CN108661181A - A kind of container - Google Patents

A kind of container Download PDF

Info

Publication number
CN108661181A
CN108661181A CN201711286127.4A CN201711286127A CN108661181A CN 108661181 A CN108661181 A CN 108661181A CN 201711286127 A CN201711286127 A CN 201711286127A CN 108661181 A CN108661181 A CN 108661181A
Authority
CN
China
Prior art keywords
chassis
container
balcony
column
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711286127.4A
Other languages
Chinese (zh)
Inventor
杨保同
周金祥
刘栋
赵楚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
Yangzhou Tonglee Reefer Container Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
Yangzhou Tonglee Reefer Container Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd, Yangzhou Tonglee Reefer Container Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN201711286127.4A priority Critical patent/CN108661181A/en
Publication of CN108661181A publication Critical patent/CN108661181A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a kind of containers.The container includes open end and is set to the balcony assemblies of open end, balcony assemblies include supporting member and overhanging component, the supporting member includes the column being connected between the upper beam of container and underbeam, overhanging component extends outwardly from container, overhanging component includes chassis and fence, chassis is linked together by supporting member and open end, and fence is upwardly extended from the surrounding of chassis along the short transverse of container, and fence is provided with the opening communicated with open end.According to container disclosed by the invention, including balcony assemblies and open end, overhanging component is connect by supporting member with open end, mostly fixed form of the side with column supporting leg that can replace Nowadays, Container shipping module balcony of this structure, and the side of container further strengthens, and container structure integral strength greatly promotes, and manufacturing process is ripe, installation is easy, and is easy to maintenance.

Description

A kind of container
Technical field
The present invention relates to container technology fields, and relate more specifically to a kind of container.
Background technology
The outporch of Nowadays, Container shipping is mostly assembled up and down and mode is fixedly mounted, mainly push up at the both ends of outporch, Bottom corner junction is arranged bolt and is connected contact, and in side, the coupling bar of setting system not yet is solid, reinforcement unit so that packaging Case and the design of modular architectural heap building, installation hour hands connect side, reinforce no good solution.Multilayer packaging Case, modular architectural heap building often also need to consider construction aesthetic perception and installation in addition in view of external force factors such as earthquake, typhoons It is convenient, as product constantly upgrades, this requirement is also constantly being promoted, therefore there is an urgent need to one kind to be simple to manufacture, install in market Easy to maintain, bolt solidity can be good outporch unit fill up the blank in this field.
Therefore, it is necessary to a kind of containers, to solve problems of the prior art at least partly.
Invention content
A series of concept of reduced forms is introduced in Summary, this will in the detailed description section into One step is described in detail.The Summary of the present invention is not meant to attempt to limit technical solution claimed Key feature and essential features do not mean that the protection domain for attempting to determine technical solution claimed more.
In order to solve the above problems at least partly, according to the first aspect of the invention, a kind of container is provided, it is described Container includes open end and is set to the balcony assemblies of open end, and the balcony assemblies include:
Supporting member, the supporting member include the column being connected between the upper beam of container and underbeam;
Overhanging component, the overhanging component extend outwardly from container, and the overhanging component includes:
Chassis, the chassis are linked together by the supporting member and the open end;And fence, the fence is certainly The surrounding of the chassis is upwardly extended along the short transverse of the container, and the fence is provided with and is communicated with the open end Opening.
According to container disclosed by the invention, including balcony assemblies and open end, overhanging component by supporting member with open Put end connection, mostly fixation side of the side with column supporting leg that can replace Nowadays, Container shipping module balcony of this structure Formula, and the side of container further strengthens, and container structure integral strength greatly promotes, and manufacturing process is ripe, peace Dressing is easy, is easy to maintenance.
Preferably, the chassis and the underbeam are fixedly mounted with by least three bolts sets connection.According to this programme, balcony assemblies It can be connect with underbeam by chassis, reinforce the bolt tenacity of the two.
Preferably, the supporting member further includes at least two pull rods, at least two pull rod for connect it is described extremely Few two columns and the chassis.According to this programme, balcony assemblies, by pull rod lateral connection, realize that bolt is solid with building block Purpose.
Preferably, the supporting member further includes the first connection component of at least two groups, and first connection component is for connecting Connect the pull rod and the column.According to this programme, the first connection component can be with the relative position of adjusting yoke and column.
Preferably, first connection component includes:
First plate, first plate are arranged on column;With
Second plate, direction of second plate from the outer surface of first plate towards the chassis extend, and with institute State pull rod connection.
According to this programme, the relative position between pull rod and column can be with flexible modulation.
Preferably, the supporting member further includes the second connection component of at least two groups, and second connection component is for connecting The pull rod and the chassis are connect, second connection component is used to adjust the gradient and precision of the chassis.According to this programme, Relative position between pull rod and chassis can be adjusted by the second connection component, so as to adjust the overboard gradient and entirety of chassis Horizontal accuracy realizes the drainage performance of overhanging balcony.
Preferably, the chassis includes:
Bottom girder, the bottom girder surround the frame of the chassis, and the bottom girder close to the underbeam is fixedly mounted with by least three bolts It sets and is connect with the underbeam;
Terrace assembly, the terrace assembly are arranged in the inside of the frame of the chassis;And floor, the floor covering layers exist The top of the bottom girder and the terrace assembly.
According to this programme so that the chassis of balcony has been also equipped with fire prevention, sound-proofing under the premise of meeting bearing requirements Energy.
Preferably, the column is two, and the maximum length of the extending direction along the underbeam of the overhanging component is small In equal to the distance between described two columns.According to this programme so that the weight of overhanging component can be balanced is distributed to two On a column, two columns of weight pair of overhanging component is avoided to apply security risk caused by pressure imbalance.
Preferably, the overhanging component further includes:
Balcony column, the balcony column are upwardly extended from the top surface of the chassis along the short transverse;With
Bracket, the bracket be configured with for the balcony column along the short transverse by channel,
Wherein, the balcony column extends up through the channel along the short transverse, and the bracket passes through connection Part is connect with the chassis.
According to this programme, chassis can stablize support balcony column, to further stablize support fence.
Description of the drawings
The following drawings of the present invention is used to understand the present invention in this as the part of the present invention.Shown in the drawings of this hair Bright embodiment and its description, device used to explain the present invention and principle.In the accompanying drawings,
Fig. 1 is the connection diagram according to the open end and balcony assemblies of the container of the present invention;
Fig. 2 is the partial cross-sectional view of underbeam and chassis as shown in Figure 1;
Fig. 3 is the partial cross-sectional view of chassis as shown in Figure 2;
Fig. 4 is the connection diagram of pull rod as shown in Figure 1 and column and chassis;
Fig. 5 is the local structural graph that pull rod as shown in Figure 4 is connect with column;
Fig. 6 is the partial cross-sectional view that balcony column as shown in Figure 1 is connect with chassis;
Fig. 7 is the local structural graph that balcony column as shown in FIG. 6 is connect with chassis;With
Fig. 8 is the structure chart of overhanging component as shown in Figure 1.
Reference sign:
100:Open end; 110:Upper beam;
120:Underbeam; 130:Lateral column;
140:Supporting member; 141:Bolt, which is fixedly mounted with, to be set;
142:Column; 143:Pull rod;
144:First connection component; 145:Second connection component;
146:First bolt; 147:Second bolt;
148:Connection fixture; 149:Gasket;
150:First fixed plate; 151:Second fixed plate;
152:First plate; 153:Second plate;
154:Backing plate; 155、156:Bolt;
157:Third plate; 170:Balcony assemblies;
171:Chassis; 172:Fence;
173:Balcony column; 174:Bracket;
175:Opening; 176:Bottom girder;
177:Terrace assembly; 178:Floor;
179:Fire-proof sound insulation material; 180:Web beam;
181:Decorative panel; 182:First extended segment;
183:Second extended segment; 184:Third extended segment;
185:Reinforcing plate; 186:Bolt assembly;
187:Channel; 188:First connecting plate;
189:Interconnecting piece; 190:Second connecting plate;
191:Bottom plate; 192:Side plate.
Specific implementation mode
In the following description, a large amount of concrete details are given in order to provide more thorough understanding of the invention.So And it is obvious to the skilled person that the present invention may not need one or more of these details and be able to Implement.In other examples, in order to avoid with the present invention obscure, for some technical characteristics well known in the art not into Row description.
In order to thoroughly understand the present invention, detailed structure will be proposed in following description, to illustrate the present invention.It is aobvious So, execution of the invention is not limited to the specific details that the those skilled in the art are familiar with.The preferable reality of the present invention Example is applied to be described in detail as follows, however other than these detailed descriptions, the present invention can also have other embodiment, should not solve It is interpreted as being confined to embodiments presented herein.
It should be understood that the purpose of term as used herein is only that description specific embodiment and not as the present invention Limitation, " one " of singulative "one" and " described/should " is also intended to include plural form, unless context is expressly noted that separately Outer mode.When the term " comprising " and/or " including " is used in this specification, indicate that there are the feature, entirety, steps Suddenly, operation, element and/or component, but do not preclude the presence or addition of other one or more features, entirety, step, operation, member Part, component and/or combination thereof.Term "upper", "lower", "front", "rear", "left", "right" used in the present invention and Similar statement for illustrative purposes only, not limits.
The cited such as ordinal number of " first " and " second " is only to identify in the present invention, without any other Meaning, such as specific sequence etc..Moreover, for example, term " first component " itself does not imply that the presence of " second component ", art Language " second component " does not imply that the presence of " first component " in itself.
Hereinafter, specific embodiments of the present invention are described in more detail with reference to the accompanying drawings, those figures show this The representative embodiment of invention is not to limit the present invention.
As shown in Figure 1, the invention discloses a kind of container (not shown), container includes open end 100.Packaging luggage Include end, front end and two side plates.Two side plates of container can be closed, and door end has openable door, and front end can be set It is equipped with open end 100.Certainly, the front end of container can be closed, and door end has openable door.Any of two side plates Open end 100 can be provided with.The present invention does not limit the position where open end 100, and the inside of container can pass through opening End 100 is communicated with the outside of container.Container further includes upper beam 110, underbeam 120, lateral column 130 and balcony assemblies 170.Packaging The personnel of the inside of case can be entered to by open end 100 in balcony assemblies 170.Personnel can also by open end 100 from Balcony assemblies 170 enter the inside of container.Certainly, container can also include multiple open ends 100 and balcony assemblies 170, each open end 100 and each balcony assemblies 170 communicate, and personnel can be by each open end 100 from container Middle disengaging.
Upper beam 110 is provided at the top of container.The bottom of container is provided with underbeam 120.In the present embodiment, collect The side plate of vanning is provided with open end 100.Upper beam 110 is located at the side of the top plate of container.Length of the upper beam 110 along container Direction extends.Upper beam 110 is connect with the top of two lateral columns 130 respectively along the both ends of the length direction of container.120 edge of underbeam The short transverse of container is arranged in correspondence in the lower section of upper beam 110.Underbeam 120 extends along the length direction of container.Underbeam The both ends of 120 length direction along container are connect with the bottom of two lateral columns 130 respectively.Height of the lateral column 130 along container Direction is spent to extend.Upper beam 110, underbeam 120 and two lateral columns 130 surround the frame of open end 100 jointly.Lateral column 130 and upper beam 110 link together by welding.Lateral column 130 links together by welding with underbeam 120.On in this way, Rigid connection is formed between beam 110, underbeam 120 and two lateral columns 130.
Certainly, the end of container can also be provided with open end 100.Upper beam 110 is located at one end of the top plate of container. Upper beam 110 extends along the width direction of container.Upper beam 110 along the both ends of the width direction of container respectively with two lateral columns 130 top connection.Underbeam 120 is arranged in correspondence with along short transverse in the lower section of upper beam 110.Width of the underbeam 120 along container Direction is spent to extend.The both ends of the width direction along container of underbeam 120 are connect with the bottom of two lateral columns 130 respectively.
As illustrated in figures 1 and 8, the outside of container is provided with balcony assemblies 170.Balcony assemblies 170 include overhanging component With supporting member 140.Overhanging component extends outwardly from container, and overhanging component includes chassis 171, fence 172, balcony column 173 and bracket 174.Fence 172 is upwardly extended from the surrounding of chassis 171 along the short transverse of container.Fence 172 be provided with The opening 175 that open end 100 communicates.Personnel 175 can be entered in balcony assemblies 170 by opening, or from balcony assemblies 170 enter the inside of container.Fence 172 can be formed by girder steel bending.Chassis 171 by supporting member 140 with open End 100 is put to link together.Chassis 171 can also be formed by girder steel bending.Balcony assemblies 170 are casting or high intensity carbon steel Bending plate group welding piece.It is steel construction high-strength bolt that bolt in balcony assemblies 170, which is solidly connected with bolt,.Balcony assemblies 170 with Building block (such as container) sturdy installation, all material for setting up balcony assemblies 170 is metal material welding, to ensure Module integral strength.The steel construction part of balcony assemblies 170 is steel plate bending part frame.The underbeam of balcony assemblies 170 and babinet 120 are fixed using high strength exploitation.Balcony assemblies 170 and the bolt maintenance of underbeam 120 are designed with internal thread built-in fitting in setting (corresponding high-strength bolt), plays the role of coupling bar admittedly.
As shown in Figures 2 and 3, chassis 171 includes bottom girder 176, terrace assembly 177 and floor 178.In the embodiment party of diagram In formula, bottom girder 176 is four, and four bottom girders 176 surround the frame of chassis 171 jointly.Bottom girder 176 is configured to C-type beam.Under The bottom girder 176 of beam 120 is connect by supporting member 140 with underbeam 120.The frame of chassis 171 is provided with terrace assembly 177.Sun The bottom girder 176 of the chassis 171 of platform component 170 is by the processing post-processing of design requirement size at the frame of the chassis 171 of balcony assemblies 170 Frame.
As shown in figure 3, terrace assembly 177 includes fire-proof sound insulation material 179, web beam 180 and decorative panel 181.Decoration Plate 181 is arranged along short transverse in minimum position.The bottom of balcony is provided with decorative panel 181, and decorative panel 181 passes through waterproof material Material is made, so that the terrace assembly 177 of balcony forms an independent cellular construction of closing.The end of decorative panel 181 with Bottom girder 176 welds together.Floor 178 is laid on the top of bottom girder 176 and terrace assembly 177.Floor 178 and decorative panel 181 Between be provided with cavity.In the cavities, short transverse is provided with fire-proof sound insulation material 179 in the top of decorative panel 181 and adds Deck transverse 180.The section of web beam 180 is c-type.Web beam 180 includes the first extended segment 182,183 and of the second extended segment Third extended segment 184.First extended segment 182 extends along the inner surface of decorative panel 181.Second extended segment 183 is from the first extended segment 182 one end is upwardly extended along short transverse.Third extended segment 184 is from the top of the second extended segment 183 along the interior table on floor 178 Face extends.Web beam 180 is used to support floor 178.Fire-proof sound insulation material 179 is filled in cavity.Fire-proof sound insulation material 179 It can be expanded material.Fire-proof sound insulation material 179 can link together bottom girder 176, decorative panel 181 and web beam 180, So that the terrace assembly 177 of balcony has been also equipped with fire prevention, sound insulation value under the premise of meeting bearing requirements.Lower portion can To be welded with several web beams 180, to ensure the structural strength of the terrace assembly 177 of balcony assemblies 170.Art technology Personnel are it is to be understood that the respective upper surface of each web beam 180 is both needed to concordantly, to ensure that the big face of the installation on floor 178 is flat It is whole.
As shown in Figure 6 to 8, balcony column 173 is fixed on the periphery of terrace assembly 177, that is, is fixed on balcony group On the outer surface of the bottom girder 176 of the chassis 171 of part 170.Balcony column 173 is from the top surface of chassis 171 along the short transverse It upwardly extends.Balcony column 173 is linked together by bracket 174 and the chassis 171 of balcony assemblies 170.In bottom girder 176 Portion's corresponding position has been welded and fixed reinforcing plate 185 in advance.185 mating balcony column 173 of reinforcing plate is provided with bolt and consolidates threaded hole, bolt Gu threaded hole and the mounting hole on bottom girder 176 are concentric.Bracket 174 is pressed into design requirement close to bottom girder 176.Control bracket 174 Mounting hole is aligned with the mounting hole center on bottom girder 176.Connected by high-strength bolt component 186 between bracket 174 and fence 172 It connects, is inserted into mounting bracket 174 and after adjusting upper and lower position after balcony column 173, tightens all high-strength bolt components 186, to reach 173 fixed purpose of balcony column.
Bracket 174 be configured with for balcony column 173 along short transverse by channel 187.Specifically, bracket 174 section is U-shaped.Bracket 174 includes the first connecting plate 188, interconnecting piece 189 and the second connecting plate 190.First connecting plate 188 can be connect by connector (such as bolt assembly 186) with chassis 171.Second connecting plate 190 can pass through connector (such as bolt assembly 186) is connect with chassis 171.Chassis 171 includes bottom girder 176.In the inside of bottom girder 176 backwards to bracket 174 Side be provided with reinforcing plate 185.First connecting plate 188, the second connecting plate 190, reinforcing plate 185 and bottom girder 176 pass through bolt Component 186 links together.In this way, the bonding strength of bracket 174 and chassis 171 can be reinforced.Interconnecting piece 189 is connect with first Plate 188 and the connection of the second connecting plate 190.Interconnecting piece 189 is provided with channel 187.The both sides in the horizontal direction of interconnecting piece 189 point It is not provided with the first connecting plate 188 and the second connecting plate 190.Balcony column 173 extends up through channel along short transverse 187.The size phase of cross section of the size of the cross section of channel 187 in the horizontal direction with balcony column 173 in the horizontal direction Match so that column does not move in the horizontal direction in channel 187.After balcony column 173 passes through bracket 174, bracket 174 passes through spiral shell Bolt assembly 186 links together with chassis 171.Bracket 174 is connected to one by the bottom girder 176 of high-strength bolt and chassis 171 It rises so that not play between balcony column 173, bracket 174 and chassis 171.Two to contact with each other of bracket 174 and chassis 171 A plane fits closely so that not occurred level displacement between bracket 174 and chassis 171, and make balcony column 173 and support Play does not occur along short transverse between frame 174.
After balcony column 173 is fixed with the installation of terrace assembly 177, it is also equipped in the top surface of balcony column 173 Handrail.Column and handrail to form an entirety by welding or riveting.
As shown in Figure 1, Figure 4 and Figure 5, supporting member 140 is fixedly mounted with including bolt sets 141, at least two columns 142, at least two A pull rod 143, the first connection component of at least two groups 144 and the second connection component of at least two groups 145.In embodiment illustrated In, supporting member 140 is fixedly mounted with including three bolts sets 141, two 142, two, column, 143, two group first of pull rod connection components 144 With two group of second connection component 145.In present embodiment, bolt be fixedly mounted with set, column, pull rod, the first connection component and second connection The quantity of component is to illustrate.Those skilled in the art it is to be understood that bolt be fixedly mounted with set, column, pull rod, the first connection component It can be different from the quantity cited by present embodiment with the quantity of the second connection component.
As depicted in figs. 1 and 2, the chassis 171 of the overhanging component of balcony assemblies 170 is fixedly mounted with by three bolts sets 141 under Beam 120 connects.Three bolts, which are fixedly mounted with, sets 141 along the setting of the extending direction interval of underbeam 120, can make balcony assemblies 170 in this way Weight it is evenly dispersed.Certainly, those skilled in the art can be arranged according to actual conditions along the extending direction interval of underbeam 120 There are multiple bolts to be fixedly mounted with and sets 141.It includes the first bolt 146, the second bolt 147, connection fixture 148 and gasket that bolt, which is fixedly mounted with and sets 141, 149.First bolt 146 and the second bolt 147 are high-strength bolt, and bolt requires to be not less than M14 high intensity outer-hexagonal spiral shells Bolt, it is ensured that the solid reliability of coupling bar, and there is enough bonding strengths.Connection fixture 148 is configured to L-type plate.Connection is solid Determine part 148 and includes the first fixed plate 150 and the second fixed plate 151 being connected with the first fixed plate 150.Bottom girder 176 passes through connection Fixing piece 148 and bolt are connect with underbeam 120.Specifically, bottom girder 176 includes bottom plate 191 and the side plate being connected with bottom plate 191 192.Side plate 192 is close to underbeam 120.The first fixed plate 150 is provided between side plate 192 and underbeam 120.First fixed plate 150 It is linked together with underbeam 120 by the first bolt 146.The head of first bolt 146 is located at the first fixed plate 150 and side plate In space between 192.Bottom plate 191 is provided with the second fixed plate 151 below short transverse.Bottom plate 191 and second is fixed Gasket 149 is provided between plate 151.Bottom plate 191, gasket 149 and the second fixed plate 151 are connected to one by the second bolt 147 It rises.In this way, during installing balcony assemblies 170, first connection fixture 148 and underbeam 120 are linked together, then will be positive Platform component 170 links together with connection fixture 148, can simplify installation procedure, is convenient for the chassis of balcony assemblies 170 171 are installed together with underbeam 120.
Two columns 142 are arranged at along the extending direction of underbeam 120 between two lateral columns 130.Between two columns 142 Distance be equal to overhanging component the extending direction along underbeam 120 maximum length.It can make the weight of balcony assemblies 170 in this way Amount balanced can be distributed on two columns 142, and two columns 142 of weight pair of balcony assemblies 170 is avoided to apply pressure not Security risk caused by balance.Column 142 extends along the short transverse of container.The top of column 142 is connect with upper beam 110. The bottom end of column 142 is connect with underbeam 120.Column 142 links together by welding with upper beam 110.Column 142 with Underbeam 120 links together by welding.In this way, forming rigidity between upper beam 110, underbeam 120 and two columns 142 Connection, it is ensured that balcony assemblies 170 are with open end 100 by being connected to form a whole.
As shown in figures 1 and 3, two columns 142 are correspondingly arranged respectively there are two pull rod 143.Two pull rods 143 are for connecting Connect column 142 and the chassis 171 of balcony assemblies 170, so that balcony assemblies 170 also have company with container in the horizontal direction It connects.Pull rod 143 can be hot-galvanized steel rounding stick.Pull rod 143 obliquely extends towards balcony assemblies 170 relative to column 142. The top of pull rod 143 is connect with column 142.The end of the bottom of pull rod 143 and the floor 178 on the chassis 171 of balcony assemblies 170 Face connects.Pull rod 143 is module design, has exchange, general performance.
As shown in Figure 4 and Figure 5, the first connection component 144 is for connecting rod 143 and column 142.First connection component 144 include the first plate 152 and the second plate 153.First plate 152 is arranged on column 142.First plate 152 connects with the welding of column 142 It is connected together.Direction of second plate 153 from the outer surface of the first plate 152 towards chassis 171 extends.First plate 152 and the second plate Backing plate 154 is additionally provided between 153.Backing plate 154 can be damping thermal insulation plate, can not only play babinet connection in this way and make With also solving the common problem (such as heat-insulated, sound insulation) of current architectural design, the entirety for greatly improving packaging tank module is anti- Shake, energy-efficient performance.It is linked together by bolt 155 between the pedestal of second plate 153, backing plate 154 and the first plate 152.Second Plate 153 is bolted with column 142 by being no less than four high intensity outer-hexagonals.Second plate 153 passes through bolt with pull rod 143 156 connections.One end of pull rod 143 is connected and fixed with the second plate 153 by high-strength bolt component.
As shown in Figure 4 and Figure 8, the second connection component 145 is used for connecting rod 143 and chassis 171.Second connection component 145 include third plate 157.One end of third plate 157 is connected to one with the bottom of pull rod 143 by high intensity outer-hexagonal nut piece It rises.The other end of third plate 157 is bolted together with the chassis 171 of balcony assemblies 170.Peace on third plate 157 After dress hole threaded hole corresponding on chassis 171 is aligned, it is connected and fixed with high-strength bolt component, to reach balcony assemblies 170 chassis 171 passes through the solid purpose of 143 lateral connection of pull rod, bolt with building block.Floor 178 is equipped on chassis 171. Floor 178 can be by by rotating the high intensity outer-hexagonal nut piece of third plate 157 so as to adjust the overboard gradient and whole water Flat precision realizes the drainage performance of overhanging balcony.In this way, compared with existing terrace assembly 177, floor 178 is not relied on The overboard gradient of itself reduces design cost while simplifying 178 structure of floor.
Specifically, the step of balcony assemblies 170 are connect with building block is as follows.By being connected and fixed for balcony assemblies 170 After part 148 is placed on the corresponding position of building block (such as container), pass through the connection fixture 148 of balcony assemblies 170 Mating high-strength bolt component, itself and underbeam 120 are consolidated by screwed plug.The terrace assembly 177 of balcony is hoisted to building wall The side of body part.The connection fixture 148 for being placed on balcony assemblies 170 slowly declines from top.Fixation on terrace assembly 177 Threaded hole is aligned with the 148 upper installing hole center of connection fixture of balcony assemblies 170.In the fixing screwed hole of terrace assembly 177 With the connection fixture 148 of balcony assemblies 170 it is sturdy before, by gasket 149 be placed on bottom girder 176 and connection fixture 148 it Between, then solid by high-strength bolt component coupling bar, the terrace bottom and construction wall bolt to reach balcony assemblies 170 are solid The purpose of connection.After terrace assembly 177 and the connection fixture 148 of balcony assemblies 170 are fixed, the master of balcony assemblies 170 Body positioning terminates, and the carrying of entire balcony and stabilization are ensured by supporting member 140.
A kind of container disclosed by the invention, container include balcony assemblies, and balcony assemblies are for packaging tank module Wall face steel structure type overhangs outporch, and what the balcony assemblies of this structure can replace Nowadays, Container shipping module balcony is mostly Fixed form of the side with column supporting leg.Meanwhile in order to adapt to the needs that container wall face overhangs balcony, by container Former side hold-down support formula outporch unit Curve guide impeller, a kind of side suitable for container is provided and is reinforced and the solid one of bolt The new steel structure formula of change overhangs outporch cellular construction.
Container structure integral strength disclosed by the invention greatly promotes, and manufacturing process is ripe, and installation is easy, and is easy to Maintenance.Outporch directly replaces original component, the outporch between two babinets to be made of high intensity carbon steel or casting, tool There is good structural strength.An entirety is made as by the chassis of outporch and fence and floor, bottom mask etc. are pre-, and installation is solid Surely it settles at one go.Outporch does not influence container body self-strength and profile arrangement, is provided greatly to spell case design It is convenient, and use scope is extensive, beautiful and generous, at low cost, the alien invasion suitable for container is fixed, and is especially used for multilayer collection The side for module of casing.The cellular construction greatly improves the installation of outporch under the premise of keeping former whole anti-seismic performance Craftsmanship and handling reliability, while effective control cost.
Unless otherwise defined, those skilled in the art of technical and scientific term used herein and the present invention Normally understood meaning is identical.Term used herein is intended merely to describe specifically to implement purpose, it is not intended that limitation is originally Invention.The terms such as herein presented " portion ", " part " can both indicate single part, can also indicate multiple parts Combination.The terms such as herein presented " installation ", " setting " can both indicate that a component was attached directly to another portion Part can also indicate that a component is attached to another component by middleware.It describes in one embodiment herein Feature can be applied to another embodiment in combination individually or with other features, unless this feature is in another implementation It is not suitable for or is otherwise noted in mode.
The present invention is illustrated by above-described embodiment, but it is to be understood that, above-described embodiment is only intended to The purpose of citing and explanation, and be not intended to limit the invention within the scope of described embodiment.In addition people in the art It is understood that the invention is not limited in above-described embodiment, introduction according to the present invention can also be made more kinds of member Variants and modifications, these variants and modifications are all fallen within scope of the present invention.Protection scope of the present invention by The appended claims and its equivalent scope are defined.

Claims (9)

1. a kind of container, the container includes open end and is set to the balcony assemblies of open end, which is characterized in that described Balcony assemblies include:
Supporting member, the supporting member include the column being connected between the upper beam of container and underbeam;
Overhanging component, the overhanging component extend outwardly from container, and the overhanging component includes:
Chassis, the chassis are linked together by the supporting member and the open end;With
Fence, the fence is upwardly extended from the surrounding of the chassis along the short transverse of the container, and the fence is set It is equipped with the opening communicated with the open end.
2. container according to claim 1, which is characterized in that the chassis and the underbeam are solid by least three bolts Device connects.
3. container according to claim 2, which is characterized in that the supporting member further includes:
At least two pull rods, at least two pull rod is for connecting at least two column and the chassis.
4. container according to claim 3, which is characterized in that the supporting member further includes:
The first connection component of at least two groups, first connection component is for connecting the pull rod and the column.
5. container according to claim 4, which is characterized in that first connection component includes:
First plate, first plate are arranged on column;With
Second plate, direction of second plate from the outer surface of first plate towards the chassis extend, and with the drawing Bar connects.
6. container according to claim 3 or 4, which is characterized in that the supporting member further includes:
The second connection component of at least two groups, second connection component is for connecting the pull rod and the chassis, and described second Connection component is used to adjust the gradient and precision of the chassis.
7. container according to claim 1, which is characterized in that the chassis includes:
Bottom girder, the bottom girder surround the frame of the chassis, close to the underbeam bottom girder be fixedly mounted with by least three bolts set with The underbeam connection;
Terrace assembly, the terrace assembly are arranged in the inside of the frame of the chassis;With
Floor, the floor covering layers are in the top of the bottom girder and the terrace assembly.
8. container according to claim 2, which is characterized in that the column be two, the overhanging component along institute The maximum length for stating the extending direction of underbeam is less than or equal to the distance between described two columns.
9. container according to claim 1, which is characterized in that the overhanging component further includes:
Balcony column, the balcony column are upwardly extended from the top surface of the chassis along the short transverse;With
Bracket, the bracket be configured with for the balcony column along the short transverse by channel,
Wherein, the balcony column extends up through the channel along the short transverse, the bracket by connector with The chassis connection.
CN201711286127.4A 2017-12-07 2017-12-07 A kind of container Withdrawn CN108661181A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711286127.4A CN108661181A (en) 2017-12-07 2017-12-07 A kind of container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711286127.4A CN108661181A (en) 2017-12-07 2017-12-07 A kind of container

Publications (1)

Publication Number Publication Date
CN108661181A true CN108661181A (en) 2018-10-16

Family

ID=63785020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711286127.4A Withdrawn CN108661181A (en) 2017-12-07 2017-12-07 A kind of container

Country Status (1)

Country Link
CN (1) CN108661181A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113335774A (en) * 2021-05-21 2021-09-03 扬州通利冷藏集装箱有限公司 Lateral part structure and container of container

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE8702124D0 (en) * 1987-05-21 1987-05-21 Scanarc S Bohlin Ab PREFABRICATED BALCONY
JPH1181442A (en) * 1997-09-11 1999-03-26 Hitachi Chem Co Ltd Veranda fitting structure for simplified house
JPH11117385A (en) * 1997-10-13 1999-04-27 Misawa Homes Co Ltd Joining structure for balcony unit
KR100919699B1 (en) * 2009-03-04 2009-10-06 (주)금성콘테이너하우스 Container house included terrace
CN102191816A (en) * 2011-04-07 2011-09-21 苏运升 Container type house
CN203129633U (en) * 2013-02-21 2013-08-14 张信东 Arc-shaped roof type container combined room
CN205348387U (en) * 2016-01-26 2016-06-29 张渝 Foldable balcony device
CN205743040U (en) * 2016-05-19 2016-11-30 山东天元起重机械安装有限公司 A kind of integrated form material hoisting platform
CN206245464U (en) * 2016-12-15 2017-06-13 四川省建筑设计研究院 One kind is gone along with sb. to guard him by power integrated prefabricated balcony
CN207597599U (en) * 2017-12-07 2018-07-10 扬州通利冷藏集装箱有限公司 A kind of container

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE8702124D0 (en) * 1987-05-21 1987-05-21 Scanarc S Bohlin Ab PREFABRICATED BALCONY
JPH1181442A (en) * 1997-09-11 1999-03-26 Hitachi Chem Co Ltd Veranda fitting structure for simplified house
JPH11117385A (en) * 1997-10-13 1999-04-27 Misawa Homes Co Ltd Joining structure for balcony unit
KR100919699B1 (en) * 2009-03-04 2009-10-06 (주)금성콘테이너하우스 Container house included terrace
CN102191816A (en) * 2011-04-07 2011-09-21 苏运升 Container type house
CN203129633U (en) * 2013-02-21 2013-08-14 张信东 Arc-shaped roof type container combined room
CN205348387U (en) * 2016-01-26 2016-06-29 张渝 Foldable balcony device
CN205743040U (en) * 2016-05-19 2016-11-30 山东天元起重机械安装有限公司 A kind of integrated form material hoisting platform
CN206245464U (en) * 2016-12-15 2017-06-13 四川省建筑设计研究院 One kind is gone along with sb. to guard him by power integrated prefabricated balcony
CN207597599U (en) * 2017-12-07 2018-07-10 扬州通利冷藏集装箱有限公司 A kind of container

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113335774A (en) * 2021-05-21 2021-09-03 扬州通利冷藏集装箱有限公司 Lateral part structure and container of container
CN113335774B (en) * 2021-05-21 2024-01-26 扬州通利冷藏集装箱有限公司 Side structure of container and container

Similar Documents

Publication Publication Date Title
CN111005655B (en) Processing technology of concrete civil air defense door
CN110318490A (en) A kind of construction method that superimposed sheet is connect with secondary beam and node connecting structure
CN103437423B (en) Controllable quantitative release connection method and structure for steel truss
CN205636474U (en) Assembled bracket structure
CN205475854U (en) Roof beam wall composite external wall component
CN109132843B (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN207597599U (en) A kind of container
CN108661181A (en) A kind of container
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN105133729B (en) A kind of special-shaped beam column steel frame with battenboard and its construction method
CN209760756U (en) Anchoring type overhanging scaffold
KR101623848B1 (en) Seismic retrofitting technique of framed building by external steel brace frame
CN206128287U (en) Assembled wing -room
CN218265114U (en) Steel frame construction node supports reinforced structure
CN201802114U (en) Communication iron tower
CN109537724A (en) One kind is unilateral to be bolted reinforcing joint for resisting continuous collapse of beam column and its construction method
CN215330448U (en) Simple to operate's building steel structure
CN204574800U (en) The combined heat-treatment furnace column of lattice
CN212001801U (en) Connecting structure of limiting assembly and prefabricated external wall panel
CN209620622U (en) A kind of promotion platform
CN207618833U (en) Right angle double door elevator car frame structure
CN205935430U (en) Installation of daylighting top fixed knot construct
CN207633608U (en) A kind of glass curtain wall and steel structure
CN206784670U (en) Mounting structure suitable for fixed external hanging type wallboard
CN205400118U (en) Eccentric outer wall underpins structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No.39, Shiqiao South Road, Yangzhou Economic Development Zone, Jiangsu Province 225102

Applicant after: YANGZHOU TONGLEE REEFER CONTAINER Co.,Ltd.

Applicant after: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd.

Applicant after: CIMC Container (Group) Co.,Ltd.

Address before: No.39, Shiqiao South Road, Yangzhou Economic Development Zone, Jiangsu Province 225102

Applicant before: YANGZHOU TONGLEE REEFER CONTAINER Co.,Ltd.

Applicant before: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd.

Applicant before: CIMC CONTAINERS HOLDING Co.,Ltd.

CB02 Change of applicant information
WW01 Invention patent application withdrawn after publication

Application publication date: 20181016

WW01 Invention patent application withdrawn after publication