CN108677729A - A kind of interim prestressing apparatus for precast segment spliced girder - Google Patents

A kind of interim prestressing apparatus for precast segment spliced girder Download PDF

Info

Publication number
CN108677729A
CN108677729A CN201810629296.1A CN201810629296A CN108677729A CN 108677729 A CN108677729 A CN 108677729A CN 201810629296 A CN201810629296 A CN 201810629296A CN 108677729 A CN108677729 A CN 108677729A
Authority
CN
China
Prior art keywords
interim
anchor slab
precast segment
sleeve
interim prestressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810629296.1A
Other languages
Chinese (zh)
Inventor
王祯
苏伟
周岳武
刘凯
张雷
李艳
邢雨
浑铁链
牟兆祥
王江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
China Railway Corp
Original Assignee
China Railway Design Corp
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp, China Railway Corp filed Critical China Railway Design Corp
Priority to CN201810629296.1A priority Critical patent/CN108677729A/en
Publication of CN108677729A publication Critical patent/CN108677729A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of interim prestressing apparatus for precast segment spliced girder, prefabricated subsection including contiguous concatenation, interim stretching bed seat is provided on the prefabricated subsection, the interim stretching bed seat includes the anchor slab passed through for interim prestressing force, and the interim prestressing force is anchored by nut and anchor slab.The anchor slab back is provided with floor, and the anchor slab, floor lower end are provided with bottom plate.Interim stretching bed seat, which can be removed, in the present invention uses, and reduces material utilization amount, mitigates segment weight.Middle sleeve of the present invention is embedded in beams of concrete prefabricated subsection, does not have to the trepanning in template, it is ensured that the globality of template reduces the type of template.Sleeve quantity of the present invention is few, and sleeve bolt hole facilitates closure, reduces water permeating of bridge floor risk during operation.Fixing steel plate of the present invention is embedded in inside concrete, and body structure surface facilitates the laying of bridge surface waterproof layer using rubber slab leveling without setting leveling steel plate.

Description

A kind of interim prestressing apparatus for precast segment spliced girder
Technical field
The invention belongs to bridge structure building fields, and in particular to a kind of interim prestressing force for precast segment spliced girder Device.
Background technology
When segmental precast erection method builds prestressed concrete beam construction, the splicing seam between prefabricated subsection needs application one Fixed interim precompression, makes epoxy resin sealant cure in the case where there is pressure state.Currently used for applying interim prestressed anchor Solid method mainly has concrete anchor block, embedded U-shaped anchor bolt to move steel pedestal and the removable steel platform in reserved anchoring duct Three kinds of seat.Concrete anchor block cannot reuse, and increase material cost and construction weight.Embedded U-shaped anchor bolt moves Steel pedestal, U-shaped anchor bolt stretch out precast concrete segment surface, need the corresponding position in template to drill, influence the entirety of template Property, and the interim stretching bed seat position of each prefabricated subsection may be inconsistent, increases templating species.Reserved anchoring duct moves Steel pedestal, later stage duct closure workload is larger, and duct blocks improper easy infiltration.
Invention content
The present invention proposes in order to solve the problems existing in the prior art, a kind of assembled for precast segment the purpose is to provide The interim prestressing apparatus of beam.
The technical scheme is that:A kind of interim prestressing apparatus for precast segment spliced girder, including adjacent spelling The prefabricated subsection connect, interim stretching bed seat is provided on the prefabricated subsection, and the interim stretching bed seat includes for answering in advance temporarily The anchor slab that power passes through, the interim prestressing force are anchored by nut and anchor slab.
The anchor slab back is provided with floor, and the anchor slab, floor lower end are provided with bottom plate.
The prefabricated subsection is beams of concrete prefabricated subsection, and the prefabricated subsection is embedded with fixing steel plate and sleeve, described It is provided with sleeve on fixing steel plate, forms threaded hole in the sleeve, the sleeve is welded with fixing steel plate.
It is fixed by bolt between the bottom plate, sleeve.
The interim prestressing force is spiral, and the spiral passes through connector spreading.
The rubber slab of leveling is provided between the interim stretching bed seat and prefabricated subsection surface.
The interim prestressing force passes through the through-hole in anchor slab, and the backing plate of enhancing is provided at the anchor slab.
It is emptied in the middle part of the fixing steel plate.
The bolt is located at the outside of floor.
The floor is two pieces and is mutually parallel.
Beneficial effects of the present invention are as follows:
Interim stretching bed seat, which can be removed, in the present invention uses, and reduces material utilization amount, mitigates segment weight.
Middle sleeve of the present invention is embedded in beams of concrete prefabricated subsection, does not have to the trepanning in template, it is ensured that the entirety of template Property, reduce the type of template.
Sleeve quantity of the present invention is few, and sleeve bolt hole facilitates closure, reduces water permeating of bridge floor risk during operation.
Fixing steel plate of the present invention is embedded in inside concrete, and body structure surface uses rubber slab leveling, without setting leveling steel plate, side Just the laying of bridge surface waterproof layer.
Description of the drawings
Fig. 1 is the installation artwork of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is the front view of the present invention;
Fig. 4 is the part drawing of fixing steel plate in the present invention;
Wherein:
1 prefabricated subsection, 2 fixing steel plate
3 sleeve, 4 rubber slab
5 bottom plate, 6 anchor slab
7 floor, 8 backing plate
9 bolt, 10 interim prestressing force
11 nut, 12 connector.
Specific implementation mode
Hereinafter, with reference to drawings and examples, the present invention is described in detail:
As shown in Fig. 1 ~ 4, a kind of interim prestressing apparatus for precast segment spliced girder includes the prefabricated subsection of contiguous concatenation 1, interim stretching bed seat is provided on the prefabricated subsection 1, and the interim stretching bed seat includes being passed through for interim prestressing force 10 Anchor slab 6, the interim prestressing force 10 are anchored by nut 12 and anchor slab 6.
6 back of the anchor slab is provided with floor 7, and the anchor slab 6,7 lower end of floor are provided with bottom plate 5.
The prefabricated subsection 1 is beams of concrete prefabricated subsection, and fixing steel plate 2 and sleeve are embedded in the prefabricated subsection 1 3, sleeve 3 is provided on the fixing steel plate 2, forms threaded hole in the sleeve 3, and the sleeve 3 is welded with fixing steel plate 2.
It is fixed by bolt 9 between the bottom plate 5, sleeve 3.
The interim prestressing force 10 is spiral, and the spiral passes through 12 spreading of connector.
The rubber slab 4 of leveling is provided between 1 surface of the interim stretching bed seat and prefabricated subsection.
The interim prestressing force 10 passes through the through-hole in anchor slab 6, and the backing plate 8 of enhancing is provided at the anchor slab 6.
It empties at 2 middle part of the fixing steel plate.
The bolt 9 is located at the outside of floor 7.
The floor 7 is two pieces and is mutually parallel.
Fixed form between the anchor slab 6, floor 7 is welding, the fixation between the bottom plate 5 and anchor slab 6, floor 7 Mode is welding, and the fixed form between the bottom plate 5 and floor 7 is welding.
The floor 7 is trapezoidal shape.
After the interim stretching bed seat is removed, 3 bolt hole of sleeve is carried out at closure using pumping of prostressed duct material Reason.
One piece of backing plate 8 is welded on the anchor slab 6 increases Out-of Plane Stiffness.Pass through four between stretching bed seat and sleeve 3 temporarily Bolt 9 connects, and one block of leveling rubber slab 4 is set between 1 body structure surface of each stretching bed seat and prefabricated subsection.Interim prestressing force 10 is adopted With spiral for prestressed concrete, the interim prestressing force of tensioning is anchored at the tensioning of previous prefabricated subsection 1 by nut 11 On pedestal.When the latter prefabricated subsection 1 is assembled, after spiral for prestressed concrete after 12 spreading of connector by being anchored at On the stretching bed seat of one prefabricated subsection.
The work progress of the present invention is as follows:
Specific construction step is:
1, fixing steel plate 2 and sleeve 3 are welded to connect, while two pieces of floors 7 are welded after anchor slab 6, and are formed temporarily with the welding of bottom plate 5 Stretching bed seat welds one piece of backing plate 8 on anchor slab 6.
2, precast concrete segment, and built-in location steel plate 2 and sleeve 3 in prefabricated subsection 1.
3, assembled previous prefabricated subsection 1, installs the interim stretching bed seat of the segment, tensioning simultaneously anchors interim prestressing force 10。
4, assembled the latter prefabricated subsection 1, installs the interim stretching bed seat of the segment, interim prestressing force 10 passes through connector 12 spreadings, tensioning and interim prestressing force 10.
5, repeat the above steps 3~step 4, until 1 assembly of all prefabricated subsections finishes.
6, after the permanent prestressing force in segment pulls, interim prestressing force 10 is removed.
7, closure processing is carried out to 3 bolt hole of sleeve using pumping of prostressed duct material.
Interim stretching bed seat, which can be removed, in the present invention uses, and reduces material utilization amount, mitigates segment weight.
Middle sleeve of the present invention is embedded in beams of concrete prefabricated subsection, does not have to the trepanning in template, it is ensured that the entirety of template Property, reduce the type of template.
Sleeve quantity of the present invention is few, and sleeve bolt hole facilitates closure, reduces water permeating of bridge floor risk during operation.
Fixing steel plate of the present invention is embedded in inside concrete, and body structure surface uses rubber slab leveling, without setting leveling steel plate, side Just the laying of bridge surface waterproof layer.

Claims (10)

1. a kind of interim prestressing apparatus for precast segment spliced girder includes the prefabricated subsection of contiguous concatenation(1), feature It is:The prefabricated subsection(1)On be provided with interim stretching bed seat, the interim stretching bed seat includes supplying interim prestressing force(10) The anchor slab passed through(6), the interim prestressing force(10)Pass through nut(12)With anchor slab(6)Anchoring.
2. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 1, it is characterised in that:Institute State anchor slab(6)Back is provided with floor(7), the anchor slab(6), floor(7)Lower end is provided with bottom plate(5).
3. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 2, it is characterised in that:Institute State prefabricated subsection(1)For beams of concrete prefabricated subsection, the prefabricated subsection(1)In be embedded with fixing steel plate(2)And sleeve(3), The fixing steel plate(2)On be provided with sleeve(3), the sleeve(3)Middle formation threaded hole, the sleeve(3)With fixing steel plate (2)Welding.
4. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 3, it is characterised in that:Institute State bottom plate(5), sleeve(3)Between pass through bolt(9)It is fixed.
5. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 4, it is characterised in that:Institute State interim prestressing force(10)For spiral, the spiral passes through connector(12)Spreading.
6. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 5, it is characterised in that:Institute State interim stretching bed seat and prefabricated subsection(1)The rubber slab of leveling is provided between surface(4).
7. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 6, it is characterised in that:Institute State interim prestressing force(10)Across anchor slab(6)In through-hole, the anchor slab(6)Place is provided with the backing plate of enhancing(8).
8. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 7, it is characterised in that:Institute State fixing steel plate(2)It empties at middle part.
9. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 8, it is characterised in that:Institute State bolt(9)Positioned at floor(7)Outside.
10. a kind of interim prestressing apparatus for precast segment spliced girder according to claim 9, it is characterised in that: The floor(7)For two pieces and it is mutually parallel.
CN201810629296.1A 2018-06-19 2018-06-19 A kind of interim prestressing apparatus for precast segment spliced girder Pending CN108677729A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810629296.1A CN108677729A (en) 2018-06-19 2018-06-19 A kind of interim prestressing apparatus for precast segment spliced girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810629296.1A CN108677729A (en) 2018-06-19 2018-06-19 A kind of interim prestressing apparatus for precast segment spliced girder

Publications (1)

Publication Number Publication Date
CN108677729A true CN108677729A (en) 2018-10-19

Family

ID=63811327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810629296.1A Pending CN108677729A (en) 2018-06-19 2018-06-19 A kind of interim prestressing apparatus for precast segment spliced girder

Country Status (1)

Country Link
CN (1) CN108677729A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235369A (en) * 2018-11-07 2019-01-18 中天海洋系统有限公司 A kind of airproof platform anchor
CN109826097A (en) * 2019-02-18 2019-05-31 腾达建设集团股份有限公司 A kind of interim prestressing force implementation method in the section of bridge subsection
CN109853398A (en) * 2019-04-05 2019-06-07 上海公路桥梁(集团)有限公司 A kind of interim prestressed structure for Precast Concrete Segmental Bridges formula bridge
CN111188276A (en) * 2020-01-17 2020-05-22 中铁电气化局集团有限公司 Segmental beam sliding and assembling construction method
CN113512934A (en) * 2021-07-08 2021-10-19 中铁第五勘察设计院集团有限公司 Temporary connection structure of prefabricated spliced bridge and prefabricated beam section
CN113756209A (en) * 2021-10-18 2021-12-07 湖南省通盛工程有限公司 Diagonal pulling and pushing construction method for large-span steel beam
CN113789811A (en) * 2021-09-16 2021-12-14 北京科技大学 Temporary fastening connection system for prefabricated large components

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002201612A (en) * 2000-12-28 2002-07-19 Taisei Corp Jig for fixing installing steel member
CN103215894A (en) * 2013-04-26 2013-07-24 中铁第一勘察设计院集团有限公司 Mobile temporary prestress tension anchor block
CN203411908U (en) * 2013-08-12 2014-01-29 中铁二局股份有限公司 Temporary tensioned prestress anchoring device
CN105735134A (en) * 2016-03-17 2016-07-06 中交第二航务工程局有限公司 Temporary tensioning method for stub matching prefabricated box girders
CN208545670U (en) * 2018-06-19 2019-02-26 中国铁路总公司 A kind of interim prestressing apparatus for precast segment spliced girder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002201612A (en) * 2000-12-28 2002-07-19 Taisei Corp Jig for fixing installing steel member
CN103215894A (en) * 2013-04-26 2013-07-24 中铁第一勘察设计院集团有限公司 Mobile temporary prestress tension anchor block
CN203411908U (en) * 2013-08-12 2014-01-29 中铁二局股份有限公司 Temporary tensioned prestress anchoring device
CN105735134A (en) * 2016-03-17 2016-07-06 中交第二航务工程局有限公司 Temporary tensioning method for stub matching prefabricated box girders
CN208545670U (en) * 2018-06-19 2019-02-26 中国铁路总公司 A kind of interim prestressing apparatus for precast segment spliced girder

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
铁道第二勘察设计院: "《南昆铁路 第3册》", pages: 151 - 152 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235369A (en) * 2018-11-07 2019-01-18 中天海洋系统有限公司 A kind of airproof platform anchor
CN109235369B (en) * 2018-11-07 2024-04-26 中天海洋系统有限公司 Airtight type platform anchoring device
CN109826097A (en) * 2019-02-18 2019-05-31 腾达建设集团股份有限公司 A kind of interim prestressing force implementation method in the section of bridge subsection
CN109853398A (en) * 2019-04-05 2019-06-07 上海公路桥梁(集团)有限公司 A kind of interim prestressed structure for Precast Concrete Segmental Bridges formula bridge
CN109853398B (en) * 2019-04-05 2024-02-23 上海公路桥梁(集团)有限公司 Temporary pre-stressing structure for prefabricated segment assembly bridge
CN111188276A (en) * 2020-01-17 2020-05-22 中铁电气化局集团有限公司 Segmental beam sliding and assembling construction method
CN113512934A (en) * 2021-07-08 2021-10-19 中铁第五勘察设计院集团有限公司 Temporary connection structure of prefabricated spliced bridge and prefabricated beam section
CN113789811A (en) * 2021-09-16 2021-12-14 北京科技大学 Temporary fastening connection system for prefabricated large components
CN113789811B (en) * 2021-09-16 2022-04-26 北京科技大学 Temporary fastening connection system for prefabricated large components
CN113756209A (en) * 2021-10-18 2021-12-07 湖南省通盛工程有限公司 Diagonal pulling and pushing construction method for large-span steel beam

Similar Documents

Publication Publication Date Title
CN108677729A (en) A kind of interim prestressing apparatus for precast segment spliced girder
CN107165272A (en) Prestressing force assembly concrete frame joint attachment structure and its construction method
CN105113425B (en) A kind of construction method of efficiently assembled steel reinforced concrete combination beam
CN102230315B (en) Prefabricated part and semi-prefabricated construction method for multistory building
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
CN107974891B (en) Municipal road assembling unit and construction method thereof
CN208545670U (en) A kind of interim prestressing apparatus for precast segment spliced girder
CN104358337B (en) Light-weight composite floor slab structure for assembling integral prefabricated double thin plates, and construction method
CN108385512A (en) One kind being based on bolted modular assembly formula Hollow High Pier splicing structure and its practice
CN203475598U (en) Shock-proof prefabricated building of steel bar truss shearing wall composite structure
CN205857530U (en) Joint bar positioner
CN105350445A (en) Novel efficient assembly-type reinforced concrete composite beam
CN110005169A (en) A kind of cracking resistance process with stressed seamless terrace
CN107605065A (en) A kind of fabricated shear wall plate, wallboard connecting structure and its construction method
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
CN110130670A (en) Corbel type temporary support system and its construction method above and below armored concrete
CN112030772A (en) Rapid construction method of continuous rigid frame bridge
CN110468727B (en) Temporary prestress tensioning pedestal and lifting point integrated structure of segmental beam and construction method
JP3569878B2 (en) Jig for connecting precast concrete slabs
CN105649248B (en) Prefabricated PC concrete core slab and Cast-in-situ Beam integral construction method
CN105752864A (en) Tower crane attachment joint and construction method thereof
CN116674079A (en) Construction method of prefabricated small box girder
CN105908883A (en) Construction method for preventing upward floating of composite floor system lightweight core formwork
JP2010053511A (en) Method for constructing road with smooth face material
CN103397778A (en) Method for constructing high-rise commercial and residential building structure transfer floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination