CN108661671A - Tunnel vault two serves as a contrast concrete vacuum and assists pouring procedure - Google Patents

Tunnel vault two serves as a contrast concrete vacuum and assists pouring procedure Download PDF

Info

Publication number
CN108661671A
CN108661671A CN201810469571.8A CN201810469571A CN108661671A CN 108661671 A CN108661671 A CN 108661671A CN 201810469571 A CN201810469571 A CN 201810469571A CN 108661671 A CN108661671 A CN 108661671A
Authority
CN
China
Prior art keywords
concrete
vault
end head
lining
head formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810469571.8A
Other languages
Chinese (zh)
Other versions
CN108661671B (en
Inventor
王�华
王新民
唐波涛
刘朝辉
张雪峰
周永明
袁俊青
高晓辉
张新波
田佳学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201810469571.8A priority Critical patent/CN108661671B/en
Publication of CN108661671A publication Critical patent/CN108661671A/en
Application granted granted Critical
Publication of CN108661671B publication Critical patent/CN108661671B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of tunnel vault two lining concrete vacuums to assist pouring procedure, belongs to technical field of tunnel construction, steps are as follows:Lining trolley is in place, installs end head formwork, exhaust pipe and concrete delivery pipe and seals, one end of vault template is contacted with the lining of completed vault two, the other end is connected with end head formwork, concrete delivery pipe above end head formwork is set to the top of concrete strengthening layer above vault template, is equipped with and the matched sealing ring of vault main reinforcement with the matched preformed hole inboard of vault main reinforcement on end head formwork;Exhaust pipe is connected to vacuum pump, concrete delivery pipe connection delivery pump carries out two lining concrete cast;End head formwork, vacuum pump and concrete delivery pipe are removed after concrete final set.Concrete is served as a contrast using supplementary means cast tunnel vault two is vacuumized, the common quality defects such as overcome arch crown part concrete cast thickness deficiency, structure variation, intensity low make tunnel vault portion structure stress more meet design idea, improve its bearing capacity.

Description

Tunnel vault two serves as a contrast concrete vacuum and assists pouring procedure
Technical field
The invention belongs to technical field of tunnel construction, are to be related to a kind of tunnel vault two to serve as a contrast concrete true more specifically Sky auxiliary pouring procedure.
Background technology
With the fast development of Tunnel Engineering technology, splash guard+draining blind pipe is gradually promoted the use of from the nineties in last century Technology makes tunnel vault leak be effectively controlled;Original arch+small is substituted using lining trolley+pumped concrete earth process The arch-wall method technique of template+artificial loading realizes tunnel concrete two and serves as a contrast full section face rapid construction, and integrated construction quality obtains To being substantially improved.
Lining trolley is made of removable supporting rack, vault template, side wall template and end head formwork etc., trolley design length For 9m or 12m, vault template is equipped with the preformed hole of installation madjack pipe, and vault template and side wall template are arranged at a certain distance behind Attached vibrator is provided with pump line feeding mouth on end head formwork.Vault driving backbreak, end head formwork pump concrete pan feeding Under the comprehensive functions of factors such as the mouth tenesmus that position is relatively low and concrete is through vibrating, easily there are two lining concrete and come to nothing now with vault As;By the larger concrete shrinkage of the pump concrete ratio of mud, also large effect, this vault come to nothing phenomenon more very.For this purpose, Concrete, which reaches to come to nothing to vault using mud-jacking technology after some strength, is filled processing.
The lining of tunnel vault two is designed as domes, and at present since vault comes to nothing seriously, vault highest position forms one The horizontal plane of elevation is reduced, i.e., domes is evolved into a local plank frame, seriously violates design idea, and dome portions Bit architecture bearing capacity declines, although having carried out mud jacking filling processing, intensity is well below strong concrete after cement slurry sets Degree, is still not achieved design strength;And cement mortar drying shrinkage is more obvious, and certain drying shrinkage is there is also after mud jacking and is come to nothing.
Invention content
The purpose of the present invention is to provide a kind of tunnel vault two lining concrete vacuums to assist pouring procedure, existing to solve The highest position that tunnel vault two present in technology serves as a contrast is come to nothing phenomenon because there are two lining concrete and vaults, leads to arch crown part The technical issues of structural-load-carrying capacity declines.
To achieve the above object, the technical solution adopted by the present invention is:A kind of lining of tunnel vault two concrete vacuum is provided Pouring procedure is assisted, is included the following steps:
Lining trolley is in place:Lining trolley is moved to the lower section of concrete strengthening layer, increasing lining trolley support makes lining cutting Vault template on trolley is adjacent to the bottom of concrete strengthening layer, and one end of vault template is made to be connect with the lining of completed vault two It touches;
End head formwork is installed:It is set with sealing ring in the exposed junction for the vault main reinforcement for being embedded in concrete strengthening layer, by end Corresponding preformed hole passes through vault main reinforcement in template, while end head formwork being made to coordinate with waterstop, the lower end of the end head formwork It is connected with the other end of vault template, is close to be laid with sealing structure progress between the splash guard and end head formwork of vault country rock laying Sealing, completes the in place of end head formwork;
Exhaust pipe and concrete delivery pipe are installed:Concrete delivery pipe is mounted on to the top of end head formwork, the coagulation Native delivery pipe is set to the top of concrete strengthening layer;The reserved of installation exhaust pipe is reserved when concrete strengthening layer is constructed in advance Exhaust pipe for being connected with vacuum pump is installed in preformed hole by hole, and the upper end of exhaust pipe extends to concrete strengthening layer Top lay falling-off region;
Two lining concrete cast:Exhaust pipe is opened to be vented automatically;By delivery pump by two lining concrete through concrete conveyance Pipe is delivered to above the concrete strengthening layer of vault region of coming to nothing and is connected on the outside of exhaust pipe until when concrete can not pour into Vacuum pump starts to extract air, the certain negative pressure of formation in the region that makes to come to nothing above the concrete strengthening layer of vault;Continue to coagulation Native delivery pipe concrete perfusion, until concrete fills the region of coming to nothing of vault;
Vacuum pump and concrete delivery pipe are removed after concrete final set, and exhaust pipe is reserved for later stage vault mud jacking Pipe;End head formwork is removed, lining trolley support, mobile lining trolley to next setting are reduced.
Further, when the lining trolley is in place, vault template overlaps 30cm with the lining of vault two is completed.
Further, the exhaust pipe serves as a contrast side close to completed vault two and is arranged.
Further, it is equipped with control between the concrete delivery pipe and delivery pump, between the vacuum pump and exhaust pipe Valve processed.
Further, the outside of the end head formwork is equipped with the groove coordinated with waterstop.
Further, the sealing structure includes the circumferential compression being embedded between the end head formwork and the splash guard Caulking gum band, the circumferential direction compression seal rubber strip pass through fluid sealant and the end head formwork and the splash guard stationary phase Even.
Further, the sealing ring is rubber washer.
Further, the outside of the end head formwork is equipped with the sealing element coordinated with the vault main reinforcement.
Further, the sealing element includes first sleeve and the institute being fixed on the end head formwork outside preformed hole The second casing that vault main reinforcement protruded length matches is stated, the first sleeve is connect with second casing by connecting pipe It is fixed;The end of second casing is blind end.
Further, it is coated at the both ends of the connecting pipe and the cooperation of the first sleeve and second casing close Sealing.
The advantageous effect that tunnel vault two provided by the invention serves as a contrast concrete vacuum auxiliary pouring procedure is:With existing skill Art is compared, and tunnel vault two of the present invention, which serves as a contrast concrete vacuum auxiliary pouring procedure, can utilize the part two poured to serve as a contrast coagulation The region of coming to nothing of soil, vault template, end head formwork and splash guard between the top and vault country rock of concrete strengthening layer carries out close Concrete is carried out concrete cast to region of coming to nothing through concrete delivery pipe using delivery pump, while passing through air extractor by envelope The top lay falling-off region of concrete strengthening layer is vacuumized, certain negative pressure is formed in the inner cavity in region of coming to nothing.Utilize this hair It is bright to improve arch crown part concrete thickness and strength of lining, so that the lining of tunnel top two is formed domes, meets design idea, Arch crown part structural-load-carrying capacity is improved, the present invention is suitable for the tunnels cast-in-place concrete secondary linings such as railway, highway, subway Construction site.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention some Embodiment for those of ordinary skill in the art without having to pay creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 be tunnel vault two provided in an embodiment of the present invention serve as a contrast concrete vacuum assist pouring procedure hogging top template and The scheme of installation of end head formwork;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the scheme of installation outside end head formwork with the sealing element of vault main reinforcement cooperation in Fig. 1;
Wherein, each reference numeral in figure:
1. vault template, 2. end head formworks, 2-1. grooves, 2-2. first sleeves, 2-3. connecting pipes, second set of 2-4. Pipe, 2-5. sealing rings, 2-6. circumferential direction compression seal rubber strips, 3. splash guards, 4. waterstops, 5. exhaust pipes, 6. concrete conveyances Pipe, 7. concrete strengthening layers, 8. vault country rocks, 9. vaults two lining, 9-1. construction joints, 10. vault main reinforcements, 11. fluid sealants, 12. It comes to nothing region.
Specific implementation mode
In order to make technical problems, technical solutions and advantages to be solved be more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
It should be noted that when element is referred to as " being fixed on " or " being set to " another element, it can be directly another On one element or it is connected on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on ... shown in the drawings or position are closed System, is merely for convenience of description of the present invention and simplification of the description, not indicating or implying the indicated device or element must have Specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature.In the description of the present invention, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
Now tunnel vault two provided by the invention lining concrete vacuum auxiliary pouring procedure is illustrated.The tunnel arch Two lining concrete vacuum of top assists pouring procedure, includes the following steps:
One, lining trolley is in place:Lining trolley is moved to the lower section of concrete strengthening layer, increasing lining trolley support will lining Vault template on platform building cart is adjacent to the bottom of concrete strengthening layer, and one end of vault template is made to be connect with the lining of completed vault two It touches.In order to avoid spillage occurs during two liner in pouring for the construction joint that adjacent concrete reinforces interlayer, the lining trolley is just When position, by vault template and the lining overlap joint of vault two 30cm can be completed.
Two, end head formwork is installed:It is set with sealing ring in the exposed junction for the vault main reinforcement for being embedded in concrete strengthening layer, by end Corresponding preformed hole passes through vault main reinforcement on head mould plate, while end head formwork being made to coordinate with waterstop, under the end head formwork End be connected with the other end of vault template, be close to vault country rock be laid with splash guard and end head formwork between laying sealing structure into Row sealing, completes the in place of end head formwork.
Three, exhaust pipe and concrete delivery pipe are installed:Concrete delivery pipe is mounted on to the top of end head formwork, it is described mixed Solidifying soil delivery pipe is set to the top of concrete strengthening layer;The pre- of installation exhaust pipe is reserved when concrete strengthening layer is constructed in advance It boxes out, the exhaust pipe for being connected with vacuum pump is installed in preformed hole, the upper end of exhaust pipe extends to concrete strengthening layer Top lay falling-off region.
Four, two lining concrete cast:Exhaust pipe is opened to be vented automatically;It is by delivery pump that two lining concrete are defeated through concrete The concrete strengthening layer upper area for sending pipe to be delivered to vault is connected true until when concrete can not pour on the outside of exhaust pipe Sky pump starts to extract air, the certain negative pressure of formation in the region that makes to come to nothing above the concrete strengthening layer of vault;Continue to concrete Delivery pipe concrete perfusion, until concrete fills the region of coming to nothing of vault;Concrete is closed after the completion of concreting in time Pump line and exhaust pipe control valve.
Five, vacuum pump and concrete delivery pipe are removed after concrete final set, and exhaust pipe is reserved for later stage vault pressure Slurry pipe;End head formwork is removed, lining trolley support, mobile lining trolley to next setting are reduced.
Tunnel vault two provided by the invention serves as a contrast concrete vacuum and assists pouring procedure, compared with prior art, the present invention Have the advantages that easy to operate, sealing effect is good, arch crown part structural-load-carrying capacity is strong, by vault template, end head formwork, prevents Water plate and surrounding sealing structure are sealed the region of coming to nothing at the top of concrete strengthening layer between vault country rock, pass through pumping Device of air vacuumizes the top face of concrete strengthening layer region of coming to nothing, and the inner cavity in the region that makes to come to nothing forms certain negative pressure, profit Concrete is subjected to concrete cast through concrete delivery pipe to region of coming to nothing with delivery pump.It is overcome using vacuum aided means Arch crown part concrete pours into a mould the common quality defects such as thickness deficiency, structure variation (arch becomes plate shape), intensity is low, makes tunnel vault Portion structure stress more meets design idea, improves the service life in tunnel.The present invention is suitable for railway, highway, subway etc. Tunnel double-lining concrete cast-in-situ construction site.
Further, referring to Fig. 1, assisting pouring procedure as tunnel vault two provided by the invention lining concrete vacuum A kind of specific implementation mode, the air extractor includes the exhaust pipe 5 being connected with vacuum pump, and the exhaust pipe 5 is set to institute It states in concrete strengthening layer 7, one end of the exhaust pipe 5 extends to the top lay falling-off region of concrete strengthening layer 7, the exhaust The lower section that the other end of pipe extends to the vault template 1 is connected with vacuum pump.Start vacuum pump, using exhaust pipe by concrete Negative pressure state is pumped into the top lay falling-off region of reinforcing layer, is facilitated concrete delivery pipe to carry out concrete cast to region of coming to nothing, is kept away Exempt from concrete in casting process and included air, ensure concrete casting quality, so that the lining of tunnel top two is formed domes, improve Arch crown part structural-load-carrying capacity.
Further, referring to Fig. 1, assisting pouring procedure as tunnel vault two provided by the invention lining concrete vacuum A kind of specific implementation mode, the exhaust pipe 5 close to completed vault two serve as a contrast 9 sides be arranged.It is convenient to de- to be arranged so Empty region is evacuated, and will not be poured into a mould concrete and be interfered.
Further, referring to Fig. 1, assisting pouring procedure as tunnel vault two provided by the invention lining concrete vacuum A kind of specific implementation mode, be all provided between the concrete delivery pipe 6 and delivery pump, between the vacuum pump and exhaust pipe 5 There is control valve.Using the installation and keying of control valve easy to exhaust pipe and concrete delivery pipe, it is being mounted on lining trolley in advance Exhaust pipe exposed junction installation control valve in the vault template of tail portion and plug, it is vault part to remove after plug installs vacuum pump Come to nothing region provide vacuum degree (negative pressure), for concrete pumping cast create conditions;Utilize the control valve on concrete delivery pipe Prevent the loss that leaks of concrete after concreting.
Further, please refer to Fig.1,2, as tunnel vault two provided by the invention lining concrete vacuum assist cast side A kind of specific implementation mode of method, the outside of the end head formwork 2 is equipped with the groove 2-1 coordinated with waterstop 4, by groove side Just waterstop is installed between adjacent vault two serves as a contrast, while also avoids that gas leakage at waterstop is installed on end head formwork.
Further, please refer to Fig.1,2, as tunnel vault two provided by the invention lining concrete vacuum assist cast side A kind of specific implementation mode of method, the sealing structure include the ring being embedded between the end head formwork 2 and the splash guard 3 To compression seal rubber strip 2-6, the circumferential direction compression seal rubber strip 2-6 passes through fluid sealant and the end head formwork 2 and described Splash guard 3 is fixedly linked.It is close to being carried out between splash guard at the top of end head formwork by circumferential compression seal rubber strip and fluid sealant Envelope ensures the sealing effect in region of coming to nothing.
Further, assist one kind of pouring procedure specific as tunnel vault two provided by the invention lining concrete vacuum Embodiment, the sealing ring 2-5 are rubber washer.Using rubber washer to the preformed hole of installation vault main reinforcement on end head formwork Place is sealed, and prevents that spillage occurs in casting process.
Further, please refer to Fig.1,3, as tunnel vault two provided by the invention lining concrete vacuum assist cast side A kind of specific implementation mode of method, the outside of the end head formwork 2 are equipped with the sealing element coordinated with the vault main reinforcement 10.Its In, sealing element can be mounted on outside the vault main reinforcement of top, since top vault main reinforcement is close to the top surface of concrete strengthening layer, two Serve as a contrast in concrete placement can the air inlet due to poorly sealed, cause top region vacuum degree effect of coming to nothing poor;And lower part The cooperation of vault main reinforcement and end head formwork is in casting process, can concrete slurry all its gap can be blocked, will not The phenomenon that there are gas leakage.
The sealing element includes first sleeve 2-2 and the vault being fixed on the end head formwork 2 outside preformed hole The second casing 2-4, the first sleeve 2-2 that 10 protruded length of main reinforcement matches and the second casing 2-4 passes through connecting tube Part 2-3 is connected and fixed.Wherein, the both ends of connecting pipe are machined with internal thread, first sleeve and the second casing and connecting pipe One end of cooperation is machined with external screw thread, first sleeve and the second casing and connecting pipe screw-thread fit, facilitates installing and dismounting It is sealed at the preformed hole to installing vault main reinforcement on end head formwork simultaneously;Wherein one end of the second casing 2-4 is blind end.
Further, please refer to Fig.1,3, as tunnel vault two provided by the invention lining concrete vacuum assist cast side A kind of specific implementation mode of method, the both ends of the connecting pipe 2-3 and the first sleeve 2-2 and the second casing 2-4 Cooperation at be coated with fluid sealant.Bobbin seal glue is further close to being carried out at the preformed hole of installation vault main reinforcement on end head formwork Envelope, is further ensured that sealing effect.
The scheme of installation of vault template, end head formwork in the specific embodiment of the present invention please refers to Fig.1 and schemes 2, steps are as follows for Specific construction:
One, lining trolley is in place, vault template overlaps 30cm with the lining of vault two is completed when in place;
Two, end head formwork is installed, stretched out outside end head formwork after overlap joint main reinforcement is penetrated rubber washer, outside the vault main reinforcement of top End first sleeve, the second casing and connecting pipe are tightly connected;Waterstop is placed in end head formwork waterstop groove;It is holding It is pressed into circumferential compression seal rubber strip between head die head and splash guard, is used in combination fluid sealant tight-closed;
Three, PVC exhaust pipes and control valve are installed in the arch crown part preformed hole of lining trolley rear end;
Four, two lining concrete vacuum auxiliary cast:Exhaust pipe and control valve are opened, in favor of being vented automatically;According to previous When pumping, two lining concrete to arch crown part of Vibration Technology cast, when concrete can not pour into, in the control valve of exhaust pipe Outside connection vacuum pump, which starts extraction air, to be made to form certain negative pressure in vault cavity;In the concrete of end head formwork arch crown part Concrete pumping pipe is connected on the outside of delivery pipe and control valve, opens control valve to vault concrete perfusion;When concrete is filled Vault come to nothing region cavity after close both sides control valve in time, prevent the concrete poured into flow out.
Five, exhaust pipe control valve is removed after concrete final set, and exhaust pipe is reserved for later stage vault madjack pipe;It removes End head formwork reduces lining trolley support, mobile lining trolley to next setting.Before tunnel vault two serves as a contrast concrete cast It need to carry out following seal operation:
1. forming the sealing between vault and country rock using the water-proof function of splash guard;
2. waterstop and cast-in-place vault two lining between the lining of concrete vault two construction joint twice is utilized to form lining cutting platform The sealing at vehicle rear;
3. serving as a contrast cast-in-place concrete using both sides side wall vault two forms both sides sealing;
4. forming the sealing between end head formwork bottom and vault template using cast-in-place concrete;
5. using elasticity circumferential compression seal rubber strip and fluid sealant formed end head formwork at the top of with vault splash guard it Between sealing;
6. overlapping vault main reinforcement using the sealing element on the outside of preformed hole on end head formwork, while rubber is set on the inside of end head formwork Rubber gasket mortar leakage prevention;
7. using first sleeve, the second casing and the connecting pipe of the setting overlap joint vault main reinforcement on the outside of end head formwork, and Carrying out closure mating surface by fluid sealant prevents gas leakage;
8. using the exhaust pipe, control valve and the plug that are mounted in advance in the vault template of lining trolley tail portion, vacuum is installed Certain vacuum degree (negative pressure) is locally provided for vault after pump, is created conditions for concrete pumping cast;
9. coagulation after preventing concrete from pouring into a mould using the concrete delivery pipe and control valve being fixed on end head formwork Soil is lost in.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (10)

1. tunnel vault two serves as a contrast concrete vacuum and assists pouring procedure, which is characterized in that include the following steps:
Lining trolley is in place:Lining trolley is moved to the lower section of concrete strengthening layer, increasing lining trolley support makes lining trolley On vault template be adjacent to the bottom of concrete strengthening layer, so that one end of vault template is contacted with the lining of completed vault two;
End head formwork is installed:It is set with sealing ring in the exposed junction for the vault main reinforcement for being embedded in concrete strengthening layer, by end head formwork Upper corresponding preformed hole passes through vault main reinforcement, while end head formwork being made to coordinate with waterstop, the lower end of the end head formwork and arch The other end of top template is connected, and laying sealing structure progress is close between being close to the splash guard and end head formwork of vault country rock laying Envelope, completes the in place of end head formwork;
Exhaust pipe and concrete delivery pipe are installed:Concrete delivery pipe is mounted on to the top of end head formwork, the concrete is defeated The top for sending pipe to be set to concrete strengthening layer;The preformed hole of installation exhaust pipe is reserved when concrete strengthening layer is constructed in advance, Exhaust pipe for being connected with vacuum pump is installed in preformed hole, the upper end of exhaust pipe extends to the top of concrete strengthening layer It comes to nothing region;
Two lining concrete cast:Exhaust pipe is opened to be vented automatically;It is by delivery pump that two lining concrete are defeated through concrete delivery pipe It send to region of coming to nothing above the concrete strengthening layer of vault and connects vacuum on the outside of exhaust pipe until when concrete can not pour into Pump starts to extract air, the certain negative pressure of formation in the region that makes to come to nothing above the concrete strengthening layer of vault;Continue defeated to concrete Pipe concrete perfusion is sent, until concrete fills the region of coming to nothing of vault;
Vacuum pump and concrete delivery pipe are removed after concrete final set, and exhaust pipe is reserved for later stage vault madjack pipe;It tears open Except end head formwork, lining trolley support, mobile lining trolley to next setting are reduced.
2. tunnel vault two as described in claim 1 serves as a contrast concrete vacuum and assists pouring procedure, it is characterised in that:The lining cutting When trolley is in place, the vault template overlaps 30cm with the lining of vault two is completed.
3. tunnel vault two as claimed in claim 2 serves as a contrast concrete vacuum and assists pouring procedure, it is characterised in that:The exhaust Pipe serves as a contrast side setting close to completed vault two.
4. tunnel vault two as claimed in claim 2 serves as a contrast concrete vacuum and assists pouring procedure, it is characterised in that:The coagulation It is equipped with control valve between native delivery pipe and delivery pump, between the vacuum pump and exhaust pipe.
5. tunnel vault two as described in claim 1 serves as a contrast concrete vacuum and assists pouring procedure, it is characterised in that:The end The outside of template is equipped with the groove coordinated with waterstop.
6. tunnel vault two as described in claim 1 serves as a contrast concrete vacuum and assists pouring procedure, it is characterised in that:The sealing Structure includes the circumferential compression seal rubber strip being embedded between the end head formwork and the splash guard, and the circumferential compression is close Envelope rubber strip is fixedly linked by fluid sealant and the end head formwork and the splash guard.
7. tunnel vault two as claimed in claim 6 serves as a contrast concrete vacuum and assists pouring procedure, it is characterised in that:The sealing Circle is rubber washer.
8. assisting pouring procedure as claim 1-7 any one of them tunnel vault two serves as a contrast concrete vacuum, it is characterised in that: The outside of the end head formwork is equipped with the sealing element coordinated with the vault main reinforcement.
9. tunnel vault two as claimed in claim 8 serves as a contrast concrete vacuum and assists pouring procedure, it is characterised in that:The sealing Part includes being fixed on first sleeve on the end head formwork outside preformed hole, matching with the vault main reinforcement protruded length Second casing, the first sleeve are connected and fixed with second casing by connecting pipe;The end of second casing is Blind end.
10. tunnel vault two as claimed in claim 9 serves as a contrast concrete vacuum and assists pouring procedure, it is characterised in that:The company It is coated with fluid sealant at the both ends of jointed tubular workpieces and the cooperation of the first sleeve and second casing.
CN201810469571.8A 2018-05-16 2018-05-16 Vacuum auxiliary pouring method for tunnel vault secondary lining concrete Active CN108661671B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810469571.8A CN108661671B (en) 2018-05-16 2018-05-16 Vacuum auxiliary pouring method for tunnel vault secondary lining concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810469571.8A CN108661671B (en) 2018-05-16 2018-05-16 Vacuum auxiliary pouring method for tunnel vault secondary lining concrete

Publications (2)

Publication Number Publication Date
CN108661671A true CN108661671A (en) 2018-10-16
CN108661671B CN108661671B (en) 2024-02-23

Family

ID=63779954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810469571.8A Active CN108661671B (en) 2018-05-16 2018-05-16 Vacuum auxiliary pouring method for tunnel vault secondary lining concrete

Country Status (1)

Country Link
CN (1) CN108661671B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184751A (en) * 2018-11-16 2019-01-11 中铁隧道集团处有限公司 Endoscopic bomb shelter monitoring device and monitoring method for tunnel-liner vault
CN110486037A (en) * 2019-08-26 2019-11-22 中铁二局第一工程有限公司 A kind of constructing structure that railway tunnel vault prevents two lining vaults from coming to nothing and method
CN110847933A (en) * 2019-10-08 2020-02-28 中铁隧道局集团建设有限公司 Method for preventing and controlling tunnel vault from being hollow
CN111894630A (en) * 2020-06-16 2020-11-06 神华包神铁路集团有限责任公司 Clearing structure and treatment method for tunnel brake tip defect
CN112538911A (en) * 2019-09-23 2021-03-23 董建军 Organic cementing material concrete
CN113217024A (en) * 2021-05-19 2021-08-06 中铁二十局集团第四工程有限公司 Crotch type pumping construction method for preventing concrete at vault of secondary lining of underground excavated tunnel from being emptied
CN113323694A (en) * 2021-06-29 2021-08-31 重庆科技学院 Tunnel lining cavity negative pressure grouting process
CN114161580A (en) * 2021-09-28 2022-03-11 湖南工业大学 Concrete on-site pumping vacuum stirring conveying pipe and construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05295995A (en) * 1992-04-21 1993-11-09 Maeda Corp Real placing shield lining method
JP2010222837A (en) * 2009-03-24 2010-10-07 Toda Constr Co Ltd Manufacturing method for inner surface covering segment for tunnel lining and form device for the same
CN107152292A (en) * 2017-06-30 2017-09-12 云南公投建设集团隧道工程有限公司 Tunnel descending inclined shaft contrary sequence method two serves as a contrast construction method
CN107386652A (en) * 2017-09-19 2017-11-24 芜湖金智王机械设备有限公司 Concreting car
CN208252128U (en) * 2018-05-16 2018-12-18 中铁十七局集团第三工程有限公司 The template of concrete vacuum casting is served as a contrast for tunnel vault two

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05295995A (en) * 1992-04-21 1993-11-09 Maeda Corp Real placing shield lining method
JP2010222837A (en) * 2009-03-24 2010-10-07 Toda Constr Co Ltd Manufacturing method for inner surface covering segment for tunnel lining and form device for the same
CN107152292A (en) * 2017-06-30 2017-09-12 云南公投建设集团隧道工程有限公司 Tunnel descending inclined shaft contrary sequence method two serves as a contrast construction method
CN107386652A (en) * 2017-09-19 2017-11-24 芜湖金智王机械设备有限公司 Concreting car
CN208252128U (en) * 2018-05-16 2018-12-18 中铁十七局集团第三工程有限公司 The template of concrete vacuum casting is served as a contrast for tunnel vault two

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184751A (en) * 2018-11-16 2019-01-11 中铁隧道集团处有限公司 Endoscopic bomb shelter monitoring device and monitoring method for tunnel-liner vault
CN109184751B (en) * 2018-11-16 2024-05-10 中铁隧道集团一处有限公司 Endoscopic type air-raid shelter monitoring device and monitoring method for tunnel lining vault
CN110486037A (en) * 2019-08-26 2019-11-22 中铁二局第一工程有限公司 A kind of constructing structure that railway tunnel vault prevents two lining vaults from coming to nothing and method
CN110486037B (en) * 2019-08-26 2024-04-05 中铁二局第一工程有限公司 Construction structure and method for preventing double-lining vault from being hollow for railway tunnel vault
CN112538911A (en) * 2019-09-23 2021-03-23 董建军 Organic cementing material concrete
CN110847933A (en) * 2019-10-08 2020-02-28 中铁隧道局集团建设有限公司 Method for preventing and controlling tunnel vault from being hollow
CN111894630A (en) * 2020-06-16 2020-11-06 神华包神铁路集团有限责任公司 Clearing structure and treatment method for tunnel brake tip defect
CN113217024A (en) * 2021-05-19 2021-08-06 中铁二十局集团第四工程有限公司 Crotch type pumping construction method for preventing concrete at vault of secondary lining of underground excavated tunnel from being emptied
CN113217024B (en) * 2021-05-19 2022-08-12 中铁二十局集团第四工程有限公司 Crotch type pumping construction method for preventing concrete at vault of secondary lining of underground excavated tunnel from being emptied
CN113323694A (en) * 2021-06-29 2021-08-31 重庆科技学院 Tunnel lining cavity negative pressure grouting process
CN113323694B (en) * 2021-06-29 2024-02-20 重庆科技学院 Negative pressure grouting process for tunnel lining cavity
CN114161580A (en) * 2021-09-28 2022-03-11 湖南工业大学 Concrete on-site pumping vacuum stirring conveying pipe and construction process

Also Published As

Publication number Publication date
CN108661671B (en) 2024-02-23

Similar Documents

Publication Publication Date Title
CN108661671A (en) Tunnel vault two serves as a contrast concrete vacuum and assists pouring procedure
CN111734457B (en) Construction method of tunnel water-drainage-preventing system
CN107859064B (en) Waterproof structure for connection of prefabricated pipe gallery and cast-in-situ pipe gallery and construction method
CN104482298B (en) HDPE (high-density polyethylene) steel-plastic composite spiral winding drainage pipe installation construction method
CN106640154A (en) Treatment method and structure for water seepage of tunnel lining circular construction joint crack
CN206616585U (en) Prefabricated formula utility tunnel of split component
CN109026079A (en) Tunnel joint waterproof structure and waterproof construction method
CN115306446A (en) Tunnel secondary lining vault grouting anti-lost grouting pipe with mold and grouting method
CN107476340A (en) A kind of subway tunnel and the new Joining Structure and its construction method at enlarging station
CN114876515A (en) Two lining platform trucks in tunnel are pour fast
CN208252128U (en) The template of concrete vacuum casting is served as a contrast for tunnel vault two
CN109667586A (en) A kind of double-layer wall of well grouting system and grouting method
CN111335926A (en) Tunnel waterproof layer, template trolley and construction method
CN108952767B (en) Flexible lapping template assembly of lining trolley and flexible lapping construction method thereof
CN217107046U (en) Corrugated steel plate self-plugging structure for highway tunnel transverse passage
CN115898469A (en) Tunnel secondary lining construction method
CN213539105U (en) A leaking stoppage structure for deep basal pit basement outer wall crack
CN214738302U (en) Waterproof wall-separating ditch structure for subway station
CN212454452U (en) Multifunctional observation hole for controlling concrete pouring of tunnel secondary lining vault
CN209687499U (en) Primary concreting concrete inverted arch
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN210178375U (en) Wedge block type sealing device for longitudinal construction joint of tunnel lining
CN212563273U (en) Tunnel waterproof layer and template trolley
CN112302714A (en) Dewatering well sealing system and construction method thereof
CN214424513U (en) Tunnel secondary lining vault gap grouting backfill device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant