CN109761174A - The convenient boom hoisting of kiln well lid - Google Patents

The convenient boom hoisting of kiln well lid Download PDF

Info

Publication number
CN109761174A
CN109761174A CN201910198181.6A CN201910198181A CN109761174A CN 109761174 A CN109761174 A CN 109761174A CN 201910198181 A CN201910198181 A CN 201910198181A CN 109761174 A CN109761174 A CN 109761174A
Authority
CN
China
Prior art keywords
lifting
well lid
force seat
pedestal
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910198181.6A
Other languages
Chinese (zh)
Inventor
宋夕杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910198181.6A priority Critical patent/CN109761174A/en
Publication of CN109761174A publication Critical patent/CN109761174A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of convenient boom hoistings of kiln well lid, including lifting by crane pedestal, lifting pedestal, which is equipped with, drags mechanism and pedestal levelling mechanism, it lifts by crane pedestal and is equipped with two lifting sliding rails, it is slidably installed respectively on two lifting sliding rails and lifts by crane slide, armstand is lifted by crane in installation respectively on two lifting slides, the top of two lifting armstands is installed by slinging beam, be slidably installed two connecting rod slides on slinging beam, the top of two connecting rod slides is equipped with upper force seat and is respectively articulated with upper connecting rod between upper force seat, the lower section of two connecting rod slides is equipped with lower force seat and is respectively articulated with lower link between lower force seat, rotational installation lifting screw rod on upper force seat, lower force seat is equipped with lifting swivel nut, manipulation device is installed on upper force seat;Well lid hanging device is installed on lower force seat.The present invention forms triangle to lifting screw rod and its connector and stablizes support by upper connecting rod and lower link, and structure is more reliable, this is conducive to borrow electric wrench driving, improves lifting efficiency.

Description

The convenient boom hoisting of kiln well lid
Technical field
The present invention relates to a kind of hoisting machinery more particularly to a kind of convenient boom hoistings of kiln well lid.
Background technique
Kiln well is usually vertical shaft, is mainly used for the work such as conveniently being checked, safeguarded between underpass, defeated in electric power Give, heating power conveying, supply water gas supply, communication cable, rain dirt discharge etc. many industries be widely used.The primary structure of kiln well includes kiln In the well lid on kiln well edge, kiln well ontology is separately connected two sections of underpass for well ontology and buckle closure, and well lid is generally circular in cross section or square Shape, be typically provided on well lid two to four not equal through holes, maintenance personnel well lid can be raised by through hole, thus into Enter kiln well ontology and carries out coherence check and maintenance work.
In order to guarantee the safety of kiln well, also for avoiding impacting urban life, kiln well lid or it is made into steel Well lid or be made into concrete manhole cover, no matter which kind of well lid, weight is all very big, and single to open difficulty big, and is easy to hurt waist Hurt hand.Traditional open method is using pick, crowbar, sledgehammer and to pull mode with suspension hook and prize well lid inner wall and manpower hook well lid Hole, to realize the purpose that well lid is moved away to kiln well.That there are safeties is low for the conventional method, tool carries that transport is inconvenient, well The disadvantages of lid and tool are easy to damage, time-consuming and laborious, it is entitled " just that inventor is disclosed that application No. is " CN201811219621.3 " Take the safe boom hoisting of formula well lid " application for a patent for invention, solved the above problems using the mechanical lifting of convenient transportation, but When the practical application boom hoisting inventors have found that because well lid weight is larger and lifting during well lid shake etc. reasons, silk Structure easily deforms at mother, influences lifting operation;And elevating screw and balanced supporting structure are worm drive, maintenance Personnel need to just be able to achieve lifting or support by the operation of long period, influence to lift by crane efficiency.Inventor is based primarily upon above-mentioned Problem improves boom hoisting, and the invention is given birth to therefrom.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of easy to operate, it is convenient to lift by crane, and structure is more reliable, lifting effect The higher convenient boom hoisting of kiln well lid of rate.
In order to solve the above technical problems, the technical scheme is that the convenient boom hoisting of kiln well lid, including lifting base Frame, the lifting pedestal are equipped with the pedestal levelling mechanism for dragging mechanism and adjusting the lifting pedestal level for facilitating carrying, The lifting pedestal is equipped with two parallel lifting sliding rails, is slidably fitted with respectively and the lifting on the two lifting sliding rails The lifting slide of sliding rail cooperation, is equipped with lifting armstand, two liftings by folding device respectively on the two lifting slides Slinging beam is equipped with by transverse beam installation apparatus between the top of armstand, two are slidably fitted on the slinging beam and is set relatively The connecting rod slide set, the tops of the two connecting rod slides are equipped with upper force seat, the two connecting rod slides and the upper force seat it Between be respectively articulated with upper connecting rod, the lower section of the two connecting rod slides is equipped with lower force seat, the two connecting rod slides with it is described under apply It has been respectively articulated with lower link between power seat, lifting screw rod is rotatably equipped on the upper force seat, the lower force seat is equipped with Lifting swivel nut corresponding with the lifting screw rod, it is described it is upper force seat on be equipped with and it is described lifting screw rod connect manipulation dress It sets;Well lid hanging device is installed on the lower force seat.
The manipulation device includes the lifting speed changer being arranged on the upper force seat as a preferred technical solution, The output shaft of the lifting speed changer with the lifting screw rod is concentric is fixedly connected, the input shaft fixation company of the lifting speed changer It is connected to manipulation connector, the manipulation connector is equipped with the electronic interconnecting piece that can be connect with electric wrench and can be with rotation The bull stick radially installed hole of operating stick connection.
As a preferred technical solution, the upper force seat include with the common hinged upper guiding axis of two upper connecting rods, Manipulation mounting base is installed on the upper guiding axis, the lifting screw rod and manipulation dress are installed in the manipulation mounting base It sets;The lower force seat include with the common hinged lower guiding axis of two lower links, through being equipped on the lower guiding axis Screw hole is hung, the lifting screw hole forms the inner hole of the lifting swivel nut, and the upper guiding axis is equipped with and the lifting screw rod pair The screw rod guiding via hole answered.
The slinging beam is equipped with screw rod relief portion as a preferred technical solution,.
The pedestal levelling mechanism includes being fixed at the lifting pedestal and being located at remote as a preferred technical solution, From the leveling fixing seat for dragging mechanism one end, vertical rotating is equipped with leveling swing rod, the tune in the leveling fixing seat Telescopic outrigger is slidably fitted on flat pendulum bar, the leveling swing rod is equipped with flexible leveling positioning pin, sets on the telescopic outrigger There are several flexible leveling adjustment holes corresponding with the flexible leveling positioning pin;The bottom end of the telescopic outrigger is equipped with swingable Buttress;It slides axially in the leveling fixing seat along shaft and swing position block is installed, the rotation peace of the leveling swing rod End is filled circumferentially arranged with several swing locating grooves corresponding with the swing position block, the swing position block is connected with Return device and return limiting device.
The lifting pedestal includes two lifting stringers disposed in parallel as a preferred technical solution, and two liftings are vertical It is equipped with Extensible connection device between beam, drags mechanism described in one end setting of the lifting stringer, the pedestal is arranged in the other end Levelling mechanism;The lifting sliding rail is respectively set on each lifting stringer;The transverse beam installation apparatus includes being fixed at Crossbeam mounting cylinder at the top of each lifting armstand, radial screw thread is equipped with crossbeam puller bolt, institute on the crossbeam mounting cylinder The both ends for stating slinging beam stretch out the two crossbeam mounting cylinders respectively and are equipped with flexible lengthening section.
The Extensible connection device includes the company being fixed on each lifting stringer as a preferred technical solution, Crossbeam is connect, two connecting cross beams are at least set on each lifting stringer, the connection on the two lifting stringers is horizontal Beam is arranged in a one-to-one correspondence, and is connected with flexible company jointly at telescopic adjustment bolt is passed through between two connecting cross beams of corresponding relationship Beam is connect, it is at least one of equipped with several corresponding with the telescopic adjustment bolt flexible at two connecting cross beams of corresponding relationship Adjustment hole.
The lifting sliding rail is cylinder line slide rail as a preferred technical solution, and the lifting slide includes at least two A series connection is slidably mounted on the linear slider on the cylinder line slide rail and with cylinder line slide rail cooperation, at least two institutes It states linear slider and is fixedly connected with slide connection frame jointly, the slide connection frame installs the lifting by the folding device Armstand.
The folding device includes the folding swivel pin being arranged on the lifting slide as a preferred technical solution, The lifting armstand is equipped with folding hinge hole corresponding with the folding swivel pin;It is located at the folding on the lifting slide Right above swivel pin or underface is detachably equipped with standing positioning pin, and the lifting armstand is equipped with to be positioned with the standing Sell corresponding standing location hole.
The well lid hanging device includes at least two being connected on the lower force seat as a preferred technical solution, Ring is mounted, is connected separately with hitch bar on the mounting ring, the bottom end of the hitch bar is connected with hook.
By adopting the above-described technical solution, the convenient boom hoisting of kiln well lid, including pedestal is lifted by crane, on the lifting pedestal Equipped with the pedestal levelling mechanism for dragging mechanism and adjusting the lifting pedestal level for facilitating carrying, the lifting pedestal is equipped with Two parallel lifting sliding rails are slidably fitted on the two lifting sliding rails respectively and the lifting of the lifting sliding rail cooperation are sliding , lifting armstand is equipped with by folding device respectively on the two lifting slides, is led between the tops of the two lifting armstands It crosses transverse beam installation apparatus and slinging beam is installed, be slidably fitted with the two connecting rod slides being oppositely arranged on the slinging beam, two The top of the connecting rod slide is equipped with upper force seat, the company of being respectively articulated between the two connecting rod slides and the upper force seat The lower section of bar, the two connecting rod slides is equipped with lower force seat, is respectively articulated between the two connecting rod slides and the lower force seat There is lower link, lifting screw rod is rotatably equipped on the upper force seat, the lower force seat is equipped with and the lifting screw rod pair The lifting swivel nut answered, is equipped on the upper force seat and the manipulation device that connect of lifting screw rod;On the lower force seat Well lid hanging device is installed.The convenient boom hoisting of kiln well lid, including lifting pedestal, the lifting pedestal, which is equipped with, facilitates carrying The pedestal levelling mechanism for dragging mechanism and adjusting lifting pedestal level, the lifting pedestal is equipped with two parallel Sliding rail is hung, is slidably fitted with the lifting slide with the lifting sliding rail cooperation, two liftings on the two lifting sliding rails respectively Lifting armstand is equipped with by folding device respectively on slide, passes through transverse beam installation apparatus between the top of the two lifting armstands Slinging beam is installed, the two connecting rod slides being oppositely arranged are slidably fitted on the slinging beam, the two connecting rod slides Top is equipped with upper force seat, has been respectively articulated with upper connecting rod, two connecting rods between the two connecting rod slides and the upper force seat The lower section of slide is equipped with lower force seat, has been respectively articulated with lower link between the two connecting rod slides and the lower force seat, described Lifting screw rod is rotatably equipped on upper force seat, the lower force seat is equipped with lifting swivel nut corresponding with the lifting screw rod, The manipulation device connecting with the lifting screw rod is installed on the upper force seat;Well lid mounting is installed on the lower force seat Device.The present invention forms triangle to described lifting screw rod and its connector and stablizes by the upper connecting rod and the lower link Support, structure is relatively reliable, can effectively avoid well lid weight bring malformation;Support the raising of reliability convenient described The power that screw rod borrows electric wrench is hung, lifting process can be accelerated, improves lifting efficiency;Operation of the present invention is simple, and it is convenient to lift by crane, It can be widely used for the kiln well lid slinging work in each field, there is biggish economic value and social value.
Detailed description of the invention
The following drawings are only intended to schematically illustrate and explain the present invention, not delimit the scope of the invention.Wherein:
Fig. 1 is the entirety perspective view of the embodiment of the present invention, and the part knot of well lid hanging device is not shown in the figure Structure;
Fig. 2 is the three-dimensional enlarged structure schematic diagram of lifting of embodiment of the present invention part, and well lid hanging device is not shown in the figure Part-structure;
Fig. 3 is the three-dimensional enlarged structure schematic diagram of top of embodiment of the present invention lifting force seat;
Fig. 4 is the three-dimensional enlarged structure schematic diagram of lower lifting structure of embodiment of the present invention force seat;
Fig. 5 is the three-dimensional enlarged structure schematic diagram of manipulation connector of the embodiment of the present invention;
Fig. 6 is the three-dimensional enlarged structure schematic diagram of lifting slide of the embodiment of the present invention;
Fig. 7 is the three-dimensional enlarged structure schematic diagram for the extension adjustment device that the embodiment of the present invention is located at lifting longeron end;
Fig. 8 is the side view of pedestal levelling mechanism of the embodiment of the present invention, has carried out section view to telescopic outrigger in figure;
Fig. 9 is the configuration schematic diagram of pedestal levelling mechanism of the embodiment of the present invention, and telescopic outrigger and branch is not shown in the figure Pier;
Figure 10 is that the embodiment of the present invention slings and moves the status diagram after well lid.
In figure: 1- kiln well;11- well lid;2- lifts by crane pedestal;21- lifts by crane stringer;22- drags mechanism;23- is telescopically connected to dress It sets;231- connecting cross beam;232- is telescopically connected to beam;233- telescopic adjustment bolt;234- telescopic adjustment hole;24- pedestal levels machine Structure;241- levels fixing seat;242- levels swing rod;243- swings position block;244- swings locating groove;245- unfreezing pressing Plate;246- return force application spring;247- return retention bead;248- telescopic outrigger;249- buttress;25- pulling handle;26- rises Hang sliding rail;3- lifts by crane slide;31- linear slider;32- slide connection frame;33- folds swivel pin;34- transposition drawstring;35- is erected Positioning pin;4- lifts by crane armstand;41- accessory mounting rack;5- transverse beam installation apparatus;51- crossbeam mounting cylinder;52- crossbeam puller bolt; 6- slinging beam;61- screw rod relief portion;62- stretches lengthening section;63- connecting rod slide;64- upper connecting rod;65- lower link;It is applied on 7- Power seat;The upper guiding axis of 71-;711- screw rod is oriented to via hole;72- manipulates mounting base;73- lifts by crane speed changer;74- lifts by crane screw rod;75- Manipulate connector;The electronic interconnecting piece of 751-;752- bull stick radially installed hole;Exert a force seat under 8-;Guiding axis under 81-;811- lifting Screw hole;9- well lid hanging device;91- mounts ring;92- hitch bar.
Specific embodiment
With reference to the accompanying drawings and examples, the present invention is further explained.In the following detailed description, only pass through explanation Mode describes exemplary embodiment of the invention.Undoubtedly, those skilled in the art will recognize, not inclined In the case where from the spirit and scope of the present invention, the described embodiments may be modified in various different ways.Cause This, attached drawing and description are regarded as illustrative in nature, and are not intended to limit the scope of the claims.
As Fig. 1 to Figure 10 jointly shown in, the convenient boom hoisting of kiln well lid, including lifting pedestal 2, on the lifting pedestal 2 Equipped with the pedestal levelling mechanism 24 for dragging mechanism 22 and adjusting 2 level of lifting pedestal for facilitating carrying, the lifting pedestal 2 Two parallel lifting sliding rails 26 are equipped with, is slidably fitted on the two lifting sliding rails 26 and matches with the lifting sliding rail 26 respectively The lifting slide 3 of conjunction.Lifting armstand 4, the two lifting armstands are equipped with by folding device respectively on the two lifting slides 3 Slinging beam 6 is equipped with by transverse beam installation apparatus 5 between 4 top.
Lifting pedestal 2 includes two lifting stringers 21 disposed in parallel described in the present embodiment, between the two lifting stringers 21 Equipped with Extensible connection device 23, mechanism 22 is dragged described in one end setting of the lifting stringer 21, is dragged described in the present embodiment signal Telephone-moving structure 22 includes movable pulley, and the other end is arranged the pedestal levelling mechanism 24, institute is respectively set on each lifting stringer 21 State lifting sliding rail 26.By the spacing of the lifting stringer 21 of the Extensible connection device 23 adjustable two, facilitate adaptation different The slinging work of specification well lid 11.The Extensible connection device 23 includes the connection being fixed on each lifting stringer 21 Two connecting cross beams 231, the institutes on the two lifting stringers 21 are at least arranged on each lifting stringer 21 for crossbeam 231 Connecting cross beam 231 is stated to be arranged in a one-to-one correspondence, between two connecting cross beams 231 of corresponding relationship pass through telescopic adjustment bolt 233 are connected with jointly and are telescopically connected to beam 232, at two connecting cross beams 231 of corresponding relationship it is at least one of be equipped with it is several with The corresponding telescopic adjustment hole 234 of the telescopic adjustment bolt 233.The present embodiment illustrates that two are arranged on each lifting stringer 21 The connecting cross beam 231, one is located at 21 middle part of lifting stringer, and one is located remotely from described one end for dragging mechanism 22. It is telescopically connected to described in the present embodiment signal on beam 232 and each connecting cross beam 231 and is all connected with two telescopic adjustment bolts 233, it is correspondingly connected with by the telescopic adjustment bolt 233 from the different telescopic adjustment holes 234 on the connecting cross beam 231 To change the spacing of the two lifting stringers 21, realization Telescopic.To improve the whole intensity of the lifting pedestal 2, this reality It applies 231 width direction of connecting cross beam in the middle part of example to be horizontally disposed with, 231 width direction of connecting cross beam described in end is vertically arranged. The connecting cross beam 231, described those skilled in the art that are set as being telescopically connected to beam 232 hold very much according to description and attached drawing signal It easily obtains, is not described in detail herein.Pulling handle 25 is arranged in the present embodiment on the connecting cross beam 231 described in end, cooperation It is described to drag the mobile the present embodiment of mechanism 22.
The width adjusting of the Extensible connection device 23 is cooperated to act on, the transverse beam installation apparatus 5 includes being fixed at The crossbeam mounting cylinder 51 at each 4 top of lifting armstand, the present embodiment illustrate the slinging beam 6 for rod-like structure, and described Hanging crossbeam 6 can slide in the crossbeam mounting cylinder 51, and radial screw thread is equipped with crossbeam and holds out against spiral shell on the crossbeam mounting cylinder 51 Bolt 52 is fixed the slinging beam 6 by the crossbeam puller bolt 52, prevents its axial activity and circumferentially rotates, The both ends of the slinging beam 6 stretch out the two crossbeam mounting cylinders 51 respectively and are equipped with flexible lengthening section 62, when two liftings are vertical When 21 spacing of beam adjusts, the crossbeam puller bolt 52 is loosened, generates the two crossbeam mounting cylinders 51 with the slinging beam 6 Opposite sliding after reaching required position, tightens institute so that the width adjusting of the Extensible connection device 23 be cooperated to act on again State crossbeam puller bolt 52.
The pedestal levelling mechanism 24 includes being fixed at the lifting pedestal 2 and dragging mechanism 22 described in being located remotely from The leveling fixing seat 241 of one end, for the present embodiment, the leveling fixing seat 241 is to be fixed on the connection of end On crossbeam 231.Vertical rotating is equipped with leveling swing rod 242 in the leveling fixing seat 241, slides on the leveling swing rod 242 Dynamic to be equipped with telescopic outrigger 248, the leveling swing rod 242 is equipped with flexible leveling positioning pin, and the telescopic outrigger 248 is equipped with Several flexible leveling adjustment holes corresponding with the flexible leveling positioning pin;Pass through the flexible leveling positioning pin and different institutes The flexible corresponding installation of leveling adjustment hole is stated, realizes the flexible leveling of the telescopic outrigger 248.The bottom end of the telescopic outrigger 248 Swingable buttress 249 is installed, the present embodiment illustrates the swing of the buttress 249 to be the swing formed after hingedly installing, this Sample is suitable in the leveling swing rod 242 in different angle, and the buttress 249 can steadily pier lean against on bottom surface, while It is suitable for influence of the ground of out-of-flatness to leveling support, the present embodiment is made to adapt to the more complicated circumferentially face rings of kiln well 1 Border.It slides axially to be equipped with along shaft in the leveling fixing seat 241 and swings position block 243, the leveling swing rod 242 turns Dynamic installation end is circumferentially arranged with several swing locating grooves 244 corresponding with the swing position block 243, the swing positioning Block 243 is connected with return device and return limiting device.
The return device includes the return connecting rod being connected on the swing position block 243, the return Connecting rod stretches out the leveling fixing seat 241 and is fixedly connected with unfreezing pressing plate 245, the unfreezing pressing plate 245 and the tune Return force application spring 246 is equipped between flat fixing seat 241, the return limiting device includes being arranged in the swing position block Return retention bead 247 on 243.The swing position block 243 is in the return force application spring 246 and institute under normal condition It states under return retention bead 247 acts on and is stuck on a certain the swings locating groove 244, when the pressing unfreezing pressing plate 245, After so that the swing position block 243 is detached from the swing locating groove 244, the leveling swing rod 242 be can be rotated, rotation To after required angle, unclamping the unfreezing pressing plate 245 is stuck in it on another swing locating groove 244, thus complete It is not only simple but also quick at the operation of the pedestal levelling mechanism 24.Leveling fixing seat 241 described in the present embodiment is arranged swing rod and keeps away Allow mouth, the leveling swing rod 242 can be adjusted to from level cooperates the retractable support of the telescopic outrigger 248 to act on vertically, this implementation The example pedestal levelling mechanism 24 is suitable for various Different Ground situations.
The lifting sliding rail 26 is cylinder line slide rail, and the lifting slide 3 includes that at least two series connection are slidably mounted on Linear slider 31 on the cylinder line slide rail and with cylinder line slide rail cooperation, at least two linear sliders 31 are total With slide connection frame 32 is fixedly connected with, the present embodiment illustrates three linear sliders 31 to be fixedly connected with the slide company jointly Frame 32 is connect, the slide connection frame 32 installs the lifting armstand 4 by the folding device.Pass through the linear slider 31 Series connection increases the length of lifting 3 sliding slot of slide, and structural member processing cost can be reduced while improving sliding stability.Institute Cylinder line slide rail and linear slider engaged therewith 31 are stated as common well-known technique on the market, details are not described herein.
The folding device includes the folding swivel pin 33 being arranged on the lifting slide 3, is set in the lifting armstand 4 There is folding hinge hole corresponding with the folding swivel pin 33.Described 33 the present embodiment of folding swivel pin is illustrated as light pin, both ends Aperture is limited with facilitating with spacer pins such as split pin or D-shaped pins, and the present embodiment is used to wind in the hole of wherein one end and be changed The mode of position drawstring 34, the transposition drawstring 34 can maintain easily personnel and replace to the pulling for the well lid 11 sling, while can subtract The use of few spacer pin, saves cost.It is located at right above the folding swivel pin 33 on the lifting slide 3 or underface can Disassembly, which is equipped with, erects positioning pin 35, and the present embodiment signal, which is located at right above the folding swivel pin 33, installs the standing positioning Pin 35, the lifting armstand 4 are equipped with standing location hole corresponding with the standing positioning pin 35.Institute is realized by the way that two pins are fixed The standing of lifting armstand 4 is stated, it is when not in use, removable to lay down the standing positioning pin 35, the lifting armstand 4 is laid flat, is dropped Low the present embodiment entirety height of C.G., walking easy to remove.Standing positioning pin 35 described in the present embodiment is also light latch structure, wherein One end opens up hole and is equipped with snap ring, which can be rigid structure, or flexible structure, and the snap ring can directly cover It is connected on the transposition drawstring 34 or using rope, even if when being movably walking, also there is no concern that it is lost.
Lifting armstand 4 described in the present embodiment is equipped with accessory mounting rack 41, can be used for installing respirator, inflator pump, flashlight The undergrounds auxiliary tools etc. such as cylinder, these tools are the well-known technique that those skilled in the art would know that, details are not described herein and It is not shown in the figure.
Be slidably fitted with the two connecting rod slides 63 being oppositely arranged on the slinging beam 6, the two connecting rod slides 63 it is upper Side is equipped with upper force seat 7, upper connecting rod 64 has been respectively articulated between the two connecting rod slides 63 and the upper force seat 7, described in two The lower section of connecting rod slide 63 is equipped with lower force seat 8, has been respectively articulated with down between the two connecting rod slides 63 and the lower force seat 8 Connecting rod 65, is rotatably equipped with lifting screw rod 74 on the upper force seat 7, the lower force seat 8 equipped with and the lifting screw rod 74 corresponding lifting swivel nuts, are equipped on the upper force seat 7 and the manipulation device that connect of lifting screw rod 74.Two it is described on Connecting rod 64 and two lower links 65 form quadrilateral structure, when the lifting screw rod 74 is rotated by driving, the upper force Seat 7 and lower 8 distance of force seat change, i.e. two vertex distances of quadrangle change, thus realize lift by crane or It puts down;The two connecting rod slides 63 can produce opposite distance change, and under the guiding role of the slinging beam 6, generate It moves horizontally.In the process, the unilateral upper connecting rod 64 and the lower link 65 form triangle and stablize support.
Upper force seat 7 described in the present embodiment include with the two common hinged upper guiding axis 71 of the upper connecting rods 64, it is described on Manipulation mounting base 72 is installed on guiding axis 71, the lifting screw rod 74 and manipulation dress are installed in the manipulation mounting base 72 It sets;The lower force seat 8 include with the common hinged lower guiding axis 81 of two lower links 65, run through on the lower guiding axis 81 Equipped with lifting screw hole 811, the lifting screw hole 811 formed it is described lifting swivel nut inner hole, the upper guiding axis 71 be equipped with The corresponding screw rod of the lifting screw rod 74 is oriented to via hole 711.The overall structure of lifting part is simplified by above structure, favorably In mitigating weight, it is moved easily.
Lifting screw rod 74 described in the present embodiment is located at the medium position of the upper connecting rod 64 and the lower link 65, so The slinging beam 6 is equipped with screw rod relief portion 61, and the present embodiment illustrates the screw rod relief portion 61 to be to be arranged in the lifting Screw rod on crossbeam 6 avoids ring, and the lifting screw rod 74 passes through the inner hole setting of screw rod evacuation ring, the screw rod relief portion 61 while keeping 6 globality of slinging beam, does not interfere the regular event of the lifting screw rod 74, in addition, also as The stationarity of the slinging beam 6, the screw rod relief portion 61 can be such that the lifting screw rod 74 has and certain incline also to be fixed Rake angle is adapted to the slightly offset of lifting position with this, is also prevented from the lifting screw rod 74 and excessively rotates and be flipped.
The manipulation device includes the lifting speed changer 73 being arranged on the upper force seat 7, for the present embodiment, The lifting speed changer 73 is arranged in the manipulation mounting base 72.It is described lifting speed changer 73 output shaft with described It hangs screw rod 74 to be fixedly connected with one heart, the input shaft of the lifting speed changer 73 is fixedly connected with manipulation connector 75, the manipulation The bull stick diameter that connector 75 is equipped with the electronic interconnecting piece 751 that can be connect with electric wrench and can connect with rotation operating stick To mounting hole 752.The present embodiment illustrates the electronic interconnecting piece 751 to be square hole, and the cutter head of corresponding electric wrench is rectangular Axis, when the cutter head of electric wrench is the casing of square inner bore, the electronic interconnecting piece 751 should be square protruding.It is pulled electronic The cutter head of hand is inserted into the electronic interconnecting piece 751, the rotation of screw rod 74 can be lifted by crane described in fast driving after starting, to realize fast Speed lifting, there are positive and negative rotation switching, this sample embodiments, and quick set-down equally can be achieved for certain electric wrench.The bull stick is radial Mounting hole 752 is illustrated as through-hole, and can be inserted into rotation operating stick can be inconvenient to grasp by manually being driven in the electric wrench When vertical, using manually carrying out some operations.The rotation operating stick is one of common tool of maintenance personnel, no longer superfluous herein It states.In addition, gravity can apply biggish resistance to the screw thread on the lifting screw rod 74, so directly because 11 weight of well lid is big The driving lifting screw rod 74 is connect, required force can be bigger, therefore the present embodiment increases the lifting speed changer 73, though It reduces a part and promotes speed, but greatly reduce required force, driven convenient for electric wrench.
Well lid hanging device 9 is installed, the well lid hanging device 9 includes at least two connections on the lower force seat 8 Mounting ring 91 on the lower force seat 8, mounting ring 91 described in the present embodiment set there are two and two mounting rings 91 be The both ends of the lower guiding axis 81 are connected to, are connected separately with hitch bar 92, the hitch bar on the mounting ring 91 92 bottom end is connected with hook.The present embodiment is illustrated with circular well lid 11, and two through holes, ability are arranged on well lid 11 Field technique personnel will recognize, for the well lid 11 set there are four through hole, the present embodiment can be by increasing the mounting The mode of bar 92 and the hook carry out using, can also be applied certainly for rectangular 11 the present embodiment of well lid, these The structure change of the well lid hanging device 9 all should be within that scope of the present invention.
The application method of the present embodiment are as follows: the present embodiment is moved to kiln Jing1Chu, the two lifting stringers 21 are rested against Kiln well 1 if two 21 width of the lifting stringer are excessive or too small, preferentially adjusts its spacing along upper;Described in being adjusted after seating against 242 expanded angle of swing rod is leveled, the telescopic outrigger 248 is also transferred to appropriate length, until the buttress 249 is effectively propped up Support, the lifting armstand 4 is erected, manually pulls the transposition drawstring 34 that the well lid hanging device 9 is made to be located at well lid 11 just The cutter head of electric wrench is inserted into the electronic interconnecting piece 751, declines the well lid hanging device 9 after unlatching by top, until Two hooks can hook two perforation hole sites of well lid 11, electric wrench is adjusted to reversion, well lid 11 is lifted, waits and hang Certain altitude is played, electric wrench is stopped and is extracted, the transposition drawstring 34 is manually pulled, makes well lid 11 far from kiln well 1, safeguards people Member can carry out underground maintenance work, and the transposition drawstring 34 is prevented at the same time as the structure to the lifting slide 3 binding positioning Only it slides back to kiln Jing1Chu, causes unexpected generation;When well lid 11 need to be put back to, need to only be carried out by opposite action.
The present embodiment is by the upper connecting rod 64 and the lower link 65, to the lifting screw rod 74 and its connection structure shape Stablize strut angle support at three shapes, structure is relatively reliable, can effectively avoid 11 weight bring malformation of well lid;Support is reliable Property raising facilitate the lifting screw rod 74 to borrow the power of electric wrench, can accelerate lifting process, improve lifting efficiency.This reality It is easy to operate to apply example, it is convenient to lift by crane, and can be widely used for the kiln well lid slinging work in each field, has biggish economic value and society It can be worth.
The above shows and describes the basic principle, main features and advantages of the invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (10)

1. the convenient boom hoisting of kiln well lid, including lifting pedestal, it is characterised in that: the lifting pedestal, which is equipped with, facilitates carrying It drags mechanism and adjusts the pedestal levelling mechanism of the lifting pedestal level, the lifting pedestal is equipped with two parallel liftings Sliding rail, is slidably fitted on the two lifting sliding rails and the lifting slide of the lifting sliding rail cooperation respectively, two liftings cunnings Lifting armstand is equipped with by folding device respectively on seat, is pacified between the top of the two lifting armstands by transverse beam installation apparatus Equipped with slinging beam, be slidably fitted with the two connecting rod slides being oppositely arranged on the slinging beam, the two connecting rod slides it is upper Side is equipped with upper force seat, and upper connecting rod has been respectively articulated between the two connecting rod slides and the upper force seat, and two connecting rods are sliding The lower section of seat is equipped with lower force seat, has been respectively articulated with lower link between the two connecting rod slides and the lower force seat, it is described on Lifting screw rod is rotatably equipped on force seat, the lower force seat is equipped with lifting swivel nut corresponding with the lifting screw rod, institute State the manipulation device for being equipped on force seat and connecting with the lifting screw rod;Well lid mounting dress is installed on the lower force seat It sets.
2. the convenient boom hoisting of kiln well lid as described in claim 1, it is characterised in that: the manipulation device includes being arranged in institute State the lifting speed changer on force seat, the output shaft of the lifting speed changer with the lifting screw rod is concentric is fixedly connected, institute The input shaft for stating lifting speed changer is fixedly connected with manipulation connector, and the manipulation connector is equipped with and can connect with electric wrench Electronic interconnecting piece and can be with the bull stick radially installed hole that connect of rotation operating stick.
3. the convenient boom hoisting of kiln well lid as described in claim 1, it is characterised in that: the upper force seat include with described in two The common hinged upper guiding axis of upper connecting rod is equipped with manipulation mounting base on the upper guiding axis, installs in the manipulation mounting base The lifting screw rod and the manipulation device;The lower force seat include with the common hinged lower guiding axis of two lower links, Through lifting screw hole is equipped on the lower guiding axis, the lifting screw hole forms the inner hole of the lifting swivel nut, the upper guiding Axis is equipped with screw rod corresponding with the lifting screw rod and is oriented to via hole.
4. the convenient boom hoisting of kiln well lid as described in claim 1, it is characterised in that: the slinging beam is kept away equipped with screw rod Allow portion.
5. the convenient boom hoisting of kiln well lid as described in claim 1, it is characterised in that: the pedestal levelling mechanism includes fixing The lifting pedestal is set and is located remotely from the leveling fixing seat for dragging mechanism one end, it is vertical in the leveling fixing seat It is rotatably equipped with leveling swing rod, telescopic outrigger is slidably fitted on the leveling swing rod, the leveling swing rod is equipped with flexible adjust Flat positioning pin, the telescopic outrigger are equipped with several flexible leveling adjustment holes corresponding with the flexible leveling positioning pin;It is described The bottom end of telescopic outrigger is equipped with swingable buttress;It slides axially in the leveling fixing seat along shaft and swing positioning is installed Block, the rotational installation end of the leveling swing rod is circumferentially arranged with several swing positioning cards corresponding with the swing position block Slot, the swing position block are connected with return device and return limiting device.
6. the convenient boom hoisting of kiln well lid as described in claim 1, it is characterised in that: the lifting pedestal is set in parallel including two The lifting stringer set is equipped with Extensible connection device between the two lifting stringers, drags described in one end setting of the lifting stringer The pedestal levelling mechanism is arranged in telephone-moving structure, the other end;The lifting sliding rail is respectively set on each lifting stringer;The cross Beam mounting device includes the crossbeam mounting cylinder being fixed at the top of each lifting armstand, radial spiral shell on the crossbeam mounting cylinder Line is equipped with crossbeam puller bolt, and the both ends of the slinging beam stretch out the two crossbeam mounting cylinders respectively and are equipped with flexible lengthen Section.
7. the convenient boom hoisting of kiln well lid as claimed in claim 6, it is characterised in that: the Extensible connection device includes fixing Connecting cross beam on each lifting stringer is set, two connecting cross beams are at least set on each lifting stringer, two The connecting cross beam on the lifting stringer is arranged in a one-to-one correspondence, and is stretched at passing through between two connecting cross beams of corresponding relationship Contracting adjusts bolt and is connected with jointly and is telescopically connected to beam, at two connecting cross beams of corresponding relationship it is at least one of be equipped with it is several with The corresponding telescopic adjustment hole of the telescopic adjustment bolt.
8. the convenient boom hoisting of kiln well lid as described in claim 1, it is characterised in that: the lifting sliding rail is sliding for cylinder straight line Rail, the lifting slide include that at least two series connection are slidably mounted on the cylinder line slide rail and slide with the cylinder straight line The linear slider of rail cooperation, at least two linear sliders are fixedly connected with slide connection frame jointly, and the slide connection frame is logical It crosses the folding device and the lifting armstand is installed.
9. the convenient boom hoisting of kiln well lid as described in claim 1, it is characterised in that: the folding device includes being arranged in institute The folding swivel pin on lifting slide is stated, the lifting armstand is equipped with folding hinge hole corresponding with the folding swivel pin; It is located at foldings swivel pin surface on the lifting slide or underface is detachably equipped with standing positioning pin, described Armstand is hung equipped with standing location hole corresponding with the standing positioning pin.
10. the convenient boom hoisting of kiln well lid as described in claim 1 to 9 any claim, it is characterised in that: the well lid Hanging device includes at least two mounting rings being connected on the lower force seat, is connected separately with mounting on the mounting ring The bottom end of bar, the hitch bar is connected with hook.
CN201910198181.6A 2019-03-15 2019-03-15 The convenient boom hoisting of kiln well lid Withdrawn CN109761174A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910198181.6A CN109761174A (en) 2019-03-15 2019-03-15 The convenient boom hoisting of kiln well lid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910198181.6A CN109761174A (en) 2019-03-15 2019-03-15 The convenient boom hoisting of kiln well lid

Publications (1)

Publication Number Publication Date
CN109761174A true CN109761174A (en) 2019-05-17

Family

ID=66458998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910198181.6A Withdrawn CN109761174A (en) 2019-03-15 2019-03-15 The convenient boom hoisting of kiln well lid

Country Status (1)

Country Link
CN (1) CN109761174A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110562894A (en) * 2019-09-02 2019-12-13 国网山东省电力公司潍坊供电公司 Cable trench inspection method
CN110577088A (en) * 2019-09-06 2019-12-17 安徽省飞龙新型材料有限公司 Well lid hoisting device and hoisting method thereof
CN111762735A (en) * 2020-07-01 2020-10-13 广东电网有限责任公司 Hoisting mechanism and cover plate hoisting device
CN113718857A (en) * 2021-09-03 2021-11-30 湖南东泉铸造有限公司 Double-hole double-cover nodular cast iron well lid and assembling device thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110562894A (en) * 2019-09-02 2019-12-13 国网山东省电力公司潍坊供电公司 Cable trench inspection method
CN110577088A (en) * 2019-09-06 2019-12-17 安徽省飞龙新型材料有限公司 Well lid hoisting device and hoisting method thereof
CN111762735A (en) * 2020-07-01 2020-10-13 广东电网有限责任公司 Hoisting mechanism and cover plate hoisting device
CN113718857A (en) * 2021-09-03 2021-11-30 湖南东泉铸造有限公司 Double-hole double-cover nodular cast iron well lid and assembling device thereof
CN113718857B (en) * 2021-09-03 2022-09-27 湖南东泉铸造有限公司 Double-hole double-cover nodular cast iron well lid and assembling device thereof

Similar Documents

Publication Publication Date Title
CN109761174A (en) The convenient boom hoisting of kiln well lid
CN106393026A (en) Tool kit for electrician
CN109052271A (en) The portable safe boom hoisting of well lid
CN205977246U (en) Tunnel bow member installation mechanism
CN207861747U (en) Precast concrete block trolley
CN113006726B (en) Adjustable lifting device for rapidly grabbing and dragging reinforcement cage in slurry hole
CN209602049U (en) The convenient boom hoisting of kiln well lid
KR20130000407U (en) Jib crane
CN208700448U (en) Anti- high wind derrick crane pylon
CN204474191U (en) The jib body dumping mechanism of tower crane
CN217281825U (en) Support frame for automatic maintenance of power dispatching
CN109823958A (en) It is a kind of applied in engineering management suspending hook apart from adjustment structure
CN110056176A (en) A kind of elevator mobile platform and application method
CN213569142U (en) High lifting machine of security for civil engineering
CN208995097U (en) The portable safe boom hoisting of well lid
CN209339580U (en) A kind of Telescopic folding elevator regularization operating platform
CN210885011U (en) Multifunctional crane assembled on forklift
CN205901178U (en) Concrete pole tower overhead earth wire hoisting device
CN219823498U (en) Pulley lifting device for weight of belt conveyor
CN214989699U (en) Wind-powered electricity generation anchor slab flange hoist and mount frock
CN208292549U (en) A kind of high pedestal jib crane lifting rope securing device
CN220056020U (en) Automatic unhooking hanger
CN213037291U (en) Simple hoisting equipment for house building construction
CN213326333U (en) Safety anti-falling mechanism in hoisting process of tower crane
CN210885047U (en) Garbage grab bridge crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190517

WW01 Invention patent application withdrawn after publication