CN108643050A - A kind of method for blocking in wall-through pull rod hole - Google Patents

A kind of method for blocking in wall-through pull rod hole Download PDF

Info

Publication number
CN108643050A
CN108643050A CN201810526533.1A CN201810526533A CN108643050A CN 108643050 A CN108643050 A CN 108643050A CN 201810526533 A CN201810526533 A CN 201810526533A CN 108643050 A CN108643050 A CN 108643050A
Authority
CN
China
Prior art keywords
rod hole
tie rod
hole
plug
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810526533.1A
Other languages
Chinese (zh)
Other versions
CN108643050B (en
Inventor
王文蔚
摆彦福
胡彬
韩华
张启东
王明
冯亮
罗晓宇
宿万东
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia highway and Bridge Construction Co., Ltd
Original Assignee
Ningxia Road & Bridge Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Road & Bridge Engineering Co ltd filed Critical Ningxia Road & Bridge Engineering Co ltd
Priority to CN201810526533.1A priority Critical patent/CN108643050B/en
Publication of CN108643050A publication Critical patent/CN108643050A/en
Application granted granted Critical
Publication of CN108643050B publication Critical patent/CN108643050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • C04B2111/27Water resistance, i.e. waterproof or water-repellent materials

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Building Environments (AREA)
  • Sealing Material Composition (AREA)

Abstract

This application discloses a kind of method for blocking in wall-through pull rod hole, include being taken out in the pvc pipe by pull rod out of tie rod hole;The first screw rod compatible with pvc pipe diameter is screwed in tie rod hole;It will be taken out in the pvc pipe in tie rod hole using the first screw rod;SBS modified asphalt waterproof coiled materials are cut into several strip structures;It chooses a wherein SBS modified asphalt waterproof coiled material and is rolled into plug;Plug is filled in tie rod hole;Plug is headed into inside consent using the second screw rod, and the second screw rod is taken out;To moistening of spraying water in around tie rod hole and hole;Tie rod hole is sealed using microdilatancy dry waterproof cement mortar.First tie rod hole is filled using plug made of SBS modified asphalt waterproof coiled materials, then it is sealed using microdilatancy dry waterproof cement mortar, the effect of tie rod hole blocks and closure can be improved, and it is easy to operate, and remaining SBS modified asphalt waterproof coiled materials in other processes can be used in SBS modified asphalt waterproof coiled materials, can reduce construction cost.

Description

A kind of method for blocking in wall-through pull rod hole
Technical field
This application involves bridges and culverts structure technical field of construction more particularly to a kind of method for blocking in wall-through pull rod hole.
Background technology
In the plant retrofit construction of highway, the Yi Ziqiang of box culvert, thin (helping) wall are strong etc. still needs to pull rod and carries out template It reinforces, worker will be arranged PVC casings outside pull rod, after removing pull rod, there are holes for meeting on concrete structure, to ensure bridge Contain constructional appearance quality and waterproof requirement.
Mainly during plastering, cement mortar is smeared from wall-through pull rod hole for the method for blocking in existing wall-through pull rod hole Enter, effect is low and hole in fill leakiness.
Invention content
This application provides a kind of method for blocking in wall-through pull rod hole, to solve the method for blocking in existing wall-through pull rod hole Mainly during plastering, cement mortar is daubed into from wall-through pull rod hole both ends, effect is low and hole in fill leakiness, and To the higher problem of working level requirement of worker.
This application provides a kind of method for blocking in wall-through pull rod hole to include:
Pull rod is taken out in the pvc pipe out of tie rod hole;
Compatible with the pvc pipe diameter the first screw rod is screwed in the tie rod hole so that the pvc pipe with it is described First screw rod connects;
It will be taken out in the pvc pipe in the tie rod hole using first screw rod;
SBS modified asphalt waterproof coiled materials are cut into several strip structures;
It chooses a wherein SBS modified asphalt waterproof coiled material and is rolled into the plug bigger 5mm than the pull rod bore dia;
The plug is filled in the tie rod hole, and plug is made to fill and lead up the tie rod hole;
The plug is headed into inside consent using the second screw rod, and second screw rod is taken out, plug is repeated and fills in, Make each reserved 30mm in the both ends of tie rod hole;
To moistening of spraying water in around the tie rod hole both ends residue 30mm and hole;
The tie rod hole is sealed using microdilatancy dry waterproof cement mortar.
Further, the cement mortar includes the ordinary cement of 3 parts by weight, the white cement of 5 parts by weight, 4 parts by weight Water, the adhesive of 1 parts by weight, the WLA-A of the 3%-5% swelling agents of ordinary cement dosage and the 8%-10% of ordinary cement dosage Waterproof powder.
Further, described adhesive is 107 glue.
Further, first screw rod screws at least 30mm in the tie rod hole.
Further, the width of every SBS modified asphalt waterproof coiled materials volume is 20mm.
Further, described be sealed to the tie rod hole using microdilatancy dry waterproof cement mortar is also wrapped later It includes:
Cement mortar outside the tie rod hole is modified.
By above technical scheme it is found that this application provides a kind of method for blocking in wall-through pull rod hole, it is modified and is dripped using SBS Plug is first filled tie rod hole made of green waterproof roll, makes each reserved 30mm in the both ends of tie rod hole, then utilizes micro- swollen Swollen dry waterproof cement mortar is sealed, and the effect of tie rod hole blocks and closure can be improved, and easy to operate, to work The level requirement of people is relatively low, and remaining SBS modified asphalt waterproofs in other processes can be used in SBS modified asphalt waterproof coiled materials Coiled material can reduce construction cost.
Description of the drawings
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor, Other drawings may also be obtained based on these drawings.
Fig. 1 is a kind of flow chart of the method for blocking in wall-through pull rod hole provided by the present application.
Specific implementation mode
Referring to Fig. 1, this application provides a kind of method for blocking in wall-through pull rod hole to include:
Step 11:Pull rod is taken out in the pvc pipe out of tie rod hole.
Step 12:The first screw rod compatible with the pvc pipe diameter is screwed in the tie rod hole, so that the PVC Pipe is connect with first screw rod.
Step 13:It will be taken out in the pvc pipe in the tie rod hole using first screw rod.
Step 14:SBS modified asphalt waterproof coiled materials are cut into several strip structures, SBS modified asphalt waterproof coiled materials are Remaining SBS modified asphalt waterproof coiled materials after other processes (such as subsiding crack processing).SBS modified asphalt waterproof coiled materials have very Good high temperature resistance, can use within the temperature range of -25 DEG C to+100 DEG C, have higher elasticity and fatigue durability, And stronger puncture resistance.
Step 15:It chooses a wherein SBS modified asphalt waterproof coiled material and is rolled into the plug bigger 5mm than the pull rod bore dia Son.
Step 16:The plug is filled in the tie rod hole, and plug is made to fill and lead up the tie rod hole.
Step 17:The plug is headed into inside consent using the second screw rod, and second screw rod is taken out, repeats to fill in Son is filled in, and each reserved 30mm in the both ends of tie rod hole is made.
Step 18:To moistening of spraying water in around the tie rod hole both ends residue 30mm and hole.
Step 19:The tie rod hole is sealed using microdilatancy dry waterproof cement mortar.
By above technical scheme it is found that this application provides a kind of method for blocking in wall-through pull rod hole, it is modified and is dripped using SBS Plug is first filled tie rod hole made of green waterproof roll, makes each reserved 30mm in the both ends of tie rod hole, then utilizes micro- swollen Swollen dry waterproof cement mortar is sealed, and the effect of tie rod hole blocks and closure can be improved, and easy to operate, to work The level requirement of people is relatively low, and remaining SBS modified asphalt waterproofs in other processes can be used in SBS modified asphalt waterproof coiled materials Coiled material can reduce construction cost.
Further, the cement mortar includes the ordinary cement of 3 parts by weight, the white cement of 5 parts by weight, 4 parts by weight The adhesive of water and 1 parts by weight, the WLA- of the 3%-5% swelling agents of ordinary cement dosage and the 8%-10% of ordinary cement dosage A waterproof powder.
White cement is the abbreviation of white portland cement, is burnt to partial melting, be able to silicic acid with the raw material of proper composition Calcium is main component, and suitable gypsum, levigate manufactured white hydraulic cementing materials is added in the poor clinker of irony.
The primary chemical composition of ordinary cement is calcium oxide, silica, aluminium oxide and iron oxide.Calcium oxide is mainly derived from Calcareous raw material, such as lime stone, chalk, marl;Aluminium oxide and silica then derive from the substance containing alumina silicate, such as viscous Soil, blast-furnace cinder, flyash etc.;Iron rule is aoxidized using the pyrite slag in gas washing in SA production.Stone for producing portland cement Calcium oxide content in grey matter raw material is generally 52% or so;Silica content in clayey raw material is aoxidized up to 57% or so The content of aluminium is then less than 20%.In order to reduce calcination temperature, and a part of fusant is generated in calcination process, often add a small amount of oxygen Change iron material.
Swelling agent is a kind of chemical admixture, is added in cement, and when cement setting hardens, volume expansion therewith rises and mends Repay contraction and tension reinforcing steel bar generation prestressing force and the effect for being sufficient filling with cement gap.
Before this first solution was made in the polysiloxane emulsion stirring that is added to the water by WLA-A waterproof powder;It is stirred in injection blender, It sequentially adds cement and filler material is stirred for, second material is made in discharging;Second material is put into wooden model, is placed in layer frame at normal temperatures certainly So condensation, demoulding spontaneously dry and the third material are made;Third material is firstly placed in roller and is rotated, then is ground into the powder more than 100 mesh, Waterproof powder has certain crack resistance, impermeability and weatherability, can play waterproof, prevent blending protective effect.
Further, described adhesive is 107 glue.107 glue scientific names be formaldehyde polyvinyl acetal stick agent, be with water be situated between The adhesive that the solution or lotion of matter are formed.Since 107 glue have the characteristics that nonflammable, price is relatively low, easy to use, use extensively In architectural engineering, it can be used as the base-material of Building Adhesive and various coating for internal and external wall, floor coating.
Further, first screw rod screws at least 30mm in the tie rod hole, to ensure the first screw rod and PVC casings It comes into full contact with, makes to be formed between them to be bonded.
Further, the width of every SBS modified asphalt waterproof coiled materials volume is 20mm.
Further, further include after the step 19:Cement mortar outside the tie rod hole is modified, to ensure to seal The outer surface of tie rod hole after stifled it is smooth, in order to avoid influence the construction of subsequent handling.
By above technical scheme it is found that this application provides a kind of method for blocking in wall-through pull rod hole, it is modified and is dripped using SBS Plug is first filled tie rod hole made of green waterproof roll, makes each reserved 30mm in the both ends of tie rod hole, then utilizes micro- swollen Swollen dry waterproof cement mortar is sealed, and the effect of tie rod hole blocks and closure can be improved, and easy to operate, to work The level requirement of people is relatively low, and remaining SBS modified asphalt waterproofs in other processes can be used in SBS modified asphalt waterproof coiled materials Coiled material can reduce construction cost.

Claims (6)

1. a kind of method for blocking in wall-through pull rod hole, which is characterized in that the method includes:
Pull rod is taken out in the pvc pipe out of tie rod hole;
The first screw rod compatible with the pvc pipe diameter is screwed in the tie rod hole, so that the pvc pipe and described first Screw rod connects;
It will be taken out in the pvc pipe in the tie rod hole using first screw rod;
SBS modified asphalt waterproof coiled materials are cut into several strip structures;
It chooses a wherein SBS modified asphalt waterproof coiled material and is rolled into the plug bigger 5mm than the pull rod bore dia;
The plug is filled in the tie rod hole, and plug is made to fill and lead up the tie rod hole;
The plug is headed into inside consent using the second screw rod, and second screw rod is taken out, plug is repeated and fills in, make drawing Each reserved 30mm in both ends of rod aperture;
To moistening of spraying water in around the tie rod hole both ends residue 30mm and hole;
The tie rod hole is sealed using microdilatancy dry waterproof cement mortar.
2. the method for blocking in wall-through pull rod hole as described in claim 1, which is characterized in that the microdilatancy dry waterproof water Cement mortar includes the ordinary cement of 3 parts by weight, the white cement of 5 parts by weight, the water of 4 parts by weight, the adhesive of 1 parts by weight, commonly The WLA-A waterproof powder of the 3%-5% swelling agents of cement consumption and the 8%-10% of ordinary cement dosage.
3. the method for blocking in wall-through pull rod hole as claimed in claim 2, which is characterized in that described adhesive is 107 glue.
4. the method for blocking in wall-through pull rod hole as described in claim 1, which is characterized in that first screw rod screws in the drawing At least 30mm in rod aperture.
5. the method for blocking in wall-through pull rod hole as described in claim 1, which is characterized in that every SBS modified pitch is anti- The width of water coiled material roll is 20mm.
6. the method for blocking in wall-through pull rod hole as described in claim 1, which is characterized in that described anti-using microdilatancy dry Water cement mortar is sealed the tie rod hole:
Cement mortar outside the tie rod hole is modified.
CN201810526533.1A 2018-05-22 2018-05-22 Plugging method for through-wall pull rod hole Active CN108643050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810526533.1A CN108643050B (en) 2018-05-22 2018-05-22 Plugging method for through-wall pull rod hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810526533.1A CN108643050B (en) 2018-05-22 2018-05-22 Plugging method for through-wall pull rod hole

Publications (2)

Publication Number Publication Date
CN108643050A true CN108643050A (en) 2018-10-12
CN108643050B CN108643050B (en) 2020-02-11

Family

ID=63758362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810526533.1A Active CN108643050B (en) 2018-05-22 2018-05-22 Plugging method for through-wall pull rod hole

Country Status (1)

Country Link
CN (1) CN108643050B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175109A (en) * 2021-04-27 2021-07-27 上海宝冶集团有限公司 Plugging method of through-wall hole

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237511A (en) * 2017-08-02 2017-10-10 大同泰瑞集团建设有限公司 A kind of efficient shear wall through-wall bolt holes blocking method
CN107338816A (en) * 2017-09-07 2017-11-10 中建七局(上海)有限公司 A kind of high artesian post-cast strip is depressured leak-blocking construction method
CN206784983U (en) * 2017-06-02 2017-12-22 中建八局第三建设有限公司 A kind of bolt hole closure fix tool of clear-water concrete
CN107514139A (en) * 2017-08-28 2017-12-26 济南城建集团有限公司 A kind of leakage-resistant device and method in split bolt hole

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206784983U (en) * 2017-06-02 2017-12-22 中建八局第三建设有限公司 A kind of bolt hole closure fix tool of clear-water concrete
CN107237511A (en) * 2017-08-02 2017-10-10 大同泰瑞集团建设有限公司 A kind of efficient shear wall through-wall bolt holes blocking method
CN107514139A (en) * 2017-08-28 2017-12-26 济南城建集团有限公司 A kind of leakage-resistant device and method in split bolt hole
CN107338816A (en) * 2017-09-07 2017-11-10 中建七局(上海)有限公司 A kind of high artesian post-cast strip is depressured leak-blocking construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175109A (en) * 2021-04-27 2021-07-27 上海宝冶集团有限公司 Plugging method of through-wall hole

Also Published As

Publication number Publication date
CN108643050B (en) 2020-02-11

Similar Documents

Publication Publication Date Title
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN102786280A (en) Novel concrete carbonization prevention coating material
EP3997048B1 (en) Dry plaster mixture for a sprayable insulation
Sikora et al. Geopolymer coating as a protection of concrete against chemical attack and corrosion
JP6508789B2 (en) Method using polymer cement mortar and polymer cement mortar
CN111140263B (en) Tunnel concrete lining crack width calculation method and crack treatment method
CN108643050A (en) A kind of method for blocking in wall-through pull rod hole
KR100769923B1 (en) Coating for waterproofing and construction method using thereof
Kavitha et al. An overview of water proofing system in concrete structures
CN112851281A (en) Method for preparing polymer quick-drying early-strength anti-corrosion mortar
KR102368899B1 (en) Eco-friendly permeable waterproofing agent
CN115093184A (en) Preparation method of cement-based material with low chloride ion migration coefficient
Tuns et al. Waterproofing solution of an existing basement against water under hydrostatic pressure. Case study
KR101193022B1 (en) A High Functional Rehabilitation Mortar
CN105297950A (en) Infilled wall and horizontal load-bearing structure gap wall surface crack-controlling construction method
WO2015197620A1 (en) Method and sealing layer for finishing materials
CN108658492A (en) A kind of cement waterproof additive and its application method
JPS59202279A (en) Grouting material for reinforcement of structure
Moro Manufactured Stones
KR20230115458A (en) Construction method of an inorganic waterproofing agent for the surface of a structure
KR20070012951A (en) Surface treatment method of concrete structure for preventing deterioration and surface structure thereof
Napier Avoiding lime failures
CN112239340A (en) Antifouling lime art mortar
RU2083773C1 (en) Method for creating water-proofing coating on concrete surfaces
Jabbari et al. Shrinkage compensating concrete for use in underground concrete structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200813

Address after: 750001 room 1217, 12 / F, building 1, Fortune Center, Qingchun building, Xingqing District, Yinchuan City, Ningxia Hui Autonomous Region

Patentee after: Ningxia Zhongda Highway Construction Co.,Ltd.

Address before: 750001 Jinfeng District, the Ningxia Hui Autonomous Region, Wanshou Road, No. 142, Yinchuan

Patentee before: NINGXIA ROAD & BRIDGE ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: Office building 2, Luqiao building, 142 Wanshou Road, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region, 750004

Patentee after: Ningxia highway and Bridge Construction Co., Ltd

Address before: 750001 room 1217, 12 / F, building 1, Fortune Center, Qingchun building, Xingqing District, Yinchuan City, Ningxia Hui Autonomous Region

Patentee before: Ningxia Zhongda Highway Construction Co.,Ltd.

CP03 Change of name, title or address