CN108661058B - Water well landfill method - Google Patents

Water well landfill method Download PDF

Info

Publication number
CN108661058B
CN108661058B CN201810473855.4A CN201810473855A CN108661058B CN 108661058 B CN108661058 B CN 108661058B CN 201810473855 A CN201810473855 A CN 201810473855A CN 108661058 B CN108661058 B CN 108661058B
Authority
CN
China
Prior art keywords
cement
landfill
water well
well
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810473855.4A
Other languages
Chinese (zh)
Other versions
CN108661058A (en
Inventor
张国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sky Blue Water Environmental Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810473855.4A priority Critical patent/CN108661058B/en
Publication of CN108661058A publication Critical patent/CN108661058A/en
Application granted granted Critical
Publication of CN108661058B publication Critical patent/CN108661058B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/12Back-filling of foundation trenches or ditches

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a water well landfill technology, in particular to a water well landfill method. The water well landfill method of the invention includes the following steps: step one, building a support disc; step two, burying the lower section of the water well; thirdly, burying the middle section of the water well; and fourthly, burying the upper section of the water well. The advantages are that: the underground water can be effectively protected from being polluted, the purpose of quickly completing water well landfill can be achieved, meanwhile, the underground water can be opened and used at any time, secondary construction and investment are avoided, landfill efficiency is high, and manpower, material resources and financial resources are saved.

Description

Water well landfill method
Technical Field
The invention relates to a water well landfill technology, in particular to a water well landfill method.
Background
Self-contained or large wells are deep holes drilled by people for water intake and drinking or for agricultural irrigation in a natural setting. The main purpose of drilling and water taking is to achieve the purpose of safe drinking and to satisfy the requirement of sufficient water quantity for irrigating farmlands. According to the demand of the times, a large number of water wells are stopped or abandoned in the middle east and the north of China in the next 10 years, and the water wells are stopped or abandoned and need to be buried. The traditional technology is lack of the landfill safety performance of the wells, and is likely to cause the secondary pollution problem of underground water sources in the wells, so how to scientifically and effectively landfill the wells is a problem which needs to be solved urgently in China.
Disclosure of Invention
The invention aims to solve the technical problem of providing a water well landfill method, which effectively overcomes the defects of the prior art.
The technical scheme for solving the technical problems is as follows: a well landfill method comprises the following steps:
step one, building a supporting disc, and fixing a prefabricated supporting disc on the well wall in the well;
step two, filling the lower section of the water well, pouring a lower section cement filling body in the water well at the upper end of the supporting disc, and curing;
thirdly, filling the middle section of the water well, pouring a middle section cement filling body in the water well at the upper end of the lower section cement filling body, and curing;
and fourthly, filling the upper section of the water well, pouring the upper section of the cement landfill body in the water well at the upper end of the middle section of the cement landfill body, and curing.
The invention has the beneficial effects that: the underground water can be effectively protected from being polluted, the purpose of quickly completing water well landfill can be achieved, meanwhile, the underground water can be opened and used at any time, secondary construction and investment are avoided, landfill efficiency is high, and manpower, material resources and financial resources are saved.
On the basis of the technical scheme, the invention can be further improved as follows.
Further, the supporting disc is horizontally fixed on the well wall in the water well.
The beneficial effect of adopting above-mentioned further scheme is that the safe effectual shaping of pouring of lower segment cement landfill body can effectual support by the supporting disk to its atress is even, does benefit to the good landfill of lower segment cement landfill body.
Further, the height of the upper section cement landfill body is 2-3.5m, the height of the middle section cement landfill body is 8-10m, and the height of the lower section cement landfill body is 1.5-2 m.
The beneficial effect of adopting the further scheme is that the landfill size is reasonable, the normal use of the soil body after the landfill is not influenced, and the follow-up secondary dismantling and use can be facilitated.
Further, the lower section cement landfill body and the upper section cement landfill body are both formed by pouring expansion cement, and the middle section cement landfill body is formed by pouring foaming cement.
The beneficial effects of adopting above-mentioned further scheme are that upper and lower section waterproof performance is good, and the middle section quality is light, and whole landfill weight is light, and construction convenience, the security performance is preferred.
Drawings
FIG. 1 is a schematic structural view of one embodiment of a water well landfill of the present invention;
fig. 2 is a schematic structural view of another embodiment of the water well landfill of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. the device comprises a support plate, 2, a lower section cement landfill body, 3, a middle section cement landfill body, 4, an upper section cement landfill body, 5 and a soil body.
Detailed Description
The principles and features of this invention are described below in conjunction with the following drawings, which are set forth by way of illustration only and are not intended to limit the scope of the invention.
The first embodiment is as follows: as shown in fig. 1, when the water well is in a non-ploughing land, the water well landfill method comprises the following steps:
step one, building a supporting disc 1, and fixing the prefabricated supporting disc 1 on the well wall in the well;
step two, filling the lower section of the water well, pouring a lower section cement filling body 2 in the water well at the upper end of the supporting disc, and curing;
thirdly, filling the middle section of the water well, pouring a middle section cement filling body 3 in the water well at the upper end of the lower section cement filling body 2, and curing;
and step four, filling the upper section of the water well, pouring the upper section cement landfill body 4 in the water well at the upper end of the middle section cement landfill body 3, and curing.
The upper end of the upper cement landfill body 4 can be flush with the ground surface or slightly protrude from the ground surface, and relevant marks can be made at the position after landfill, so that the landfill can be conveniently removed at the later stage and then used again.
Preferably, the supporting plate 1 is horizontally fixed on the well wall in the well, and the whole stress is uniform.
It should be noted that the supporting plate 1 may be a prefabricated cement plate, or may be a metal plate with better structural strength and hardness, but the best one should be a cement plate, taking the cement plate as an example, during construction, a horizontal ring groove is formed on the inner wall of the water well (round well), a formwork is built in the ring groove, the cement plate is poured on the formwork, and after natural drying and airing, the next process is performed on the cement plate 1.
Preferably, the height of the upper section of cement landfill body 4 is 2-3.5m, the height of the middle section of cement landfill body 3 is 8-10m, the height of the lower section of cement landfill body 2 is 1.5-2m, and in the building process, the height of the soil body 5 is determined according to the plants planted or the application of the current land, and is generally selected to be 1.5 m; the upper section of the cement landfill body 4 is generally set to be 3m, so that better structural strength and waterproof performance are ensured; the middle section cement landfill body 3 is generally formed by pouring cement (foaming cement) with light weight, the height of the middle section cement landfill body is generally 10m, so that the weight of the whole landfill body is reduced, accidents such as collapse and the like are not easy to happen in the later period, the safety performance of the middle section cement landfill body is improved, the lower section cement landfill body 2 needs to be poured in layers when being poured, a cement layer with the height within 50cm is poured on the supporting disc 1 firstly, and the complete pouring of the lower section cement landfill body 2 is continuously completed on the cement layer after the cement layer is solidified or partially solidified, so that unsafe accidents such as collapse and the like, which are possibly caused by the supporting disc 1 when the lower section cement landfill body 2 is poured integrally, are avoided, the height of the middle section cement landfill body is not too high, and the height of the.
Preferably, the lower cement landfill body 2 and the upper cement landfill body 4 are both formed by pouring expansive cement, the waterproof performance is good, secondary pollution of underground water caused by the fact that ground water enters underground water inside a well through the lower cement landfill body 2 and the upper cement landfill body 4 after the landfill is well can be avoided, the structural strength of the lower cement landfill body and the upper cement landfill body is good, the middle cement landfill body 3 is formed by pouring foaming cement, the weight is light, and later-stage dismantling is facilitated.
Because of the lower section cement landfill body 2 and the upper section cement landfill body 4 are lower than the middle section cement landfill body 3 in height after the whole landfill, when the water well needs to be restarted later, the lower section cement landfill body 2 and the upper section cement landfill body 4 can be dismantled relatively easily due to the lower height, and the middle section cement landfill body 3 adopts the foaming cement to pour the height of the middle section cement landfill body, but the foaming cement is dismantled conveniently and quickly, and the later-period dismantling work of the landfill object in the water well is facilitated.
Example two: as shown in fig. 2, the water well is in the cultivated land, and the water well landfill method comprises the following steps:
step one, building a supporting disc 1, and fixing the prefabricated supporting disc 1 on the well wall in the well;
step two, filling the lower section of the water well, pouring a lower section cement filling body 2 in the water well at the upper end of the supporting disc, and curing;
thirdly, filling the middle section of the water well, pouring a middle section cement filling body 3 in the water well at the upper end of the lower section cement filling body 2, and curing;
step four, water well upper section landfill, pouring an upper section cement landfill body 4 in the water well at the upper end of the middle section cement landfill body 3, and curing;
and fifthly, soil body landfill, namely, the soil body 5 is buried in the water well at the upper end of the upper-section cement landfill body 4 of the soil mining surface soil layer until the upper surface of the soil body 5 is flush with the ground surface.
Preferably, the height of the soil body 5 is 1-1.5m, the height of the upper section cement landfill body 4 is 2-3.5m, the height of the middle section cement landfill body 3 is 8-10m, and the height of the lower section cement landfill body 2 is 1.5-2m, so that the use of normal cultivated land is not influenced by the landfill of a water well.
The other steps are the same as those of the first embodiment.
The technical scheme of this application aims at solving how to bury fast and do not influence the problem of secret quality of water after the well abandonment, and the landfill is efficient, and safe no secondary pollution to make things convenient for the later stage to accomplish fast when restarting demolishs of landfill thing, be suitable for the strategic demands of military specially.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (1)

1. A well landfill method is characterized by comprising the following steps:
step one, building a supporting disc (1), and fixing the prefabricated supporting disc (1) on the well wall in the well; during construction, a horizontal ring groove is formed in the inner wall of the water well, and the supporting disc (1) is horizontally fixed on the ring groove;
step two, filling the lower section of the water well, pouring a lower section cement filling body (2) in the water well at the upper end of the supporting disc (1), and curing;
thirdly, filling the middle section of the water well, pouring a middle section cement filling body (3) in the water well at the upper end of the lower section cement filling body (2), and curing;
fourthly, filling the upper section of the water well, pouring an upper section cement landfill body (4) in the water well at the upper end of the middle section cement landfill body (3), and curing;
the height of the upper section cement landfill body (4) is 2-3.5m, the height of the middle section cement landfill body (3) is 8-10m, and the height of the lower section cement landfill body (2) is 1.5-2 m; the lower section cement landfill body (2) and the upper section cement landfill body (4) are both formed by pouring expansion cement, and the middle section cement landfill body (3) is formed by pouring foaming cement.
CN201810473855.4A 2018-05-17 2018-05-17 Water well landfill method Active CN108661058B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810473855.4A CN108661058B (en) 2018-05-17 2018-05-17 Water well landfill method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810473855.4A CN108661058B (en) 2018-05-17 2018-05-17 Water well landfill method

Publications (2)

Publication Number Publication Date
CN108661058A CN108661058A (en) 2018-10-16
CN108661058B true CN108661058B (en) 2021-05-07

Family

ID=63776123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810473855.4A Active CN108661058B (en) 2018-05-17 2018-05-17 Water well landfill method

Country Status (1)

Country Link
CN (1) CN108661058B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2532087A (en) * 2014-11-10 2016-05-11 Henry Patrick Method of installing services under footways
CN106677198A (en) * 2017-01-20 2017-05-17 上海长凯岩土工程有限公司 Well plugging method under dynamic water level state
CN106894428A (en) * 2015-12-21 2017-06-27 中冶天工集团有限公司 Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN206385557U (en) * 2016-12-07 2017-08-08 山西省第三建筑工程公司 The water-impervious plugging mechanism of dewatering well on deep basal pit raft plate
CN107313437A (en) * 2016-04-27 2017-11-03 上海十三冶建设有限公司 The shut-in well construction method of foundation ditch pressure-bearing dewatering well

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201567583U (en) * 2009-12-29 2010-09-01 中国建筑第二工程局有限公司 Quick low-cost closed dewatering well device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2532087A (en) * 2014-11-10 2016-05-11 Henry Patrick Method of installing services under footways
CN106894428A (en) * 2015-12-21 2017-06-27 中冶天工集团有限公司 Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN107313437A (en) * 2016-04-27 2017-11-03 上海十三冶建设有限公司 The shut-in well construction method of foundation ditch pressure-bearing dewatering well
CN206385557U (en) * 2016-12-07 2017-08-08 山西省第三建筑工程公司 The water-impervious plugging mechanism of dewatering well on deep basal pit raft plate
CN106677198A (en) * 2017-01-20 2017-05-17 上海长凯岩土工程有限公司 Well plugging method under dynamic water level state

Also Published As

Publication number Publication date
CN108661058A (en) 2018-10-16

Similar Documents

Publication Publication Date Title
CN101845820B (en) Sinking-assistant construction method for sinking sunk well
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN103498486B (en) A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well
CN103541352B (en) A kind of at ground, sandy soil stratum major diameter Vertical spots underground continuous construction method
CN104499560B (en) Combined rainwater seepage well and construction method
CN206220085U (en) A kind of permeable pile tube system for accelerating to consolidate
CN103233464A (en) Manual hole digging pile and construction method thereof
CN207278276U (en) Cross the shallow-depth-excavation tunnel supporting construction of ground fissure crushed zone
CN106480878A (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN108661058B (en) Water well landfill method
CN212612585U (en) Anti-freezing pile foundation in severe cold area
CN103924592B (en) A kind of pressure-type PHA anchor pole and construction method thereof
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN203559426U (en) Dewatering open caisson of underground structure
CN206015806U (en) A kind of pre-buried adjustable sewer pipe fitting
CN211849527U (en) High water pressure drop well combination plugging device
US10794034B2 (en) Adapter frame
CN206143783U (en) Supporting device for preventing mud rock landslide
CN104746507B (en) Construction waste regeneration drainage CFG pile foundation and construction method thereof
CN204139190U (en) A kind of Liftable preformed bricks fetal membrane
CN209353320U (en) A kind of casing bit used with the cooperation blanking of sinking tubular gravel pile machine
CN103485358B (en) The construction method of underground structure precipitation open caisson
CN103306277B (en) A kind of construction method utilizing rigid pile to embed Low Intensity Concrete Piles making compound water stop curtain
CN206015695U (en) Buried pipe
CN110820780A (en) Combined plugging device and method for high-water-pressure-drop water well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210625

Address after: 101200 No.7, Anle East Street, Ping'an Street, Pinggu town, Pinggu District, Beijing

Patentee after: Beijing Sky Blue Water Environmental Technology Co.,Ltd.

Address before: 101200 No.7, Anle East Street, Ping'an Street, Pinggu town, Pinggu District, Beijing

Patentee before: Zhang Guoliang

TR01 Transfer of patent right