CN108854239A - It is a kind of to freeze double filter devices - Google Patents
It is a kind of to freeze double filter devices Download PDFInfo
- Publication number
- CN108854239A CN108854239A CN201810778636.7A CN201810778636A CN108854239A CN 108854239 A CN108854239 A CN 108854239A CN 201810778636 A CN201810778636 A CN 201810778636A CN 108854239 A CN108854239 A CN 108854239A
- Authority
- CN
- China
- Prior art keywords
- valve
- filter
- pump
- exchanger
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000001914 filtration Methods 0.000 claims abstract description 244
- 238000001816 cooling Methods 0.000 claims abstract description 107
- 238000007710 freezing Methods 0.000 claims abstract description 90
- 230000008014 freezing Effects 0.000 claims abstract description 90
- 230000001839 systemic circulation Effects 0.000 claims description 73
- 239000002689 soil Substances 0.000 claims description 72
- 239000000498 cooling water Substances 0.000 claims description 42
- 230000004087 circulation Effects 0.000 claims description 38
- 238000005057 refrigeration Methods 0.000 claims description 35
- 239000002826 coolant Substances 0.000 claims description 30
- 239000003507 refrigerant Substances 0.000 claims description 28
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000002360 preparation method Methods 0.000 abstract description 3
- 238000011084 recovery Methods 0.000 abstract description 3
- 238000004146 energy storage Methods 0.000 description 24
- 239000007788 liquid Substances 0.000 description 13
- 238000000034 method Methods 0.000 description 9
- 238000011017 operating method Methods 0.000 description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000013329 compounding Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000706 filtrate Substances 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D37/00—Processes of filtration
- B01D37/02—Precoating the filter medium; Addition of filter aids to the liquid being filtered
- B01D37/025—Precoating the filter medium; Addition of filter aids to the liquid being filtered additives incorporated in the filter
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D35/00—Filtering devices having features not specifically covered by groups B01D24/00 - B01D33/00, or for applications not specifically covered by groups B01D24/00 - B01D33/00; Auxiliary devices for filtration; Filter housing constructions
- B01D35/18—Heating or cooling the filters
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D36/00—Filter circuits or combinations of filters with other separating devices
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Treatment Of Sludge (AREA)
Abstract
The present invention is to provide a kind of double filter devices of freezing, the arrangement increases working efficiency, reduces production cost, realizes freezing and filtering, quickly cooling and thermal energy recovery process and filtration system a preparation and a use function respectively.
Description
Technical field
The present invention relates to a kind of filter devices in filtering flow field, and in particular to a kind of to freeze double filter devices.
Technical background
Currently, in the filtering of the industries liquid such as medicine, chemical industry, light industry, drink, the single function of freezing and filtering unit in the market
It can freeze and filter disjunctor realization to be completed to filter at low temperature by filtrate body, Multifunctional resource, which can not achieve, to be caused to waste;Due to
Freezing and filtering unit equipment is multicomponent combination, is not that the equipment component seller of vulnerable part is not usually spare with buyer, is producing
Occurring equipment single element failure in the process will result in a whole set of compressor emergency shutdown, it is necessary to until that could produce after troubleshooting, have
Equipment component need repairing or replace, but repair or procurement cycle will be 1 week~3 months, thus delay and produce, such as mention
High efficiency performance is more multi-functional to have much room for improvement;Because of liquid difference, liquid being filtered cannot use same filtration system, in the market
The a set of filtration system of freezing and filtering unit cannot meet.
Summary of the invention
In view of the above-mentioned problems, freeze double filter devices it is an object of the invention to provide a kind of, the arrangement increases working efficiency,
Production cost is reduced, realizes freezing and filtering, quickly cooling and thermal energy recovery process and filtration system a preparation and a use function respectively.
The double filter devices of a kind of freezing, including:Z8 refrigeration system, A cooling water recirculation system, B cooling water cyclic system
System, A coolant circulating system, B coolant circulating system, C coolant circulating system, the cold feed liquor system of A, the cold feed liquor system of AA, the cold feed liquor of B
The cold feed liquor system of system, BB, the cold feed liquor system of C, the cold feed liquor system of CC, soil series system is hung in A filter, soil series system is hung in AA filter, the soil series is hung in B filter
It is big that system, BB filter hang soil series system, soil series system is hung in C filter, soil series system, A systemic circulation cooling system, AA systemic circulation cooling system, B are hung in CC filter
Circulation temperature lowering system, BB systemic circulation cooling system, C systemic circulation cooling system, CC systemic circulation cooling system, A freezing and filtering system,
AA freezing and filtering system, B freezing and filtering system, BB freezing and filtering system, C freezing and filtering system, CC freezing and filtering system, D are normal
The normal feed liquor system of feed liquor system, DD, the normal feed liquor system of E, the normal feed liquor system of EE, the normal feed liquor system of F, the normal feed liquor system of FF, G often into
The normal feed liquor system of liquid system, GG, D room temperature filtration system, DD room temperature filtration system, E room temperature filtration system, EE room temperature filtering system
System, F room temperature filtration system, FF room temperature filtration system, G room temperature filtration system, GG room temperature filtration system, A add-on system, AA addition
System, B add-on system, BB add-on system.
The A cooling water recirculation system includes:B2 valve, Z12 cooling tower, B1 valve, G6 cooling pump pass through pipeline and the Z8
The condenser inlet and outlet connection of refrigeration system forms A cooling water circulation loop;
The B cooling water recirculation system includes:B3 valve, Z11 exchanger, E6 valve, the Z12 cooling tower, the B1 valve, the G6
Cooling pump forms B cooling water circulation loop by pipeline and the inlet and outlet connection of the condenser of the Z8 refrigeration system;
The A coolant circulating system includes:A1 valve, Z9 refrigerant tank, A2 valve, G7 refrigerant pump, A3 valve, Z3 exchanger, A4 valve pass through
Pipeline connect to form A refrigerant circulation circuit with the evaporator inlet-outlet of the Z8 refrigeration system;
The B coolant circulating system includes:The A1 valve, the Z9 refrigerant tank, the A2 valve, the G7 refrigerant pump, A5 valve,
Z10 exchanger, A6 valve connect to form B refrigerant circulation circuit by pipeline with the evaporator inlet-outlet of the Z8 refrigeration system;
The C coolant circulating system includes:The A1 valve, the Z9 refrigerant tank, the A2 valve, the G7 refrigerant pump, A8 valve,
Z3Z exchanger, A7 valve connect to form C refrigerant circulation circuit by pipeline with the evaporator inlet-outlet of the Z8 refrigeration system;
The cold feed liquor system of A includes:Z1 protects filter, C1 valve, G1 pump, Z2 exchanger, the Z3 exchanger, C2 valve, A9 valve, G2
Pump, Z4 filter, C3 valve, E5 valve, Z5 agitator tank, C4 valve, G3 pump, Z6 filter connect to form the cold feed liquor circuit A by pipeline;
The cold feed liquor system of AA includes:Z1Z protect filter, C1C valve, G1G pump, Z2Z exchanger, the Z3Z exchanger, C2C valve,
A9A valve, G2G pump, Z4Z filter, C3C valve, E5E valve, Z5Z agitator tank, C4C valve, G3G pump, Z6Z filter are connected by pipeline
Form the cold feed liquor circuit AA;
The cold feed liquor system of B includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3 are handed over
Parallel operation, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the E5 valve, the Z5 agitator tank are logical
Piping connects to form the cold feed liquor circuit B;
The cold feed liquor system of BB includes:It is Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, described
Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the E5E valve, institute
Z5Z agitator tank is stated to connect to form the cold feed liquor circuit BB by pipeline;
The cold feed liquor system of C includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3 are handed over
Parallel operation, the C2 valve, D2 valve, M7 valve, G3 pump, the Z6 filter, D5 valve, the E5 valve, the Z5 agitator tank pass through
Pipeline connects to form the cold feed liquor circuit C;
The cold feed liquor system of CC includes:It is Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, described
It is Z3Z exchanger, the C2C valve, D2D valve, M7M valve, G3G pump, the Z6Z filter, D5D valve, the E5E valve, described
Z5Z agitator tank connects to form the cold feed liquor circuit CC by pipeline;
Soil series system is hung in the A filter:C8 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the E5
Valve, the Z5 agitator tank connect to form the Z4 filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the AA filter:C8C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, institute
State E5E valve, the Z5Z agitator tank connects to form the Z4Z filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the B filter:D8 valve, G3 pump, the Z6 filter, the D5 valve, the E5 valve, the Z5 are stirred
Tank is mixed to connect to form the Z6 filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the BB filter:D8D valve, G3G pump, the Z6Z filter, the D5D valve, the E5E valve, institute
Z5Z agitator tank is stated to connect to form the Z6Z filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the C filter:C7 valve, G4 pump, Z7 filter, E4 valve, the E5 valve, the Z5 agitator tank pass through pipeline
Connection forms the Z7 filter precoating filter aid circulation loop;
Soil series system is hung in the CC filter:C7C valve, G4G pump, Z7Z filter, E4E valve, the E5E valve, the Z5Z agitator tank
It connects to form the Z7Z filter precoating filter aid circulation loop by pipeline;
The A systemic circulation cooling system includes:E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, the A9 valve,
The G2 pump, the Z4 filter, the C3 valve, the C4 valve, the G3 pump, the Z6 filter, C5 valve, the Z2 exchange
Device connects to form A systemic circulation cooling circuit by pipeline;
The AA systemic circulation cooling system includes:It is E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve, described
A9A valve, G2G pump, the Z4Z filter, the C3C valve, the C4C valve, the G3G pump, the Z6Z filter, C5C
Valve, the Z2Z exchanger connect to form AA systemic circulation cooling circuit by pipeline;
The B systemic circulation cooling system includes:It is the E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, described
A9 valve, G2 pump, the Z4 filter, the C3 valve, F1 valve, the Z2 exchanger connect to form B systemic circulation by pipeline
Cool down circuit;
The BB systemic circulation cooling system includes:The E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve,
The A9A valve, G2G pump, the Z4Z filter, the C3C valve, F1F valve, the Z2Z exchanger connect shape by pipeline
At BB systemic circulation cooling circuit;
The C systemic circulation cooling system includes:It is the E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, described
D2 valve, the M7 valve, G3 pump, the Z6 filter, the C5 valve, the Z2 exchanger connect that form C big by pipeline
Circulation temperature lowering circuit;
The CC systemic circulation cooling system includes:The E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve,
The D2D valve, the M7M valve, G3G pump, the Z6Z filter, the C5C valve, the Z2Z exchanger are connected by pipeline
It connects to form CC systemic circulation cooling circuit;
The A freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the C4 valve, the G3 pump, institute
State Z6 filter, the C5 valve, the Z2 exchanger, G4 pump, the Z7 filter, C6 valve connect to form A by pipeline
Freezing and filtering circuit;
The AA freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the C4C valve,
The G3G pump, the Z6Z filter, the C5C valve, the Z2Z exchanger, the G4G pump, the Z7Z filter, C6C valve
It connects to form AA freezing and filtering circuit by pipeline;
The B freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the F1 valve, the Z2 exchange
Device, G4 pump, the Z7 filter, the C6 valve connect to form B freezing and filtering circuit by pipeline;
The BB freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the F1F valve,
The Z2Z exchanger, G4G pump, the Z7Z filter, the C6C valve connect to form BB freezing and filtering time by pipeline
Road;
The C freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the D2 valve, the M7 valve, G3 pump, the Z6 filter, the C5 valve, the Z2 exchange
Device, G4 pump, the Z7 filter, the C6 valve connect to form C freezing and filtering circuit by pipeline;
The CC freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the D2D valve, the M7M valve, G3G pump, the Z6Z filter, the C5C valve,
The Z2Z exchanger, G4G pump, the Z7Z filter, the C6C valve connect to form CC freezing and filtering time by pipeline
Road;
The normal feed liquor system of D includes:The Z1 shield filter, D1 valve, the D2 valve, the A9 valve, G2 pump, the Z4 mistake
Filter, the C3 valve, the E5 valve, the Z5 agitator tank, the C4 valve, G3 pump, the Z6 filter are connected by pipeline
It connects to form the normal feed liquor circuit D;
The normal feed liquor system of DD includes:The Z1Z shield filter, D1D valve, the D2D valve, the A9A valve, G2G pump, institute
State Z4Z filter, the C3C valve, the E5E valve, the Z5Z agitator tank, the C4C valve, G3G pump, Z6Z filtering
Machine connects to form the normal feed liquor circuit DD by pipeline;
The normal feed liquor system of E includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, the G2 are pumped, are described
Z4 filter, the C3 valve, the E5 valve, the Z5 agitator tank piping connect to form the normal feed liquor circuit E;
The normal feed liquor system of EE includes:The Z1Z protects filter, the D1D valve, the D2D valve, the A9A valve, the G2G
Pump, the Z4Z filter, the C3C valve, the E5E valve, the Z5Z agitator tank piping connect to form the normal feed liquor circuit EE;
The normal feed liquor system of F includes:Z1 shield filter, the D1 valve, the M7 valve, G3 pump, the Z6 filter,
The D5 valve, the E5 valve, the Z5 agitator tank connect to form the normal feed liquor circuit F by pipeline;
The normal feed liquor system of FF includes:The Z1Z shield filter, the D1D valve, the M7M valve, G3G pump, the Z6Z
Filter, the D5D valve, the E5E valve, the Z5Z agitator tank connect to form the normal feed liquor circuit FF by pipeline;
The normal feed liquor system of G includes:It is Z1 shield filter, the D1 valve, F2 valve, G4 pump, the Z7 filter, described
E4 valve, the E5 valve, the Z5 agitator tank connect to form the normal feed liquor circuit G by pipeline;
The normal feed liquor system of GG includes:The Z1Z shield filter, the D1D valve, F2F valve, G4G pump, Z7Z filtering
Machine, the E4E valve, the E5E valve, the Z5Z agitator tank connect to form the normal feed liquor circuit GG by pipeline;
The D room temperature filtration system includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, G2 pump, institute
State Z4 filter, the C3 valve, the C4 valve, G3 pump, the Z6 filter, D4 valve connect to form D room temperature by pipeline
Filtration circuit;
The DD room temperature filtration system includes:It is Z1Z shield filter, the D1D valve, the D2D valve, the A9A valve, described
G2G pump, the Z4Z filter, the C3C valve, the C4C valve, the G3G pump, the Z6Z filter, D4D valve pass through pipeline
Connection forms DD room temperature filtration circuit;
The E room temperature filtration system includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, G2 pump, institute
State Z4 filter, D3 valve connects to form E room temperature filtration circuit by pipeline;
The EE room temperature filtration system includes:It is Z1Z shield filter, the D1D valve, the D2D valve, the A9A valve, described
G2G pump, the Z4Z filter, D3D valve connect to form EE room temperature filtration circuit by pipeline;
The F room temperature filtration system includes:The Z1 shield filter, the D1 valve, the M7 valve, G3 pump, Z6 filtering
Machine, the D4 valve connect to form F room temperature filtration circuit by pipeline;
The FF room temperature filtration system includes:The Z1Z shield filter, the D1D valve, the M7M valve, the G3G are pumped, are described
Z6Z filter, the D4D valve connect to form FF room temperature filtration circuit by pipeline;
The G room temperature filtration system includes:The Z1 shield filter, the D1 valve, the F2 valve, G4 pump, Z7 filtering
Machine, the C6 valve connect to form G room temperature filtration circuit by pipeline;
The GG room temperature filtration system includes:The Z1Z shield filter, the D1D valve, the F2F valve, the G4G are pumped, are described
Z7Z filter, the C6C valve connect to form GG room temperature filtration circuit by pipeline;
The A add-on system includes:The Z5 agitator tank, G5 addition pump, D6 valve, the Z4 filter connect to be formed by pipeline
A adds circuit;
The AA add-on system includes:The Z5Z agitator tank, G5G addition pump, D6D valve, the Z4Z filter are connected by pipeline
It connects to form AA addition circuit;
The B add-on system includes:The Z5 agitator tank, G5 addition pump, D7 valve, the Z6 filter are connected by pipeline
It forms B and adds circuit;
The BB add-on system includes:The Z5Z agitator tank, G5G addition pump, D7D valve, the Z6Z filter pass through pipe
Road connects to form BB addition circuit.
The present invention can realize that freezing and filtering, room temperature filtering, quickly cooling are handed over automated and semi-automatic operating procedure respectively
Change, speed heat exchange etc. processes use be to select according to demand, operating procedure is described below, before executing each single item system, own
System is all that closed state has reached to service requirement, and the pump element in execution system is opened and closed according to designer's design requirement
(Pump belongs to closed state into pipe path individually in some execution systems), all elements do not represented opening and closing function as exchange
Device, filter etc..Because equipment operating procedures is more, is not written in patent if any individual links well-known technique, is solved by designer
It releases, example exhaust valve pipeline gets rid of native device etc..
Execute speed heat swap operation:Start the B cooling water recirculation system, (or the B is cold for the A coolant circulating system
Matchmaker's circulatory system or the C coolant circulating system), start the Z8 refrigeration system later, the liquid exchanged later passes through pipe
Road starting G10 is pumped into the Z11 exchanger and swaps, and realizes speed heat exchange process.
Execute quickly cooling swap operation:Start the A cooling water recirculation system(Or the B cooling water recirculation system)With it is described
B coolant circulating system, starts the Z8 refrigeration system later, and the liquid exchanged later is pumped into described by pipeline starting G8
Z10 exchanger swaps, and realizes quickly cooling exchange process.
Execute the A freezing and filtering system operation:The cold feed liquor system of starting A is completed feed liquor and is turned off, and starts institute later
It states A filter extension soil series system to carry out precoating drainage Jie to the Z4 filter, complete and close, starts the B filter extension soil series system later
Precoating drainage is carried out to the Z6 filter to be situated between, complete and close;Start the A cooling water recirculation system simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration system later and carries out cold energy energy storage;Start institute when cold energy energy storage reaches requirement later
A systemic circulation cooling system is stated, later when cooling reaches filtering requirement, the A systemic circulation cooling system is closed, starts institute later
It states A freezing and filtering system and the A add-on system carries out normal filtration.
Execute the B freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the B to be turned off, it is right later
The A filter hangs soil series system and carries out precoating drainage Jie, completes and close;Start the A cooling water recirculation system simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration system later and carries out cold energy energy storage;Start institute when cold energy energy storage reaches requirement later
B systemic circulation cooling system is stated, later when cooling reaches filtering requirement, the B systemic circulation cooling system is closed, starts institute later
It states B freezing and filtering system and the A add-on system carries out normal filtration.
Execute the C freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the C to be turned off, it is right later
The B filter hangs soil series system and carries out precoating drainage Jie, completes and close;Start the A cooling water recirculation system simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration system later and carries out cold energy energy storage;Start institute when cold energy energy storage reaches requirement later
C systemic circulation cooling system is stated, later when cooling reaches filtering requirement, the C systemic circulation cooling system is closed, starts institute later
It states C freezing and filtering system and the B add-on system carries out normal filtration.
Execute the D room temperature filtration system operation:Start the normal feed liquor system of the D, completion feed liquor is turned off, Zhi Houqi
It moves the A filter extension soil series system to carry out precoating drainage Jie to the Z4 filter, complete and close, starts the B filter extension soil later
System carries out precoating drainage to the Z6 filter and is situated between, completes and closes, and starts the D room temperature filtration system and the A later
Add-on system, into normal filtration.
Execute the E room temperature filtration system operation:Start the normal feed liquor system of the E, completion feed liquor is turned off, Zhi Houqi
It moves the A filter extension soil series system to carry out precoating drainage Jie to the Z4 filter, complete and close, starts the E room temperature mistake later
Filter system and the A add-on system, into normal filtration.
Execute the F room temperature filtration system operation:Start the normal feed liquor system of the F, completion feed liquor is turned off, Zhi Houqi
It moves the B filter extension soil series system to carry out precoating drainage Jie to the Z6 filter, complete and close, starts the F room temperature mistake later
Filter system and the B add-on system, into normal filtration.
Execute the G room temperature filtration system operation:Start the normal feed liquor system of the G, completion feed liquor is turned off, Zhi Houqi
It moves the C filter extension soil series system to carry out precoating drainage Jie to the Z7 filter, complete and close, starts the G room temperature mistake later
Filter system, into normal filtration.
Execute the AA freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the AA to be turned off, later
Start the AA filter extension soil series system to carry out precoating drainage Jie to the Z4Z filter, complete and close, starts the BB filter later
Soil series system is hung to carry out precoating drainage Jie to the Z6Z filter, complete and close;Start the A cooling water recirculation system simultaneously
(Or the B cooling water recirculation system)With the C coolant circulating system, starts the Z8 refrigeration system later and carry out cold energy storage
Energy;Start the AA systemic circulation cooling system when cold energy energy storage reaches requirement later, later when cooling reaches filtering requirement,
The AA systemic circulation cooling system is closed, starts the AA freezing and filtering system later and the AA add-on system carries out normal mistake
Filter.
Execute the BB freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the BB to be turned off, later
Precoating drainage is carried out to AA filter extension soil series system to be situated between, complete and close;Start the A cooling water recirculation system simultaneously(Or institute
State B cooling water recirculation system)With the C coolant circulating system, starts the Z8 refrigeration system later and carry out cold energy energy storage;Later
Start the BB systemic circulation cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, closes institute
BB systemic circulation cooling system is stated, starts BB freezing and filtering system later and the AA add-on system carries out normal filtration.
Execute the CC freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the CC to be turned off, later
Precoating drainage is carried out to BB filter extension soil series system to be situated between, complete and close;Start the A cooling water recirculation system simultaneously(Or institute
State B cooling water recirculation system)With the C coolant circulating system, starts the Z8 refrigeration system later and carry out cold energy energy storage;Later
Start the CC systemic circulation cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, closes institute
CC systemic circulation cooling system is stated, starts the CC freezing and filtering system later and the BB add-on system carries out normal filtration.
Execute the DD room temperature filtration system operation:Start the normal feed liquor system of the DD, complete feed liquor be turned off, later
Start the AA filter extension soil series system to carry out precoating drainage Jie to the Z4Z filter, complete and close, starts the BB filter later
Hang the soil series system precoating drainage carried out to the Z6Z filter and be situated between, complete and close, start later the DD room temperature filtration system and
The AA add-on system, into normal filtration.
Execute the EE room temperature filtration system operation:Start the normal feed liquor system of the EE, complete feed liquor be turned off, later
Start the AA filter extension soil series system to carry out precoating drainage Jie to the Z4Z filter, complete and close, it is normal to start the EE later
Warm filtration system and the AA add-on system, into normal filtration.
Execute the FF room temperature filtration system operation:Start the normal feed liquor system of the FF, complete feed liquor be turned off, later
Start the BB filter extension soil series system to carry out precoating drainage Jie to the Z6Z filter, complete and close, it is normal to start the FF later
Warm filtration system and the BB add-on system, into normal filtration.
Execute the GG room temperature filtration system operation:Start the normal feed liquor system of the GG, complete feed liquor be turned off, later
Start the CC filter extension soil series system to carry out precoating drainage Jie to the Z7Z filter, complete and close, it is normal to start the GG later
Warm filtration system, into normal filtration.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
B2 valve, Z12 cooling tower, B1 valve, G6 cooling pump, B3 valve, Z11 exchanger, E6 valve, A1 valve, Z9 refrigerant tank, A2 valve, G7 are cold
Matchmaker's pump, A3 valve, Z3 exchanger, A4 valve, A5 valve, Z10 exchanger, A6 valve, A8 valve, Z3Z exchanger, A7 valve, Z1 protect filter, Z1Z
Protect filter, C1 valve, C1C valve, G1 pump, G1G pump, Z2 exchanger, Z2Z exchanger, C2 valve, C2C valve, A9 valve, A9A valve, G2 pump,
G2G pump, Z4 filter, Z4Z filter, C3 valve, C3C valve, E5 valve, E5E valve, Z5 agitator tank, Z5Z agitator tank, C4 valve, C4C valve,
G3 pump, G3G pump, Z6 filter, Z6Z filter, D2 valve, D2D valve, M7 valve, M7M valve, D5 valve, D5D valve, C8 valve, C8C valve, D8
Valve, D8D valve, C7 valve, C7C valve, G4 pump, G4G pump, Z7 filter, Z7Z filter, E4 valve, E4E valve, E1 valve, E1E valve, C5 valve,
C5C valve, F1 valve, F1F valve, D1 valve, D1D valve, F2 valve, F2F valve, D4 valve, D4D valve, D3 valve, D3D valve, C6 valve, C6C valve, G5 add
Add pump, G5G addition pump, D6 valve, D6D valve, D7 valve, D7D valve, G8 pump, G10 pump, Z8 refrigeration system.
Specific embodiment
Now in conjunction with attached drawing and foregoing invention content, the present invention is described in further detail.Referring to Fig.1, mesh of the invention
Provide it is a kind of freeze double filter devices, the arrangement increases working efficiency, reduce production cost, realize freezed respectively
Filter, quickly cooling and thermal energy recovery process and filtration system a preparation and a use function.
A kind of double filter devices of freezing, including:Z8 refrigeration system, A cooling water recirculation system, B cooling water recirculation system, A
The cold feed liquor system of coolant circulating system, B coolant circulating system, C coolant circulating system, A, the cold feed liquor system of AA, the cold feed liquor system of B
System, the cold feed liquor system of BB, the cold feed liquor system of C, the cold feed liquor system of CC, A filter hang soil series system, soil series system is hung in AA filter, the soil series is hung in B filter
It is big that system, BB filter hang soil series system, soil series system is hung in C filter, soil series system, A systemic circulation cooling system, AA systemic circulation cooling system, B are hung in CC filter
Circulation temperature lowering system, BB systemic circulation cooling system, C systemic circulation cooling system, CC systemic circulation cooling system, A freezing and filtering system,
AA freezing and filtering system, B freezing and filtering system, BB freezing and filtering system, C freezing and filtering system, CC freezing and filtering system, D are normal
The normal feed liquor system of feed liquor system, DD, the normal feed liquor system of E, the normal feed liquor system of EE, the normal feed liquor system of F, the normal feed liquor system of FF, G often into
The normal feed liquor system of liquid system, GG, D room temperature filtration system, DD room temperature filtration system, E room temperature filtration system, EE room temperature filtering system
System, F room temperature filtration system, FF room temperature filtration system, G room temperature filtration system, GG room temperature filtration system, A add-on system, AA addition
System, B add-on system, BB add-on system.
The A cooling water recirculation system includes:B2 valve, Z12 cooling tower, B1 valve, G6 cooling pump pass through pipeline and the Z8
The condenser inlet and outlet connection of refrigeration system forms A cooling water circulation loop;
The B cooling water recirculation system includes:B3 valve, Z11 exchanger, E6 valve, the Z12 cooling tower, the B1 valve, the G6
Cooling pump forms B cooling water circulation loop by pipeline and the inlet and outlet connection of the condenser of the Z8 refrigeration system;
The A coolant circulating system includes:A1 valve, Z9 refrigerant tank, A2 valve, G7 refrigerant pump, A3 valve, Z3 exchanger, A4 valve pass through
Pipeline connect to form A refrigerant circulation circuit with the evaporator inlet-outlet of the Z8 refrigeration system;
The B coolant circulating system includes:The A1 valve, the Z9 refrigerant tank, the A2 valve, the G7 refrigerant pump, A5 valve,
Z10 exchanger, A6 valve connect to form B refrigerant circulation circuit by pipeline with the evaporator inlet-outlet of the Z8 refrigeration system;
The C coolant circulating system includes:The A1 valve, the Z9 refrigerant tank, the A2 valve, the G7 refrigerant pump, A8 valve,
Z3Z exchanger, A7 valve connect to form C refrigerant circulation circuit by pipeline with the evaporator inlet-outlet of the Z8 refrigeration system;
The cold feed liquor system of A includes:Z1 protects filter, C1 valve, G1 pump, Z2 exchanger, the Z3 exchanger, C2 valve, A9 valve, G2
Pump, Z4 filter, C3 valve, E5 valve, Z5 agitator tank, C4 valve, G3 pump, Z6 filter connect to form the cold feed liquor circuit A by pipeline;
The cold feed liquor system of AA includes:Z1Z protect filter, C1C valve, G1G pump, Z2Z exchanger, the Z3Z exchanger, C2C valve,
A9A valve, G2G pump, Z4Z filter, C3C valve, E5E valve, Z5Z agitator tank, C4C valve, G3G pump, Z6Z filter are connected by pipeline
Form the cold feed liquor circuit AA;
The cold feed liquor system of B includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3 are handed over
Parallel operation, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the E5 valve, the Z5 agitator tank are logical
Piping connects to form the cold feed liquor circuit B;
The cold feed liquor system of BB includes:It is Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, described
Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the E5E valve, institute
Z5Z agitator tank is stated to connect to form the cold feed liquor circuit BB by pipeline;
The cold feed liquor system of C includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3 are handed over
Parallel operation, the C2 valve, D2 valve, M7 valve, G3 pump, the Z6 filter, D5 valve, the E5 valve, the Z5 agitator tank pass through
Pipeline connects to form the cold feed liquor circuit C;
The cold feed liquor system of CC includes:It is Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, described
It is Z3Z exchanger, the C2C valve, D2D valve, M7M valve, G3G pump, the Z6Z filter, D5D valve, the E5E valve, described
Z5Z agitator tank connects to form the cold feed liquor circuit CC by pipeline;
Soil series system is hung in the A filter:C8 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the E5
Valve, the Z5 agitator tank connect to form the Z4 filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the AA filter:C8C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, institute
State E5E valve, the Z5Z agitator tank connects to form the Z4Z filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the B filter:D8 valve, G3 pump, the Z6 filter, the D5 valve, the E5 valve, the Z5 are stirred
Tank is mixed to connect to form the Z6 filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the BB filter:D8D valve, G3G pump, the Z6Z filter, the D5D valve, the E5E valve, institute
Z5Z agitator tank is stated to connect to form the Z6Z filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the C filter:C7 valve, G4 pump, Z7 filter, E4 valve, the E5 valve, the Z5 agitator tank pass through pipeline
Connection forms the Z7 filter precoating filter aid circulation loop;
Soil series system is hung in the CC filter:C7C valve, G4G pump, Z7Z filter, E4E valve, the E5E valve, the Z5Z agitator tank
It connects to form the Z7Z filter precoating filter aid circulation loop by pipeline;
The A systemic circulation cooling system includes:E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, the A9 valve,
The G2 pump, the Z4 filter, the C3 valve, the C4 valve, the G3 pump, the Z6 filter, C5 valve, the Z2 exchange
Device connects to form A systemic circulation cooling circuit by pipeline;
The AA systemic circulation cooling system includes:It is E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve, described
A9A valve, G2G pump, the Z4Z filter, the C3C valve, the C4C valve, the G3G pump, the Z6Z filter, C5C
Valve, the Z2Z exchanger connect to form AA systemic circulation cooling circuit by pipeline;
The B systemic circulation cooling system includes:It is the E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, described
A9 valve, G2 pump, the Z4 filter, the C3 valve, F1 valve, the Z2 exchanger connect to form B systemic circulation by pipeline
Cool down circuit;
The BB systemic circulation cooling system includes:The E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve,
The A9A valve, G2G pump, the Z4Z filter, the C3C valve, F1F valve, the Z2Z exchanger connect shape by pipeline
At BB systemic circulation cooling circuit;
The C systemic circulation cooling system includes:It is the E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, described
D2 valve, the M7 valve, G3 pump, the Z6 filter, the C5 valve, the Z2 exchanger connect that form C big by pipeline
Circulation temperature lowering circuit;
The CC systemic circulation cooling system includes:The E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve,
The D2D valve, the M7M valve, G3G pump, the Z6Z filter, the C5C valve, the Z2Z exchanger are connected by pipeline
It connects to form CC systemic circulation cooling circuit;
The A freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the C4 valve, the G3 pump, institute
State Z6 filter, the C5 valve, the Z2 exchanger, G4 pump, the Z7 filter, C6 valve connect to form A by pipeline
Freezing and filtering circuit;
The AA freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the C4C valve,
The G3G pump, the Z6Z filter, the C5C valve, the Z2Z exchanger, the G4G pump, the Z7Z filter, C6C valve
It connects to form AA freezing and filtering circuit by pipeline;
The B freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the F1 valve, the Z2 exchange
Device, G4 pump, the Z7 filter, the C6 valve connect to form B freezing and filtering circuit by pipeline;
The BB freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the F1F valve,
The Z2Z exchanger, G4G pump, the Z7Z filter, the C6C valve connect to form BB freezing and filtering time by pipeline
Road;
The C freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the D2 valve, the M7 valve, G3 pump, the Z6 filter, the C5 valve, the Z2 exchange
Device, G4 pump, the Z7 filter, the C6 valve connect to form C freezing and filtering circuit by pipeline;
The CC freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the D2D valve, the M7M valve, G3G pump, the Z6Z filter, the C5C valve,
The Z2Z exchanger, G4G pump, the Z7Z filter, the C6C valve connect to form CC freezing and filtering time by pipeline
Road;
The normal feed liquor system of D includes:The Z1 shield filter, D1 valve, the D2 valve, the A9 valve, G2 pump, the Z4 mistake
Filter, the C3 valve, the E5 valve, the Z5 agitator tank, the C4 valve, G3 pump, the Z6 filter are connected by pipeline
It connects to form the normal feed liquor circuit D;
The normal feed liquor system of DD includes:The Z1Z shield filter, D1D valve, the D2D valve, the A9A valve, G2G pump, institute
State Z4Z filter, the C3C valve, the E5E valve, the Z5Z agitator tank, the C4C valve, G3G pump, Z6Z filtering
Machine connects to form the normal feed liquor circuit DD by pipeline;
The normal feed liquor system of E includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, the G2 are pumped, are described
Z4 filter, the C3 valve, the E5 valve, the Z5 agitator tank piping connect to form the normal feed liquor circuit E;
The normal feed liquor system of EE includes:The Z1Z protects filter, the D1D valve, the D2D valve, the A9A valve, the G2G
Pump, the Z4Z filter, the C3C valve, the E5E valve, the Z5Z agitator tank piping connect to form the normal feed liquor circuit EE;
The normal feed liquor system of F includes:Z1 shield filter, the D1 valve, the M7 valve, G3 pump, the Z6 filter,
The D5 valve, the E5 valve, the Z5 agitator tank connect to form the normal feed liquor circuit F by pipeline;
The normal feed liquor system of FF includes:The Z1Z shield filter, the D1D valve, the M7M valve, G3G pump, the Z6Z
Filter, the D5D valve, the E5E valve, the Z5Z agitator tank connect to form the normal feed liquor circuit FF by pipeline;
The normal feed liquor system of G includes:It is Z1 shield filter, the D1 valve, F2 valve, G4 pump, the Z7 filter, described
E4 valve, the E5 valve, the Z5 agitator tank connect to form the normal feed liquor circuit G by pipeline;
The normal feed liquor system of GG includes:The Z1Z shield filter, the D1D valve, F2F valve, G4G pump, Z7Z filtering
Machine, the E4E valve, the E5E valve, the Z5Z agitator tank connect to form the normal feed liquor circuit GG by pipeline;
The D room temperature filtration system includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, G2 pump, institute
State Z4 filter, the C3 valve, the C4 valve, G3 pump, the Z6 filter, D4 valve connect to form D room temperature by pipeline
Filtration circuit;
The DD room temperature filtration system includes:It is Z1Z shield filter, the D1D valve, the D2D valve, the A9A valve, described
G2G pump, the Z4Z filter, the C3C valve, the C4C valve, the G3G pump, the Z6Z filter, D4D valve pass through pipeline
Connection forms DD room temperature filtration circuit;
The E room temperature filtration system includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, G2 pump, institute
State Z4 filter, D3 valve connects to form E room temperature filtration circuit by pipeline;
The EE room temperature filtration system includes:It is Z1Z shield filter, the D1D valve, the D2D valve, the A9A valve, described
G2G pump, the Z4Z filter, D3D valve connect to form EE room temperature filtration circuit by pipeline;
The F room temperature filtration system includes:The Z1 shield filter, the D1 valve, the M7 valve, G3 pump, Z6 filtering
Machine, the D4 valve connect to form F room temperature filtration circuit by pipeline;
The FF room temperature filtration system includes:The Z1Z shield filter, the D1D valve, the M7M valve, the G3G are pumped, are described
Z6Z filter, the D4D valve connect to form FF room temperature filtration circuit by pipeline;
The G room temperature filtration system includes:The Z1 shield filter, the D1 valve, the F2 valve, G4 pump, Z7 filtering
Machine, the C6 valve connect to form G room temperature filtration circuit by pipeline;
The GG room temperature filtration system includes:The Z1Z shield filter, the D1D valve, the F2F valve, the G4G are pumped, are described
Z7Z filter, the C6C valve connect to form GG room temperature filtration circuit by pipeline;
The A add-on system includes:The Z5 agitator tank, G5 addition pump, D6 valve, the Z4 filter connect to be formed by pipeline
A adds circuit;
The AA add-on system includes:The Z5Z agitator tank, G5G addition pump, D6D valve, the Z4Z filter are connected by pipeline
It connects to form AA addition circuit;
The B add-on system includes:The Z5 agitator tank, G5 addition pump, D7 valve, the Z6 filter are connected by pipeline
It forms B and adds circuit.
The BB add-on system includes:The Z5Z agitator tank, G5G addition pump, D7D valve, the Z6Z filter are logical
Piping connects to form BB addition circuit.
The present invention can realize that freezing and filtering, room temperature filtering, quickly cooling are handed over automated and semi-automatic operating procedure respectively
Change, speed heat exchange etc. processes use be to select according to demand, operating procedure is described below, before executing each single item system, own
System is all that closed state has reached to service requirement, and the pump element in execution system is opened and closed according to designer's design requirement
(Pump belongs to closed state into pipe path individually in some execution systems), all elements do not represented opening and closing function as exchange
Device, filter etc..Because equipment operating procedures is more, is not written in patent if any individual links well-known technique, is solved by designer
It releases, example exhaust valve pipeline gets rid of native device etc..
Execute speed heat swap operation:Start the B cooling water recirculation system, (or the B is cold for the A coolant circulating system
Matchmaker's circulatory system or the C coolant circulating system), start the Z8 refrigeration system later, the liquid exchanged later passes through pipe
Road starting G10 is pumped into the Z11 exchanger and swaps, and realizes speed heat exchange process.
Execute quickly cooling swap operation:Start the A cooling water recirculation system(Or the B cooling water recirculation system)With it is described
B coolant circulating system, starts the Z8 refrigeration system later, and the liquid exchanged later is pumped into described by pipeline starting G8
Z10 exchanger swaps, and realizes quickly cooling exchange process.
Execute the A freezing and filtering system operation:The cold feed liquor system of starting A is completed feed liquor and is turned off, and starts institute later
It states A filter extension soil series system to carry out precoating drainage Jie to the Z4 filter, complete and close, starts the B filter extension soil series system later
Precoating drainage is carried out to the Z6 filter to be situated between, complete and close;Start the A cooling water recirculation system simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration system later and carries out cold energy energy storage;Start institute when cold energy energy storage reaches requirement later
A systemic circulation cooling system is stated, later when cooling reaches filtering requirement, the A systemic circulation cooling system is closed, starts institute later
It states A freezing and filtering system and the A add-on system carries out normal filtration.
Execute the B freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the B to be turned off, it is right later
The A filter hangs soil series system and carries out precoating drainage Jie, completes and close;Start the A cooling water recirculation system simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration system later and carries out cold energy energy storage;Start institute when cold energy energy storage reaches requirement later
B systemic circulation cooling system is stated, later when cooling reaches filtering requirement, the B systemic circulation cooling system is closed, starts institute later
It states B freezing and filtering system and the A add-on system carries out normal filtration.
Execute the C freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the C to be turned off, it is right later
The B filter hangs soil series system and carries out precoating drainage Jie, completes and close;Start the A cooling water recirculation system simultaneously and the A is cold
Matchmaker's circulatory system starts the Z8 refrigeration system later and carries out cold energy energy storage;Start institute when cold energy energy storage reaches requirement later
C systemic circulation cooling system is stated, later when cooling reaches filtering requirement, the C systemic circulation cooling system is closed, starts institute later
It states C freezing and filtering system and the B add-on system carries out normal filtration.
Execute the D room temperature filtration system operation:Start the normal feed liquor system of the D, completion feed liquor is turned off, Zhi Houqi
It moves the A filter extension soil series system to carry out precoating drainage Jie to the Z4 filter, complete and close, starts the B filter extension soil later
System carries out precoating drainage to the Z6 filter and is situated between, completes and closes, and starts the D room temperature filtration system and the A later
Add-on system, into normal filtration.
Execute the E room temperature filtration system operation:Start the normal feed liquor system of the E, completion feed liquor is turned off, Zhi Houqi
It moves the A filter extension soil series system to carry out precoating drainage Jie to the Z4 filter, complete and close, starts the E room temperature mistake later
Filter system and the A add-on system, into normal filtration.
Execute the F room temperature filtration system operation:Start the normal feed liquor system of the F, completion feed liquor is turned off, Zhi Houqi
It moves the B filter extension soil series system to carry out precoating drainage Jie to the Z6 filter, complete and close, starts the F room temperature mistake later
Filter system and the B add-on system, into normal filtration.
Execute the G room temperature filtration system operation:Start the normal feed liquor system of the G, completion feed liquor is turned off, Zhi Houqi
It moves the C filter extension soil series system to carry out precoating drainage Jie to the Z7 filter, complete and close, starts the G room temperature mistake later
Filter system, into normal filtration.
Execute the AA freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the AA to be turned off, later
Start the AA filter extension soil series system to carry out precoating drainage Jie to the Z4Z filter, complete and close, starts the BB filter later
Soil series system is hung to carry out precoating drainage Jie to the Z6Z filter, complete and close;Start the A cooling water recirculation system simultaneously
(Or the B cooling water recirculation system)With the C coolant circulating system, starts the Z8 refrigeration system later and carry out cold energy storage
Energy;Start the AA systemic circulation cooling system when cold energy energy storage reaches requirement later, later when cooling reaches filtering requirement,
The AA systemic circulation cooling system is closed, starts the AA freezing and filtering system later and the AA add-on system carries out normal mistake
Filter.
Execute the BB freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the BB to be turned off, later
Precoating drainage is carried out to AA filter extension soil series system to be situated between, complete and close;Start the A cooling water recirculation system simultaneously(Or institute
State B cooling water recirculation system)With the C coolant circulating system, starts the Z8 refrigeration system later and carry out cold energy energy storage;Later
Start the BB systemic circulation cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, closes institute
BB systemic circulation cooling system is stated, starts BB freezing and filtering system later and the AA add-on system carries out normal filtration.
Execute the CC freezing and filtering system operation:Start the cold feed liquor system completion feed liquor of the CC to be turned off, later
Precoating drainage is carried out to BB filter extension soil series system to be situated between, complete and close;Start the A cooling water recirculation system simultaneously(Or institute
State B cooling water recirculation system)With the C coolant circulating system, starts the Z8 refrigeration system later and carry out cold energy energy storage;Later
Start the CC systemic circulation cooling system when cold energy energy storage reaches requirement, later when cooling reaches filtering requirement, closes institute
CC systemic circulation cooling system is stated, starts the CC freezing and filtering system later and the BB add-on system carries out normal filtration.
Execute the DD room temperature filtration system operation:Start the normal feed liquor system of the DD, complete feed liquor be turned off, later
Start the AA filter extension soil series system to carry out precoating drainage Jie to the Z4Z filter, complete and close, starts the BB filter later
Hang the soil series system precoating drainage carried out to the Z6Z filter and be situated between, complete and close, start later the DD room temperature filtration system and
The AA add-on system, into normal filtration.
Execute the EE room temperature filtration system operation:Start the normal feed liquor system of the EE, complete feed liquor be turned off, later
Start the AA filter extension soil series system to carry out precoating drainage Jie to the Z4Z filter, complete and close, it is normal to start the EE later
Warm filtration system and the AA add-on system, into normal filtration.
Execute the FF room temperature filtration system operation:Start the normal feed liquor system of the FF, complete feed liquor be turned off, later
Start the BB filter extension soil series system to carry out precoating drainage Jie to the Z6Z filter, complete and close, it is normal to start the FF later
Warm filtration system and the BB add-on system, into normal filtration.
Execute the GG room temperature filtration system operation:Start the normal feed liquor system of the GG, complete feed liquor be turned off, later
Start the CC filter extension soil series system to carry out precoating drainage Jie to the Z7Z filter, complete and close, it is normal to start the GG later
Warm filtration system, into normal filtration.
Cooperate manual operation two-in-one system, to it is cumbersome and can unified instruction devise modularization but need to cooperate
Personnel acquire data and carry out compounding practice, because the pressure difference and flow of filtering flow change all in lasting variation and diatomite additive amount
It requires, also need the requirement such as temperature difference to freezing and filtering, need the implementation of artificial detection data partly to instruction cannot be completely unified
Automation or manualization cooperation, the cooling tower can design using in circulating water temperature adjustable extent voluntarily auto-control unlatching with
It closes, the cooling tower on the water tank, do not mark in view by display touch screen, control power distribution cabinet, module etc.
Out;Two-in-one control manually is added using automatically controlled and part is automatically controlled to valve portion used, carries out Regulating Pressure of Relief Values automatic protection dress
It sets, the outlet of pump power source is connect with the high pressure port of safety valve, brought with preventing the failure of electric control valve and its violating operation
Big pressure difference bring the possibility of damage to partial devices, the row pressure port connection of safety valve can liquid storage container, to prevent row pressure liquid
Body is lost and its splashing bring hidden danger!Can design at feed liquor and out liquid multi-pipeline to valve control, meet a variety of liquid
Transform filter cleaning of body etc..My existing several patented technologies are additionally used simultaneously:Patent of invention title:A kind of automation
Freezing filtration device and its operating method, patent of invention number:201110433647.X patent of invention title:A kind of modularization is low
Warm filter device and its operating method, patent of invention number:201110433715.2 to ensure scientific and technological content and its city of the invention
Field, practical value.
Claims (2)
1. a kind of freeze double filter devices, which is characterized in that including:Z8 refrigeration system, A cooling water recirculation system, B cooling water follow
The cold feed liquor system of loop system, A coolant circulating system, B coolant circulating system, C coolant circulating system, A, the cold feed liquor system of AA, B are cold
The cold feed liquor system of feed liquor system, BB, the cold feed liquor system of C, the cold feed liquor system of CC, soil series system is hung in A filter, soil series system is hung in AA filter, B filter is hung
Soil series system, BB filter hang soil series system, soil series system is hung in C filter, soil series system is hung in CC filter, A systemic circulation cooling system, AA systemic circulation cooling system
System, B systemic circulation cooling system, BB systemic circulation cooling system, C systemic circulation cooling system, CC systemic circulation cooling system, A were freezed
Filter system, AA freezing and filtering system, B freezing and filtering system, BB freezing and filtering system, C freezing and filtering system, CC freezing and filtering system
System, the normal feed liquor system of D, the normal feed liquor system of DD, the normal feed liquor system of E, the normal feed liquor system of EE, the normal feed liquor system of F, the normal feed liquor system of FF
System, the normal feed liquor system of G, the normal feed liquor system of GG, D room temperature filtration system, DD room temperature filtration system, E room temperature filtration system, EE room temperature
Filtration system, F room temperature filtration system, FF room temperature filtration system, G room temperature filtration system, GG room temperature filtration system, A add-on system,
AA add-on system, B add-on system, BB add-on system.
2. the double filter devices of a kind of freezing according to claim 1, which is characterized in that the A cooling water recirculation system packet
It includes:B2 valve, Z12 cooling tower, B1 valve, G6 cooling pump are formed by pipeline and the inlet and outlet connection of the condenser of the Z8 refrigeration system
A cooling water circulation loop;
The B cooling water recirculation system includes:B3 valve, Z11 exchanger, E6 valve, the Z12 cooling tower, the B1 valve, the G6
Cooling pump forms B cooling water circulation loop by pipeline and the inlet and outlet connection of the condenser of the Z8 refrigeration system;
The A coolant circulating system includes:A1 valve, Z9 refrigerant tank, A2 valve, G7 refrigerant pump, A3 valve, Z3 exchanger, A4 valve pass through
Pipeline connect to form A refrigerant circulation circuit with the evaporator inlet-outlet of the Z8 refrigeration system;
The B coolant circulating system includes:The A1 valve, the Z9 refrigerant tank, the A2 valve, the G7 refrigerant pump, A5 valve,
Z10 exchanger, A6 valve connect to form B refrigerant circulation circuit by pipeline with the evaporator inlet-outlet of the Z8 refrigeration system;
The C coolant circulating system includes:The A1 valve, the Z9 refrigerant tank, the A2 valve, the G7 refrigerant pump, A8 valve,
Z3Z exchanger, A7 valve connect to form C refrigerant circulation circuit by pipeline with the evaporator inlet-outlet of the Z8 refrigeration system;
The cold feed liquor system of A includes:Z1 protects filter, C1 valve, G1 pump, Z2 exchanger, the Z3 exchanger, C2 valve, A9 valve, G2
Pump, Z4 filter, C3 valve, E5 valve, Z5 agitator tank, C4 valve, G3 pump, Z6 filter connect to form the cold feed liquor circuit A by pipeline;
The cold feed liquor system of AA includes:Z1Z protect filter, C1C valve, G1G pump, Z2Z exchanger, the Z3Z exchanger, C2C valve,
A9A valve, G2G pump, Z4Z filter, C3C valve, E5E valve, Z5Z agitator tank, C4C valve, G3G pump, Z6Z filter are connected by pipeline
Form the cold feed liquor circuit AA;
The cold feed liquor system of B includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3 are handed over
Parallel operation, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the E5 valve, the Z5 agitator tank are logical
Piping connects to form the cold feed liquor circuit B;
The cold feed liquor system of BB includes:It is Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, described
Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the E5E valve, institute
Z5Z agitator tank is stated to connect to form the cold feed liquor circuit BB by pipeline;
The cold feed liquor system of C includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3 are handed over
Parallel operation, the C2 valve, D2 valve, M7 valve, G3 pump, the Z6 filter, D5 valve, the E5 valve, the Z5 agitator tank pass through
Pipeline connects to form the cold feed liquor circuit C;
The cold feed liquor system of CC includes:It is Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, described
It is Z3Z exchanger, the C2C valve, D2D valve, M7M valve, G3G pump, the Z6Z filter, D5D valve, the E5E valve, described
Z5Z agitator tank connects to form the cold feed liquor circuit CC by pipeline;
Soil series system is hung in the A filter:C8 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the E5
Valve, the Z5 agitator tank connect to form the Z4 filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the AA filter:C8C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, institute
State E5E valve, the Z5Z agitator tank connects to form the Z4Z filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the B filter:D8 valve, G3 pump, the Z6 filter, the D5 valve, the E5 valve, the Z5 are stirred
Tank is mixed to connect to form the Z6 filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the BB filter:D8D valve, G3G pump, the Z6Z filter, the D5D valve, the E5E valve, institute
Z5Z agitator tank is stated to connect to form the Z6Z filter precoating filter aid circulation loop by pipeline;
Soil series system is hung in the C filter:C7 valve, G4 pump, Z7 filter, E4 valve, the E5 valve, the Z5 agitator tank pass through pipeline
Connection forms the Z7 filter precoating filter aid circulation loop;
Soil series system is hung in the CC filter:C7C valve, G4G pump, Z7Z filter, E4E valve, the E5E valve, the Z5Z agitator tank
It connects to form the Z7Z filter precoating filter aid circulation loop by pipeline;
The A systemic circulation cooling system includes:E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, the A9 valve,
The G2 pump, the Z4 filter, the C3 valve, the C4 valve, the G3 pump, the Z6 filter, C5 valve, the Z2 exchange
Device connects to form A systemic circulation cooling circuit by pipeline;
The AA systemic circulation cooling system includes:It is E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve, described
A9A valve, G2G pump, the Z4Z filter, the C3C valve, the C4C valve, the G3G pump, the Z6Z filter, C5C
Valve, the Z2Z exchanger connect to form AA systemic circulation cooling circuit by pipeline;
The B systemic circulation cooling system includes:It is the E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, described
A9 valve, G2 pump, the Z4 filter, the C3 valve, F1 valve, the Z2 exchanger connect to form B systemic circulation by pipeline
Cool down circuit;
The BB systemic circulation cooling system includes:The E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve,
The A9A valve, G2G pump, the Z4Z filter, the C3C valve, F1F valve, the Z2Z exchanger connect shape by pipeline
At BB systemic circulation cooling circuit;
The C systemic circulation cooling system includes:It is the E1 valve, the Z2 exchanger, the Z3 exchanger, the C2 valve, described
D2 valve, the M7 valve, G3 pump, the Z6 filter, the C5 valve, the Z2 exchanger connect that form C big by pipeline
Circulation temperature lowering circuit;
The CC systemic circulation cooling system includes:The E1E valve, the Z2Z exchanger, the Z3Z exchanger, the C2C valve,
The D2D valve, the M7M valve, G3G pump, the Z6Z filter, the C5C valve, the Z2Z exchanger are connected by pipeline
It connects to form CC systemic circulation cooling circuit;
The A freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the C4 valve, the G3 pump, institute
State Z6 filter, the C5 valve, the Z2 exchanger, G4 pump, the Z7 filter, C6 valve connect to form A by pipeline
Freezing and filtering circuit;
The AA freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the C4C valve,
The G3G pump, the Z6Z filter, the C5C valve, the Z2Z exchanger, the G4G pump, the Z7Z filter, C6C valve
It connects to form AA freezing and filtering circuit by pipeline;
The B freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the A9 valve, G2 pump, the Z4 filter, the C3 valve, the F1 valve, the Z2 exchange
Device, G4 pump, the Z7 filter, the C6 valve connect to form B freezing and filtering circuit by pipeline;
The BB freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the A9A valve, G2G pump, the Z4Z filter, the C3C valve, the F1F valve,
The Z2Z exchanger, G4G pump, the Z7Z filter, the C6C valve connect to form BB freezing and filtering time by pipeline
Road;
The C freezing and filtering system includes:The Z1 shield filter, the C1 valve, G1 pump, the Z2 exchanger, the Z3
Exchanger, the C2 valve, the D2 valve, the M7 valve, G3 pump, the Z6 filter, the C5 valve, the Z2 exchange
Device, G4 pump, the Z7 filter, the C6 valve connect to form C freezing and filtering circuit by pipeline;
The CC freezing and filtering system includes:The Z1Z shield filter, the C1C valve, G1G pump, the Z2Z exchanger, institute
State Z3Z exchanger, the C2C valve, the D2D valve, the M7M valve, G3G pump, the Z6Z filter, the C5C valve,
The Z2Z exchanger, G4G pump, the Z7Z filter, the C6C valve connect to form CC freezing and filtering time by pipeline
Road;
The normal feed liquor system of D includes:The Z1 shield filter, D1 valve, the D2 valve, the A9 valve, G2 pump, the Z4 mistake
Filter, the C3 valve, the E5 valve, the Z5 agitator tank, the C4 valve, G3 pump, the Z6 filter are connected by pipeline
It connects to form the normal feed liquor circuit D;
The normal feed liquor system of DD includes:The Z1Z shield filter, D1D valve, the D2D valve, the A9A valve, G2G pump, institute
State Z4Z filter, the C3C valve, the E5E valve, the Z5Z agitator tank, the C4C valve, G3G pump, Z6Z filtering
Machine connects to form the normal feed liquor circuit DD by pipeline;
The normal feed liquor system of E includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, the G2 are pumped, are described
Z4 filter, the C3 valve, the E5 valve, the Z5 agitator tank piping connect to form the normal feed liquor circuit E;
The normal feed liquor system of EE includes:The Z1Z protects filter, the D1D valve, the D2D valve, the A9A valve, the G2G
Pump, the Z4Z filter, the C3C valve, the E5E valve, the Z5Z agitator tank piping connect to form the normal feed liquor circuit EE;
The normal feed liquor system of F includes:Z1 shield filter, the D1 valve, the M7 valve, G3 pump, the Z6 filter,
The D5 valve, the E5 valve, the Z5 agitator tank connect to form the normal feed liquor circuit F by pipeline;
The normal feed liquor system of FF includes:The Z1Z shield filter, the D1D valve, the M7M valve, G3G pump, the Z6Z
Filter, the D5D valve, the E5E valve, the Z5Z agitator tank connect to form the normal feed liquor circuit FF by pipeline;
The normal feed liquor system of G includes:It is Z1 shield filter, the D1 valve, F2 valve, G4 pump, the Z7 filter, described
E4 valve, the E5 valve, the Z5 agitator tank connect to form the normal feed liquor circuit G by pipeline;
The normal feed liquor system of GG includes:The Z1Z shield filter, the D1D valve, F2F valve, G4G pump, Z7Z filtering
Machine, the E4E valve, the E5E valve, the Z5Z agitator tank connect to form the normal feed liquor circuit GG by pipeline;
The D room temperature filtration system includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, G2 pump, institute
State Z4 filter, the C3 valve, the C4 valve, G3 pump, the Z6 filter, D4 valve connect to form D room temperature by pipeline
Filtration circuit;
The DD room temperature filtration system includes:It is Z1Z shield filter, the D1D valve, the D2D valve, the A9A valve, described
G2G pump, the Z4Z filter, the C3C valve, the C4C valve, the G3G pump, the Z6Z filter, D4D valve pass through pipeline
Connection forms DD room temperature filtration circuit;
The E room temperature filtration system includes:The Z1 shield filter, the D1 valve, the D2 valve, the A9 valve, G2 pump, institute
State Z4 filter, D3 valve connects to form E room temperature filtration circuit by pipeline;
The EE room temperature filtration system includes:It is Z1Z shield filter, the D1D valve, the D2D valve, the A9A valve, described
G2G pump, the Z4Z filter, D3D valve connect to form EE room temperature filtration circuit by pipeline;
The F room temperature filtration system includes:The Z1 shield filter, the D1 valve, the M7 valve, G3 pump, Z6 filtering
Machine, the D4 valve connect to form F room temperature filtration circuit by pipeline;
The FF room temperature filtration system includes:The Z1Z shield filter, the D1D valve, the M7M valve, the G3G are pumped, are described
Z6Z filter, the D4D valve connect to form FF room temperature filtration circuit by pipeline;
The G room temperature filtration system includes:The Z1 shield filter, the D1 valve, the F2 valve, G4 pump, Z7 filtering
Machine, the C6 valve connect to form G room temperature filtration circuit by pipeline;
The GG room temperature filtration system includes:The Z1Z shield filter, the D1D valve, the F2F valve, the G4G are pumped, are described
Z7Z filter, the C6C valve connect to form GG room temperature filtration circuit by pipeline;
The A add-on system includes:The Z5 agitator tank, G5 addition pump, D6 valve, the Z4 filter connect to be formed by pipeline
A adds circuit;
The AA add-on system includes:The Z5Z agitator tank, G5G addition pump, D6D valve, the Z4Z filter are connected by pipeline
It connects to form AA addition circuit;
The B add-on system includes:The Z5 agitator tank, G5 addition pump, D7 valve, the Z6 filter are connected by pipeline
It forms B and adds circuit;
The BB add-on system includes:The Z5Z agitator tank, G5G addition pump, D7D valve, the Z6Z filter pass through pipe
Road connects to form BB addition circuit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810778636.7A CN108854239A (en) | 2018-07-16 | 2018-07-16 | It is a kind of to freeze double filter devices |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810778636.7A CN108854239A (en) | 2018-07-16 | 2018-07-16 | It is a kind of to freeze double filter devices |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108854239A true CN108854239A (en) | 2018-11-23 |
Family
ID=64302477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810778636.7A Pending CN108854239A (en) | 2018-07-16 | 2018-07-16 | It is a kind of to freeze double filter devices |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108854239A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109603280A (en) * | 2019-02-22 | 2019-04-12 | 高云芝 | A kind of cold and hot double filtration systems |
CN109603282A (en) * | 2019-02-22 | 2019-04-12 | 高云芝 | A kind of technique of hot and cold double filtration systems |
CN109663406A (en) * | 2019-02-22 | 2019-04-23 | 高云芝 | A kind of method of hot and cold filtering |
CN109876524A (en) * | 2019-02-22 | 2019-06-14 | 高云芝 | A kind of freezing and filtering unit |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN212091216U (en) * | 2018-07-16 | 2020-12-08 | 高云芝 | Freezing double-filter device |
-
2018
- 2018-07-16 CN CN201810778636.7A patent/CN108854239A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN212091216U (en) * | 2018-07-16 | 2020-12-08 | 高云芝 | Freezing double-filter device |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109603280A (en) * | 2019-02-22 | 2019-04-12 | 高云芝 | A kind of cold and hot double filtration systems |
CN109603282A (en) * | 2019-02-22 | 2019-04-12 | 高云芝 | A kind of technique of hot and cold double filtration systems |
CN109663406A (en) * | 2019-02-22 | 2019-04-23 | 高云芝 | A kind of method of hot and cold filtering |
CN109876524A (en) * | 2019-02-22 | 2019-06-14 | 高云芝 | A kind of freezing and filtering unit |
CN109876524B (en) * | 2019-02-22 | 2021-10-26 | 高云芝 | Freezing filter unit |
CN109603282B (en) * | 2019-02-22 | 2021-11-05 | 高云芝 | Cold and hot double-filtering system |
CN109603280B (en) * | 2019-02-22 | 2022-02-18 | 高云芝 | Cold and hot two filtration system |
CN109663406B (en) * | 2019-02-22 | 2022-02-18 | 高云芝 | Cold and hot filtering method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108759201A (en) | A kind of freezing filtration device of double refrigeration systems | |
CN108854239A (en) | It is a kind of to freeze double filter devices | |
CN108654206A (en) | A kind of freezing filtration device | |
CN108654197A (en) | A kind of low-temperature filter | |
CN108619784A (en) | A kind of freezing and filtering equipment | |
CN108889022A (en) | It is a kind of to freeze double filter plants | |
CN108771910A (en) | A kind of double filter devices of double refrigeration | |
CN108993024A (en) | A kind of quickly cooling technique in freezing and filtering unit | |
CN109331540A (en) | A kind of extraction raffinate treatment process of freezing and filtering unit | |
CN108722010A (en) | A kind of integrated form freezing and filtering unit | |
CN108722012A (en) | A kind of technique of integrated form freezing and filtering unit | |
CN212091216U (en) | Freezing double-filter device | |
CN212091270U (en) | Freezing filter equipment | |
CN108939660A (en) | A kind of dual system refrigeration process of freezing and filtering unit | |
CN108889026A (en) | A kind of filtering technique of freezing and filtering unit | |
CN108827053A (en) | A kind of thermal energy recycling technique of freezing and filtering unit | |
CN212091271U (en) | Freezing filtration equipment of two refrigerating system | |
CN108722011A (en) | A kind of filter at low temperature equipment | |
CN212068011U (en) | Double-refrigeration double-filtering device | |
CN108686421A (en) | A kind of double filter plants of double refrigeration | |
CN212067983U (en) | Double-refrigeration double-filtering equipment | |
CN212067995U (en) | Freezing filtration equipment | |
CN207471788U (en) | A kind of air conditioner | |
CN212091232U (en) | Low-temperature filtering device | |
CN212091209U (en) | Freezing double-filtering equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |