CN108561080A - Flatness control device and control method for pipe shed of stone tunnel - Google Patents
Flatness control device and control method for pipe shed of stone tunnel Download PDFInfo
- Publication number
- CN108561080A CN108561080A CN201810622989.8A CN201810622989A CN108561080A CN 108561080 A CN108561080 A CN 108561080A CN 201810622989 A CN201810622989 A CN 201810622989A CN 108561080 A CN108561080 A CN 108561080A
- Authority
- CN
- China
- Prior art keywords
- guide sleeve
- casing
- drilling rod
- pipe
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004575 stone Substances 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000005553 drilling Methods 0.000 claims abstract description 52
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 238000004519 manufacturing process Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 description 6
- 229910000712 Boron steel Inorganic materials 0.000 description 5
- 238000005520 cutting process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/24—Guiding or centralising devices for drilling rods or pipes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Soil Sciences (AREA)
- Mechanical Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses a device and a method for controlling flatness of a pipe shed of a stone tunnel, which are characterized by comprising the following steps: the drill rod drilling device is characterized in that a guide sleeve is arranged on the periphery of the drill rod, the outer diameter of the guide sleeve is matched with the diameter of a formed hole, the guide sleeve and the drill rod can rotate relatively, and axial limitation is realized, so that the guide sleeve can drill along with the drill rod. According to the invention, the front end drill bit obtains front end guide by utilizing the guide sleeve arranged on the first section of drill rod, so that deviation is effectively avoided, and meanwhile, the straightness control of the whole drill rod is realized by matching with the limit of the orifice guide pipe, so that the engineering progress is greatly improved, and the quality of a pipe shed is ensured.
Description
Technical field
The present invention relates to apply stone matter tunneltron canopy flatness control device and control in stone matter tunnel pipe roof construction
Method.
Background technology
In the prior art, it is to use down-the-hole drilled as holes for stone matter tunnel pipe roof construction, then steel pipe is installed and noted
Operation is starched, in tunneltron canopy is at work progress is bored, pipe canopy off-design position, typically constructs in position of spudding in order to prevent
Concrete is oriented to wall, is carried within the walls to the pre-buried guiding steel pipe of vertical angle for control pipe canopy angle for pre-buried one in concrete guiding
Degree, still, during pipe canopy depth is continuously increased, the front end drill bit in drilling, which fails to obtain, is oriented to control, when drilling machine bores
Into when encountering soft rock in the process, drill bit inevitably occurs to float or sink, and because drill pipe diameter is than drilling diameter and brill
Head diameter is carefully very much, causes that bending occurs in hole position or not straight phenomenon, any not straight phenomenon such as eccentric will all lead to pipe
Boron steel pipe is difficult to install, and pipe canopy quality is difficult to be guaranteed, and also has generation because pipe boron steel pipe is sunk down into Tunnel, causes in tunnel
It needs to carry out cutting process to pipe boron steel pipe when road excavates.
Invention content
The present invention is to provide a kind of stone matter tunneltron canopy flatness control to avoid the problems of above-mentioned prior art
Device and control method, to ensure pipe roof construction glacing flatness, it is ensured that pipe boron steel pipe Fast Installation in place, makes pipe canopy give full play to
Effect.
The present invention is to solve technical problem to adopt the following technical scheme that:
The characteristics of stone matter tunneltron canopy flatness control device of the present invention is:In drilling rod periphery, guide sleeve is set, it is described
The outer diameter of guide sleeve matches with drilling diameter, can be relatively rotated between the guide sleeve and drilling rod, and with axial
Limit, enables the guide sleeve that drilling rod to be followed to be crept into.
The characteristics of stone matter tunneltron canopy flatness control device of the present invention, lies also in:The guide sleeve is provided in the most
On the first segment drilling rod of drill bit.
The characteristics of stone matter tunneltron canopy flatness control device of the present invention, lies also in:It is limit with the boss of two ends of drill
Platform at the both ends of drilling rod and is on the outside of limiting stand and is set with limit casing, stage casing is connected between the limit casing of both ends
Casing, the internal diameter of the limit casing is less than the outer diameter of limiting stand, and is more than drilling rod outer diameter, and the internal diameter of the stage casing casing is more than
The outer diameter of limiting stand collectively forms guide sleeve by both ends limit casing and stage casing casing, the outer diameter of the guide sleeve at
Bore dia matches.
The characteristics of stone matter tunneltron canopy method for controlling planeness of the present invention is to carry out as follows:
Step 1:Aperture guide pipe is made in tunnel portal or section Portal Section;
Step 2:Stone matter tunneltron canopy flatness control device described in claim 1 is made, is behind drill bit
Guide sleeve is set on the first segment drilling rod of impactor;
Step 3:Drilling machine starts to creep into the guide pipe of aperture, obtains initial guiding using aperture guide pipe, passes through spreading
Drilling rod is constantly pushed ahead;
Step 4:With going deep into for drilling machine, front end drill bit is obtained using the guide sleeve being arranged on the first segment drilling rod
Front end is oriented to, and avoids deviation, while coordinating the limit of aperture guide pipe, realizes the flatness control of whole drilling rod.
The characteristics of stone matter tunneltron canopy method for controlling planeness of the present invention, lies also in:
For mountain tunnel hole, concrete of constructing first is oriented to wall, and is oriented to embedded steel tube conduct in wall in concrete
Aperture guide pipe;
For Subway Tunnel, steel pipe is fixed temporarily on the side wall of subway station as aperture guide pipe.
The present invention has the beneficial effect that compared with prior art:
1, the present invention makes drill bit in drilling process obtain good lead using the guide sleeve being arranged on first segment drilling rod
To avoiding its that apparent deviation occurs, also therefore avoid the influence because of steel pipe deviation to tunnel cutting;
2, the straight of pipe canopy pore-forming has been effectively ensured using front end guide sleeve and tie tail aperture guide pipe in the present invention
Degree;The steel pipe after pore-forming is smoothly installed, project progress is greatly improved, ensures pipe canopy quality.
Description of the drawings
Fig. 1 is guide sleeve and first segment drilling rod fit structure schematic diagram in the present invention;
Fig. 2 is drilling machine advanced state schematic diagram in the present invention;
Figure label:11 drill bits, 12 impactors, 13 drilling rods, 13a first segment drilling rods, 13b guide sleeves, 14 apertures are oriented to
Pipe, 102 limiting stands, 103 limit casings, 104 stage casing casings.
Specific implementation mode
The structure type of stone matter tunneltron canopy flatness control device is in the present embodiment:It is arranged in the periphery of drilling rod and is oriented to
Casing, outer diameter and the drilling diameter of guide sleeve match, can be relatively rotated between guide sleeve and drilling rod, and with axial
Limit, enables guide sleeve that drilling rod to be followed to be crept into;In specific implementation, guide sleeve is provided in closest to drill bit
On first segment drilling rod.
Referring to Fig. 1, the setting in the present embodiment for guide sleeve is using the boss at the both ends of drilling rod 13 as limiting stand
102, it is set with limit casing 103 in the both ends of drilling rod 13 and the outside that is in limiting stand 102, the limit casing 103 at both ends
Between connect stage casing casing 104;Wherein, the internal diameter of limit casing 103 is less than the outer diameter of limiting stand 102, and is more than drilling rod outer diameter,
Limit casing 103 can be rotated relative to drilling rod, and obtain axial limiting on limiting stand 102;Stage casing casing 104 it is interior
Diameter is more than the outer diameter of limiting stand 102, and guide sleeve, guide sleeve are collectively formed by both ends limit casing 103 and stage casing casing 104
Outer diameter match with drilling diameter.
To realize stone matter tunneltron canopy flatness control, drill by such as implementation Process:
Step 1:Aperture guide pipe 14 is made in tunnel portal or section Portal Section.
Step 2:Stone matter tunneltron canopy flatness control device in the present embodiment is made, is close to 11 rear impact of drill bit
Guide sleeve 13b is set on the first segment drilling rod 13a of device 12.
Step 3:Drilling machine starts to creep into aperture guide pipe 14, obtains initial guiding using aperture guide pipe 14, passes through
Extension drill rod 13 is constantly pushed ahead;
Step 4:With going deep into for drilling machine, front end drill bit 11 utilizes the guide sleeve 13b being arranged on first segment drilling rod 13a
It obtains front end to be oriented to, avoids deviation, while coordinating the limit of aperture guide pipe 14, realize the flatness control of whole drilling rod;.
In specific implementation, for mountain tunnel hole, the concrete that can construct is oriented to wall, is oriented in concrete pre-buried in wall
Steel pipe is as aperture guide pipe 14;It, can for the occasion for not having construction concrete guiding wall, such as in the construction of Subway Tunnel
To be fixed temporarily steel pipe on the side wall of subway station as aperture guide pipe 14.
It in specific implementation, needs to carry out processing of scraping to the inner wall of limit casing 103, to reduce its rubbing between drilling rod
It wipes;It is welded, is formed firm whole between limit casing 103 and stage casing casing 104.
The present invention is in Beijing-Shanghai high speed Jinan connecting line two-wire Four-Lane Road greatly across, flat large section pulp-water spring Tunnel Engineering
In tested, effect is verified, and effectively controls pipe canopy glacing flatness, ensure that pipe boron steel pipe Fast Installation, is obtained good
Economic benefit and social benefit, provide reference foundation for stone matter tunnel pipe roof construction.
Claims (5)
1. a kind of stone matter tunneltron canopy flatness control device, it is characterized in that:In drilling rod periphery, guide sleeve, the guiding are set
The outer diameter of casing matches with drilling diameter, can be relatively rotated between the guide sleeve and drilling rod, and has axial limiting,
Enable the guide sleeve that drilling rod to be followed to be crept into.
2. stone matter tunneltron canopy flatness control device according to claim 1, it is characterized in that the guide sleeve is to set
It sets on the first segment drilling rod closest to drill bit.
3. stone matter tunneltron canopy flatness control device according to claim 1 or claim 2, it is characterized in that:With the convex of two ends of drill
Platform is limiting stand (102), at the both ends of drilling rod and is on the outside of limiting stand (102) and is set with limit casing (103),
Stage casing casing (104) is connected between both ends limit casing (103), the internal diameter of the limit casing (103) is less than limiting stand (102)
Outer diameter, and be more than drilling rod outer diameter, the internal diameter of the stage casing casing (104) is more than the outer diameter of limiting stand (102), is limited by both ends
Casing (103) and stage casing casing (104) collectively form guide sleeve, and outer diameter and the drilling diameter of the guide sleeve match.
4. a kind of stone matter tunneltron canopy method for controlling planeness, it is characterized in that carrying out as follows:
Step 1:In tunnel portal or section Portal Section field fabrication aperture guide pipe (14);
Step 2:Stone matter tunneltron canopy flatness control device described in claim 1 is made, is behind drill bit (11)
Guide sleeve is set on the first segment drilling rod (13a) of impactor (12);
Step 3:Drilling machine starts to creep into aperture guide pipe (14), obtains initial guiding using aperture guide pipe (14), passes through
Extension drill rod (13) is constantly pushed ahead;
Step 4:With going deep into for drilling machine, front end drill bit (11) utilizes the guide sleeve being arranged on the first segment drilling rod (13a)
Pipe obtains front end and is oriented to, and avoids deviation, while coordinating the limit of aperture guide pipe (14), realizes the glacing flatness control of whole drilling rod
System.
5. stone matter tunneltron canopy method for controlling planeness according to claim 4, it is characterized in that:
For mountain tunnel hole, concrete of constructing first is oriented to wall, and is oriented in wall embedded steel tube as aperture in concrete
Guide pipe (14);
For Subway Tunnel, steel pipe is fixed temporarily on the side wall of subway station as aperture guide pipe (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810622989.8A CN108561080A (en) | 2018-06-15 | 2018-06-15 | Flatness control device and control method for pipe shed of stone tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810622989.8A CN108561080A (en) | 2018-06-15 | 2018-06-15 | Flatness control device and control method for pipe shed of stone tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108561080A true CN108561080A (en) | 2018-09-21 |
Family
ID=63553696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810622989.8A Pending CN108561080A (en) | 2018-06-15 | 2018-06-15 | Flatness control device and control method for pipe shed of stone tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108561080A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4972911A (en) * | 1989-03-08 | 1990-11-27 | Oy Tampella Ab | Travelling centralizer arrangement in a rock drill |
CN203097745U (en) * | 2013-01-31 | 2013-07-31 | 泰州市宝锐石油设备制造有限公司 | Long-life petroleum drilling tool |
CN204532329U (en) * | 2015-04-21 | 2015-08-05 | 中国葛洲坝集团股份有限公司 | Borehole accuracy precise control device |
CN207144853U (en) * | 2017-08-08 | 2018-03-27 | 中国石油集团长城钻探工程有限公司钻井技术服务公司 | A kind of non-rotating drilling rod protection device |
CN208280901U (en) * | 2018-06-15 | 2018-12-25 | 中铁四局集团有限公司 | Flatness control device for pipe shed of stone tunnel |
-
2018
- 2018-06-15 CN CN201810622989.8A patent/CN108561080A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4972911A (en) * | 1989-03-08 | 1990-11-27 | Oy Tampella Ab | Travelling centralizer arrangement in a rock drill |
CN203097745U (en) * | 2013-01-31 | 2013-07-31 | 泰州市宝锐石油设备制造有限公司 | Long-life petroleum drilling tool |
CN204532329U (en) * | 2015-04-21 | 2015-08-05 | 中国葛洲坝集团股份有限公司 | Borehole accuracy precise control device |
CN207144853U (en) * | 2017-08-08 | 2018-03-27 | 中国石油集团长城钻探工程有限公司钻井技术服务公司 | A kind of non-rotating drilling rod protection device |
CN208280901U (en) * | 2018-06-15 | 2018-12-25 | 中铁四局集团有限公司 | Flatness control device for pipe shed of stone tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100567698C (en) | Tunnel advanced support air circulated drilling construction method and drilling tool | |
CN110607989B (en) | Rock drilling trolley and tunnel tunneling construction method for reducing surrounding rock disturbance | |
CN105178970A (en) | Horizontal oriented spiral drilling machine | |
CN105064919A (en) | Ultra-short-radius radial lateral drilling method for horizontal wells | |
CN112012751B (en) | Precise excavation method for gentle slope inclined shaft | |
CN104929517A (en) | Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method | |
AU2018412370A1 (en) | A long-distance drilling and hydrofracturing integrated device and method in underground mine | |
CN104879163A (en) | Downhole small advance orientation exploration water discharging device and method | |
CN106837382A (en) | A kind of subway tunnel country rock pre grouting from the surface reinforcement process | |
KR101448294B1 (en) | direction controllable boring method and apparatus for boring | |
CN110847325A (en) | Construction process of sewage pipe network in villages and towns by horizontal directional drilling | |
CN208280901U (en) | Flatness control device for pipe shed of stone tunnel | |
CN104912480B (en) | Coal bed gas near-end docks the brill completion method of horizontal well | |
CN108561080A (en) | Flatness control device and control method for pipe shed of stone tunnel | |
Danilov et al. | Justification of basic diagrams of horizontal drilling deflectors | |
CN112682090A (en) | Coal seam drilling interconnection method and system based on impact process and gas extraction method | |
CN109162717B (en) | Mining and tunnel engineering hydraulic tunneling method and equipment thereof | |
CN111608572A (en) | Down-the-hole drill and impact drill matched pile foundation pore-forming construction method | |
CN206957583U (en) | A kind of equipment of coal mine long range throughbore | |
CN100510320C (en) | Tunneling method | |
CN216381401U (en) | Equipment for preventing tunnel from being dug excessively | |
CN102235151A (en) | Advanced hole-forming method of sand gravel boulder layer | |
CN205876187U (en) | Be applied to equipment of medium -length hole rig rock drilling | |
CN210460560U (en) | Bushing type small core coring device | |
CN107461208A (en) | A kind of contact pipeline well and construction method on inclined orebody |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180921 |