CN108643393A - A kind of construction method of brick masonry wall piece recycling - Google Patents

A kind of construction method of brick masonry wall piece recycling Download PDF

Info

Publication number
CN108643393A
CN108643393A CN201810576646.2A CN201810576646A CN108643393A CN 108643393 A CN108643393 A CN 108643393A CN 201810576646 A CN201810576646 A CN 201810576646A CN 108643393 A CN108643393 A CN 108643393A
Authority
CN
China
Prior art keywords
wall piece
masonry wall
constructional column
masonry
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810576646.2A
Other languages
Chinese (zh)
Other versions
CN108643393B (en
Inventor
郑文忠
苏志明
周威
李玉芳
王英
李艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Thousand Construction Materials Co Ltd
Harbin Institute of Technology
Original Assignee
Harbin Thousand Construction Materials Co Ltd
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Thousand Construction Materials Co Ltd, Harbin Institute of Technology filed Critical Harbin Thousand Construction Materials Co Ltd
Priority to CN201810576646.2A priority Critical patent/CN108643393B/en
Publication of CN108643393A publication Critical patent/CN108643393A/en
Application granted granted Critical
Publication of CN108643393B publication Critical patent/CN108643393B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

A kind of construction method of brick masonry wall piece recycling, the present invention relates to engineering construction technology fields, and in particular to a kind of construction method of brick masonry wall piece recycling.The problem of the present invention is to solve the environmental pollutions and the wasting of resources that are faced in masonry structure building demolition.Method:Horizontal connection between masonry wall piece specifically includes shape connection, L-shaped connection is connected with T shapes, is not only suitable for the intersection wall piece of arrangement constructional column, is also applied for the intersection wall piece of no constructional column.The notch and implantation connection reinforcing bar for taking out collar extension size and being less than internal diameter are opened with corning machine in the masonry wall piece both sides removed, adjacent two brick masonry walls blade unit is connected with constructional column simultaneously, and collar tie beam is rationally set, it can effectively improve with the whole anti-seismic performance for removing the new masonry structure building that brick masonry wall blade unit is built, and environmental pollution can be reduced, the wasting of resources is reduced, the recycling for removing brick masonry wall piece, with good economic efficiency and social benefit are realized.

Description

A kind of construction method of brick masonry wall piece recycling
Technical field
The present invention relates to engineering construction technology fields, and in particular to a kind of construction party of brick masonry wall piece recycling Method.
Background technology
Brick masonry structure building has the characteristics that quantity is big, widespread as one of main building type in China.Due to society The update with design-build standard can be developed, masonry structure building often cannot be satisfied new in use space and in terms of using function The seismic seeurity that use demand and relevant criterion require, results in the problem of a large amount of masonry structure buildings face dismounting.If The masonry of dismounting is treated as building waste, the waste and environmental disruption of resource can be caused.
Invention content
The environmental pollution and the wasting of resources that the invention aims to solve the problems, such as to face in masonry structure building demolition, And provide a kind of construction method of brick masonry wall piece recycling.
A kind of construction method of brick masonry wall piece recycling of the present invention is used in the both sides of the brick masonry wall piece of dismounting Corning machine, which is opened, to be taken several notches and is implanted into connection reinforcing bar, the brick masonry wall pieces of adjacent two dismountings connected by constructional column or No constructional column connection, is arranged collar tie beam after the completion of connection;The collar extension size of the notch is less than internal diameter size, two neighboring notch Clear distance is not less than the internal diameter size of notch;The constructional column connection includes that a shape connects, L-shaped connection is connected with T shapes;The no structure It includes linear type connection to make column connection.
Beneficial effects of the present invention:
The present invention improves the whole anti-seismic performance with the new masonry structure building for removing the construction of brick masonry wall blade unit, Environmental pollution is reduced, is reduced resource waste, has achieved the purpose that removing brick masonry wall piece recycles, and has good economy Benefit and social benefit.
Description of the drawings
Fig. 1 is the structural schematic diagram after the first masonry wall piece fluting;
The structural schematic diagram that Fig. 2 connects for the linear type of no constructional column;
Fig. 3 is the side schematic view after the first masonry wall piece fluting;
Fig. 4 is the structural schematic diagram of shape connection;
Fig. 5 is the structural schematic diagram of L-shaped connection;
Fig. 6 is the structural schematic diagram of T shapes connection.
Specific implementation mode
Specific implementation mode one:Illustrate present embodiment, a kind of brick masonry wall piece weight of present embodiment in conjunction with Fig. 1 and Fig. 3 The construction method utilized again is to open to take several notches 4 and be implanted into connection using corning machine in the both sides of the brick masonry wall piece of dismounting The brick masonry wall piece of reinforcing bar 6, adjacent two dismountings is connected by constructional column or is connected without constructional column, setting circle after the completion of connection Beam;The collar extension size of the notch 4 is less than internal diameter size, and the clear distance of two neighboring notch 4 is not less than the internal diameter size of notch 4; The constructional column connection includes that a shape connects, L-shaped connection is connected with T shapes;The no constructional column connection includes shape connection.
Specific implementation mode two:Embodiment is described with reference to Fig. 4, and present embodiment is different from specific implementation mode one It is:The one shape connection is to carry out according to the following steps:First masonry wall piece 1 and the second masonry wall piece 2 are coaxially disposed, first Constructional column 5 is set between masonry wall piece 1 and the second masonry wall piece 2;The first masonry wall piece 1, the second masonry wall piece 2 and construction The thickness of column 5 is identical;Along height of house direction coring is used in the side of the first masonry wall piece 1 and the second masonry wall piece 2 respectively Machine, which is opened, takes several notches 4, and then the notch 4 in 2 outside of the first masonry wall piece 1 and the second masonry wall piece is implanted into connection reinforcing bar 6, the connection reinforcing bar 6 in neighbouring two notches 4 is staggered, and is built the first masonry wall piece 1, second by connecting reinforcing bar 6 Body wall piece 2 and constructional column 5 connect, and connection reinforcing bar 6 is each passed through the first masonry wall piece 1 and second through its both ends of constructional column 5 and builds The notch 4 of 2 inside of body wall piece is anchored in the first masonry wall piece 1 and the second masonry wall piece 2;Then the reinforcing bar of constructional column 5 is bound, Pillar side form, notch 4 from the casting concrete to 2 both sides of the first masonry wall piece 1 and the second masonry wall piece and constructional column 5, i.e., Complete shape connection.Other are same as the specific embodiment one.
Specific implementation mode three:Present embodiment that embodiment is described with reference to Fig.5, and specific implementation mode one or two are not Be:The L-shaped connection is to carry out according to the following steps:First masonry wall piece 1 and the second masonry wall piece 2 are vertically arranged, Constructional column 5 is arranged in the angle of first masonry wall piece 1 and the second masonry wall piece 2;The first masonry wall piece 1 and 5 phase of constructional column The thickness of adjacent side is identical, and the second masonry wall piece 2 is identical as the thickness of 5 sides adjacent of constructional column;Distinguish along height of house direction It is opened using corning machine in the side of the first masonry wall piece 1 and the second masonry wall piece 2 and takes several notches 4;Then in the first masonry The notch 4 in 2 outside of wall piece 1 and the second masonry wall piece is implanted into connection reinforcing bar 6;Connection reinforcing bar 6 in neighbouring two notches 4 It is staggered, one end of a connection reinforcing bar 6 is anchored in constructional column 5, the other end passes through the slot of 1 inside of the first masonry wall piece Mouth 4 is anchored in the first masonry wall piece 1;A connection reinforcing bar 6 is taken again, one end is anchored in constructional column 5, the other end passes through the The notch 4 of two masonry wall pieces, 2 inside is anchored in the second masonry wall piece 2;Then the reinforcing bar of binding constructional column 5, pillar side form, to Casting concrete in the notch 4 and constructional column 5 of 2 both sides of first masonry wall piece 1 and the second masonry wall piece completes L-shaped connection. Other are the same as one or two specific embodiments.
Specific implementation mode four:Present embodiment that embodiment is described with reference to Fig.6, and specific implementation mode one to three it Unlike one:The T shapes connection is to carry out according to the following steps:First masonry wall piece 1, the second masonry wall piece 2 and third are built Body wall piece 3 is arranged according to section to be T-shaped, and the second masonry wall piece 2 is perpendicular to the first masonry wall piece 1 and third masonry Wall piece 3 is arranged, in the intersection of the first masonry wall piece 1, the second masonry wall piece 2 and third masonry wall piece 3 that are mutually perpendicular to two axis Constructional column 5 is set;Each length of side of the constructional column 5 thickness of wall piece adjacent with the side is identical;Distinguish along height of house direction It is opened using corning machine in the side of the first masonry wall piece 1, the second masonry wall piece 2 and third masonry wall piece 3 and takes several notches 4; Then the notch 4 in 3 outside of the first masonry wall piece 1, the second masonry wall piece 2 and third masonry wall piece is implanted into connection reinforcing bar 6;On Under connection reinforcing bar 6 in two neighboring notch 4 be staggered, by connecting reinforcing bar 6 by the first masonry wall piece 1, third masonry wall Piece 3 and constructional column 5 connect, and connection reinforcing bar 6 is each passed through the first masonry wall piece 1 and third masonry wall through its both ends of constructional column 5 The notch 4 of 3 inside of piece is anchored in the first masonry wall piece 1 and third masonry wall piece 3, and one end of a connection reinforcing bar 6 is anchored In in constructional column 5, the other end passes through the notch 4 of 2 inside of the second masonry wall piece to be anchored in the second masonry wall piece 2;Then it binds The reinforcing bar of constructional column 5, pillar side form, to the notch of 3 both sides of the first masonry wall piece 1, the second masonry wall piece 2 and third masonry wall piece 4 and constructional column 5 in casting concrete, i.e., complete T-shaped connection.Other are identical as one of specific implementation mode one to three.
Specific implementation mode five:Embodiment is described with reference to Fig. 2, present embodiment and specific implementation mode one to four it Unlike one:The linear type connection is to carry out according to the following steps:First masonry wall piece 1 and the second masonry wall piece 2 is coaxial Setting, the first masonry wall piece 1 are identical with the thickness of the second masonry wall piece 2;Along height of house direction respectively in the first masonry The side of wall piece 1 and the second masonry wall piece 2 is opened using corning machine and takes several notches 4, then in the first masonry wall piece 1 and second The notch 4 in 2 outside of masonry wall piece is implanted into connection reinforcing bar 6, and the connection reinforcing bar 6 in neighbouring two notches 4 is staggered, leads to It crosses connection reinforcing bar 6 to connect the first masonry wall piece 1 and the second masonry wall piece 2, the both ends of connection reinforcing bar 6 are each passed through the first masonry The notch 4 of 2 inside of wall piece 1 and the second masonry wall piece is anchored in the first masonry wall piece 1 and the second masonry wall piece 2, then branch side Mould, to the notch 4 of 2 both sides of the first masonry wall piece 1 and the second masonry wall piece and the first masonry wall piece 1 and the second masonry wall piece 2 Junction casting concrete, that is, complete no constructional column linear type connection.One of other and specific implementation mode one to four phase Together.
Beneficial effects of the present invention are verified using following embodiment:
Embodiment one:A kind of construction method of brick masonry wall piece recycling is adopted in the both sides of the brick masonry wall piece of dismounting It is opened with corning machine and takes several notches 4 and be implanted into connection reinforcing bar 6, the brick masonry wall piece of adjacent two dismountings is connected by constructional column It connects or is connected without constructional column, collar tie beam is set after the completion of connection;The collar extension size of the notch 4 is less than internal diameter size, two neighboring The clear distance of notch 4 is not less than the internal diameter size of notch 4;The constructional column connection includes that a shape connects, L-shaped connection is connected with T shapes; The no constructional column connection includes shape connection.
The one shape connection is to carry out according to the following steps:First masonry wall piece 1 and the second masonry wall piece 2 are coaxially disposed, Constructional column 5 is set between the first masonry wall piece 1 and the second masonry wall piece 2;The first masonry wall piece 1, the second masonry wall piece 2 It is identical with the thickness of constructional column 5;It is adopted respectively in the side of the first masonry wall piece 1 and the second masonry wall piece 2 along height of house direction It is opened with corning machine and takes several notches 4, then in 4 company of being implanted into of notch in 2 outside of the first masonry wall piece 1 and the second masonry wall piece Connect reinforcing bar 6, the connection reinforcing bar 6 in neighbouring two notches 4 is staggered, by connect reinforcing bar 6 by the first masonry wall piece 1, Second masonry wall piece 2 and constructional column 5 connect, and connection reinforcing bar 6 is each passed through 1 He of the first masonry wall piece through its both ends of constructional column 5 The notch 4 of second masonry wall piece, 2 inside is anchored in the first masonry wall piece 1 and the second masonry wall piece 2;Then constructional column 5 is bound Reinforcing bar, pillar side form pours mixed into the notch 4 and constructional column 5 of 2 both sides of the first masonry wall piece 1 and the second masonry wall piece Solidifying soil completes shape connection.
The L-shaped connection is to carry out according to the following steps:First masonry wall piece 1 and the second masonry wall piece 2 are vertically arranged, Constructional column 5 is arranged in the angle of first masonry wall piece 1 and the second masonry wall piece 2;The first masonry wall piece 1 and 5 phase of constructional column The thickness of adjacent side is identical, and the second masonry wall piece 2 is identical as the thickness of 5 sides adjacent of constructional column;Distinguish along height of house direction It is opened using corning machine in the side of the first masonry wall piece 1 and the second masonry wall piece 2 and takes several notches 4;Then in the first masonry The notch 4 in 2 outside of wall piece 1 and the second masonry wall piece is implanted into connection reinforcing bar 6;Connection reinforcing bar 6 in neighbouring two notches 4 It is staggered, one end of a connection reinforcing bar 6 is anchored in constructional column 5, the other end passes through the slot of 1 inside of the first masonry wall piece Mouth 4 is anchored in the first masonry wall piece 1;A connection reinforcing bar 6 is taken again, one end is anchored in constructional column 5, the other end passes through the The notch 4 of two masonry wall pieces, 2 inside is anchored in the second masonry wall piece 2;Then the reinforcing bar of binding constructional column 5, pillar side form, to Casting concrete in the notch 4 and constructional column 5 of 2 both sides of first masonry wall piece 1 and the second masonry wall piece completes L-shaped connection.
The T shapes connection is to carry out according to the following steps:By the first masonry wall piece 1, the second masonry wall piece 2 and third masonry wall Piece 3 is arranged according to section to be T-shaped, and the second masonry wall piece 2 is perpendicular to the first masonry wall piece 1 and third masonry wall piece 3 settings are arranged in the intersection for the first masonry wall piece 1, the second masonry wall piece 2 and the third masonry wall piece 3 for being mutually perpendicular to two axis Constructional column 5;Each length of side of the constructional column 5 thickness of wall piece adjacent with the side is identical;Along height of house direction respectively The side of one masonry wall piece 1, the second masonry wall piece 2 and third masonry wall piece 3 is opened using corning machine takes several notches 4;Then Notch 4 in 3 outside of the first masonry wall piece 1, the second masonry wall piece 2 and third masonry wall piece is implanted into connection reinforcing bar 6;Phase up and down Connection reinforcing bar 6 in adjacent two notches 4 is staggered, by connecting reinforcing bar 6 by the first masonry wall piece 1,3 and of third masonry wall piece Constructional column 5 connects, and connection reinforcing bar 6 is each passed through through its both ends of constructional column 5 in the first masonry wall piece 1 and third masonry wall piece 3 The notch 4 of side is anchored in the first masonry wall piece 1 and third masonry wall piece 3, and one end of a connection reinforcing bar 6 is anchored in construction In column 5, the other end passes through the notch 4 of 2 inside of the second masonry wall piece to be anchored in the second masonry wall piece 2;Then constructional column 5 is bound Reinforcing bar, pillar side form, to the notch 4 and structure of 3 both sides of the first masonry wall piece 1, the second masonry wall piece 2 and third masonry wall piece Casting concrete in column 5 is made, i.e., complete T-shaped connection.
The linear type connection is to carry out according to the following steps:First masonry wall piece 1 and the second masonry wall piece 2 are coaxially set It sets, the first masonry wall piece 1 is identical with the thickness of the second masonry wall piece 2;Along height of house direction respectively in the first masonry wall The side of piece 1 and the second masonry wall piece 2 is opened using corning machine and takes several notches 4, is then built in the first masonry wall piece 1 and second The notch 4 in 2 outside of body wall piece is implanted into connection reinforcing bar 6, and the connection reinforcing bar 6 in neighbouring two notches 4 is staggered, passes through Connection reinforcing bar 6 connects the first masonry wall piece 1 and the second masonry wall piece 2, and the both ends of connection reinforcing bar 6 are each passed through the first masonry wall The notch 4 of 2 inside of piece 1 and the second masonry wall piece is anchored in the first masonry wall piece 1 and the second masonry wall piece 2, then branch side form, To the notch 4 of 2 both sides of the first masonry wall piece 1 and the second masonry wall piece and the company of the first masonry wall piece 1 and the second masonry wall piece 2 Place's casting concrete is connect, that is, completes the linear type connection of no constructional column.
Embodiment improves the whole shock resistances with the new masonry structure building for removing the construction of brick masonry wall blade unit Can, environmental pollution is reduced, is reduced resource waste, has achieved the purpose that removing brick masonry wall piece recycles, and has good Economic benefit and social benefit.

Claims (5)

1. a kind of construction method of brick masonry wall piece recycling, it is characterised in that the construction method of brick masonry wall piece recycling It is to open to take several notches (4) and be implanted into connection reinforcing bar (6) using corning machine in the both sides of the brick masonry wall piece of dismounting, it is adjacent The brick masonry wall piece of two dismountings is connected by constructional column or is connected without constructional column, and collar tie beam is arranged after the completion of connection;The notch (4) collar extension size is less than internal diameter size, and the clear distance of two neighboring notch (4) is not less than the internal diameter size of notch (4);The structure It includes that a shape connects, L-shaped connection is connected with T shapes to make column connection;The no constructional column connection includes linear type connection.
2. a kind of construction method of brick masonry wall piece recycling according to claim 1, it is characterised in that a shape Connection is to carry out according to the following steps:First masonry wall piece (1) and the second masonry wall piece (2) are coaxially disposed, in the first masonry wall Constructional column (5) is set between piece (1) and the second masonry wall piece (2);The first masonry wall piece (1), the second masonry wall piece (2) and The thickness of constructional column (5) is identical;Along height of house direction respectively in the side of the first masonry wall piece (1) and the second masonry wall piece (2) Face is opened using corning machine takes several notches (4), then the slot on the outside of the first masonry wall piece (1) and the second masonry wall piece (2) Mouth (4) is implanted into connection reinforcing bar (6), and the connection reinforcing bar (6) in neighbouring two notches (4) is staggered, and passes through and connects steel Muscle (6) connects the first masonry wall piece (1), the second masonry wall piece (2) and constructional column (5), and connection reinforcing bar (6) runs through constructional column (5) notch (4) that its both ends is each passed through on the inside of the first masonry wall piece (1) and the second masonry wall piece (2) is anchored at the first masonry In wall piece (1) and the second masonry wall piece (2);Then the reinforcing bar of binding constructional column (5), pillar side form, to the first masonry wall piece (1) With the notch (4) and constructional column (5) interior casting concrete of second masonry wall piece (2) both sides, that is, complete shape connection.
3. a kind of construction method of brick masonry wall piece recycling according to claim 1, it is characterised in that the L-shaped connects Connect is to carry out according to the following steps:First masonry wall piece (1) and the second masonry wall piece (2) are vertically arranged, in the first masonry wall piece (1) and constructional column (5) is arranged in the angle of the second masonry wall piece (2);The first masonry wall piece (1) is adjacent with constructional column (5) The thickness of side is identical, and the second masonry wall piece (2) is identical as the thickness of constructional column (5) sides adjacent;Along height of house direction point It is not opened using corning machine in the side of the first masonry wall piece (1) and the second masonry wall piece (2) and takes several notches (4);Then exist Notch (4) on the outside of first masonry wall piece (1) and the second masonry wall piece (2) is implanted into connection reinforcing bar (6);Neighbouring two slots Connection reinforcing bar (6) in mouth (4) is staggered, and one end of a connection reinforcing bar (6) is anchored in constructional column (5), the other end Notch (4) on the inside of the first masonry wall piece (1) is anchored in the first masonry wall piece (1);A connection reinforcing bar (6) is taken again, One end is anchored in constructional column (5), the other end passes through the notch (4) on the inside of the second masonry wall piece (2) to be anchored at the second masonry In wall piece (2);Then the reinforcing bar of binding constructional column (5), pillar side form, to the first masonry wall piece (1) and the second masonry wall piece (2) The notch (4) and constructional column (5) interior casting concrete of both sides complete L-shaped connection.
4. a kind of construction method of brick masonry wall piece recycling according to claim 1, it is characterised in that the T shapes connect Connect is to carry out according to the following steps:By the first masonry wall piece (1), the second masonry wall piece (2) and third masonry wall piece (3) according to section It is arranged to be T-shaped, the second masonry wall piece (2) sets perpendicular to the first masonry wall piece (1) and third masonry wall piece (3) It sets, is set in the intersection of the first masonry wall piece (1), the second masonry wall piece (2) and the third masonry wall piece (3) that are mutually perpendicular to two axis Set constructional column (5);Each length of side thickness of wall piece adjacent with the side of the constructional column (5) is identical;Along height of house direction point Do not opened using corning machine in the side of the first masonry wall piece (1), the second masonry wall piece (2) and third masonry wall piece (3) take it is several A notch (4);Then the notch (4) on the outside of the first masonry wall piece (1), the second masonry wall piece (2) and third masonry wall piece (3) It is implanted into connection reinforcing bar (6);Connection reinforcing bar (6) in neighbouring two notches (4) is staggered, by connecting reinforcing bar (6) By the first masonry wall piece (1), third masonry wall piece (3) and constructional column (5) connect, connection reinforcing bar (6) through constructional column (5) its two The notch (4) being each passed through on the inside of the first masonry wall piece (1) and third masonry wall piece (3) is held to be anchored at the first masonry wall piece (1) With in third masonry wall piece (3), one end of a connection reinforcing bar (6) is anchored in constructional column (5), the other end passes through second to build Notch (4) on the inside of body wall piece (2) is anchored in the second masonry wall piece (2);Then the reinforcing bar of binding constructional column (5), pillar side Mould, to the notch (4) and constructional column of the first masonry wall piece (1), the second masonry wall piece (2) and third masonry wall piece (3) both sides (5) interior casting concrete, i.e., complete T-shaped connection.
5. a kind of construction method of brick masonry wall piece recycling according to claim 1, it is characterised in that a word Shape connection is to carry out according to the following steps:First masonry wall piece (1) and the second masonry wall piece (2) are coaxially disposed, described first builds Body wall piece (1) is identical with the thickness of the second masonry wall piece (2);Along height of house direction respectively in the first masonry wall piece (1) and The side of two masonry wall pieces (2) is opened using corning machine takes several notches (4), is then built in the first masonry wall piece (1) and second Notch (4) on the outside of body wall piece (2) is implanted into connection reinforcing bar (6), and the connection reinforcing bar (6) in neighbouring two notches (4) is handed over Mistake setting is connected the first masonry wall piece (1) and the second masonry wall piece (2) by connecting reinforcing bar (6), the two of connection reinforcing bar (6) The notch (4) being each passed through on the inside of the first masonry wall piece (1) and the second masonry wall piece (2) is held to be anchored at the first masonry wall piece (1) With in the second masonry wall piece (2), then branch side form, to the notch of the first masonry wall piece (1) and second masonry wall piece (2) both sides (4) and the junction casting concrete of the first masonry wall piece (1) and the second masonry wall piece (2), that is, the one of no constructional column is completed Font connects.
CN201810576646.2A 2018-06-05 2018-06-05 Construction method for recycling brick masonry wall piece Active CN108643393B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810576646.2A CN108643393B (en) 2018-06-05 2018-06-05 Construction method for recycling brick masonry wall piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810576646.2A CN108643393B (en) 2018-06-05 2018-06-05 Construction method for recycling brick masonry wall piece

Publications (2)

Publication Number Publication Date
CN108643393A true CN108643393A (en) 2018-10-12
CN108643393B CN108643393B (en) 2020-08-25

Family

ID=63752009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810576646.2A Active CN108643393B (en) 2018-06-05 2018-06-05 Construction method for recycling brick masonry wall piece

Country Status (1)

Country Link
CN (1) CN108643393B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560392A (en) * 2004-03-05 2005-01-05 刘庆军 Method of wall cutting and house constructing
CN103993741A (en) * 2014-06-06 2014-08-20 扬州大学 Method for building anti-seismic bricked formwork constructional column
CN207228409U (en) * 2017-06-21 2018-04-13 杨连树 The non-bearing wall body of gypsum injection molded

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560392A (en) * 2004-03-05 2005-01-05 刘庆军 Method of wall cutting and house constructing
CN103993741A (en) * 2014-06-06 2014-08-20 扬州大学 Method for building anti-seismic bricked formwork constructional column
CN207228409U (en) * 2017-06-21 2018-04-13 杨连树 The non-bearing wall body of gypsum injection molded

Also Published As

Publication number Publication date
CN108643393B (en) 2020-08-25

Similar Documents

Publication Publication Date Title
CN104975716A (en) Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete
CN106400982A (en) Stirrup-densified splicing joint for fabricated reinforced concrete columns
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN107574930A (en) It is a kind of that H profile steel and the regeneration monolith connecting node of U-shaped steel are set
CN206859453U (en) A kind of modified insulated wall light steel skeleton
CN108661171A (en) A kind of prefabricated assembled concrete frame joint connection structure
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
WO2016041237A1 (en) High-strength regenerative mixed steel pipe concrete anti-shock column with internal local restraint, and construction process
CN107178209A (en) A kind of constructional column and agent structure integrated construction method
CN212613903U (en) Brick-concrete structure old building body composite reinforcement structure
CN103541505A (en) Steel rib glass concrete special-shaped section column
CN103195190A (en) Recycled concrete brick and insulating layer composite wall with tie reinforcing steel bars and manufacturing method thereof
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN207878789U (en) A kind of assembled architecture reinforcing steel bar connecting device
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN207277549U (en) It is a kind of that H profile steel and the regeneration monolith connecting node of U-shaped steel are set
CN204826414U (en) Reinforcing bar keel structure
CN201224941Y (en) Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building
CN108643393A (en) A kind of construction method of brick masonry wall piece recycling
CN104947948B (en) A kind of reinforcement means of rammed earth body of wall
CN107327046A (en) A kind of steel pipe bundle combining structure
CN103541500A (en) Special-shaped section steel tube glass concrete core column
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN105971196A (en) Method for constructing masonry structure embedded square concrete filled steel tube ring beam-constructional column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant