CN108537511A - The method, apparatus and computer readable storage medium of project process displaying - Google Patents

The method, apparatus and computer readable storage medium of project process displaying Download PDF

Info

Publication number
CN108537511A
CN108537511A CN201810319947.7A CN201810319947A CN108537511A CN 108537511 A CN108537511 A CN 108537511A CN 201810319947 A CN201810319947 A CN 201810319947A CN 108537511 A CN108537511 A CN 108537511A
Authority
CN
China
Prior art keywords
vivid
progress
project
node
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810319947.7A
Other languages
Chinese (zh)
Inventor
冯丰
唐洪凯
李剑
曾佳林
蔡岷村
李泽粤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wanyi Technology Co Ltd
Original Assignee
Wanyi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wanyi Technology Co Ltd filed Critical Wanyi Technology Co Ltd
Priority to CN201810319947.7A priority Critical patent/CN108537511A/en
Publication of CN108537511A publication Critical patent/CN108537511A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention discloses a kind of methods of project process displaying, including:Obtain the two-level node under level-one profession node;Obtain the vivid process under the two-level node;The progress of the vivid process is counted and shown according to the examination position of the vivid process.The invention also discloses a kind of project process displaying device and computer readable storage mediums.The present invention by obtain two-level node under vivid process, count and shows the progress of vivid process according to the examinations position of vivid process, realize for care project process different role personnel succinctly, intuitively show project process.

Description

The method, apparatus and computer readable storage medium of project process displaying
Technical field
Method, the project process shown the present invention relates to field of engineering technology more particularly to a kind of project process shows dress It sets and computer readable storage medium.
Background technology
With the development of computer software technology, many Project Management Softwares have been emerged in large numbers, has realized and formulates the project plan, prison The functions such as project process, evaluation item risk are controlled, implement the entirety management to project with assisting project leader's higher efficiency, especially It is monitoring project process and project risk.
The building engineering field segmented under engineering project, due to being concerned about that the role of the related personnel of architectural engineering progress is many It is more, including engineering Party A, construction party, management side, customer etc., simultaneously because building structure complexity is various, the professional item that is related to Mesh is various, work progress link is numerous and checks and accepts that object type is more, the project process exhibition in existing Project Management Software Show that function is not appropriate for for carrying out succinct to above-mentioned numerous related personnel by project process and intuitively showing.
The above is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that the above is existing skill Art.
Invention content
The main purpose of the present invention is to provide a kind of project process displaying method, project process displaying device and can Read computer storage media, it is intended to which the project process displaying function of solving in Project Management Software in the prior art can not be succinct The technical issues of intuitively showing project process.
To achieve the above object, the present invention provides a kind of method of project process displaying, the side of the project process displaying Method includes the following steps:
Obtain the two-level node under level-one profession node;
Obtain the vivid process under the two-level node;
The progress of the vivid process is counted and shown according to the examination position of the vivid process.
Preferably, the examination position according to the vivid process counts and shows the progress step of the vivid process Include later:
According to the vivid process statistics and show the progress of the two-level node;
According to the statistics of the two-level node and show the progress of the level-one profession node.
Preferably, described according to the vivid process statistics and to show that the progress step of the two-level node includes:
Determine the weight of each vivid process;
According to the statistics of the weight of each vivid process and each vivid process and show the two level The progress of node.
Preferably, the weight step of the determination each vivid process includes:
Obtain the benchmark weight and adjusting range of each vivid process;
The weight of each vivid process is determined according to the benchmark weight of each vivid process and adjusting range.
Preferably, the statistics according to the two-level node and the progress step of the level-one profession node is shown Including:
Determine the weight of each two-level node;
According to the statistics of the weight of each two-level node and each two-level node and show the level-one The progress of professional node.
Preferably, the weight step of the determination each two-level node includes:
Obtain the benchmark weight and adjusting range of each two-level node;
The weight of each two-level node is determined according to the benchmark weight of each two-level node and adjusting range.
Preferably, the step of examination position according to the vivid process counts and shows the vivid process progress Including:
The construction object of the vivid process is determined according to the examination position of the vivid process;
When the construction object be single type when, counted according to the construction object and show it is described image process into Degree;
When the construction object is multiple types, respectively statistics and the corresponding image process of the various construction objects into Degree, and according to the inclusion relation Subsystem Based on Layered Structure Model between a plurality of types of construction objects into showing the vivid process progress.
Preferably, the examination position according to the vivid process counts and shows the vivid process progress step packet It includes:
Judge for showing whether the display area area of the vivid process progress is more than default display area area threshold Value;
When for showing that the display area area of the vivid process progress is more than the default display area area threshold When, vivid process progress corresponding with the various examination positions is counted respectively;
It is shown simultaneously in the display area of the display vivid process progress corresponding with the various examination positions Vivid process progress.
In addition, to achieve the above object, the present invention also provides the device of project process displaying, which includes:It deposits The project process displaying control program that reservoir, processor and being stored in can be run on the memory and on the processor, The project process displaying control program realizes the step of project process methods of exhibiting as described above when being executed by the processor Suddenly.
In addition, to achieve the above object, the present invention also proposes a kind of computer readable storage medium, which is characterized in that institute It states and is stored with project process displaying control program on computer readable storage medium, the project process displaying control program is located The step of reason device realizes project process methods of exhibiting as described above when executing.
The method, apparatus and readable computer storage medium for a kind of project process displaying that the embodiment of the present invention proposes, are obtained The two-level node under level-one profession node is taken, the vivid process under the two-level node is obtained, according to testing for the vivid process Receive the progress that position counts and shows the vivid process.The present invention by for the process designated image process under two-level node, The progress of vivid process is counted and show according to the examination position of vivid process, is realized to be concerned about the different role of project process Personnel it is succinct, intuitively show project process.
Description of the drawings
Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of project process methods of exhibiting first embodiment of the present invention;
Fig. 3 is the flow diagram of project process methods of exhibiting second embodiment of the present invention;
Fig. 4 is the flow diagram of project process methods of exhibiting 3rd embodiment of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:The two-level node under level-one profession node is obtained, obtains described two Vivid process under grade node counts according to the examination position of the vivid process and shows the progress of the vivid process.
Since in the prior art, building structure complexity is various, is related to items are various, work progress link is numerous simultaneously And it is more to check and accept object type, project process in existing Project Management Software displaying function be not appropriate for for by project into Degree is carried out succinct and is intuitively shown to above-mentioned numerous related personnel.
The present invention provides a solution, by for the process designated image process under two-level node, according to vivid work The examination position of sequence counts and shows the progress of vivid process, realizes personnel's letter of the different role to be concerned about project process It is clean, intuitively show project process.
As shown in Figure 1, the terminal structure schematic diagram for the hardware running environment that Fig. 1, which is the embodiment of the present invention, to be related to.
Terminal of the embodiment of the present invention is that project process shows device.
As shown in Figure 1, the device may include:Processor 1001, such as CPU, communication bus 1002, memory 1003. Wherein, communication bus 1002 is for realizing the connection communication between these components.Memory 1003 can be high-speed RAM storage Device can also be stable memory (non-volatile memory), such as magnetic disk storage.Memory 1003 is optional It can also be the storage device independently of aforementioned processor 1001.
It will be understood by those skilled in the art that the restriction of the not structure paired terminal of terminal structure shown in Fig. 1, can wrap It includes than illustrating more or fewer components, either combines certain components or different components arrangement.
As shown in Figure 1, as may include operating system and project in a kind of memory 1003 of computer storage media Progress display controls application program.
In device shown in Fig. 1, processor 1001 can be used for calling the project process exhibition stored in memory 1003 Show control program, and executes following operation:
Obtain the two-level node under level-one profession node;
Obtain the vivid process under the two-level node;
The progress of the vivid process is counted and shown according to the examination position of the vivid process.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control Sequence also executes following operation:
According to the vivid process statistics and show the progress of the two-level node;
According to the statistics of the two-level node and show the progress of the level-one profession node.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control Sequence also executes following operation:
Determine the weight of each vivid process;
According to the statistics of the weight of each vivid process and each vivid process and show the two level The progress of node.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control Sequence also executes following operation:
Obtain the benchmark weight and adjusting range of each vivid process;
The weight of each vivid process is determined according to the benchmark weight of each vivid process and adjusting range.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control Sequence also executes following operation:
Determine the weight of each two-level node;
According to the statistics of the weight of each two-level node and each two-level node and show the level-one The progress of professional node.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control Sequence also executes following operation:
Obtain the benchmark weight and adjusting range of each two-level node;
The weight of each two-level node is determined according to the benchmark weight of each two-level node and adjusting range.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control Sequence also executes following operation:
The construction object of the vivid process is determined according to the examination position of the vivid process;
When the construction object be single type when, counted according to the construction object and show it is described image process into Degree;
When the construction object is multiple types, respectively statistics and the corresponding image process of the various construction objects into Degree, and according to the inclusion relation Subsystem Based on Layered Structure Model between a plurality of types of construction objects into showing the vivid process progress.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control Sequence also executes following operation:
Judge for showing whether the display area area of the vivid process progress is more than default display area area threshold Value;
When for showing that the display area area of the vivid process progress is more than the default display area area threshold When, vivid process progress corresponding with the various examination positions is counted respectively;
Image corresponding with the various examination positions is shown simultaneously in the region of the display vivid process progress Process progress.
With reference to Fig. 2, first embodiment of the invention provides a kind of method of project process displaying, the method includes:
Step S10 obtains the two-level node under level-one profession node.
The process type that project is included is various, in order to which finally energy level clearly shows all process steps progress, first many Multi-process is classified according to the profession belonging to it.
Level-one profession node is defined with many types, and the two-level node under level-one profession node can be that belong to the level-one special The various processes of industry node can also be thinner professional classification, such as the process type further divided according to major field. Such as in construction projects, level-one profession node is electromechanics, civil engineering, finishing, garden is built and this five, milestone, and level-one is electromechanical Two-level node under professional node includes pipeline set aside pre-embedded engineering, dispatch from foreign news agency and high-low pressure power engineering and heavy current engineering, two level Process under node heavy current engineering includes obtaining dispatch from foreign news agency power supply plan.
Step S20 obtains the vivid process under the two-level node.
Working procedures are generally comprised under two-level node, need to pick out vivid process from these working procedures.Vivid work Sequence refers to that the effect that process is completed is the process that its progress can be directly observed from appearance.Such as in construction engineering project In, the two-level node under level-one Civil Specialities node includes major project, basement civil air defense engineering, indoor terrace engineering, wallboard Engineering and plastering engineering etc. are all the two-level node that its progress can be observed from the appearance for the building completed, these two levels Include vivid process in process corresponding to node.
Step S30 counts according to the examination position of the vivid process and shows the progress of the vivid process.
Vivid process checks and accepts the difference at position according to it, is counted using different modes and shows its progress.
The construction object that the image process is first determined according to the examination position of vivid process, when construction object is single type When, it is counted according to the construction object and shows vivid process progress;When object of constructing is multiple types, count respectively and various The corresponding vivid process progress of object of constructing, and according to the inclusion relation Subsystem Based on Layered Structure Model between a plurality of types of construction objects into displaying Vivid process progress.
It is illustrated by taking construction engineering project as an example below and how to count and open up according to the examination position of vivid process Show its progress.The examination position type that construction-engineering project may include is:By stages, pile foundation, Lou Dong, floor, facade, room, Ground library and gardens.Wherein, by stages with pile foundation be the corresponding examination position of level-one profession node, be not belonging to the examination portion of vivid process Bit class.
When the examination position of vivid process be building, library or when gardens, the construction object of the image process be building, The single type in library or gardens counts according to the construction object and shows the image process progress.Specifically, when vivid process Construction object be Lou Dongshi, need to count and show respectively the progress situation that the vivid process in each building is completed.In software reality On now, first shows that the page of a building list, the buildings page Shang Yigedong are mark, show each all images downstairs respectively The Percent Complete of process;The mark in corresponding each building can show another page when certain building mark is selected, With each vivid process to identify on the page, whether showing that each vivid process is completed respectively.
When the examination position of vivid process is floor, facade or room, the construction object of the image process includes a variety of Type counts vivid process progress corresponding with various construction objects respectively, and according between a plurality of types of construction objects Inclusion relation Subsystem Based on Layered Structure Model is into the vivid process progress of displaying.Construction object be comprising a plurality of types of concrete meanings:Such as examination portion Position is floor, because building includes floor, which includes the two kinds of construction objects in building and floor;For example examination part is Room, because it includes floor again that floor, which includes room, building, which applies for three kinds in total comprising building, floor and room Work object.
Specifically, it when the examination position of vivid process is room, needs to count and show room, floor and Lou Dong respectively Progress situation.In software realization, first show that the page of a building list, the buildings page Shang Yigedong are mark, respectively Show the Percent Complete of each all vivid processes downstairs;The mark in corresponding each building, when certain building mark is selected, It can show another page, each floor in the buildings page Shang Yigai is mark, shows that lower of each floor is tangible respectively As the Percent Complete of process;The mark of corresponding each floor can show another page when certain floor identification is selected Face with each room of the floor is mark on the page, whether showing that the vivid process in each room is completed respectively.
In the present embodiment, by for the process designated image process under two-level node, according to the examination portion of vivid process Position counts and shows the progress of vivid process, and the personnel for realizing the different role to be concerned about project process are succinct, intuitive exhibition Show project process.
Further, with reference to Fig. 3, second embodiment of the invention provides a kind of project process displaying based on first embodiment Method, the present embodiment further include after step S30:
Step S40 according to the vivid process statistics and shows the progress of the two-level node.
The weight for determining each vivid process, according to the statistics of the weight of each vivid process and each vivid process And show the progress of two-level node.Specifically, the progress percentage of each vivid process corresponding weight coefficient is multiplied by obtain The weighting progress of each image process, then the weighting progress of all vivid processes is summed, it obtains belonging to vivid process The progress of two-level node is estimated.
In order to adapt to the demand of different types of project process statistics, need the demand according to practical application scene to image The weight of process is adjusted.After the benchmark weight and adjusting range for obtaining each vivid process, according to each vivid work The benchmark weight and adjusting range of sequence determine the weight of each vivid process.
Step S50 according to the statistics of the two-level node and shows the progress of the level-one profession node.
The weight for determining each two-level node, according to the statistics of the weight of each two-level node and each two-level node And show the progress of the level-one profession node.Specifically, the progress percentage of each two-level node is multiplied by corresponding weight Coefficient obtains the weighting progress of each two-level node, then the weighting progress of all two-level nodes is summed, and obtains two level section The progress estimation of first nodes belonging to point.
In order to adapt to the demand of different types of project process statistics, need the demand according to practical application scene to two level The weight of node is adjusted.After the benchmark weight and adjusting range for obtaining each two-level node, according to each two level section The benchmark weight and adjusting range of point determine the weight of each two-level node.
In the present embodiment, first according to vivid process statistics and the progress of two-level node is shown, further according to two level section The statistics of point and the progress for showing level-one profession node realize the effect of the whole project process of hierarchical multi-angle displaying Fruit.
Further, with reference to Fig. 4, third embodiment of the invention is based on the first embodiment or the second embodiment and provides a kind of item The method of mesh progress display, the present embodiment include in step S30:
Step S60 judges for showing whether the region area of the vivid process progress is more than preset area threshold value.
In addition to comprising level-one profession node image progress display, two-level node image progress display, three-level image process into It spends outside the multi-layer methods of exhibiting of displaying, it, can be with when for showing that the region area of vivid process progress is sufficiently large The progress of all vivid processes is shown in a manner of tiling by a variety of examination positions.
Need first to preset a region area threshold value, the area threshold according to simultaneously show it is a variety of check and accept positions institute it is tangible Maximum region area as shared by process is configured, and is judged for showing whether the region area of vivid process progress is more than Preset area threshold value.
Step S70, when for showing that the region area of the vivid process progress is more than the preset area threshold value, point It Tong Ji not vivid process progress corresponding with the various examination positions.
When judging that the region area for showing vivid process progress is more than preset area threshold value, show current item Part allows the progress that all vivid processes are shown in the form of tiling, then corresponding all according to various examination positions statistics respectively Vivid process progress.
Specifically, can be all under the direct upper layer node of vivid procedure-node i.e. two-level node for what is shown simultaneously The progress of vivid process, at this time according to the various examination positions occurred under two-level node count respectively its corresponding vivid process into Degree;For show simultaneously can also be all vivid processes under level-one profession node on two-level node progress, this When according to the various examination positions occurred under level-one profession node count its corresponding vivid process progress respectively.In above-mentioned scene In, it may appear that it needs according to the progress for belonging to same examination position but the vivid procedure-node of variety classes or different majors An overall progress estimation is obtained, it at this time can be to different weights be assigned to it respectively, according to it in a manner of average weighted Progress obtains the estimation to overall progress.
Step S80 is shown and the various examination positions pair simultaneously in the region of the displaying vivid process progress The vivid process progress answered.
In the present embodiment, by judging whether the region area for showing vivid process progress is more than preset area threshold Value, counts vivid process progress corresponding with various examinations positions respectively when being more than, and the same area displaying simultaneously with it is various Check and accept the corresponding vivid process progress in position, the displaying of this progress that all vivid processes are shown in the form of tiling and classify Method, more visual pattern, the progress situation for more completely reflecting integrated engineering.
The present invention also provides a kind of device of project process displaying, which includes:Memory, processor and it is stored in institute State the project process displaying control program that can be run on memory and on the processor, the project process displaying control journey The step of project process methods of exhibiting is realized when sequence is executed by the processor.
In addition, the embodiment of the present invention also proposes a kind of computer readable storage medium, the computer readable storage medium On be stored with project process displaying control program, project process displaying control program is realized described when being executed by processor The step of project process methods of exhibiting.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that process, method, article or system including a series of elements include not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this There is also other identical elements in the process of element, method, article or system.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art Going out the part of contribution can be expressed in the form of software products, which is stored in one as described above In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions use so that a station terminal equipment (can be mobile phone, Computer, server, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of method of project process displaying, which is characterized in that the method for the project process displaying includes the following steps:
Obtain the two-level node under level-one profession node;
Obtain the vivid process under the two-level node;
The progress of the vivid process is counted and shown according to the examination position of the vivid process.
2. the method for project process displaying as described in claim 1, which is characterized in that the testing according to the vivid process Position is received to count and show that the progress step of the vivid process includes later:
According to the vivid process statistics and show the progress of the two-level node;
According to the statistics of the two-level node and show the progress of the level-one profession node.
3. the method for project process displaying as claimed in claim 2, which is characterized in that described according to the vivid process progress It counts and shows that the progress step of the two-level node includes:
Determine the weight of each vivid process;
According to the statistics of the weight of each vivid process and each vivid process and show the two-level node Progress.
4. the method for project process displaying as claimed in claim 3, which is characterized in that determination each vivid process Weight step include:
Obtain the benchmark weight and adjusting range of each vivid process;
The weight of each vivid process is determined according to the benchmark weight of each vivid process and adjusting range.
5. the method for project process as claimed in claim 2 displaying, which is characterized in that it is described according to the two-level node into Degree counts and shows that the progress step of the level-one profession node includes:
Determine the weight of each two-level node;
According to the statistics of the weight of each two-level node and each two-level node and show the level-one profession The progress of node.
6. the method for project process displaying as claimed in claim 5, which is characterized in that determination each two-level node Weight step include:
Obtain the benchmark weight and adjusting range of each two-level node;
The weight of each two-level node is determined according to the benchmark weight of each two-level node and adjusting range.
7. such as the method for claim 1 to 6 any one of them project process displaying, which is characterized in that described according to the shape As the examination position of process counts and the step of showing the vivid process progress includes:
The construction object of the vivid process is determined according to the examination position of the vivid process;
When the construction object is single type, is counted according to the construction object and show the vivid process progress;
When the construction object is multiple types, vivid process progress corresponding with the various construction objects is counted respectively, And according to the inclusion relation Subsystem Based on Layered Structure Model between a plurality of types of construction objects into showing the vivid process progress.
8. such as the method for claim 1 to 6 any one of them project process displaying, which is characterized in that described according to the shape As the examination position of process counts and shows that the vivid process progress step includes:
Judge for showing whether the display area area of the vivid process progress is more than default display area area threshold;
When for showing that the display area area of the vivid process progress is more than the default display area area threshold, point It Tong Ji not vivid process progress corresponding with the various examination positions;
Image corresponding with the various examination positions is shown simultaneously in the display area of the display vivid process progress Process progress.
9. a kind of project process shows device, which is characterized in that described device includes:It memory, processor and is stored in described On memory and the project process presentation program that can run on the processor, the project process presentation program is by the place It manages when device executes and realizes such as the step of project process methods of exhibiting described in any item of the claim 1 to 8.
10. a kind of computer readable storage medium, which is characterized in that be stored on the computer readable storage medium project into Presentation program is spent, is realized as described in any item of the claim 1 to 8 when the project process presentation program is executed by processor The step of project process methods of exhibiting.
CN201810319947.7A 2018-04-10 2018-04-10 The method, apparatus and computer readable storage medium of project process displaying Pending CN108537511A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810319947.7A CN108537511A (en) 2018-04-10 2018-04-10 The method, apparatus and computer readable storage medium of project process displaying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810319947.7A CN108537511A (en) 2018-04-10 2018-04-10 The method, apparatus and computer readable storage medium of project process displaying

Publications (1)

Publication Number Publication Date
CN108537511A true CN108537511A (en) 2018-09-14

Family

ID=63479607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810319947.7A Pending CN108537511A (en) 2018-04-10 2018-04-10 The method, apparatus and computer readable storage medium of project process displaying

Country Status (1)

Country Link
CN (1) CN108537511A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109615252A (en) * 2018-12-14 2019-04-12 万翼科技有限公司 The monitoring method and device of project
CN113379244A (en) * 2021-06-10 2021-09-10 筑橙科技(深圳)有限公司 Construction progress calculation method and system based on spraying robot construction
CN113393212A (en) * 2021-06-16 2021-09-14 筑橙科技(深圳)有限公司 Outer wall spraying engineering project management platform and management method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105117866A (en) * 2015-09-30 2015-12-02 北京恒华伟业科技股份有限公司 Progress state data processing method and apparatus
CN106096905A (en) * 2016-05-31 2016-11-09 北京诚公通信工程监理股份有限公司 A kind of project management method and system
CN107067220A (en) * 2016-06-20 2017-08-18 杨玉海 The full-automatic lateral road figure technical method of project management progress
CN107169673A (en) * 2017-06-09 2017-09-15 上海嘉实(集团)有限公司 Management system/method, computer-readable recording medium and the terminal of construction project
CN107679066A (en) * 2017-08-04 2018-02-09 平安科技(深圳)有限公司 Project information methods of exhibiting, electronic installation and computer-readable recording medium
CN107705069A (en) * 2017-09-27 2018-02-16 北京小米移动软件有限公司 Progress display methods and device
CN107730196A (en) * 2017-08-01 2018-02-23 上海壹账通金融科技有限公司 Project scheduling management method and terminal device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105117866A (en) * 2015-09-30 2015-12-02 北京恒华伟业科技股份有限公司 Progress state data processing method and apparatus
CN106096905A (en) * 2016-05-31 2016-11-09 北京诚公通信工程监理股份有限公司 A kind of project management method and system
CN107067220A (en) * 2016-06-20 2017-08-18 杨玉海 The full-automatic lateral road figure technical method of project management progress
CN107169673A (en) * 2017-06-09 2017-09-15 上海嘉实(集团)有限公司 Management system/method, computer-readable recording medium and the terminal of construction project
CN107730196A (en) * 2017-08-01 2018-02-23 上海壹账通金融科技有限公司 Project scheduling management method and terminal device
CN107679066A (en) * 2017-08-04 2018-02-09 平安科技(深圳)有限公司 Project information methods of exhibiting, electronic installation and computer-readable recording medium
CN107705069A (en) * 2017-09-27 2018-02-16 北京小米移动软件有限公司 Progress display methods and device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109615252A (en) * 2018-12-14 2019-04-12 万翼科技有限公司 The monitoring method and device of project
CN113379244A (en) * 2021-06-10 2021-09-10 筑橙科技(深圳)有限公司 Construction progress calculation method and system based on spraying robot construction
CN113393212A (en) * 2021-06-16 2021-09-14 筑橙科技(深圳)有限公司 Outer wall spraying engineering project management platform and management method

Similar Documents

Publication Publication Date Title
CN108537511A (en) The method, apparatus and computer readable storage medium of project process displaying
US7987110B2 (en) Managing organizational resources
KR101960162B1 (en) Building Integrated Management System and Method Based on Digital SOP and Prediction
US7483841B1 (en) Project management system and method
US20050080655A1 (en) System and model for performance value based collaborative relationships
KR20160149406A (en) Apparatus for managing a disastear and method thereof
US20120316930A1 (en) Integrated system and methods for tracking and reporting construction, completion, and inspection status
Sun et al. Resilience evaluation framework for integrated civil infrastructure–community systems under seismic hazard
CN108639879A (en) A kind of control method of elevator operation, the control device and application server of elevator
Terzic et al. Repair time model for buildings considering the earthquake hazard
CN110807580B (en) Method for analyzing key safety risk of super high-rise construction machinery based on complex network
CN108537462A (en) Confirmation method, device, computer readable storage medium and the system of project process
CN108132827A (en) A kind of network slice method for mapping resource, relevant device and system
CN103634147A (en) Network topology management method and equipment
CN107909103A (en) A kind of diamond 4C standards automatic grading method, equipment and storage device
US9734034B2 (en) System and method for processing data
Mani et al. Estimating labor productivity frontier: A pilot study
CN107341859A (en) A kind of engineering project Work attendance management system
CN104700334A (en) Real estate transaction tax integrated house price evaluation method
CN113536433A (en) BIM platform-based dynamic escape route optimization system for evacuation after disaster of building
Blagojević et al. F-RecN+ iRe-CoDeS: Computational framework for regional recovery simulation using advanced building recovery models
CN108549988A (en) The treating method and apparatus of problem
JP2019075078A (en) Construction site image determination device and construction site image determination program
CN110310038A (en) Appraisal procedure, device, equipment and the readable storage medium storing program for executing of model or strategy
JP6341550B1 (en) Construction site image determination device and construction site image determination program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180914

RJ01 Rejection of invention patent application after publication