CN108661638A - A kind of method of ring holes recycling ore pillar - Google Patents

A kind of method of ring holes recycling ore pillar Download PDF

Info

Publication number
CN108661638A
CN108661638A CN201810435965.1A CN201810435965A CN108661638A CN 108661638 A CN108661638 A CN 108661638A CN 201810435965 A CN201810435965 A CN 201810435965A CN 108661638 A CN108661638 A CN 108661638A
Authority
CN
China
Prior art keywords
ore pillar
ore
fore
ring holes
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810435965.1A
Other languages
Chinese (zh)
Other versions
CN108661638B (en
Inventor
程崇强
王少泉
蔺帅宇
周育
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC North Dalian Engineering Technology Co Ltd
Northern Engineering and Technology Corp MCC
Original Assignee
MCC North Dalian Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC North Dalian Engineering Technology Co Ltd filed Critical MCC North Dalian Engineering Technology Co Ltd
Priority to CN201810435965.1A priority Critical patent/CN108661638B/en
Publication of CN108661638A publication Critical patent/CN108661638A/en
Application granted granted Critical
Publication of CN108661638B publication Critical patent/CN108661638B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Abstract

The present invention relates to a kind of methods that ring holes recycle ore pillar, when being exploited including open air trestle, nugget is arranged along orebody trend, each nugget divides mineral building and ore pillar, Development system and adopt Barebone, it is characterised in that using ring holes back production mine thickness ore pillar fore-set unit and using pole unit between long fanhole(s) back production.It is an advantage of the invention that:The transition from open-pit underground first stage is exploited using shallow hole shrinkage method, ore pillar mine unrecovered long, measures engineering amount can be reduced using such recovery method, save the time of ore pillar processing, it can ensure the uniform of broken ore lumpiness simultaneously, improve the rate of recovery of ore pillar recycling.

Description

A kind of method of ring holes recycling ore pillar
Technical field
The invention belongs to underground ore pillar recovery technology fields more particularly to transition from open-pit underground first stage to use shallow-hole shrinkage Method is exploited, a kind of method of ore pillar ring holes recycling ore pillar unrecovered long.
Background technology
Shallow hole shrinkage method is one kind of open-stope method, is generally that back production unit is exploited with nugget, nugget is divided into again Mineral building and ore pillar two parts, mineral building are the major parts of ore back production, and ore pillar is the major part for ensureing production safety, ore pillar packet Fore-set, foundation and studding are included.To the stope of low-angle dip and inclined orebody, also there are ore pillars in a certain number of fields.Mineral building returns Goaf is formed after adopting, goaf must be handled in due course, and otherwise goaf large area generates, and will cause large-scale rock Shifting accident.Therefore it is an important job to the recycling of the ore pillar in open-stope method mine and Mined-out Area control.
Pillar recovery is a component part of block stoping, it is desirable that considers to adopt accurate, cutting engineering together with mineral building.But I State part open-stope method mine, after mineral building back production, slowly without the recycling of ore pillar, this not only causes the damage of stock number It loses, also improves difficulty to follow-up pillar recovery.
Invention content
The purpose of the present invention is exploited for the transition from open-pit underground first stage using shallow hole shrinkage method, and ore pillar is unrecovered long, is Eliminate the method that the ring holes for the features such as ore pillar mine amount can recycle by mine hidden danger simultaneously recycle ore pillar.
The purpose of the present invention is be achieved through the following technical solutions.
A kind of method of ring holes recycling ore pillar of the present invention, including when open air trestle exploitation, along orebody trend cloth Set nugget, each nugget divides mineral building and ore pillar, Development system and adopts Barebone and includes level haulageway, return aircourse I, returns Ventilating shaft, pedestrian's vent (-escape) raise, pedestrian's vent (-escape) raise connection roadway and bottom structure are opened stage by stage using shallow hole shrinkage method It adopts, after mineral building back production, forms the goaf of mineral building size, stay set ore pillar in the first stage, the ore pillar includes thick mine Column, fore-set, studding and foundation, the thick ore pillar is apart from outdoor bottom 20-30m, it is characterised in that including using ring holes Pole unit between back production thickness ore pillar-fore-set unit and the long fanhole(s) back production of use;
It is described to include using ring holes back production thickness ore pillar-fore-set unit:
1)Arteries and veins external position newly digs return aircourse II among thick ore pillar, while every 50m, being dug perpendicular to mine in studding corresponding position The connecting taxiway of body;
2)In ore body connecting taxiway, using Simba1354 drill jumboes along the annular big gun of orebody trend construction thick ore pillar and fore-set The ring holes distance from bottom goaf of hole, the thick ore pillar and fore-set and construction tunnel should stay 0.5m ~ 2.0m is impermeable to wear, The ring holes powder charge of the thick ore pillar and fore-set carries out powder charge using BQF-100 type explosive loaders;
Pole unit includes between the long fanhole(s) back production of the use:
1)Studding drilling chamber is dug in pedestrian's vent (-escape) raise connection roadway;
2)It is constructed respectively along studding inclination angle using QZJ-100B down-the-hole drills downwards and in studding drilling chamber in ore body connecting taxiway Between column length fanhole(s), the blasthole distance from bottom goaf of column length fanhole(s) and pedestrian's vent (-escape) raise connection roadway there are 0.5m ~ 2.0m is impermeable to be worn, and blast hole projectile filling uses explosive loading truck;
Explosion is carried out to installing the thick ore pillar of medicine and the ring holes of fore-set and column length fanhole(s), entire blasting network is adopted It is passed by primacord using after nonel tube ignition primacord using initiator detonation nonel tube with double-detonating network It is quick-fried to detonator in hole, then by millisecond difference Nonel detonator ignite igniting primer;
Using the adjacent face of ore pillar and goaf as the scope of freedom, in order to make full use of this scope of freedom, thick ore pillar and fore-set and studding equal Using different sections of short-delay blasting of same row, i.e., first detonates close to the blasthole on the scope of freedom, then detonate successively into ore pillar, Column length fanhole(s) lags behind thick ore pillar and the detonation of fore-set ring holes, and first stage foundation waits for that next stage mineral building back production finishes It is recycled together with next stage fore-set afterwards;
The ore pillar ore of avalanche after explosion is then charged into mine car by bottom structure ore removal, passes through level haulageway to auxiliary shaft Parking lot, eventually by auxiliary shaft hoisting to earth's surface.
The blasthole diameter 76mm of the thick ore pillar and fore-set ring holes, minimum burden 1.6m ~ 2.0m, bottom hole pitch 2.5m ~ 3.0m, blasthole array pitch 1.6m ~ 2.0m..
The blasthole diameter 100mm of column length fanhole(s) between described, minimum burden 1.6m, bottom hole pitch are 2.5m ~ 3.0m, Array pitch is 1.1 ~ 1.6m.
The beneficial effects of the invention are as follows create to meet personnel and equipment walking, construction and ventilation etc. using new pick return aircourse Condition, it is ensured that the safety of operation and production;Then advanced drill jumbo, 360 ° of blastholes that are circular layout is utilized to reduce measure Quantities accelerates the penetration rate of blasthole, saves the time of ore pillar processing, while can ensure the equal of broken ore lumpiness It is even, improve the rate of recovery of ore pillar recycling.In addition, handling studding using long fanhole(s), the operation peace of construction personnel ensure that Entirely, the effect in processing goaf is also played.
Description of the drawings
Fig. 1 is the front sectional elevation A-A of the method for ring holes recycling ore pillar of the present invention.
Fig. 2 is the left view B-B sectional views of Fig. 1 of the present invention.
Fig. 3 is that Fig. 1 of the present invention overlooks C-C sectional views.
1. level haulageway in figure, 2. returnairshafts, 3. return aircourses I, 4. new pick return aircourses II, 5. ore bodies connection Network road, 6. people's row vent (-escape) raises, 7. studding drilling chambers, 8. thick ore pillars, 9. fore-sets, 10. studdings, 11. foundation, 12. bottoms Structure, 13. ring holes, 14. long fanhole(s)s, 15. goafs.
Specific implementation mode
The following further describes the present invention with reference to the drawings.
As shown in Figs. 1-3, the method for a kind of ring holes of the invention recycling ore pillar, including when open air trestle exploitation, Nugget is arranged along orebody trend, and each nugget divides mineral building and ore pillar, Development system and to adopt Barebone include level haulageway 1, return aircourse I 3, returnairshaft 2, pedestrian's vent (-escape) raise 6, pedestrian's vent (-escape) raise connection roadway and bottom structure 12, using shallow bore hole Shrinkage method is exploited stage by stage, after mineral building back production, is formed the goaf 15 of mineral building size, is stayed set mine in the first stage Column, the ore pillar include thick ore pillar 8, fore-set 9, studding 10 and foundation 11, and the thick ore pillar 8 is apart from outdoor bottom 20- 30m, it is characterised in that including using 13 back production thickness ore pillar of ring holes-fore-set unit and using between long fan-shaped 14 blasthole back production Pole unit;
It is described to include using ring holes back production thickness ore pillar-fore-set unit:
1)Return aircourse II 4 is newly dug in 8 intermediate arteries and veins external position of thick ore pillar, while every 50m, it is vertical in the pick of 10 corresponding position of studding In the connecting taxiway 5 of ore body;
2)In ore body connecting taxiway 5, using Simba1354 drill jumboes along the annular of orebody trend construction thick ore pillar 8 and fore-set 9 The 10 distance from bottom goaf 15 of ring holes of blasthole 13, the thick ore pillar 8 and fore-set 9 and construction tunnel should stay 0.5m ~ 2.0m is impermeable to be worn, and construction tunnel includes:Return aircourse 3, new pick return aircourse 4 and ore body connecting taxiway 5 etc., the thickness 13 powder charge of ring holes of ore pillar 8 and fore-set 9 carries out powder charge using BQF-100 type explosive loaders;
Pole unit includes between the long fanhole(s) back production of the use:
1)Studding drilling chamber 7 is dug in pedestrian's vent (-escape) raise connection roadway;
2)It is applied respectively along studding inclination angle using QZJ-100B down-the-hole drills downwards and in studding drilling chamber 7 in ore body connecting taxiway 5 Break column length fanhole(s), the blasthole distance from bottom goaf 15 of column length fanhole(s) 14 and pedestrian's vent (-escape) raise connection roadway It wears there are 0.5m ~ 2.0m is impermeable, blast hole projectile filling uses explosive loading truck;
Explosion is carried out to installing the thick ore pillar 8 of medicine and the ring holes 13 of fore-set 9 and 10 long fanhole(s) 14 of studding, it is entire quick-fried The network that scores a goal use double-detonating network, using initiator detonate nonel tube, using nonel tube ignite primacord after by Detonator in primacord propagation of explosion to hole then ignites igniting primer by millisecond difference Nonel detonator;
Using the adjacent face of ore pillar and goaf 15 as the scope of freedom, in order to make full use of this scope of freedom, thick ore pillar 8 and fore-set 9 and Column 10 is all made of with the short-delay blasting for arranging different sections, i.e., first detonates close to the blasthole on the scope of freedom, then successively into ore pillar Detonation, 10 long fanhole(s) 14 of studding lag behind thick ore pillar 8 and the detonation of 9 ring holes 13 of fore-set, and first stage foundation 11 waits for down It is recycled together with next stage fore-set after the mineral building back production of one stage;This detonation mode effectively ensure it is safe and reliable, Accurately detonate.
The transition from open-pit underground first stage is exploited using shallow hole shrinkage method, ore pillar mine unrecovered long uses this hair The method of bright ring holes recycling ore pillar can reduce measures engineering amount, save the time of ore pillar processing, while can protect The uniform of broken ore lumpiness is demonstrate,proved, the rate of recovery of ore pillar recycling is improved.

Claims (3)

1. a kind of method of ring holes recycling ore pillar, including when open air trestle exploitation, arrange nugget along orebody trend, each Nugget divides mineral building and ore pillar, Development system and to adopt Barebone include level haulageway, return aircourse, returnairshaft, Hang Rentong Wind courtyard, pedestrian's vent (-escape) raise connection roadway and bottom structure are exploited stage by stage using shallow hole shrinkage method, mineral building back production knot Shu Hou forms the goaf of mineral building size, stays set ore pillar in the first stage, the ore pillar include thick ore pillar, fore-set, studding and Foundation, the thick ore pillar is apart from outdoor bottom 20-30m, it is characterised in that including using ring holes back production thickness ore pillar-fore-set Pole unit between unit and the long fanhole(s) back production of use;
It is described to include using ring holes back production thickness ore pillar-fore-set unit:
1)Arteries and veins external position newly digs return aircourse among thick ore pillar, while every 50m, being dug perpendicular to ore body in studding corresponding position Connecting taxiway;
2)In ore body connecting taxiway, using Simba1354 drill jumboes along the annular big gun of orebody trend construction thick ore pillar and fore-set The ring holes distance from bottom goaf of hole, the thick ore pillar and fore-set and construction tunnel should stay 0.5m ~ 2.0m is impermeable to wear, The ring holes powder charge of the thick ore pillar and fore-set carries out powder charge using BQF-100 type explosive loaders;
Pole unit includes between the long fanhole(s) back production of the use:
1)Studding drilling chamber is dug in pedestrian's vent (-escape) raise connection roadway;
2)It is constructed respectively along studding inclination angle using QZJ-100B down-the-hole drills downwards and in studding drilling chamber in ore body connecting taxiway Between column length fanhole(s), the blasthole distance from bottom goaf of column length fanhole(s) and pedestrian's vent (-escape) raise connection roadway there are 0.5m ~ 2.0m is impermeable to be worn, and blast hole projectile filling uses explosive loading truck;
Explosion is carried out to installing the thick ore pillar of medicine and the ring holes of fore-set and column length fanhole(s), entire blasting network is adopted It is passed by primacord using after nonel tube ignition primacord using initiator detonation nonel tube with double-detonating network It is quick-fried to detonator in hole, then by millisecond difference Nonel detonator ignite igniting primer;
Using the adjacent face of ore pillar and goaf as the scope of freedom, in order to make full use of this scope of freedom, thick ore pillar and fore-set and studding equal Using different sections of short-delay blasting of same row, i.e., first detonates close to the blasthole on the scope of freedom, then detonate successively into ore pillar, Column length fanhole(s) lags behind thick ore pillar and the detonation of fore-set ring holes, and first stage foundation waits for that next stage mineral building back production finishes It is recycled together with next stage fore-set afterwards;
The ore pillar ore of avalanche after explosion is then charged into mine car by bottom structure ore removal, passes through level haulageway to auxiliary shaft Parking lot, eventually by auxiliary shaft hoisting to earth's surface.
2. the method for ring holes recycling ore pillar according to claim 1, it is characterised in that the thick ore pillar and fore-set The blasthole diameter 76mm of ring holes, minimum burden 1.6m ~ 2.0m, bottom hole pitch 2.5m ~ 3.0m, blasthole array pitch 1.6m ~ 2.0m。
3. the method for ring holes recycling ore pillar according to claim 1, it is characterised in that column length sector big gun between described The blasthole diameter 100mm in hole, minimum burden 1.6m, bottom hole pitch are 2.5m ~ 3.0m, and array pitch is 1.1 ~ 1.6m.
CN201810435965.1A 2018-05-09 2018-05-09 A kind of method of ring holes recycling ore pillar Active CN108661638B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810435965.1A CN108661638B (en) 2018-05-09 2018-05-09 A kind of method of ring holes recycling ore pillar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810435965.1A CN108661638B (en) 2018-05-09 2018-05-09 A kind of method of ring holes recycling ore pillar

Publications (2)

Publication Number Publication Date
CN108661638A true CN108661638A (en) 2018-10-16
CN108661638B CN108661638B (en) 2019-09-24

Family

ID=63778740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810435965.1A Active CN108661638B (en) 2018-05-09 2018-05-09 A kind of method of ring holes recycling ore pillar

Country Status (1)

Country Link
CN (1) CN108661638B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2083832C1 (en) * 1995-09-26 1997-07-10 Научно-исследовательский институт горной геомеханики и маркшейдерского дела "ВНИМИ" Method for development of steep impact-risky seams
CN103615250A (en) * 2013-12-09 2014-03-05 中南大学 Subsection-studding all-open-stoping backfilling collaborative mining method
CN205225270U (en) * 2015-12-25 2016-05-11 河北钢铁集团矿业有限公司 Mining drilling chamber structure is filled to underground
CN106121647A (en) * 2016-08-04 2016-11-16 西北矿冶研究院 Method for centralized recovery of lag pillars through fractional blasting
CN106223958A (en) * 2016-08-10 2016-12-14 山东华联矿业股份有限公司 The slant middle thick orebody subregion rock drilling stage ore deposit afterwards filling that falls works in coordination with mining codes
CN106677780A (en) * 2017-02-21 2017-05-17 中冶北方(大连)工程技术有限公司 Upward and downward staged rock drilling, sublevel bottom cutting and ore removal subsequent backfilling mining method
CN107035372A (en) * 2017-06-09 2017-08-11 临沂会宝岭铁矿有限公司 A kind of moat ditch formula polycrystalline substance enters trackside peak abutment post recovery method
CN107339104A (en) * 2017-08-03 2017-11-10 长沙矿山研究院有限责任公司 Security personnel's curtain wall recovery method
CN107939402A (en) * 2017-12-28 2018-04-20 昆明冶金高等专科学校 The mining methods of firm inclined thick ore body more than a kind of back production ore-rock is medium
CN107989614A (en) * 2017-12-06 2018-05-04 昆明冶金高等专科学校 The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2083832C1 (en) * 1995-09-26 1997-07-10 Научно-исследовательский институт горной геомеханики и маркшейдерского дела "ВНИМИ" Method for development of steep impact-risky seams
CN103615250A (en) * 2013-12-09 2014-03-05 中南大学 Subsection-studding all-open-stoping backfilling collaborative mining method
CN205225270U (en) * 2015-12-25 2016-05-11 河北钢铁集团矿业有限公司 Mining drilling chamber structure is filled to underground
CN106121647A (en) * 2016-08-04 2016-11-16 西北矿冶研究院 Method for centralized recovery of lag pillars through fractional blasting
CN106223958A (en) * 2016-08-10 2016-12-14 山东华联矿业股份有限公司 The slant middle thick orebody subregion rock drilling stage ore deposit afterwards filling that falls works in coordination with mining codes
CN106677780A (en) * 2017-02-21 2017-05-17 中冶北方(大连)工程技术有限公司 Upward and downward staged rock drilling, sublevel bottom cutting and ore removal subsequent backfilling mining method
CN107035372A (en) * 2017-06-09 2017-08-11 临沂会宝岭铁矿有限公司 A kind of moat ditch formula polycrystalline substance enters trackside peak abutment post recovery method
CN107339104A (en) * 2017-08-03 2017-11-10 长沙矿山研究院有限责任公司 Security personnel's curtain wall recovery method
CN107989614A (en) * 2017-12-06 2018-05-04 昆明冶金高等专科学校 The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production
CN107939402A (en) * 2017-12-28 2018-04-20 昆明冶金高等专科学校 The mining methods of firm inclined thick ore body more than a kind of back production ore-rock is medium

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张立新: "《李楼铁矿首采采场中深孔爆破参数的确定》", 《采矿技术》 *
焦满岱: "《厂坝铅锌矿采场矿柱的回收爆破》", 《矿业工程》 *

Also Published As

Publication number Publication date
CN108661638B (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN105735993B (en) A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion
CN101328809B (en) Non-bottom pillar deep hole falling-back type mining method
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN102778182B (en) Beside-roadway topping pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure
CN102844522B (en) underground mining
CN108661643A (en) It a kind of coal working face end adopts return channel and cuts top release shield lane method
CN108643910A (en) A method of controlling caving for coal mine stope tight roof Advance presplitting
CN103123247A (en) Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN103244180B (en) Gob-side entry driving surrounding rock control method using remaining small pillars
CN104481539A (en) Extruding blasting caving mining method for self-pulling slot
CN101876520A (en) Segment pre-blasting technology for steeply dipping hard coal seam roof
CN102927866A (en) Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN106767213B (en) A kind of Roof Control blasting method of soft broken top plate ore body back production
LU500326B1 (en) Method for extracting pressure relief gas through thick and hard roof rock stratum blasting permeability increase and directional long borehole interception
CN106247876A (en) High working face cuts greatly a blasting method for fully-mechanized mining working tight roof overhead caving
CN102967191A (en) Blasting method for treatment of gob
CN111520183A (en) Method for treating gas generated by mining, blasting, roof cutting, pressure relief and permeability improvement of coal seam group under thick-layer sandstone
CN115012936B (en) Pressure relief and danger relieving method for coal mine TBM during tunneling and coal penetration
CN106643355B (en) A kind of overhead caving method of the huge thick tight roof of deep coalmine
CN108625855A (en) Safe and efficient mining methods under a kind of obturation
CN108590651B (en) A kind of method of more drilling chamber recycling ore pillars
CN212154765U (en) Deep hole pre-splitting structure for fully mechanized mining face waste rock area
CN104879128B (en) Severe inclined thick coal seam coal winning technology based on the advanced pre- quick-fried reduction of top coal
CN108661638B (en) A kind of method of ring holes recycling ore pillar
CN106884660A (en) A kind of method that protection pillar base angle presplit blasting release controls roadway deformation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant