CN108561888A CN201810677315.8A CN201810677315A CN108561888A CN 108561888 A CN108561888 A CN 108561888A CN 201810677315 A CN201810677315 A CN 201810677315A CN 108561888 A CN108561888 A CN 108561888A
Authority
CN
China
Prior art keywords
sludge
conveyer belt
power plant
coal
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810677315.8A
Other languages
Chinese (zh)
Inventor
王明传
李德波
冯炳全
周小川
蒋勇军
徐兵
刘少杰
胡波
冯永新
湛志钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Electric Power Design Institute
Original Assignee
Guangdong Electric Power Design Institute
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute, Guangdong Power Grid Co Ltd filed Critical Guangdong Electric Power Design Institute
Priority to CN201810677315.8A priority Critical patent/CN108561888A/en
Publication of CN108561888A publication Critical patent/CN108561888A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G7/00Incinerators or other apparatus for consuming industrial waste, e.g. chemicals
    • F23G7/001Incinerators or other apparatus for consuming industrial waste, e.g. chemicals for sludges or waste products from water treatment installations
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/44Details; Accessories
    • F23G5/442Waste feed arrangements
    • F23G5/444Waste feed arrangements for solid waste
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2201/00Pretreatment
    • F23G2201/70Blending
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2205/00Waste feed arrangements
    • F23G2205/12Waste feed arrangements using conveyors
    • F23G2205/122Belt conveyor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2209/00Specific waste
    • F23G2209/12Sludge, slurries or mixtures of liquids
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/12Heat utilisation in combustion or incineration of waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Gasification And Melting Of Waste (AREA)

Abstract

The invention discloses a kind of coal-burning power plant's sludge co-combustion systems, including hopper, storage bin, the first oscillating feeder, the second oscillating feeder, first conveyer belt and the second conveyer belt.Hopper is used to collect the sludge that dummy car transport comes;First conveyer belt is for transporting sludge to storage bin;Storage bin is for storing sludge, the discharge port connection of feeding mouth and first conveyer belt;Second is used for conveyer belt in sludge is transported to boiler of power plant;First oscillating feeder and the second oscillating feeder are used for rationed sludge, and the first oscillating feeder is set between hopper discharge port and first conveyer belt feeding mouth, and the second oscillating feeder is set between storing bin discharge port external and the second conveyer belt feeding mouth.Sludge co-combustion system in coal-burning power plant's disclosed by the invention can unload sludge in discharging storage workshop, and finally transport sludge and mix burning into boiler, complete the integrated process of sludge unloading, storage and feeding.

Description

A kind of coal-burning power plant's sludge co-combustion system
Technical field
The present invention relates to sludge blending and burning technology fields, more specifically to a kind of coal-burning power plant's sludge co-combustion system.
Background technology
Sewage treatment plant will produce a large amount of sludge during treated sewage, and sludge carries out landfill and will produce secondary dirt Dye, and after sludge is carried out mixed burning according to a certain percentage with fire coal, dioxin, nitrogen oxides, sulfide and the lead of discharge, The pollutants such as cadmium, mercury are less;It simultaneously during burning, can be generated electricity using the calorific value of sludge, realize solid waste The recovery energy of object solves the problems, such as sludge bulk deposition.
In conclusion how to provide it is a kind of sludge can be mixed the coal-burning power plant's sludge burnt in boiler of power plant mix burning system System, is a problem to be solved by those skilled in the art.
Invention content
In view of this, the object of the present invention is to provide a kind of coal-burning power plant's sludge co-combustion system, it can be by sewage treatment plant The sludge of generation is transported to the coal handling system of power plant, and is finally transported to the boiler of power plant and carried out mixing burning.
To achieve the goals above, the present invention provides the following technical solutions:
A kind of coal-burning power plant's sludge co-combustion system, including:
Hopper for collecting the sludge that dummy car transport comes;
For quantitatively distributing the sludge in the hopper to the first oscillating feeder of first conveyer belt, described first The feeding mouth of oscillating feeder is connect with the discharge port of the hopper, the discharge port of first oscillating feeder and described first The feeding mouth of conveyer belt connects;
For transporting sludge to the first conveyer belt of storage bin;
Storage bin for storing sludge, feeding mouth are connect with the discharge port of the first conveyer belt;
Second oscillating feeder, feeding mouth are connect with the discharge port of the storage bin, discharge port and the second conveyer belt Feeding mouth connection;
The second conveyer belt for sludge to be transported to boiler of power plant.
Preferably, the hopper be set to underground, between the first conveyer belt and the storage bin be equipped with can by sludge to The bucket elevator that top is promoted.
Preferably, coal-burning power plant's sludge co-combustion system is set there are two the discharging group that can work independently, each described to unload Material group includes the hopper, first oscillating feeder, the first conveyer belt and the bucket elevator, and two buckets carry The discharge port of machine is connect with the feeding mouth of the storage bin.
Preferably, the storage bin is equipped with high-order level-sensing device, low level level-sensing device and continuous material level meter.
Preferably, the top of the hopper is equipped with the truck scale for measuring the dummy car weight.
Preferably, the discharge port of second conveyer belt is equipped with T-piece splitting valve, and two of the triple valve material distributing valve go out Material mouth conveys band connection with two thirds at boiler inlet respectively.
Preferably, the first conveyer belt and second conveyer belt are all-sealed conveyer belt, are existed to avoid sludge It emits bad smell in transportational process.
Preferably, further include air draft system, the air inlet of the air draft system and coal-burning power plant's sludge co-combustion system The connection of discharging storage workshop, the pressure fan of the first gas outlet of the air draft system and boiler connects, the air draft system Second gas outlet is connected to by air blower with outdoor, and is equipped with activated carbon adsorption between the air blower and the second outlet and is filled It sets.
Preferably, the air inlet of the air draft system also with the first conveyer belt or second conveyer belt or the storage Feed bin connects.
Sludge co-combustion system in coal-burning power plant's provided by the invention includes hopper, storage bin, the first oscillating feeder, second shakes Dynamic batcher, first conveyer belt and the second conveyer belt.Hopper is used to collect the sludge that dummy car transport comes;First conveyer belt is used for Sludge is transported to storage bin;Storage bin is for storing sludge, the discharge port connection of feeding mouth and first conveyer belt;Second is defeated Send band for sludge to be transported to boiler of power plant.First oscillating feeder and the second oscillating feeder are used for rationed sludge, First oscillating feeder is set between hopper discharge port and first conveyer belt feeding mouth, and the second oscillating feeder goes out set on storage bin Between material mouth and the second conveyer belt feeding mouth.
During the work time, hopper and storage bin are independently arranged, and the sludge that transport comes is discharged in hopper by dummy car, are expected Bucket is transported sludge to storage bin by the first oscillating feeder and first conveyer belt, storage bin by the second oscillating feeder with Sludge is transported in the boiler of power plant by the second conveyer belt.The application by above-mentioned each component discharging storage workshop to sludge into Row unloading, and finally transport and carry out mixing burning into boiler, complete the integrated process of sludge unloading, storage and feeding.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the structural schematic diagram of sludge co-combustion system in coal-burning power plant's provided by the present invention.
Reference numeral in Fig. 1 is:
Discharging storage workshop 01;Hopper 1, the first oscillating feeder 2, first conveyer belt 3, bucket elevator 4, storage bin 5, second It is oscillating feeder 6, the second conveyer belt 7, T-piece splitting valve 8, air draft system 9, air blower 10, activated carbon adsorption device 11, continuous Level-sensing device 12, high-order level-sensing device 13, low level level-sensing device 14, third conveyer belt 15.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Core of the invention is to provide a kind of coal-burning power plant's sludge co-combustion system, the sludge that can generate sewage treatment plant It transports to the coal handling system of power plant, and finally transports to the boiler of power plant and carry out mixing burning.
Referring to FIG. 1, Fig. 1 is the structural schematic diagram of sludge co-combustion system in coal-burning power plant's provided by the present invention.
The present invention provides a kind of coal-burning power plant's sludge co-combustion system, including hopper 1, storage bin 5, first conveyer belt 3, second Conveyer belt 7, the first oscillating feeder 2 and the second oscillating feeder 6;Hopper 1 is used to collect the sludge that dummy car transport comes;First Conveyer belt 3 is used to from hopper 1 transport sludge to storage bin 5;Storage bin 5 is for storing sludge, feeding mouth and the first conveying It is connected with 3 discharge port;Second conveyer belt 7 is used to sludge being transported to boiler of power plant.First oscillating feeder and the second vibration Batcher 6 for evenly distributing sludge, the first oscillating feeder 2 be set to 1 discharge port of hopper and 3 feeding mouth of first conveyer belt it Between, the second oscillating feeder 6 is set between 7 feeding mouth of 5 discharge port of storage bin and the second conveyer belt.
Specifically, hopper 1, storage bin 5, first conveyer belt 3, the second conveyer belt 7, the first oscillating feeder 2 and second shake The components such as dynamic batcher 6 are arranged in discharging storage workshop 01, while discharging storage workshop 01 is provided with unloading for dummy car Position, dummy car are parked to the unloading for unloading parking stall progress sludge.
Storage bin 5 and hopper 1 are independently arranged, and hopper 1 is mainly used for tentatively storing the sludge that dummy car transport comes, Then first conveyer belt 3 transports the sludge in hopper 1 into storage bin 5.5 inside of storage bin can store sludge, and it is stored Sludge directly docked with the boiler of power plant.
First oscillating feeder 2 and the second oscillating feeder 6 are separately positioned on first conveyer belt 3 and the second conveyer belt 7 At feeding mouth, the first oscillating feeder 2 and the second oscillating feeder 6 are under the driving of respective motor, dirt that top is fallen Mud carries out quantitative, uniform distribution, to make the dropping down onto in corresponding conveyer belt of sludge continuous uniform.
It should be noted that the second oscillating feeder 6 needs to adjust output feelings according to the sludge quantity needed for burning actually is mixed Condition makes sludge mixture proportion meet the requirements.In addition, belted electronic balance and calibration equipment can be arranged in the second conveyer belt 7, to protect Barrier sludge mixes the accuracy of burning amount.
During the work time, the sludge that transport comes is discharged in hopper 1 by dummy car, and hopper 1 passes through the first vibrating feed Machine 2 and first conveyer belt 3 transport sludge to storage bin 5, and storage bin 5 will by the second oscillating feeder 6 and the second conveyer belt 7 Sludge is transported in the boiler of power plant.The application unloads sludge in discharging storage workshop 01 by above-mentioned each component, and It carries out mixing burning in final transport to boiler, completes the integrated process of sludge unloading, storage and feeding.
Optionally, illumination can be arranged in conjunction with actual demand, communication, fire-fighting, overhaul for sludge co-combustion system in coal-burning power plant's Hang equal facilities.Wherein communications service specifically use can acquire and control the I/O distant stations of individual field devices signal, and lead to It crosses remote I/O matching device and I/O processors is communicated.Flushing facility can be also arranged in coal-burning power plant's sludge co-combustion system, so as to Cleaning is rinsed to 01 inside of discharging storage workshop and each component, flushing water can pass through the flushing water of dredge pump dispatch to power plant Sedimentation basin carries out subsequent processing.Optionally, the anti-blocking facility of air bubble can be arranged in storage bin 5 and hopper 1.
It should be understood that the loading capacity and quantity of dummy car need to be selected in conjunction with actual demand, if hopper 1 is daily It is 600 tons to carry out doses, and it is 30 tons of vehicle as dummy car use the loading capacity that is averaged, then needs 20 into factory's vehicle number daily Vehicle.Optionally, power-free dust-removing can be arranged at feeding mouth in the bandwidth 0.5m of first conveyer belt 3, belt speed 0.8m/s, output 60t/h Deflector chute.Optionally, the dischargeable capacity of storage bin 5 is 200m3, if the proportion of sludge is 1.2t/m3, the capacity of storage bin 5 About 240 tons.Optionally, the total measurement (volume) of hopper 1 is 100m3
Further, the unloading of sludge is carried out in order to facilitate dummy car, while saving space, on the basis of above-described embodiment On, hopper 1 is set to underground, and being equipped between first conveyer belt 3 and storage bin 5 can be by bucket elevator 4 that sludge is promoted upward.Specifically , hopper 1 is arranged in underground, and dummy car, which is moved to the top of hopper 1 and topples over sludge downwards, can be completed unloading for sludge It carries, while the setting of hopper 1 is in underground, avoids sludge square accumulation on the ground, save space.In addition, due to storage bin 5 Setting on the ground side, in order to by sludge from the storage bin 5 on 1 internal forwarding to ground of hopper of underground, in first conveyer belt 3 Bucket elevator 4 is set between storage bin 5, and sludge is lifted and be finally transported to storage bin 5 and stored by bucket elevator 4.
Further, sludge co-combustion system in coal-burning power plant's sets that there are two the discharging group that can work independently, each discharging groups Include hopper 1, the first oscillating feeder 2, first conveyer belt 3 and bucket elevator 4, the discharge port of two bucket elevators 4 is and storing The feeding mouth in storehouse 5 connects.Specifically, the transport of dewatered sludge and storing process arrange that coal-burning power plant's sludge mixes burning using two-way System is arranged altogether there are two discharging group.Under normal circumstances, two discharging groups are run simultaneously is unloaded and is transported to sludge;And two A discharging group can be spare each other, when one of discharging group breaks down or there are when other special circumstances, a discharging group Isolated operation can also meet system requirements.
Optionally, in order to monitor the sludge amount of storage inside storage bin 5, storage bin 5 is equipped with high-order level-sensing device 13, low level material Position meter 14 and continuous material level meter 12.Specifically, continuous material level meter 12 is arranged on the top of storage bin 5, for monitoring sludge in real time Amount of storage;High-order level-sensing device 13 and low level level-sensing device 14 are for the situation inside periodic monitor storage bin 5.
Optionally, dummy car is managed for convenience, in a specific embodiment provided by the present application, hopper 1 Top is equipped with the truck scale for measuring dummy car weight.Truck scale is specifically located above hopper 1 and unloads parking stall, and truck scale is set It is equipped with weight sensor, to carry out Weighing to dummy car, detects the sludge quantity that the transport of each dummy car comes.Truck scale Operation principle and structure can refer to the prior art.
Optionally, it is contemplated that the setting of boiler of power plant inlet is there are two third conveyer belt 15, in the present embodiment, the second conveying Be equipped with T-piece splitting valve 8 with 7 discharge port, two discharge ports of triple valve material distributing valve respectively with two thirds at boiler inlet Conveyer belt 15 connects.Specifically, T-piece splitting valve 8 to the second conveyer belt 7 transport come sludge be allocated after, using itself Two discharge ports export sludge, realize the transportational process of sludge.It shakes in addition, the coal spout of third conveyer belt 15 can also be arranged Anti- locking device is moved, to avoid coal breakage blockage.
Further, in order to avoid sludge emits bad smell in transportational process to outside, in any one above-mentioned embodiment On the basis of, first conveyer belt 3 and the second conveyer belt 7 are all-sealed conveyer belt.Specifically, in view of sludge will produce less Odorant pollutant is measured, be easy to cause plant area's pollution, therefore first conveyer belt 3 and the second conveyer belt 7 use total closed type structure, only The feeding mouth of first conveyer belt 3 and discharge port are connected to each other with the first oscillating feeder 2 and bucket elevator 4 respectively, and the first conveying Band 3 then makes sludge be in enclosure space in transportational process, to avoid sludge from emitting bad smell.Second conveyer belt, 7 situation phase Together, it is not repeating herein.
In order to further mitigate the pollution in discharging storage workshop 01, on the basis of any one above-mentioned embodiment, combustion Coal-fired plant's sludge co-combustion system further includes air draft system 9, the air inlet of air draft system 9 and unloading for coal-burning power plant's sludge co-combustion system Expect that storage workshop 01 connects, the first gas outlet of air draft system 9 and the pressure fan of boiler connect, the second outlet of air draft system 9 Mouth is connected to by air blower 10 with outdoor, and activated carbon adsorption device 11 is equipped between air blower 10 and second outlet.
Specifically, air draft system 9 specifically includes the components such as air blower 10, air inlet and the discharging of air draft system 9 store vehicle Between 01 connection, to being extracted to the air inside discharging storage workshop 01.Boiler is commonly equipped with pressure fan, after extraction Air can be entered in the boiler of power plant by the first gas outlet and pressure fan, mix burning with sludge in donkey boiler and coal-fired. Air after extraction can also drain into outdoor environment by the second gas outlet, it is possible to understand that, the sky in discharging storage workshop 01 Gas needs to be cleared up using activated carbon adsorption device 11 or other devices before being expelled to outdoor, removes the peculiar smell in gas, keeps away Exempt to cause environmental pollution.
Optionally, the air inlet of air draft system 9 is also connect with first conveyer belt 3 or the second conveyer belt 7 or storage bin 5.By It is all made of enclosed construction in first conveyer belt 3 and the second conveyer belt 7, inner air is easy to be influenced by sludge, while closed Air in space is inevitably leaked by feeding mouth and discharge port to discharging storage workshop 01.Therefore air draft system 9 can also lead to It crosses associated pipe to connect with first conveyer belt 3, the second conveyer belt 7, so that the two is formed tiny structure, to avoid first conveyer belt 3 It is escaped with the peculiar smell in the enclosure space of the second conveyer belt 7.The air inlet of air draft system 8 can also be connect with storage bin 5, make storage Feed bin 5 is in micro-vacuum state, avoids distributing for peculiar smell.
It should be understood that during sludge is transported to boiler and carries out mixing burning, boiler can scavenge to outside, It usually requires to be dusted exhaust gas and desulfurization process in actual production process.Such as can specifically use low-carbon combustion device and SCR denitration is dusted processing using electrostatic precipitator and wet electrical dust precipitator.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other The difference of embodiment, just to refer each other for identical similar portion between each embodiment.
Sludge co-combustion system in coal-burning power plant's provided by the present invention is described in detail above.Tool used herein Principle and implementation of the present invention are described for body example, and the explanation of above example is only intended to help to understand this hair Bright method and its core concept.It should be pointed out that for those skilled in the art, not departing from the present invention , can be with several improvements and modifications are made to the present invention under the premise of principle, these improvement and modification also fall into right of the present invention It is required that protection domain in.

Claims (9)

1. a kind of coal-burning power plant's sludge co-combustion system, which is characterized in that including:
Hopper (1) for collecting the sludge that dummy car transport comes;
For quantitatively distributing the sludge in the hopper (1) to the first oscillating feeder (2) of first conveyer belt (3), institute The feeding mouth for stating the first oscillating feeder (2) is connect with the discharge port of the hopper (1), first oscillating feeder (2) Discharge port is connect with the feeding mouth of the first conveyer belt (3);
For sludge being transported to the first conveyer belt (3) of storage bin (5);
Storage bin (5) for storing sludge, feeding mouth are connect with the discharge port of the first conveyer belt (3);
Second oscillating feeder (6), feeding mouth are connect with the discharge port of the storage bin (5), discharge port and the second conveying The feeding mouth of band (7) connects;
The second conveyer belt (7) for sludge to be transported to boiler of power plant.
2. sludge co-combustion system in coal-burning power plant's according to claim 1, which is characterized in that the hopper (1) is set to underground, Being equipped between the first conveyer belt (3) and the storage bin (5) can be by bucket elevator (4) that sludge is promoted upward.
3. sludge co-combustion system in coal-burning power plant's according to claim 2, which is characterized in that coal-burning power plant's sludge mixes burning System is set there are two the discharging group that can work independently, and each discharging group is given including the hopper (1), first vibration Material machine (2), the first conveyer belt (3) and the bucket elevator (4), the discharge ports of two bucket elevators (4) with the storage The feeding mouth of feed bin (5) connects.
4. sludge co-combustion system in coal-burning power plant's according to claim 3, which is characterized in that the storage bin (5) is equipped with height Position level-sensing device (13), low level level-sensing device (14) and continuous material level meter (12).
5. sludge co-combustion system in coal-burning power plant's according to claim 4, which is characterized in that set above the hopper (1) It is useful for measuring the truck scale of the dummy car weight.
6. sludge co-combustion system in coal-burning power plant's according to claim 1, which is characterized in that second conveyer belt (7) Discharge port is equipped with T-piece splitting valve (8), two discharge ports of the triple valve material distributing valve respectively with two at boiler inlet the Three conveyer belts (15) connect.
7. coal-burning power plant's sludge co-combustion system according to claim 1~6 any one, which is characterized in that described first Conveyer belt (3) and second conveyer belt (7) are all-sealed conveyer belt, are distributed in transportational process to avoid sludge different Taste.
8. sludge co-combustion system in coal-burning power plant's according to claim 7, which is characterized in that further include air draft system (9), institute The air inlet for stating air draft system (9) is connect with the discharging storage workshop (01) of coal-burning power plant's sludge co-combustion system, the suction First gas outlet of wind system (9) and the pressure fan of boiler connect, and the second gas outlet of the air draft system (9) passes through air blower (10) it is connected to outdoor, and is equipped with activated carbon adsorption device (11) between the air blower (10) and the second outlet.
9. sludge co-combustion system in coal-burning power plant's according to claim 8, which is characterized in that the air draft system (9) into Gas port is also connect with the first conveyer belt (3) or second conveyer belt (7) or the storage bin (5).
CN201810677315.8A 2018-06-27 2018-06-27 A kind of coal-burning power plant's sludge co-combustion system Pending CN108561888A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810677315.8A CN108561888A (en) 2018-06-27 2018-06-27 A kind of coal-burning power plant's sludge co-combustion system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810677315.8A CN108561888A (en) 2018-06-27 2018-06-27 A kind of coal-burning power plant's sludge co-combustion system

Publications (1)

Publication Number Publication Date
CN108561888A true CN108561888A (en) 2018-09-21

Family

ID=63554686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810677315.8A Pending CN108561888A (en) 2018-06-27 2018-06-27 A kind of coal-burning power plant's sludge co-combustion system

Country Status (1)

Country Link
CN (1) CN108561888A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110793041A (en) * 2019-09-17 2020-02-14 中国能源建设集团广东省电力设计研究院有限公司 Sludge blending combustion system
CN111023115A (en) * 2019-12-27 2020-04-17 中国能源建设集团广东省电力设计研究院有限公司 Sludge blending combustion system of coal-fired power plant
CN111288461A (en) * 2020-04-10 2020-06-16 上海东石塘再生能源有限公司 Control system and method for controlling charging amount of sludge
CN111412478A (en) * 2020-04-10 2020-07-14 上海东石塘再生能源有限公司 Household garbage incinerator for cooperatively treating dried sludge and treatment method thereof
CN114135872A (en) * 2021-12-02 2022-03-04 上海发电设备成套设计研究院有限责任公司 Fully-closed automatic sludge feeding system device and method and application thereof
CN114505160A (en) * 2022-01-05 2022-05-17 国能龙源环保有限公司 Coal-fired boiler synergistic solid waste recycling direct doping system and working method thereof
CN115043569A (en) * 2022-06-22 2022-09-13 华能湖南岳阳发电有限责任公司 Sludge blending combustion system and method for thermal power plant

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201955663U (en) * 2010-09-16 2011-08-31 南京科律自动化设备有限公司 Intelligent control system for raw material conveying equipment
CN102730916A (en) * 2012-06-01 2012-10-17 南京国能环保工程有限公司 Treatment process of in-depth dehydration and resource utilization for sludge
CN103172233A (en) * 2013-04-03 2013-06-26 江苏华通动力重工有限公司 Blending combustion treatment device of municipal sludge and treatment method
CN105240859A (en) * 2015-10-30 2016-01-13 大连科林能源工程技术开发有限公司 Energy-self-supplying type chemical engineering sludge drying and burning system
CN208431781U (en) * 2018-06-27 2019-01-25 广东电网有限责任公司 A kind of boiler sludge co-combustion system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201955663U (en) * 2010-09-16 2011-08-31 南京科律自动化设备有限公司 Intelligent control system for raw material conveying equipment
CN102730916A (en) * 2012-06-01 2012-10-17 南京国能环保工程有限公司 Treatment process of in-depth dehydration and resource utilization for sludge
CN103172233A (en) * 2013-04-03 2013-06-26 江苏华通动力重工有限公司 Blending combustion treatment device of municipal sludge and treatment method
CN105240859A (en) * 2015-10-30 2016-01-13 大连科林能源工程技术开发有限公司 Energy-self-supplying type chemical engineering sludge drying and burning system
CN208431781U (en) * 2018-06-27 2019-01-25 广东电网有限责任公司 A kind of boiler sludge co-combustion system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国设备管理协会编: "《中国设备管理发展报告 1982-2007》", vol. 1, 30 April 2008, 北京:中国物资出版社, pages: 293 *
姬爱民等著: "《污泥热处理》", vol. 1, 31 August 2014, 北京:冶金工业出版社, pages: 135 - 136 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110793041A (en) * 2019-09-17 2020-02-14 中国能源建设集团广东省电力设计研究院有限公司 Sludge blending combustion system
CN111023115A (en) * 2019-12-27 2020-04-17 中国能源建设集团广东省电力设计研究院有限公司 Sludge blending combustion system of coal-fired power plant
CN111288461A (en) * 2020-04-10 2020-06-16 上海东石塘再生能源有限公司 Control system and method for controlling charging amount of sludge
CN111412478A (en) * 2020-04-10 2020-07-14 上海东石塘再生能源有限公司 Household garbage incinerator for cooperatively treating dried sludge and treatment method thereof
CN111412478B (en) * 2020-04-10 2021-07-30 上海东石塘再生能源有限公司 Household garbage incinerator for cooperatively treating dried sludge and treatment method thereof
CN114135872A (en) * 2021-12-02 2022-03-04 上海发电设备成套设计研究院有限责任公司 Fully-closed automatic sludge feeding system device and method and application thereof
CN114505160A (en) * 2022-01-05 2022-05-17 国能龙源环保有限公司 Coal-fired boiler synergistic solid waste recycling direct doping system and working method thereof
CN115043569A (en) * 2022-06-22 2022-09-13 华能湖南岳阳发电有限责任公司 Sludge blending combustion system and method for thermal power plant
CN115043569B (en) * 2022-06-22 2023-09-08 华能湖南岳阳发电有限责任公司 Sludge co-firing system and co-firing method for thermal power plant

Similar Documents

Publication Publication Date Title
CN108561888A (en) A kind of coal-burning power plant's sludge co-combustion system
CN105968349A (en) Chelating agent for waste incineration and application thereof
CN101310835B (en) Semi-dry method refuse burning fume cleaning treatment method and system thereof
CN102886369B (en) Multifunctional dust collection device for concrete mixing plant and bin
CN203460319U (en) Dust removing system for main building of concrete mixing station
CN208431781U (en) A kind of boiler sludge co-combustion system
JP2006248741A (en) Moisture control device and method for coal ash
KR101214822B1 (en) Apparatus for transferring the biomass fuel for mixed fuel burning
CN202542473U (en) Conveying process system for activated carbon powder body
CN209612626U (en) The calcium hydroxide accurate measurement feeding system of consumer waste incineration dry FGD process
CN109876598A (en) The technique that active carbon conveys spraying system and its purifying smoke
CN109833766A (en) A kind of novel semi-dry desulphurization calcium hydroxide charging metering system and method
CN212798753U (en) Dust remover ash discharge system
CN108438943A (en) A kind of sulphur automobile loading system in bulk and its loading method
CN205731465U (en) A kind of pulping system of lime stone slurry
CN201721912U (en) Metering control blanking chain plate type cleaning combined conveyer for blanking equipment
CN203512422U (en) Sintering flue gas desulfurized fly ash bin
CN210448720U (en) Hg and SO3Low-temperature electric dust removal system with synergistic removal function
CN2657757Y (en) Spray device of active carbon for purifying smoke of garbage incineration
CN207734780U (en) The device of adsorption cleaning processing is carried out to viscosity or flue gas containing wet dust
CN216457966U (en) Calcium-based moving bed full-dry type desulfurization dust removal device
CN102530560A (en) Activated carbon powder delivery process system
CN208115501U (en) A kind of purification device of dry fume deacidification
CN107930324A (en) The device and method of adsorption cleaning processing is carried out to viscosity or flue gas containing wet dust
CN210820249U (en) Automatic production system for water stabilizing material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200110

Address after: 510000 room 501-503, annex building, Huaye building, No.1-3, Chumo new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant after: Guangdong Electric Power Research Institute of energy technology limited liability company

Address before: 510600 No. 757 Dongfeng East Road, Guangzhou, Guangdong, Yuexiu District

Applicant before: GUANGDONG STATE GRID CO., LTD.

Applicant before: Guangdong Electric Power Research Institute of energy technology limited liability company

CB02 Change of applicant information
CB02 Change of applicant information

Address after: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000

Applicant after: China Southern Power Grid Power Technology Co.,Ltd.

Address before: Room 501-503, annex building, Huaye building, No.1-3 Chuimao new street, Xihua Road, Yuexiu District, Guangzhou City, Guangdong Province 510000

Applicant before: GUANGDONG ELECTRIC POWER SCIENCE RESEARCH INSTITUTE ENERGY TECHNOLOGY Co.,Ltd.