CN212091209U - Freezing double-filtering equipment - Google Patents

Freezing double-filtering equipment Download PDF

Info

Publication number
CN212091209U
CN212091209U CN201821124146.7U CN201821124146U CN212091209U CN 212091209 U CN212091209 U CN 212091209U CN 201821124146 U CN201821124146 U CN 201821124146U CN 212091209 U CN212091209 U CN 212091209U
Authority
CN
China
Prior art keywords
valve
filter
pump
exchanger
pipelines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821124146.7U
Other languages
Chinese (zh)
Inventor
薛玉翔
刘叶青
高凌风
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821124146.7U priority Critical patent/CN212091209U/en
Application granted granted Critical
Publication of CN212091209U publication Critical patent/CN212091209U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model provides a freezing two filtration equipment, include: the system comprises a refrigeration system, a cooling water circulation system, a refrigerant circulation system, a cold liquid inlet system, a soil filtration and hanging system, a large circulation cooling system, a freezing and filtering system, a normal liquid inlet system, a normal temperature filtering system adding system, a solid-liquid separation system, a cold liquid extraction system and a normal liquid extraction system; the equipment improves the working efficiency, reduces the production cost, and respectively realizes the processes of freezing filtration, quick cooling, heat energy recovery and the like and the function of a filtration system for standby.

Description

Freezing double-filtering equipment
Technical Field
The utility model relates to a filtration equipment in fluid filtration field, concretely relates to freezing two filtration equipment.
Background
At present, in liquid filtration in the industries of medicine, chemical industry, light industry, beverage and the like, a freezing filter unit in the market realizes that the filtration of filtered liquid is finished at low temperature by single-function freezing and filtration in a connected manner, and multifunctional resources cannot be realized to cause waste; as the freezing and filtering unit equipment is a multi-element combination, equipment element sellers and buyers which are not quick-wear parts are not always reserved, the whole unit is shut down when a single element of the equipment fails in the production process, the whole unit can be produced only after the failure is eliminated, some equipment elements need to be maintained or replaced, but the maintenance or purchase period is 1 week-3 months, so that the production is delayed, and more functions are exerted if the efficiency is improved; because of different liquids, the same filtering system cannot be used for the filtered liquid, and one set of filtering system of the freezing filter unit on the market cannot be met.
Disclosure of Invention
To the problem, the utility model aims at providing a freezing two filtration equipment, this equipment has improved work efficiency, reduction in production cost, has realized respectively that freezing filtration, rapid cooling and processes such as heat recovery and filtration system are equipped with a function.
A freezing double-filtration device comprises a refrigerating system Z8, a cooling water circulation system A, a cooling water circulation system B, a refrigerant circulation system A, a refrigerant circulation system B, a refrigerant circulation system C, a cold liquid inlet system A, a cold liquid inlet system AA, a cold liquid inlet system B, a cold liquid inlet system BB, a cold liquid inlet system CC, a soil filtration and hanging system A, a soil filtration and hanging system AA, a soil filtration and hanging system B, a soil filtration and hanging system BB, a large circulation cooling system A, a large circulation cooling system AA, a large circulation cooling system B, a large circulation cooling system BB, a large circulation cooling system CC, a freezing and filtering system A, a freezing and filtering system AA, a freezing and filtering system B, a freezing and filtering system BB, a freezing and filtering system C, a freezing and filtering system CC, a normal liquid inlet system D, a normal liquid inlet system DD, a normal liquid inlet system B, a cold liquid circulation system C, a cold liquid filtration and, A normal liquid inlet system E, a normal liquid inlet system EE, a normal liquid inlet system F, a normal liquid inlet system FF, a normal liquid inlet system G, a normal liquid inlet system GG, a normal temperature filtration system D, a normal temperature filtration system DD, a normal temperature filtration system E, a normal temperature filtration system EE, a normal temperature filtration system F, a normal temperature filtration system FF, a normal temperature filtration system G, a normal temperature filtration system GG, an addition system A, an addition system AA, an addition system B, an addition system BB, a solid-liquid separation system A, a solid-liquid separation system AA, a solid-liquid separation system B, a solid-liquid separation system BB, a solid-liquid separation system C, a solid-liquid separation system CC, a cold liquid extraction system A, a cold liquid extraction system AA, a cold liquid extraction system B, a cold liquid extraction system BB, a cold liquid extraction system C, a cold liquid extraction system CC, a normal liquid extraction system D, a normal liquid extraction, A normal liquid extraction system EE, a normal liquid extraction system F, a normal liquid extraction system FF, a normal liquid extraction system G and a normal liquid extraction system GG;
the cooling water circulation system A is formed by connecting a valve B2, a cooling tower Z12, a valve B1 and a cooling pump G6 with the inlet and the outlet of a condenser of the refrigeration system Z8 through pipelines;
the cooling water circulation system B is formed by connecting a valve B3, an exchanger Z11, a valve E6, the cooling tower Z12, a valve B1 and the cooling pump G6 with an inlet and an outlet of a condenser of the refrigeration system Z8 through pipelines;
the cooling tower Z12 is respectively connected with a valve B2 and a valve E6 in series;
the refrigerant circulating system A is formed by connecting a valve A1, a refrigerant tank Z9, a valve A2, a refrigerant pump G7, a valve A3, an exchanger Z3 and a valve A4 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant circulation system B is formed by connecting the valve A1, the refrigerant tank Z9, the valve A2, the refrigerant pump G7, the valve A5, the exchanger Z10 and the valve A6 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant pump G7 is respectively connected with the valve A3 and the valve A5 in series;
the refrigerant circulating system C is formed by connecting the valve a1, the refrigerant tank Z9, the valve a2, the refrigerant pump G7, the valve A8, the exchanger Z3Z and the valve a7 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant pump G7 is respectively connected with the valve A8 and the valve A5 in series
The cold liquid inlet system A is formed by connecting a filter protection device Z1, a valve C1, a pump G1, an exchanger Z2, the exchanger Z3, a valve C2, a valve A9, a pump G2, a filter Z4, a valve C3, a valve E5, a stirring tank Z5, a valve C4, a pump G3 and a filter Z6 through pipelines;
the cold liquid inlet system AA is formed by connecting a filter protection device Z1Z, a valve C1C, a pump G1G, the exchanger Z2Z, the exchanger Z3Z, a valve C2C, a valve A9A, a pump G2G, a filter Z4Z, a valve C3C, a valve E5E, an agitator tank Z5Z, a valve C4C, a pump G3G and a filter Z6Z through pipelines;
the cold liquid inlet system B is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines;
the cold liquid inlet system A comprises a cold liquid inlet system B;
the cold liquid inlet system BB is formed by connecting the filter protector Z1Z, the valve C1C, the pump G1G, an exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines;
the cold liquid inlet system AA comprises a cold liquid inlet system BB;
the cold liquid inlet system C is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the cold liquid inlet system CC is formed by connecting the filter protector Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, a valve D2D, a valve M7M, the pump G3G, the filter Z6Z, a valve D5D, the valve E5E and the stirring tank Z5Z through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series;
the filter hanging soil system A is formed by connecting a valve C8, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines, and the filter hanging soil system A is a circulating loop of pre-coated filter aid of the filter Z4;
the filter hanging soil system AA is formed by connecting a valve C8C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z4Z;
the filter hanging soil system B is formed by connecting a valve D8, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines, and the filter hanging soil system B is a circulation loop of pre-coated filter aid of the filter Z6;
the valve E5 is respectively connected with the valve C3 and the valve D5 in series;
the filter suspension system BB is formed by connecting a valve D8D, the pump G3G, the filter Z6Z, the valve D5D, the valve E5E and the stirring tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z6Z;
the filter hanging soil system C is formed by connecting a valve C7, a pump G4, a filter Z7, a valve F4, a valve E4, a valve E5 and the stirring tank Z5 through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z7;
the valve E5 is respectively connected with the valve D5 and the valve E4 in series;
the filter hanging soil system CC is formed by connecting a valve C7C, a pump G4G, a filter Z7Z, a valve F4F, a valve E4E, a valve E5E and an agitator tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z7Z;
the valve E5E is respectively connected with the valve D5D and the valve E4E in series;
the large-circulation cooling system A is formed by connecting a valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6, a valve C5 and the exchanger Z2 through pipelines;
the large-circulation cooling system AA is formed by connecting a valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z, the valve C5C and the exchanger Z2Z through pipelines;
the large circulation cooling system B is formed by connecting the valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve F1 and the exchanger Z2 through pipelines;
the valve C3 is respectively connected with the valve C4 and the valve F1 in series;
the large-circulation cooling system BB is formed by connecting the valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve F1F and the exchanger Z2Z through pipelines;
the valve C3C is respectively connected with the valve C4C and the valve F1F in series;
the large-circulation cooling system C is formed by connecting the valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve C5 and the exchanger Z2 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the major cycle cooling system CC is formed by connecting the valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve D2D, the valve M7M, the pump G3G, the filter Z6Z, the valve C5C and the exchanger Z2Z through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series;
the freezing and filtering system A is formed by connecting the sheath filter Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6, the valve C5, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the freeze filtration system AA is formed by connecting the nutating filter Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z, the valve C5C, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C by pipes;
the freezing and filtering system B is formed by connecting the filter-protecting filter Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve F1, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve C3 is respectively connected with the valve C4 and the valve F1 in series; the freezing and filtering system BB is formed by connecting the strainer Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve F1F, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C by pipelines;
the valve C3C is respectively connected with the valve C4C and the valve F1F in series;
the freezing and filtering system C is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve C5, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the freezing and filtering system CC is formed by connecting the nutating filter Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve D2D, the valve M7M, the pump G3G, the filter Z6Z, the valve C5C, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series; the normal liquid inlet system D is formed by connecting the filter-protecting device Z1, a valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5, the stirring tank Z5, the valve C4, the pump G3 and the filter Z6 through pipelines;
the ordinary liquid system DD is formed by connecting the filter protector Z1Z, a valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E, the stirring tank Z5Z, the valve C4C, the pump G3G and the filter Z6Z through pipelines;
the normal liquid inlet system E is formed by connecting the filter-protecting device Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines;
the normal liquid system D comprises a normal liquid system E;
the ordinary liquid feeding system EE is formed by connecting the filter-protecting device Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines;
the normal liquid system DD comprises a normal liquid system EE;
the ordinary liquid system F is formed by connecting the filter protector Z1, the valve D1, the valve M7, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines;
the valve D1 is respectively connected with the valve D2 and the valve M7 in series;
the normal liquid system FF is formed by connecting the filter protector Z1Z, the valve D1D, the valve M7M, the pump G3G, the filter Z6Z, the valve D5D, the valve E5E and the stirring tank Z5Z through pipelines;
the valve D1D is respectively connected with a valve D2D and a valve M7M in series;
the normal liquid system G is formed by connecting the filter protector Z1, the valve D1, a valve F2, the pump G4, the filter Z7, the valve F4, the valve E4, the valve E5 and the stirring tank Z5 through pipelines;
the valve D1 is respectively connected with the valve M7 and the valve F2 in series;
the ordinary intake system GG is formed by connecting the filter protector Z1Z, the valve D1D, the valve F2F, the pump G4G, the filter Z7Z, the valve F4F, the valve E4E, the valve E5E and the stirring tank Z5Z through pipelines;
the valve D1D is respectively connected in series with the valve M7M and the valve F2F
The normal temperature filtration system D is formed by connecting the filter protector Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6 and the valve D4 through pipelines;
the normal temperature filtering system DD is formed by connecting the filter protector Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z and the valve D4D through pipelines;
the normal temperature filtering system E is formed by connecting the filter protector Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4 and the valve D3 through pipelines;
the filter Z4 is respectively connected with a valve C3 and a valve D3 in series;
the normal temperature filtering system EE is formed by connecting the filter protector Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z and the valve D3D through pipelines;
the filter Z4Z is respectively connected with a valve C3C and a valve D3D in series;
the normal temperature filtering system F is formed by connecting the filter protector Z1, the valve D1, the valve M7, the pump G3, the filter Z6 and the valve D4 through pipelines;
the valve D1 is respectively connected with the valve D2 and the valve M7 in series;
the normal temperature filtering system FF is formed by connecting the filter protector Z1Z, the valve D1D, the valve M7M, the pump G3G, the filter Z6Z and the valve D4D through pipelines;
the valve D1D is respectively connected with a valve D2D and a valve M7M in series;
the normal temperature filtering system G is formed by connecting the filter protector Z1, the valve D1, the valve F2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve D1 is respectively connected with the valve M7 and the valve F2 in series;
the normal temperature filtering system GG is formed by connecting the filter protector Z1Z, the valve D1D, the valve F2F, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C through pipelines;
the valve D1D is respectively connected with the valve M7M and the valve F2F in series;
the adding system A is formed by connecting the stirring tank Z5, an adding pump G5, a valve D6 and the filter Z4 through pipelines;
the adding system AA is formed by connecting the stirring tank Z5Z, an adding pump G5G, a valve D6D and the filter Z4Z through pipelines;
the adding system B is formed by connecting the stirring tank Z5, the adding pump G5, a valve D7 and the filter Z6 through pipelines;
the addition pump G5 is respectively connected with the valve D6 and the valve D7 in series;
the addition system BB is formed by connecting the stirring tank Z5Z, the addition pump G5G, a valve D7D and the filter Z6Z through pipelines;
the addition pump G5G is respectively connected with a valve D6D and a valve D7D in series;
the solid-liquid separation system A is formed by connecting a valve M1, a pump G11, a centrifuge Z14, a pump G12, a valve M6, the valve D2, the valve A9, the pump G2 and the filter Z4 through pipelines;
the solid-liquid separation system AA is formed by connecting a valve M1M, a pump G11G, the centrifuge Z14Z, a pump G12G, a valve M6M, the valve D2D, the valve A9A, the pump G2G and the filter Z4Z through pipelines;
the solid-liquid separation system B is formed by connecting a valve M2, the pump G11, the centrifuge Z14, the pump G12, the valve M6, the valve M7, the pump G3 and the filter Z6 through pipelines;
the valve M6 is respectively connected with the valve D2 and the valve M7 in series;
the solid-liquid separation system BB is formed by connecting a valve M2M, the pump G11G, the centrifuge Z14Z, the pump G12G, the valve M6M, the valve M7M, the pump G3G and the filter Z6Z through pipelines;
the valve M6M is respectively connected with the valve D2D and the valve M7M in series;
the solid-liquid separation system C is formed by connecting a valve F3, the valve E4, a valve M3, the pump G11, the centrifuge Z14, the pump G12, the valve M6, the valve F2, the pump G4 and the filter Z7 through pipelines;
the pump G11 is respectively connected with the valve M2 and the valve M3 in series;
the solid-liquid separation system CC is formed by connecting a valve F3F, the valve E4E, a valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G, the valve M6M, the valve F2F, the pump G4G and the filter Z7Z through pipelines;
the pump G11G is respectively connected with a valve M2M and a valve M3M in series;
said cold liquid withdrawal system A is formed by said filter Z4, said valve M1, said valve C3, said valve D5, said filter Z6, said valve M2, said valve C4, said valve M7, said valve D2, said valve C2, said valve A9, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said filter Z7, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5 being connected by pipes;
said cold liquid withdrawal system AA is formed by said filter Z4Z, said valve M1M, said valve C3C, said valve D5D, said filter Z6Z, said valve M2M, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said valve A9A, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said filter Z7Z, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said centrifuge G11G, said centrifuge Z14Z, said pump G12G, said valve M5M being connected by a pipe;
said cold liquid withdrawal system B is formed by piping connection of said filter Z4, said valve M1, said valve C3, said valve C4, said valve M7, said valve D2, said valve C2, said valve A9, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5;
the valve C3 is respectively connected with the valve D5 and the valve C4 in series;
said cold liquid withdrawal system BB is formed by piping said filter Z4Z, said valve M1M, said valve C3C, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said valve A9A, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said pump G11G, said centrifuge Z14Z, said pump G12G, said valve M5M;
the valve C3C is respectively connected with the valve D5D and the valve C4C in series;
said cold liquid withdrawal system C is formed by piping connection of said valve D5, said filter Z6, said valve M2, said valve C4, said valve M7, said valve D2, said valve C2, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said filter Z7, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5;
the valve F3 is respectively connected with the valve C1 and the filter Z7 in series;
said cold liquid withdrawal system CC is formed by said valve D5D, said filter Z6Z, said valve M2M, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said filter Z7Z, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said pump G11G, said centrifuge Z14Z, said pump G12G, said valve M5M being connected by pipes;
the valve F3F is respectively connected with the valve C1C and the filter Z7Z in series;
the normal liquid pumping system D is formed by connecting the filter Z4, the valve M1, the valve C3, the valve C4, the valve M7, the valve D2, the valve A9, the valve D1, the filter Z6, the valve D5, the valve M2, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the normal liquid suction system DD is formed by connecting the filter Z4Z, the valve M1M, the valve C3C, the valve C4C, the valve M7M, the valve D2D, the valve A9A, the valve D1D, the filter Z6Z, the valve D5D, the valve M2M, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipes;
the normal liquid extraction system E is formed by connecting the filter Z4, the valve M1, the valve C3, the valve C4, the valve M7, the valve D2, the valve A9, the valve D1, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the valve D1 is respectively connected with the filter Z6 and the valve M3 in series;
the normal liquid extraction system EE is formed by connecting the filter Z4Z, the valve M1M, the valve C3C, the valve C4C, the valve M7M, the valve D2D, the valve A9A, the valve D1D, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipelines;
the valve D1D is respectively connected with the filter Z6Z and the valve M3M in series;
the normal liquid extraction system F is formed by connecting the filter Z6, the valve M2, the valve D5, the valve C4, the valve M7, the valve D1, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the valve D1 is respectively connected with the valve A9 and the valve M7 in series;
the liquid extraction system FF is formed by connecting the filter Z6Z, the valve M2M, the valve D5D, the valve C4C, the valve M7M, the valve D1D, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M through pipelines;
the valve D1D is respectively connected with the valve A9A and the valve M7M in series;
the normal liquid extraction system G is formed by connecting the filter Z7, the valve F3, the valve F4, the valve E4, the valve M3, the valve C4, the valve M7, the valve D1, the valve F2, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the pump G11 is respectively connected with a valve M3 and a valve F2 in series;
the normal liquid pumping system GG is formed by connecting the filter Z7Z, the valve F3F, the valve F4F, the valve E4E, the valve M3M, the valve C4C, the valve M7M, the valve D1D, the valve F2F, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipelines;
the pump G11G is connected in series with valve M3M and valve F2F, respectively.
If valves are not listed in the system, the valves are added according to requirements in actual manufacturing and operation, and the valves which cannot realize unified instructions are realized by adopting manual opening and closing matching.
The invention can be realized by automatic and semi-automatic operation processes respectively, the working procedures of freezing filtration, normal temperature filtration, quick cold exchange, quick heat exchange and the like are selected according to requirements, the operation process is described below, before each system is executed, all the systems are in a closed state and meet the requirements to be operated, the opening and closing of pump elements in the execution system are according to the design requirements of designers (individual pumps in some execution systems are in a closed state to form a pipeline passage), all the elements do not represent opening and closing functions such as an exchanger, a filter and the like, if the known technology of individual links is not written in patents, the explanation is explained by the designers such as an exhaust valve pipeline, a soil throwing device and the like.
Performing a rapid heat exchange operation: starting the cooling water circulation system B and the refrigerant circulation system A (or the refrigerant circulation system B or the refrigerant circulation system C), then starting the refrigerating system Z8, and then sending the exchanged liquid into the exchanger Z11 for exchange through a pipeline starting pump G10, so as to realize a rapid heat exchange process.
And (3) executing a rapid cooling exchange operation: and starting the cooling water circulation system A (or the cooling water circulation system B) and the refrigerant circulation system B, then starting the refrigerating system Z8, and then sending the exchanged liquid into the exchanger Z10 for exchange through a pipeline starting pump G8 to realize a quick cooling exchange process.
Performing the freeze filtration system a operation: starting the cold liquid inlet system A to finish liquid inlet and close the cold liquid inlet system A, then starting the soil filtering and hanging system A to perform pre-coating and filter aid on the filter Z4, finishing and closing the filter, and then starting the soil filtering and hanging system B to perform pre-coating and filter aid on the filter Z6, finishing and closing the filter; simultaneously starting the cooling water circulation system A and the refrigerant circulation system A, and then starting the refrigeration system Z8 to store cold energy; and then starting the major cycle cooling system A when the cold energy storage meets the requirement, then closing the major cycle cooling system A when the cooling meets the filtering requirement, and then starting the freezing and filtering system A and the adding system A to carry out normal filtering.
Performing the freeze filtration system B operation: starting the cold liquid inlet system B to finish liquid inlet and close the cold liquid inlet system B, and then pre-coating the soil filtration and suspension system A to aid filtration, finish and close; simultaneously starting the cooling water circulation system A and the refrigerant circulation system A, and then starting the refrigeration system Z8 to store cold energy; and then starting the major cycle cooling system B when the cold energy storage meets the requirement, then closing the major cycle cooling system B when the cooling meets the filtering requirement, and then starting the freezing and filtering system B and the adding system A to carry out normal filtering.
Performing the freeze filtration system C operation: starting the cold liquid inlet system C to finish liquid inlet and close the cold liquid inlet system C, and then pre-coating the soil filtration and suspension system B to assist filtration, finish and close; simultaneously starting the cooling water circulation system A and the refrigerant circulation system A, and then starting the refrigeration system Z8 to store cold energy; and then starting the major cycle cooling system C when the cold energy storage meets the requirement, then closing the major cycle cooling system C when the cooling meets the filtering requirement, and then starting the freezing and filtering system C and the adding system B for normal filtering.
And (3) executing the operation of the normal temperature filtering system D: the normal-temperature liquid feeding system D is started, liquid feeding is completed to close the normal-temperature liquid feeding system D, then the soil covering system A is started to pre-coat and filter aid, finish and close the filter Z4, then the soil covering system B is started to pre-coat and filter aid, finish and close the filter Z6, and then the normal-temperature filtering system D and the adding system A are started to enter normal filtering.
And (3) executing the operation of the normal temperature filtering system E: and starting the normal liquid feeding system E, finishing liquid feeding to close the normal liquid feeding system E, then starting the soil filtering and hanging system A to pre-coat, aid filtering medium, finish and close the filter Z4, and then starting the normal temperature filtering system E and the adding system A to enter normal filtering.
And (3) executing the operation of the normal temperature filtration system F: and starting the normal liquid feeding system F, completing liquid feeding to close the normal liquid feeding system F, then starting the soil filtering and hanging system B to pre-coat, aid filtering medium, complete and close the filter Z6, and then starting the normal temperature filtering system F and the adding system B to enter normal filtering.
And executing the operation of the normal temperature filtration system G: and starting the normal liquid feeding system G, finishing liquid feeding to close the normal liquid feeding system G, then starting the soil filtering and hanging system C to pre-coat, aid filtering medium, finish and close the filter Z7, and then starting the normal temperature filtering system G to enter normal filtering.
After the filtration is finished, the solid-liquid separation system A, the solid-liquid separation system B, the solid-liquid separation system C, the normal liquid extraction system A, the normal liquid extraction system B, the normal liquid extraction system C and the like are adaptively started according to the selection of requirements, and the processes of solid-liquid separation, liquid extraction and the like are completed.
Performing the freeze filtration system AA operation: starting the cold liquid inlet system AA to finish liquid inlet and close the cold liquid inlet system AA, then starting the soil leaching and coating system AA to perform pre-coating and filter aid on the filter Z4Z, finishing and closing the filter, and then starting the soil leaching and coating system BB to perform pre-coating and filter aid on the filter Z6Z, finishing and closing the filter; simultaneously starting the cooling water circulation system A (or the cooling water circulation system B) and the refrigerant circulation system C, and then starting the refrigeration system Z8 to store cold energy; and then starting the large-circulation cooling system AA when the cold energy storage meets the requirement, then closing the large-circulation cooling system AA when the cooling meets the filtering requirement, and then starting the freezing and filtering system AA and the adding system AA to carry out normal filtering.
Performing the freeze filtration system BB operation: starting the cold liquid inlet system BB to finish liquid inlet and closing the cold liquid inlet system BB, and then pre-coating the soil filtration and hanging system AA to assist filtration, finishing and closing; simultaneously starting the cooling water circulation system A (or the cooling water circulation system B) and the refrigerant circulation system C, and then starting the refrigeration system Z8 to store cold energy; and then starting the large-circulation cooling system BB when the cold energy storage meets the requirement, then closing the large-circulation cooling system BB when the cooling meets the filtering requirement, and then starting the freezing and filtering system BB and the adding system AA to carry out normal filtering.
Performing the freeze filtration system CC operation: starting the cold liquid inlet system CC to finish liquid inlet and close the cold liquid inlet system CC, and then pre-coating the soil filtration and hanging system BB for assisting filtration, finishing and closing; starting the cooling water circulation system B and the refrigerant circulation system C at the same time, and then starting the refrigerating system Z8 to store cold energy; and then starting the major cycle cooling system CC when the cold energy storage meets the requirement, then closing the major cycle cooling system CC when the cooling meets the filtering requirement, and then starting the freezing and filtering system CC and the adding system BB for normal filtering.
Executing the operation of the normal temperature filtering system DD: and starting the normal liquid feeding system DD to complete liquid feeding and close the normal liquid feeding system DD, then starting the soil filtering and hanging system AA to pre-coat and aid filtering medium on the filter Z4Z, completing and closing the normal liquid feeding system DD, starting the soil filtering and hanging system BB to pre-coat and aid filtering medium on the filter Z6Z, completing and closing the normal liquid feeding system DD, completing and closing the liquid feeding system AA, and then starting the normal temperature filtration system DD and the adding system AA to perform normal filtration.
Executing the EE operation of the normal temperature filtration system: and starting the normal liquid feeding system EE to feed liquid and close the normal liquid feeding system EE, then starting the soil hanging filtration system AA to pre-coat and aid filtration media for the filter Z4Z, completing and closing the normal liquid feeding system EE and the soil hanging filtration system AA, and then starting the normal temperature filtration system EE and the addition system AA to perform normal filtration.
Executing the FF operation of the normal temperature filtration system: starting the normal liquid feeding system FF, completing liquid feeding and closing the normal liquid feeding system FF, then starting the soil filtering and hanging system BB to pre-coat and aid filtering media, completing and closing the filter Z6Z, and then starting the normal temperature filtering system FF and the adding system BB to enter normal filtering.
Executing the normal temperature filtration system GG operation: the normal liquid inlet system GG is started, liquid inlet is completed to close the normal liquid inlet system GG, then the soil hanging filtering system CC is started to pre-coat filter aid, finish and close the filtering machine Z7Z, and then the normal temperature filtering system GG is started to enter normal filtering.
After the filtration is finished, the solid-liquid separation system AA, the solid-liquid separation system BB, the solid-liquid separation system CC, the normal liquid extraction system AA, the normal liquid extraction system BB, the normal liquid extraction system CC and the like are adaptively started according to the selection of requirements, and the processes of solid-liquid separation, liquid extraction and the like are finished.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
b2 valve, Z12 cooling tower, B1 valve, G6 cooling pump, B3 valve, Z11 exchanger, E6 valve, A1 valve, Z9 refrigerant tank, A2 valve, G7 refrigerant pump, A3 valve, Z3 exchanger, A4 valve, A5 valve, Z10 exchanger, A6 valve, A8 valve, Z3Z exchanger, A7 valve, Z1 strainer, Z1Z strainer, C1 valve, C1C valve, G1 pump, G1G pump, Z2 exchanger, Z2 2 exchanger, C2 valve, C2 2 valve, A9 2 valve, G2 pump, G2 2 pump, Z2 filter, Z364 2 filter, C2 valve, C3 2 valve, E5E 2 valve, Z2 valve, C2 pump, C2 valve, C2 pump, Z2 valve, C2 valve, C2 pump, Z2, C2 valve, 2, C2 valve, C2, Z2, C36, C6C valve, D1 valve, D1D valve, F2 valve, F2F valve, D4 valve, D4D valve, D3 valve, D3D valve, G5 addition pump, G5G addition pump, D6 valve, D6D valve, D7 valve, D7D valve, M1 valve, M1M valve, G11 pump, G11G pump, Z14 centrifuge, Z14Z centrifuge, G12 pump, G12G pump, M6 valve, M6M valve, M2 valve, M2M valve, M3 valve, M3 valve, F3 valve, F3F valve, F4 valve, F4F valve, M3M valve, M5 valve, M5M valve, G8 pump, G10 valve, Z8 refrigeration system.
Detailed Description
The present invention will now be described in further detail with reference to the attached drawings and the above description of the invention. Referring to fig. 1, the present invention provides a freezing double-filtering apparatus, which improves the working efficiency and reduces the production cost, and realizes the functions of freezing filtration, rapid cooling, heat energy recovery and other processes and filtering systems.
A freezing double-filtration device comprises a refrigerating system Z8, a cooling water circulation system A, a cooling water circulation system B, a refrigerant circulation system A, a refrigerant circulation system B, a refrigerant circulation system C, a cold liquid inlet system A, a cold liquid inlet system AA, a cold liquid inlet system B, a cold liquid inlet system BB, a cold liquid inlet system CC, a soil filtration and hanging system A, a soil filtration and hanging system AA, a soil filtration and hanging system B, a soil filtration and hanging system BB, a large circulation cooling system A, a large circulation cooling system AA, a large circulation cooling system B, a large circulation cooling system BB, a large circulation cooling system CC, a freezing and filtering system A, a freezing and filtering system AA, a freezing and filtering system B, a freezing and filtering system BB, a freezing and filtering system C, a freezing and filtering system CC, a normal liquid inlet system D, a normal liquid inlet system DD, a normal liquid inlet system B, a cold liquid circulation system C, a cold liquid filtration and, A normal liquid inlet system E, a normal liquid inlet system EE, a normal liquid inlet system F, a normal liquid inlet system FF, a normal liquid inlet system G, a normal liquid inlet system GG, a normal temperature filtration system D, a normal temperature filtration system DD, a normal temperature filtration system E, a normal temperature filtration system EE, a normal temperature filtration system F, a normal temperature filtration system FF, a normal temperature filtration system G, a normal temperature filtration system GG, an addition system A, an addition system AA, an addition system B, an addition system BB, a solid-liquid separation system A, a solid-liquid separation system AA, a solid-liquid separation system B, a solid-liquid separation system BB, a solid-liquid separation system C, a solid-liquid separation system CC, a cold liquid extraction system A, a cold liquid extraction system AA, a cold liquid extraction system B, a cold liquid extraction system BB, a cold liquid extraction system C, a cold liquid extraction system CC, a normal liquid extraction system D, a normal liquid extraction, A normal liquid extraction system EE, a normal liquid extraction system F, a normal liquid extraction system FF, a normal liquid extraction system G and a normal liquid extraction system GG;
the cooling water circulation system A is formed by connecting a valve B2, a cooling tower Z12, a valve B1 and a cooling pump G6 with the inlet and the outlet of a condenser of the refrigeration system Z8 through pipelines;
the cooling water circulation system B is formed by connecting a valve B3, an exchanger Z11, a valve E6, the cooling tower Z12, a valve B1 and the cooling pump G6 with an inlet and an outlet of a condenser of the refrigeration system Z8 through pipelines;
the cooling tower Z12 is respectively connected with a valve B2 and a valve E6 in series;
the refrigerant circulating system A is formed by connecting a valve A1, a refrigerant tank Z9, a valve A2, a refrigerant pump G7, a valve A3, an exchanger Z3 and a valve A4 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant circulation system B is formed by connecting the valve A1, the refrigerant tank Z9, the valve A2, the refrigerant pump G7, the valve A5, the exchanger Z10 and the valve A6 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant pump G7 is respectively connected with the valve A3 and the valve A5 in series;
the refrigerant circulating system C is formed by connecting the valve a1, the refrigerant tank Z9, the valve a2, the refrigerant pump G7, the valve A8, the exchanger Z3Z and the valve a7 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant pump G7 is respectively connected with the valve A8 and the valve A5 in series
The cold liquid inlet system A is formed by connecting a filter protection device Z1, a valve C1, a pump G1, an exchanger Z2, the exchanger Z3, a valve C2, a valve A9, a pump G2, a filter Z4, a valve C3, a valve E5, a stirring tank Z5, a valve C4, a pump G3 and a filter Z6 through pipelines;
the cold liquid inlet system AA is formed by connecting a filter protection device Z1Z, a valve C1C, a pump G1G, the exchanger Z2Z, the exchanger Z3Z, a valve C2C, a valve A9A, a pump G2G, a filter Z4Z, a valve C3C, a valve E5E, an agitator tank Z5Z, a valve C4C, a pump G3G and a filter Z6Z through pipelines;
the cold liquid inlet system B is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines;
the cold liquid inlet system A comprises a cold liquid inlet system B;
the cold liquid inlet system BB is formed by connecting the filter protector Z1Z, the valve C1C, the pump G1G, an exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines;
the cold liquid inlet system AA comprises a cold liquid inlet system BB;
the cold liquid inlet system C is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the cold liquid inlet system CC is formed by connecting the filter protector Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, a valve D2D, a valve M7M, the pump G3G, the filter Z6Z, a valve D5D, the valve E5E and the stirring tank Z5Z through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series;
the filter hanging soil system A is formed by connecting a valve C8, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines, and the filter hanging soil system A is a circulating loop of pre-coated filter aid of the filter Z4;
the filter hanging soil system AA is formed by connecting a valve C8C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z4Z;
the filter hanging soil system B is formed by connecting a valve D8, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines, and the filter hanging soil system B is a circulation loop of pre-coated filter aid of the filter Z6;
the valve E5 is respectively connected with the valve C3 and the valve D5 in series;
the filter suspension system BB is formed by connecting a valve D8D, the pump G3G, the filter Z6Z, the valve D5D, the valve E5E and the stirring tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z6Z;
the filter hanging soil system C is formed by connecting a valve C7, a pump G4, a filter Z7, a valve F4, a valve E4, a valve E5 and the stirring tank Z5 through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z7;
the valve E5 is respectively connected with the valve D5 and the valve E4 in series;
the filter hanging soil system CC is formed by connecting a valve C7C, a pump G4G, a filter Z7Z, a valve F4F, a valve E4E, a valve E5E and an agitator tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z7Z;
the valve E5E is respectively connected with the valve D5D and the valve E4E in series;
the large-circulation cooling system A is formed by connecting a valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6, a valve C5 and the exchanger Z2 through pipelines;
the large-circulation cooling system AA is formed by connecting a valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z, the valve C5C and the exchanger Z2Z through pipelines;
the large circulation cooling system B is formed by connecting the valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve F1 and the exchanger Z2 through pipelines;
the valve C3 is respectively connected with the valve C4 and the valve F1 in series;
the large-circulation cooling system BB is formed by connecting the valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve F1F and the exchanger Z2Z through pipelines;
the valve C3C is respectively connected with the valve C4C and the valve F1F in series;
the large-circulation cooling system C is formed by connecting the valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve C5 and the exchanger Z2 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the major cycle cooling system CC is formed by connecting the valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve D2D, the valve M7M, the pump G3G, the filter Z6Z, the valve C5C and the exchanger Z2Z through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series;
the freezing and filtering system A is formed by connecting the sheath filter Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6, the valve C5, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the freeze filtration system AA is formed by connecting the nutating filter Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z, the valve C5C, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C by pipes;
the freezing and filtering system B is formed by connecting the filter-protecting filter Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve F1, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve C3 is respectively connected with the valve C4 and the valve F1 in series; the freezing and filtering system BB is formed by connecting the strainer Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve F1F, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C by pipelines;
the valve C3C is respectively connected with the valve C4C and the valve F1F in series;
the freezing and filtering system C is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve C5, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the freezing and filtering system CC is formed by connecting the nutating filter Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve D2D, the valve M7M, the pump G3G, the filter Z6Z, the valve C5C, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series; the normal liquid inlet system D is formed by connecting the filter-protecting device Z1, a valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5, the stirring tank Z5, the valve C4, the pump G3 and the filter Z6 through pipelines;
the ordinary liquid system DD is formed by connecting the filter protector Z1Z, a valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E, the stirring tank Z5Z, the valve C4C, the pump G3G and the filter Z6Z through pipelines;
the normal liquid inlet system E is formed by connecting the filter-protecting device Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines;
the normal liquid system D comprises a normal liquid system E;
the ordinary liquid feeding system EE is formed by connecting the filter-protecting device Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines;
the normal liquid system DD comprises a normal liquid system EE;
the ordinary liquid system F is formed by connecting the filter protector Z1, the valve D1, the valve M7, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines;
the valve D1 is respectively connected with the valve D2 and the valve M7 in series;
the normal liquid system FF is formed by connecting the filter protector Z1Z, the valve D1D, the valve M7M, the pump G3G, the filter Z6Z, the valve D5D, the valve E5E and the stirring tank Z5Z through pipelines;
the valve D1D is respectively connected with a valve D2D and a valve M7M in series;
the normal liquid system G is formed by connecting the filter protector Z1, the valve D1, a valve F2, the pump G4, the filter Z7, the valve F4, the valve E4, the valve E5 and the stirring tank Z5 through pipelines;
the valve D1 is respectively connected with the valve M7 and the valve F2 in series;
the ordinary intake system GG is formed by connecting the filter protector Z1Z, the valve D1D, the valve F2F, the pump G4G, the filter Z7Z, the valve F4F, the valve E4E, the valve E5E and the stirring tank Z5Z through pipelines;
the valve D1D is respectively connected in series with the valve M7M and the valve F2F
The normal temperature filtration system D is formed by connecting the filter protector Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6 and the valve D4 through pipelines;
the normal temperature filtering system DD is formed by connecting the filter protector Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z and the valve D4D through pipelines;
the normal temperature filtering system E is formed by connecting the filter protector Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4 and the valve D3 through pipelines;
the filter Z4 is respectively connected with a valve C3 and a valve D3 in series;
the normal temperature filtering system EE is formed by connecting the filter protector Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z and the valve D3D through pipelines;
the filter Z4Z is respectively connected with a valve C3C and a valve D3D in series;
the normal temperature filtering system F is formed by connecting the filter protector Z1, the valve D1, the valve M7, the pump G3, the filter Z6 and the valve D4 through pipelines;
the valve D1 is respectively connected with the valve D2 and the valve M7 in series;
the normal temperature filtering system FF is formed by connecting the filter protector Z1Z, the valve D1D, the valve M7M, the pump G3G, the filter Z6Z and the valve D4D through pipelines;
the valve D1D is respectively connected with a valve D2D and a valve M7M in series;
the normal temperature filtering system G is formed by connecting the filter protector Z1, the valve D1, the valve F2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve D1 is respectively connected with the valve M7 and the valve F2 in series;
the normal temperature filtering system GG is formed by connecting the filter protector Z1Z, the valve D1D, the valve F2F, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C through pipelines;
the valve D1D is respectively connected with the valve M7M and the valve F2F in series;
the adding system A is formed by connecting the stirring tank Z5, an adding pump G5, a valve D6 and the filter Z4 through pipelines;
the adding system AA is formed by connecting the stirring tank Z5Z, an adding pump G5G, a valve D6D and the filter Z4Z through pipelines;
the adding system B is formed by connecting the stirring tank Z5, the adding pump G5, a valve D7 and the filter Z6 through pipelines;
the addition pump G5 is respectively connected with the valve D6 and the valve D7 in series;
the addition system BB is formed by connecting the stirring tank Z5Z, the addition pump G5G, a valve D7D and the filter Z6Z through pipelines;
the addition pump G5G is respectively connected with a valve D6D and a valve D7D in series;
the solid-liquid separation system A is formed by connecting a valve M1, a pump G11, a centrifuge Z14, a pump G12, a valve M6, the valve D2, the valve A9, the pump G2 and the filter Z4 through pipelines;
the solid-liquid separation system AA is formed by connecting a valve M1M, a pump G11G, the centrifuge Z14Z, a pump G12G, a valve M6M, the valve D2D, the valve A9A, the pump G2G and the filter Z4Z through pipelines;
the solid-liquid separation system B is formed by connecting a valve M2, the pump G11, the centrifuge Z14, the pump G12, the valve M6, the valve M7, the pump G3 and the filter Z6 through pipelines;
the valve M6 is respectively connected with the valve D2 and the valve M7 in series;
the solid-liquid separation system BB is formed by connecting a valve M2M, the pump G11G, the centrifuge Z14Z, the pump G12G, the valve M6M, the valve M7M, the pump G3G and the filter Z6Z through pipelines;
the valve M6M is respectively connected with the valve D2D and the valve M7M in series;
the solid-liquid separation system C is formed by connecting a valve F3, the valve E4, a valve M3, the pump G11, the centrifuge Z14, the pump G12, the valve M6, the valve F2, the pump G4 and the filter Z7 through pipelines;
the pump G11 is respectively connected with the valve M2 and the valve M3 in series;
the solid-liquid separation system CC is formed by connecting a valve F3F, the valve E4E, a valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G, the valve M6M, the valve F2F, the pump G4G and the filter Z7Z through pipelines;
the pump G11G is respectively connected with a valve M2M and a valve M3M in series;
said cold liquid withdrawal system A is formed by said filter Z4, said valve M1, said valve C3, said valve D5, said filter Z6, said valve M2, said valve C4, said valve M7, said valve D2, said valve C2, said valve A9, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said filter Z7, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5 being connected by pipes;
said cold liquid withdrawal system AA is formed by said filter Z4Z, said valve M1M, said valve C3C, said valve D5D, said filter Z6Z, said valve M2M, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said valve A9A, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said filter Z7Z, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said centrifuge G11G, said centrifuge Z14Z, said pump G12G, said valve M5M being connected by a pipe;
said cold liquid withdrawal system B is formed by piping connection of said filter Z4, said valve M1, said valve C3, said valve C4, said valve M7, said valve D2, said valve C2, said valve A9, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5;
the valve C3 is respectively connected with the valve D5 and the valve C4 in series;
said cold liquid withdrawal system BB is formed by piping said filter Z4Z, said valve M1M, said valve C3C, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said valve A9A, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said pump G11G, said centrifuge Z14Z, said pump G12G, said valve M5M;
the valve C3C is respectively connected with the valve D5D and the valve C4C in series;
said cold liquid withdrawal system C is formed by piping connection of said valve D5, said filter Z6, said valve M2, said valve C4, said valve M7, said valve D2, said valve C2, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said filter Z7, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5;
the valve F3 is respectively connected with the valve C1 and the filter Z7 in series;
said cold liquid withdrawal system CC is formed by said valve D5D, said filter Z6Z, said valve M2M, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said filter Z7Z, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said pump G11G, said centrifuge Z14Z, said pump G12G, said valve M5M being connected by pipes;
the valve F3F is respectively connected with the valve C1C and the filter Z7Z in series;
the normal liquid pumping system D is formed by connecting the filter Z4, the valve M1, the valve C3, the valve C4, the valve M7, the valve D2, the valve A9, the valve D1, the filter Z6, the valve D5, the valve M2, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the normal liquid suction system DD is formed by connecting the filter Z4Z, the valve M1M, the valve C3C, the valve C4C, the valve M7M, the valve D2D, the valve A9A, the valve D1D, the filter Z6Z, the valve D5D, the valve M2M, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipes;
the normal liquid extraction system E is formed by connecting the filter Z4, the valve M1, the valve C3, the valve C4, the valve M7, the valve D2, the valve A9, the valve D1, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the valve D1 is respectively connected with the filter Z6 and the valve M3 in series;
the normal liquid extraction system EE is formed by connecting the filter Z4Z, the valve M1M, the valve C3C, the valve C4C, the valve M7M, the valve D2D, the valve A9A, the valve D1D, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipelines;
the valve D1D is respectively connected with the filter Z6Z and the valve M3M in series;
the normal liquid extraction system F is formed by connecting the filter Z6, the valve M2, the valve D5, the valve C4, the valve M7, the valve D1, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the valve D1 is respectively connected with the valve A9 and the valve M7 in series;
the liquid extraction system FF is formed by connecting the filter Z6Z, the valve M2M, the valve D5D, the valve C4C, the valve M7M, the valve D1D, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M through pipelines;
the valve D1D is respectively connected with the valve A9A and the valve M7M in series;
the normal liquid extraction system G is formed by connecting the filter Z7, the valve F3, the valve F4, the valve E4, the valve M3, the valve C4, the valve M7, the valve D1, the valve F2, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the pump G11 is respectively connected with a valve M3 and a valve F2 in series;
the normal liquid pumping system GG is formed by connecting the filter Z7Z, the valve F3F, the valve F4F, the valve E4E, the valve M3M, the valve C4C, the valve M7M, the valve D1D, the valve F2F, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipelines;
the pump G11G is connected in series with valve M3M and valve F2F, respectively.
If valves are not listed in the system, the valves are added according to requirements in actual manufacturing and operation, and the valves which cannot realize unified instructions are realized by adopting manual opening and closing matching.
The invention can be realized by automatic and semi-automatic operation processes respectively, the working procedures of freezing filtration, normal temperature filtration, quick cold exchange, quick heat exchange and the like are selected according to requirements, the operation process is described below, before each system is executed, all the systems are in a closed state and meet the requirements to be operated, the opening and closing of pump elements in the execution system are according to the design requirements of designers (individual pumps in some execution systems are in a closed state to form a pipeline passage), all the elements do not represent opening and closing functions such as an exchanger, a filter and the like, if the known technology of individual links is not written in patents, the explanation is explained by the designers such as an exhaust valve pipeline, a soil throwing device and the like.
Performing a rapid heat exchange operation: starting the cooling water circulation system B and the refrigerant circulation system A (or the refrigerant circulation system B or the refrigerant circulation system C), then starting the refrigerating system Z8, and then sending the exchanged liquid into the exchanger Z11 for exchange through a pipeline starting pump G10, so as to realize a rapid heat exchange process.
And (3) executing a rapid cooling exchange operation: and starting the cooling water circulation system A (or the cooling water circulation system B) and the refrigerant circulation system B, then starting the refrigerating system Z8, and then sending the exchanged liquid into the exchanger Z10 for exchange through a pipeline starting pump G8 to realize a quick cooling exchange process.
Performing the freeze filtration system a operation: starting the cold liquid inlet system A to finish liquid inlet and close the cold liquid inlet system A, then starting the soil filtering and hanging system A to perform pre-coating and filter aid on the filter Z4, finishing and closing the filter, and then starting the soil filtering and hanging system B to perform pre-coating and filter aid on the filter Z6, finishing and closing the filter; simultaneously starting the cooling water circulation system A and the refrigerant circulation system A, and then starting the refrigeration system Z8 to store cold energy; and then starting the major cycle cooling system A when the cold energy storage meets the requirement, then closing the major cycle cooling system A when the cooling meets the filtering requirement, and then starting the freezing and filtering system A and the adding system A to carry out normal filtering.
Performing the freeze filtration system B operation: starting the cold liquid inlet system B to finish liquid inlet and close the cold liquid inlet system B, and then pre-coating the soil filtration and suspension system A to aid filtration, finish and close; simultaneously starting the cooling water circulation system A and the refrigerant circulation system A, and then starting the refrigeration system Z8 to store cold energy; and then starting the major cycle cooling system B when the cold energy storage meets the requirement, then closing the major cycle cooling system B when the cooling meets the filtering requirement, and then starting the freezing and filtering system B and the adding system A to carry out normal filtering.
Performing the freeze filtration system C operation: starting the cold liquid inlet system C to finish liquid inlet and close the cold liquid inlet system C, and then pre-coating the soil filtration and suspension system B to assist filtration, finish and close; simultaneously starting the cooling water circulation system A and the refrigerant circulation system A, and then starting the refrigeration system Z8 to store cold energy; and then starting the major cycle cooling system C when the cold energy storage meets the requirement, then closing the major cycle cooling system C when the cooling meets the filtering requirement, and then starting the freezing and filtering system C and the adding system B for normal filtering.
And (3) executing the operation of the normal temperature filtering system D: the normal-temperature liquid feeding system D is started, liquid feeding is completed to close the normal-temperature liquid feeding system D, then the soil covering system A is started to pre-coat and filter aid, finish and close the filter Z4, then the soil covering system B is started to pre-coat and filter aid, finish and close the filter Z6, and then the normal-temperature filtering system D and the adding system A are started to enter normal filtering.
And (3) executing the operation of the normal temperature filtering system E: and starting the normal liquid feeding system E, finishing liquid feeding to close the normal liquid feeding system E, then starting the soil filtering and hanging system A to pre-coat, aid filtering medium, finish and close the filter Z4, and then starting the normal temperature filtering system E and the adding system A to enter normal filtering.
And (3) executing the operation of the normal temperature filtration system F: and starting the normal liquid feeding system F, completing liquid feeding to close the normal liquid feeding system F, then starting the soil filtering and hanging system B to pre-coat, aid filtering medium, complete and close the filter Z6, and then starting the normal temperature filtering system F and the adding system B to enter normal filtering.
And executing the operation of the normal temperature filtration system G: and starting the normal liquid feeding system G, finishing liquid feeding to close the normal liquid feeding system G, then starting the soil filtering and hanging system C to pre-coat, aid filtering medium, finish and close the filter Z7, and then starting the normal temperature filtering system G to enter normal filtering.
After the filtration is finished, the solid-liquid separation system A, the solid-liquid separation system B, the solid-liquid separation system C, the normal liquid extraction system A, the normal liquid extraction system B, the normal liquid extraction system C and the like are adaptively started according to the selection of requirements, and the processes of solid-liquid separation, liquid extraction and the like are completed.
Performing the freeze filtration system AA operation: starting the cold liquid inlet system AA to finish liquid inlet and close the cold liquid inlet system AA, then starting the soil leaching and coating system AA to perform pre-coating and filter aid on the filter Z4Z, finishing and closing the filter, and then starting the soil leaching and coating system BB to perform pre-coating and filter aid on the filter Z6Z, finishing and closing the filter; simultaneously starting the cooling water circulation system A (or the cooling water circulation system B) and the refrigerant circulation system C, and then starting the refrigeration system Z8 to store cold energy; and then starting the large-circulation cooling system AA when the cold energy storage meets the requirement, then closing the large-circulation cooling system AA when the cooling meets the filtering requirement, and then starting the freezing and filtering system AA and the adding system AA to carry out normal filtering.
Performing the freeze filtration system BB operation: starting the cold liquid inlet system BB to finish liquid inlet and closing the cold liquid inlet system BB, and then pre-coating the soil filtration and hanging system AA to assist filtration, finishing and closing; simultaneously starting the cooling water circulation system A (or the cooling water circulation system B) and the refrigerant circulation system C, and then starting the refrigeration system Z8 to store cold energy; and then starting the large-circulation cooling system BB when the cold energy storage meets the requirement, then closing the large-circulation cooling system BB when the cooling meets the filtering requirement, and then starting the freezing and filtering system BB and the adding system AA to carry out normal filtering.
Performing the freeze filtration system CC operation: starting the cold liquid inlet system CC to finish liquid inlet and close the cold liquid inlet system CC, and then pre-coating the soil filtration and hanging system BB for assisting filtration, finishing and closing; starting the cooling water circulation system B and the refrigerant circulation system C at the same time, and then starting the refrigerating system Z8 to store cold energy; and then starting the major cycle cooling system CC when the cold energy storage meets the requirement, then closing the major cycle cooling system CC when the cooling meets the filtering requirement, and then starting the freezing and filtering system CC and the adding system BB for normal filtering.
Executing the operation of the normal temperature filtering system DD: and starting the normal liquid feeding system DD to complete liquid feeding and close the normal liquid feeding system DD, then starting the soil filtering and hanging system AA to pre-coat and aid filtering medium on the filter Z4Z, completing and closing the normal liquid feeding system DD, starting the soil filtering and hanging system BB to pre-coat and aid filtering medium on the filter Z6Z, completing and closing the normal liquid feeding system DD, completing and closing the liquid feeding system AA, and then starting the normal temperature filtration system DD and the adding system AA to perform normal filtration.
Executing the EE operation of the normal temperature filtration system: and starting the normal liquid feeding system EE to feed liquid and close the normal liquid feeding system EE, then starting the soil hanging filtration system AA to pre-coat and aid filtration media for the filter Z4Z, completing and closing the normal liquid feeding system EE and the soil hanging filtration system AA, and then starting the normal temperature filtration system EE and the addition system AA to perform normal filtration.
Executing the FF operation of the normal temperature filtration system: starting the normal liquid feeding system FF, completing liquid feeding and closing the normal liquid feeding system FF, then starting the soil filtering and hanging system BB to pre-coat and aid filtering media, completing and closing the filter Z6Z, and then starting the normal temperature filtering system FF and the adding system BB to enter normal filtering.
Executing the normal temperature filtration system GG operation: the normal liquid inlet system GG is started, liquid inlet is completed to close the normal liquid inlet system GG, then the soil hanging filtering system CC is started to pre-coat filter aid, finish and close the filtering machine Z7Z, and then the normal temperature filtering system GG is started to enter normal filtering.
After the filtration is finished, the solid-liquid separation system AA, the solid-liquid separation system BB, the solid-liquid separation system CC, the normal liquid extraction system AA, the normal liquid extraction system BB, the normal liquid extraction system CC and the like are adaptively started according to the selection of requirements, and the processes of solid-liquid separation, liquid extraction and the like are finished.
The cooling tower can be designed to automatically control the automatic opening and closing within the adjustable range of circulating water temperature, is arranged above the water storage tank, and displays that a touch screen, a control power distribution cabinet, a module and the like are not marked in a view; the automatic protection device for the constant pressure of the safety valve is implemented by adopting two-in-one control of electric control and partial electric control and manual control on the used valve part, the outlet of the pump power source is connected with the high-pressure port of the safety valve so as to prevent the possibility that the failure of the electric control valve and the large pressure difference caused by the violation of the operation of the electric control valve cause damage to partial devices, and the pressure discharge port of the safety valve is connected with a liquid container capable of storing liquid so as to prevent the loss of the pressure discharge liquid and the hidden danger caused by the splashing of the! The liquid inlet and outlet can be controlled by multi-pipeline directional valves to meet the requirements of conversion, filtration, cleaning and the like of various liquids. Meanwhile, the method also adopts a plurality of patent technologies existing in the inventor: the invention has the patent name: an automatic freezing and filtering device and an operation method thereof, and patent numbers of invention are as follows: 201110433647.X, inventive patent name: a modular low-temperature filtering device and an operation method thereof, and patent numbers of invention are as follows: 201110433715.2 to ensure the technological content and market and practical value of the invention.

Claims (1)

1. A freezing double-filtration device is characterized by comprising a refrigerating system Z8, a cooling water circulation system A, a cooling water circulation system B, a refrigerant circulation system A, a refrigerant circulation system B, a refrigerant circulation system C, a cold liquid inlet system A, a cold liquid inlet system AA, a cold liquid inlet system B, a cold liquid inlet system BB, a cold liquid inlet system C, a cold liquid inlet system CC, a soil filtration and hanging system A, a soil filtration and hanging system AA, a soil filtration and hanging system B, a soil filtration and hanging system BB, a soil filtration and hanging system CC, a large circulation cooling system A, a large circulation cooling system AA, a large circulation cooling system B, a large circulation cooling system C, a large circulation cooling system CC, a freezing and filtration system A, a freezing and filtration system AA, a freezing and filtration system B, a freezing and filtration system BB, a freezing and filtration system C, a freezing and filtration system CC, a normal liquid inlet system D, a normal liquid inlet system, A normal liquid inlet system DD, a normal liquid inlet system E, a normal liquid inlet system EE, a normal liquid inlet system F, a normal liquid inlet system FF, a normal liquid inlet system G, a normal liquid inlet system GG, a normal temperature filtration system D, a normal temperature filtration system DD, a normal temperature filtration system E, a normal temperature filtration system EE, a normal temperature filtration system F, a normal temperature filtration system FF, a normal temperature filtration system G, a normal temperature filtration system GG, an addition system A, an addition system AA, an addition system B, an addition system BB, a solid-liquid separation system A, a solid-liquid separation system AA, a solid-liquid separation system B, a solid-liquid separation system BB, a solid-liquid separation system C, a cold liquid extraction system A, a cold liquid extraction system AA, a cold liquid extraction system B, a cold liquid extraction system BB, a cold liquid extraction system C, a cold liquid extraction system CC, a normal liquid extraction system D, a normal liquid extraction, A normal liquid extraction system E, a normal liquid extraction system EE, a normal liquid extraction system F, a normal liquid extraction system FF, a normal liquid extraction system G and a normal liquid extraction system GG;
the cooling water circulation system A is formed by connecting a valve B2, a cooling tower Z12, a valve B1 and a cooling pump G6 with the inlet and the outlet of a condenser of the refrigeration system Z8 through pipelines;
the cooling water circulation system B is formed by connecting a valve B3, an exchanger Z11, a valve E6, the cooling tower Z12, a valve B1 and the cooling pump G6 with an inlet and an outlet of a condenser of the refrigeration system Z8 through pipelines;
the cooling tower Z12 is respectively connected with a valve B2 and a valve E6 in series;
the refrigerant circulating system A is formed by connecting a valve A1, a refrigerant tank Z9, a valve A2, a refrigerant pump G7, a valve A3, an exchanger Z3 and a valve A4 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant circulation system B is formed by connecting the valve A1, the refrigerant tank Z9, the valve A2, the refrigerant pump G7, the valve A5, the exchanger Z10 and the valve A6 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant pump G7 is respectively connected with the valve A3 and the valve A5 in series;
the refrigerant circulating system C is formed by connecting the valve a1, the refrigerant tank Z9, the valve a2, the refrigerant pump G7, the valve A8, the exchanger Z3Z and the valve a7 with an inlet and an outlet of an evaporator of the refrigeration system Z8 through pipelines;
the refrigerant pump G7 is respectively connected with the valve A8 and the valve A5 in series
The cold liquid inlet system A is formed by connecting a filter protection device Z1, a valve C1, a pump G1, an exchanger Z2, the exchanger Z3, a valve C2, a valve A9, a pump G2, a filter Z4, a valve C3, a valve E5, a stirring tank Z5, a valve C4, a pump G3 and a filter Z6 through pipelines;
the cold liquid inlet system AA is formed by connecting a filter protection device Z1Z, a valve C1C, a pump G1G, the exchanger Z2Z, the exchanger Z3Z, a valve C2C, a valve A9A, a pump G2G, a filter Z4Z, a valve C3C, a valve E5E, an agitator tank Z5Z, a valve C4C, a pump G3G and a filter Z6Z through pipelines;
the cold liquid inlet system B is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines;
the cold liquid inlet system A comprises a cold liquid inlet system B;
the cold liquid inlet system BB is formed by connecting the filter protector Z1Z, the valve C1C, the pump G1G, an exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines;
the cold liquid inlet system AA comprises a cold liquid inlet system BB;
the cold liquid inlet system C is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the cold liquid inlet system CC is formed by connecting the filter protector Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, a valve D2D, a valve M7M, the pump G3G, the filter Z6Z, a valve D5D, the valve E5E and the stirring tank Z5Z through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series;
the filter hanging soil system A is formed by connecting a valve C8, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines, and the filter hanging soil system A is a circulating loop of pre-coated filter aid of the filter Z4;
the filter hanging soil system AA is formed by connecting a valve C8C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z4Z;
the filter hanging soil system B is formed by connecting a valve D8, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines, and the filter hanging soil system B is a circulation loop of pre-coated filter aid of the filter Z6;
the valve E5 is respectively connected with the valve C3 and the valve D5 in series;
the filter suspension system BB is formed by connecting a valve D8D, the pump G3G, the filter Z6Z, the valve D5D, the valve E5E and the stirring tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z6Z;
the filter hanging soil system C is formed by connecting a valve C7, a pump G4, a filter Z7, a valve F4, a valve E4, a valve E5 and the stirring tank Z5 through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z7;
the valve E5 is respectively connected with the valve D5 and the valve E4 in series;
the filter hanging soil system CC is formed by connecting a valve C7C, a pump G4G, a filter Z7Z, a valve F4F, a valve E4E, a valve E5E and an agitator tank Z5Z through pipelines, and is a circulation loop of pre-coated filter aid of the filter Z7Z;
the valve E5E is respectively connected with the valve D5D and the valve E4E in series;
the large-circulation cooling system A is formed by connecting a valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6, a valve C5 and the exchanger Z2 through pipelines;
the large-circulation cooling system AA is formed by connecting a valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z, the valve C5C and the exchanger Z2Z through pipelines;
the large circulation cooling system B is formed by connecting the valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve F1 and the exchanger Z2 through pipelines;
the valve C3 is respectively connected with the valve C4 and the valve F1 in series;
the large-circulation cooling system BB is formed by connecting the valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve F1F and the exchanger Z2Z through pipelines;
the valve C3C is respectively connected with the valve C4C and the valve F1F in series;
the large-circulation cooling system C is formed by connecting the valve E1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve C5 and the exchanger Z2 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the major cycle cooling system CC is formed by connecting the valve E1E, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve D2D, the valve M7M, the pump G3G, the filter Z6Z, the valve C5C and the exchanger Z2Z through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series;
the freezing and filtering system A is formed by connecting the sheath filter Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6, the valve C5, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the freeze filtration system AA is formed by connecting the nutating filter Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z, the valve C5C, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C by pipes;
the freezing and filtering system B is formed by connecting the filter-protecting filter Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve F1, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve C3 is respectively connected with the valve C4 and the valve F1 in series; the freezing and filtering system BB is formed by connecting the strainer Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve F1F, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C by pipelines;
the valve C3C is respectively connected with the valve C4C and the valve F1F in series;
the freezing and filtering system C is formed by connecting the filter-protecting device Z1, the valve C1, the pump G1, the exchanger Z2, the exchanger Z3, the valve C2, the valve D2, the valve M7, the pump G3, the filter Z6, the valve C5, the exchanger Z2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve C2 is respectively connected with the valve A9 and the valve D2 in series;
the freezing and filtering system CC is formed by connecting the nutating filter Z1Z, the valve C1C, the pump G1G, the exchanger Z2Z, the exchanger Z3Z, the valve C2C, the valve D2D, the valve M7M, the pump G3G, the filter Z6Z, the valve C5C, the exchanger Z2Z, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C through pipelines;
the valve C2C is respectively connected with the valve A9A and the valve D2D in series; the normal liquid inlet system D is formed by connecting the filter-protecting device Z1, a valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5, the stirring tank Z5, the valve C4, the pump G3 and the filter Z6 through pipelines;
the ordinary liquid system DD is formed by connecting the filter protector Z1Z, a valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E, the stirring tank Z5Z, the valve C4C, the pump G3G and the filter Z6Z through pipelines;
the normal liquid inlet system E is formed by connecting the filter-protecting device Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve E5 and the stirring tank Z5 through pipelines;
the normal liquid system D comprises a normal liquid system E;
the ordinary liquid feeding system EE is formed by connecting the filter-protecting device Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve E5E and the stirring tank Z5Z through pipelines;
the normal liquid system DD comprises a normal liquid system EE;
the ordinary liquid system F is formed by connecting the filter protector Z1, the valve D1, the valve M7, the pump G3, the filter Z6, the valve D5, the valve E5 and the stirring tank Z5 through pipelines;
the valve D1 is respectively connected with the valve D2 and the valve M7 in series;
the normal liquid system FF is formed by connecting the filter protector Z1Z, the valve D1D, the valve M7M, the pump G3G, the filter Z6Z, the valve D5D, the valve E5E and the stirring tank Z5Z through pipelines;
the valve D1D is respectively connected with a valve D2D and a valve M7M in series;
the normal liquid system G is formed by connecting the filter protector Z1, the valve D1, a valve F2, the pump G4, the filter Z7, the valve F4, the valve E4, the valve E5 and the stirring tank Z5 through pipelines;
the valve D1 is respectively connected with the valve M7 and the valve F2 in series;
the ordinary intake system GG is formed by connecting the filter protector Z1Z, the valve D1D, the valve F2F, the pump G4G, the filter Z7Z, the valve F4F, the valve E4E, the valve E5E and the stirring tank Z5Z through pipelines;
the valve D1D is respectively connected in series with the valve M7M and the valve F2F
The normal temperature filtration system D is formed by connecting the filter protector Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4, the valve C3, the valve C4, the pump G3, the filter Z6 and the valve D4 through pipelines;
the normal temperature filtering system DD is formed by connecting the filter protector Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z, the valve C3C, the valve C4C, the pump G3G, the filter Z6Z and the valve D4D through pipelines;
the normal temperature filtering system E is formed by connecting the filter protector Z1, the valve D1, the valve D2, the valve A9, the pump G2, the filter Z4 and the valve D3 through pipelines;
the filter Z4 is respectively connected with a valve C3 and a valve D3 in series;
the normal temperature filtering system EE is formed by connecting the filter protector Z1Z, the valve D1D, the valve D2D, the valve A9A, the pump G2G, the filter Z4Z and the valve D3D through pipelines;
the filter Z4Z is respectively connected with a valve C3C and a valve D3D in series;
the normal temperature filtering system F is formed by connecting the filter protector Z1, the valve D1, the valve M7, the pump G3, the filter Z6 and the valve D4 through pipelines;
the valve D1 is respectively connected with the valve D2 and the valve M7 in series;
the normal temperature filtering system FF is formed by connecting the filter protector Z1Z, the valve D1D, the valve M7M, the pump G3G, the filter Z6Z and the valve D4D through pipelines;
the valve D1D is respectively connected with a valve D2D and a valve M7M in series;
the normal temperature filtering system G is formed by connecting the filter protector Z1, the valve D1, the valve F2, the pump G4, the filter Z7, the valve F4 and the valve C6 through pipelines;
the valve D1 is respectively connected with the valve M7 and the valve F2 in series;
the normal temperature filtering system GG is formed by connecting the filter protector Z1Z, the valve D1D, the valve F2F, the pump G4G, the filter Z7Z, the valve F4F and the valve C6C through pipelines;
the valve D1D is respectively connected with the valve M7M and the valve F2F in series;
the adding system A is formed by connecting the stirring tank Z5, an adding pump G5, a valve D6 and the filter Z4 through pipelines;
the adding system AA is formed by connecting the stirring tank Z5Z, an adding pump G5G, a valve D6D and the filter Z4Z through pipelines;
the adding system B is formed by connecting the stirring tank Z5, the adding pump G5, a valve D7 and the filter Z6 through pipelines;
the addition pump G5 is respectively connected with the valve D6 and the valve D7 in series;
the addition system BB is formed by connecting the stirring tank Z5Z, the addition pump G5G, a valve D7D and the filter Z6Z through pipelines;
the addition pump G5G is respectively connected with a valve D6D and a valve D7D in series;
the solid-liquid separation system A is formed by connecting a valve M1, a pump G11, a centrifuge Z14, a pump G12, a valve M6, the valve D2, the valve A9, the pump G2 and the filter Z4 through pipelines;
the solid-liquid separation system AA is formed by connecting a valve M1M, a pump G11G, the centrifuge Z14Z, a pump G12G, a valve M6M, the valve D2D, the valve A9A, the pump G2G and the filter Z4Z through pipelines;
the solid-liquid separation system B is formed by connecting a valve M2, the pump G11, the centrifuge Z14, the pump G12, the valve M6, the valve M7, the pump G3 and the filter Z6 through pipelines;
the valve M6 is respectively connected with the valve D2 and the valve M7 in series;
the solid-liquid separation system BB is formed by connecting a valve M2M, the pump G11G, the centrifuge Z14Z, the pump G12G, the valve M6M, the valve M7M, the pump G3G and the filter Z6Z through pipelines;
the valve M6M is respectively connected with the valve D2D and the valve M7M in series;
the solid-liquid separation system C is formed by connecting a valve F3, the valve E4, a valve M3, the pump G11, the centrifuge Z14, the pump G12, the valve M6, the valve F2, the pump G4 and the filter Z7 through pipelines;
the pump G11 is respectively connected with the valve M2 and the valve M3 in series;
the solid-liquid separation system CC is formed by connecting a valve F3F, the valve E4E, a valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G, the valve M6M, the valve F2F, the pump G4G and the filter Z7Z through pipelines;
the pump G11G is respectively connected with a valve M2M and a valve M3M in series;
said cold liquid withdrawal system A is formed by said filter Z4, said valve M1, said valve C3, said valve D5, said filter Z6, said valve M2, said valve C4, said valve M7, said valve D2, said valve C2, said valve A9, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said filter Z7, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5 being connected by pipes;
said cold liquid withdrawal system AA is formed by said filter Z4Z, said valve M1M, said valve C3C, said valve D5D, said filter Z6Z, said valve M2M, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said valve A9A, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said filter Z7Z, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said centrifuge G11G, said centrifuge Z14Z, said pump G12G, said valve M5M being connected by a pipe;
said cold liquid withdrawal system B is formed by piping connection of said filter Z4, said valve M1, said valve C3, said valve C4, said valve M7, said valve D2, said valve C2, said valve A9, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5;
the valve C3 is respectively connected with the valve D5 and the valve C4 in series;
said cold liquid withdrawal system BB is formed by piping said filter Z4Z, said valve M1M, said valve C3C, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said valve A9A, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said pump G11G, said centrifuge Z14Z, said pump G12G, said valve M5M;
the valve C3C is respectively connected with the valve D5D and the valve C4C in series;
said cold liquid withdrawal system C is formed by piping connection of said valve D5, said filter Z6, said valve M2, said valve C4, said valve M7, said valve D2, said valve C2, said exchanger Z3, said exchanger Z2, said valve F2, said valve E1, said valve D1, said valve C1, said filter Z7, said valve F3, said valve F4, said valve E4, said valve F1, said valve M3, said pump G11, said centrifuge Z14, said pump G12, said valve M5;
the valve F3 is respectively connected with the valve C1 and the filter Z7 in series;
said cold liquid withdrawal system CC is formed by said valve D5D, said filter Z6Z, said valve M2M, said valve C4C, said valve M7M, said valve D2D, said valve C2C, said exchanger Z3Z, said exchanger Z2Z, said valve F2F, said valve E1E, said valve D1D, said valve C1C, said filter Z7Z, said valve F3F, said valve F4F, said valve E4E, said valve F1F, said valve M3M, said pump G11G, said centrifuge Z14Z, said pump G12G, said valve M5M being connected by pipes;
the valve F3F is respectively connected with the valve C1C and the filter Z7Z in series;
the normal liquid pumping system D is formed by connecting the filter Z4, the valve M1, the valve C3, the valve C4, the valve M7, the valve D2, the valve A9, the valve D1, the filter Z6, the valve D5, the valve M2, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the normal liquid suction system DD is formed by connecting the filter Z4Z, the valve M1M, the valve C3C, the valve C4C, the valve M7M, the valve D2D, the valve A9A, the valve D1D, the filter Z6Z, the valve D5D, the valve M2M, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipes;
the normal liquid extraction system E is formed by connecting the filter Z4, the valve M1, the valve C3, the valve C4, the valve M7, the valve D2, the valve A9, the valve D1, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the valve D1 is respectively connected with the filter Z6 and the valve M3 in series;
the normal liquid extraction system EE is formed by connecting the filter Z4Z, the valve M1M, the valve C3C, the valve C4C, the valve M7M, the valve D2D, the valve A9A, the valve D1D, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipelines;
the valve D1D is respectively connected with the filter Z6Z and the valve M3M in series;
the normal liquid extraction system F is formed by connecting the filter Z6, the valve M2, the valve D5, the valve C4, the valve M7, the valve D1, the valve M3, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the valve D1 is respectively connected with the valve A9 and the valve M7 in series;
the liquid extraction system FF is formed by connecting the filter Z6Z, the valve M2M, the valve D5D, the valve C4C, the valve M7M, the valve D1D, the valve M3M, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M through pipelines;
the valve D1D is respectively connected with the valve A9A and the valve M7M in series;
the normal liquid extraction system G is formed by connecting the filter Z7, the valve F3, the valve F4, the valve E4, the valve M3, the valve C4, the valve M7, the valve D1, the valve F2, the pump G11, the centrifuge Z14, the pump G12 and the valve M5 through pipelines;
the pump G11 is respectively connected with a valve M3 and a valve F2 in series;
the normal liquid pumping system GG is formed by connecting the filter Z7Z, the valve F3F, the valve F4F, the valve E4E, the valve M3M, the valve C4C, the valve M7M, the valve D1D, the valve F2F, the pump G11G, the centrifuge Z14Z, the pump G12G and the valve M5M by pipelines;
the pump G11G is connected in series with valve M3M and valve F2F, respectively.
CN201821124146.7U 2018-07-16 2018-07-16 Freezing double-filtering equipment Active CN212091209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821124146.7U CN212091209U (en) 2018-07-16 2018-07-16 Freezing double-filtering equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821124146.7U CN212091209U (en) 2018-07-16 2018-07-16 Freezing double-filtering equipment

Publications (1)

Publication Number Publication Date
CN212091209U true CN212091209U (en) 2020-12-08

Family

ID=73620141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821124146.7U Active CN212091209U (en) 2018-07-16 2018-07-16 Freezing double-filtering equipment

Country Status (1)

Country Link
CN (1) CN212091209U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108889022A (en) * 2018-07-16 2018-11-27 高云芝 It is a kind of to freeze double filter plants

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108889022A (en) * 2018-07-16 2018-11-27 高云芝 It is a kind of to freeze double filter plants

Similar Documents

Publication Publication Date Title
CN108654197A (en) A kind of low-temperature filter
CN108759201A (en) A kind of freezing filtration device of double refrigeration systems
CN108654206A (en) A kind of freezing filtration device
CN108854239A (en) It is a kind of to freeze double filter devices
CN212091209U (en) Freezing double-filtering equipment
CN104807368B (en) Water cooled chiller shell-and-tube heat exchanger glueballs automatic on-line cleaning device and method
CN108619784A (en) A kind of freezing and filtering equipment
CN212091216U (en) Freezing double-filter device
CN212067983U (en) Double-refrigeration double-filtering equipment
CN202569788U (en) Energy-saving refrigeration filtering unit
CN212068011U (en) Double-refrigeration double-filtering device
CN212091271U (en) Freezing filtration equipment of two refrigerating system
CN212091232U (en) Low-temperature filtering device
CN212091270U (en) Freezing filter equipment
CN212067995U (en) Freezing filtration equipment
CN108889022A (en) It is a kind of to freeze double filter plants
CN212091269U (en) Integrated form freeze filter unit
CN108771910A (en) A kind of double filter devices of double refrigeration
CN108993024A (en) A kind of quickly cooling technique in freezing and filtering unit
CN109331540A (en) A kind of extraction raffinate treatment process of freezing and filtering unit
CN108722010A (en) A kind of integrated form freezing and filtering unit
CN108722012A (en) A kind of technique of integrated form freezing and filtering unit
CN208732786U (en) Packaged type boiler feed water system
CN108722011A (en) A kind of filter at low temperature equipment
CN108744712A (en) A kind of freezing and filtering equipment of double refrigeration systems

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant