CN108643050B - Plugging method for through-wall pull rod hole - Google Patents

Plugging method for through-wall pull rod hole Download PDF

Info

Publication number
CN108643050B
CN108643050B CN201810526533.1A CN201810526533A CN108643050B CN 108643050 B CN108643050 B CN 108643050B CN 201810526533 A CN201810526533 A CN 201810526533A CN 108643050 B CN108643050 B CN 108643050B
Authority
CN
China
Prior art keywords
pull rod
rod hole
hole
plug
modified asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810526533.1A
Other languages
Chinese (zh)
Other versions
CN108643050A (en
Inventor
王文蔚
摆彦福
胡彬
韩华
张启东
王明
冯亮
罗晓宇
宿万东
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia highway and Bridge Construction Co., Ltd
Original Assignee
Ningxia Road & Bridge Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Road & Bridge Engineering Co ltd filed Critical Ningxia Road & Bridge Engineering Co ltd
Priority to CN201810526533.1A priority Critical patent/CN108643050B/en
Publication of CN108643050A publication Critical patent/CN108643050A/en
Application granted granted Critical
Publication of CN108643050B publication Critical patent/CN108643050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • C04B2111/27Water resistance, i.e. waterproof or water-repellent materials

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Building Environments (AREA)
  • Sealing Material Composition (AREA)

Abstract

The application discloses a method for plugging a through-wall pull rod hole, which comprises the steps of taking a pull rod out of a PVC pipe in the pull rod hole; screwing a first screw rod matched with the diameter of the PVC pipe into the pull rod hole; taking out the PVC pipe in the pull rod hole by using a first screw; cutting the SBS modified asphalt waterproof coiled material into a plurality of strip-shaped structures; selecting one SBS modified asphalt waterproof coiled material and rolling the selected SBS modified asphalt waterproof coiled material into a plug; plugging the plug into the pull rod hole; pushing the plug into the plug hole by using a second screw rod, and taking out the second screw rod; spraying water to the periphery of the pull rod hole and the hole for wetting; and sealing the pull rod hole by using the micro-expansion hard waterproof cement mortar. The plug made of the SBS modified asphalt waterproof coiled material is used for filling the pull rod hole, and then the micro-expansion dry-hard waterproof cement mortar is used for sealing, so that the plugging effect and the sealing property of the pull rod hole can be improved, the operation is simple, and the SBS modified asphalt waterproof coiled material can adopt the residual SBS modified asphalt waterproof coiled material in other working procedures, so that the construction cost can be reduced.

Description

Plugging method for through-wall pull rod hole
Technical Field
The application relates to the technical field of bridge and culvert structure construction, in particular to a plugging method of a through-wall pull rod hole.
Background
In the extension and reconstruction construction of the expressway, the straight wall, the thin wall (supporting wall) strength and the like of the box culvert still need to be reinforced by the pull rod, a PVC sleeve is sleeved outside the pull rod by a worker, and after the pull rod is disassembled, holes can be reserved on a concrete structure object so as to ensure the appearance quality and the waterproof requirement of a bridge and culvert structure.
The existing method for plugging the through-wall draw bar hole mainly comprises the step of plastering cement mortar in the through-wall draw bar hole, so that the effect is low, and the hole is not densely filled.
Disclosure of Invention
The application provides a plugging method of a through-wall draw rod hole, which aims to solve the problems that cement mortar is smeared into the through-wall draw rod hole from two ends of the through-wall draw rod hole in the plastering process, the effect is low, the filling in the hole is not compact, and the requirement on the working level of workers is high in the existing plugging method of the through-wall draw rod hole.
The application provides a plugging method of a through-wall pull rod hole, which comprises the following steps:
taking the pull rod out of the PVC pipe in the pull rod hole;
screwing a first screw rod matched with the diameter of the PVC pipe into the pull rod hole so as to connect the PVC pipe with the first screw rod;
taking out the PVC pipe in the pull rod hole by using the first screw;
cutting the SBS modified asphalt waterproof coiled material into a plurality of strip-shaped structures;
selecting one SBS modified asphalt waterproof coiled material and rolling the SBS modified asphalt waterproof coiled material into a plug with the diameter being 5mm larger than that of the pull rod hole;
plugging the plug into the pull rod hole, and filling the plug into the pull rod hole;
pushing the plug into the plug hole by using a second screw, taking out the second screw, and repeatedly plugging the plug into the plug hole to reserve 30mm of each of two ends of the pull rod hole;
spraying water to wet the periphery of the rest 30mm at the two ends of the pull rod hole and the hole;
and sealing the pull rod hole by using micro-expansion hard waterproof cement mortar.
Further, the cement mortar comprises 3 parts by weight of ordinary cement, 5 parts by weight of white cement, 4 parts by weight of water, 1 part by weight of binder, 3% -5% of an expanding agent and 8% -10% of WLA-A waterproof powder.
Further, the adhesive is 107 glue.
Further, the first screw is screwed into the pull rod hole for at least 30 mm.
Further, the width of each SBS modified asphalt waterproof roll is 20 mm.
Further, the step of sealing the pull rod hole with the micro-expansion dry-hard waterproof cement mortar further comprises:
and finishing cement mortar outside the pull rod hole.
According to the technical scheme, the plug made of the SBS modified asphalt waterproof coiled material is used for filling the pull rod hole, the two ends of the pull rod hole are reserved with 30mm respectively, then the micro-expansion dry and hard waterproof cement mortar is used for sealing, the effect and the sealing performance of plugging the pull rod hole can be improved, the operation is simple, the requirement on the level of workers is low, the SBS modified asphalt waterproof coiled material can adopt the residual SBS modified asphalt waterproof coiled material in other procedures, and the construction cost can be reduced.
Drawings
In order to more clearly explain the technical solution of the present application, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to the drawings without any creative effort.
Fig. 1 is a flowchart of a method for plugging a through-wall tie rod hole provided in the present application.
Detailed Description
Referring to fig. 1, the application provides a method for plugging a through-wall tie rod hole, which comprises the following steps:
step 11: and taking the pull rod out of the PVC pipe in the pull rod hole.
Step 12: and screwing a first screw rod matched with the diameter of the PVC pipe into the pull rod hole so as to connect the PVC pipe with the first screw rod.
Step 13: and taking out the PVC pipe in the pull rod hole by using the first screw.
Step 14: the SBS modified asphalt waterproof coiled material is cut into a plurality of strip-shaped structures, and the SBS modified asphalt waterproof coiled material is the residual SBS modified asphalt waterproof coiled material after other processes (such as settlement joint treatment). The SBS modified asphalt waterproof coiled material has good high temperature resistance, can be used in the temperature range of-25 ℃ to +100 ℃, and has high elasticity, fatigue resistance and puncture resistance.
Step 15: and selecting one SBS modified asphalt waterproof coiled material to be rolled into a plug with the diameter 5mm larger than that of the pull rod hole.
Step 16: and plugging the plug into the pull rod hole, and filling the pull rod hole with the plug.
And step 17: and pushing the plug into the plug hole by using a second screw, taking out the second screw, and repeatedly plugging the plug into the plug hole to ensure that the two ends of the pull rod hole are respectively reserved with 30 mm.
Step 18: and spraying water to wet the periphery of the rest 30mm at the two ends of the pull rod hole and the hole.
Step 19: and sealing the pull rod hole by using micro-expansion hard waterproof cement mortar.
According to the technical scheme, the plug made of the SBS modified asphalt waterproof coiled material is used for filling the pull rod hole, the two ends of the pull rod hole are reserved with 30mm respectively, then the micro-expansion dry and hard waterproof cement mortar is used for sealing, the effect and the sealing performance of plugging the pull rod hole can be improved, the operation is simple, the requirement on the level of workers is low, the SBS modified asphalt waterproof coiled material can adopt the residual SBS modified asphalt waterproof coiled material in other procedures, and the construction cost can be reduced.
Further, the cement mortar comprises 3 parts by weight of portland cement, 5 parts by weight of white cement, 4 parts by weight of water and 1 part by weight of a binder, 3-5% of an expanding agent and 8-10% of WLA-a waterproof powder.
White cement is a white hydraulic cementing material prepared by burning raw materials with proper components until the raw materials are partially melted, adding a proper amount of gypsum into clinker with low iron content, and grinding.
The main chemical constituents of ordinary cement are calcium oxide, silicon oxide, aluminum oxide and iron oxide. The calcium oxide is mainly derived from calcareous raw materials, such as limestone, chalk, marl and the like; the alumina and the silica are derived from aluminum silicate-containing substances, such as clay, blast furnace slag, fly ash and the like; the ferric oxide utilizes pyrite slag in the production of sulfuric acid. The content of calcium oxide in the calcareous raw material for producing the portland cement is about 52 percent generally; the content of silicon oxide in the clay raw material reaches about 57 percent, and the content of aluminum oxide is less than 20 percent. In order to lower the calcination temperature and to form a part of the melt during calcination, a small amount of iron oxide raw material is often added.
The expanding agent is a chemical additive added in cement, when the cement is set and hardened, it expands with the volume, and plays the role of compensating the shrinkage and stretching the reinforcing bar to generate prestress and fully filling the cement gap.
The WLA-A waterproof powder is prepared by adding an organic silicon emulsion into water and stirring to prepare a solution A; injecting into a stirrer for stirring, sequentially adding cement and filler for stirring, and discharging to obtain material B; putting the material B into a wood die, placing the wood die on a layer frame, naturally condensing at normal temperature, demoulding and naturally drying to prepare a material C; the waterproof powder has certain crack resistance, impermeability and weather resistance, and can play waterproof, impermeable and protective roles.
Further, the adhesive is 107 glue. The 107 adhesive is polyvinyl formal adhesive and is formed by solution or emulsion with water as a medium. The 107 glue has the characteristics of non-ignition, low price, convenient use and the like, is widely used in building engineering, and can be used as building adhesive and base materials of various interior and exterior wall coatings and ground coatings.
Further, the first screw is screwed into the pull rod hole for at least 30mm, so that the first screw is fully contacted with the PVC sleeve, and a stable connection is formed between the first screw and the PVC sleeve.
Further, the width of each SBS modified asphalt waterproof roll is 20 mm.
Further, the step 19 is followed by: and finishing cement mortar outside the pull rod hole to ensure the smoothness of the outer surface of the plugged pull rod hole so as to avoid influencing the construction of subsequent processes.
According to the technical scheme, the plug made of the SBS modified asphalt waterproof coiled material is used for filling the pull rod hole, the two ends of the pull rod hole are reserved with 30mm respectively, then the micro-expansion dry and hard waterproof cement mortar is used for sealing, the effect and the sealing performance of plugging the pull rod hole can be improved, the operation is simple, the requirement on the level of workers is low, the SBS modified asphalt waterproof coiled material can adopt the residual SBS modified asphalt waterproof coiled material in other procedures, and the construction cost can be reduced.

Claims (4)

1. A method for plugging a through-wall draw rod hole is characterized by comprising the following steps: taking the pull rod out of the PVC pipe in the pull rod hole;
screwing a first screw rod matched with the diameter of the PVC pipe into the pull rod hole so as to connect the PVC pipe with the first screw rod; taking out the PVC pipe in the pull rod hole by using the first screw;
cutting the SBS modified asphalt waterproof coiled material into a plurality of strip-shaped structures; selecting one SBS modified asphalt waterproof coiled material and rolling the SBS modified asphalt waterproof coiled material into a plug with the diameter being 5mm larger than that of the pull rod hole;
plugging the plug into the pull rod hole, and filling the plug into the pull rod hole; pushing the plug into the plug hole by using a second screw, taking out the second screw, and repeatedly plugging the plug into the plug hole to reserve 30mm of each of two ends of the pull rod hole;
spraying water to wet the periphery of the rest 30mm at the two ends of the pull rod hole and the hole; sealing the pull rod hole by using micro-expansion hard waterproof cement mortar;
the micro-expansion dry hard waterproof cement mortar comprises 3 parts by weight of ordinary cement, 5 parts by weight of white cement, 4 parts by weight of water, 1 part by weight of adhesive, 3-5% of expansion agent of the amount of the ordinary cement and 8-10% of WLA-A waterproof powder of the amount of the ordinary cement;
the method is characterized in that the method also comprises the following steps of after the pull rod hole is sealed by utilizing micro-expansion dry-hard waterproof cement mortar: and finishing cement mortar outside the pull rod hole.
2. The method for plugging a through-wall draw rod hole of claim 1, wherein the adhesive is 107 glue.
3. The method for plugging a through-wall draw rod hole of claim 1, wherein the first screw is screwed into the draw rod hole by at least 30 mm.
4. The method for plugging a through-wall draw rod hole according to claim 1, wherein the width of each roll of SBS modified asphalt waterproof coiled material is 20 mm.
CN201810526533.1A 2018-05-22 2018-05-22 Plugging method for through-wall pull rod hole Active CN108643050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810526533.1A CN108643050B (en) 2018-05-22 2018-05-22 Plugging method for through-wall pull rod hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810526533.1A CN108643050B (en) 2018-05-22 2018-05-22 Plugging method for through-wall pull rod hole

Publications (2)

Publication Number Publication Date
CN108643050A CN108643050A (en) 2018-10-12
CN108643050B true CN108643050B (en) 2020-02-11

Family

ID=63758362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810526533.1A Active CN108643050B (en) 2018-05-22 2018-05-22 Plugging method for through-wall pull rod hole

Country Status (1)

Country Link
CN (1) CN108643050B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175109A (en) * 2021-04-27 2021-07-27 上海宝冶集团有限公司 Plugging method of through-wall hole

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237511A (en) * 2017-08-02 2017-10-10 大同泰瑞集团建设有限公司 A kind of efficient shear wall through-wall bolt holes blocking method
CN107338816A (en) * 2017-09-07 2017-11-10 中建七局(上海)有限公司 A kind of high artesian post-cast strip is depressured leak-blocking construction method
CN206784983U (en) * 2017-06-02 2017-12-22 中建八局第三建设有限公司 A kind of bolt hole closure fix tool of clear-water concrete
CN107514139A (en) * 2017-08-28 2017-12-26 济南城建集团有限公司 A kind of leakage-resistant device and method in split bolt hole

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206784983U (en) * 2017-06-02 2017-12-22 中建八局第三建设有限公司 A kind of bolt hole closure fix tool of clear-water concrete
CN107237511A (en) * 2017-08-02 2017-10-10 大同泰瑞集团建设有限公司 A kind of efficient shear wall through-wall bolt holes blocking method
CN107514139A (en) * 2017-08-28 2017-12-26 济南城建集团有限公司 A kind of leakage-resistant device and method in split bolt hole
CN107338816A (en) * 2017-09-07 2017-11-10 中建七局(上海)有限公司 A kind of high artesian post-cast strip is depressured leak-blocking construction method

Also Published As

Publication number Publication date
CN108643050A (en) 2018-10-12

Similar Documents

Publication Publication Date Title
CN103145380B (en) Cement-based shrinkage-free joint filling sealing mortar for doors and windows and preparation method and construction method thereof
KR101528120B1 (en) Repairing and reinforcing material for concrete structure and method of repairing and reinforcing concrete structure using the same
CN103159440A (en) Cement-based shrinkage-free wall hole-penetrating blocking material and preparation method and construction method
JP2015530353A (en) Hydraulic composition
US10029950B2 (en) Mortar mixture for thermal insulation and/or as fire protection and for universal applications, and methods for the production and use thereof
CN104529329B (en) A kind of fire prevention exterior wall dry powder and mortar
CN104098317A (en) Plaster dry blend and use method thereof
CN105347760A (en) Slow-setting type waterproof mortar having self-repairing function and secondary permeability resistance as well as preparation method thereof
CN103420658A (en) Tile seam filling agent
KR20090102983A (en) Construction method of the outer wall for forming waterproof and insulation layer
CN103643754A (en) Waterproof processing structure and method on joint of wall interfaces of building
CN104230294A (en) Gypsum-based masonry mortar and preparation method thereof
CN109133695A (en) A kind of phosphorus building gypsum plastering mortar waterproof admixture and its application method
CN108643050B (en) Plugging method for through-wall pull rod hole
CN105347767A (en) Quick-setting type waterproof mortar having self-repairing function and secondary permeability resistance as well as preparation method thereof
CN103833289A (en) Quick-setting anti-crack polymeric mortar
KR101354249B1 (en) A composite of hauyne cement by using fly ash of fluidize-bed boiler and manufacturing method thereof
Degirmenci et al. Chemical resistance of pozzolanic plaster for earthen walls
JP6508789B2 (en) Method using polymer cement mortar and polymer cement mortar
CN106810162B (en) A kind of wet-laid process is laid with the binding paste and preparation method thereof of self-adhesive coiled material
CN102976693B (en) Outer-wall external thermal-insulation anti-crack mortar prepared from superfine sand
CN104817853A (en) Waterproof material for building construction
KR970069942A (en) Manufacturing method of cement crack repair material for floor mortar and concrete slab
KR100961004B1 (en) Polymer-modified mortar composition and waterproof coating method using the same
CN112851281A (en) Method for preparing polymer quick-drying early-strength anti-corrosion mortar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200813

Address after: 750001 room 1217, 12 / F, building 1, Fortune Center, Qingchun building, Xingqing District, Yinchuan City, Ningxia Hui Autonomous Region

Patentee after: Ningxia Zhongda Highway Construction Co.,Ltd.

Address before: 750001 Jinfeng District, the Ningxia Hui Autonomous Region, Wanshou Road, No. 142, Yinchuan

Patentee before: NINGXIA ROAD & BRIDGE ENGINEERING Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Office building 2, Luqiao building, 142 Wanshou Road, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region, 750004

Patentee after: Ningxia highway and Bridge Construction Co., Ltd

Address before: 750001 room 1217, 12 / F, building 1, Fortune Center, Qingchun building, Xingqing District, Yinchuan City, Ningxia Hui Autonomous Region

Patentee before: Ningxia Zhongda Highway Construction Co.,Ltd.