Invention content
In view of this, the object of the present invention is to provide a kind of coal-burning power plant's sludge co-combustion system, it can be by sewage treatment plant
The sludge of generation is transported to the coal handling system of power plant, and is finally transported to the boiler of power plant and carried out mixing burning.
To achieve the goals above, the present invention provides the following technical solutions:
A kind of coal-burning power plant's sludge co-combustion system, including:
Hopper for collecting the sludge that dummy car transport comes;
For quantitatively distributing the sludge in the hopper to the first oscillating feeder of first conveyer belt, described first
The feeding mouth of oscillating feeder is connect with the discharge port of the hopper, the discharge port of first oscillating feeder and described first
The feeding mouth of conveyer belt connects;
For transporting sludge to the first conveyer belt of storage bin;
Storage bin for storing sludge, feeding mouth are connect with the discharge port of the first conveyer belt;
Second oscillating feeder, feeding mouth are connect with the discharge port of the storage bin, discharge port and the second conveyer belt
Feeding mouth connection;
The second conveyer belt for sludge to be transported to boiler of power plant.
Preferably, the hopper be set to underground, between the first conveyer belt and the storage bin be equipped with can by sludge to
The bucket elevator that top is promoted.
Preferably, coal-burning power plant's sludge co-combustion system is set there are two the discharging group that can work independently, each described to unload
Material group includes the hopper, first oscillating feeder, the first conveyer belt and the bucket elevator, and two buckets carry
The discharge port of machine is connect with the feeding mouth of the storage bin.
Preferably, the storage bin is equipped with high-order level-sensing device, low level level-sensing device and continuous material level meter.
Preferably, the top of the hopper is equipped with the truck scale for measuring the dummy car weight.
Preferably, the discharge port of second conveyer belt is equipped with T-piece splitting valve, and two of the triple valve material distributing valve go out
Material mouth conveys band connection with two thirds at boiler inlet respectively.
Preferably, the first conveyer belt and second conveyer belt are all-sealed conveyer belt, are existed to avoid sludge
It emits bad smell in transportational process.
Preferably, further include air draft system, the air inlet of the air draft system and coal-burning power plant's sludge co-combustion system
The connection of discharging storage workshop, the pressure fan of the first gas outlet of the air draft system and boiler connects, the air draft system
Second gas outlet is connected to by air blower with outdoor, and is equipped with activated carbon adsorption between the air blower and the second outlet and is filled
It sets.
Preferably, the air inlet of the air draft system also with the first conveyer belt or second conveyer belt or the storage
Feed bin connects.
Sludge co-combustion system in coal-burning power plant's provided by the invention includes hopper, storage bin, the first oscillating feeder, second shakes
Dynamic batcher, first conveyer belt and the second conveyer belt.Hopper is used to collect the sludge that dummy car transport comes;First conveyer belt is used for
Sludge is transported to storage bin;Storage bin is for storing sludge, the discharge port connection of feeding mouth and first conveyer belt;Second is defeated
Send band for sludge to be transported to boiler of power plant.First oscillating feeder and the second oscillating feeder are used for rationed sludge,
First oscillating feeder is set between hopper discharge port and first conveyer belt feeding mouth, and the second oscillating feeder goes out set on storage bin
Between material mouth and the second conveyer belt feeding mouth.
During the work time, hopper and storage bin are independently arranged, and the sludge that transport comes is discharged in hopper by dummy car, are expected
Bucket is transported sludge to storage bin by the first oscillating feeder and first conveyer belt, storage bin by the second oscillating feeder with
Sludge is transported in the boiler of power plant by the second conveyer belt.The application by above-mentioned each component discharging storage workshop to sludge into
Row unloading, and finally transport and carry out mixing burning into boiler, complete the integrated process of sludge unloading, storage and feeding.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Core of the invention is to provide a kind of coal-burning power plant's sludge co-combustion system, the sludge that can generate sewage treatment plant
It transports to the coal handling system of power plant, and finally transports to the boiler of power plant and carry out mixing burning.
Referring to FIG. 1, Fig. 1 is the structural schematic diagram of sludge co-combustion system in coal-burning power plant's provided by the present invention.
The present invention provides a kind of coal-burning power plant's sludge co-combustion system, including hopper 1, storage bin 5, first conveyer belt 3, second
Conveyer belt 7, the first oscillating feeder 2 and the second oscillating feeder 6;Hopper 1 is used to collect the sludge that dummy car transport comes;First
Conveyer belt 3 is used to from hopper 1 transport sludge to storage bin 5;Storage bin 5 is for storing sludge, feeding mouth and the first conveying
It is connected with 3 discharge port;Second conveyer belt 7 is used to sludge being transported to boiler of power plant.First oscillating feeder and the second vibration
Batcher 6 for evenly distributing sludge, the first oscillating feeder 2 be set to 1 discharge port of hopper and 3 feeding mouth of first conveyer belt it
Between, the second oscillating feeder 6 is set between 7 feeding mouth of 5 discharge port of storage bin and the second conveyer belt.
Specifically, hopper 1, storage bin 5, first conveyer belt 3, the second conveyer belt 7, the first oscillating feeder 2 and second shake
The components such as dynamic batcher 6 are arranged in discharging storage workshop 01, while discharging storage workshop 01 is provided with unloading for dummy car
Position, dummy car are parked to the unloading for unloading parking stall progress sludge.
Storage bin 5 and hopper 1 are independently arranged, and hopper 1 is mainly used for tentatively storing the sludge that dummy car transport comes,
Then first conveyer belt 3 transports the sludge in hopper 1 into storage bin 5.5 inside of storage bin can store sludge, and it is stored
Sludge directly docked with the boiler of power plant.
First oscillating feeder 2 and the second oscillating feeder 6 are separately positioned on first conveyer belt 3 and the second conveyer belt 7
At feeding mouth, the first oscillating feeder 2 and the second oscillating feeder 6 are under the driving of respective motor, dirt that top is fallen
Mud carries out quantitative, uniform distribution, to make the dropping down onto in corresponding conveyer belt of sludge continuous uniform.
It should be noted that the second oscillating feeder 6 needs to adjust output feelings according to the sludge quantity needed for burning actually is mixed
Condition makes sludge mixture proportion meet the requirements.In addition, belted electronic balance and calibration equipment can be arranged in the second conveyer belt 7, to protect
Barrier sludge mixes the accuracy of burning amount.
During the work time, the sludge that transport comes is discharged in hopper 1 by dummy car, and hopper 1 passes through the first vibrating feed
Machine 2 and first conveyer belt 3 transport sludge to storage bin 5, and storage bin 5 will by the second oscillating feeder 6 and the second conveyer belt 7
Sludge is transported in the boiler of power plant.The application unloads sludge in discharging storage workshop 01 by above-mentioned each component, and
It carries out mixing burning in final transport to boiler, completes the integrated process of sludge unloading, storage and feeding.
Optionally, illumination can be arranged in conjunction with actual demand, communication, fire-fighting, overhaul for sludge co-combustion system in coal-burning power plant's
Hang equal facilities.Wherein communications service specifically use can acquire and control the I/O distant stations of individual field devices signal, and lead to
It crosses remote I/O matching device and I/O processors is communicated.Flushing facility can be also arranged in coal-burning power plant's sludge co-combustion system, so as to
Cleaning is rinsed to 01 inside of discharging storage workshop and each component, flushing water can pass through the flushing water of dredge pump dispatch to power plant
Sedimentation basin carries out subsequent processing.Optionally, the anti-blocking facility of air bubble can be arranged in storage bin 5 and hopper 1.
It should be understood that the loading capacity and quantity of dummy car need to be selected in conjunction with actual demand, if hopper 1 is daily
It is 600 tons to carry out doses, and it is 30 tons of vehicle as dummy car use the loading capacity that is averaged, then needs 20 into factory's vehicle number daily
Vehicle.Optionally, power-free dust-removing can be arranged at feeding mouth in the bandwidth 0.5m of first conveyer belt 3, belt speed 0.8m/s, output 60t/h
Deflector chute.Optionally, the dischargeable capacity of storage bin 5 is 200m3, if the proportion of sludge is 1.2t/m3, the capacity of storage bin 5
About 240 tons.Optionally, the total measurement (volume) of hopper 1 is 100m3。
Further, the unloading of sludge is carried out in order to facilitate dummy car, while saving space, on the basis of above-described embodiment
On, hopper 1 is set to underground, and being equipped between first conveyer belt 3 and storage bin 5 can be by bucket elevator 4 that sludge is promoted upward.Specifically
, hopper 1 is arranged in underground, and dummy car, which is moved to the top of hopper 1 and topples over sludge downwards, can be completed unloading for sludge
It carries, while the setting of hopper 1 is in underground, avoids sludge square accumulation on the ground, save space.In addition, due to storage bin 5
Setting on the ground side, in order to by sludge from the storage bin 5 on 1 internal forwarding to ground of hopper of underground, in first conveyer belt 3
Bucket elevator 4 is set between storage bin 5, and sludge is lifted and be finally transported to storage bin 5 and stored by bucket elevator 4.
Further, sludge co-combustion system in coal-burning power plant's sets that there are two the discharging group that can work independently, each discharging groups
Include hopper 1, the first oscillating feeder 2, first conveyer belt 3 and bucket elevator 4, the discharge port of two bucket elevators 4 is and storing
The feeding mouth in storehouse 5 connects.Specifically, the transport of dewatered sludge and storing process arrange that coal-burning power plant's sludge mixes burning using two-way
System is arranged altogether there are two discharging group.Under normal circumstances, two discharging groups are run simultaneously is unloaded and is transported to sludge;And two
A discharging group can be spare each other, when one of discharging group breaks down or there are when other special circumstances, a discharging group
Isolated operation can also meet system requirements.
Optionally, in order to monitor the sludge amount of storage inside storage bin 5, storage bin 5 is equipped with high-order level-sensing device 13, low level material
Position meter 14 and continuous material level meter 12.Specifically, continuous material level meter 12 is arranged on the top of storage bin 5, for monitoring sludge in real time
Amount of storage;High-order level-sensing device 13 and low level level-sensing device 14 are for the situation inside periodic monitor storage bin 5.
Optionally, dummy car is managed for convenience, in a specific embodiment provided by the present application, hopper 1
Top is equipped with the truck scale for measuring dummy car weight.Truck scale is specifically located above hopper 1 and unloads parking stall, and truck scale is set
It is equipped with weight sensor, to carry out Weighing to dummy car, detects the sludge quantity that the transport of each dummy car comes.Truck scale
Operation principle and structure can refer to the prior art.
Optionally, it is contemplated that the setting of boiler of power plant inlet is there are two third conveyer belt 15, in the present embodiment, the second conveying
Be equipped with T-piece splitting valve 8 with 7 discharge port, two discharge ports of triple valve material distributing valve respectively with two thirds at boiler inlet
Conveyer belt 15 connects.Specifically, T-piece splitting valve 8 to the second conveyer belt 7 transport come sludge be allocated after, using itself
Two discharge ports export sludge, realize the transportational process of sludge.It shakes in addition, the coal spout of third conveyer belt 15 can also be arranged
Anti- locking device is moved, to avoid coal breakage blockage.
Further, in order to avoid sludge emits bad smell in transportational process to outside, in any one above-mentioned embodiment
On the basis of, first conveyer belt 3 and the second conveyer belt 7 are all-sealed conveyer belt.Specifically, in view of sludge will produce less
Odorant pollutant is measured, be easy to cause plant area's pollution, therefore first conveyer belt 3 and the second conveyer belt 7 use total closed type structure, only
The feeding mouth of first conveyer belt 3 and discharge port are connected to each other with the first oscillating feeder 2 and bucket elevator 4 respectively, and the first conveying
Band 3 then makes sludge be in enclosure space in transportational process, to avoid sludge from emitting bad smell.Second conveyer belt, 7 situation phase
Together, it is not repeating herein.
In order to further mitigate the pollution in discharging storage workshop 01, on the basis of any one above-mentioned embodiment, combustion
Coal-fired plant's sludge co-combustion system further includes air draft system 9, the air inlet of air draft system 9 and unloading for coal-burning power plant's sludge co-combustion system
Expect that storage workshop 01 connects, the first gas outlet of air draft system 9 and the pressure fan of boiler connect, the second outlet of air draft system 9
Mouth is connected to by air blower 10 with outdoor, and activated carbon adsorption device 11 is equipped between air blower 10 and second outlet.
Specifically, air draft system 9 specifically includes the components such as air blower 10, air inlet and the discharging of air draft system 9 store vehicle
Between 01 connection, to being extracted to the air inside discharging storage workshop 01.Boiler is commonly equipped with pressure fan, after extraction
Air can be entered in the boiler of power plant by the first gas outlet and pressure fan, mix burning with sludge in donkey boiler and coal-fired.
Air after extraction can also drain into outdoor environment by the second gas outlet, it is possible to understand that, the sky in discharging storage workshop 01
Gas needs to be cleared up using activated carbon adsorption device 11 or other devices before being expelled to outdoor, removes the peculiar smell in gas, keeps away
Exempt to cause environmental pollution.
Optionally, the air inlet of air draft system 9 is also connect with first conveyer belt 3 or the second conveyer belt 7 or storage bin 5.By
It is all made of enclosed construction in first conveyer belt 3 and the second conveyer belt 7, inner air is easy to be influenced by sludge, while closed
Air in space is inevitably leaked by feeding mouth and discharge port to discharging storage workshop 01.Therefore air draft system 9 can also lead to
It crosses associated pipe to connect with first conveyer belt 3, the second conveyer belt 7, so that the two is formed tiny structure, to avoid first conveyer belt 3
It is escaped with the peculiar smell in the enclosure space of the second conveyer belt 7.The air inlet of air draft system 8 can also be connect with storage bin 5, make storage
Feed bin 5 is in micro-vacuum state, avoids distributing for peculiar smell.
It should be understood that during sludge is transported to boiler and carries out mixing burning, boiler can scavenge to outside,
It usually requires to be dusted exhaust gas and desulfurization process in actual production process.Such as can specifically use low-carbon combustion device and
SCR denitration is dusted processing using electrostatic precipitator and wet electrical dust precipitator.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other
The difference of embodiment, just to refer each other for identical similar portion between each embodiment.
Sludge co-combustion system in coal-burning power plant's provided by the present invention is described in detail above.Tool used herein
Principle and implementation of the present invention are described for body example, and the explanation of above example is only intended to help to understand this hair
Bright method and its core concept.It should be pointed out that for those skilled in the art, not departing from the present invention
, can be with several improvements and modifications are made to the present invention under the premise of principle, these improvement and modification also fall into right of the present invention
It is required that protection domain in.