CN110308926A CN201910442276.8A CN201910442276A CN110308926A CN 110308926 A CN110308926 A CN 110308926A CN 201910442276 A CN201910442276 A CN 201910442276A CN 110308926 A CN110308926 A CN 110308926A
Authority
CN
China
Prior art keywords
information
exploitation
incidence relation
demand
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910442276.8A
Other languages
Chinese (zh)
Inventor
顾申杰
唐苏俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Bank Co Ltd
Original Assignee
Ping An Bank Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Bank Co Ltd filed Critical Ping An Bank Co Ltd
Priority to CN201910442276.8A priority Critical patent/CN110308926A/en
Publication of CN110308926A publication Critical patent/CN110308926A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • G06F8/71Version control; Configuration management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The present invention provides a kind of software information methods of exhibiting, device, computer installation and storage medium.The software information methods of exhibiting includes: demand information, the exploitation information of development phase and the version information, the test information of test phase, the production information of production phase that software project demand stage is obtained from preset data source;The demand information and the exploitation information are associated, the first incidence relation is obtained;The exploitation information is associated with the version information, obtains the second incidence relation;The exploitation information and the test information are associated, third incidence relation is obtained;The exploitation information is associated with the production information, obtains the 4th incidence relation;The software project information of default dimension is shown according to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation.The information in integration software life cycle each stage of the present invention is shown, and realization is managed software project from global visual angle.

Description

Software information methods of exhibiting, device, computer installation and computer storage medium
Technical field
The present invention relates to technical field of software development, and in particular to a kind of software information methods of exhibiting, device, computer dress It sets and computer storage medium.
Background technique
Currently, software development management process generally falls into demand management, development process management and test process management, this three Respectively there are corresponding management tool, such as JIRA (software project management system), QC (Quality Center), mind in a stage The CASE such as soldier (Computer-AidedSoftwareEngineering) tool carries out version management, test and management and defect pipe The work such as reason.CASE tool is a kind of for auxiliary development, analysis, test, the spy for safeguarding another computer program and/or document Different software tool.Although the open source resources of CASE tool are very abundant, due to lacking the support of establishment, Ge Gekai The quality of source tool is irregular.More important point is that open source software is developed by a unified tissue, no With software between there is no globality, it is difficult to the information in integration software life cycle each stage is shown, it is difficult to realize from Global visual angle is managed software project.Because of the presence of this limitation, the effect of software development process management module is allowed It has a greatly reduced quality, so that the application of open source software lacks globality, is not able to satisfy the composite demand of user in reality.With software item Purpose gradually increases the continuous expansion with software size, more units, more team collaborative development make the discretization of software development Degree increases, and carries out the integration, change and iteration control that discrete management will be unfavorable for software product by different open source CASE tools, The work of software developer and administrative staff are virtually increased at the same time.
Summary of the invention
In view of the foregoing, it is necessary to propose that a kind of software information methods of exhibiting, device, computer installation and computer are deposited The robustness and scene adaptability of software information displaying can be improved in storage media.
The first aspect of the application provides a kind of software information methods of exhibiting, which comprises
Demand information, the exploitation information of development phase and the version for obtaining software project demand stage from preset data source are believed Breath, the test information of test phase, the production information of production phase;
The demand information and the exploitation information are associated, the demand information and the exploitation information are obtained First incidence relation;
The exploitation information is associated with the version information, obtains the exploitation information and the version information Second incidence relation;
The exploitation information and the test information are associated, the exploitation information and the test information are obtained Third incidence relation;
The exploitation information is associated with the production information, obtains the exploitation information and the production information 4th incidence relation;
Default dimension is shown according to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation The software project information of degree.
In alternatively possible implementation, described be associated the demand information with the exploitation information includes:
Calculate the demand information and it is described exploitation information the degree of association, according to the degree of association by the demand information with The exploitation information is associated.
In alternatively possible implementation, the default dimension may include:
Demand dimension, version dimension, personnel's dimension.
It is described to be associated with according to first incidence relation, the second incidence relation, third in alternatively possible implementation Relationship, the 4th incidence relation show that the software project information of default dimension includes:
User right is obtained, is associated with according to the user right, first incidence relation, the second incidence relation, third Relationship, the 4th incidence relation show the software project information of the default dimension.
In alternatively possible implementation, the method also includes:
Monitor whether the preset data source has new information;If there is new information in the preset data source, obtaining should The new information and the demand information, exploitation information, test information or production information are associated by new information.
In alternatively possible implementation, the software project information for showing the default dimension includes:
The software item of the default dimension is shown using Flash/Flex, Silverlight, HTML5 or JavaFx technology Mesh information.
In alternatively possible implementation, described be associated the demand information with the exploitation information includes:
The need are calculated according to the development task title in the demand title and the exploitation information in the demand information Seek first degree of association of information and the exploitation information;And/or
Institute is calculated according to the development time progress in the plan development time and the exploitation information in the demand information State second degree of association of demand information and the exploitation information;
Determine that the demand information is with the exploitation information according to first degree of association and/or second degree of association No association.
The second aspect of the application provides a kind of software information displaying device, and described device includes:
Module is obtained, for obtaining the demand information of software project demand stage from preset data source, the development phase opens Photos and sending messages and version information, the test information of test phase, the production information of production phase;
First relating module obtains the demand letter for the demand information and the exploitation information to be associated First incidence relation of breath and the exploitation information;
Second relating module obtains the exploitation letter for the exploitation information to be associated with the version information Second incidence relation of breath and the version information;
Third relating module obtains the exploitation letter for the exploitation information and the test information to be associated The third incidence relation of breath and the test information;
4th relating module obtains the exploitation letter for the exploitation information to be associated with the production information 4th incidence relation of breath and the production information;
Display module, for according to first incidence relation, the second incidence relation, third incidence relation, the 4th association Relationship shows the software project information of default dimension.
The third aspect of the application provides a kind of computer installation, and the computer installation includes processor, the processing Device is for realizing the software information methods of exhibiting when executing the computer program stored in memory.
The fourth aspect of the application provides a kind of computer storage medium, is stored thereon with computer program, the calculating Machine program realizes the software information methods of exhibiting when being executed by processor.
The present invention from preset data source obtain the demand information of software project demand stage, the exploitation information of development phase with Version information, the test information of test phase, the production information of production phase;By the demand information and the exploitation information into Row association obtains the first incidence relation of the demand information and the exploitation information;By the exploitation information and the version Information is associated, and obtains the second incidence relation of the exploitation information and the version information;By the exploitation information and institute It states test information to be associated, obtains the third incidence relation of the exploitation information and the test information;The exploitation is believed Breath is associated with the production information, obtains the 4th incidence relation of the exploitation information and the production information;According to institute State the software project letter that the first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation show default dimension Breath.The information in integration software life cycle each stage of the present invention is shown, and is realized from global visual angle and is carried out to software project Management.
Detailed description of the invention
Fig. 1 is the flow chart of software information methods of exhibiting provided in an embodiment of the present invention.
Fig. 2 is the structure chart that software information provided in an embodiment of the present invention shows device.
Fig. 3 is the schematic diagram of computer installation provided in an embodiment of the present invention.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real Applying example, the present invention will be described in detail.It should be noted that in the absence of conflict, embodiments herein and embodiment In feature can be combined with each other.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, described embodiment is only It is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.
Preferably, software information methods of exhibiting of the invention is applied in one or more computer installation.The meter Calculation machine device be it is a kind of can be according to the instruction for being previously set or store, automatic progress numerical value calculating and/or information processing are set Standby, hardware includes but is not limited to microprocessor, specific integrated circuit (Application Specific Integrated Circuit, ASIC), programmable gate array (Field-Programmable Gate Array, FPGA), digital processing unit (Digital Signal Processor, DSP), embedded device etc..
The computer installation can be the calculating such as desktop PC, notebook, palm PC and cloud server and set It is standby.The computer installation can carry out people by modes such as keyboard, mouse, remote controler, touch tablet or voice-operated devices with user Machine interaction.
Embodiment one
Fig. 1 is the flow chart for the software information methods of exhibiting that the embodiment of the present invention one provides.The software information displaying side Method is applied to computer installation.
The information in invention software information displaying method integration software life cycle each stage is shown, and is realized from complete Office visual angle is managed software project.
As shown in Figure 1, the software information methods of exhibiting includes:
Step 101, demand information, the exploitation information of development phase of software project demand stage are obtained from preset data source With version information, the test information of test phase, the production information of production phase.
Can corresponding information directly be obtained from the data source of software project different phase.For example, can be from demand stage Demand data source in obtain the demand information, the exploitation information is obtained from the development task data source of development phase, The version information is obtained from the version repository data source of development phase, obtains institute from the test cases data source of test phase Test information is stated, obtains the production information from the creation data source of production phase.
Alternatively, the initial data of different phase can be obtained from the data source of different phase, from the initial data Extract corresponding information.For example, demand initial data can be obtained from demand data source, extracted from the demand initial data The demand information.For another example, exploitation initial data can be obtained from development task data source, from the exploitation initial data Extract the exploitation information.
The demand information may include demand title, demand ID, demand type, desired content, plan development time, meter Draw issuing time, demand change record, party in request (such as product manager) etc..
The exploitation information may include development task title, development task ID, development time progress, exploitation change note Record, exploitation responsible person, exploitation manpower etc..
The version information may include version number.In the present embodiment, the version information is development task publication Version information, the version number are released versions number.
The test information may include test cases type, test cases ID, test report, testing progress, test case Example implementation rate, test cases percent of pass, test cases bug number, test owner, test manpower etc..The test cases type It may include smoke test case, system testing case, regression test case.The test cases implementation rate may include smoldering Test cases implementation rate, system testing case implementation rate, regression test case implementation rate.The test cases percent of pass can wrap Include smoke test case percent of pass, system testing case percent of pass, regression test case percent of pass.The test cases bug number It may include smoke test case bug number, system testing case bug number, regression test case bug number.
The production information may include production problem types, production problem ID, the description of production problem, corrective measure, throwing Produce receipt etc..
Step 102, the demand information and the exploitation information are associated, obtain the demand information and is opened with described First incidence relation of photos and sending messages.
Demand information and the first incidence relation of exploitation information indicate the corresponding relationship of demand and development task.One demand A development task can be corresponded to, multiple development tasks can be corresponded to.For example, development task T1 and development task T2 are demand Q1 Development task, then the demand information of demand Q1 and the exploitation information of development task T1 and development task T2 are associated.It will It may include being associated demand ID and development task ID that the demand information is associated with the exploitation information.
In the present embodiment, when the demand information and the exploitation information to be associated, the demand letter is calculated The demand information and the exploitation information, are associated by the degree of association of breath and the exploitation information according to the degree of association. Title and development task title it can calculate the demand information and first degree of association for developing information according to demand.It can be with Identical text or character in the demand title and the development task title are searched, according to the identical text or character meter Calculate first degree of association.Alternatively, the demand information and institute can be calculated according to plan development time and development time progress State second degree of association of exploitation information.It can determine the degree of conformity of the plan development time and the development time progress, root Second degree of association is calculated according to the degree of conformity.Described in being determined according to first degree of association and/or second degree of association Whether demand information is associated with the exploitation information.For example, being preset if first degree of association or second degree of association are greater than Threshold value then judges the demand information and the exploitation information association.
Step 103, the exploitation information is associated with the version information, obtains the exploitation information and the version Second incidence relation of this information.
Develop the corresponding relationship of the second incidence relation the expression development task and released version of information and version information.One Released version can correspond to a development task, can also correspond to multiple development tasks.For example, development task T1 and development task The version number of T2 is 1.0, then by the exploitation information of development task T1 and development task T2 and version number for 1.0 version information into Row association.It may include closing development task ID and version number that the exploitation information is associated with the version information Connection.
In the present embodiment, the release information of available each development task, it is each according to release information determination The corresponding relationship of development task and version number closes the exploitation information with the version information according to the corresponding relationship Connection.
Step 104, the exploitation information and the test information are associated, obtain the exploitation information and the survey Try the third incidence relation of information.
It develops information and tests the corresponding relationship of third incidence relation the expression development task and test cases of information.One Development task can correspond to a test cases, can also correspond to multiple test cases.For example, the test cases of development task T1 Including C1 and C2, then the version information of the exploitation information of development task T1 and test cases C1, C2 is associated.It is opened described It may include being associated development task ID and test cases ID that photos and sending messages are associated with the test information.
In the present embodiment, the mapping relations of available development task and test case, according to development task and test The exploitation information and the test information are associated by use-case mapping relations.
Step 105, the exploitation information is associated with the production information, obtains the exploitation information and the life Produce the 4th incidence relation of information.
The 4th incidence relation for developing information and production information indicates development task and produces the corresponding relationship of problem.One Development task can correspond to a production problem, can also correspond to multiple production problems.For example, the production problem of development task T1 Including P1 and P2, then the exploitation information of development task T1 and the production information of production problem P1 and production problem P2 are closed Connection.It may include closing development task ID and production problem ID that the exploitation information is associated with the production information Connection.
In the present embodiment, the mapping relations of available production information and development task, according to production information and exploitation The exploitation information is associated by the mapping relations of task with the production information.
Step 106, according to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation exhibition Show the software project information of default dimension.
The default dimension may include demand dimension, version dimension, personnel's dimension.The information of default dimension can be generated It shows interface, the software project information for presetting dimension described in showing interface is shown in the information.
The software project information of demand dimension includes that specified demand information and being associated with the demand information (can be directly linked Or indirect association) other information (such as version information, test information, production information).Specifically, the software of demand dimension Project information may include specified demand information and the associated exploitation information of the demand information and the exploitation information association Version information, the production information with the test information of the exploitation information association and the exploitation information association.For example, demand Q1 Development task includes development task T1 and development task T2, and the version number of development task T1 and development task T2 is 1.0, and exploitation is appointed The test cases of business T1 includes C1 and C2, and the test cases of development task T2 includes test cases C3 and C4, development task T1's Production problem includes P1 and P2, and the production problem of development task T2 includes P3, then shows demand information, the development task of demand Q1 It the version information of T1 and development task T2, the test cases information of development task T1 and development task T2, development task T1 and opens The production problem information of hair task T2.
The software project information of version dimension includes that specified version information and being associated with the version information (can be directly linked Or indirect association) other information (such as exploitation information, demand information, test information, production information).Specifically, version The software project information of dimension may include specified version information and the associated exploitation information of the version information and the exploitation The demand information of information association, the production information with the test information of the exploitation information association and the exploitation information association.Example Such as, the corresponding development task of version number 1.0 includes development task T1 and development task T2, and development task T1 is with development task T2 The development task of demand Q1, the test cases of development task T1 include C1 and C2, and the test cases of development task T2 includes test Case C3 and C4, the production problem of development task T1 include P1 and P2, and the production problem of development task T2 includes P3, then shows version The exploitation information of this number 1.0 corresponding development task T1 and development task T2, development task T1 need corresponding with development task T2 Ask the demand information of Q1, the test cases information of development task T1 and development task T2, development task T1 and development task T2 Produce problem information.Multiple development tasks that same version includes may belong to the same demand, also may belong to different need It asks.
The software project information of personnel's dimension may include designated person, the corresponding demand information of the designated person, exploitation Information or test information and the demand information, exploitation information or the other information for testing information association.For example, if designated person For party in request, then the software project information of personnel's dimension may include the relevant demand information of the designated person, with the demand The version information of the exploitation information of information association and the exploitation information association, test information, production information.For another example, if nominator Member is developer, then the software project information of personnel's dimension may include the relevant exploitation information of the designated person and should Develop demand information, the test information, production information of information association.For another example, if designated person is tester, personnel dimension The software project information of degree may include the relevant test information of the designated person, with the exploitation information of the test information association, With the demand information, version information and production information of the exploitation information association.
The information that can receive user shows request, shows that request shows the software of the default dimension according to the information Project information.User can specify the dimension (for example, demand dimension or version dimension) of information displaying and specified requirements (such as refers to Fixed demand information or version information) when receiving the information and showing request, can according to the authentication information of user to Family is verified, if being verified, shows that request shows the software project information of the default dimension according to the information.It is no Then, if verifying does not pass through, do not show that request shows the software project information of the default dimension according to the information.
The authentication information may include account and password.User can pass through the keyboard, mouse or touch of the terminal One of screen or a variety of inputs account and/or password.The account can be user name, phone number, mailbox, user Coding etc..It is (such as logical that the password can be the password (such as password of number, letter composition) of character composition, graphical passwords Cross the graphical passwords of touch screen touch-control input) etc..
The authentication information may include user certificate (such as USBKey).The user certificate includes to show user identity Information.
The authentication information can also include biological information (such as finger print information, iris information).
The authentication information can also include other information, such as organization number.The organization number indicates user institute Belong to tissue/company.
Available user right shows the software project information of the default dimension according to the user right.It can be with Different software project information is shown to different rights user.It, can be with for example, for project leader (such as exploitation responsible person) It shows and software project information of the specify information directly with the default dimension of indirect association.For general staff's (such as exploit person Member), it can show the software project information for the default dimension being directly linked with specify information.It can be according to the log-on message of user (such as user name) shows software project information corresponding with its permission.
It can be layered and show the software project information.For example, the page of two levels is generated for demand dimension, including Homepage and the second level page.The homepage shows specified demand information and the associated exploitation information of the demand information, described The second level page, which is shown with the version information of the exploitation information association, with the test information of the exploitation information association, with the exploitation, to be believed Cease associated production information.Alternatively, the page of three levels or three or more level can be generated for default dimension.
Optionally, the software project information for showing the default dimension include: using Flash/Flex, Silverlight, HTML5 or JavaFx technology show the software project information of the default dimension.
The software information methods of exhibiting of embodiment one from preset data source obtain software project demand stage demand information, The exploitation information and version information, the test information of test phase, the production information of production phase of development phase;By the demand Information is associated with the exploitation information, obtains the first incidence relation of the demand information and the exploitation information;By institute It states exploitation information to be associated with the version information, obtains the exploitation information and be associated with the second of the version information System;The exploitation information and the test information are associated, the third of the exploitation information and the test information is obtained Incidence relation;The exploitation information is associated with the production information, obtains the exploitation information and the production information The 4th incidence relation;According to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation exhibition Show the software project information of default dimension.The information in one integration software life cycle each stage of embodiment is shown, and is realized Software project is managed from global visual angle.
As an alternative embodiment, the method also includes: monitor whether the preset data source has new letter Breath;If there is new information in the preset data source, the new information is obtained, by the new information and the demand information, is opened Photos and sending messages, test information or production information are associated.
As an alternative embodiment, the method also includes: reception refers to the operation of the software project information It enables, the software project information is operated according to the operational order.Operating to the software project information can be with Including increasing information in the software project information, deleting information or modification information.
As an alternative embodiment, the method also includes: the software project information is sent to default It is people.For example, the information for showing software project information displaying interface is sent to default contact person.Can by mail, The software project information is sent to default contact person by the modes such as short message, wechat.
Embodiment two
Fig. 2 is the structure chart that software information provided by Embodiment 2 of the present invention shows device.The software information shows dress It sets 20 and is applied to computer installation.The software information displaying of the present apparatus is that the information in integration software life cycle each stage carries out It shows.The software information shows that device 20 may be implemented to be managed software project from global visual angle.As shown in Fig. 2, institute It states software information and shows that device 20 may include obtaining module 201, the first relating module 202, the second relating module 203, third Relating module 204, the 4th relating module 205, display module 206.
Module 201 is obtained, for obtaining the demand information of software project demand stage, development phase from preset data source Develop information and version information, the test information of test phase, the production information of production phase.
Can corresponding information directly be obtained from the data source of software project different phase.For example, can be from demand stage Demand data source in obtain the demand information, the exploitation information is obtained from the development task data source of development phase, The version information is obtained from the version repository data source of development phase, obtains institute from the test cases data source of test phase Test information is stated, obtains the production information from the creation data source of production phase.
Alternatively, the initial data of different phase can be obtained from the data source of different phase, from the initial data Extract corresponding information.For example, demand initial data can be obtained from demand data source, extracted from the demand initial data The demand information.For another example, exploitation initial data can be obtained from development task data source, from the exploitation initial data Extract the exploitation information.
The demand information may include demand title, demand ID, demand type, desired content, plan development time, meter Draw issuing time, demand change record, party in request (such as product manager) etc..
The exploitation information may include development task title, development task ID, development time progress, exploitation change note Record, exploitation responsible person, exploitation manpower etc..
The version information may include version number.In the present embodiment, the version information is development task publication Version information, the version number are released versions number.
The test information may include test cases type, test cases ID, test report, testing progress, test case Example implementation rate, test cases percent of pass, test cases bug number, test owner, test manpower etc..The test cases type It may include smoke test case, system testing case, regression test case.The test cases implementation rate may include smoldering Test cases implementation rate, system testing case implementation rate, regression test case implementation rate.The test cases percent of pass can wrap Include smoke test case percent of pass, system testing case percent of pass, regression test case percent of pass.The test cases bug number It may include smoke test case bug number, system testing case bug number, regression test case bug number.
The production information may include production problem types, production problem ID, the description of production problem, corrective measure, throwing Produce receipt etc..
First relating module 202 obtains the demand for the demand information and the exploitation information to be associated First incidence relation of information and the exploitation information.
Demand information and the first incidence relation of exploitation information indicate the corresponding relationship of demand and development task.One demand A development task can be corresponded to, multiple development tasks can be corresponded to.For example, development task T1 and development task T2 are demand Q1 Development task, then the demand information of demand Q1 and the exploitation information of development task T1 and development task T2 are associated.It will It may include being associated demand ID and development task ID that the demand information is associated with the exploitation information.
In the present embodiment, when the demand information and the exploitation information to be associated, the demand letter is calculated The demand information and the exploitation information, are associated by the degree of association of breath and the exploitation information according to the degree of association. Title and development task title it can calculate the demand information and first degree of association for developing information according to demand.It can be with Identical text or character in the demand title and the development task title are searched, according to the identical text or character meter Calculate first degree of association.Alternatively, the demand information and institute can be calculated according to plan development time and development time progress State second degree of association of exploitation information.It can determine the degree of conformity of the plan development time and the development time progress, root Second degree of association is calculated according to the degree of conformity.Described in being determined according to first degree of association and/or second degree of association Whether demand information is associated with the exploitation information.For example, being preset if first degree of association or second degree of association are greater than Threshold value then judges the demand information and the exploitation information association.
Second relating module 203 obtains the exploitation for the exploitation information to be associated with the version information Second incidence relation of information and the version information.
Develop the corresponding relationship of the second incidence relation the expression development task and released version of information and version information.One Released version can correspond to a development task, can also correspond to multiple development tasks.For example, development task T1 and development task The version number of T2 is 1.0, then by the exploitation information of development task T1 and development task T2 and version number for 1.0 version information into Row association.It may include closing development task ID and version number that the exploitation information is associated with the version information Connection.
In the present embodiment, the release information of available each development task, it is each according to release information determination The corresponding relationship of development task and version number closes the exploitation information with the version information according to the corresponding relationship Connection.
Third relating module 204 obtains the exploitation for the exploitation information and the test information to be associated The third incidence relation of information and the test information.
It develops information and tests the corresponding relationship of third incidence relation the expression development task and test cases of information.One Development task can correspond to a test cases, can also correspond to multiple test cases.For example, the test cases of development task T1 Including C1 and C2, then the version information of the exploitation information of development task T1 and test cases C1, C2 is associated.It is opened described It may include being associated development task ID and test cases ID that photos and sending messages are associated with the test information.
In the present embodiment, the mapping relations of available development task and test case, according to development task and test The exploitation information and the test information are associated by use-case mapping relations.
4th relating module 205 obtains the exploitation for the exploitation information to be associated with the production information 4th incidence relation of information and the production information;
The 4th incidence relation for developing information and production information indicates development task and produces the corresponding relationship of problem.One Development task can correspond to a production problem, can also correspond to multiple production problems.For example, the production problem of development task T1 Including P1 and P2, then the exploitation information of development task T1 and the production information of production problem P1 and production problem P2 are closed Connection.It may include closing development task ID and production problem ID that the exploitation information is associated with the production information Connection.
In the present embodiment, the mapping relations of available production information and development task, according to production information and exploitation The exploitation information is associated by the mapping relations of task with the production information.
Display module 206, for being closed according to first incidence relation, the second incidence relation, third incidence relation, the 4th Connection relationship shows the software project information of default dimension.
The default dimension may include demand dimension, version dimension, personnel's dimension.The information of default dimension can be generated It shows interface, the software project information for presetting dimension described in showing interface is shown in the information.
The software project information of demand dimension includes that specified demand information and being associated with the demand information (can be directly linked Or indirect association) other information (such as version information, test information, production information).Specifically, the software of demand dimension Project information may include specified demand information and the associated exploitation information of the demand information and the exploitation information association Version information, the production information with the test information of the exploitation information association and the exploitation information association.For example, demand Q1 Development task includes development task T1 and development task T2, and the version number of development task T1 and development task T2 is 1.0, and exploitation is appointed The test cases of business T1 includes C1 and C2, and the test cases of development task T2 includes test cases C3 and C4, development task T1's Production problem includes P1 and P2, and the production problem of development task T2 includes P3, then shows demand information, the development task of demand Q1 It the version information of T1 and development task T2, the test cases information of development task T1 and development task T2, development task T1 and opens The production problem information of hair task T2.
The software project information of version dimension includes that specified version information and being associated with the version information (can be directly linked Or indirect association) other information (such as exploitation information, demand information, test information, production information).Specifically, version The software project information of dimension may include specified version information and the associated exploitation information of the version information and the exploitation The demand information of information association, the production information with the test information of the exploitation information association and the exploitation information association.Example Such as, the corresponding development task of version number 1.0 includes development task T1 and development task T2, and development task T1 is with development task T2 The development task of demand Q1, the test cases of development task T1 include C1 and C2, and the test cases of development task T2 includes test Case C3 and C4, the production problem of development task T1 include P1 and P2, and the production problem of development task T2 includes P3, then shows version The exploitation information of this number 1.0 corresponding development task T1 and development task T2, development task T1 need corresponding with development task T2 Ask the demand information of Q1, the test cases information of development task T1 and development task T2, development task T1 and development task T2 Produce problem information.Multiple development tasks that same version includes may belong to the same demand, also may belong to different need It asks.
The software project information of personnel's dimension may include designated person, the corresponding demand information of the designated person, exploitation Information or test information and the demand information, exploitation information or the other information for testing information association.For example, if designated person For party in request, then the software project information of personnel's dimension may include the relevant demand information of the designated person, with the demand The version information of the exploitation information of information association and the exploitation information association, test information, production information.For another example, if nominator Member is developer, then the software project information of personnel's dimension may include the relevant exploitation information of the designated person and should Develop demand information, the test information, production information of information association.For another example, if designated person is tester, personnel dimension The software project information of degree may include the relevant test information of the designated person, with the exploitation information of the test information association, With the demand information, version information and production information of the exploitation information association.
The information that can receive user shows request, shows that request shows the software of the default dimension according to the information Project information.User can specify the dimension (for example, demand dimension or version dimension) of information displaying and specified requirements (such as refers to Fixed demand information or version information) when receiving the information and showing request, can according to the authentication information of user to Family is verified, if being verified, shows that request shows the software project information of the default dimension according to the information.It is no Then, if verifying does not pass through, do not show that request shows the software project information of the default dimension according to the information.
The authentication information may include account and password.User can pass through the keyboard, mouse or touch of the terminal One of screen or a variety of inputs account and/or password.The account can be user name, phone number, mailbox, user Coding etc..It is (such as logical that the password can be the password (such as password of number, letter composition) of character composition, graphical passwords Cross the graphical passwords of touch screen touch-control input) etc..
The authentication information may include user certificate (such as USBKey).The user certificate includes to show user identity Information.
The authentication information can also include biological information (such as finger print information, iris information).
The authentication information can also include other information, such as organization number.The organization number indicates user institute Belong to tissue/company.
Available user right shows the software project information of the default dimension according to the user right.It can be with Different software project information is shown to different rights user.It, can be with for example, for project leader (such as exploitation responsible person) It shows and software project information of the specify information directly with the default dimension of indirect association.For general staff's (such as exploit person Member), it can show the software project information for the default dimension being directly linked with specify information.It can be according to the log-on message of user (such as user name) shows software project information corresponding with its permission.
It can be layered and show the software project information.For example, the page of two levels is generated for demand dimension, including Homepage and the second level page.The homepage shows specified demand information and the associated exploitation information of the demand information, described The second level page, which is shown with the version information of the exploitation information association, with the test information of the exploitation information association, with the exploitation, to be believed Cease associated production information.Alternatively, the page of three levels or three or more level can be generated for default dimension.
Optionally, the software project information for showing the default dimension include: using Flash/Flex, Silverlight, HTML5 or JavaFx technology show the software project information of the default dimension.
The software information of embodiment two shows that device 20 obtains the demand letter of software project demand stage from preset data source Breath, the exploitation information of development phase and version information, the test information of test phase, the production information of production phase;It will be described Demand information is associated with the exploitation information, obtains the first incidence relation of the demand information and the exploitation information; The exploitation information is associated with the version information, the exploitation information is obtained and is associated with the second of the version information Relationship;The exploitation information and the test information are associated, the of the exploitation information and the test information is obtained Three incidence relations;The exploitation information is associated with the production information, the exploitation information is obtained and the production is believed 4th incidence relation of breath;According to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation Show the software project information of default dimension.The information in two integration software life cycle each stage of embodiment is shown, real Now software project is managed from global visual angle.
In another embodiment, the code optimization device 20 can also include: monitoring module, described default for monitoring Whether data source has new information;If there is new information in the preset data source, the new information is obtained, by the new information It is associated with the demand information, exploitation information, test information or production information.
In another embodiment, the code optimization device 20 can also include: operation module, for receiving to described soft The operational order of part project information operates the software project information according to the operational order.To the software item It may include increasing information in the software project information, deleting information or modification information that mesh information, which carries out operation,.
In another embodiment, the code optimization device 20 can also include: sending module, be used for the software item Mesh information is sent to default contact person.For example, the information for showing software project information displaying interface is sent to default It is people.The software project information can be sent to default contact person by modes such as mail, short message, wechats.
Embodiment three
The present embodiment provides a kind of computer storage medium, it is stored with computer program in the computer storage medium, it should The step in above-mentioned software information methods of exhibiting embodiment is realized when computer program is executed by processor, such as shown in FIG. 1 Step 101-106:
Step 101, demand information, the exploitation information of development phase of software project demand stage are obtained from preset data source With version information, the test information of test phase, the production information of production phase;
Step 102, the demand information and the exploitation information are associated, obtain the demand information and is opened with described First incidence relation of photos and sending messages;
Step 103, the exploitation information is associated with the version information, obtains the exploitation information and the version Second incidence relation of this information;
Step 104, the exploitation information and the test information are associated, obtain the exploitation information and the survey Try the third incidence relation of information;
Step 105, the exploitation information is associated with the production information, obtains the exploitation information and the life Produce the 4th incidence relation of information;
Step 106, according to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation exhibition Show the software project information of default dimension.
Alternatively, the function of each module in above-mentioned apparatus embodiment is realized when the computer program is executed by processor, such as Module 201-206 in Fig. 2:
Module 201 is obtained, for obtaining the demand information of software project demand stage, development phase from preset data source Develop information and version information, the test information of test phase, the production information of production phase;
First relating module 202 obtains the demand for the demand information and the exploitation information to be associated First incidence relation of information and the exploitation information;
Second relating module 203 obtains the exploitation for the exploitation information to be associated with the version information Second incidence relation of information and the version information;
Third relating module 204 obtains the exploitation for the exploitation information and the test information to be associated The third incidence relation of information and the test information;
4th relating module 205 obtains the exploitation for the exploitation information to be associated with the production information 4th incidence relation of information and the production information;
Display module 206, for being closed according to first incidence relation, the second incidence relation, third incidence relation, the 4th Connection relationship shows the software project information of default dimension.
Example IV
Fig. 3 is the schematic diagram for the computer installation that the embodiment of the present invention four provides.The computer installation 30 includes storage Device 301, processor 302 and it is stored in the computer program that can be run in the memory 301 and on the processor 302 303, such as software information presentation program.The processor 302 realizes above-mentioned software information when executing the computer program 303 Step in methods of exhibiting embodiment, such as step 101-106 shown in FIG. 1:
Step 101, demand information, the exploitation information of development phase of software project demand stage are obtained from preset data source With version information, the test information of test phase, the production information of production phase;
Step 102, the demand information and the exploitation information are associated, obtain the demand information and is opened with described First incidence relation of photos and sending messages;
Step 103, the exploitation information is associated with the version information, obtains the exploitation information and the version Second incidence relation of this information;
Step 104, the exploitation information and the test information are associated, obtain the exploitation information and the survey Try the third incidence relation of information;
Step 105, the exploitation information is associated with the production information, obtains the exploitation information and the life Produce the 4th incidence relation of information;
Step 106, according to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation exhibition Show the software project information of default dimension.
Alternatively, the function of each module in above-mentioned apparatus embodiment is realized when the computer program is executed by processor, such as Module 201-206 in Fig. 2:
Module 201 is obtained, for obtaining the demand information of software project demand stage, development phase from preset data source Develop information and version information, the test information of test phase, the production information of production phase;
First relating module 202 obtains the demand for the demand information and the exploitation information to be associated First incidence relation of information and the exploitation information;
Second relating module 203 obtains the exploitation for the exploitation information to be associated with the version information Second incidence relation of information and the version information;
Third relating module 204 obtains the exploitation for the exploitation information and the test information to be associated The third incidence relation of information and the test information;
4th relating module 205 obtains the exploitation for the exploitation information to be associated with the production information 4th incidence relation of information and the production information;
Display module 206, for being closed according to first incidence relation, the second incidence relation, third incidence relation, the 4th Connection relationship shows the software project information of default dimension.
Illustratively, the computer program 303 can be divided into one or more modules, one or more of Module is stored in the memory 301, and is executed by the processor 302, to complete this method.It is one or more of Module can be the series of computation machine program instruction section that can complete specific function, and the instruction segment is for describing the computer Implementation procedure of the program 303 in the computer installation 30.For example, the computer program 303 can be divided into Fig. 2 Acquisition module 201, the first relating module 202, the second relating module 203, third relating module 204, the 4th relating module 205, display module 206, each module concrete function is referring to embodiment two.
The computer installation 30 can be the calculating such as desktop PC, notebook, palm PC and cloud server Equipment.It will be understood by those skilled in the art that the schematic diagram 3 is only the example of computer installation 30, do not constitute to meter The restriction of calculation machine device 30 may include perhaps combining certain components or different portions than illustrating more or fewer components Part, such as the computer installation 30 can also include input-output equipment, network access equipment, bus etc..
Alleged processor 302 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor 302 is also possible to any conventional processing Device etc., the processor 302 are the control centres of the computer installation 30, are entirely calculated using various interfaces and connection The various pieces of machine device 30.
The memory 301 can be used for storing the computer program 303, and the processor 302 is by operation or executes The computer program or module being stored in the memory 301, and the data being stored in memory 301 are called, it realizes The various functions of the computer installation 30.The memory 301 can mainly include storing program area and storage data area, In, storing program area can application program needed for storage program area, at least one function (such as sound-playing function, image Playing function etc.) etc.;Storage data area, which can be stored, uses created data (such as audio number according to computer installation 30 According to, phone directory etc.) etc..In addition, memory 301 may include high-speed random access memory, it can also include non-volatile deposit Reservoir, such as hard disk, memory, plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card), at least one disk memory, flush memory device or other Volatile solid-state part.
If the integrated module of the computer installation 30 is realized in the form of software function module and as independent production Product when selling or using, can store in a computer readable storage medium.Based on this understanding, the present invention realizes All or part of the process in above-described embodiment method can also instruct relevant hardware to complete by computer program, The computer program can be stored in a computer storage medium, which, can be real when being executed by processor The step of existing above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code, the computer journey Sequence code can be source code form, object identification code form, executable file or certain intermediate forms etc..It is described computer-readable Medium may include: any entity or device, recording medium, USB flash disk, mobile hard that can carry the computer program code Disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It needs to illustrate It is that the content that the computer-readable medium includes can be fitted according to the requirement made laws in jurisdiction with patent practice When increase and decrease, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium does not include electric carrier wave letter Number and telecommunication signal.
In several embodiments provided by the present invention, it should be understood that disclosed system, device and method can be with It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the module It divides, only a kind of logical function partition, there may be another division manner in actual implementation.
The module as illustrated by the separation member may or may not be physically separated, aobvious as module The component shown may or may not be physical module, it can and it is in one place, or may be distributed over multiple In network unit.Some or all of the modules therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
It, can also be in addition, each functional module in each embodiment of the present invention can integrate in a processing module It is that modules physically exist alone, can also be integrated in two or more modules in a module.Above-mentioned integrated mould Block both can take the form of hardware realization, can also realize in the form of hardware adds software function module.
The above-mentioned integrated module realized in the form of software function module, can store and computer-readable deposit at one In storage media.Above-mentioned software function module is stored in a storage medium, including some instructions are used so that a computer It is each that equipment (can be personal computer, server or the network equipment etc.) or processor (processor) execute the present invention The part steps of embodiment the method.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included in the present invention.Any attached associated diagram label in claim should not be considered as right involved in limitation to want It asks.Furthermore, it is to be understood that one word of " comprising " is not excluded for other modules or step, odd number is not excluded for plural number.It is stated in system claims Multiple modules or device can also be implemented through software or hardware by a module or device.The first, the second equal words It is used to indicate names, and does not indicate any particular order.
Finally it should be noted that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although reference Preferred embodiment describes the invention in detail, those skilled in the art should understand that, it can be to of the invention Technical solution is modified or equivalent replacement, without departing from the spirit and scope of the technical solution of the present invention.

Claims (10)

1. a kind of software information methods of exhibiting, which is characterized in that the described method includes:
From preset data source obtain software project demand stage demand information, the exploitation information of development phase and version information, Test information, the production information of production phase of test phase;
The demand information and the exploitation information are associated, the first of the demand information and the exploitation information is obtained Incidence relation;
The exploitation information is associated with the version information, obtains the second of the exploitation information and the version information Incidence relation;
The exploitation information and the test information are associated, the third of the exploitation information and the test information is obtained Incidence relation;
The exploitation information is associated with the production information, obtains the 4th of the exploitation information and the production information Incidence relation;
Default dimension is shown according to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation Software project information.
2. the method as described in claim 1, which is characterized in that described to close the demand information and the exploitation information Connection includes:
Calculate the demand information and it is described exploitation information the degree of association, according to the degree of association by the demand information with it is described Exploitation information is associated.
3. the method as described in claim 1, which is characterized in that the default dimension includes demand dimension, version dimension, personnel Dimension.
4. the method as described in claim 1, which is characterized in that it is described according to first incidence relation, the second incidence relation, Third incidence relation, the 4th incidence relation show that the software project information of default dimension includes:
Obtain user right, according to the user right, first incidence relation, the second incidence relation, third incidence relation, 4th incidence relation shows the software project information of the default dimension.
5. such as method of any of claims 1-4, which is characterized in that the method also includes:
Monitor whether the preset data source has new information;
If there is new information in the preset data source, obtain the new information, by the new information and the demand information, Exploitation information, test information or production information are associated.
6. such as method of any of claims 1-4, which is characterized in that the software item for showing the default dimension Mesh information includes:
The software project letter of the default dimension is shown using Flash/Flex, Silverlight, HTML5 or JavaFx technology Breath.
7. such as method of any of claims 1-4, which is characterized in that described by the demand information and the exploitation Information, which is associated, includes:
The demand is calculated according to the development task title in the demand title and the exploitation information in the demand information to believe First degree of association of breath and the exploitation information;And/or
The need are calculated according to the development time progress in the plan development time and the exploitation information in the demand information Seek second degree of association of information and the exploitation information;
Determine whether the demand information closes with the exploitation information according to first degree of association and/or second degree of association Connection.
8. a kind of software information shows device, which is characterized in that described device includes:
Module is obtained, for obtaining demand information, the exploitation of the development phase letter of software project demand stage from preset data source Breath and version information, the test information of test phase, the production information of production phase;
First relating module, for the demand information and the exploitation information to be associated, obtain the demand information with First incidence relation of the exploitation information;
Second relating module, for the exploitation information to be associated with the version information, obtain the exploitation information with Second incidence relation of the version information;
Third relating module, for the exploitation information and the test information to be associated, obtain the exploitation information with The third incidence relation of the test information;
4th relating module, for the exploitation information to be associated with the production information, obtain the exploitation information with 4th incidence relation of the production information;
Display module, for according to first incidence relation, the second incidence relation, third incidence relation, the 4th incidence relation Show the software project information of default dimension.
9. a kind of computer installation, it is characterised in that: the computer installation includes processor, and the processor is deposited for executing The computer program stored in reservoir is to realize the software information methods of exhibiting as described in any one of claim 1-7.
10. a kind of computer storage medium, computer program is stored in the computer storage medium, it is characterised in that: institute It states and realizes the software information methods of exhibiting as described in any one of claim 1-7 when computer program is executed by processor.
CN201910442276.8A 2019-05-24 2019-05-24 Software information methods of exhibiting, device, computer installation and computer storage medium Pending CN110308926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910442276.8A CN110308926A (en) 2019-05-24 2019-05-24 Software information methods of exhibiting, device, computer installation and computer storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910442276.8A CN110308926A (en) 2019-05-24 2019-05-24 Software information methods of exhibiting, device, computer installation and computer storage medium

Publications (1)

Publication Number Publication Date
CN110308926A true CN110308926A (en) 2019-10-08

Family

ID=68075267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910442276.8A Pending CN110308926A (en) 2019-05-24 2019-05-24 Software information methods of exhibiting, device, computer installation and computer storage medium

Country Status (1)

Country Link
CN (1) CN110308926A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111461666A (en) * 2020-04-07 2020-07-28 中国建设银行股份有限公司 Demand tracking matrix display method and system
CN111638905A (en) * 2020-05-12 2020-09-08 中信百信银行股份有限公司 Version number generation method and device, electronic equipment and readable storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105677332A (en) * 2015-12-30 2016-06-15 上海玖镕信息科技有限公司 Software developing requirement management system
CN105893050A (en) * 2016-04-05 2016-08-24 延锋伟世通电子科技(南京)有限公司 Method for carrying out overall lifecycle management on software project based on project lifecycle management (PLMS), subversion (SVN) and Jenkins
CN108664386A (en) * 2017-03-30 2018-10-16 北京神州泰岳软件股份有限公司 A kind of automated testing method and platform
CN109214776A (en) * 2018-08-23 2019-01-15 山东电力建设第三工程有限公司 A kind of thermoelectricity EPC general contract of civil engineering management overall process total factor control platform
CN109683860A (en) * 2018-12-04 2019-04-26 郑州云海信息技术有限公司 A kind of computer software project management platform, equipment and readable storage medium storing program for executing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105677332A (en) * 2015-12-30 2016-06-15 上海玖镕信息科技有限公司 Software developing requirement management system
CN105893050A (en) * 2016-04-05 2016-08-24 延锋伟世通电子科技(南京)有限公司 Method for carrying out overall lifecycle management on software project based on project lifecycle management (PLMS), subversion (SVN) and Jenkins
CN108664386A (en) * 2017-03-30 2018-10-16 北京神州泰岳软件股份有限公司 A kind of automated testing method and platform
CN109214776A (en) * 2018-08-23 2019-01-15 山东电力建设第三工程有限公司 A kind of thermoelectricity EPC general contract of civil engineering management overall process total factor control platform
CN109683860A (en) * 2018-12-04 2019-04-26 郑州云海信息技术有限公司 A kind of computer software project management platform, equipment and readable storage medium storing program for executing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111461666A (en) * 2020-04-07 2020-07-28 中国建设银行股份有限公司 Demand tracking matrix display method and system
CN111638905A (en) * 2020-05-12 2020-09-08 中信百信银行股份有限公司 Version number generation method and device, electronic equipment and readable storage medium

Similar Documents

Publication Publication Date Title
US11687216B2 (en) Digital processing systems and methods for dynamically updating documents with data from linked files in collaborative work systems
CA2937017C (en) Integrated design application
CN104461858B (en) software compatibility pre-testing method and system
Chong et al. An explanatory case study on cloud computing applications in the built environment
Celik et al. Blockchain supported BIM data provenance for construction projects
US20090150887A1 (en) Process Aware Change Management
CN104298478B (en) The deduction acted based on filename to thesaurus
US20070288275A1 (en) It services architecture planning and management
CN102567840A (en) Hybrid task board and critical path method based project management application interface
Jackson et al. Architecting Cloud Computing Solutions: Build cloud strategies that align technology and economics while effectively managing risk
US11532386B2 (en) Generating and customizing summarized notes
CN110266533A (en) Big data platform management system
US20230281109A1 (en) Debugging data privacy pipelines using sample data
US20230281342A1 (en) Granting entitlements to log data generated by a data privacy pipeline to facilitate debugging
CN106663041A (en) Recovering usability of cloud based service from system failure
CN108921600A (en) Realize the device and method and storage medium of information classification
CN110244899A (en) Electronic contract on-line processing method, Online Processing System and terminal
Keskin et al. Architecting a BIM-based digital twin platform for airport asset management: a model-based system engineering with SysML approach
CN110308926A (en) Software information methods of exhibiting, device, computer installation and computer storage medium
CN108351766A (en) Slave mobile device creates and modification application
WO2022127474A1 (en) Providing explainable machine learning model results using distributed ledgers
Li Jira 7 Essentials
US11922145B2 (en) Initiating data privacy pipelines using reusable templates
US11481211B1 (en) Dynamically creating source code comments
CN113506095A (en) Order dynamic rule checking and distributing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination