CN108537511A - The method, apparatus and computer readable storage medium of project process displaying - Google Patents
The method, apparatus and computer readable storage medium of project process displaying Download PDFInfo
- Publication number
- CN108537511A CN108537511A CN201810319947.7A CN201810319947A CN108537511A CN 108537511 A CN108537511 A CN 108537511A CN 201810319947 A CN201810319947 A CN 201810319947A CN 108537511 A CN108537511 A CN 108537511A
- Authority
- CN
- China
- Prior art keywords
- vivid
- progress
- project
- node
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The invention discloses a kind of methods of project process displaying, including:Obtain the two-level node under level-one profession node;Obtain the vivid process under the two-level node;The progress of the vivid process is counted and shown according to the examination position of the vivid process.The invention also discloses a kind of project process displaying device and computer readable storage mediums.The present invention by obtain two-level node under vivid process, count and shows the progress of vivid process according to the examinations position of vivid process, realize for care project process different role personnel succinctly, intuitively show project process.
Description
Technical field
Method, the project process shown the present invention relates to field of engineering technology more particularly to a kind of project process shows dress
It sets and computer readable storage medium.
Background technology
With the development of computer software technology, many Project Management Softwares have been emerged in large numbers, has realized and formulates the project plan, prison
The functions such as project process, evaluation item risk are controlled, implement the entirety management to project with assisting project leader's higher efficiency, especially
It is monitoring project process and project risk.
The building engineering field segmented under engineering project, due to being concerned about that the role of the related personnel of architectural engineering progress is many
It is more, including engineering Party A, construction party, management side, customer etc., simultaneously because building structure complexity is various, the professional item that is related to
Mesh is various, work progress link is numerous and checks and accepts that object type is more, the project process exhibition in existing Project Management Software
Show that function is not appropriate for for carrying out succinct to above-mentioned numerous related personnel by project process and intuitively showing.
The above is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that the above is existing skill
Art.
Invention content
The main purpose of the present invention is to provide a kind of project process displaying method, project process displaying device and can
Read computer storage media, it is intended to which the project process displaying function of solving in Project Management Software in the prior art can not be succinct
The technical issues of intuitively showing project process.
To achieve the above object, the present invention provides a kind of method of project process displaying, the side of the project process displaying
Method includes the following steps:
Obtain the two-level node under level-one profession node;
Obtain the vivid process under the two-level node;
The progress of the vivid process is counted and shown according to the examination position of the vivid process.
Preferably, the examination position according to the vivid process counts and shows the progress step of the vivid process
Include later:
According to the vivid process statistics and show the progress of the two-level node;
According to the statistics of the two-level node and show the progress of the level-one profession node.
Preferably, described according to the vivid process statistics and to show that the progress step of the two-level node includes:
Determine the weight of each vivid process;
According to the statistics of the weight of each vivid process and each vivid process and show the two level
The progress of node.
Preferably, the weight step of the determination each vivid process includes:
Obtain the benchmark weight and adjusting range of each vivid process;
The weight of each vivid process is determined according to the benchmark weight of each vivid process and adjusting range.
Preferably, the statistics according to the two-level node and the progress step of the level-one profession node is shown
Including:
Determine the weight of each two-level node;
According to the statistics of the weight of each two-level node and each two-level node and show the level-one
The progress of professional node.
Preferably, the weight step of the determination each two-level node includes:
Obtain the benchmark weight and adjusting range of each two-level node;
The weight of each two-level node is determined according to the benchmark weight of each two-level node and adjusting range.
Preferably, the step of examination position according to the vivid process counts and shows the vivid process progress
Including:
The construction object of the vivid process is determined according to the examination position of the vivid process;
When the construction object be single type when, counted according to the construction object and show it is described image process into
Degree;
When the construction object is multiple types, respectively statistics and the corresponding image process of the various construction objects into
Degree, and according to the inclusion relation Subsystem Based on Layered Structure Model between a plurality of types of construction objects into showing the vivid process progress.
Preferably, the examination position according to the vivid process counts and shows the vivid process progress step packet
It includes:
Judge for showing whether the display area area of the vivid process progress is more than default display area area threshold
Value;
When for showing that the display area area of the vivid process progress is more than the default display area area threshold
When, vivid process progress corresponding with the various examination positions is counted respectively;
It is shown simultaneously in the display area of the display vivid process progress corresponding with the various examination positions
Vivid process progress.
In addition, to achieve the above object, the present invention also provides the device of project process displaying, which includes:It deposits
The project process displaying control program that reservoir, processor and being stored in can be run on the memory and on the processor,
The project process displaying control program realizes the step of project process methods of exhibiting as described above when being executed by the processor
Suddenly.
In addition, to achieve the above object, the present invention also proposes a kind of computer readable storage medium, which is characterized in that institute
It states and is stored with project process displaying control program on computer readable storage medium, the project process displaying control program is located
The step of reason device realizes project process methods of exhibiting as described above when executing.
The method, apparatus and readable computer storage medium for a kind of project process displaying that the embodiment of the present invention proposes, are obtained
The two-level node under level-one profession node is taken, the vivid process under the two-level node is obtained, according to testing for the vivid process
Receive the progress that position counts and shows the vivid process.The present invention by for the process designated image process under two-level node,
The progress of vivid process is counted and show according to the examination position of vivid process, is realized to be concerned about the different role of project process
Personnel it is succinct, intuitively show project process.
Description of the drawings
Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of project process methods of exhibiting first embodiment of the present invention;
Fig. 3 is the flow diagram of project process methods of exhibiting second embodiment of the present invention;
Fig. 4 is the flow diagram of project process methods of exhibiting 3rd embodiment of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:The two-level node under level-one profession node is obtained, obtains described two
Vivid process under grade node counts according to the examination position of the vivid process and shows the progress of the vivid process.
Since in the prior art, building structure complexity is various, is related to items are various, work progress link is numerous simultaneously
And it is more to check and accept object type, project process in existing Project Management Software displaying function be not appropriate for for by project into
Degree is carried out succinct and is intuitively shown to above-mentioned numerous related personnel.
The present invention provides a solution, by for the process designated image process under two-level node, according to vivid work
The examination position of sequence counts and shows the progress of vivid process, realizes personnel's letter of the different role to be concerned about project process
It is clean, intuitively show project process.
As shown in Figure 1, the terminal structure schematic diagram for the hardware running environment that Fig. 1, which is the embodiment of the present invention, to be related to.
Terminal of the embodiment of the present invention is that project process shows device.
As shown in Figure 1, the device may include:Processor 1001, such as CPU, communication bus 1002, memory 1003.
Wherein, communication bus 1002 is for realizing the connection communication between these components.Memory 1003 can be high-speed RAM storage
Device can also be stable memory (non-volatile memory), such as magnetic disk storage.Memory 1003 is optional
It can also be the storage device independently of aforementioned processor 1001.
It will be understood by those skilled in the art that the restriction of the not structure paired terminal of terminal structure shown in Fig. 1, can wrap
It includes than illustrating more or fewer components, either combines certain components or different components arrangement.
As shown in Figure 1, as may include operating system and project in a kind of memory 1003 of computer storage media
Progress display controls application program.
In device shown in Fig. 1, processor 1001 can be used for calling the project process exhibition stored in memory 1003
Show control program, and executes following operation:
Obtain the two-level node under level-one profession node;
Obtain the vivid process under the two-level node;
The progress of the vivid process is counted and shown according to the examination position of the vivid process.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control
Sequence also executes following operation:
According to the vivid process statistics and show the progress of the two-level node;
According to the statistics of the two-level node and show the progress of the level-one profession node.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control
Sequence also executes following operation:
Determine the weight of each vivid process;
According to the statistics of the weight of each vivid process and each vivid process and show the two level
The progress of node.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control
Sequence also executes following operation:
Obtain the benchmark weight and adjusting range of each vivid process;
The weight of each vivid process is determined according to the benchmark weight of each vivid process and adjusting range.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control
Sequence also executes following operation:
Determine the weight of each two-level node;
According to the statistics of the weight of each two-level node and each two-level node and show the level-one
The progress of professional node.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control
Sequence also executes following operation:
Obtain the benchmark weight and adjusting range of each two-level node;
The weight of each two-level node is determined according to the benchmark weight of each two-level node and adjusting range.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control
Sequence also executes following operation:
The construction object of the vivid process is determined according to the examination position of the vivid process;
When the construction object be single type when, counted according to the construction object and show it is described image process into
Degree;
When the construction object is multiple types, respectively statistics and the corresponding image process of the various construction objects into
Degree, and according to the inclusion relation Subsystem Based on Layered Structure Model between a plurality of types of construction objects into showing the vivid process progress.
Further, processor 1001 can call the project process stored in memory 1003 to show that journey is applied in control
Sequence also executes following operation:
Judge for showing whether the display area area of the vivid process progress is more than default display area area threshold
Value;
When for showing that the display area area of the vivid process progress is more than the default display area area threshold
When, vivid process progress corresponding with the various examination positions is counted respectively;
Image corresponding with the various examination positions is shown simultaneously in the region of the display vivid process progress
Process progress.
With reference to Fig. 2, first embodiment of the invention provides a kind of method of project process displaying, the method includes:
Step S10 obtains the two-level node under level-one profession node.
The process type that project is included is various, in order to which finally energy level clearly shows all process steps progress, first many
Multi-process is classified according to the profession belonging to it.
Level-one profession node is defined with many types, and the two-level node under level-one profession node can be that belong to the level-one special
The various processes of industry node can also be thinner professional classification, such as the process type further divided according to major field.
Such as in construction projects, level-one profession node is electromechanics, civil engineering, finishing, garden is built and this five, milestone, and level-one is electromechanical
Two-level node under professional node includes pipeline set aside pre-embedded engineering, dispatch from foreign news agency and high-low pressure power engineering and heavy current engineering, two level
Process under node heavy current engineering includes obtaining dispatch from foreign news agency power supply plan.
Step S20 obtains the vivid process under the two-level node.
Working procedures are generally comprised under two-level node, need to pick out vivid process from these working procedures.Vivid work
Sequence refers to that the effect that process is completed is the process that its progress can be directly observed from appearance.Such as in construction engineering project
In, the two-level node under level-one Civil Specialities node includes major project, basement civil air defense engineering, indoor terrace engineering, wallboard
Engineering and plastering engineering etc. are all the two-level node that its progress can be observed from the appearance for the building completed, these two levels
Include vivid process in process corresponding to node.
Step S30 counts according to the examination position of the vivid process and shows the progress of the vivid process.
Vivid process checks and accepts the difference at position according to it, is counted using different modes and shows its progress.
The construction object that the image process is first determined according to the examination position of vivid process, when construction object is single type
When, it is counted according to the construction object and shows vivid process progress;When object of constructing is multiple types, count respectively and various
The corresponding vivid process progress of object of constructing, and according to the inclusion relation Subsystem Based on Layered Structure Model between a plurality of types of construction objects into displaying
Vivid process progress.
It is illustrated by taking construction engineering project as an example below and how to count and open up according to the examination position of vivid process
Show its progress.The examination position type that construction-engineering project may include is:By stages, pile foundation, Lou Dong, floor, facade, room,
Ground library and gardens.Wherein, by stages with pile foundation be the corresponding examination position of level-one profession node, be not belonging to the examination portion of vivid process
Bit class.
When the examination position of vivid process be building, library or when gardens, the construction object of the image process be building,
The single type in library or gardens counts according to the construction object and shows the image process progress.Specifically, when vivid process
Construction object be Lou Dongshi, need to count and show respectively the progress situation that the vivid process in each building is completed.In software reality
On now, first shows that the page of a building list, the buildings page Shang Yigedong are mark, show each all images downstairs respectively
The Percent Complete of process;The mark in corresponding each building can show another page when certain building mark is selected,
With each vivid process to identify on the page, whether showing that each vivid process is completed respectively.
When the examination position of vivid process is floor, facade or room, the construction object of the image process includes a variety of
Type counts vivid process progress corresponding with various construction objects respectively, and according between a plurality of types of construction objects
Inclusion relation Subsystem Based on Layered Structure Model is into the vivid process progress of displaying.Construction object be comprising a plurality of types of concrete meanings:Such as examination portion
Position is floor, because building includes floor, which includes the two kinds of construction objects in building and floor;For example examination part is
Room, because it includes floor again that floor, which includes room, building, which applies for three kinds in total comprising building, floor and room
Work object.
Specifically, it when the examination position of vivid process is room, needs to count and show room, floor and Lou Dong respectively
Progress situation.In software realization, first show that the page of a building list, the buildings page Shang Yigedong are mark, respectively
Show the Percent Complete of each all vivid processes downstairs;The mark in corresponding each building, when certain building mark is selected,
It can show another page, each floor in the buildings page Shang Yigai is mark, shows that lower of each floor is tangible respectively
As the Percent Complete of process;The mark of corresponding each floor can show another page when certain floor identification is selected
Face with each room of the floor is mark on the page, whether showing that the vivid process in each room is completed respectively.
In the present embodiment, by for the process designated image process under two-level node, according to the examination portion of vivid process
Position counts and shows the progress of vivid process, and the personnel for realizing the different role to be concerned about project process are succinct, intuitive exhibition
Show project process.
Further, with reference to Fig. 3, second embodiment of the invention provides a kind of project process displaying based on first embodiment
Method, the present embodiment further include after step S30:
Step S40 according to the vivid process statistics and shows the progress of the two-level node.
The weight for determining each vivid process, according to the statistics of the weight of each vivid process and each vivid process
And show the progress of two-level node.Specifically, the progress percentage of each vivid process corresponding weight coefficient is multiplied by obtain
The weighting progress of each image process, then the weighting progress of all vivid processes is summed, it obtains belonging to vivid process
The progress of two-level node is estimated.
In order to adapt to the demand of different types of project process statistics, need the demand according to practical application scene to image
The weight of process is adjusted.After the benchmark weight and adjusting range for obtaining each vivid process, according to each vivid work
The benchmark weight and adjusting range of sequence determine the weight of each vivid process.
Step S50 according to the statistics of the two-level node and shows the progress of the level-one profession node.
The weight for determining each two-level node, according to the statistics of the weight of each two-level node and each two-level node
And show the progress of the level-one profession node.Specifically, the progress percentage of each two-level node is multiplied by corresponding weight
Coefficient obtains the weighting progress of each two-level node, then the weighting progress of all two-level nodes is summed, and obtains two level section
The progress estimation of first nodes belonging to point.
In order to adapt to the demand of different types of project process statistics, need the demand according to practical application scene to two level
The weight of node is adjusted.After the benchmark weight and adjusting range for obtaining each two-level node, according to each two level section
The benchmark weight and adjusting range of point determine the weight of each two-level node.
In the present embodiment, first according to vivid process statistics and the progress of two-level node is shown, further according to two level section
The statistics of point and the progress for showing level-one profession node realize the effect of the whole project process of hierarchical multi-angle displaying
Fruit.
Further, with reference to Fig. 4, third embodiment of the invention is based on the first embodiment or the second embodiment and provides a kind of item
The method of mesh progress display, the present embodiment include in step S30:
Step S60 judges for showing whether the region area of the vivid process progress is more than preset area threshold value.
In addition to comprising level-one profession node image progress display, two-level node image progress display, three-level image process into
It spends outside the multi-layer methods of exhibiting of displaying, it, can be with when for showing that the region area of vivid process progress is sufficiently large
The progress of all vivid processes is shown in a manner of tiling by a variety of examination positions.
Need first to preset a region area threshold value, the area threshold according to simultaneously show it is a variety of check and accept positions institute it is tangible
Maximum region area as shared by process is configured, and is judged for showing whether the region area of vivid process progress is more than
Preset area threshold value.
Step S70, when for showing that the region area of the vivid process progress is more than the preset area threshold value, point
It Tong Ji not vivid process progress corresponding with the various examination positions.
When judging that the region area for showing vivid process progress is more than preset area threshold value, show current item
Part allows the progress that all vivid processes are shown in the form of tiling, then corresponding all according to various examination positions statistics respectively
Vivid process progress.
Specifically, can be all under the direct upper layer node of vivid procedure-node i.e. two-level node for what is shown simultaneously
The progress of vivid process, at this time according to the various examination positions occurred under two-level node count respectively its corresponding vivid process into
Degree;For show simultaneously can also be all vivid processes under level-one profession node on two-level node progress, this
When according to the various examination positions occurred under level-one profession node count its corresponding vivid process progress respectively.In above-mentioned scene
In, it may appear that it needs according to the progress for belonging to same examination position but the vivid procedure-node of variety classes or different majors
An overall progress estimation is obtained, it at this time can be to different weights be assigned to it respectively, according to it in a manner of average weighted
Progress obtains the estimation to overall progress.
Step S80 is shown and the various examination positions pair simultaneously in the region of the displaying vivid process progress
The vivid process progress answered.
In the present embodiment, by judging whether the region area for showing vivid process progress is more than preset area threshold
Value, counts vivid process progress corresponding with various examinations positions respectively when being more than, and the same area displaying simultaneously with it is various
Check and accept the corresponding vivid process progress in position, the displaying of this progress that all vivid processes are shown in the form of tiling and classify
Method, more visual pattern, the progress situation for more completely reflecting integrated engineering.
The present invention also provides a kind of device of project process displaying, which includes:Memory, processor and it is stored in institute
State the project process displaying control program that can be run on memory and on the processor, the project process displaying control journey
The step of project process methods of exhibiting is realized when sequence is executed by the processor.
In addition, the embodiment of the present invention also proposes a kind of computer readable storage medium, the computer readable storage medium
On be stored with project process displaying control program, project process displaying control program is realized described when being executed by processor
The step of project process methods of exhibiting.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that process, method, article or system including a series of elements include not only those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this
There is also other identical elements in the process of element, method, article or system.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art
Going out the part of contribution can be expressed in the form of software products, which is stored in one as described above
In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions use so that a station terminal equipment (can be mobile phone,
Computer, server, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (10)
1. a kind of method of project process displaying, which is characterized in that the method for the project process displaying includes the following steps:
Obtain the two-level node under level-one profession node;
Obtain the vivid process under the two-level node;
The progress of the vivid process is counted and shown according to the examination position of the vivid process.
2. the method for project process displaying as described in claim 1, which is characterized in that the testing according to the vivid process
Position is received to count and show that the progress step of the vivid process includes later:
According to the vivid process statistics and show the progress of the two-level node;
According to the statistics of the two-level node and show the progress of the level-one profession node.
3. the method for project process displaying as claimed in claim 2, which is characterized in that described according to the vivid process progress
It counts and shows that the progress step of the two-level node includes:
Determine the weight of each vivid process;
According to the statistics of the weight of each vivid process and each vivid process and show the two-level node
Progress.
4. the method for project process displaying as claimed in claim 3, which is characterized in that determination each vivid process
Weight step include:
Obtain the benchmark weight and adjusting range of each vivid process;
The weight of each vivid process is determined according to the benchmark weight of each vivid process and adjusting range.
5. the method for project process as claimed in claim 2 displaying, which is characterized in that it is described according to the two-level node into
Degree counts and shows that the progress step of the level-one profession node includes:
Determine the weight of each two-level node;
According to the statistics of the weight of each two-level node and each two-level node and show the level-one profession
The progress of node.
6. the method for project process displaying as claimed in claim 5, which is characterized in that determination each two-level node
Weight step include:
Obtain the benchmark weight and adjusting range of each two-level node;
The weight of each two-level node is determined according to the benchmark weight of each two-level node and adjusting range.
7. such as the method for claim 1 to 6 any one of them project process displaying, which is characterized in that described according to the shape
As the examination position of process counts and the step of showing the vivid process progress includes:
The construction object of the vivid process is determined according to the examination position of the vivid process;
When the construction object is single type, is counted according to the construction object and show the vivid process progress;
When the construction object is multiple types, vivid process progress corresponding with the various construction objects is counted respectively,
And according to the inclusion relation Subsystem Based on Layered Structure Model between a plurality of types of construction objects into showing the vivid process progress.
8. such as the method for claim 1 to 6 any one of them project process displaying, which is characterized in that described according to the shape
As the examination position of process counts and shows that the vivid process progress step includes:
Judge for showing whether the display area area of the vivid process progress is more than default display area area threshold;
When for showing that the display area area of the vivid process progress is more than the default display area area threshold, point
It Tong Ji not vivid process progress corresponding with the various examination positions;
Image corresponding with the various examination positions is shown simultaneously in the display area of the display vivid process progress
Process progress.
9. a kind of project process shows device, which is characterized in that described device includes:It memory, processor and is stored in described
On memory and the project process presentation program that can run on the processor, the project process presentation program is by the place
It manages when device executes and realizes such as the step of project process methods of exhibiting described in any item of the claim 1 to 8.
10. a kind of computer readable storage medium, which is characterized in that be stored on the computer readable storage medium project into
Presentation program is spent, is realized as described in any item of the claim 1 to 8 when the project process presentation program is executed by processor
The step of project process methods of exhibiting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810319947.7A CN108537511A (en) | 2018-04-10 | 2018-04-10 | The method, apparatus and computer readable storage medium of project process displaying |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810319947.7A CN108537511A (en) | 2018-04-10 | 2018-04-10 | The method, apparatus and computer readable storage medium of project process displaying |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108537511A true CN108537511A (en) | 2018-09-14 |
Family
ID=63479607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810319947.7A Pending CN108537511A (en) | 2018-04-10 | 2018-04-10 | The method, apparatus and computer readable storage medium of project process displaying |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108537511A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109615252A (en) * | 2018-12-14 | 2019-04-12 | 万翼科技有限公司 | The monitoring method and device of project |
CN113379244A (en) * | 2021-06-10 | 2021-09-10 | 筑橙科技(深圳)有限公司 | Construction progress calculation method and system based on spraying robot construction |
CN113393212A (en) * | 2021-06-16 | 2021-09-14 | 筑橙科技(深圳)有限公司 | Outer wall spraying engineering project management platform and management method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105117866A (en) * | 2015-09-30 | 2015-12-02 | 北京恒华伟业科技股份有限公司 | Progress state data processing method and apparatus |
CN106096905A (en) * | 2016-05-31 | 2016-11-09 | 北京诚公通信工程监理股份有限公司 | A kind of project management method and system |
CN107067220A (en) * | 2016-06-20 | 2017-08-18 | 杨玉海 | The full-automatic lateral road figure technical method of project management progress |
CN107169673A (en) * | 2017-06-09 | 2017-09-15 | 上海嘉实(集团)有限公司 | Management system/method, computer-readable recording medium and the terminal of construction project |
CN107679066A (en) * | 2017-08-04 | 2018-02-09 | 平安科技(深圳)有限公司 | Project information methods of exhibiting, electronic installation and computer-readable recording medium |
CN107705069A (en) * | 2017-09-27 | 2018-02-16 | 北京小米移动软件有限公司 | Progress display methods and device |
CN107730196A (en) * | 2017-08-01 | 2018-02-23 | 上海壹账通金融科技有限公司 | Project scheduling management method and terminal device |
-
2018
- 2018-04-10 CN CN201810319947.7A patent/CN108537511A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105117866A (en) * | 2015-09-30 | 2015-12-02 | 北京恒华伟业科技股份有限公司 | Progress state data processing method and apparatus |
CN106096905A (en) * | 2016-05-31 | 2016-11-09 | 北京诚公通信工程监理股份有限公司 | A kind of project management method and system |
CN107067220A (en) * | 2016-06-20 | 2017-08-18 | 杨玉海 | The full-automatic lateral road figure technical method of project management progress |
CN107169673A (en) * | 2017-06-09 | 2017-09-15 | 上海嘉实(集团)有限公司 | Management system/method, computer-readable recording medium and the terminal of construction project |
CN107730196A (en) * | 2017-08-01 | 2018-02-23 | 上海壹账通金融科技有限公司 | Project scheduling management method and terminal device |
CN107679066A (en) * | 2017-08-04 | 2018-02-09 | 平安科技(深圳)有限公司 | Project information methods of exhibiting, electronic installation and computer-readable recording medium |
CN107705069A (en) * | 2017-09-27 | 2018-02-16 | 北京小米移动软件有限公司 | Progress display methods and device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109615252A (en) * | 2018-12-14 | 2019-04-12 | 万翼科技有限公司 | The monitoring method and device of project |
CN113379244A (en) * | 2021-06-10 | 2021-09-10 | 筑橙科技(深圳)有限公司 | Construction progress calculation method and system based on spraying robot construction |
CN113393212A (en) * | 2021-06-16 | 2021-09-14 | 筑橙科技(深圳)有限公司 | Outer wall spraying engineering project management platform and management method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108537511A (en) | The method, apparatus and computer readable storage medium of project process displaying | |
US7987110B2 (en) | Managing organizational resources | |
KR101960162B1 (en) | Building Integrated Management System and Method Based on Digital SOP and Prediction | |
US7483841B1 (en) | Project management system and method | |
US20050080655A1 (en) | System and model for performance value based collaborative relationships | |
KR20160149406A (en) | Apparatus for managing a disastear and method thereof | |
US20120316930A1 (en) | Integrated system and methods for tracking and reporting construction, completion, and inspection status | |
Sun et al. | Resilience evaluation framework for integrated civil infrastructure–community systems under seismic hazard | |
CN108639879A (en) | A kind of control method of elevator operation, the control device and application server of elevator | |
Terzic et al. | Repair time model for buildings considering the earthquake hazard | |
CN110807580B (en) | Method for analyzing key safety risk of super high-rise construction machinery based on complex network | |
CN108537462A (en) | Confirmation method, device, computer readable storage medium and the system of project process | |
CN108132827A (en) | A kind of network slice method for mapping resource, relevant device and system | |
CN103634147A (en) | Network topology management method and equipment | |
CN107909103A (en) | A kind of diamond 4C standards automatic grading method, equipment and storage device | |
US9734034B2 (en) | System and method for processing data | |
Mani et al. | Estimating labor productivity frontier: A pilot study | |
CN107341859A (en) | A kind of engineering project Work attendance management system | |
CN104700334A (en) | Real estate transaction tax integrated house price evaluation method | |
CN113536433A (en) | BIM platform-based dynamic escape route optimization system for evacuation after disaster of building | |
Blagojević et al. | F-RecN+ iRe-CoDeS: Computational framework for regional recovery simulation using advanced building recovery models | |
CN108549988A (en) | The treating method and apparatus of problem | |
JP2019075078A (en) | Construction site image determination device and construction site image determination program | |
CN110310038A (en) | Appraisal procedure, device, equipment and the readable storage medium storing program for executing of model or strategy | |
JP6341550B1 (en) | Construction site image determination device and construction site image determination program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180914 |
|
RJ01 | Rejection of invention patent application after publication |