CN108560344A - 一种基于pfwd模量的老路基处治深度确定方法 - Google Patents
一种基于pfwd模量的老路基处治深度确定方法 Download PDFInfo
- Publication number
- CN108560344A CN108560344A CN201810401411.XA CN201810401411A CN108560344A CN 108560344 A CN108560344 A CN 108560344A CN 201810401411 A CN201810401411 A CN 201810401411A CN 108560344 A CN108560344 A CN 108560344A
- Authority
- CN
- China
- Prior art keywords
- modulus
- roadbed
- layer
- pfwd
- flexure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开了一种基于PFWD模量的老路基处治深度确定方法,首先通过建立老路基改良前PFWD所测模量Ep与贝克曼梁所弯沉L的幂函数关系方程,并检测、分析得到每填筑一层改良土对弯沉值的减少效果;然后测得未改良且土质相同的路段的老路基顶PFWD模量Ep,采用建立的老路基改良前Ep和L的关系,反算该段路基顶面弯沉L,根据老路基顶面弯沉L与新建路床验收设计弯沉值L0之间的差值以及每填筑一层改良土对弯沉值的减少效果,确定改良土处治层数。本发明操作简单、易于推广,能够解决公路改扩建工程中老路基处治深度确定的问题。
Description
技术领域
本发明属于道路工程技术领域,涉及一种基于PFWD模量的老路基处治深度确定方法。
背景技术
我国南方路网密度大,修筑时间早,很多公路急需通过改扩建提高通行能力。由于南方湿热多雨,老路基与周围环境的湿热交换导致其含水率逐渐从修筑时的最佳含水率增加到某一与气候、土质等相适应的平衡状态,含水率最大增加65%以上,导致路基刚度显著减低。对这些老路基进行拼接时,由于其刚度低,无法满足路床要求,需进行石灰或水泥等改良土换填,如何有效确定换填深度是老路基拼接的关键技术之一。
目前对新建道路路床改良的研究较多,但与新建道路路床厚度提前已知不同,在对老路路床处治之前,尚需根据其工作性能确定处治深度,目前对此研究较少,路基的处治深度取值主要依赖于工程经验,无理论依据,或者取上路床或整个路床深度,由此可能造成以下不良后果:
1)路基处治深度不够,处治后仍不能满足路面对路基的要求;
2)路基处治深度过大,造成不必要的经济浪费。
因此,设计一种老路基处治深度确定方法,具有重要的工程实践意义。
发明内容
为实现上述目的,本发明提供一种基于PFWD模量的老路基处治深度确定方法,解决了现有技术中路基处治深度不够,处治后仍不能满足路面对路基的要求或路基处治深度过大,造成不必要的经济浪费的问题。
本发明所采用的技术方案是,一种基于PFWD模量的老路基处治深度确定方法,具体按照以下步骤进行:
步骤a:在相同土质路段选取一个试验段,在未改良老路基顶选取一定数目测点,各测点上依次用PFWD即便携式落锤弯沉仪所测模量Ep,采用5.4m贝克曼梁路面弯沉仪所测弯沉L;
步骤b:建立未改良路基PFWD所测模量Ep与所测弯沉L之间的幂函数关系,如式(1)所示:
L=AEp B; (1)
其中:A、B为幂函数模型的参数,由所测弯沉L和所测模量Ep拟合得到;
步骤c:从试验段老路基顶面向下开挖至新设计路床底部的标高位置,对底部进行整平碾压后选取测点利用5.4m贝克曼梁路面弯沉仪采集未铺改良土层弯沉L1;再根据新设计路床厚度,分层填筑改良土,每层改良土厚度一致,直至填筑至路床顶设计标高;待每层改良土强度稳定后,选取与碾压后,测量弯沉L1位置对应的测点检测每层改良土的弯沉L2;
步骤d:根据第一层改良土测点弯沉L2与弯沉L1的减少值和每填筑一层改良土弯沉值与上一层改良土弯沉值的减少值得到每一层的累计减少弯沉值,为减少误差,取各测点弯沉减少效果的平均值;
步骤e:在未改良且与试验段土质相同路段的老路基顶测得PFWD模量Ep,按式(1)计算得到该段路基顶面弯沉L,根据弯沉L与新建路床验收设计弯沉值L0之间的差值ΔL和步骤d分析得到的每一层改良土的累计减少弯沉值来确定改良土层数,若ΔL小于每一层的累计减少弯沉值且大于上一层的累计减少弯沉值,需换填该层对应深度的改良土,则满足设计弯沉值L0的要求,从而根据老路基顶的模量Ep以确定路基处治深度。
进一步的,所述步骤a中试验段长度为50~100m,测点数为15~25个。
进一步的,所述步骤c中新设计路床底部测点为2~4个。
进一步的,所述步骤c中试验段路床填筑的改良土为无机结合料改良土。
本发明的有益效果是,与现有技术相比,本发明采用路基改良前的PFWD模量Ep与贝克曼梁弯沉L的函数关系和每填筑一层改良土对弯沉值的减少效果,来确定路基处治深度,方便快捷、成本较低、易于推广,可有效解决路基处治深度不够而无法满足要求或路基处治深度过大而造成的经济浪费问题。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1是一种基于PFWD模量的老路基处治深度确定方法的流程图;
图2是改良前路基PFWD模量Ep与弯沉L关系图;
图3是改良土的弯沉减少效果图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
一种基于PFWD模量的老路基处治深度确定方法,流程如图1所示,具体按照以下步骤进行:
步骤a:在相同土质路段选取一个试验段,在未改良老路基顶选取一定数目测点,各测点上依次用PFWD即便携式落锤弯沉仪所测模量Ep,采用5.4m贝克曼梁路面弯沉仪检测弯沉L;
其中,步骤a中,试验段长度为50~100m;测点数为15~25个,用以减少误差及保证样本数,在各测点上用PFWD所测模量Ep时取数据稳定后的模量数值;
步骤b:建立未改良路基PFWD所测模量Ep与所测弯沉L之间的幂函数关系,如式(1)所示:
L=AEp B; (1)
其中:A、B为幂函数模型的参数,由所测弯沉L和所测模量Ep拟合得到;
步骤c:从试验段老路基顶面向下开挖至新设计路床底部的标高位置,对底部进行整平碾压后选取测点利用5.4m贝克曼梁路面弯沉仪采集未铺改良土层弯沉L1;再根据新设计路床厚度,分层填筑改良土,每层改良土厚度一致,直至填筑至路床顶设计标高;待每层改良土强度稳定后,选取与碾压后测量弯沉L1位置对应的测点检测每层改良土的弯沉L2;
其中,步骤c中,新设计路床底部测点为2~4个,用以减少误差和保证样本数;试验段路床填筑的改良土为无机结合料改良土,先通过碾压工艺确定适当的改良土压实层厚,再根据新设计路床厚度和改良土适宜压实层厚确定填筑层数;
改良土强度稳定时间需根据无机结合料种类并经试验确定;
步骤d:根据第一层改良土测点弯沉L2与弯沉L1的减少值和每填筑一层改良土弯沉值与上一层改良土弯沉值的减少值得到每一层的累计减少弯沉值,为减少误差,取各测点弯沉减少效果的平均值;
步骤e:在未改良且与试验段土质相同路段的老路基顶测得PFWD模量Ep,按式(1)计算得到该段路基顶面弯沉L,根据弯沉L与新建路床验收设计弯沉值L0之间的差值ΔL和步骤d分析得到的每一层改良土的累计减少弯沉值来确定改良土层数,若ΔL小于每一层的累计减少弯沉值且大于上一层的累计减少弯沉值,需换填该层对应深度的改良土,则满足设计弯沉值L0的要求,从而根据老路基顶的模量Ep以确定路基处治深度。
实施例
以某一公路改扩建工程的含砂低液限黏土老路基路段为实施例,该路段新设计路床厚度1.2m,路床顶-15cm至路床顶为15cm碎石层,新设计路床顶-15cm设计弯沉值L0为178(0.01mm),采用7%水泥改良方案,即水泥与土的质量比为7%,可通过现行规范得到。
步骤a:在含砂低液限黏土老路基段选取一个100m的试验段,将老路面完全破除清理后,沿行车道或超车道中心线按等距5m在老路基顶面布置共20个测点,在各测点依次用PFWD检测模量Ep,采用5.4m贝克曼梁路面弯沉仪检测弯沉L,其检测结果如表1所示;
表1含砂低液限原状黏土弯沉L与模量Ep的检测结果
测点号 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
PFWD模量Ep(MPa) | 25.4 | 21.3 | 17.7 | 25.8 | 21.7 | 5.8 | 5.7 | 16.2 | 18.5 | 47.5 |
弯沉L | 436 | 360 | 496 | 448 | 470 | 700 | 586 | 524 | 480 | 246 |
测点号 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |
PFWD模量Ep(MPa) | 21.4 | 39.8 | 29.5 | 31.6 | 22.9 | 39.5 | 40.3 | 17.1 | 24.5 | 33.9 |
弯沉L | 454 | 290 | 374 | 308 | 466 | 288 | 298 | 474 | 450 | 318 |
步骤b:含砂低液限黏土路基PFWD模量Ep对弯沉L的影响规律,如图2所示,从图2可知,含砂低液限黏土路基PFWD模量Ep与弯沉L呈幂函数关系,如式(2)所示,
L=3567.1Ep -0.675(R2=0.9082); (2)
其中,L为5.4m贝克曼梁路面弯沉仪所测弯沉;Ep为PFWD所测模量;R2为相关系数;
步骤c:从试验段老路基顶面向下开挖至新设计路床底部,对底部进行整平碾压后选取2个测点依次利用5.4m贝克曼梁路面弯沉仪采集未铺改良土层弯沉L1,L1即为0层的弯沉数据,也即没有铺改良土层时候的弯沉数据,也就是原状土层顶面的弯沉,所以未改良土层号计为“0”;通过现场碾压试验,确定水泥改良土的适宜碾压厚度为20cm,考虑到除碎石层厚的路床厚度为105cm,因此,以每层21cm的压实厚度分层填筑5层水泥改良土,直至碎石层底即新设计路床顶-15cm,通过现场试验发现,水泥改良土强度稳定时间为7天,每层填筑7天后,选取与碾压后测量弯沉L1位置对应的测点检测每层改良土的弯沉L2,检测结果如表2-3所示;
表2试验段未铺改良土层弯沉L1与模量Ep的检测结果
测点号 | 测点1 | 测点2 |
未改良土层号 | 0 | 0 |
模量Ep(MPa) | 28.9 | 27.8 |
弯沉L1(0.01mm) | 384 | 400 |
表3试验段下承层、改良土层弯沉L2与模量Ep的检测结果
步骤d:现场通过大量的试验发现,路基施工时,弯沉而非模量对水泥改良土处治厚度起控制作用,因此在确定路基处治深度时,以弯沉为控制指标,为确定水泥改良土对弯沉的改善效果,需对比分析试验段含砂低液限黏土路基顶面与5层改良土的各层顶面的弯沉数据,根据图3可知,在含砂低液限黏土试验路段,随水泥改良土的填筑,改良土层顶面弯沉值减小的规律如下:
(1)第1层改良土层顶面弯沉值相比于含砂低液限黏土路基顶面减小120(0.01mm);
(2)第2层改良土层顶面弯沉值相比于第1层减小79(0.01mm),累计减小199(0.01mm);
(3)第3层改良土层顶面弯沉值相比于第2层减小64(0.01mm),累计减小263(0.01mm);
(4)第4层改良土层顶面弯沉值相比于第3层减小54(0.01mm),累计减小317(0.01mm);
(5)第5层改良土层顶面弯沉值相比于第4层减小35(0.01mm),累计减小352(0.01mm);
步骤e:现场大量试验表明,老路基经过若干年运营后内部压实度、含水率较为均匀,开挖不同深度后所测PFWD模量Ep和5.4m贝克曼梁路面弯沉仪采集弯沉值L相当,因此,以其顶面测试结果代表不同开挖深度的测试结果,因此,在利用试验段成果确定其它含砂低液限黏土路段老路基处治深度时,考虑到PFWD相对于5.4m贝克曼梁路面弯沉仪携带便捷,测试方便,测试效率高,首先在含砂低液限黏土路段测得路基顶PFWD模量Ep,根据式(2)计算得到该段路基顶面弯沉L,再根据该弯沉值L与新建路床验收设计弯沉值L0之间的差值和路床每填筑一层改良土弯沉值的减少规律,提出路基处治深度标准:
(1)在含砂低液限黏土路段测得路基顶PFWD模量Ep≥90.0MPa,根据式(2)得到对应弯沉值L≤178(0.01mm),弯沉值L与新建路床验收设计弯沉值L0之间的差值ΔL≤0mm,弯沉值L满足新设计路床顶-15cm设计弯沉值L0的要求,故用PFWD检测路基顶面时,若模量Ep≥90.0MPa,可确定该路基无需处治;
(2)在含砂低液限黏土路段测得路基顶PFWD模量为39.5MPa≤Ep<90.0MPa时,根据式(2)得到对应弯沉值为178(0.01mm)<L≤298(0.01mm),弯沉值L与新建路床验收设计弯沉值L0之间的差值0mm<ΔL≤120(0.01mm),根据步骤d改良土层顶面弯沉值减小的规律可知,需换填1层厚21cm的水泥改良土才能满足新设计路床顶-15cm设计弯沉值的要求,故用PFWD检测路基顶面时,若39.5MPa≤Ep<90.0MPa,可确定用水泥改良土换填21cm;
(3)在含砂低液限黏土路段测得路基顶PFWD模量为28.0MPa≤Ep<39.5MPa时,根据式(2)得到对应弯沉值为298(0.01mm)<L≤377(0.01mm),弯沉值L与新建路床验收设计弯沉值L0之间的差值120(0.01mm)<ΔL≤199(0.01mm),根据步骤d改良土层顶面弯沉值减小的规律可知,需换填2层总厚度为42cm的水泥改良土才能满足新设计路床顶-15cm设计弯沉值的要求,故用PFWD检测路基顶面时,若28.0MPa≤Ep<39.5MPa,可确定用水泥改良土换填42cm;
(4)在含砂低液限黏土路段测得路基顶PFWD模量为22.0MPa≤Ep<28.0MPa时,根据式(2)得到对应弯沉值为377(0.01mm)<L≤441(0.01mm),弯沉值L与新建路床验收设计弯沉值L0之间的差值199(0.01mm)<ΔL≤263(0.01mm),根据步骤d改良土层顶面弯沉值减小的规律可知,需换填3层总厚度为63cm的水泥改良土才能满足新设计路床顶-15cm设计弯沉值的要求,故用PFWD检测路基顶面时,若22.0MPa≤Ep<28.0MPa,可确定用水泥改良土换填63cm;
(5)在含砂低液限黏土路段测得路基顶PFWD模量为18.5MPa≤Ep<22.0MPa时,根据式(2)得到对应弯沉值为441(0.01mm)<L≤495(0.01mm),弯沉值L与新建路床验收设计弯沉值L0之间的差值263(0.01mm)<ΔL≤317(0.01mm),根据步骤d改良土层顶面弯沉值减小的规律可知,需换填4层总厚度为84cm的水泥改良土才能满足新设计路床顶-15cm设计弯沉值的要求,故用PFWD检测路基顶面时,若18.5MPa≤Ep<22.0MPa,可确定用水泥改良土换填84cm;
(6)在含砂低液限黏土路段测得路基顶PFWD模量Ep<18.5MPa时,根据式(2)得到对应弯沉值大于495(0.01mm),弯沉值L与新建路床验收设计弯沉值L0之间的差值ΔL>317(0.01mm),根据步骤d改良土层顶面弯沉值减小的规律可知,需换填5层总厚度为105cm的水泥改良土才能满足新设计路床顶-15cm设计弯沉值的要求,故用PFWD检测路基顶面时,若Ep<18.5MPa,可确定用水泥改良土换填105cm。
以上所述仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内所作的任何修改、等同替换、改进等,均包含在本发明的保护范围内。
Claims (4)
1.一种基于PFWD模量的老路基处治深度确定方法,其特征在于,具体按照以下步骤进行:
步骤a:在相同土质路段选取一个试验段,在未改良老路基顶选取一定数目测点,各测点上依次用PFWD即便携式落锤弯沉仪所测模量Ep,采用5.4m贝克曼梁路面弯沉仪所测弯沉L;
步骤b:建立未改良路基PFWD所测模量Ep与所测弯沉L之间的幂函数关系,如式(1)所示:
L=AEp B; (1)
其中:A、B为幂函数模型的参数,由所测弯沉L和所测模量Ep拟合得到;
步骤c:从试验段老路基顶面向下开挖至新设计路床底部的标高位置,对底部进行整平碾压后选取测点利用5.4m贝克曼梁路面弯沉仪采集未铺改良土层弯沉L1;再根据新设计路床厚度,分层填筑改良土,每层改良土厚度一致,直至填筑至路床顶设计标高;待每层改良土强度稳定后,选取与碾压后,测量弯沉L1位置对应的测点检测每层改良土的弯沉L2;
步骤d:根据第一层改良土测点弯沉L2与弯沉L1的减少值和每填筑一层改良土弯沉值与上一层改良土弯沉值的减少值得到每一层的累计减少弯沉值,为减少误差,取各测点弯沉减少效果的平均值;
步骤e:在未改良且与试验段土质相同路段的老路基顶测得PFWD模量Ep,按式(1)计算得到该段路基顶面弯沉L,根据弯沉L与新建路床验收设计弯沉值L0之间的差值ΔL和步骤d分析得到的每一层改良土的累计减少弯沉值来确定改良土层数,若ΔL小于每一层的累计减少弯沉值且大于上一层的累计减少弯沉值,需换填该层对应深度的改良土,则满足设计弯沉值L0的要求,从而根据老路基顶的模量Ep以确定路基处治深度。
2.根据权利要求1所述的一种基于PFWD模量的老路基处治深度确定方法,其特征在于,所述步骤a中试验段长度为50~100m,测点数为15~25个。
3.根据权利要求1所述的一种基于PFWD模量的老路基处治深度确定方法,其特征在于,所述步骤c中新设计路床底部测点为2~4个。
4.根据权利要求1所述的一种基于PFWD模量的老路基处治深度确定方法,其特征在于,所述步骤c中试验段路床填筑的改良土为无机结合料改良土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810401411.XA CN108560344B (zh) | 2018-04-28 | 2018-04-28 | 一种基于pfwd模量的老路基处治深度确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810401411.XA CN108560344B (zh) | 2018-04-28 | 2018-04-28 | 一种基于pfwd模量的老路基处治深度确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108560344A true CN108560344A (zh) | 2018-09-21 |
CN108560344B CN108560344B (zh) | 2020-04-17 |
Family
ID=63537179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810401411.XA Active CN108560344B (zh) | 2018-04-28 | 2018-04-28 | 一种基于pfwd模量的老路基处治深度确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108560344B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112323558A (zh) * | 2020-11-03 | 2021-02-05 | 长沙理工大学 | 以路基顶面设计回弹模量为目标的路基刚度补偿施工方法 |
CN113326659A (zh) * | 2021-06-16 | 2021-08-31 | 长沙理工大学 | 一种红黏土压实度快速检测方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1576817A (zh) * | 2004-09-07 | 2005-02-09 | 长安大学 | 一种填石路基的模量反算方法 |
CN1648343A (zh) * | 2005-02-02 | 2005-08-03 | 重庆交通学院 | 一种确定小交通量道路路面厚度的简易方法 |
JP2009062754A (ja) * | 2007-09-07 | 2009-03-26 | Mitsubishi Materials Corp | 保水性路盤材料の選定方法等 |
CN103334369A (zh) * | 2013-06-22 | 2013-10-02 | 太仓博天网络科技有限公司 | 一种路面弯沉检测系统 |
CN106284011A (zh) * | 2016-08-16 | 2017-01-04 | 桐城市永锦建筑工程有限公司 | 路基施工方法 |
-
2018
- 2018-04-28 CN CN201810401411.XA patent/CN108560344B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1576817A (zh) * | 2004-09-07 | 2005-02-09 | 长安大学 | 一种填石路基的模量反算方法 |
CN1648343A (zh) * | 2005-02-02 | 2005-08-03 | 重庆交通学院 | 一种确定小交通量道路路面厚度的简易方法 |
JP2009062754A (ja) * | 2007-09-07 | 2009-03-26 | Mitsubishi Materials Corp | 保水性路盤材料の選定方法等 |
CN103334369A (zh) * | 2013-06-22 | 2013-10-02 | 太仓博天网络科技有限公司 | 一种路面弯沉检测系统 |
CN106284011A (zh) * | 2016-08-16 | 2017-01-04 | 桐城市永锦建筑工程有限公司 | 路基施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112323558A (zh) * | 2020-11-03 | 2021-02-05 | 长沙理工大学 | 以路基顶面设计回弹模量为目标的路基刚度补偿施工方法 |
CN113326659A (zh) * | 2021-06-16 | 2021-08-31 | 长沙理工大学 | 一种红黏土压实度快速检测方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108560344B (zh) | 2020-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Scala | Simple methods of flexible pavement design using cone penetrometers | |
AU2007327261B9 (en) | An information-based high vacuum densification method for fast treatment of soft soil | |
CN101962928B (zh) | 冲击碾压处理风积沙路基基底的施工方法 | |
CN106049407A (zh) | 一种地基强夯施工方法 | |
CN107604770A (zh) | 无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法 | |
CN108560344A (zh) | 一种基于pfwd模量的老路基处治深度确定方法 | |
CN110080051A (zh) | 一种土工袋桥式路堤结构及其施工方法 | |
CN113481962B (zh) | 一种自动化施工深层强夯复合地基的方法 | |
CN104818658B (zh) | 一种湿陷性黄土地基层上道路拓宽方法 | |
CN107815937B (zh) | 高速公路拓宽路基的分部填筑方法 | |
Rowe et al. | The observed behaviour of a geotextile-reinforced embankment constructed on peat | |
CN111576384B (zh) | 高能级强夯的施工方法 | |
CN106032667A (zh) | 一种大能量强夯处理地基的工艺 | |
CN102031743A (zh) | 泥岩填筑路堤的施工方法 | |
CN206800092U (zh) | 滨海滩涂软基复合式换填结构及滨海软土路基 | |
Zhussupbekov et al. | Features of the bearing capacity estimation of the collapsing soil bases | |
Korkiala-Tanttu et al. | Effect of the spring and overload on the rutting of a low-volume road: HVS-Nordic-research | |
CN107675693A (zh) | 道路泥炭土软基综合治理方法 | |
CN100365210C (zh) | 定位夯实路基施工方法 | |
Truebe et al. | Lowell test road: helping improve road surfacing design | |
CN204753289U (zh) | 一种湿陷性黄土地基层上道路拓宽体系 | |
CN113215889A (zh) | 一种多雨潮湿地区软岩路基施工方法 | |
Law | A parametric study of efficiency of buttress walls in reducing the excavation-induced tunnel movement | |
CN112359698A (zh) | 一种道路路基注浆快速修复施工方法 | |
Blanchet et al. | Application of Li and Selig railway formation design method to expansive soil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |