CN108616142A - 一种调速器水头与负载开限协联曲线自适应控制方法 - Google Patents

一种调速器水头与负载开限协联曲线自适应控制方法 Download PDF

Info

Publication number
CN108616142A
CN108616142A CN201810322367.3A CN201810322367A CN108616142A CN 108616142 A CN108616142 A CN 108616142A CN 201810322367 A CN201810322367 A CN 201810322367A CN 108616142 A CN108616142 A CN 108616142A
Authority
CN
China
Prior art keywords
load
head
limit
combination curve
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810322367.3A
Other languages
English (en)
Other versions
CN108616142B (zh
Inventor
涂勇
刘欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Yangtze Power Co Ltd
Original Assignee
China Yangtze Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Yangtze Power Co Ltd filed Critical China Yangtze Power Co Ltd
Priority to CN201810322367.3A priority Critical patent/CN108616142B/zh
Publication of CN108616142A publication Critical patent/CN108616142A/zh
Application granted granted Critical
Publication of CN108616142B publication Critical patent/CN108616142B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/382
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

一种调速器水头与负载开限协联曲线自适应控制方法,包括:按照主机厂家提供的数据,在触摸屏上设置水头与负载开限协联曲线原始数据;系统初始化,读取触摸屏上设置的水头与负载开限协联曲线原始数据;检测机组并网运行时有功功率能否达到机组功率给定值;检测若机组有功功率是否初次达到额定功率值且保持稳定运行;对水头与负载开度协联曲线表进行初次修正;检测机组并网运行时有功功率能否达到机组功率给定值;检测若机组有功功率是否达到额定功率值且保持稳定运行;对水头与负载开限协联曲线表进行实时修正。本发明可以解决由于水头与负载开限协联曲线失真,导致的机组正常运行被负载开限压住负荷或者负载开限不能起到防止机组过负荷的问题。

Description

一种调速器水头与负载开限协联曲线自适应控制方法
技术领域
本发明属于水电站自动控制领域,涉及一种调速器水头与负载开限协联曲线自适应控制方法。
背景技术
目前,水轮发电机组运行过程中,调速器水头与负载开限协联曲线是按照主机厂家提供的数据设置的。而主机厂家提供的数据是通过模型试验后,综合计算得出的理论数据,往往与真机实际运行的情况不符,现场设置后的调速器水头与负载开限协联曲线也不能根据实际运行情况实时自修正自适应。若设置的调速器水头与负载开限协联曲线失真,则会导致机组正常运行,被负载开限压住负荷或者负载开限不能起到防止机组过负荷的作用,影响机组安全稳定运行。
发明内容
为解决上述技术问题,本发明提供一种调速器水头与负载开限协联曲线自适应控制方法。该方法在机组并网运行情况下,对调速器水头与负载开限协联曲线进行实时自修正自适应的控制。旨在解决机组并网运行过程中,由于调速器水头与负载开限协联曲线设置不合理导致的一系列机组运行问题。
本发明采取的技术方案为:
一种调速器水头与负载开限协联曲线自适应控制方法,包括以下步骤:
步骤1:按照主机厂家提供的数据,在触摸屏上设置水头与负载开限协联曲线原始数据;
步骤2:系统初始化,读取触摸屏上设置的水头与负载开限协联曲线原始数据;
步骤3:检测机组并网运行时有功功率能否达到机组功率给定值,若能,进入下一步;若不能,且y-y<ε,式中ε为开度误差且ε>0,y为根据协联曲线的线性插值,y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1),y为当前开度;则调速器电控系统以一定周期T一定步长Y步长自动累加当前水头对应的负载开限值,直到机组有功功率能达到功率给定值进入下一步。
步骤4:检测若机组有功功率是否初次达到额定功率值且保持稳定运行,若是,调速器电控系统自动记录当前水头h及额定开度值y,进入下一步;否则,返回步骤3;
步骤5:对水头与负载开度协联曲线表进行初次修正;
步骤6:检测机组并网运行时有功功率能否达到机组功率给定值,若能,进入下一步;若不能,且y-y<ε,则调速器电控系统以一定周期T一定步长Y步长自动累加当前水头对应的负载开限值,直到机组有功功率能达到功率给定值进入下一步;
步骤7:检测若机组有功功率是否达到额定功率值且保持稳定运行,若是,调速器电控系统自动记录当前水头h及额定开度值y,进入下一步;否则,返回步骤6;
步骤8:对水头与负载开限协联曲线表进行实时修正;
通过上述步骤,完成水头与负载开限协联曲线实时自适应控制。
步骤1中,设水头与负载开限协联曲线原始数据表格如表1所示,表1中n、i都为正整数,1<i≤n,Yi为Hi水头对应的负载开限;
表1水头与负载开限协联曲线原始数据表
H1 H2 H3 Hi-1 Hi Hn-1 Hn
Y1 Y2 Y3 Yi-1 Yi Yn-1 Yn
步骤5中,初次修正步骤如下:
①、通过查表计算出当前水头h对应的负载开限y
若Hi-1≤h≤Hi,则y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1)。
②、计算表中负载开限和实际应设负载开限偏差值。
△Y=k*y+△y-y
上式中k为负载开限与额定开度的比例系数,△y为负载开限与额定开度的偏移量;
③、修正水头与负载开限协联曲线表,表中H1到Hn每个水头对应的负载开限都增加△Y,
for(i=1;i≤n;i++)
Yi=Yi+△Y。
步骤8中,实时修正步骤如下:
①、通过查表计算出当前水头h对应的负载开限y
若Hi-1≤h≤Hi,则y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1)。
②、计算实际应设负载开限和表中负载开限差值。
△Y=k*y+△y-y
上式中k为负载开限与额定开度的比例系数,△y为负载开限与额定开度的偏移量。
③、修正水头与负载开限协联曲线表,表中Hi-1和Hi两个水头对应的负载开限都增加△Y。
Yi=Yi+△Y;Yi-1=Yi-1+△Y。
④、返回步骤6。
修正方法不局限于此方法,可运用其他优化算法。
本发明一种调速器水头与负载开限协联曲线自适应控制方法,技术效果如下:
1)、采用本发明方法,可以实现水头与负载开限协联曲线的实时自修正自适应功能,解决由于水头与负载开限协联曲线失真导致的机组正常运行被负载开限压住负荷或者负载开限不能起到防止机组过负荷的问题。
2)、采用本发明方法,可以提高调速器电控系统的智能自动化水平。
3)、本发明的方法简单高效可行。
附图说明
图1是本发明调速器水头与负载开限协联曲线自适应控制方法的控制流程图。
具体实施方式
若设置的水头与负载开限协联曲线失真,则会导致机组正常运行被负载开限压住负荷或者负载开限不能起到防止机组过负荷的作用,影响机组安全稳定运行。本发明适用于使用水头与负载开限协联曲线进行调速器电气控制的水电发电机组,旨在解决机组并网运行过程中,由于调速器水头与负载开限协联曲线设置不合理导致的一系列机组运行问题。
一种调速器水头与负载开限协联曲线自适应控制方法,包括以下步骤:
1)、按照主机厂家提供的数据,在调速器电气控制设备人机交互界面上,设置水头与负载开限协联曲线原始数据。设水头与负载开限协联曲线原始数据表格如表1所示。表1中n、i都为正整数,1<i≤n,Yi为Hi水头对应的负载开限。
表1水头与负载开限协联曲线原始数据表
H1 H2 H3 Hi-1 Hi Hn-1 Hn
Y1 Y2 Y3 Yi-1 Yi Yn-1 Yn
2)、系统初始化,读取调速器电气控制设备人机交互界面上设置的水头与负载开限协联曲线原始数据。
3)、检测机组并网运行时有功功率能否达到机组功率给定值,若能,进入下一步;若不能,且y-y<ε。式中ε为开度误差且ε>0,y为根据协联曲线的线性插值,y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1),y为当前开度。则调速器电控系统以一定周期T一定步长Y步长,自动累加当前水头对应的负载开限值,直到机组有功功率能达到功率给定值进入下一步。
4)、检测若机组有功功率是否初次达到额定功率值且保持稳定运行。若是,调速器电控系统自动记录当前水头h及额定开度值y,进入下一步;否则,返回步骤3)。
5)、对水头与负载开度协联曲线表进行初次修正,初次修正步骤如下:
①、通过查表计算出当前水头h对应的负载开限y
若Hi-1≤h≤Hi,则y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1)。
②、计算表中负载开限和实际应设负载开限偏差值。
△Y=k*y+△y-y
上式中,k为负载开限与额定开度的比例系数,△y为负载开限与额定开度的偏移量。
③、修正水头与负载开限协联曲线表,表中H1到Hn每个水头对应的负载开限都增加△Y。
for(i=1;i≤n;i++)
Yi=Yi+△Y
6)、检测机组并网运行时有功功率能否达到机组功率给定值,若能,进入下一步;若不能,且y-y<ε,则调速器电控系统以一定周期T一定步长Y步长自动累加当前水头对应的负载开限值,直到机组有功功率能达到功率给定值进入下一步。
7)、检测若机组有功功率是否达到额定功率值且保持稳定运行,若是,调速器电控系统自动记录当前水头h及额定开度值y,进入下一步;否则,返回步骤6)
8)、对水头与负载开限协联曲线表进行实时修正,修正步骤如下:
①、通过查表计算出当前水头h对应的负载开限y
若Hi-1≤h≤Hi,则y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1)。
②、计算实际应设负载开限和表中负载开限差值。
△Y=k*y+△y-y
上式中k为负载开限与额定开度的比例系数,△y为负载开限与额定开度的偏移量。
③、修正水头与负载开限协联曲线表,表中Hi-1和Hi两个水头对应的负载开限都增加△Y。
Yi=Yi+△Y;Yi-1=Yi-1+△Y。
④、返回步骤6)。
修正方法不局限于此方法,可运用其他优化算法。
根据本发明的一种调速器水头与负载开限协联曲线自适应控制方法,将其应用于某电站调速器水头与负载开限协联曲线自动控制。下面将参照此示例性实施例对本发明做进一步说明。
某水电站,调速器电气控制系统将负载开限与额定开度的比例系数k取1,负载开限与额定开度的偏移量△y取1%,水头与负载开限协联曲线原始数据表格如表2所示,调速器运行过程中,调速器电控系统自动记录当前水头h与对应水轮机组额定开度值y数据表格如表3所示,水头与负载开限协联曲线数据优化过程数据表格如表4所示。优化后,水头与负载开限协联曲线数据与实际需求值更加接近。
表2水头与负载开限协联曲线原始数据表
60 64 68 72 76 80 84 88 92 96 100 104 108 112 120
96 96 96 96 96 96 96 96 96 96 90 83 77 72 70
表3水头与对应水轮机组额定开度值数据表
110.94 108.24 111.9 107.16 104.58 99.96 97.38 102 105.12
70.17 74.17 69.04 75.07 80.23 86.61 93.84 83.79 79.06
表4水头与负载开限协联曲线优化数据表

Claims (4)

1.一种调速器水头与负载开限协联曲线自适应控制方法,其特征在于包括以下步骤:
步骤1:按照主机厂家提供的数据,在触摸屏上设置水头与负载开限协联曲线原始数据;
步骤2:系统初始化,读取触摸屏上设置的水头与负载开限协联曲线原始数据;
步骤3:检测机组并网运行时有功功率能否达到机组功率给定值,若能,进入下一步;若不能,且y-y<ε,式中ε为开度误差且ε>0,y为根据协联曲线的线性插值,y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1),y为当前开度;则调速器电控系统以一定周期T一定步长Y步长自动累加当前水头对应的负载开限值,直到机组有功功率能达到功率给定值进入下一步。
步骤4:检测若机组有功功率是否初次达到额定功率值且保持稳定运行,若是,调速器电控系统自动记录当前水头h及额定开度值y,进入下一步;否则,返回步骤3;
步骤5:对水头与负载开度协联曲线表进行初次修正;
步骤6:检测机组并网运行时有功功率能否达到机组功率给定值,若能,进入下一步;若不能,且y-y<ε,则调速器电控系统以一定周期T一定步长Y步长自动累加当前水头对应的负载开限值,直到机组有功功率能达到功率给定值进入下一步;
步骤7:检测若机组有功功率是否达到额定功率值且保持稳定运行,若是,调速器电控系统自动记录当前水头h及额定开度值y,进入下一步;否则,返回步骤6;
步骤8:对水头与负载开限协联曲线表进行实时修正;
通过上述步骤,完成水头与负载开限协联曲线实时自适应控制。
2.根据权利要求1所述一种调速器水头与负载开限协联曲线自适应控制方法,其特征在于:步骤1中,设水头与负载开限协联曲线原始数据表格如表1所示,表1中n、i都为正整数,1<i≤n,Yi为Hi水头对应的负载开限;
表1 水头与负载开限协联曲线原始数据表
H1 H2 H3 Hi-1 Hi Hn-1 Hn Y1 Y2 Y3 Yi-1 Yi Yn-1 Yn
3.根据权利要求1所述一种调速器水头与负载开限协联曲线自适应控制方法,其特征在于:步骤5中,初次修正步骤如下:
①、通过查表计算出当前水头h对应的负载开限y
若Hi-1≤h≤Hi,则y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1)。
②、计算表中负载开限和实际应设负载开限偏差值。
△Y=k*y+△y-y
上式中k为负载开限与额定开度的比例系数,△y为负载开限与额定开度的偏移量;
③、修正水头与负载开限协联曲线表,表中H1到Hn每个水头对应的负载开限都增加△Y,
for(i=1;i≤n;i++)
Yi=Yi+△Y。
4.根据权利要求1所述一种调速器水头与负载开限协联曲线自适应控制方法,其特征在于:步骤8中,实时修正步骤如下:
①、通过查表计算出当前水头h对应的负载开限y
若Hi-1≤h≤Hi,则y=Yi-1+(Yi-Yi-1)(h-Hi-1)/(Hi-Hi-1)。
②、计算实际应设负载开限和表中负载开限差值。
△Y=k*y+△y-y
上式中k为负载开限与额定开度的比例系数,△y为负载开限与额定开度的偏移量。
③、修正水头与负载开限协联曲线表,表中Hi-1和Hi两个水头对应的负载开限都增加△Y。
Yi=Yi+△Y;Yi-1=Yi-1+△Y。
④、返回步骤6。
CN201810322367.3A 2018-04-11 2018-04-11 一种调速器水头与负载开限协联曲线自适应控制方法 Active CN108616142B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810322367.3A CN108616142B (zh) 2018-04-11 2018-04-11 一种调速器水头与负载开限协联曲线自适应控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810322367.3A CN108616142B (zh) 2018-04-11 2018-04-11 一种调速器水头与负载开限协联曲线自适应控制方法

Publications (2)

Publication Number Publication Date
CN108616142A true CN108616142A (zh) 2018-10-02
CN108616142B CN108616142B (zh) 2021-04-13

Family

ID=63659680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810322367.3A Active CN108616142B (zh) 2018-04-11 2018-04-11 一种调速器水头与负载开限协联曲线自适应控制方法

Country Status (1)

Country Link
CN (1) CN108616142B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763932A (zh) * 2019-01-10 2019-05-17 中国长江电力股份有限公司 调速器水头开度与有功功率协联曲线自适应控制方法
CN109814372A (zh) * 2019-01-10 2019-05-28 中国长江电力股份有限公司 基于水头开度与有功功率协联曲线的调速器功率模式控制方法
CN111191908A (zh) * 2019-12-25 2020-05-22 国网江苏省电力有限公司电力科学研究院 一种负荷事件检测方法、系统及存储介质
CN117055343A (zh) * 2023-08-08 2023-11-14 中国长江电力股份有限公司 一种水头空载开度曲线在线自动修正方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4743160A (en) * 1984-09-18 1988-05-10 Lucien Megnint Process and device for limiting the overspeed of a low head hydroelectric generating set
CN101404043A (zh) * 2008-09-10 2009-04-08 陕西电力科学研究院 水轮机及其有压过水系统仿真方法
CN103850872A (zh) * 2014-03-06 2014-06-11 国家电网公司 转桨式水轮机协联关系综合优化试验方法
CN105065191A (zh) * 2015-07-16 2015-11-18 国家电网公司 一种加快高水头水电机组减负荷后系统稳定的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4743160A (en) * 1984-09-18 1988-05-10 Lucien Megnint Process and device for limiting the overspeed of a low head hydroelectric generating set
CN101404043A (zh) * 2008-09-10 2009-04-08 陕西电力科学研究院 水轮机及其有压过水系统仿真方法
CN103850872A (zh) * 2014-03-06 2014-06-11 国家电网公司 转桨式水轮机协联关系综合优化试验方法
CN105065191A (zh) * 2015-07-16 2015-11-18 国家电网公司 一种加快高水头水电机组减负荷后系统稳定的方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘小兵等: "清江梯级电站水轮机调速器特点分析", 《水电与新能源》 *
张海等: "混流式水轮发电机组自动开机并网超时浅析", 《通信电源技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763932A (zh) * 2019-01-10 2019-05-17 中国长江电力股份有限公司 调速器水头开度与有功功率协联曲线自适应控制方法
CN109814372A (zh) * 2019-01-10 2019-05-28 中国长江电力股份有限公司 基于水头开度与有功功率协联曲线的调速器功率模式控制方法
CN111191908A (zh) * 2019-12-25 2020-05-22 国网江苏省电力有限公司电力科学研究院 一种负荷事件检测方法、系统及存储介质
CN117055343A (zh) * 2023-08-08 2023-11-14 中国长江电力股份有限公司 一种水头空载开度曲线在线自动修正方法
CN117055343B (zh) * 2023-08-08 2024-06-11 中国长江电力股份有限公司 一种水头空载开度曲线在线自动修正方法

Also Published As

Publication number Publication date
CN108616142B (zh) 2021-04-13

Similar Documents

Publication Publication Date Title
CN108616142A (zh) 一种调速器水头与负载开限协联曲线自适应控制方法
CN108708818B (zh) 一种调速器水头与空载开度协联曲线自修正自适应控制方法
Wang et al. Transient stability enhancement and voltage regulation of power systems
CN107317353B (zh) 一种含分布式光伏发电配电网电压控制方法及系统
Liang et al. Two-level dynamic stochastic optimal power flow control for power systems with intermittent renewable generation
CN108512258B (zh) 一种基于改进多智能体一致性算法的风电场有功调度方法
CN103378601A (zh) 一种基于bang-bang控制的一次调频方法及装置
CN108964127B (zh) 一种双馈风力发电系统故障穿越的控制方法
CN105119543B (zh) 一种发电机组调速系统远端线路甩负荷的控制方法及系统
CN109763932A (zh) 调速器水头开度与有功功率协联曲线自适应控制方法
CN103559924A (zh) 核电站汽轮机控制系统的调试方法、装置及系统
CN109301814B (zh) 一种接入电网风电容量分析方法和系统
CN111490551B (zh) 基于分布式牛顿法的配电网光伏发电集群电压控制方法
CN106202793A (zh) 一种基于一次调频限制的电网频率稳定仿真方法
Wu et al. Reliable ${H} _ {\infty} $ Fuzzy Control for a Class of Discrete-Time Nonlinear Systems Using Multiple Fuzzy Lyapunov Functions
CN110941909A (zh) 光伏电站和风电场参数主导性辨识计算方法及系统
CN104131847A (zh) 汽轮机组定滑压自动优化控制系统及其自动优化方法
CN111835022A (zh) 一种工业孤网频率调节方法、装置及系统
CN111082473A (zh) 一种厂站级无功协调控制方法和系统
CN113193575B (zh) 低延迟的电网频率调节控制方法、系统、存储介质及设备
CN108494017A (zh) 一种基于逆变器的自治型微电网系统分布式协调控制方法
CN105207249A (zh) 一种风电场恒定功率因数控制系统及其控制方法
Li et al. Parallel power flow calculation based on multi-port inversed matrix method
CN108919878A (zh) 一种发电厂的功率协调控制系统
CN110311603B (zh) 一种直接整定水电站调速器最优调节参数的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant