CN108534619A - The method of big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing - Google Patents

The method of big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing Download PDF

Info

Publication number
CN108534619A
CN108534619A CN201711271385.5A CN201711271385A CN108534619A CN 108534619 A CN108534619 A CN 108534619A CN 201711271385 A CN201711271385 A CN 201711271385A CN 108534619 A CN108534619 A CN 108534619A
Authority
CN
China
Prior art keywords
narrow
dike
levee body
throwing
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711271385.5A
Other languages
Chinese (zh)
Other versions
CN108534619B (en
Inventor
张阳
王峰
西子阳
张光权
石磊
黄春花
尤奎
杨韵嘏
李宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongda Blasting Co Ltd
Beijing Zkl Bt & E Co Ltd
Original Assignee
Hongda Blasting Co Ltd
Beijing Zkl Bt & E Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongda Blasting Co Ltd, Beijing Zkl Bt & E Co Ltd filed Critical Hongda Blasting Co Ltd
Priority to CN201711271385.5A priority Critical patent/CN108534619B/en
Publication of CN108534619A publication Critical patent/CN108534619A/en
Application granted granted Critical
Publication of CN108534619B publication Critical patent/CN108534619B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/062Constructions floating in operational condition, e.g. breakwaters or wave dissipating walls
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Treatment Of Sludge (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of methods of big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing.This method specifically includes, and prefabricated formation length is 30 50 meters of narrow dikes, will be in the narrow dike explosion throwing to deep foundation trench silt soft foundation;It is quick-fried in the narrow dike both sides cloth medicine progress side of throwing in place, jackstone material is mended to the narrow dike and is increased, until meeting predetermined value H0;It is quick-fried in the levee body both sides cloth medicine progress secondary side of narrow dike again, jackstone material is mended to the narrow dike and is widened to both sides;Step 3 is repeated until reaching levee body design width value L;Next section of the quick-fried of levee body of progress that repeat the above steps fills out construction, until completing whole levee body.Due to the adoption of the above technical scheme, method of the invention can effectively solve the problem that the problem of big cross section depth foundation trench bottomed depth of underwater sludge soft base explosion levee body or bottomed short of width;Row silt channel can be provided for underwater sludge soft base, effectively solve the displacement of big cross section depth foundation trench mud and is not thorough, dike cardiolith bottomed situations such as design requirement is not achieved.

Description

The method of big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing
Technical field
The invention belongs to explosion field, more particularly, to the processing of big cross section depth foundation trench soft base, for embankment, breakwater, The method of the big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing of the Soft Ground of the engineerings such as shore protection.
Background technology
Strong area is acted in trends such as Nearshore Shallow Sea area, Hekou District, straits and water channel exits, trend is to continental shelf The a large amount of loose terrestrial sediments in seabed are eroded, carry and are accumulated again, are formed a series of hundreds and thousands of rice of extensions, are up to counted Ten meters, the alternate ribbon sea-floor relief of piston ring land.Sedimentation is washed away and carried under one's arms to the external force such as ocean current, trend, storm tide, is formed Sand-flour sand-mud mixes alternate landform.China coastal seas bank Development Engineering creates the engineerings such as embankment, breakwater and frequently encounters section Among silty sand ground groove bigger, silt soft foundation is deep and in tidal current scour formation, the treatment of soft foundation referred to as in foundation trench.
The technology of blasting procedure processing Underwater Soft Foundation is widely used to harbour breakwater, reclaims fields from the sea, the engineerings such as shore protection, Saving economic, guarantee safety etc. has significant advantage.But the treatment of soft foundation in foundation trench, especially big cross section, deep base In terms of the treatment of soft foundation of slot, traditional solution or be sea wall early construction design link avoid such landform or Heavy excavation is carried out to mud basis using traditional method.
What processing Muddy Soft Foundations construction application was more is the method for compacting mud by explosion displacement or directional-sliding at present.But it is right In this complicated and universal sea wall environment of big cross section depth foundation trench silt soft foundation, previous compacting mud by explosion construction technology is often difficult to Reach design requirement or the inadequate levee body of replacement depth is bottomed is unsatisfactory for design requirement or the bottomed width of levee body platform is inadequate, this is just New technology is needed to handle the sea wall Construction Problems of big cross section depth foundation trench Silty soft foundation.
Invention content
To solve the above-mentioned problems, the purpose of the present invention is handling the defect of soft base for above-mentioned explosion method, one kind is provided The new method for big cross section embankment breakwater depth foundation trench Silty soft foundation, it is more than 20 that this method, which is applicable in levee body section width, Rice, length are more than 30 meters, levee body axis is vertical with foundation trench axis or oblique, silt depth are more than 10 meters of deep foundation trench silt soft Base.
To achieve the above object, the technical solution adopted by the present invention is:Big cross section embankment breakwater depth foundation trench silt soft foundation The method of explosion method processing
Include the following steps:
Step 1:Prefabricated formation length is 30-50 meters of narrow dikes, will be in the narrow dike explosion throwing to deep foundation trench silt soft foundation;
Step 2:Jackstone material is mended to the narrow dike and is increased, until meeting predetermined value HLevee body thickness, in the narrow dike two of throwing in place It is quick-fried that side cloth medicine carries out side;
Step 3:Jackstone material is mended to the narrow dike to widen to both sides, then carries out secondary side in the levee body both sides cloth medicine of narrow dike It is quick-fried;
Step 4:Step 3 is repeated until reaching levee body design width value L;
Step 5:Repetition step 1-4 carries out next section of the quick-fried of levee body and fills out construction, until completing whole levee body.
Further, the step 1 the specific steps are:
Step 1.1:Determine that the width of narrow dike, width are controlled in 10-12m;
Step 1.2:The throwing elevation for determining narrow dike, the not upper water of levee body, ensures that vehicle safety is logical when needing to meet high tide level Row, quick-fried rear levee crown are no more than design altitude, throwing elevation 0.5m on design high-water;
Step 1.3:Determine that the throwing drilling depth of narrow dike, throwing drilling depth are controlled in 4-8m;
Further, the benefit in the step 2 is thrown elevation and should be met:
H1+H2≥H0 (1)
In formula:H1For throwing height;H2To mend the height thrown;H0For levee body section design height.
Further, both sides are widened in the step 3, and quick-fried width of filling out should be controlled in 4-6m every time, final entirety throwing width Following formula should be met:
L=L0–K1H1–A (2)
In formula:L is throwing width;L0For berm width or bottomed width;H1For the above stone riprap height in mud face;K1For mud The above stone riprap slope ratio in face, K1=0.8~1.0;A-correction value, A=0~2;
Further, heretofore described blasting parameter design should meet following requirement:
(a) line dose is calculated according to the following formula:
q'L=qoLHHN
HN=HM+HB
Q' in formulaL- line cloth dose (kg/m);
qo- explosive specific charge (kg/m3), i.e., the quick-fried dose except needed for unit volume mud takes 0.1~0.3kg/m3
LH- blasting discharging sedimentation rockfills the horizontal distance (m) once promoted, takes 4~8m;
HN- it is included in the mud overall thickness (m) of mud packet thickness;
HM- design displacement silt depth (m);
HB- mud packet thickness (m).
(b) the become silted up dose that rockfills of onepull row is calculated as follows:
Q=q'L LL
The dose (kg) that rockfills that becomes silted up is arranged in Q-onepull in formula;
q'L- line cloth dose (kg/m), i.e., the dose being distributed in unit cloth medicine length;
LLThe cloth medicated thread length (m) that-blasting discharging sedimentation rockfills.
(c) dynamite quantity per hole is calculated according to the following formula:
Q1=Q/m
M=LL/(a+1)
Q in formula1- dynamite quantity per hole (kg);
The dose (kg) that rockfills that becomes silted up is arranged in Q-onepull;
Cloth medicine hole count of m-;
LLThe cloth medicated thread length (m) that-blasting discharging sedimentation rockfills;
A-pack spacing (m), takes 4-6m.
(d) pack takes 0.45~0.55H in mud face length of embedment belowN
The present invention further improvement lies in that, the cloth medicine pack spacing a of step (1) described explosion takes 4-6m;
The present invention further improvement lies in that, the quick-fried cloth medicine pack spacing a in step (2) (3) described side takes 5m;
The invention has the advantages that due to the adoption of the above technical scheme, method of the invention can effectively solve the problem that big disconnected The problem of face depth foundation trench bottomed depth of underwater sludge soft base explosion levee body or bottomed short of width;Can be that underwater sludge soft base carries Supply and discharge silt channel effectively solves the displacement of big cross section depth foundation trench mud and is not thorough, dike cardiolith bottomed situations such as design requirement is not achieved.
Description of the drawings
Fig. 1 is the big cross section depth foundation trench soft base schematic diagram of the present invention.
Pack position figure when Fig. 2 is throwing of the present invention narrow dike job platform.
Fig. 3 is the quick-fried pack position figure in first and second side.
Fig. 4, which is that circulation side is quick-fried, forms complete levee body.
Specific implementation mode:
For the benefit of to the understanding of the present invention, illustrate with reference to the accompanying drawings and embodiments.
The method of big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing of the present invention, it is disconnected to be specifically applicable in levee body Face width is more than 20 meters, length is more than 30 meters, levee body axis is vertical with foundation trench axis or oblique, silt depth are more than 10 meters of depth Foundation trench silt soft foundation explosion treatment is constructed;More specifically embodiment, the levee body axis is vertical with foundation trench axis, is silt in foundation trench Shale soft base, foundation trench are silty sand ground, 80 meters of foundation trench width, about 32 meters of silt depth, bottomed 87 meters of the width of levee body design, design outside 7.8 meters of elevation of top surface, mud face elevation -6.4, designs -38 meters of bottomed elevation.
As a kind of method and step of explosion method processing big cross section depth foundation trench silt soft foundation of Fig. 1-Fig. 4 present invention includes:Throwing Explosion forms narrow dike, narrow dike mend throw increase both sides side is quick-fried, narrow dike mend throw widen both sides side is quick-fried, quick-fried the is formationed levee body of circulation side, repetition Above step completes entire levee body.
The method of big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing,
Step 1:Prefabricated formation length is 30-50 meters of narrow dikes, will be in the narrow dike explosion throwing to deep foundation trench silt soft foundation;
Step 2:Jackstone material is mended to the narrow dike and is increased, until meeting predetermined value HLevee body thickness, in the narrow dike two of throwing in place It is quick-fried that side cloth medicine carries out side;
Step 3:Jackstone material is mended to the narrow dike to widen to both sides, then carries out secondary side in the levee body both sides cloth medicine of narrow dike It is quick-fried;
Step 4:Step 3 is repeated until reaching levee body design width value L;
Step 5:Repetition step 1-4 carries out next section of the quick-fried of levee body and fills out construction, until completing whole levee body.
The step 1 the specific steps are:
Step 1.1:Determine that the width of narrow dike, width are controlled in 10-12m;
Step 1.2:The throwing elevation for determining narrow dike, the not upper water of levee body, ensures that vehicle safety is logical when needing to meet high tide level Row, quick-fried rear levee crown are no more than design altitude, throwing elevation 0.5m preferably on design high-water;
Step 1.3:Determine that the throwing drilling depth of narrow dike, throwing drilling depth LH, LH=4-8m determine pack according to throwing drilling depth Line cloth dose q'L, cloth medicine number and depth of burying HN carry out the then explosion of cloth medicine, until forming 30-50 meters of narrow dikes;
Benefit in the step 2, which throws elevation, to be met:
H1+H2≥H0 (1)
In formula:H1For throwing height;H2To mend the height thrown;H0For levee body section design height.
Both sides are widened in the step 3, and quick-fried width of filling out should be controlled in 4-6m every time, and final entirety throwing width should meet such as Lower formula:
L=L0–K1H1–A (2)
In formula:L is throwing width;
L0For berm width or bottomed width;
H1For the above stone riprap height in mud face;
K1For the above stone riprap slope ratio in mud face, K1=0.8~1.0;
A-correction value, A=0~2.
In the step 1.3:
First, line cloth dose q' is found out according to following formulaL
q'L=qoLHHN (3)
HN=HM+HB (4)
Q' in formulaL- line cloth dose (kg/m);
qo- explosive specific charge (kg/m3), i.e., the quick-fried dose except needed for unit volume mud takes 0.1~0.3kg/m3
LH- blasting discharging sedimentation rockfills the horizontal distance (m) once promoted, takes 4~8m;
HN- it is included in the mud overall thickness (m) of mud packet thickness;
HM- design displacement silt depth (m);
HB- mud packet thickness (m).
Secondly, according to line cloth dose q'LIt asks onepull to arrange the dose Q that rockfills that becomes silted up, is calculated as follows:
Q=q'L LL (5)
The dose (kg) that rockfills that becomes silted up is arranged in Q-onepull in formula;
q'L- line cloth dose (kg/m), i.e., the dose being distributed in unit cloth medicine length;
LLThe cloth medicated thread length (m) that-blasting discharging sedimentation rockfills.
Finally, dynamite quantity per hole is calculated to be calculated according to the following formula:
Q1=Q/m
M=LL/(a+1)
Q in formula1- dynamite quantity per hole (kg);
The dose (kg) that rockfills that becomes silted up is arranged in Q-onepull;
Cloth medicine hole count of m-;
LLThe cloth medicated thread length (m) that-blasting discharging sedimentation rockfills;
A-pack spacing (m), takes 4-6m.
(d) pack takes 0.45~0.55H in mud face length of embedment belowN
The quick-fried cloth medicine pack spacing a in side described in the step 2 and 3, takes 5 meters.
This method be applicable in that levee body section width is more than 20 meters, length is more than 30 meters, levee body axis is vertical with foundation trench axis or Oblique, silt depth are more than 10 meters of deep foundation trench silt soft foundation.
Embodiment:
Step 1:Throwing explosion forms narrow dike, first throws forward a narrow dike along levee body axis, levee body width 10m, elevation 8m, Throwing drilling depth 8m.Using crawler crane vibration-impact type powder charge, 3 60kg packs, each 2 of both sides are arranged per separate explosion dike head front 60kg packs, 4 meters of pack spacing, every time total dose 420kg, cycle explosion promote to form narrow dike.
Step 2:First time side is quick-fried, after narrow dike forms 40 meters, is mended to narrow dike and throws and increase, 8 meters of elevation.Two each side arrangements 8 A 60kg packs, pack spacing are 5 meters, total dose 960kg.
Step 3:Second of side is quick-fried, and narrow dike mends throwing and both sides respectively widen 4 meters, and 8 60kg medicines are respectively arranged in 8 meters of elevation, both sides Packet, pack spacing are 5 meters, total dose 960kg.
Step 4:Circulation step 2-3, until reaching levee body design width.
Step 5:Circulation step 1-4 carries out next section of levee body construction, until completing whole levee body.

Claims (7)

1. the method for big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing, which is characterized in that
Step 1:Prefabricated formation length is 30-50 meters of narrow dikes, will be in the narrow dike explosion throwing to deep foundation trench silt soft foundation;
Step 2:Jackstone material is mended to the narrow dike and is increased, until meeting predetermined value HLevee body thickness, in the narrow dike both sides cloth of throwing in place It is quick-fried that medicine carries out side;
Step 3:Jackstone material is mended to the narrow dike to widen to both sides, then quick-fried in the levee body both sides cloth medicine progress secondary side of narrow dike;
Step 4:Step 3 is repeated until reaching levee body design width value L;
Step 5:Repetition step 1-4 carries out next section of the quick-fried of levee body and fills out construction, until completing whole levee body.
2. method according to claim 1, which is characterized in that the step 1 the specific steps are:
Step 1.1:Determine that the width of narrow dike, width are controlled in 10-12m;
Step 1.2:The throwing elevation for determining narrow dike, the not upper water of levee body, ensures that vehicle safety passes through when needing to meet high tide level, quick-fried Levee crown is no more than design altitude, throwing elevation 0.5m preferably on design high-water afterwards;
Step 1.3:Determine that the throwing drilling depth of narrow dike, throwing drilling depth LH, LH=4-8m determine the line cloth of pack according to throwing drilling depth Dose q'L, cloth medicine number and depth of burying HN carry out the then explosion of cloth medicine, until forming 30-50 meters of narrow dikes.
3. method according to claim 1, which is characterized in that the benefit in the step 2, which throws elevation, to be met:
H1+H2≥H0 (1)
In formula:H1For throwing height;H2To mend the height thrown;H0For levee body section design height.
4. method according to claim 1, which is characterized in that both sides are widened in the step 3, and each quick-fried width of filling out should control In 4-6m, final entirety throwing width should meet following formula:
L=L0–K1H1–A (2)
In formula:L is throwing width;
L0For berm width or bottomed width;
H1For the above stone riprap height in mud face;
K1For the above stone riprap slope ratio in mud face, K1=0.8~1.0;
A-correction value, A=0~2.
5. method according to claim 2, which is characterized in that in the step 1.3:
First, line cloth dose q' is found out according to following formulaL
q'L=qoLHHN (3)
HN=HM+HB (4)
Q' in formulaL- line cloth dose (kg/m);
qo- explosive specific charge (kg/m3), i.e., the quick-fried dose except needed for unit volume mud takes 0.1~0.3kg/m3
LH- blasting discharging sedimentation rockfills the horizontal distance (m) once promoted, takes 4~8m;
HN- it is included in the mud overall thickness (m) of mud packet thickness;
HM- design displacement silt depth (m);
HB- mud packet thickness (m).
Secondly, according to line cloth dose q'LIt asks onepull to arrange the dose Q that rockfills that becomes silted up, is calculated as follows:
Q=q'LLL (5)
The dose (kg) that rockfills that becomes silted up is arranged in Q-onepull in formula;
q'L- line cloth dose (kg/m), i.e., the dose being distributed in unit cloth medicine length;
LLThe cloth medicated thread length (m) that-blasting discharging sedimentation rockfills.
Finally, dynamite quantity per hole is calculated to be calculated according to the following formula:
Q1=Q/m
M=LL/(a+1)
Q in formula1- dynamite quantity per hole (kg);
The dose (kg) that rockfills that becomes silted up is arranged in Q-onepull;
Cloth medicine hole count of m-;
LLThe cloth medicated thread length (m) that-blasting discharging sedimentation rockfills;
A-pack spacing (m), takes 4-6m.
(d) pack takes 0.45~0.55H in mud face length of embedment belowN
6. according to the method described in claim 1, it is characterized in that, the quick-fried cloth medicine pack spacing in side described in the step 2 and 3 A takes 5 meters.
7. according to claim 1-7 any one of them methods, which is characterized in that it is more than 20 that this method, which is applicable in levee body section width, Rice, length are more than 30 meters, levee body axis is vertical with foundation trench axis or oblique, silt depth are more than 10 meters of deep foundation trench silt soft Base.
CN201711271385.5A 2017-12-05 2017-12-05 Soft foundation explosion method for treating sludge in deep foundation groove of large-section dike breakwater Active CN108534619B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711271385.5A CN108534619B (en) 2017-12-05 2017-12-05 Soft foundation explosion method for treating sludge in deep foundation groove of large-section dike breakwater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711271385.5A CN108534619B (en) 2017-12-05 2017-12-05 Soft foundation explosion method for treating sludge in deep foundation groove of large-section dike breakwater

Publications (2)

Publication Number Publication Date
CN108534619A true CN108534619A (en) 2018-09-14
CN108534619B CN108534619B (en) 2020-08-07

Family

ID=63489781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711271385.5A Active CN108534619B (en) 2017-12-05 2017-12-05 Soft foundation explosion method for treating sludge in deep foundation groove of large-section dike breakwater

Country Status (1)

Country Link
CN (1) CN108534619B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737845A (en) * 2019-01-25 2019-05-10 安徽江南爆破工程有限公司 Sub-bottom changes blasting demolishing method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1220332A (en) * 1997-12-18 1999-06-23 中国科学院力学研究所 'Core covering' section embankment explosion method construction technology
CN102251516A (en) * 2011-04-13 2011-11-23 北京中科力爆炸技术工程有限公司 Water jackstone blasting mud displacement embanking method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1220332A (en) * 1997-12-18 1999-06-23 中国科学院力学研究所 'Core covering' section embankment explosion method construction technology
CN102251516A (en) * 2011-04-13 2011-11-23 北京中科力爆炸技术工程有限公司 Water jackstone blasting mud displacement embanking method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
童琪华: "海岸堤防工程深厚淤泥层爆破挤淤法处治", 《上海国土资源》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109737845A (en) * 2019-01-25 2019-05-10 安徽江南爆破工程有限公司 Sub-bottom changes blasting demolishing method
CN109737845B (en) * 2019-01-25 2021-03-30 安徽江南爆破工程有限公司 Blasting demolition method for soil dam

Also Published As

Publication number Publication date
CN108534619B (en) 2020-08-07

Similar Documents

Publication Publication Date Title
CN105672199B (en) A kind of dock structure and its construction method suitable for silt coast
CN105178245A (en) Large filling bag ecological embankment and revetment building method for river lake channel
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN101691755A (en) Method for constructing liquified discarded soil in construction of subaqueous structure
CN102251516A (en) Water jackstone blasting mud displacement embanking method
CN203782664U (en) Anti-scour structure of sandy foundation water gate
CN104406471B (en) The diversion blasting construction method of intertidal zone explosive replacement fill
CN111893947A (en) Blasting and silt squeezing construction method for deep soft foundation of breakwater in fishing port
CN106400744A (en) Comprehensive side-slope treatment structure for preventing river channel erosion and construction method thereof
CN100516367C (en) Geotechnical soil-ballasted sack cofferdam for water piers of river-crossing bridge and its production method
CN107816050A (en) A kind of concrete cofferdam and earth rock cofferdam combined cofferdam and its construction method
CN108534619A (en) The method of big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing
CN104612128B (en) Vacuum preloading reinforcement construction method applicable to underwater silt environment
CN113123376B (en) Method for detecting, managing and reinforcing scouring form of pile foundation
CN107190709B (en) Method for building river channel in newly dredged soil reclamation land-enclosed area
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN102605742B (en) Method for building vertical breakwater
CN102808394B (en) Construction method for fine sand ultra-long interception embankment closure gap bottom guard with deep covering layer
CN100538250C (en) A kind of method of limiting drug amount directional blasting replacement mollisol stone packing
CN109826201A (en) A kind of weak soil foundation pit step method for protecting support
CN101705668A (en) Damming water conservancy project construction structure constructed in flowing water and construction method thereof
CN211228358U (en) Improved generation seawall dyke foot reinforced structure
CN109610465B (en) Excavation construction method for ultra-large-area deep foundation pit
CN206607548U (en) A kind of protective slope structure of Channel slope
CN1070969C (en) 'Core covering' section embankment explosion method construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant