CN108590652A - A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend - Google Patents

A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend Download PDF

Info

Publication number
CN108590652A
CN108590652A CN201810437250.XA CN201810437250A CN108590652A CN 108590652 A CN108590652 A CN 108590652A CN 201810437250 A CN201810437250 A CN 201810437250A CN 108590652 A CN108590652 A CN 108590652A
Authority
CN
China
Prior art keywords
ore
nugget
segmentation
exploiting field
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810437250.XA
Other languages
Chinese (zh)
Other versions
CN108590652B (en
Inventor
蔺帅宇
刘召胜
程崇强
韩波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC North Dalian Engineering Technology Co Ltd
Northern Engineering and Technology Corp MCC
Original Assignee
MCC North Dalian Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC North Dalian Engineering Technology Co Ltd filed Critical MCC North Dalian Engineering Technology Co Ltd
Priority to CN201810437250.XA priority Critical patent/CN108590652B/en
Publication of CN108590652A publication Critical patent/CN108590652A/en
Application granted granted Critical
Publication of CN108590652B publication Critical patent/CN108590652B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/006Ventilation at the working face of galleries or tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions

Abstract

The invention discloses a kind of sublevel caving method without sill pillar dividing a nugget along orebody trend, including dividing nugget along orebody trend, nugget is divided into stage and segmentation, road connecting taxiway and route are tunneled in nugget is respectively segmented, developing and system include return aircourse, exploiting field return air raise, stope box, exploiting field ramp 4 and exploiting field air inlet courtyard;The mining sequence of nugget is that from top to bottom, segmentation mining sequence is to move back to adopt from both ends to centre;To fanhole(s) in construction in route, using millisecond short delay blasting;First segmentation ore falls the ore of recycling 1/3 after mine, ore coating of remaining ore as next segmentation ore recuperation.After a upper segmentation is advanced is once segmented 30m or more, the next stage can back production simultaneously, after each substoping, block route connecting taxiway in time.Present invention has the advantages that infrastructure project amount and adopting that quasi- quantities is few, production time and the investment in mine are highly shortened, ore mining time is improved.

Description

A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend
Technical field
The invention belongs to underground mining method technical field more particularly to grade of ore height, ore body item number 1 ~ 2, ore bodies A kind of thin and middle thick sublevel caving method without sill pillar dividing a nugget along orebody trend.
Background technology
Ore body division is usually multiple nuggets by across pitch sublevel caving method without sill pillar, and each nugget arranges that an exploiting field slips Then well will fall mine ore using electric LHD and have bad luck to stope box into, while long range is arranged in stage casing bottom Rail mounted transport system undertakes the transport task of ore-rock.But in some grade of ores height, ore body item number only has 1 ~ 2, and ore body is thin And in the exploitation of middle thickness, the infrastructure project of long-distance transportation system and a plurality of stope box is carried out, this infrastructure project occupies A large amount of time cost has tremendous influence to shifting to an earlier date ore removal and front capital input.
Invention content
The purpose of the present invention allows avalanche for earth's surface, while the grade of ore is high, ore body item number 1 ~ 2, ore body it is thin and in Thickness, infrastructure project amount and adopt the features such as quasi- quantities is few, and ore removal is fast, and mine loss and dilution is small along orebody trend divide a mine The sublevel caving method without sill pillar of block.
The purpose of the present invention is be achieved through the following technical solutions.
A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend of the present invention, it is characterised in that including under Row step:
The first step:Nugget is divided along orebody trend, nugget length is that orebody trend is long, and nugget is divided into stage and segmentation, Nugget be respectively segmented it is intermediate tunnel road connecting taxiway, then respectively to both ends driving road in ore body, the 1/2 of a length of nugget length of route, Development system includes return aircourse, exploiting field return air raise, stope box, exploiting field ramp and exploiting field air inlet day with Barebone is adopted Well;
Second step:The mining sequence of nugget is that from top to bottom, segmentation mining sequence is to move back to adopt from both ends to centre;
Third walks:It is utilized in route in rock drilling equipment construction to fanhole(s), using millisecond short delay blasting;
4th step:The fresh distinguished and admirable air duct through in exploiting field air inlet courtyard, route enters Stope face, the dirt behind cleaning face Wind, to return air level, is then discharged through return aircourse, returnairshaft through route, exploiting field return air raise connecting taxiway, exploiting field return air raise Earth's surface;
5th step:To the sled hair work of empty jacking row or gib after stope ventilation, it is ensured that the safety of follow-up work;
6th step:The ore fallen after mine is had bad luck by diesel LHD to stope box, then by locomotive haulage mine car to main shaft Parking lot, finally by main shaft hooist to earth's surface;
7th step:First segmentation ore falls the ore of recycling 1/3 after mine, ore of remaining ore as next segmentation ore recuperation Coating.After a upper segmentation is advanced is once segmented 30m or more, the next stage can back production simultaneously.After each substoping, Route connecting taxiway is blocked in time.
6th step:For buried depth be less than 300m ore body, fall the ore after mine by diesel LHD down to Then underground truck directly transports earth's surface by underground trucks entering ramp.
The stage a height of 60m ~ 100m, is segmented into high 10m ~ 20m.
The beneficial effects of the invention are as follows the long routes of the present invention, are not limited, are filled by cable length using diesel LHD It point utilizes its maneuverability, and this mining methods infrastructure project amount and to adopt quasi- quantities few, highly shortened mine Production time and investment improve ore mining time.
Description of the drawings
Fig. 1 is the sublevel caving method without sill pillar front sectional elevation A-A that the present invention divides a nugget along orebody trend;
Fig. 2 is the left view B-B sectional views of Fig. 1 of the present invention.
Fig. 3 is that Fig. 1 of the present invention overlooks C-C sectional views.
Courtyard is entered the wind in 1. return aircourse in figure, 2. routes, 3. route connecting taxiways, 4. exploiting field ramps, 5. exploiting fields, 6. exploiting field return air raise, 7. stope boxes, 8. blastholes, 9. broken ores.
Specific implementation mode
The following further describes the present invention with reference to the drawings.
As shown in Figs. 1-3, a kind of sublevel caving method without sill pillar dividing a nugget along orebody trend of the invention, it is special Sign is to include the following steps:
The first step:Nugget is divided along orebody trend, nugget length is that orebody trend is long, and nugget stage high 60m is segmented high 20m, Nugget is respectively segmented intermediate driving road connecting taxiway 3, then respectively to both ends driving road 2 in ore body;Development system and adopt Barebone Courtyard 5 is entered the wind including return aircourse 1, exploiting field return air raise 6, stope box 7, exploiting field ramp 4 and exploiting field;
Second step:The mining sequence of nugget is that from top to bottom, segmentation mining sequence is to move back to adopt from both ends to centre;
Third walks:It is utilized in route 2 in rock drilling equipment construction to fanhole(s) 8, using millisecond short delay blasting;
4th step:It is fresh it is distinguished and admirable enter Stope face through exploiting field air inlet courtyard 5, the air duct in route, behind cleaning face Waste air is horizontal to return air through route, exploiting field return air raise connecting taxiway, exploiting field return air raise 6, then through return aircourse 1, returnairshaft Earth's surface is discharged;
5th step:To the sled hair work of empty jacking row or gib after stope ventilation, it is ensured that the safety of follow-up work;
6th step:The ore 9 fallen after mine is had bad luck by diesel LHD to stope box 7, then by locomotive haulage mine car to master Well parking lot, finally by main shaft hooist to earth's surface;It is less than the ore body of 300m for buried depth, falls the ore after mine by diesel oil scraper Then machine directly transports earth's surface down to underground truck by underground trucks entering ramp 4;
7th step:First segmentation ore 9 falls the ore of recycling 1/3 after mine, mine of remaining ore as next segmentation ore recuperation Stone coating, after a upper segmentation is advanced is once segmented 30m or more, next stage can back production simultaneously, each substoping knot Shu Hou in time blocks route connecting taxiway 3.

Claims (3)

1. a kind of sublevel caving method without sill pillar dividing a nugget along orebody trend, it is characterised in that include the following steps:
The first step:Nugget is divided along orebody trend, nugget length is that orebody trend is long, and nugget is divided into stage and segmentation, Nugget be respectively segmented it is intermediate tunnel road connecting taxiway, then respectively to both ends driving road in ore body, the 1/2 of a length of nugget length of route, Development system includes return aircourse 1, exploiting field return air raise 6, stope box 7, exploiting field ramp 4 and exploiting field air inlet with Barebone is adopted Courtyard 5;
Second step:The mining sequence of nugget is that from top to bottom, segmentation mining sequence is to move back to adopt from both ends to centre;
Third walks:It is utilized in route in rock drilling equipment construction to fanhole(s), using millisecond short delay blasting;
4th step:The fresh distinguished and admirable air duct through in exploiting field air inlet courtyard, route enters Stope face, the dirt behind cleaning face Wind, to return air level, is then discharged through return aircourse, returnairshaft through route, exploiting field return air raise connecting taxiway, exploiting field return air raise Earth's surface;
5th step:To the sled hair work of empty jacking row or gib after stope ventilation, it is ensured that the safety of follow-up work;
6th step:The ore fallen after mine is had bad luck by diesel LHD to stope box, then by locomotive haulage mine car to main shaft Parking lot, finally by main shaft hooist to earth's surface;
7th step:First segmentation ore falls the ore of recycling 1/3 after mine, ore of remaining ore as next segmentation ore recuperation Coating;
After a upper segmentation is advanced is once segmented 30m or more, the next stage can back production simultaneously, after each substoping, and When block route connecting taxiway.
2. the sublevel caving method without sill pillar according to claim 1 for dividing a nugget along orebody trend, it is characterised in that 6th step:It is less than the ore body of 300m for buried depth, falls the ore after mine by diesel LHD down to underground truck, Then earth's surface is directly transported by underground trucks entering ramp.
3. the sublevel caving method without sill pillar according to claim 1 for dividing a nugget along orebody trend, it is characterised in that The stage a height of 60m ~ 100m, is segmented into high 10m ~ 20m.
CN201810437250.XA 2018-05-09 2018-05-09 A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend Active CN108590652B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810437250.XA CN108590652B (en) 2018-05-09 2018-05-09 A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810437250.XA CN108590652B (en) 2018-05-09 2018-05-09 A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend

Publications (2)

Publication Number Publication Date
CN108590652A true CN108590652A (en) 2018-09-28
CN108590652B CN108590652B (en) 2019-05-21

Family

ID=63636406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810437250.XA Active CN108590652B (en) 2018-05-09 2018-05-09 A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend

Country Status (1)

Country Link
CN (1) CN108590652B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734411A (en) * 2020-07-07 2020-10-02 中冶北方(大连)工程技术有限公司 Ore blending method of sill pillar-free sublevel caving method with vertically-arranged approach

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358574A (en) * 2014-09-04 2015-02-18 广东安元矿业勘察设计有限公司 Horizontal room-and-pillar mining method of slightly inclined orebody
CN105298492A (en) * 2015-11-03 2016-02-03 化工部长沙设计研究院 Room-and-pillar mining method for mining gentle dip thin ore body
AU2014344670A1 (en) * 2013-10-28 2016-04-07 China University Of Mining And Technology Solid cementation backfill roadway type mining method for ultra-thick seam
CN105952450A (en) * 2016-06-20 2016-09-21 中钢集团马鞍山矿山研究院有限公司 Novel method for collaboratively exploiting underground double stopes of underground mine
CN106223956A (en) * 2016-06-30 2016-12-14 广西大学 Medium-length hole courtyard mining afterwards filling method
CN106761745A (en) * 2017-03-06 2017-05-31 长沙矿山研究院有限责任公司 The outer sublevel open stope method of arteries and veins
CN107093364A (en) * 2017-06-26 2017-08-25 辽宁科技大学 The indoor ore drawing device of many segmentations of automatic height adjustment and polycrystalline substance and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2014344670A1 (en) * 2013-10-28 2016-04-07 China University Of Mining And Technology Solid cementation backfill roadway type mining method for ultra-thick seam
CN104358574A (en) * 2014-09-04 2015-02-18 广东安元矿业勘察设计有限公司 Horizontal room-and-pillar mining method of slightly inclined orebody
CN105298492A (en) * 2015-11-03 2016-02-03 化工部长沙设计研究院 Room-and-pillar mining method for mining gentle dip thin ore body
CN105952450A (en) * 2016-06-20 2016-09-21 中钢集团马鞍山矿山研究院有限公司 Novel method for collaboratively exploiting underground double stopes of underground mine
CN106223956A (en) * 2016-06-30 2016-12-14 广西大学 Medium-length hole courtyard mining afterwards filling method
CN106761745A (en) * 2017-03-06 2017-05-31 长沙矿山研究院有限责任公司 The outer sublevel open stope method of arteries and veins
CN107093364A (en) * 2017-06-26 2017-08-25 辽宁科技大学 The indoor ore drawing device of many segmentations of automatic height adjustment and polycrystalline substance and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734411A (en) * 2020-07-07 2020-10-02 中冶北方(大连)工程技术有限公司 Ore blending method of sill pillar-free sublevel caving method with vertically-arranged approach

Also Published As

Publication number Publication date
CN108590652B (en) 2019-05-21

Similar Documents

Publication Publication Date Title
CN107869349B (en) A kind of mechanized mining method of gently inclined medium thick orebody
CN103628877B (en) A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method
CN103603665B (en) Upper dish side ore body stoping method in the scope of adopting of mine
CN104790956A (en) Remote control heading machine tunnel type or fully-mechanized top coal exploitation end slope coal technology
CN110359914B (en) Safe and low-cost combined sublevel mining method for gently inclined medium-thickness ore body
CN102953733A (en) Central outside-vein house pillar type combined crosscut two-end inside-vein continuous segment filling mining method
CN106194188B (en) Pseudo- inclination room and pillar stoping is carried in the quick-fried power collaboration of scraper-
CN104358574B (en) The horizontal room-and-pillar stoping of gently inclined orebody
CN104612692B (en) Formation continuous filling mining method followed by segmentation ore caving polycrystalline substance
CN104179505B (en) A kind of underground mining method of phosphorus ore
CN108590652B (en) A kind of sublevel caving method without sill pillar dividing a nugget along orebody trend
CN112796759B (en) Mechanical mining and waste rock filling method for inclined thin vein
CN108301835B (en) Pseudo- inclined ramp road panel point pillar method of stoping
CN111828008A (en) Filling mining method for downward layered herringbone access arrangement
RU2543765C2 (en) Method of open mining of mineral deposits with forming of dump with large volume and height in difficult conditions
CN102979532A (en) Development method of transportation through auxiliary slope ramp matched with rubber belt inclined shaft
CN110469330A (en) A kind of sublevel open stope method of the pillar without bottom structure
Guryev Sustainable development of Crude ore resources and benefication facilities of JSC «Apatit» based on best engineering solutions
CN102322290A (en) Adhesive tape inclined shaft exploitation way for large-scale underground metal mine
CN110388210B (en) Stope structure arrangement mode suitable for combined sectional mining of slowly-inclined medium-thickness ore body
CN113062740A (en) Pillar-free multi-directional ramp small layered filling mining method
CN108104818A (en) Underground mining method for thick massive ore body
CN111022054B (en) Adjacent equidirectional asynchronous mining open pit mine and mining method thereof
CN110905510A (en) Strip and block stoping method for horizontal ore pillar of metal ore body
CN103939132B (en) A kind of mineral deposit underground mining transportation resources of continuous and automatic

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant