CN107730196A - Project scheduling management method and terminal device - Google Patents

Project scheduling management method and terminal device Download PDF

Info

Publication number
CN107730196A
CN107730196A CN201710646760.3A CN201710646760A CN107730196A CN 107730196 A CN107730196 A CN 107730196A CN 201710646760 A CN201710646760 A CN 201710646760A CN 107730196 A CN107730196 A CN 107730196A
Authority
CN
China
Prior art keywords
object icon
task
attributes object
taskbar
viewing area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710646760.3A
Other languages
Chinese (zh)
Other versions
CN107730196B (en
Inventor
唐晟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OneConnect Smart Technology Co Ltd
Original Assignee
OneConnect Financial Technology Co Ltd Shanghai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OneConnect Financial Technology Co Ltd Shanghai filed Critical OneConnect Financial Technology Co Ltd Shanghai
Priority to CN201710646760.3A priority Critical patent/CN107730196B/en
Priority to PCT/CN2018/077045 priority patent/WO2019024489A1/en
Publication of CN107730196A publication Critical patent/CN107730196A/en
Application granted granted Critical
Publication of CN107730196B publication Critical patent/CN107730196B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0481Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
    • G06F3/0482Interaction with lists of selectable items, e.g. menus
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0484Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
    • G06F3/04847Interaction techniques to control parameter settings, e.g. interaction with sliders or dials

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Computer Interaction (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • User Interface Of Digital Computer (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of project scheduling management method and terminal device, suitable for technical field of information management, this method includes:Instructed according to the establishment of item received, create item view, multiple viewing areas of sequential are included in the item view;Multiple tasks column is generated in the viewing area;Display properties object icon is bound for each taskbar, the attributes object icon is used for the implementation member for identifying the task corresponding to it represented by taskbar;If receiving the completion instruction on a task, in taskbar corresponding to this task, the color for the attributes object icon for binding display is changed to the second preset value by the first preset value, updated with finished item progress.The invention enables each implementation member of project can intuitively view the director of each task, it is thus understood that the implementation progress of each task, without cumbersome communication work is carried out again, improves the efficiency of management of project process, shortens the cycle of software development.

Description

Project scheduling management method and terminal device
Technical field
The invention belongs to technical field of information management, more particularly to a kind of project scheduling management method and terminal device.
Background technology
At present, each implementation link of software development process will generally be completed by different functional engineers.For example, Link is implemented in product demand, UI designs, front end exploitation, backstage exploitation, software test etc., will have corresponding engineer to come successively Complete.If however, there is unfinished situation of exceeding the time limit in a certain implementation link, the Project Manager of the exploration project need into The substantial amounts of communication work of row just can determine that problem goes out and which implements link at and determines which engineer is task be stranded in.Separately Outside, in real process, the engineer that difference implements link is also possible to be distributed in different job sites, thus whole software is opened The management of hair process is relatively complicated, time-consuming, consequently leads to the execution that each engineer is difficult to the whole software development process of control Progress.If the previous each engineer for implementing link has completed its respective task, and development task does not circulate in time The engineer of extremely next implementation link, then it can equally influence the implementation progress of whole software development process.
To sum up, in the prior art, exist because project scheduling management efficiency is low cause software development cycle longer the problem of.
The content of the invention
In view of this, it is existing to solve the embodiments of the invention provide a kind of project scheduling management method and terminal device In technology because project scheduling management efficiency is low causes software development cycle longer the problem of.
The first aspect of the embodiment of the present invention provides a kind of project scheduling management method, including:
Instructed according to the establishment of item received, create item view, include sequential in the item view Multiple viewing areas, each viewing area represent a development phase of project respectively;
Multiple tasks column is generated in the viewing area, each taskbar represents that the viewing area is corresponding respectively Development phase in a task;
Display properties object icon is bound for each taskbar, the attributes object icon is used to identify corresponding to it The implementation member of task represented by the taskbar;
If receiving the completion instruction on a task, in the taskbar corresponding to this task, will bind The color of the attributes object icon of display is changed to the second preset value by the first preset value, is updated with finished item progress.
The second aspect of the embodiment of the present invention provides a kind of project scheduling management device, including:
Establishment of item unit, instructed for the establishment of item that basis receives, establishment item view, in the item view Include multiple viewing areas of sequential, each viewing area represents a development phase of project respectively;
Taskbar generation unit, for generating multiple tasks column, each taskbar difference in the viewing area Represent a task in the development phase corresponding to the viewing area;
Display unit is bound, for binding display properties object icon, the attributes object figure for each taskbar Mark the implementation member for identifying the task represented by the taskbar corresponding to it;
Color changing unit, if for receiving the completion instruction on a task, in institute corresponding to this task State in taskbar, the color for the attributes object icon for binding display is changed to the second preset value by the first preset value, with Finished item progress updates.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in In the memory and the computer program that can run on the processor, described in the computing device during computer program Realize following steps:
Instructed according to the establishment of item received, create item view, include sequential in the item view Multiple viewing areas, each viewing area represent a development phase of project respectively;
Multiple tasks column is generated in the viewing area, each taskbar represents that the viewing area is corresponding respectively Development phase in a task;
Display properties object icon is bound for each taskbar, the attributes object icon is used to identify corresponding to it The implementation member of task represented by the taskbar;
If receiving the completion instruction on a task, in the taskbar corresponding to this task, will bind The color of the attributes object icon of display is changed to the second preset value by the first preset value, is updated with finished item progress.
The fourth aspect of the embodiment of the present invention provides a kind of computer-readable recording medium, the computer-readable storage Media storage has computer program, and the computer program realizes following steps when being executed by processor:
Instructed according to the establishment of item received, create item view, include sequential in the item view Multiple viewing areas, each viewing area represent a development phase of project respectively;
Multiple tasks column is generated in the viewing area, each taskbar represents that the viewing area is corresponding respectively Development phase in a task;
Display properties object icon is bound for each taskbar, the attributes object icon is used to identify corresponding to it The implementation member of task represented by the taskbar;
If receiving the completion instruction on a task, in the taskbar corresponding to this task, will bind The color of the attributes object icon of display is changed to the second preset value by the first preset value, is updated with finished item progress.
In the embodiment of the present invention, by generating different taskbars in the viewing area associated from the project development stage, And the display properties object icon in taskbar so that each engineer of development project can be according to corresponding to taskbar Attributes object icon, intuitively view the implementation personnel of each task, thus cumbersome poorly efficient repetition ditch need not be carried out again Logical work;When any implementation member completes its responsible task, by taskbar by the attributes object of implementation member The color of icon is changed, and ensure that the color based on each attributes object icon in item view, can be recognized in real time each Individual the implementing member of the task completes situation, thus, it is possible to the implementation progress of clear and definite whole development project, accelerates each reality The handing-over and circulation of task between member are applied, thus improves the efficiency of management of project process, shortens the cycle of software development.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art In the required accompanying drawing used be briefly described, it should be apparent that, drawings in the following description be only the present invention some Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these Accompanying drawing obtains other accompanying drawings.
Fig. 1 is the implementation process figure for the project scheduling management method that the embodiment of the present invention one provides;
Fig. 2 is the implementation process figure for the project scheduling management method that the embodiment of the present invention two provides;
Fig. 3 is the implementation process figure for the project scheduling management method that the embodiment of the present invention three provides;
Fig. 4 is the implementation process figure for the project scheduling management method that the embodiment of the present invention four provides;
Fig. 5 is the schematic diagram for the progress bar that the embodiment of the present invention four provides;
Fig. 6 is the implementation process figure for the project scheduling management method that the embodiment of the present invention five provides;
Fig. 7 is the structured flowchart for the project scheduling management device that the embodiment of the present invention six provides;
Fig. 8 is the structured flowchart for the project scheduling management device that the embodiment of the present invention six provides;
Fig. 9 is the structured flowchart for the project scheduling management device that the embodiment of the present invention six provides;
Figure 10 is the structured flowchart for the project scheduling management device that the embodiment of the present invention six provides;
Figure 11 is the schematic diagram for the terminal device that the embodiment of the present invention seven provides.
Embodiment
In describing below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc Body details, thoroughly to understand the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention can also be realized in the other embodiments of details.In other situations, omit to well-known system, device, electricity Road and the detailed description of method, in case unnecessary details hinders description of the invention.
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
Embodiment one
Fig. 1 shows the implementation process of project scheduling management method provided in an embodiment of the present invention, and this method flow includes Step S101 to S104.The specific implementation principle of each step is as follows.
S101:Instructed according to the establishment of item received, create item view, include in the item view and sequentially arrange Multiple viewing areas of row, each viewing area represents a development phase of project respectively.
In the application client of terminal device, displaying has various functions button.When detecting establishment of item button When being selected, the establishment of item instruction that user sends can be received.The user for example can be director or the project pipe of project Reason person.Instructed based on establishment of item, create the item view related to an engineering project.Engineering project is including but not limited to soft Part exploration project, construction-engineering project and research and production project etc..Item view is used to be each implementation phase in engineering project Implementation progress generate a visual reference page.
In the embodiment of the present invention, being specifically described for technical scheme is carried out by taking development project as an example.It is worth noting that, The embodiment of the present invention applies also for the Other Engineering project outside development project.
Before a development project starts, according to the execution flow of whole development project, work out more The individual development phase.Such as product demand investigation stage, UI design phases, front end development phase, backstage development phase and software Test phase etc..In the embodiment of the present invention, after item view is created, inputted according to Project Manager in item view Development phase quantity, generation with the multiple viewing areas of development phase quantity identical.
The title for the development phase that Project Manager is inputted is preferably based on, the title of each development phase is distinguished The predeterminated position being shown in corresponding viewing area, so that based on title shown in viewing area, can be directly perceived Ground views which development phase the viewing area corresponds to.
In item view, according to the execution sequence of each development phase, each viewing area is arranged.When detecting When dragging based on any viewing area instructs, putting in order for the viewing area can be adjusted, with software development During, project leader can be with flexible dispatching and the execution sequence of adjustment each development phase.
S102:Multiple tasks column is generated in the viewing area, each taskbar represents the viewing area respectively A task in development phase corresponding to domain.
Each development phase is generally required for the implementation member of multiple different functions to be completed to cooperate with, and different implementation The task that member is responsible for can generally also be not quite similar.For each task corresponding to clearly each development phase, showing In region, the taskbar for representing a task in the development phase corresponding to the viewing area is generated.In viewing area, task The quantity on column is identical with the task quantity of development phase corresponding to the viewing area.
S103:Display properties object icon is bound for each taskbar, the attributes object icon is used to identify it The implementation member of task represented by the corresponding taskbar.
According to the implementation member of each task, it is related in item view to be that each taskbar binding to it implements member Attributes object icon.Attributes object icon is unique such as that can be used for the individual human head picture or Personal name for the person of being implemented as The visual control of one implementation member of mark.
In an initial condition, the color of each attributes object icon is the first preset value, such as grey.
Exemplarily, the mode with taskbar bind properties object icon for example can be:Each implementation member passes through it Personal account carrys out login application program client, in taskbar choice box, inputs the keyword matched with taskbar, Jin Erfa Column addition of going out on missions is asked., will when receiving when adding the confirmation of request based on the taskbar of Project Manager's return The attributes object icon and taskbar for identifying implementation member are bound.
S104:, will in the taskbar corresponding to this task if receiving the completion instruction on a task The color for binding the attributes object icon of display is changed to the second preset value by the first preset value, with finished item progress more Newly.
When a certain implementation member A in development project logs in above-mentioned application client by its people's account When, implementation member can view each viewing area, taskbar and attribute in its extent of competence in above-mentioned item view Object icon.
If detecting, implementation member A sends task in the taskbar comprising its attributes object icon and completes instruction, The color of attributes object icon corresponding with implementing member A is converted into the second preset value from the first preset value.Second preset value Such as can be by implementing other customized colors of member A in addition to grey.
If other in development project implement the access authority that member also possesses above-mentioned taskbar, can be at this The attributes object icon that implementation member A is viewed in business column is the second preset value, it is thus possible to determines that implementing member A has completed Its responsible task.If the attributes object icon that implementation member B is viewed in the taskbar is still the first preset value, Then it is capable of determining that implementing member B not yet completes its responsible task.
In the embodiment of the present invention, by generating different taskbars in the viewing area associated from the project development stage, And the display properties object icon in taskbar so that each engineer of development project can be according to corresponding to taskbar Attributes object icon, intuitively view the implementation personnel of each task, thus cumbersome poorly efficient repetition ditch need not be carried out again Logical work;When any implementation member completes its responsible task, by taskbar by the attributes object of implementation member The color of icon is changed, and ensure that the color based on each attributes object icon in item view, can be recognized in real time each Individual the implementing member of the task completes situation, thus, it is possible to the implementation progress of clear and definite whole development project, accelerates each reality The handing-over and circulation of task between member are applied, thus improves the efficiency of management of project process, shortens the cycle of software development.
Embodiment two
The embodiment of the present invention is on the basis of above-described embodiment one, to the binding mode of attributes object icon in taskbar Further limit, as shown in Fig. 2 above-mentioned S103 is specifically included:
S1031:Attributes object icon list is shown in the item view, is included in the attributes object icon list Multiple attributes object icons.
After the completion of item view establishment, in current item view, displaying has attributes object icon list.Project pipe Reason person can input server link address in attributes object icon list, so as to the implementation in remote server is successfully called During information about firms, it can be generated in attributes object icon list and identify each attributes object icon for implementing member.
For example, if Project Manager with inputting the connection of company's domain server in the setting column of attributes object icon list Location, and detect that Project Manager sends confirmation instruction, then according to the link address, it is confirmed whether to exist to be provided with and implements member Information calls the domain server of service.If in the presence of the domain server for being provided with implementation information about firms calling service, reading prestores Each implementation information about firms in domain server so that item view can be in attributes object icon list, with attributes object The form of icon identifies different implementation members.
S1032:When the taskbar binding event associated with a task is triggered, in the attributes object icon list In, instruction is chosen according to the attributes object icon received, it is determined that and each attribute of display and taskbar binding Object icon.
Project Manager is by switching the focus in item view, any taskbar that can be in viewing area is shifted focus to When, selection instruction is sent, then taskbar binding event is triggered.Now, Project Manager can switch to focus above-mentioned category Sex object icon list, with the implementation member of a further task according to corresponding to the taskbar, in attributes object icon The attributes object icon of mark implementation member is chosen in list.
After attributes object icon is chosen, each attributes object icon selected by user is tied up with the taskbar It is fixed.
In the embodiment of the present invention, the attributes object icon of each implementation member is identified respectively by showing in advance so that item Mesh keeper can determine to need the implementation member for completing each task respectively in dependence object icon list, thus improve The flexibility of project management.
Embodiment three
The embodiment of the present invention on the basis of above-described embodiment one, make by the mode to be circulated to task in development project Further limit, as shown in figure 3, after above-mentioned S104, in addition to:
S105:At any one time, if detecting, the color of any attributes object icon changes, and judges and is somebody's turn to do In the viewing area of attributes object icon binding display, whether the color of each attributes object icon is described the Two preset values.
When detect it is any implementation member sent in the taskbar bound in its attributes object icon task complete refer to When making, the color of the attributes object icon of implementation member is changed to the second preset value.Now, the color of attributes object icon Changed.
Because attributes object icon is shown in the taskbar bound with it, taskbar is located in viewing area, therefore, can be with Determine the viewing area for including the attributes object icon.When the color of attributes object icon changes, acquisition is present in The all properties object icon of the viewing area, i.e. obtain all category of the bound display of each taskbar in the viewing area Sex object icon.Whether the color for each attributes object icon for judging to acquire all is changed to the second preset value.
S106:If in the viewing area shown with attributes object icon binding, each attributes object icon Color be second preset value, then in another viewing area being arranged in behind the viewing area, obtain respectively with it is each The personal account of implementation member corresponding to the attributes object icon of individual taskbar binding.
If the color of each attributes object icon got is all changed to the second preset value, it is determined that goes out current aobvious Show in the development phase corresponding to region, each implementation member has completed its being each responsible for for task, therefore whole software is opened The real-time implementation progress of hair project circulated to next development phase.Therefore, in item view, according to the row of each viewing area Row order, determines next viewing area of current display area, with the viewing area that this is determined, obtain respectively with The corresponding personal account for implementing member of attributes object icon of each taskbar binding.
Wherein, required use when personal account is implements member login's above-mentioned application client based on project management Account.
S107:Task start prompt message is generated, and the task start prompt message is respectively sent to each described Personal account.
In the embodiment of the present invention, acknowledged a debt by the way that the task start prompt message of generation is sent to each acquired Number so that each implementation member of next development phase can timely receive task start prompt message, so as to task based access control Starting prompt message, it is thus understood that the software development task completed needed for oneself can proceed by, therefore, each development phase Implementation member need not carry out that cumbersome ground is multi-party to be linked up confirmation and can carry out the work rapidly again, showing for task delay will not be produced As it is thus achieved that the automatic management of project, improving the efficiency of software project development.
Example IV
The embodiment of the present invention on the basis of above-described embodiment one, make by the mode to be circulated to task in development project Further limit, as shown in figure 4, after above-mentioned S104, in addition to:
S108:In each viewing area, the first sum and statistics color of the attributes object icon are counted For the second sum of the attributes object icon of second preset value.
In each viewing area, the attributes object icon for being shown in each taskbar is obtained, including color is first pre- If the attributes object icon and color of value are the attributes object icon of the second preset value.Count the total of these attributes object icons Number, then the sum is the first sum.Sum output by the attributes object icon that wherein color is the second preset value is second total Number.
S109:Calculate the described second total ratio with the described first sum.
S110:The progress bar associated with the ratio is generated, is entered with the task schedule to each viewing area Row displaying.
As shown in figure 5, including the subregion 1 for characterizing task performance in progress bar, occupied according to the subregion The ratio of the progress bar gross area 2 is different, can generate different progress bars.
In the embodiment of the present invention, the ratio that subregion occupies progress bar area is the ratio of the above-mentioned second sum and the first sum Value.Progress bar corresponding to each viewing area is showed in the predeterminated position in the viewing area.
In the embodiment of the present invention, due to the implementation of the first sum corresponding development phase of attributes object icon in viewing area Membership, color are the second sum of the attributes object icon of the second preset value to that in the development phase, should complete task Implementation membership, thus by calculating the ratio of the second sum and the first sum, and generate the progress bar that is associated with ratio, The real-time schedule of each software development phase can be intuitively shown in item view.
Embodiment five:
The embodiment of the present invention on the basis of above-described embodiment one, make by project management mode when exceeding the time limit to complete to task Further limit, as shown in fig. 6, after above-mentioned S104, in addition to:
S111:The time limit is completed in the plan for obtaining each single item task.
In the embodiment of the present invention, Project Manager can trigger task in taskbar by way of clicking by mouse right button Column shows various functions option.When detecting that time limit setting options are triggered, the plan that can receive project Administrator is complete Into the time limit, time limit task association corresponding with the taskbar is completed in the plan.
S112:Reached if the time limit is completed in the plan of any one task, and in the taskbar corresponding to this task The color for binding the attributes object icon of display is first preset value, then the flickering display attributes object icon.
At any one time, it is identical if detecting that the moment with plan completes the time limit, it is determined that color is still in column of going out on missions For each attributes object icon of the first preset value, and flickering display is carried out to it, so that other implement members in item view In, each implementation member for not being timely completed task can be recognized.
S113:Obtain and implement member corresponding to the attributes object icon, and the task time-out on implementation member is accused Alert information is sent to default management account.
In the embodiment of the present invention, Project Manager is required when logging in application client based on project management to be used Personal account is management account.According to the implementation member corresponding to each attributes object icon of current time institute's flickering display, Task time-out prompt message based on these implementation members is sent to account is managed, includes reality in task time-out prompt message The personal information of member, including function, responsible task and department etc. are applied, so that Project Manager can surpass according to the task When prompt message, it is rapid it is clear and definite which to implement member's work below standard, so as to perform effective administrative aspects, urge and implementing Member steps up the exploitation of execution task, farthest to shorten the execution cycle of development project.
It should be understood that the size of the sequence number of each step is not meant to the priority of execution sequence, each process in above-described embodiment Execution sequence should determine that the implementation process without tackling the embodiment of the present invention forms any limit with its function and internal logic It is fixed.
Embodiment six
Corresponding to the project scheduling management method described in foregoing embodiments, Fig. 7 shows item provided in an embodiment of the present invention The structured flowchart of mesh schedule management apparatus, for convenience of description, it illustrate only the part related to the embodiment of the present invention.
Reference picture 7, the device include:
Establishment of item unit 701, for according to the establishment of item instruction received, creating item view, the project regards Include multiple viewing areas of sequential in figure, each viewing area represents a development phase of project respectively.
Taskbar generation unit 702, for generating multiple tasks column, each taskbar point in the viewing area A task in the development phase corresponding to the viewing area is not represented.
Display unit 703 is bound, for binding display properties object icon, the attributes object for each taskbar Icon is used for the implementation member for identifying the task corresponding to it represented by taskbar.
Color changing unit 704, if for receiving the completion instruction on a task, corresponding to this task In the taskbar, the color for the attributes object icon for binding display is changed to the second preset value by the first preset value, Updated with finished item progress.
Alternatively, the binding display unit 703 includes:
Subelement is shown, for showing attributes object icon list, the attributes object icon in the item view Multiple attributes object icons are included in list.
Determination subelement, for when associated with a task taskbar binding event be triggered when, in the attribute pair As in icon list, instruction is chosen according to the attributes object icon received, it is determined that and showing each with taskbar binding The individual attributes object icon.
Alternatively, as shown in figure 8, above-mentioned project scheduling management device also includes:
Judging unit 705, at any one time, the color of any attributes object icon to become if detecting More, then judge to bind with the attributes object icon in the viewing area of display, the color of each attributes object icon Whether it is second preset value.
First acquisition unit 706, if for being bound with the attributes object icon in the viewing area shown, Ge Gesuo The color for stating attributes object icon is second preset value, then another viewing area after the viewing area is arranged in In, the personal account with the implementation member corresponding to the attributes object icon of each taskbar binding is obtained respectively.
Tip element 707, sent respectively for generating task start prompt message, and by the task start prompt message To each personal account.
Alternatively, as shown in figure 9, above-mentioned project scheduling management device also includes:
Statistic unit 708, in each viewing area, count the attributes object icon first sum with And statistics color is the second sum of the attributes object icon of second preset value.
Computing unit 709, for calculating the described second total ratio with the described first sum.
Progress bar display unit 710, for generating the progress bar related to the ratio, with to each viewing area The project process of corresponding development phase is shown.
Alternatively, as shown in Figure 10, above-mentioned project scheduling management device also includes:
The time limit is completed in second acquisition unit 711, the plan for obtaining each single item task.
Flash cell 712, reached if the time limit is completed in the plan for any one task, and institute corresponding to this task The color for stating the attributes object icon that display is bound in taskbar is first preset value, then the flickering display attribute pair As icon.
3rd acquiring unit 713, implement member corresponding to the attributes object icon for obtaining, and will on the implementation into The task time-out warning information of member is sent to default management account.
In the embodiment of the present invention, by generating different taskbars in the viewing area associated from the project development stage, And the display properties object icon in taskbar so that each engineer of development project can be according to corresponding to taskbar Attributes object icon, intuitively view the implementation personnel of each task, thus cumbersome poorly efficient repetition ditch need not be carried out again Logical work;When any implementation member completes its responsible task, by taskbar by the attributes object of implementation member The color of icon is changed, and ensure that the color based on each attributes object icon in item view, can be recognized in real time each Individual the implementing member of the task completes situation, thus, it is possible to the implementation progress of clear and definite whole development project, accelerates each reality The handing-over and circulation of task between member are applied, thus improves the efficiency of management of project process, shortens the cycle of software development.
Embodiment seven
Figure 11 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 11, the terminal of the embodiment Equipment 11 includes:Processor 1100, memory 1101 and it is stored in the memory 1101 and can be in the processor The computer program 1102 run on 1100, such as project scheduling management program.The processor 1100 performs the computer Realize the step in above-mentioned each project process embodiment of the method during program 1102, such as the step 101 shown in Fig. 1 is to 104.Or Person, the processor 1100 realize each module/unit in above-mentioned each device embodiment when performing the computer program 1102 Function, such as the function of unit 701 to 704 shown in Fig. 7.
Exemplary, the computer program 1102 can be divided into one or more module/units, it is one or Multiple module/the units of person are stored in the memory 1101, and are performed by the processor 1100, to complete the present invention. One or more of module/units can be the series of computation machine programmed instruction section that can complete specific function, the instruction Section is used to describe implementation procedure of the computer program 1102 in the terminal device 11.
The terminal device 11 can be that the calculating such as desktop PC, notebook, palm PC and cloud server are set It is standby.The terminal device may include, but be not limited only to, processor 1100, memory 1101.Those skilled in the art can manage Solution, Figure 11 is only the example of terminal device 11, does not form the restriction to terminal device 11, can include than illustrate it is more or Less part, some parts or different parts are either combined, such as the terminal device can also include input and output Equipment, network access equipment, bus etc..
Alleged processor 1100 can be CPU (Central Processing Unit, CPU), can be with It is other general processors, digital signal processor (Digital Signal Processor, DSP), application specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other PLDs, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor can also be any conventional processor Deng.
The memory 1101 can be the internal storage unit of the terminal device 11, such as the hard disk of terminal device 11 Or internal memory.The memory 1101 can also be the External memory equipment of the terminal device 11, such as the terminal device 11 The plug-in type hard disk of upper outfit, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) block, flash card (Flash Card) etc..Further, the memory 1101 can also both include the terminal device 11 Internal storage unit also include External memory equipment.The memory 1101 is used to store the computer program and described Other programs and data needed for terminal device.The memory 1101, which can be also used for temporarily storing, to have exported or has incited somebody to action The data to be exported.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each work( Can unit, module division progress for example, in practical application, can be as needed and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device are divided into different functional units or module, more than completion The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used To be that unit is individually physically present, can also two or more units it is integrated in a unit, it is above-mentioned integrated Unit can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.In addition, each function list Member, the specific name of module are not limited to the protection domain of the application also only to facilitate mutually distinguish.Said system The specific work process of middle unit, module, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, and is not described in detail or remembers in some embodiment The part of load, it may refer to the associated description of other embodiments.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein Member and algorithm steps, it can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually Performed with hardware or software mode, application-specific and design constraint depending on technical scheme.Professional and technical personnel Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, can be with Realize by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of division of logic function, there can be other dividing mode when actually realizing, such as Multiple units or component can combine or be desirably integrated into another system, or some features can be ignored, or not perform.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be by some interfaces, device Or INDIRECT COUPLING or the communication connection of unit, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated module/unit realized in the form of SFU software functional unit and as independent production marketing or In use, it can be stored in a computer read/write memory medium.Based on such understanding, the present invention realizes above-mentioned implementation All or part of flow in example method, by computer program the hardware of correlation can also be instructed to complete, described meter Calculation machine program can be stored in a computer-readable recording medium, and the computer program can be achieved when being executed by processor The step of stating each embodiment of the method..Wherein, the computer program includes computer program code, the computer program Code can be source code form, object identification code form, executable file or some intermediate forms etc..Computer-readable Jie Matter can include:Can carry any entity or device of the computer program code, recording medium, USB flash disk, mobile hard disk, Magnetic disc, CD, computer storage, read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It is it should be noted that described The content that computer-readable medium includes can carry out appropriate increasing according to legislation in jurisdiction and the requirement of patent practice Subtract, such as in some jurisdictions, electric carrier signal and electricity are not included according to legislation and patent practice, computer-readable medium Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although with reference to foregoing reality Example is applied the present invention is described in detail, it will be understood by those within the art that:It still can be to foregoing each Technical scheme described in embodiment is modified, or carries out equivalent substitution to which part technical characteristic;And these are changed Or replace, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme, all should Within protection scope of the present invention.

Claims (10)

  1. A kind of 1. project scheduling management method, it is characterised in that including:
    Instructed according to the establishment of item received, create item view, include the multiple of sequential in the item view Viewing area, each viewing area represent a development phase of project respectively;
    Multiple tasks column is generated in the viewing area, each taskbar represents to open corresponding to the viewing area respectively A task in the hair stage;
    Display properties object icon is bound for each taskbar, the attributes object icon is used to identify described corresponding to it The implementation member of task represented by taskbar;
    If receiving the completion instruction on a task, in the taskbar corresponding to this task, binding is shown The color of the attributes object icon the second preset value is changed to by the first preset value, updated with finished item progress.
  2. 2. project scheduling management method as claimed in claim 1, it is characterised in that described to show for each taskbar binding Show attributes object icon, including:
    Attributes object icon list is shown in the item view, multiple category are included in the attributes object icon list Sex object icon;
    When the taskbar binding event associated with a task is triggered, in the attributes object icon list, according to connecing The attributes object icon received chooses instruction, it is determined that and each attributes object icon of display and taskbar binding.
  3. 3. project scheduling management method as claimed in claim 2, it is characterised in that also include:
    At any one time, if detecting, the color of any attributes object icon changes, and judges and the attributes object In the viewing area of icon binding display, whether the color of each attributes object icon is described second default Value;
    If in the viewing area shown with attributes object icon binding, the color of each attributes object icon is Second preset value, then in another viewing area being arranged in behind the viewing area, obtain tied up with each taskbar respectively The personal account of implementation member corresponding to the fixed attributes object icon;
    Task start prompt message is generated, and the task start prompt message is respectively sent to each personal account.
  4. 4. project scheduling management method as claimed in claim 1, it is characterised in that also include:
    In each viewing area, the first sum and statistics color that count the attributes object icon are described second Second sum of the attributes object icon of preset value;
    Calculate the described second total ratio with the described first sum;
    The generation progress bar related to the ratio, carried out with the project process that the development phase is corresponded to each viewing area Displaying.
  5. 5. project scheduling management method as claimed in claim 1, it is characterised in that also include:
    The time limit is completed in the plan for obtaining each single item task;
    Reached if the time limit is completed in the plan of any one task, and binding display in the taskbar corresponding to this task The color of the attributes object icon is first preset value, then the flickering display attributes object icon;
    Obtain and implement member corresponding to the attributes object icon, and will be sent on the task time-out warning information of implementation member To default management account.
  6. 6. a kind of terminal device, it is characterised in that the terminal device includes memory, processor and is stored in the storage Realized in device and the computer program that can run on the processor, described in the computing device during computer program as follows Step:
    Instructed according to the establishment of item received, create item view, include the multiple of sequential in the item view Viewing area, each viewing area represent a development phase of project respectively;
    Multiple tasks column is generated in the viewing area, each taskbar represents to open corresponding to the viewing area respectively A task in the hair stage;
    Display properties object icon is bound for each taskbar, the attributes object icon is used to identify described corresponding to it The implementation member of task represented by taskbar;
    If receiving the completion instruction on a task, in the taskbar corresponding to this task, binding is shown The color of the attributes object icon the second preset value is changed to by the first preset value, updated with finished item progress.
  7. 7. terminal device as claimed in claim 6, it is characterised in that described in the computing device during computer program, also Realize following steps:
    Attributes object icon list is shown in the item view, multiple category are included in the attributes object icon list Sex object icon;
    When the taskbar binding event associated with a task is triggered, in the attributes object icon list, according to connecing The attributes object icon received chooses instruction, it is determined that and each attributes object icon of display and taskbar binding.
  8. 8. terminal device as claimed in claim 6, it is characterised in that described in the computing device during computer program, also Realize following steps:
    At any one time, if detecting, the color of any attributes object icon changes, and judges and the attributes object In the viewing area of icon binding display, whether the color of each attributes object icon is described second default Value;
    If in the viewing area shown with attributes object icon binding, the color of each attributes object icon is Second preset value, then in another viewing area being arranged in behind the viewing area, obtain tied up with each taskbar respectively The personal account of implementation member corresponding to the fixed attributes object icon;
    Task start prompt message is generated, and the task start prompt message is respectively sent to each personal account.
  9. 9. terminal device as claimed in claim 6, it is characterised in that described in the computing device during computer program, also Realize following steps:
    The time limit is completed in the plan for obtaining each single item task;
    Reached if the time limit is completed in the plan of any one task, and binding display in the taskbar corresponding to this task The color of the attributes object icon is first preset value, then the flickering display attributes object icon;
    Obtain and implement member corresponding to the attributes object icon, and will be sent on the task time-out warning information of implementation member To default management account.
  10. 10. a kind of computer-readable recording medium, the computer-readable recording medium storage has computer program, and its feature exists In when the computer program is executed by processor the step of realization such as any one of claim 1 to 5 methods described.
CN201710646760.3A 2017-08-01 2017-08-01 Project progress management method and terminal equipment Active CN107730196B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710646760.3A CN107730196B (en) 2017-08-01 2017-08-01 Project progress management method and terminal equipment
PCT/CN2018/077045 WO2019024489A1 (en) 2017-08-01 2018-02-23 Project progress management method, device, terminal apparatus and medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710646760.3A CN107730196B (en) 2017-08-01 2017-08-01 Project progress management method and terminal equipment

Publications (2)

Publication Number Publication Date
CN107730196A true CN107730196A (en) 2018-02-23
CN107730196B CN107730196B (en) 2021-04-02

Family

ID=61201693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710646760.3A Active CN107730196B (en) 2017-08-01 2017-08-01 Project progress management method and terminal equipment

Country Status (2)

Country Link
CN (1) CN107730196B (en)
WO (1) WO2019024489A1 (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108428114A (en) * 2018-03-20 2018-08-21 网易(杭州)网络有限公司 Information processing method and device, storage medium, the electronic device of project
CN108537511A (en) * 2018-04-10 2018-09-14 万翼科技有限公司 The method, apparatus and computer readable storage medium of project process displaying
CN108921493A (en) * 2018-05-31 2018-11-30 沈文策 A kind of information display method and device based on display interface
CN108984241A (en) * 2018-06-05 2018-12-11 微服云联科技(深圳)有限公司 Processing method, device, computer equipment and the storage medium of billboard card
CN109064135A (en) * 2018-07-28 2018-12-21 万翼科技有限公司 Reminding method, device and the computer readable storage medium of node state
CN109165931A (en) * 2018-09-25 2019-01-08 阿里巴巴集团控股有限公司 Project workflow management method and device
CN109522084A (en) * 2018-11-28 2019-03-26 亚信科技(中国)有限公司 A kind of agility based on devops sees board processing method and system
CN109858789A (en) * 2019-01-17 2019-06-07 网易(杭州)网络有限公司 Human resources visible processing method, device, equipment and readable storage medium storing program for executing
CN109978512A (en) * 2019-04-10 2019-07-05 上海外高桥造船有限公司 The control method of project management system, electronic equipment, storage medium
CN110009308A (en) * 2019-04-10 2019-07-12 上海外高桥造船有限公司 Project management system
CN110135674A (en) * 2019-02-20 2019-08-16 深圳大维理文科技有限公司 Transaction management system and office management method
CN110555661A (en) * 2018-05-31 2019-12-10 西安海平方网络科技有限公司 information display method, device and equipment of building element and readable storage medium
CN110570170A (en) * 2019-09-19 2019-12-13 中国银行股份有限公司 project information display method and device
CN110704142A (en) * 2018-07-09 2020-01-17 富士施乐株式会社 Information processing apparatus, storage medium, and information processing method
CN111950974A (en) * 2020-07-02 2020-11-17 广州仓实信息科技有限公司 Progress information processing method and device, computer equipment and storage medium
CN112868037A (en) * 2018-12-17 2021-05-28 株式会社日立制作所 Process management support system, process management support method, and process management support program
CN113344513A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Project information management method and device, electronic equipment and storage medium
CN113450062A (en) * 2020-09-07 2021-09-28 北京新氧科技有限公司 Project information processing method, system, electronic device and storage medium
CN113570220A (en) * 2021-07-14 2021-10-29 深圳市创茶网络科技有限公司 Task management method and device, computer equipment and storage medium
WO2022048329A1 (en) * 2020-09-01 2022-03-10 北京达佳互联信息技术有限公司 Menu display method and apparatus
CN117473798A (en) * 2023-12-26 2024-01-30 国家超级计算天津中心 Simulation project management method, device, equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013042A (en) * 2009-09-08 2011-04-13 英业达股份有限公司 Marking and querying system and method for conducting project management task according to time
CN102439612A (en) * 2009-05-19 2012-05-02 微软公司 Summary tasks for top-down project planning
CN102541880A (en) * 2010-12-17 2012-07-04 金蝶软件(中国)有限公司 Gantt chart generating method and system
CN105741009A (en) * 2016-01-07 2016-07-06 里法诺夫·尼尔·金 Dynamic method for collecting, tracking, storing and reporting development event efforts
US20170068916A1 (en) * 2015-09-08 2017-03-09 Oracle International Corporation System and method for providing a tradeoff between time and quality for a task
CN106681701A (en) * 2015-11-09 2017-05-17 华为技术有限公司 Task display method and device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7191141B2 (en) * 2001-06-13 2007-03-13 Ricoh Company, Ltd. Automated management of development project files over a network
CN101901402A (en) * 2009-05-27 2010-12-01 北京正辰科技发展有限责任公司 Project management system
CN106529904A (en) * 2016-10-25 2017-03-22 乐视控股(北京)有限公司 Branching view generating method and branching view generating device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102439612A (en) * 2009-05-19 2012-05-02 微软公司 Summary tasks for top-down project planning
CN102013042A (en) * 2009-09-08 2011-04-13 英业达股份有限公司 Marking and querying system and method for conducting project management task according to time
CN102541880A (en) * 2010-12-17 2012-07-04 金蝶软件(中国)有限公司 Gantt chart generating method and system
US20170068916A1 (en) * 2015-09-08 2017-03-09 Oracle International Corporation System and method for providing a tradeoff between time and quality for a task
CN106681701A (en) * 2015-11-09 2017-05-17 华为技术有限公司 Task display method and device
CN105741009A (en) * 2016-01-07 2016-07-06 里法诺夫·尼尔·金 Dynamic method for collecting, tracking, storing and reporting development event efforts

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108428114A (en) * 2018-03-20 2018-08-21 网易(杭州)网络有限公司 Information processing method and device, storage medium, the electronic device of project
CN108537511A (en) * 2018-04-10 2018-09-14 万翼科技有限公司 The method, apparatus and computer readable storage medium of project process displaying
CN110555661A (en) * 2018-05-31 2019-12-10 西安海平方网络科技有限公司 information display method, device and equipment of building element and readable storage medium
CN108921493A (en) * 2018-05-31 2018-11-30 沈文策 A kind of information display method and device based on display interface
CN108984241A (en) * 2018-06-05 2018-12-11 微服云联科技(深圳)有限公司 Processing method, device, computer equipment and the storage medium of billboard card
CN108984241B (en) * 2018-06-05 2020-08-04 微服云联科技(深圳)有限公司 Billboard card processing method and device, computer equipment and storage medium
CN110704142A (en) * 2018-07-09 2020-01-17 富士施乐株式会社 Information processing apparatus, storage medium, and information processing method
CN109064135A (en) * 2018-07-28 2018-12-21 万翼科技有限公司 Reminding method, device and the computer readable storage medium of node state
CN109165931A (en) * 2018-09-25 2019-01-08 阿里巴巴集团控股有限公司 Project workflow management method and device
CN109522084A (en) * 2018-11-28 2019-03-26 亚信科技(中国)有限公司 A kind of agility based on devops sees board processing method and system
CN112868037A (en) * 2018-12-17 2021-05-28 株式会社日立制作所 Process management support system, process management support method, and process management support program
CN109858789A (en) * 2019-01-17 2019-06-07 网易(杭州)网络有限公司 Human resources visible processing method, device, equipment and readable storage medium storing program for executing
CN109858789B (en) * 2019-01-17 2021-03-05 网易(杭州)网络有限公司 Human resource visualization processing method, device, equipment and readable storage medium
CN110135674A (en) * 2019-02-20 2019-08-16 深圳大维理文科技有限公司 Transaction management system and office management method
CN109978512A (en) * 2019-04-10 2019-07-05 上海外高桥造船有限公司 The control method of project management system, electronic equipment, storage medium
CN110009308A (en) * 2019-04-10 2019-07-12 上海外高桥造船有限公司 Project management system
CN110570170A (en) * 2019-09-19 2019-12-13 中国银行股份有限公司 project information display method and device
CN110570170B (en) * 2019-09-19 2021-12-10 中国银行股份有限公司 Project information display method and device
CN111950974A (en) * 2020-07-02 2020-11-17 广州仓实信息科技有限公司 Progress information processing method and device, computer equipment and storage medium
CN111950974B (en) * 2020-07-02 2024-05-14 广州仓实信息科技有限公司 Progress information processing method, device, computer equipment and storage medium
WO2022048329A1 (en) * 2020-09-01 2022-03-10 北京达佳互联信息技术有限公司 Menu display method and apparatus
CN113450062A (en) * 2020-09-07 2021-09-28 北京新氧科技有限公司 Project information processing method, system, electronic device and storage medium
CN113344513A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Project information management method and device, electronic equipment and storage medium
CN113570220A (en) * 2021-07-14 2021-10-29 深圳市创茶网络科技有限公司 Task management method and device, computer equipment and storage medium
CN113570220B (en) * 2021-07-14 2024-01-12 深圳市创茶网络科技有限公司 Task management method, device, computer equipment and storage medium
CN117473798A (en) * 2023-12-26 2024-01-30 国家超级计算天津中心 Simulation project management method, device, equipment and storage medium
CN117473798B (en) * 2023-12-26 2024-05-14 国家超级计算天津中心 Simulation project management method, device, equipment and storage medium

Also Published As

Publication number Publication date
WO2019024489A1 (en) 2019-02-07
CN107730196B (en) 2021-04-02

Similar Documents

Publication Publication Date Title
CN107730196A (en) Project scheduling management method and terminal device
CN109358851A (en) Creation method, device and the computer readable storage medium of chart components
CN110310088A (en) Workflow configuration method and Related product
US20140282109A1 (en) Context frame for sharing context information
US8965831B2 (en) System, method, and software program product for enabling users to create and use rule patterns to generate custom product-configuration rules
US10902339B2 (en) System and method providing automatic completion of task structures in a project plan
CA2878451C (en) Collaborative due diligence review system
CN107728878A (en) Display methods, terminal and the computer-readable recording medium of application icon
CN110535679A (en) Management method, framework, network slice sales platform and the management system of slice
CN107844698A (en) Financial APP authority setting method, device, equipment and storage medium
CN110517145A (en) Data trade method and relevant device based on multi-tiling interchain
CN108509599A (en) A kind of creation method and device of data model
CN112199007A (en) Menu display method and device, electronic equipment and storage medium
CN109325024A (en) Label display method, apparatus, terminal device and the storage medium of project
CN109726119A (en) Test scene creation method, application method, device, client and server
CN109582581A (en) A kind of result based on crowdsourcing task determines method and relevant device
CN106250110A (en) Set up the method and device of model
CN115392501A (en) Data acquisition method and device, electronic equipment and storage medium
CN109522086B (en) Operation method and device for window, computer device and readable storage medium
CN109542432A (en) Air control rule editing method and terminal device
CN110362767A (en) Bury a processing method, device, system and computer readable storage medium
CN112163949A (en) Intelligent contract generation method and device based on contract component imaging
CN110308926A (en) Software information methods of exhibiting, device, computer installation and computer storage medium
CN110502474A (en) Order allocation method, device and storage medium based on distributed memory system
CN110300222A (en) A kind of short message display method, system and terminal device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180607

Address after: 518000 Room 201, building A, 1 front Bay Road, Shenzhen Qianhai cooperation zone, Shenzhen, Guangdong

Applicant after: Shenzhen one ledger Intelligent Technology Co., Ltd.

Address before: 200000 Xuhui District, Shanghai Kai Bin Road 166, 9, 10 level.

Applicant before: Shanghai Financial Technologies Ltd

GR01 Patent grant
GR01 Patent grant