CN108589595A - Express-way guard-rail plates fast replacement system device and application method - Google Patents

Express-way guard-rail plates fast replacement system device and application method Download PDF

Info

Publication number
CN108589595A
CN108589595A CN201810655117.1A CN201810655117A CN108589595A CN 108589595 A CN108589595 A CN 108589595A CN 201810655117 A CN201810655117 A CN 201810655117A CN 108589595 A CN108589595 A CN 108589595A
Authority
CN
China
Prior art keywords
express
rail plates
way guard
lifting
guard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810655117.1A
Other languages
Chinese (zh)
Other versions
CN108589595B (en
Inventor
刘少伟
杨树强
刘鹏冲
冯静静
林向楠
王林茂
赵磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810655117.1A priority Critical patent/CN108589595B/en
Publication of CN108589595A publication Critical patent/CN108589595A/en
Application granted granted Critical
Publication of CN108589595B publication Critical patent/CN108589595B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • E01F15/04Continuous barriers extending along roads or between traffic lanes essentially made of longitudinal beams or rigid strips supported above ground at spaced points
    • E01F15/0484Installing; Repairing; Adjusting

Abstract

Express-way guard-rail plates fast replacement system device, mainly by boom hoisting, rack and rinion adjustment and adjuster composition, boom hoisting is fixed on transport maintenance car, promising boom hoisting provides the power supply of electric power on transport maintenance car, the motor of boom hoisting is electrically connected to a power source by control circuit, boom hoisting is responsible for new express-way guard-rail plates being lifted on rack and rinion adjustment, rack and rinion adjustment is responsible for the mounting hole coarse alignment by the mounting hole of new express-way guard-rail plates and interfaced express-way guard-rail plates, adjuster is responsible for the mounting hole fine alignment by the mounting hole of new express-way guard-rail plates and interfaced express-way guard-rail plates, bolt is manually worn after mounting hole fine alignment, band nut, it is screwed with wireless electric wrench.Compared with prior art, it only operated, be can be completed with three people using apparatus of the present invention replacement express-way guard-rail plates within ten to 12 minutes.Change over the sea of faces's work pattern shouldered by people's half the circumference of the sleeve where it joins the shoulder.Reduce security risk on a highway.

Description

Express-way guard-rail plates fast replacement system device and application method
Technical field
The present invention relates to highway maintenance field more particularly to a kind of express-way guard-rail plates fast replacement system devices And application method.
Background technology
Currently, in highway maintenance field, especially in terms of express-way guard-rail plates replacement, shouldered mainly by people's half the circumference of the sleeve where it joins the shoulder Manual work, express-way guard-rail plates just need three or four people that could move.Ordinary circumstance replaces one piece of freeway guardrail Plate, which needs seven or eight people to operate 30 minutes, to be completed.Operating personnel's labor intensity is big, and the activity duration is long, on a highway The high vehicle flowrate of speed is big, also increases operating personnel's security risk.Therefore, a kind of highway shield that is time saving, laborsaving, saving people is designed Breast board fast replacement system device and application method are the current technical issues that need to address.
Invention content
Technical problem to be solved by the invention is to provide one group of express-way guard-rail plates fast replacement system devices.
The present invention the technical solution to solve the technical problem is that:Express-way guard-rail plates fast replacement system device, mainly It is made of boom hoisting, rack and rinion adjustment and adjuster, boom hoisting is fixed on transport maintenance car, is had on transport maintenance car The power supply of electric power is provided for boom hoisting, the motor of boom hoisting is electrically connected to a power source by control circuit, and boom hoisting is responsible for New express-way guard-rail plates are lifted on rack and rinion adjustment, rack and rinion adjustment be responsible for by the mounting hole of new express-way guard-rail plates and with The mounting hole coarse alignment of its express-way guard-rail plates docked, adjuster be responsible for the mounting hole of new express-way guard-rail plates and The mounting hole fine alignment of interfaced express-way guard-rail plates manually wears bolt, band nut after mounting hole fine alignment, with wireless Electric wrench screws.
It, will after completing more the changing jobs of new and old express-way guard-rail plates using adjuster, rack and rinion adjustment and boom hoisting The old express-way guard-rail plates disassembled are lifted on transport maintenance car.
As a preferred embodiment of the present invention, the boom hoisting is cantilevered boom hoisting, mainly by lifting by crane Column, lifting arm and express-way guard-rail plates handgrip are constituted, and have footing, lifting column solid by footing in the lower end of lifting column It is scheduled on the carriage chassis of transport maintenance car, hoist engine is installed on the upside of the rear portion of lifting arm, is set in the front end of lifting arm There is pulley, hook is equipped on the lifting rope of hoist engine, express-way guard-rail plates handgrip is hung on hook.
As another preferred embodiment of the present invention, the express-way guard-rail plates handgrip is by two symmetrical gripping arm structures At two gripping arms are hinged with articulated shaft at middle part, and the upper end of two gripping arms is connected with chain splicing, is equipped in the lower end of two gripping arms Supporting plate has reinforcing rib, express-way guard-rail plates handgrip to be hung on hook by chain splicing between supporting plate and gripping arm.
As another preferred embodiment of the present invention, the lifting column is upper and lower connected structure, hypomere internal orifice size Match with epimere external dimensions, there is jack on hypomere, have on epimere it is multiple be used for adjust lifting stem height on hypomere The matched jack of jack, hypomere connect with epimere bolt II.
As another preferred embodiment of the present invention, the lifting arm is formed by front and back two parts grafting, lifting arm Rear portion is divided into ┍ shapes, the interior mouth-shaped of the front of the rear part of the lifting arm of ┍ shapes, the outside of size and lifting arm front Shape, size match, and have jack on rear portion, have on front it is multiple be used for adjust lifting arm lengths with the jack phase on rear portion Matched jack, front are connect with rear portion bolt I, and the lower end of the rear part of lifting arm is equipped with the blind hole that Open Side Down, lifting The upper end of the column side is equipped with an annular groove, and lifting column is inserted into blind hole, between lifting column top and blind hole bottom There are pressure bearing, blind hole side wall to be equipped with the screw hole of installation locking handle, position and the lifting the upper end of the column side of screw hole Annular groove matches.
As another preferred embodiment of the present invention, the rack and rinion adjustment includes chassis, there are four the bottom surface on chassis is set Universal wheel is respectively fixed with the gate-type frame being made of two telescopic columns and telescoping mechanism in chassis left and right ends, is stretched at two It is equipped with jack between contracting column, template plate is hinged with by connecting axis pin in the front end of the telescopic rod of telescoping mechanism, on a left side It is equipped with connecting rod between the template plate at right both ends, locating template is equipped at the both ends of connecting rod, in the lower edge of locating template On be welded with positioning plate, be welded with clamping mechanism on the upper outer surface of locating template, it is solid on the inner surface of locating template Surely there is non-slip mat, U-shaped operating handle is equipped between the template plate at both ends.Locating template can be made by moving U-shaped operating handle It is converted between horizontal position A and upright position B.Adjusting telescoping mechanism can be such that locating template moves forward or back.
As another preferred embodiment of the present invention, the telescoping mechanism is twist-type telescopic mechanism, twist-type telescopic The telescopic rod of mechanism is long barrel nuts, has hinge hole, long barrel nuts to be cut with scissors by connecting axis pin in the leading portion of long barrel nuts It is connected to template plate, long barrel nuts are sleeved in housing, and leading screw is installed in long barrel nuts, has convex on leading screw Shoulder is equipped with locating cover in the rear end of housing, has on locating cover and pass through with the matched annular groove of positioning convex shoulder on leading screw, leading screw Annular groove rotation on positioning convex shoulder and locating cover on leading screw is fixed, and regulation handle is equipped in the end of leading screw.By adjusting hand Handle is by adjusting the relative position between its internal leading screw and long barrel nuts, to change the length of telescoping mechanism.
As another preferred embodiment of the present invention, it is equipped with tool box in the middle part of the upper surface of described chassis, in tool box It is the handrail of handle that, which respectively there are a upper end in both sides, and the lower end of handrail is connected with chassis, and the top of handrail and the upper end of diagonal control arm connect, The lower end of diagonal control arm is connect with chassis.
As another preferred embodiment of the present invention, the adjuster is mainly made of elevating mechanism, in elevator Free bearing is fixed on structure, free bearing is hinged by axis pin and cross bar, positioning groove plate is fixed on the top at the middle part of cross bar, in cross bar Be fixedly arranged at the front end with set I, H-type frame is hinged with by axis on set I, is equipped with set II in the upper end of H-type frame, it is fixed to be equipped in set II Position bar, has free bearing, free bearing to be hinged with puller column by free bearing on cross bar at the rear portion of positioning groove plate on cross bar, is pushing up Screw hole is held out against in the middle part of tight column, lead screw is held out against holding out against to be installed in screw hole, claw hook is hinged in the upper end of puller column, There is antiskid plate in the front end for holding out against lead screw, rotary handle is installed in the tail end for holding out against lead screw;Another as the present invention is excellent Scheme, the elevating mechanism is selected to be made of elevating screw and lifting set, lifting set spinning is on elevating screw, in lifting set Lower end is equipped with stabilizer blade, and lifting is sleeved in housing, is equipped with transparent cover in the upper end of housing, has locating ring on the inner wall of transparent cover Slot has on elevating screw and passes through positioning ring groove and convex with housing with the matched positioning convex shoulder of positioning ring groove, elevating screw Shoulder is rotatably connected, and regulation handle is housed on the positioning convex shoulder of elevating screw.
As another preferred embodiment of the present invention, the elevating mechanism is by elevating screw, lifting set, conical gear I It is formed with bevel gear II, conical gear I is fixedly mounted on elevating screw, and bevel gear II is meshed with conical gear I, is risen Below conical gear I on elevating screw, gear set shell upper end is fixedly connected drop set spinning with the upper pars infrasegmentalis of housing, Gear set shell lower end is fixedly connected with the lower section upper portion of housing, and the side of gear set shell is useful for installation bevel gear II end The circular hole of axis, the position of the circular hole, which should ensure that, makes bevel gear II be meshed with conical gear I, and II end axis of gear, which is equipped with, to be adjusted Handle, the upper end of elevating screw is by the rotatable company of positioning convex shoulder on the positioning ring groove and elevating screw of outer set upper side and transparent cover It connects, lifting is sleeved in the lower end of housing, and stabilizer blade is equipped in the lower end of lifting set.
The application method of express-way guard-rail plates fast replacement system device:Rack and rinion adjustment is placed in the high speed needed replacing Beside highway protecting plate, moving U-shaped operating handle makes locating template be in position B state, adjusts both ends jack piston rod, makes Locating template and express-way guard-rail plates docile, are used in combination clamping mechanism clamping express-way guard-rail plates, manually lay down highway Guardrail board connects bolt, and moving U-shaped operating handle makes locating template be in position A condition, is protected highway with rack and rinion adjustment Breast board is transported under the express-way guard-rail plates handgrip of boom hoisting, catches highway to protect with express-way guard-rail plates handgrip Express-way guard-rail plates, are lifted into boom hoisting and are safeguarded on transport vehicle by the intermediate position of breast board, then new highway is protected Breast board is lifted on rack and rinion adjustment, is transported to the position for needing replacing express-way guard-rail plates, and moving U-shaped operating handle makes positioning Template is in position B state, and adjustment both ends jack piston rod makes express-way guard-rail plates be in coarse alignment, installation accurate adjustment dress It sets, adjustment regulation handle makes new and old express-way guard-rail plates mounting hole fine alignment, screws rotary handle and makes to hold out against lead screw and holds out against height Fast highway protecting plate is manually put on bolt and is fastened with wireless electric wrench.Pack up express-way guard-rail plates fast replacement system dress It sets, more change jobs completion.
Compared with prior art, express-way guard-rail plates are replaced only with three people's operations, ten to ten using apparatus of the present invention It can be completed within two minutes.Change over the sea of faces's work pattern shouldered by people's half the circumference of the sleeve where it joins the shoulder.The safety reduced on a highway is hidden Suffer from.
Description of the drawings
Fig. 1 is boom hoisting(1)Front view;
Fig. 2 be in Fig. 1 K to partial view;
Fig. 3 is adjuster(3)Axonometric drawing;
Fig. 4 is adjuster(3)The axonometric drawing of another program;
Fig. 5 is rack and rinion adjustment(5)Axonometric drawing;
Fig. 6 is rack and rinion adjustment(5)Another operating position axonometric drawing;
Fig. 7 is the partial enlarged view at M in Fig. 1;
Fig. 8 is telescoping mechanism(5-11)Schematic cross-sectional view;
Fig. 9 is elevating mechanism(3-1)Schematic cross-sectional view;
Figure 10 is elevating mechanism(3-1)The schematic cross-sectional view of another program;
Figure 11 is adjuster of the present invention(3)Sectional view.
Specific implementation mode
As shown, express-way guard-rail plates fast replacement system device, mainly by boom hoisting 1, rack and rinion adjustment 5 and essence Device 3 is adjusted to form, it is characterised in that:Boom hoisting 1 is fixed on transport maintenance car, the promising boom hoisting on transport maintenance car 1 provides the power supply of electric power, and the motor of boom hoisting 1 is electrically connected to a power source by control circuit, and boom hoisting 1 is responsible for will newly at a high speed Highway protecting plate is lifted on rack and rinion adjustment 5, and rack and rinion adjustment 5 is responsible by the mounting hole of new express-way guard-rail plates and interfaced Express-way guard-rail plates mounting hole coarse alignment, adjuster 3 be responsible for by the mounting holes of new express-way guard-rail plates and and its The mounting hole fine alignment of the express-way guard-rail plates of docking is manually worn bolt, band nut after mounting hole fine alignment, is pulled with radio Hand screws.
It, will after completing more the changing jobs of new and old express-way guard-rail plates using adjuster, rack and rinion adjustment and boom hoisting The old express-way guard-rail plates disassembled are lifted on transport maintenance car.
The boom hoisting 1 is cantilevered boom hoisting, mainly public by lifting column 1-6, lifting arm 1-9 and high speed Road guardrail board handgrip 1-1 is constituted, and has footing 1-12, lifting column 1-6 to be fixed by footing 1-12 in the lower end of lifting column 1-6 On the carriage chassis of transport maintenance car, hoist engine 1-10 is installed on the upside of the rear portion of lifting arm 1-9, lifting arm 1-9's Front end is equipped with pulley 1-8, and hook 1-7, express-way guard-rail plates handgrip are equipped on the lifting rope 1-11 of hoist engine 1-10 1-1 is hung on hook 1-7.
The express-way guard-rail plates handgrip 1-1 is made of two symmetrical gripping arm 1-1-1, and two gripping arm 1-1-1 exist Middle part is hinged with articulated shaft 1-1-4, the upper end chain splicing 1-1-3 connections of two gripping arm 1-1-1, two gripping arm 1-1-1's Lower end is equipped with supporting plate 1-1-2, there is reinforcing rib 1-1-5, express-way guard-rail plates handgrip between supporting plate 1-1-2 and gripping arm 1-1-1 1-1 is by the 1-1-3 hangings of chain splicing on hook 1-7.
The lifting column 1-6 is upper and lower connected structure, and hypomere internal orifice size matches with epimere external dimensions, hypomere On have jack, have on epimere it is multiple be used for adjust lifting column 1-6 height with the matched jack of jack on hypomere, hypomere with Epimere II 1-14 connections of bolt.
The lifting arm 1-9 is formed by front and back two parts grafting, and the rear portion of lifting arm 1-9 is divided into ┍ shapes, ┍ shapes The interior mouth-shaped of front of rear part of lifting arm 1-9, size and the fronts lifting arm 1-9 outer shape, size match, There is jack on rear portion, there are multiple jacks to match with the jack on rear portion for being used for adjusting lifting arm 1-9 length on front, it is preceding Portion is connect with rear portion with I 1-13 of bolt, and the lower end of the rear part of lifting arm 1-9 is equipped with the blind hole that Open Side Down, lifting column 1-6 Upper side is equipped with an annular groove, and lifting column 1-6 is inserted into blind hole, the lifting tops column 1-6 and blind hole bottom it Between have a pressure bearing, blind hole side wall is equipped with the screw hole of installation locking handle 1-15, the position of screw hole on lifting column 1-6 The annular groove of end side surface matches.
The rack and rinion adjustment 5 includes chassis 5-1, and the bottom surface of chassis 5-1 is set there are four universal wheel 5-2, the left sides 5-1 on chassis Right both ends are respectively fixed with the gate-type frame being made of two telescopic column 5-4 and telescoping mechanism 5-11, in two telescopic column 5-4 Between be equipped with jack 5-3, telescoping mechanism 5-11 telescopic rod front end by connect axis pin 5-12 be hinged with template plate 5-16 is equipped with connecting rod 5-15 between the template plate 5-16 of left and right ends, and positioning mould is equipped at the both ends of connecting rod 5-15 Plate 5-7 is welded with positioning plate 5-8 on the lower edge of locating template 5-7, is welded on the upper outer surface of locating template 5-7 Have clamping mechanism 5-14, non-slip mat 5-6 be fixed on the inner surface of locating template 5-7, the template plate 5-16 at both ends it Between be equipped with U-shaped operating handle 5-13.Moving U-shaped operating handle 5-13 can make locating template 5-7 in horizontal position A and vertical position It sets and converts between B.Adjusting telescoping mechanism 5-11 can be such that locating template 5-7 moves forward or back.
The telescoping mechanism 5-11 is twist-type telescopic mechanism, as shown in figure 8, the telescopic rod of twist-type telescopic mechanism is Long barrel nuts 5-11-3 has hinge hole, long barrel nuts 5-11-3 to pass through connecting pin in the leading portion of long barrel nuts 5-11-3 Axis 5-12 is hinged with template plate 5-16, and long barrel nuts 5-11-3 is sleeved in housing 5-11-2, in long barrel nuts 5-11- It is installed with leading screw 5-11-1 on 3, there is positioning convex shoulder 5-11-4 on leading screw 5-11-1, locating cover is equipped in the rear end of housing 5-11-2 5-11-5 has and the matched annular grooves of positioning convex shoulder 5-11-4 on leading screw 5-11-1, leading screw 5-11- on locating cover 5-11-5 1 rotates fixation by the annular groove on the positioning convex shoulder 5-11-4 and locating cover 5-11-5 on leading screw 5-11-1, in leading screw 5-11- 1 end is equipped with regulation handle 5-10.By regulation handle 5-10 by adjusting its internal leading screw 5-11-1 and long barrel nuts Relative position between 5-11-3, to change the length of telescoping mechanism 5-11.
Tool box 3-17 is equipped in the middle part of the upper surface of described chassis 5-1, the both sides of 3-17 respectively have the upper end to be in tool box The lower end of the handrail 3-18 of handle, handrail 3-18 are connected with chassis 5-1, and the top of handrail 3-18 connects with the upper end of diagonal control arm 3-19 It connects, the lower end of diagonal control arm 3-19 is connect with chassis 5-1.
The adjuster 3 is mainly made of elevating mechanism 3-1, and free bearing 3-14 is fixed on elevating mechanism 3-1, hinge Seat 3-14 is hinged by axis pin and cross bar 3-10, positioning groove plate 3-7 is fixed on the top at the middle part of cross bar 3-10, in cross bar 3- 10 be fixedly arranged at the front end with covers I 3-9, is hinged with H-type frame 3-2 by axis 3-13 on covering I 3-9, is equipped in the upper end of H-type frame 3-2 II 3-16 is covered, locating rod 3-4 is equipped in II 3-16 covering, has free bearing 3-17 on cross bar 3-10, free bearing 3-17 is in positioning groove plate The rear portion of 3-7 is hinged with puller column 3-3 on cross bar 3-10 by free bearing 3-17, is held out against in the middle part of puller column 3-3 Screw hole, lead screw 3-5 is held out against holding out against to be installed in screw hole, is hinged with claw hook 3-12 in the upper end of puller column 3-3, is being held out against silk There is antiskid plate 3-18 in the front end of bar 3-5, and rotary handle 3-19 is equipped in the tail end for holding out against lead screw 3-5;The elevating mechanism 3-1 is made of elevating screw 3-1-1 and lifting set 3-1-2, as shown in figure 9, lifting set 3-1-2 spinnings are in elevating screw 3-1-1 On, it is equipped with stabilizer blade 3-6 in the lower end of lifting set 3-1-2, lifting set 3-1-2 is sleeved in housing 3-1-3, housing 3-1-3's Upper end is equipped with transparent cover 3-1-4, has positioning ring groove on the inner wall of transparent cover 3-1-4, has on elevating screw 3-1-1 and positioning ring groove Matched positioning convex shoulder, elevating screw 3-1-1 and housing 3-1-3 are rotatably connected by positioning ring groove and positioning convex shoulder, are lifted Regulation handle 3-15 is housed on the positioning convex shoulder of lead screw 3-1-1.
The elevating mechanism 3-1 is by elevating screw 3-1-1, lifting set 3-1-2, I 3-1-5 of conical gear and conical gear II 3-1-6 is formed, and as shown in Figure 10, I 3-1-5 of conical gear is fixedly mounted on elevating screw 3-1-1, bevel gear II 3-1- 6 are meshed with I 3-1-5 of conical gear, under I 3-1-5 of conical gear of the lifting set 3-1-2 spinnings on elevating screw 3-1-1 Face, the gear set upper ends shell 3-1-7 are fixedly connected with the upper pars infrasegmentalis of housing 3-1-3, the gear set lower ends shell 3-1-7 and housing The lower section upper portion of 3-1-3 is fixedly connected, and the side of gear set shell 3-1-7 is useful for the ends installation bevel gear II 3-1-6 axis Circular hole, the position of the circular hole, which should ensure that, makes bevel gear II 3-1-6 be meshed with I 3-1-5 of conical gear, II ends 3-1-6 of gear Axis is equipped with regulation handle 3-15, the upper end of elevating screw 3-1-1 by the upper ends housing 3-1-3 and transparent cover 3-1-4 positioning ring groove It is rotatably connected with the positioning convex shoulder on elevating screw 3-1-1, lifting set 3-1-2 is sleeved in the lower end of housing 3-1-3, is being risen The lower end of drop set 3-1-2 is equipped with stabilizer blade 3-6.
The application method of express-way guard-rail plates fast replacement system device:Rack and rinion adjustment 5 is placed in the height needed replacing Beside fast highway protecting plate, moving U-shaped operating handle 5-13 makes locating template 5-7 be in position B state, adjusts both ends jack 5-3 piston rods make locating template 5-7 and express-way guard-rail plates docile, and clamping mechanism 5-14 clamping freeway guardrails are used in combination Plate manually lays down express-way guard-rail plates connection bolt, and moving U-shaped operating handle 5-13 makes locating template 5-7 be in position A shapes Express-way guard-rail plates are transported under the express-way guard-rail plates handgrip 1-1 of boom hoisting 1, with height by state with rack and rinion adjustment 5 Fast highway protecting plate handgrip 1-1 catches the intermediate position of express-way guard-rail plates, is hung express-way guard-rail plates with boom hoisting 1 It is attached to and safeguards on transport vehicle, then new express-way guard-rail plates are lifted on rack and rinion adjustment 5, be transported to and need replacing highway The position of guardrail board, moving U-shaped operating handle 5-13 makes locating template 5-7 be in position B state, adjusts both ends jack 5-3 Piston rod makes express-way guard-rail plates be in coarse alignment, installs adjuster 3, and adjustment regulation handle 3-15 makes new and old highway Guardrail board mounting hole fine alignment, screws rotary handle 3-19 and makes to hold out against lead screw 3-5 and hold out against express-way guard-rail plates, manually puts on spiral shell Bolt is simultaneously fastened with wireless electric wrench.Express-way guard-rail plates fast replacement system device is packed up, more change jobs completion.

Claims (11)

1. express-way guard-rail plates fast replacement system device, mainly by boom hoisting(1), rack and rinion adjustment(5)And adjuster (3)Composition, it is characterised in that:Boom hoisting(1)It is fixed on transport maintenance car, the promising boom hoisting on transport maintenance car (1)The power supply of electric power, boom hoisting are provided(1)Motor be electrically connected to a power source by control circuit, boom hoisting(1)Being responsible for will New express-way guard-rail plates are lifted into rack and rinion adjustment(5)On, rack and rinion adjustment(5)It is responsible for the mounting hole of new express-way guard-rail plates With the mounting hole coarse alignment of interfaced express-way guard-rail plates, adjuster(3)It is responsible for new express-way guard-rail plates The mounting hole fine alignment of mounting hole and interfaced express-way guard-rail plates manually wears bolt, band spiral shell after mounting hole fine alignment Cap is screwed with wireless electric wrench.
2. express-way guard-rail plates fast replacement system device according to claim 1, it is characterised in that:The lifting Device(1)For cantilevered boom hoisting, mainly by lifting column(1-6), lifting arm(1-9)With express-way guard-rail plates handgrip (1-1)It constitutes, in lifting column(1-6)Lower end have footing(1-12), lift by crane column(1-6)Pass through footing(1-12)It is fixed on On the carriage chassis for transporting maintenance car, in lifting arm(1-9)Rear portion on the upside of hoist engine is installed(1-10), in lifting arm(1- 9)Front end be equipped with pulley(1-8), in hoist engine(1-10)Lifting rope(1-11)It is equipped with hook(1-7), high speed public affairs Road guardrail board handgrip(1-1)Hanging is in hook(1-7)On.
3. express-way guard-rail plates fast replacement system device according to claim 2, it is characterised in that:The high speed Highway protecting plate handgrip(1-1)By two symmetrical gripping arms(1-1-1)It constitutes, two gripping arms(1-1-1)In middle part articulated shaft (1-1-4)It is hinged, two gripping arms(1-1-1)Upper end chain splicing(1-1-3)Connection, in two gripping arms(1-1-1)Lower end Equipped with supporting plate(1-1-2), in supporting plate(1-1-2)With gripping arm(1-1-1)Between have reinforcing rib(1-1-5), express-way guard-rail plates Handgrip(1-1)Pass through chain splicing(1-1-3)Hanging is in hook(1-7)On.
4. express-way guard-rail plates fast replacement system device according to claim 2, it is characterised in that:The lifting Column(1-6)For upper and lower connected structure, hypomere internal orifice size matches with epimere external dimensions, there is jack on hypomere, on epimere Have it is multiple be used for adjust lifting column(1-6)Height with the matched jack of jack on hypomere, hypomere and epimere bolt II (1-14)Connection.
5. express-way guard-rail plates fast replacement system device according to claim 2, it is characterised in that:The lifting Arm(1-9)It is formed by front and back two parts grafting, lifting arm(1-9)Rear portion be divided into ┍ shapes, the lifting arm of ┍ shapes(1-9)'s Interior mouth-shaped, size and the lifting arm of the front of part afterwards(1-9)Outer shape, the size of front match, and have on rear portion slotting Hole has on front and multiple is used for adjusting lifting arm(1-9)The jack of length to match with the jack on rear portion, front and rear portion With bolt I(1-13)Connection, lifting arm(1-9)The lower end of rear part be equipped with the blind hole that Open Side Down, lift by crane column(1-6)On End side surface is equipped with an annular groove, lifts by crane column(1-6)It is inserted into blind hole, in lifting column(1-6)Top and blind hole bottom Between have a pressure bearing, blind hole side wall is equipped with installation locking handle(1-15)Screw hole, position and the lifting column of screw hole (1-6)The annular groove of upper side matches.
6. express-way guard-rail plates fast replacement system device according to claim 1, it is characterised in that:The coarse adjustment Device(5)Including chassis(5-1), chassis(5-1)Bottom surface set there are four universal wheel(5-2), on chassis(5-1)Left and right ends point It is not fixed with by two telescopic columns(5-4)And telescoping mechanism(5-11)The gate-type frame of composition, in two telescopic columns(5-4)It Between be equipped with jack(5-3), in telescoping mechanism(5-11)Telescopic rod front end pass through connect axis pin(5-12)It is hinged with template Bottom plate(5-16), the template plate in left and right ends(5-16)Between be equipped with connecting rod(5-15), in connecting rod(5-15)Two End is equipped with locating template(5-7), in locating template(5-7)Lower edge on be welded with positioning plate(5-8), in locating template (5-7)Upper outer surface on be welded with clamping mechanism(5-14), in locating template(5-7)Inner surface on be fixed with non-slip mat (5-6), the template plate at both ends(5-16)Between be equipped with U-shaped operating handle(5-13).
7. express-way guard-rail plates fast replacement system device according to claim 6, it is characterised in that:Described is flexible Mechanism(5-11)Telescopic rod for twist-type telescopic mechanism, twist-type telescopic mechanism is long barrel nuts(5-11-3), in long cylinder Shape nut(5-11-3)Leading portion have hinge hole, long barrel nuts(5-11-3)By connecting axis pin(5-12)It is hinged with template bottom Plate(5-16), long barrel nuts(5-11-3)It is sleeved on housing(5-11-2)It is interior, in long barrel nuts(5-11-3)On be installed with Leading screw(5-11-1), leading screw(5-11-1)On have positioning convex shoulder(5-11-4), in housing(5-11-2)Rear end be equipped with locating cover (5-11-5), in locating cover(5-11-5)On have and leading screw(5-11-1)On positioning convex shoulder(5-11-4)Matched annular groove, Leading screw(5-11-1)Pass through leading screw(5-11-1)On positioning convex shoulder(5-11-4)And locating cover(5-11-5)On annular groove rotation Turn to fix, in leading screw(5-11-1)End be equipped with regulation handle(5-10).
8. express-way guard-rail plates fast replacement system device according to claim 6, it is characterised in that:The chassis (5-1)The upper surface of middle part be equipped with tool box(3-17), in tool box(3-17)Both sides respectively have a upper end be handle handrail(3- 18), handrail(3-18)Lower end and chassis(5-1)It is connected, handrail(3-18)Top and diagonal control arm(3-19)Upper end connection, Diagonal control arm(3-19)Lower end and chassis(5-1)Connection.
9. express-way guard-rail plates fast replacement system device according to claim 1, it is characterised in that:The accurate adjustment Device(3)Mainly by elevating mechanism(3-1)It constitutes, in elevating mechanism(3-1)On be fixed with free bearing(3-14), free bearing(3-14)It is logical Cross axis pin and cross bar(3-10)It is hinged, in cross bar(3-10)The top at middle part be fixed with positioning groove plate(3-7), in cross bar(3- 10)Be fixedly arranged at the front end with set I(3-9), in set I(3-9)On pass through axis(3-13)It is hinged with H-type frame(3-2), in H-type frame(3-2) Upper end be equipped with set II(3-16), in set II(3-16)It is interior to be equipped with locating rod(3-4), in cross bar(3-10)On have free bearing(3- 17), free bearing(3-17)In positioning groove plate(3-7)Rear portion, in cross bar(3-10)On pass through free bearing(3-17)Be hinged with hold out against it is vertical Column(3-3), in puller column(3-3)Middle part hold out against screw hole, hold out against lead screw holding out against to be installed in screw hole(3-5), pushing up Tight column(3-3)Upper end be hinged with claw hook(3-12), holding out against lead screw(3-5)Front end have antiskid plate(3-18), holding out against Lead screw(3-5)Tail end rotary handle is installed(3-19);The elevating mechanism(3-1)By elevating screw(3-1-1)And liter Drop set(3-1-2)Composition, lifting set(3-1-2)Spinning is in elevating screw(3-1-1)On, it is covered in lifting(3-1-2)Lower end set There is stabilizer blade(3-6), lifting set(3-1-2)It is sleeved on housing(3-1-3)It is interior, in housing(3-1-3)Upper end be equipped with transparent cover(3-1- 4), in transparent cover(3-1-4)Inner wall on have positioning ring groove, in elevating screw(3-1-1)On have and the matched positioning of positioning ring groove Convex shoulder, elevating screw(3-1-1)With housing(3-1-3)It is rotatably connected by positioning ring groove and positioning convex shoulder, elevating screw(3- 1-1)Positioning convex shoulder on be equipped with regulation handle(3-15).
10. express-way guard-rail plates fast replacement system device according to claim 8, it is characterised in that:The liter Descending mechanism(3-1)By elevating screw(3-1-1), lifting set(3-1-2), conical gear I(3-1-5)And bevel gear II(3-1- 6)Composition, conical gear I(3-1-5)It is fixedly mounted on elevating screw(3-1-1)On, bevel gear II(3-1-6)With circular cone tooth Wheel I(3-1-5)It is meshed, lifting set(3-1-2)Spinning is in elevating screw(3-1-1)On conical gear I(3-1-5)Under Face, gear set shell(3-1-7)Upper end and housing(3-1-3)Upper pars infrasegmentalis be fixedly connected, gear set shell(3-1-7)Lower end With housing(3-1-3)Lower section upper portion be fixedly connected, gear set shell(3-1-7)Side be useful for installation bevel gear II (3-1-6)The circular hole of axis is held, the position of the circular hole, which should ensure that, makes bevel gear II(3-1-6)With conical gear I(3-1-5)Mutually nibble It closes, gear II(3-1-6)Axis is held to be equipped with regulation handle(3-15), elevating screw(3-1-1)Upper end by housing(3-1-3)On End and transparent cover(3-1-4)Positioning ring groove and elevating screw(3-1-1)On positioning convex shoulder be rotatably connected, lifting set(3-1- 2)It is sleeved on housing(3-1-3)Lower end in, lifting cover(3-1-2)Lower end be equipped with stabilizer blade(3-6).
11. the application method of express-way guard-rail plates fast replacement system device:By rack and rinion adjustment(5)It is placed in the height needed replacing Beside fast highway protecting plate, U-shaped operating handle is moved(5-13)Make locating template(5-7)In position B state, both ends thousand are adjusted Jin top(5-3)Piston rod makes locating template(5-7)With express-way guard-rail plates docile, clamping mechanism is used in combination(5-14)Clamping is high Fast highway protecting plate manually lays down express-way guard-rail plates connection bolt, moves U-shaped operating handle(5-13)Make locating template (5-7)In position A condition, rack and rinion adjustment is used(5)Express-way guard-rail plates are transported to boom hoisting(1)Highway shield Breast board handgrip(1-1)Under, with express-way guard-rail plates handgrip(1-1)The intermediate position for catching express-way guard-rail plates, with rise Device for hoisting(1)Express-way guard-rail plates are lifted into and are safeguarded on transport vehicle, then new express-way guard-rail plates are lifted into coarse adjustment dress It sets(5)On, it is transported to the position for needing replacing express-way guard-rail plates, moves U-shaped operating handle(5-13)Make locating template (5-7)In position B state, both ends jack is adjusted(5-3)Piston rod height makes express-way guard-rail plates mounting hole coarse alignment, Adjuster is installed(3), adjust regulation handle(3-15)Make new and old express-way guard-rail plates mounting hole fine alignment, screws rotation hand (3-19)Make to hold out against lead screw(3-5)Express-way guard-rail plates are held out against, bolt is manually put on and are fastened with wireless electric wrench, are packed up Express-way guard-rail plates fast replacement system device, more change jobs completion.
CN201810655117.1A 2018-06-23 2018-06-23 Expressway guardrail plate rapid replacement system device and use method Active CN108589595B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810655117.1A CN108589595B (en) 2018-06-23 2018-06-23 Expressway guardrail plate rapid replacement system device and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810655117.1A CN108589595B (en) 2018-06-23 2018-06-23 Expressway guardrail plate rapid replacement system device and use method

Publications (2)

Publication Number Publication Date
CN108589595A true CN108589595A (en) 2018-09-28
CN108589595B CN108589595B (en) 2024-02-13

Family

ID=63634091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810655117.1A Active CN108589595B (en) 2018-06-23 2018-06-23 Expressway guardrail plate rapid replacement system device and use method

Country Status (1)

Country Link
CN (1) CN108589595B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258393A (en) * 2019-07-17 2019-09-20 云南长江现代交通设施有限公司 A kind of mechanical trolley for installing wave beams of highway steel guard rail

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120001028U (en) * 2010-08-03 2012-02-13 안현숙 Shock absorbing reinforced Guard rail
CN202849933U (en) * 2012-08-20 2013-04-03 中建七局第一建筑有限公司 Anti-collision guardrail
CN106141246A (en) * 2016-08-26 2016-11-23 山东省路桥集团有限公司 Special drilling machine for heightening highway guardrail
CN206916674U (en) * 2017-06-29 2018-01-23 内蒙古综合交通科学研究院有限责任公司 W-type guardrail panel mounting
CN108178102A (en) * 2017-11-23 2018-06-19 浙江交工集团股份有限公司 A kind of self-locking type fixture and its installation method
CN208395737U (en) * 2018-06-23 2019-01-18 刘少伟 Express-way guard-rail plates fast replacement system device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120001028U (en) * 2010-08-03 2012-02-13 안현숙 Shock absorbing reinforced Guard rail
CN202849933U (en) * 2012-08-20 2013-04-03 中建七局第一建筑有限公司 Anti-collision guardrail
CN106141246A (en) * 2016-08-26 2016-11-23 山东省路桥集团有限公司 Special drilling machine for heightening highway guardrail
CN206916674U (en) * 2017-06-29 2018-01-23 内蒙古综合交通科学研究院有限责任公司 W-type guardrail panel mounting
CN108178102A (en) * 2017-11-23 2018-06-19 浙江交工集团股份有限公司 A kind of self-locking type fixture and its installation method
CN208395737U (en) * 2018-06-23 2019-01-18 刘少伟 Express-way guard-rail plates fast replacement system device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258393A (en) * 2019-07-17 2019-09-20 云南长江现代交通设施有限公司 A kind of mechanical trolley for installing wave beams of highway steel guard rail
CN110258393B (en) * 2019-07-17 2024-02-27 云南长江现代交通设施有限公司 Mechanical trolley for mounting highway wave beam steel guardrail

Also Published As

Publication number Publication date
CN108589595B (en) 2024-02-13

Similar Documents

Publication Publication Date Title
JP5378594B2 (en) Aircraft assembly method
CN207744063U (en) A kind of adjustable monitor camera of security against fire
CN107473102A (en) A kind of miniature crawler belt derrick car of substation equipment maintenance and repair
CN109850825A (en) A kind of packaged type material handling lifting device
CN109761174A (en) The convenient boom hoisting of kiln well lid
CN208395737U (en) Express-way guard-rail plates fast replacement system device
CN108589595A (en) Express-way guard-rail plates fast replacement system device and application method
CN210656028U (en) Lifting type operation platform and crank arm type overhead working truck
CN108584825A (en) A kind of electric power overhaul platform that can stablize lifting
CN106215384B (en) Concrete bar climbs workbench and its climbing device
KR20120131896A (en) Vertical and horizontal type Hydro-crane
CN213085415U (en) High-altitude operation platform with high practicability
CN205685289U (en) A kind of Multifunction that adnexa is installed in wind turbine tower installs car
CN108002249A (en) Substation equipment maintenance and repair small space boom hoisting
CN208917726U (en) A kind of highway engineering construction alarming device
CN205670640U (en) A kind of portable high-efficiency electric power overhaul support
CN206166549U (en) Lifting type article shelf
CN213387691U (en) Aerial working platform with protection function
CN210048454U (en) Adjustable lifting platform
CN211141397U (en) Lifting device for assembling hub cover of wind generating set
CN216948145U (en) Hydropower station maintenance platform
CN108033306B (en) Upper drawing type pay-off rack
CN217889577U (en) Efficient hollow metal rod boring device
CN207121384U (en) Handle hand-rail type apparatus for examination and repair of the all-electric scissor aerial work platform with jack
CN217148505U (en) Integrated light well cover opening tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant