when cooling reaches filtering requirement, described in closing
CC systemic circulation cooling systems, start the CC freezing and filtering systems later and the BB add-on systems carry out normal filtration.
Execute the DD room temperature filtration system operation:Start the normal feed liquor systems of the DD, complete feed liquor be turned off, later
Start the AA filters extension soil series system to carry out precoating drainage Jie to the Z4Z filters, complete and close, starts the BB filters later
Hang the soil series system precoating drainage carried out to the Z6Z filters and be situated between, complete and close, start later the DD room temperature filtration system and
The AA add-on systems, into normal filtration.
Execute the EE room temperature filtration system operation:Start the normal feed liquor systems of the EE, complete feed liquor be turned off, later
Start the AA filters extension soil series system to carry out precoating drainage Jie to the Z4Z filters, complete and close, it is normal to start the EE later
Warm filtration system and the AA add-on systems, into normal filtration.
Execute the FF room temperature filtration system operation:Start the normal feed liquor systems of the FF, complete feed liquor be turned off, later
Start the BB filters extension soil series system to carry out precoating drainage Jie to the Z6Z filters, complete and close, it is normal to start the FF later
Warm filtration system and the BB add-on systems, into normal filtration.
Execute the GG room temperature filtration system operation:Start the normal feed liquor systems of the GG, complete feed liquor be turned off, later
Start the CC filters extension soil series system to carry out precoating drainage Jie to the Z7Z filters, complete and close, it is normal to start the GG later
Warm filtration system, into normal filtration.
It after filtering, selects according to demand, adaptation starts the A solid-liquid separation systems, the AA is separated by solid-liquid separation system
System, the B solid-liquid separation systems, the BB solid-liquid separation systems, the C solid-liquid separation systems, the CC solid-liquid separation systems,
The cold liquid of A extracts the cold liquid extraction system of system, the AA, the cold liquid extraction systems of the B, the cold liquid extractions of the BB out
The cold liquid extraction system of system, the C, the cold liquid extraction systems of the CC, the normal liquid extraction systems of the D, the normal liquid of the DD
Body extracts the normal liquid extraction system of system, the E out, the normal liquid of the EE extracts the normal liquid extraction system of system, the F out, described
The normal liquid extraction systems of FF, the normal liquid extraction systems of the G, the normal liquid extraction systems of the GG etc., complete separation of solid and liquid and liquid
The techniques such as body extraction.
Coordinate manual operation two-in-one system, to it is cumbersome and can unified instruction devise modularization but need to coordinate
Personnel's gathered data carrys out compounding practice, because the pressure difference and flow of filtering flow change all in lasting variation and diatomite additive amount
It requires, also need to the requirements such as the temperature difference to freezing and filtering, the implementation half of artificial detection data is needed to instruction cannot be completely unified
Automation or manualization cooperation, the cooling tower can design using in circulating water temperature adjustable extent voluntarily auto-control unlatching with
It closes, the cooling tower on the water tank, do not mark in view by display touch screen, control power distribution cabinet, module etc.
Go out;Two-in-one control manually is added using automatically controlled and part is automatically controlled to valve portion used, carries out Regulating Pressure of Relief Values automatic protection dress
It sets, the outlet of pump power source is connect with the high pressure port of safety valve, brought with preventing the failure of electric control valve and its violating operation
Big pressure difference bring the possibility of damage to partial devices, the row pressure port connection of safety valve can liquid storage container, to prevent row pressure liquid
The hidden danger that body is lost in and its splash zone comes!Feed liquor and go out at liquid can to design multi-pipeline to valve control, meet a variety of liquid
Transform filter cleaning of body etc..My existing several patented technologies are additionally used simultaneously:Patent of invention title:A kind of automation
Freezing filtration device and its operating method, patent of invention number:201110433647.X patent of invention title:A kind of modularization is low
Warm filter device and its operating method, patent of invention number:201110433715.2 to ensure scientific and technological content and its city of the invention
Field, practical value.
Claims (2)
1. a kind of double filter plants of double refrigeration, which is characterized in that including:Z8 refrigeration systems, Z8Z refrigeration systems, A cooling water circulations
System, AA cooling water recirculation systems, B cooling water recirculation systems, BB cooling water recirculation systems, C cooling water recirculation systems, CC coolings
Water circulation system, A coolant circulating systems, AA coolant circulating systems, B coolant circulating systems, BB coolant circulating systems, C refrigerants follow
The cold feed liquor system of loop system, CC coolant circulating systems, A, the cold feed liquor systems of AA, the cold feed liquor systems of B, the cold feed liquor systems of BB, C it is cold into
The cold feed liquor system of liquid system, CC, A filters hang soil series system, soil series system is hung in AA filters, soil series system is hung in B filters, soil series system is hung in BB filters, soil is hung in C filters
System, CC filters hang soil series system, A systemic circulations cooling system, AA systemic circulations cooling system, B systemic circulations cooling system, BB systemic circulations drop
Warm system, C systemic circulations cooling system, CC systemic circulations cooling system, A freezing and filtering systems, AA freezing and filtering systems, B were freezed
The normal feed liquor system of filter system, BB freezing and filtering systems, C freezing and filtering systems, CC freezing and filtering systems, D, the normal feed liquor systems of DD, E
Normal feed liquor system, the normal feed liquor systems of EE, the normal feed liquor systems of F, the normal feed liquor systems of FF, the normal feed liquor systems of G, the normal feed liquor systems of GG, D are normal
Warm filtration system, DD room temperature filtration system, E room temperature filtration system, EE room temperature filtration system, F room temperature filtration system, FF room temperature mistakes
Filter system, G room temperature filtration system, GG room temperature filtration system, A add-on systems, AA add-on systems, B add-on systems, BB additions system
System, A solid-liquid separation systems, AA solid-liquid separation systems, B solid-liquid separation systems, BB solid-liquid separation systems, C solid-liquid separation systems, CC
The cold liquid extraction system of solid-liquid separation system, A, the cold liquid extraction systems of AA, the cold liquid extraction systems of B, BB cold liquid extractions system
The cold liquid extraction system of system, C, the cold liquid extraction systems of CC, the normal liquid extraction systems of D, the normal liquid extraction systems of DD, the normal liquid of E
The normal liquid extraction system of extraction system, EE, the normal liquid extraction systems of F, the normal liquid extraction systems of FF, the normal liquid extraction systems of G, GG
Normal liquid extracts system out.
2. a kind of double filter plants of double refrigeration according to claim 1, which is characterized in that the A cooling water recirculation systems packet
It includes:B2 valves, B4 valves, Z12 cooling towers, B1 valves, G6 cooling pumps are imported and exported by pipeline and the condenser of the Z8 refrigeration systems to be connected
It connects to form A cooling water circulation loops;
The AA cooling water recirculation systems include:B2B valves, B4B valves, Z12Z cooling towers, B1B valves, G6G cooling pumps by pipeline with
The condenser inlet and outlet connection of the Z8Z refrigeration systems forms AA cooling water circulation loops;
The B cooling water recirculation systems include:B6 valves, B3 valves, Z11 exchangers, E6 valves, the B4 valves, the Z12 cooling towers,
The B1 valves, the G6 cooling pumps form B cooling waters by the condenser inlet and outlet connection of pipeline and the Z8 refrigeration systems and follow
Loop back path;
The BB cooling water recirculation systems include:B6B valves, B3B valves, Z11Z exchangers, E6E valves, the B4B valves, the Z12Z
Cooling tower, the B1B valves, the G6G cooling pumps are formed by pipeline and the inlet and outlet connection of the condenser of the Z8Z refrigeration systems
BB cooling water circulation loops;
The C cooling water recirculation systems include:The B6 valves, B7 valves, the B3B valves, the Z11Z exchangers, the E6E valves,
B5 valves, the B4 valves, the Z12 cooling towers, the B1 valves, the G6 cooling pumps are cold by pipeline and the Z8 refrigeration systems
Condenser inlet and outlet connection forms C cooling water circulation loops;
The CC cooling water recirculation systems include:The B6B valves, the B7 valves, the B3 valves, the Z11 exchangers, the E6
Valve, the B5 valves, the B4B valves, the Z12Z cooling towers, the B1B valves, the G6G cooling pumps pass through pipeline and the Z8Z
The condenser inlet and outlet connection of refrigeration system forms CC cooling water circulation loops;
The A coolant circulating systems include:A1 valves, Z9 refrigerant tanks, A2 valves, G7 refrigerant pumps, A3 valves, Z3 exchangers, A4 valves, A7 valves
It connect to form A refrigerant circulation circuits with the evaporator inlet-outlet of the Z8 refrigeration systems by pipeline;
The AA coolant circulating systems include:A1A valves, Z9Z refrigerant tanks, A2A valves, G7G refrigerant pumps, Z3Z exchangers, A4A valves,
A7A valves connect to form AA refrigerant circulation circuits by pipeline with the evaporator inlet-outlet of the Z8Z refrigeration systems;
The B coolant circulating systems include:The A1 valves, the Z9 refrigerant tanks, the A2 valves, the G7 refrigerant pumps, A5 valves,
Z10 exchangers, A6 valves, the A7 valves, which are connect by pipeline with the evaporator inlet-outlet of the Z8 refrigeration systems, to be formed B refrigerants and follows
Loop back path;
The BB coolant circulating systems include:The A1A valves, the Z9Z refrigerant tanks, the A2A valves, the G7G refrigerant pumps, A8
Valve, the A5 valves, the Z10 exchangers, the A6 valves, B8 valves, the A7A valves pass through pipeline and the Z8Z refrigeration systems
Evaporator inlet-outlet connects to form BB refrigerant circulation circuits;
The C coolant circulating systems include:The A1 valves, the Z9 refrigerant tanks, the A2 valves, the G7 refrigerant pumps, the A8
The evaporator that valve, the Z3Z exchangers, the A4A valves, the B8 valves, the A7 valves pass through pipeline and the Z8 refrigeration systems
Inlet and outlet connection forms C refrigerant circulation circuits;
The CC coolant circulating systems include:The A1A valves, the Z9Z refrigerant tanks, the A2A valves, the G7G refrigerant pumps, institute
A8 valves, the A3 valves, the Z3 exchangers, the A4 valves, the B8 valves, the A7A valves is stated by pipeline and the Z8Z to freeze
The evaporator inlet-outlet of system connects to form CC refrigerant circulation circuits;
The cold feed liquor systems of A include:Z1 protects filter, C1 valves, G1 pumps, Z2 exchangers, the Z3 exchangers, C2 valves, A9 valves, G2
Pump, Z4 filters, C3 valves, E5 valves, Z5 agitator tanks, C4 valves, G3 pump, Z6 filters connect to form the cold feed liquor circuits A by pipeline;
The cold feed liquor systems of AA include:Z1Z protect filter, C1C valves, G1G pumps, Z2Z exchangers, the Z3Z exchangers, C2C valves,
A9A valves, G2G pumps, Z4Z filters, C3C valves, E5E valves, Z5Z agitator tanks, C4C valves, G3G pump, Z6Z filters are connected by pipeline
Form the cold feed liquor circuits AA;
The cold feed liquor systems of B include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3 are handed over
Parallel operation, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the E5 valves, the Z5 agitator tanks are logical
Piping connects to form the cold feed liquor circuits B;
The cold feed liquor systems of BB include:It is Z1Z shield filter, the C1C valves, G1G pumps, the Z2Z exchangers, described
Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the E5E valves, institute
Z5Z agitator tanks are stated to connect to form the cold feed liquor circuits BB by pipeline;
The cold feed liquor systems of C include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3 are handed over
Parallel operation, the C2 valves, D2 valves, M7 valves, G3 pumps, the Z6 filters, D5 valves, the E5 valves, the Z5 agitator tanks pass through
Pipeline connects to form the cold feed liquor circuits C;
The cold feed liquor systems of CC include:It is Z1Z shield filter, the C1C valves, G1G pumps, the Z2Z exchangers, described
It is Z3Z exchangers, the C2C valves, D2D valves, M7M valves, G3G pumps, the Z6Z filters, D5D valves, the E5E valves, described
Z5Z agitator tanks connect to form the cold feed liquor circuits CC by pipeline;
Soil series system is hung in the A filters:C8 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the E5
Valve, the Z5 agitator tanks connect to form the Z4 filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the AA filters:C8C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, institute
State E5E valves, the Z5Z agitator tanks connect to form the Z4Z filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the B filters:D8 valves, G3 pumps, the Z6 filters, the D5 valves, the E5 valves, the Z5 are stirred
Tank is mixed to connect to form the Z6 filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the BB filters:D8D valves, G3G pumps, the Z6Z filters, the D5D valves, the E5E valves, institute
Z5Z agitator tanks are stated to connect to form the Z6Z filters precoating filter aid circulation loop by pipeline;
Soil series system is hung in the C filters:C7 valves, G4 pumps, Z7 filters, E4 valves, the E5 valves, the Z5 agitator tanks pass through pipeline
Connection forms the Z7 filters precoating filter aid circulation loop;
Soil series system is hung in the CC filters:C7C valves, G4G pumps, Z7Z filters, E4E valves, the E5E valves, the Z5Z agitator tanks
It connects to form the Z7Z filters precoating filter aid circulation loop by pipeline;
The A systemic circulations cooling system includes:E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, the A9 valves,
The G2 pumps, the Z4 filters, the C3 valves, the C4 valves, the G3 pump, the Z6 filters, C5 valves, the Z2 are exchanged
Device connects to form A systemic circulations cooling circuit by pipeline;
The AA systemic circulations cooling system includes:It is E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves, described
A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the C4C valves, the G3G pump, the Z6Z filters, C5C
Valve, the Z2Z exchangers connect to form AA systemic circulations cooling circuit by pipeline;
The B systemic circulations cooling system includes:It is the E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, described
A9 valves, G2 pumps, the Z4 filters, the C3 valves, F1 valves, the Z2 exchangers connect to form B systemic circulations by pipeline
Cool down circuit;
The BB systemic circulations cooling system includes:The E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves,
The A9A valves, G2G pumps, the Z4Z filters, the C3C valves, F1F valves, the Z2Z exchangers connect shape by pipeline
At BB systemic circulations cooling circuit;
The C systemic circulations cooling system includes:It is the E1 valves, the Z2 exchangers, the Z3 exchangers, the C2 valves, described
D2 valves, the M7 valves, G3 pumps, the Z6 filters, the C5 valves, the Z2 exchangers connect that form C big by pipeline
Circulation temperature lowering circuit;
The CC systemic circulations cooling system includes:The E1E valves, the Z2Z exchangers, the Z3Z exchangers, the C2C valves,
The D2D valves, the M7M valves, G3G pumps, the Z6Z filters, the C5C valves, the Z2Z exchangers are connected by pipeline
It connects to form CC systemic circulations cooling circuit;
The A freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the C4 valves, the G3 pump, institute
State Z6 filters, the C5 valves, the Z2 exchangers, G4 pumps, the Z7 filters, C6 valves connect to form A by pipeline
Freezing and filtering circuit;
The AA freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the C4C valves,
The G3G pumps, the Z6Z filters, the C5C valves, the Z2Z exchangers, the G4G pump, the Z7Z filters, C6C valves
It connects to form AA freezing and filterings circuit by pipeline;
The B freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the A9 valves, G2 pumps, the Z4 filters, the C3 valves, the F1 valves, the Z2 are exchanged
Device, G4 pumps, the Z7 filters, the C6 valves connect to form B freezing and filterings circuit by pipeline;
The BB freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the A9A valves, G2G pumps, the Z4Z filters, the C3C valves, the F1F valves,
The Z2Z exchangers, G4G pumps, the Z7Z filters, the C6C valves connect to form BB freezing and filterings time by pipeline
Road;
The C freezing and filtering systems include:The Z1 shields filter, the C1 valves, G1 pumps, the Z2 exchangers, the Z3
Exchanger, the C2 valves, the D2 valves, the M7 valves, G3 pumps, the Z6 filters, the C5 valves, the Z2 are exchanged
Device, G4 pumps, the Z7 filters, the C6 valves connect to form C freezing and filterings circuit by pipeline;
The CC freezing and filtering systems include:The Z1Z shields filter, the C1C valves, G1G pumps, the Z2Z exchangers, institute
State Z3Z exchangers, the C2C valves, the D2D valves, the M7M valves, G3G pumps, the Z6Z filters, the C5C valves,
The Z2Z exchangers, G4G pumps, the Z7Z filters, the C6C valves connect to form CC freezing and filterings time by pipeline
Road;
The normal feed liquor systems of D include:The Z1 shields filter, D1 valves, the D2 valves, the A9 valves, G2 pumps, the Z4 mistakes
Filter, the C3 valves, the E5 valves, the Z5 agitator tanks, the C4 valves, G3 pumps, the Z6 filters are connected by pipeline
It connects to form the normal feed liquor circuits D;
The normal feed liquor systems of DD include:The Z1Z shields filter, D1D valves, the D2D valves, the A9A valves, G2G pumps, institute
State Z4Z filters, the C3C valves, the E5E valves, the Z5Z agitator tanks, the C4C valves, G3G pumps, Z6Z filterings
Machine connects to form the normal feed liquor circuits DD by pipeline;
The normal feed liquor systems of E include:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, the G2 are pumped, are described
Z4 filters, the C3 valves, the E5 valves, the Z5 agitator tanks piping connect to form the normal feed liquor circuits E;
The normal feed liquor systems of EE include:The Z1Z shields filter, the D1D valves, the D2D valves, the A9A valves, the G2G
Pump, the Z4Z filters, the C3C valves, the E5E valves, the Z5Z agitator tanks piping connect to form the normal feed liquor circuits EE;
The normal feed liquor systems of F include:Z1 shield filter, the D1 valves, the M7 valves, G3 pumps, the Z6 filters,
The D5 valves, the E5 valves, the Z5 agitator tanks connect to form the normal feed liquor circuits F by pipeline;
The normal feed liquor systems of FF include:The Z1Z shields filter, the D1D valves, the M7M valves, G3G pumps, the Z6Z
Filter, the D5D valves, the E5E valves, the Z5Z agitator tanks connect to form the normal feed liquor circuits FF by pipeline;
The normal feed liquor systems of G include:It is Z1 shield filter, the D1 valves, F2 valves, G4 pumps, the Z7 filters, described
E4 valves, the E5 valves, the Z5 agitator tanks connect to form the normal feed liquor circuits G by pipeline;
The normal feed liquor systems of GG include:The Z1Z shields filter, the D1D valves, F2F valves, G4G pumps, Z7Z filterings
Machine, the E4E valves, the E5E valves, the Z5Z agitator tanks connect to form the normal feed liquor circuits GG by pipeline;
The D room temperature filtration system includes:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, G2 pumps, institute
State Z4 filters, the C3 valves, the C4 valves, G3 pumps, the Z6 filters, D4 valves connect to form D room temperature by pipeline
Filtration circuit;
The DD room temperature filtration system includes:It is Z1Z shield filter, the D1D valves, the D2D valves, the A9A valves, described
G2G pumps, the Z4Z filters, the C3C valves, the C4C valves, the G3G pump, the Z6Z filters, D4D valves pass through pipeline
Connection forms DD room temperature filtration circuits;
The E room temperature filtration system includes:The Z1 shields filter, the D1 valves, the D2 valves, the A9 valves, G2 pumps, institute
State Z4 filters, D3 valves connect to form E room temperature filtration circuits by pipeline;
The EE room temperature filtration system includes:It is Z1Z shield filter, the D1D valves, the D2D valves, the A9A valves, described
G2G pumps, the Z4Z filters, D3D valves connect to form EE room temperature filtration circuits by pipeline;
The F room temperature filtration system includes:The Z1 shields filter, the D1 valves, the M7 valves, G3 pumps, Z6 filterings
Machine, the D4 valves connect to form F room temperature filtration circuits by pipeline;
The FF room temperature filtration system includes:The Z1Z shields filter, the D1D valves, the M7M valves, the G3G are pumped, are described
Z6Z filters, the D4D valves connect to form FF room temperature filtration circuits by pipeline;
The G room temperature filtration system includes:The Z1 shields filter, the D1 valves, the F2 valves, G4 pumps, Z7 filterings
Machine, the C6 valves connect to form G room temperature filtration circuits by pipeline;
The GG room temperature filtration system includes:The Z1Z shields filter, the D1D valves, the F2F valves, the G4G are pumped, are described
Z7Z filters, the C6C valves connect to form GG room temperature filtration circuits by pipeline;
The A add-on systems include:The Z5 agitator tanks, G5 additions pump, D6 valves, the Z4 filters connect to be formed by pipeline
A adds circuit;
The AA add-on systems include:The Z5Z agitator tanks, G5G additions pump, D6D valves, the Z4Z filters are connected by pipeline
It connects to form AA additions circuit;
The B add-on systems include:The Z5 agitator tanks, G5 additions pump, D7 valves, the Z6 filters are connected by pipeline
It forms B and adds circuit;
The BB add-on systems include:The Z5Z agitator tanks, G5G additions pump, D7D valves, the Z6Z filters pass through pipe
Road connects to form BB additions circuit;
The A solid-liquid separation systems include:M1 valves, G11 pumps, Z14 centrifuges, G12 pump, M6 valves, the D2 valves, the A9 valves,
The G2 pumps, the Z4 filters connect to form A separation of solid and liquid circulation loops by pipeline;
The AA solid-liquid separation systems include:M1M valves, G11G pumps, Z14Z centrifuges, G12G pump, M6M valves, the D2D valves, institute
A9A valves, G2G pumps, the Z4Z filters is stated to connect to form AA separation of solid and liquid circulation loops by pipeline;
The B solid-liquid separation systems include:M2 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M6 valves, institute
M7 valves, G3 pumps, the Z6 filters is stated to connect to form B separation of solid and liquid circulation loops by pipeline;
The BB solid-liquid separation systems include:M2M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M6M
Valve, the M7M valves, G3G pumps, the Z6Z filters connect to form BB separation of solid and liquid circulation loops by pipeline;
The C solid-liquid separation systems include:F3 valves, the E4 valves, M3 valves, G11 pumps, the Z14 centrifuges, the G12
Pump, the M6 valves, the F2 valves, the G4 pump, the Z7 filters connect to form C separation of solid and liquid circulation loops by pipeline;
The CC solid-liquid separation systems include:F3F valves, the E4E valves, M3M valves, G11G pumps, the Z14Z centrifuges, institute
G12G pumps, the M6M valves, the F2F valves, the G4G pump, the Z7Z filters is stated to connect to form CC solid-liquids point by pipeline
From circulation loop;
The cold liquid of A extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the D5 valves, the Z6 mistakes
It is filter, the M2 valves, the C4 valves, the M7 valves, the D2 valves, the C2 valves, the A9 valves, the Z3 exchangers, described
It is Z2 exchangers, the F2 valves, the E1 valves, the D1 valves, the C1 valves, the Z7 filters, the F3 valves, F4 valves, described
E4 valves, the F1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, M5 valves connect to be formed by pipeline
The cold liquid of A extracts circuit out;
The cold liquid of AA extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the D5D valves, described
Z6Z filters, the M2M valves, the C4C valves, the M7M valves, the D2D valves, the C2C valves, the A9A valves, the Z3Z
Exchanger, the Z2Z exchangers, the F2F valves, the E1E valves, the D1D valves, the C1C valves, the Z7Z filters, institute
State F3F valves, F4F valves, the E4E valves, the F1F valves, the M3M valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, M5M valves connect to form AA cold liquid extractions circuit by pipeline;
The cold liquid of B extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the C2 valves, the A9 valves, the Z3 exchangers, the Z2 exchangers, the F2 valves, the E1 valves, the D1
Valve, the C1 valves, the F3 valves, the F4 valves, the E4 valves, the F1 valves, the M3 valves, the G11 pump, the Z14 from
Scheming, G12 pumps, the M5 valves connect to form B cold liquid extractions circuit by pipeline;
The cold liquid of BB extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
M7M valves, the D2D valves, the C2C valves, the A9A valves, the Z3Z exchangers, the Z2Z exchangers, the F2F valves, institute
State E1E valves, the D1D valves, the C1C valves, the F3F valves, the F4F valves, the E4E valves, the F1F valves, the M3M
Valve, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the cold liquid extractions of BB by pipeline
Circuit;
The cold liquid of C extracts system out and includes:The D5 valves, the Z6 filters, the M2 valves, the C4 valves, the M7 valves,
The D2 valves, the C2 valves, the Z3 exchangers, the Z2 exchangers, the F2 valves, the E1 valves, the D1 valves, the C1
Valve, the Z7 filters, the F3 valves, the F4 valves, the E4 valves, the F1 valves, the M3 valves, the G11 are pumped, are described
Z14 centrifuges, G12 pumps, the M5 valves connect to form C cold liquid extractions circuit by pipeline;
The cold liquid of CC extracts system out and includes:It is the D5D valves, the Z6Z filters, the M2M valves, the C4C valves, described
M7M valves, the D2D valves, the C2C valves, the Z3Z exchangers, the Z2Z exchangers, the F2F valves, the E1E valves, institute
State D1D valves, the C1C valves, the Z7Z filters, the F3F valves, the F4F valves, the E4E valves, the F1F valves, described
M3M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the cold liquid of CC by pipeline
Extract circuit out;
The normal liquid of D extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the A9 valves, the D1 valves, the Z6 filters, the D5 valves, the M2 valves, the M3 valves, the G11 pump,
The Z14 centrifuges, G12 pumps, the M5 valves connect to form B cold liquid extractions circuit by pipeline;
The normal liquid of DD extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
M7M valves, the D2D valves, the A9A valves, the D1D valves, the Z6Z filters, the D5D valves, the M2M valves, the M3M
Valve, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves connect to form the normal liquid extractions of DD by pipeline
Circuit;
The normal liquid of E extracts system out and includes:The Z4 filters, the M1 valves, the C3 valves, the C4 valves, the M7 valves,
The D2 valves, the A9 valves, the D1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5
Valve connects to form E normal liquid extractions circuit by pipeline;
The normal liquid of EE extracts system out and includes:It is the Z4Z filters, the M1M valves, the C3C valves, the C4C valves, described
It is M7M valves, the D2D valves, the A9A valves, the D1D valves, the M3M valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, the M5M valves connect to form EE normal liquid extractions circuit by pipeline;
The normal liquid of F extracts system out and includes:The Z6 filters, the M2 valves, the D5 valves, the C4 valves, the M7 valves,
The D1 valves, the M3 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5 valves connect to form F by pipeline
Normal liquid extracts circuit out;
The FF liquid extracts system out:It is the Z6Z filters, the M2M valves, the D5D valves, the C4C valves, described
M7M valves, the D1D valves, the M3M valves, G11G pumps, the Z14Z centrifuges, the G12G pump, the M5M valves pass through
Pipeline connects to form FF normal liquid extractions circuit;
The normal liquid of G extracts system out and includes:The Z7 filters, the F3 valves, the F4 valves, the E4 valves, the M3 valves,
The C4 valves, the M7 valves, the D1 valves, the F2 valves, G11 pumps, the Z14 centrifuges, the G12 pump, the M5
Valve connects to form G normal liquid extractions circuit by pipeline;
The normal liquid of GG extracts system out and includes:It is the Z7Z filters, the F3F valves, the F4F valves, the E4E valves, described
It is M3M valves, the C4C valves, the M7M valves, the D1D valves, the F2F valves, G11G pumps, the Z14Z centrifuges, described
G12G pumps, the M5M valves connect to form GG normal liquid extractions circuit by pipeline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810780145.6A CN108686421A (en) | 2018-07-16 | 2018-07-16 | A kind of double filter plants of double refrigeration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810780145.6A CN108686421A (en) | 2018-07-16 | 2018-07-16 | A kind of double filter plants of double refrigeration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108686421A true CN108686421A (en) | 2018-10-23 |
Family
ID=63850651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810780145.6A Pending CN108686421A (en) | 2018-07-16 | 2018-07-16 | A kind of double filter plants of double refrigeration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108686421A (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN212067983U (en) * | 2018-07-16 | 2020-12-04 | 高云芝 | Double-refrigeration double-filtering equipment |
-
2018
- 2018-07-16 CN CN201810780145.6A patent/CN108686421A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN212067983U (en) * | 2018-07-16 | 2020-12-04 | 高云芝 | Double-refrigeration double-filtering equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108759201A (en) | A kind of freezing filtration device of double refrigeration systems | |
CN108654197A (en) | A kind of low-temperature filter | |
CN108654206A (en) | A kind of freezing filtration device | |
CN108854239A (en) | It is a kind of to freeze double filter devices | |
CN108619784A (en) | A kind of freezing and filtering equipment | |
CN108771910A (en) | A kind of double filter devices of double refrigeration | |
CN108889022A (en) | It is a kind of to freeze double filter plants | |
CN104848484B (en) | The control method and air conditioner of air conditioner | |
CN108722010A (en) | A kind of integrated form freezing and filtering unit | |
CN108993024A (en) | A kind of quickly cooling technique in freezing and filtering unit | |
CN109331540A (en) | A kind of extraction raffinate treatment process of freezing and filtering unit | |
CN108722012A (en) | A kind of technique of integrated form freezing and filtering unit | |
CN108686421A (en) | A kind of double filter plants of double refrigeration | |
CN108744712A (en) | A kind of freezing and filtering equipment of double refrigeration systems | |
CN108722011A (en) | A kind of filter at low temperature equipment | |
CN212067983U (en) | Double-refrigeration double-filtering equipment | |
CN212091216U (en) | Freezing double-filter device | |
CN212068011U (en) | Double-refrigeration double-filtering device | |
CN108827053A (en) | A kind of thermal energy recycling technique of freezing and filtering unit | |
CN212091270U (en) | Freezing filter equipment | |
CN108889026A (en) | A kind of filtering technique of freezing and filtering unit | |
CN108939660A (en) | A kind of dual system refrigeration process of freezing and filtering unit | |
CN212091209U (en) | Freezing double-filtering equipment | |
CN212091271U (en) | Freezing filtration equipment of two refrigerating system | |
CN212091232U (en) | Low-temperature filtering device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |