CN1070969C - 'Core covering' section embankment explosion method construction technology - Google Patents

'Core covering' section embankment explosion method construction technology Download PDF

Info

Publication number
CN1070969C
CN1070969C CN 97121735 CN97121735A CN1070969C CN 1070969 C CN1070969 C CN 1070969C CN 97121735 CN97121735 CN 97121735 CN 97121735 A CN97121735 A CN 97121735A CN 1070969 C CN1070969 C CN 1070969C
Authority
CN
China
Prior art keywords
mud
cartridge bag
thickness
bag
equal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97121735
Other languages
Chinese (zh)
Other versions
CN1220332A (en
Inventor
杨振声
张加华
王峰
陶俊
赵丕彪
杨庆华
蔡元美
金镠
吴晓春
廖秋春
廖小兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Engineering Company Third Engineering Bureau Of Water Resources And Hydropower In Guangdong Province
Institute of Mechanics of CAS
Original Assignee
Zhuhai Engineering Company Third Engineering Bureau Of Water Resources And Hydropower In Guangdong Province
Institute of Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Engineering Company Third Engineering Bureau Of Water Resources And Hydropower In Guangdong Province, Institute of Mechanics of CAS filed Critical Zhuhai Engineering Company Third Engineering Bureau Of Water Resources And Hydropower In Guangdong Province
Priority to CN 97121735 priority Critical patent/CN1070969C/en
Publication of CN1220332A publication Critical patent/CN1220332A/en
Application granted granted Critical
Publication of CN1070969C publication Critical patent/CN1070969C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The present invention relates to a construction technology of core covering sections by a seawall explosion method, which is characterized in that: firstly, mixed stone materials for filling and cutting mountains on land are adopted; when a filling seawall body reaches the height designed by a project and a certain size, explosives are arranged on the boundary of mudstone on both sides of a seawall head and the seawall body, and are detonated to form a seawall explosion method of a core covering section on filling mixed soil layers on both sides of the seawall head and the seawall body. The present invention can be widely applied to the soft foundation treatment of the projects of breakwaters, revetments, cofferdams, etc. in port engineering. The present invention has the advantages of low project cost, good project quality, etc.

Description

" Bao Xin " section sea wall explosion method construction technology
The present invention relates in the port works that the section of hydrotechnical construction is chosen and the method for Soft Ground under water.Be applicable to engineering treatment of soft foundation such as mole, shore protection and cofferdam, be meant " Bao Xin " section sea wall explosion method construction technology especially.
On soft foundation, build mole, shore protection and cofferdam, form of fracture commonly used is real core dike, soft base processing method, its method is divided into two kinds: 1. mechanical desilting, with dredge boat soft subgrade soil layers such as mud are removed earlier, form the jackstone foundation trench, jackstone waterborne and land jackstone combine, and form the real core dike of the design section in mole, shore protection and cofferdam etc.; 2. the become silted up method desilting of rockfilling of blast row is embedding group's cartridge bag in the mud of jackstone dike head forward position, and the blast desilting is finished simultaneously with rockfilling.In the mud of dike both sides, bury group cartridge bag again, basically form the real core dike section of design after the explosive treatment.These two kinds of methods that adopt in the engineering exist following shortcoming at present: the desilting of 1. dredging, be subjected to the influence of soft basic stable side slope, the desilting area is big, need dredge navigation channel and jackstone operation waterborne, will be with the main equipment and the folk prescription cost height of dredging, shortcoming such as engineering posterior settlements such as the mole of building, shore protection and cofferdam are big.2. the blast row silt method of rockfilling requires to handle hardpan, pore-forming powder charge cost height when handling the jackstone dike heart.3. two kinds of methods all are to have adopted the form of real core dike, and the jackstone amount that needs is big, whole construction costs height.
The purpose of this invention is to provide a kind of " Bao Xin " section sea wall explosion method construction technology, it can form mole, shore protection and the cofferdam of " Bao Xin " section, mole, shore protection and cofferdam after building can be maintained a long-term stability, reduce construction link simultaneously, reduce construction costs greatly.The present invention is directed to the shortcoming that prior art exists, proposed the explosion method construction technology of " Bao Xin " section sea wall, promptly, made sea wall both sides toes such as mole, shore protection and cofferdam have certain width to drop down onto on the hardpan with the method for blast, and the dike heart is not felt at ease, middle parcel one mud bag.
The technical solution that the present invention adopts is as follows: at first adopt land throwing to fill out mountain mixing building stones at the construction initiating terminal, the dike head can not carry out soft basic explosive treatment or carry out part blast desilting and handle, when carrying out part blast desilting processing, when throwing is filled out body and is reached engineering design and throw raising journey and drilling depth Δ S, fill out body forward position mudstone intersection in throwing and throw in group's cartridge bag (when silt depth is thicker, group's cartridge bag is embedded in the mud), the group is after cartridge bag detonates, and makes that the interface drops down onto the degree of depth certain in the mud under the stone riprap; Repeat above-mentioned steps, the dike heart constantly advances forward, forms a levee body of not feeling at ease.When jackstone dike head is advanced to certain-length Δ L, embedding group's cartridge bag in the mud of the both sides of dike, the levee body both sides are dropped down onto on the hardpan, thereby the mud of dike heart bottom certain width is wrapped in the middle of stone riprap and the hardpan, formed the form of fracture of " Bao Xin " dike; The end of a year or month width of both sides, the angle of fall, described sea wall slope is a 5-10 rice; The embedding point of side direction cartridge bag is to the distance L on jackstone levee slope top yShould equal the thickness H of 1.5-1.8 times of stone riprap RCartridge bag buried depth W eShould equal the thickness H of 0.55-0.65 mud doubly sThe unit length dose q (kilogram/rice) of charge collocation should equal 15-25 kilogram/rice; The dike head need carry out part explosive treatment soft when base, and cartridge bag should be placed muck surface and falling rocks intersection, just cartridge bag to the levee slope apex distance from S yShould equal the thickness H of 0.9-1.1 times of stone riprap RIn the time of in the mud that group's cartridge bag is embedded into the mudstone intersection, cartridge bag to the levee slope apex distance from S yShould equal the thickness H of 1.5-2.0 times of stone riprap RCartridge bag buried depth W eShould equal the thickness H of 0.3-0.4 mud doubly sThe unit length dose q (kilogram/rice) of described charge collocation should satisfy following relation: q H m ΔS = 0.3 ~ 0.4 (Δ S is filled into dipstick metering, H for throwing in the formula mBe silt depth); The soft basic thickness of handling when needs such as mud are during greater than 10 meters, and the explosive treatment of dike both sides is: stone riprap is thrown when filling out engineering design elevation and certain-length Δ L, embedding group's cartridge bag in the mud of stone riprap both sides then, cartridge bag to the levee slope apex distance from L yShould equal the thickness H of 1.6-2.0 times of stone riprap RCartridge bag buried depth W eShould equal the thickness H of 0.55-0.65 mud doubly sThe unit length dose q (kilogram/rice) of charge collocation should equal 25-40 kilogram/rice.
For feature of the present invention and effect are described, also the present invention is further illustrated in conjunction with the accompanying drawings below to enumerate embodiment, wherein:
Fig. 1 is " Bao Xin " sea wall profile after the explosive treatment of the present invention.
Fig. 2 is that " Bao Xin " sea wall section side direction was buried the medicine drawing of site before the present invention was exploded.
Fig. 3 is that the present invention " Bao Xin " sea wall part explosive treatment dike head buries the medicine drawing of site.
Below in conjunction with accompanying drawing the present invention is introduced in detail.At first see also Fig. 1, Fig. 2 and Fig. 3, at first adopt land throwing to fill out mountain mixing building stones in the present embodiment, when throwing is filled out levee body and is reached engineering design elevation and certain drilling depth, can not carry out dike head explosive treatment at bottom silt thickness under less than 10 meters situation, only carry out levee body both sides explosive treatment, stone riprap 12 is thrown when filling out engineering design elevation and certain-length Δ L (Δ L is that the distance that advances the dike head is arrived on the bank), quick-fried preceding throwing that forms in the accompanying drawing 3 filled out line 31, embedding group's cartridge bag 21 (as shown in Figure 2) in the mud 11 of the mudstone intersection of stone riprap 12 both sides then, and ignition group cartridge bag 12, make soft foundation mud 11 outer moving after the blast, make dike both sides toe that certain end of a year or month width be arranged, the mixing building stones that the both sides of body section are filled out in throwing fall, drop down onto on the hardpan, be formed centrally a mud bag at dike, constitute " Bao Xin " section sea wall (as shown in Figure 1).The dike both sides toe of described formation " Bao Xin " section sea wall drops down onto on the hardpan, and end of a year or month width is 6~10 meters.Cartridge bag 21 to the levee slope apex distance from L yShould equal the thickness H of 1.5-1.8 times of stone riprap 12 R Cartridge bag 21 buried depth W e(W eBe the distance of muck surface to cartridge bag) should equal the thickness H of 0.55-0.65 mud 11 doubly sThe unit length dose q (kilogram/rice) of charge collocation should equal 15-25 kilogram/rice.
The soft foundation silt depths of handling when needs such as mud need carry out dike head part blast desilting and handle during greater than 10 meters in dike head progradation.Stone riprap 12 is thrown when filling out engineering design elevation and certain drilling depth Δ S (Δ S is filled into dipstick metering for throwing), forms to throw before the blast in the accompanying drawing to fill out line 31 (as shown in Figure 3), throws in group's cartridge bag 32 then near jackstone dike head mudstone intersection, cartridge bag 32 to the levee slope apex distance from S yShould equal the thickness H of 0.9-1.1 times of stone riprap 12 RWhen needs are embedded into group's cartridge bag 33 in the mud 11, cartridge bag 33 to the levee slope apex distance from S yShould equal the thickness H of 1.5-2.0 times of stone riprap 12 RCartridge bag 33 buried depth W eShould equal the thickness H of 0.3-0.4 mud 11 doubly sThe unit length dose q (kilogram/rice) of charge collocation should satisfy following relation: q H m ΔS = 0.3 ~ 0.4 (Δ S is filled into dipstick metering, H for throwing in the formula mBe mud 11 thickness).
The soft basic thickness of handling when needs such as mud are during greater than 10 meters, the explosive treatment of dike both sides is: stone riprap is thrown when filling out engineering design elevation and certain-length Δ L, quick-fried preceding throwing that forms in the accompanying drawing filled out line 31 (as shown in Figure 3), embedding group cartridge bag 21 (as shown in Figure 2) in the mud 11 of jackstone dike both sides then, cartridge bag 21 to the levee slope apex distance from L yShould equal the thickness H of 1.6-2.0 times of stone riprap 12 R Cartridge bag 21 buried depth W eShould equal the thickness H of 0.55-0.65 mud 11 doubly sUnit dose q (kilogram/rice) of charge collocation should equal 25-40 kilogram/rice.
Utilize the present invention " Bao Xin " section sea wall explosion method construction technology, behind the formation sea wall, throw some jackstones 15 at the face of heading sea of sea wall again, jackstone 15 links to each other with stone riprap 12.Jackstone 15 below seawater 16 surfaces, plays the effect of reinforcing stone riprap 12 on the surface of bottom silt 11.
The Dredging that adopts in the present invention and the present construction is compared with the complete dredging method of blast, because adopting " cored " section sea wall explosion method construction, both guaranteed stability of foundation, make again construction costs greatly Reduce (in " cored " section test embankment, reduce jackstone amount 30%, reduce construction costs 18%), The soft base of dike head is not processed or section processes, has simplified construction technology, has reduced construction volume.

Claims (5)

1, a kind of bag core section sea wall explosion method construction technology earlier adopts land throwing to fill out mountain mixings building stones at the construction initiating terminal, and fill out levee body when throwing and reach the engineering design elevation and necessarily during drilling depth, it is characterized in that,
If the thickness of bottom silt is during less than 10 meters, the dike head can not carry out explosive treatment, if the thickness of bottom silt is during greater than 10 meters, carry out the part explosive treatment, fill out in the mud that body dike head mudstone has a common boundary or the embedding group of muck surface cartridge bag in throwing, and ignite group's cartridge bag, dike heart part jackstone does not require to be fallen on the hardpan; And in the levee body both sides, when emphasis carries out explosive treatment, fill out in the mud of body section mudstone intersection or the embedding group of muck surface cartridge bag in throwing, and ignite group's cartridge bag, and soft foundation mud is moved outward, make dike both sides toe that certain end of a year or month width be arranged, the mixing building stones that the both sides of body section are filled out in throwing fall, drop down onto on the hardpan, be formed centrally a mud bag, constitute bag core section sea wall at dike.
2, bag core section sea wall explosion method construction technology according to claim 1 is characterized in that the dike both sides toe of described formation bag core section sea wall drops down onto on the hardpan, and end of a year or month width is 6~10 meters, constitutes bag core section sea wall.
3, bag core section sea wall explosion method construction technology according to claim 1 and 2 is characterized in that, the embedding point of side direction cartridge bag is to the distance L on jackstone levee slope top yShould equal the thickness H of 1.5-1.8 times of stone riprap RCartridge bag buried depth W eShould equal the thickness H of 0.55-0.65 mud doubly sThe unit length dose q of charge collocation should equal 15-25 kilogram/rice.
4, " Bao Xin " according to claim 1 section sea wall explosion method construction technology is characterized in that, the dike head need carry out part explosive treatment soft when base, and cartridge bag should be placed muck surface and falling rocks intersection, just cartridge bag to the levee slope apex distance from S yShould equal the thickness H of 0.9-1.1 times of stone riprap RIn the time of in the mud that group's cartridge bag is embedded into the mudstone intersection, cartridge bag to the levee slope apex distance from S yShould equal the thickness H of 1.5-2.0 times of stone riprap RCartridge bag buried depth W eShould equal the thickness H of 0.3-0.4 mud doubly sThe unit length dose q of described charge collocation should satisfy following relation: q H m ΔS = 0.3 ~ 0.4
Δ S is filled into dipstick metering, H for throwing in the formula mBe silt depth
5, " Bao Xin " according to claim 1 and 2 section sea wall explosion method construction technology, it is characterized in that, the soft basic thickness of handling when needs such as mud are during greater than 10 meters, the explosive treatment of dike both sides is: stone riprap is thrown when filling out engineering design elevation and certain-length Δ L, embedding group cartridge bag in the mud of stone riprap both sides then, cartridge bag to the levee slope apex distance from L yShould equal the thickness H of 1.6-2.0 times of stone riprap RCartridge bag buried depth W eShould equal the thickness H of 0.55-0.65 mud doubly sThe unit length dose q of charge collocation should equal 25-40 kilogram/rice.
CN 97121735 1997-12-18 1997-12-18 'Core covering' section embankment explosion method construction technology Expired - Fee Related CN1070969C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97121735 CN1070969C (en) 1997-12-18 1997-12-18 'Core covering' section embankment explosion method construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97121735 CN1070969C (en) 1997-12-18 1997-12-18 'Core covering' section embankment explosion method construction technology

Publications (2)

Publication Number Publication Date
CN1220332A CN1220332A (en) 1999-06-23
CN1070969C true CN1070969C (en) 2001-09-12

Family

ID=5176410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97121735 Expired - Fee Related CN1070969C (en) 1997-12-18 1997-12-18 'Core covering' section embankment explosion method construction technology

Country Status (1)

Country Link
CN (1) CN1070969C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116006B (en) * 2011-03-23 2012-08-29 大连市市政设计研究院有限责任公司 Method for building sea filling embankment
CN103114558B (en) * 2013-02-18 2015-06-03 宁波高新区围海工程技术开发有限公司 Steep slope zone blast slit squeezing embanking method
CN104631249B (en) * 2015-01-05 2016-06-08 陈绍文 Horizontal compacting mud by explosion fills out sea method of constructing roadway
CN108534619B (en) * 2017-12-05 2020-08-07 北京中科力爆炸技术工程有限公司 Soft foundation explosion method for treating sludge in deep foundation groove of large-section dike breakwater

Also Published As

Publication number Publication date
CN1220332A (en) 1999-06-23

Similar Documents

Publication Publication Date Title
CN102116006B (en) Method for building sea filling embankment
Sowers Failures in limestones in humid subtropics
CN102635108A (en) Process for treating valley silt soft foundation in mountain area by explosion method
CN1070969C (en) 'Core covering' section embankment explosion method construction technology
CN111893947A (en) Blasting and silt squeezing construction method for deep soft foundation of breakwater in fishing port
CN109506532B (en) Method for determining unit consumption of underwater drilling blasting explosive
Milanovic Prevention and remediation in karst engineering
CN1033302A (en) The process for explosive treatment of mud soft base under water
Wilson et al. Earth and rockfill dams
CN108534619A (en) The method of big cross section embankment breakwater depth foundation trench silt soft foundation explosion method processing
CN217678900U (en) Silt dam adopting arsenicum sand modules for stacking
CN112729030A (en) All-weather construction method for intertidal zone blasting and silt squeezing
Acker et al. Foundation and abutment treatment for rockfill dams
Carlyle et al. SHEK PIK DAM.
Bassell Earth Dams: a study
Stroppini et al. Foundation treatment for embankment dams on rock
Barron Abutment and Foundation Treatment for High Embankment Dams on Rock
Mejia et al. Design of the dams of the Panama Canal Expansion
LaFrenz et al. Explosive Excavation Research: Projects TUGBOAT and TRINIDAD
Wallace et al. Foundation practices for Talbingo dam, Australia
Robison Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam
Walker et al. Treatment of high embankment dam foundations
Afif et al. Challenging conditions in the design and construction of Puah Dam in Malaysia
Andersland et al. Earthwork in cold regions
SU1656047A1 (en) Method of erecting a dam of hard rock by directed explosions on water-pervious foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination