CN108532468A - A kind of multi-functional bridge support frame for construction facilitating adjusting - Google Patents

A kind of multi-functional bridge support frame for construction facilitating adjusting Download PDF

Info

Publication number
CN108532468A
CN108532468A CN201810430442.8A CN201810430442A CN108532468A CN 108532468 A CN108532468 A CN 108532468A CN 201810430442 A CN201810430442 A CN 201810430442A CN 108532468 A CN108532468 A CN 108532468A
Authority
CN
China
Prior art keywords
construction
bridge
operation console
support frame
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810430442.8A
Other languages
Chinese (zh)
Inventor
马士滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wudi Hao Yuan Net Tools Co Ltd
Original Assignee
Wudi Hao Yuan Net Tools Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wudi Hao Yuan Net Tools Co Ltd filed Critical Wudi Hao Yuan Net Tools Co Ltd
Priority to CN201810430442.8A priority Critical patent/CN108532468A/en
Publication of CN108532468A publication Critical patent/CN108532468A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The present invention provides a kind of multi-functional bridge support frame for construction facilitating adjusting, including bridge construction operation console, and mobile support column arrangement is adjusted, roof reinforcement structure, anti-falling object from high altitude mesh-plate structure, hand extract wind wheel construction, removable staircase structure up and down, glove tool box reinforce cross bar, longitudinally fixed bar, protective fence, link, fixed plate, glove hook reinforces triangle pole and snap ring.The setting of rotating handle of the present invention and fixed iron thorn, is conducive to that supporting rack is fixed, increases the stability of supporting rack;The setting of hydraulic top and support column is conducive to the needs according to real work, adjusts the height of supporting rack, meets the needs to different height bridge construction;Extract basket, hanging ring, rope, winding wheel, the setting of rocking bar and rocking handle, be conducive to by ground construction equipment lift to the upper surface of bridge construction operation console, increase the use function of supporting rack, save manpower, improve efficiency.

Description

A kind of multi-functional bridge support frame for construction facilitating adjusting
Technical field
The invention belongs to equipment for bridge construction technical fields more particularly to a kind of multi-functional bridge construction facilitating adjusting to use Supporting rack.
Background technology
With the development of transportation, bridge construction, including river bridge, land bridge are more and more.In bridge Bridge pier is the basis built in beam construction, in general, the construction of highway, Railway Bridges And Piers is constructed using attached pier bracket, conventional bracket first exists Pre-buried bulk steel plate in pier, by shelf bracket, monolithic lifting is welded with pre-embedded steel slab in place after the completion of bridge the following group is welded, and holder is taken If front and back be required to do a large amount of work, and sets up holder and need to put into a large amount of temporary facilities, installation period is long, and investment is more, gives Bridge construction personnel bring great work difficulty, and should not be used for multiple times, revolving difference, meanwhile, in the security performance of bracket On there is also many loopholes, stability is poor, is unfavorable for widely popularizing.
China Patent Publication No. is CN206233110U, and invention and created name is a kind of bridge construction supporting rack, including cross Frame, fixing bolt lock stick, positioning plate, protective shell, the second fixed block and holder, washer are equipped on the downside of the crossbearer, and horizontal Frame is connected by washer with shaft, and the bottom end of the shaft is inlaid with the first telescopic rod, and the inside of the fixing bolt is fixed It is connected with shaft, pedestal is installed on the upside of the protective shell, the top of the pedestal is inlaid with pedestal, the tumbler Downside is provided with pedestal, and the intermediate position of second fixed block is equipped with the second telescopic rod, and the second fixed block passes through second Telescopic rod is connected with pedestal, and the intermediate position of the holder is provided with pedestal.But existing bridge construction with supporting rack also There is cannot be adjusted according to the difference of bridge height, toward supporting rack top haul inconvenience and have a single function.
Therefore, a kind of multi-functional bridge support frame for construction facilitating adjusting of invention is very necessary.
Invention content
In order to solve the above technical problem, the present invention provides a kind of multi-functional bridge support frame for construction facilitating adjusting, It cannot be adjusted according to the difference of bridge height with supporting rack with solving existing bridge construction, not toward supporting rack top haul The problem of conveniently and having a single function.A kind of multi-functional bridge support frame for construction facilitating adjusting, including bridge construction operation console, Adjustable mobile support column arrangement, roof reinforcement structure, anti-falling object from high altitude mesh-plate structure, hand extract winds wheel construction, removable Dynamic staircase structure up and down, glove tool box reinforce cross bar, longitudinally fixed bar, protective fence, link, fixed plate, glove hook, reinforcing Triangle pole and snap ring, the adjustable mobile support column arrangement are bolted to the lower surface four of bridge construction operation console respectively Angle Position;The roof reinforcement structure is bolted to respectively at left and right sides of the upper surface of bridge construction operation console;Described Anti- falling object from high altitude mesh-plate structure is plugged on respectively at left and right sides of the inside of bridge construction operation console;The hand extract winding wheel Structural bolts are connected to the upper surface right positions of bridge construction operation console;The removable staircase structure up and down is articulated in down Portion reinforces the upper surface leftward position of cross bar;The glove tool box is placed on the upper surface left lateral position of bridge construction operation console It sets;The reinforcing cross bar is transversely mounted on the inside of adjustable mobile support column arrangement and adjustable mobile support column arrangement Side position;The longitudinally fixed bar longitudinal bolt is connected to the front surface centre position of bridge construction operation console;Described is anti- Guardrail is bolted to respectively at left and right sides of the upper surface of bridge construction operation console;The link is welded on the outside of protective fence Upper position;The bolt of fixing plate is connected to the lower surface leftward position of bridge construction operation console;The glove hook weldering It is connected on the lower surface of fixed plate;Described reinforcing triangle pole one end is bolted to position on the outside of the lower surface of bridge construction operation console It sets, the other end is bolted to the outer upper position of adjustable mobile support column arrangement;The snap ring is glued to left side and sets The upper surface for the protective fence set;The adjustable mobile support column arrangement includes support base, movable pulley, hydraulic top, support Column, card slot and hydraulic operation pipe, the movable pulley are bolted to the lower surface corner location of support base respectively;Described Hydraulic top is bolted to the upper surface centre position of support base;The support column is plugged on the upper inside position of hydraulic top It sets;The card slot is opened in the inner right side position of support column;The hydraulic operation is pipe integrated to be arranged in hydraulic top Left side centre position.
Preferably, the roof reinforcement structure includes fixinig plate, and fixed wire lever adjusts long nut, adjusting bolt, top Tight wire lever and sucker, the lower end of the fixation wire lever are welded on the upper surface centre position of fixinig plate, the fixation The threaded upper ends of wire lever are connected to the inner lower position for adjusting long nut;The adjusting long nut, which is threaded in, to be held out against The outer surface lower position of wire lever;The adjusting bolt is bolted to the front surface two up and down for adjusting long nut respectively Centre position;The sucker is glued to the upper end for holding out against wire lever.
Preferably, the anti-falling object from high altitude mesh-plate structure include hook, oil thread rope, pull slot, block, clamping screw and Backgauge web plate, left end of the welding hook in oil thread rope;The oil thread rope is welded on the right side of the upper surface of backgauge web plate Position;The pull slot is opened in respectively at left and right sides of the inside of bridge construction operation console;The block screw is connected to The leftward position of backgauge web plate;The clamping screw is threaded in respectively at left and right sides of the lower surface of bridge construction operation console Position;The backgauge web plate is plugged on the inside of pull slot.
Preferably, the described hand extract winding wheel construction includes fixed frame, extract basket, hanging ring, rope, winding wheel, Rocking bar and rocking handle, the hanging ring are welded on the upper surface centre position of extract basket;Rope one end system is connected on hanging ring Outer surface upper position, the other end is welded on the left side centre position of winding wheel;The Voluble axle is connected on fixed frame Rear surface upper position;The rocking bar is plugged on the front surface upper position of winding wheel;The rocking handle screw, which is connected to, to be shaken The front surface upper position of bar.
Preferably, the described removable staircase structure up and down includes montant, pedal, anti-skidding mat, hanger and Anti-slip cover, The pedal cross screw is connected between montant and the inside of montant;The anti-skidding mat is glued to the upper of pedal Surface centre position;The hanger screw is connected to the upper end of montant;The Anti-slip cover is socketed in the outer surface of montant.
Preferably, threaded hole is offered respectively at left and right sides of the inside of the support base;The threaded hole it is interior Portion is threaded with fixed iron thorn;The upper end of the fixation iron thorn is welded with rotating handle.
Preferably, leftward position of the fixed mount setting in fixinig plate.
Preferably, the reinforcing cross bar is connected in card slot;The intersection of the reinforcing cross bar and longitudinally fixed bar It is provided with fastening bolt.
Preferably, the protective fence specifically uses stainless steel wire net;The protective fence is arranged in the outside of fixinig plate.
Preferably, fixation iron thorn is specifically pierced using conical iron;The outer surface of the fixation iron thorn is provided with Screw thread.
Preferably, the extract basket specifically uses rectangle stainless steel basket.
Preferably, the hanger is articulated in the outer surface for reinforcing cross bar.
Preferably, the rope is through the inside of the through-hole of bridge construction operation console inner right side setting.
Preferably, the outer surface for being articulated in link.
Preferably, the backgauge web plate specifically uses stainless steel web plate.
Preferably, the movable pulley is specifically using the universal wheel with brake block.
Preferably, the hydraulic top specifically uses the hydraulic top of model S-8.
Compared with prior art, beneficial effects of the present invention are:
1. in the present invention, the setting of the rotating handle and fixed iron thorn is conducive to that supporting rack is fixed, increases support The stability of frame.
2. in the present invention, the setting of the hydraulic top and support column is conducive to the needs according to real work, adjusts branch The height of support meets the needs to different height bridge construction.
3. in the present invention, the fixation wire lever adjusts long nut, clamping screw and the setting for holding out against wire lever, has Conducive to the adjusting of height is carried out, can play the role of secondary fixed, it is ensured that operator by sucker suction in the lower surface of bridge The safety of member.
4. in the present invention, the backgauge web plate specifically uses stainless steel web plate, is conducive to play the role of protection, increase The function of supporting rack, prevents the pendant object on bridge top from falling, injures passerby by a crashing object.
5. in the present invention, the setting of the hook and oil thread rope is conducive to play the role of hanging support, ensures backgauge The stability of web plate.
6. in the present invention, the extract basket, hanging ring, rope, winding wheel, the setting of rocking bar and rocking handle, be conducive to by Construction equipment on ground is lifted to the upper surface of bridge construction operation console, is increased the use function of supporting rack, is saved people Power improves efficiency.
7. in the present invention, the montant, the setting of pedal and hanger is conducive to play the role of staircase, facilitates behaviour Make the upper lower bracing frame of personnel, and conveniently moving.
8. in the present invention, the setting of the anti-skidding mat and Anti-slip cover is conducive to play anti-skidding effect, ensures personnel The safety of upper lower bracing frame.
9. in the present invention, the reinforcing cross bar, the setting of longitudinally fixed bar and reinforcing triangle pole is conducive to play reinforcing Effect, increase the stability of supporting rack.
10. in the present invention, the setting of the snap ring and glove tool box is conducive to be clamped headlamp, facilitates offer photograph It is bright, it is convenient for the storage of construction equipment.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention.
Fig. 2 is the structural schematic diagram of the adjustable mobile support column arrangement of the present invention.
Fig. 3 is the structural schematic diagram of the roof reinforcement structure of the present invention.
Fig. 4 is the structural schematic diagram of the anti-falling object from high altitude mesh-plate structure of the present invention.
Fig. 5 is the structural schematic diagram of the hand extract winding wheel construction of the present invention.
Fig. 6 is the structural schematic diagram of the removable staircase structure up and down of the present invention.
In figure:
1, bridge construction operation console;2, mobile support column arrangement is adjusted;21, support base;211, rotating handle;212, screw thread Hole;213, fixed iron thorn;22, movable pulley;23, hydraulic top;24, support column;25, card slot;26, hydraulic operation pipe;3, top adds Fixing structure;31, fixinig plate;32, fixed wire lever;33, long nut is adjusted;34, adjusting bolt;35, wire lever is held out against;36, it inhales Disk;4, anti-falling object from high altitude mesh-plate structure;41, it links up with;42, oil thread rope;43, pull slot;44, block;45, clamping screw;46, it keeps off Expect web plate;5, hand extract winds wheel construction;51, fixed frame;52, extract basket;53, hanging ring;54, rope;55, winding wheel; 56, rocking bar;57, rocking handle;6, staircase structure up and down is moved;61, montant;62, pedal;63, anti-skidding mat;64, hanger; 65, Anti-slip cover;7, glove tool box;8, cross bar is reinforced;9, longitudinally fixed bar;10, protective fence;11, link;12, fixed plate; 13, glove hook;14, triangle pole is reinforced;15, snap ring.
Specific implementation mode
The present invention is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 6
The present invention provides a kind of multi-functional bridge support frame for construction facilitating adjusting, including bridge construction operation console 1, is adjusted Mobile support column arrangement 2, roof reinforcement structure 3, anti-falling object from high altitude mesh-plate structure 4, hand extract wind wheel construction 5, move Upper and lower staircase structure 6, glove tool box 7 reinforce cross bar 8, longitudinally fixed bar 9, protective fence 10, link 11, fixed plate 12, glove Hook 13, reinforces triangle pole 14 and snap ring 15, and the adjustable mobile support column arrangement 2 is bolted to bridge construction behaviour respectively Make the lower surface corner location of platform 1;The roof reinforcement structure 3 is bolted to the upper table of bridge construction operation console 1 respectively At left and right sides of face;The anti-falling object from high altitude mesh-plate structure 4 is plugged on respectively at left and right sides of the inside of bridge construction operation console 1; The hand extract winding wheel construction 5 is bolted to the upper surface right positions of bridge construction operation console 1;Described is removable Dynamic staircase structure 6 up and down is articulated in the upper surface leftward position that lower part reinforces cross bar 8;The glove tool box 7 is placed on bridge The upper surface leftward position of beam constructing operation platform 1;The reinforcing cross bar 8 is transversely mounted on adjustable mobile support column arrangement 2 With the upper inside position of adjustable mobile support column arrangement 2;9 longitudinal bolt of longitudinally fixed bar is connected to bridge construction The front surface centre position of operation console 1;The upper surface that the protective fence 10 is bolted to bridge construction operation console 1 respectively is left Right both sides;The link 11 is welded on the outer upper position of protective fence 10;The fixed plate 12 is bolted to bridge The lower surface leftward position of constructing operation platform 1;The glove hook 13 is welded on the lower surface of fixed plate 12;The reinforcing three 14 one end of angular pole is bolted to the lower surface outer fix of bridge construction operation console 1, and the other end is bolted to adjustable shifting The outer upper position of dynamic support column arrangement 2;The snap ring 15 is glued to the upper surface for the protective fence 10 that left side is arranged;It is described Adjustable mobile support column arrangement 2 include support base 21, movable pulley 22, hydraulic top 23, support column 24, card slot 25 and hydraulic pressure Operation pipe 26, the movable pulley 22 are bolted to the lower surface corner location of support base 21 respectively;The hydraulic top 23 are bolted to the upper surface centre position of support base 21;The support column 24 is plugged on the upper inside of hydraulic top 23 Position;The card slot 25 is opened in the inner right side position of support column 24;26 integrated setting of hydraulic operation pipe exists The left side centre position of hydraulic top 23.
In above-described embodiment, specifically, the roof reinforcement structure 3 includes fixinig plate 31, fixed wire lever 32 is adjusted Long nut 33, adjusting bolt 34 hold out against wire lever 35 and sucker 36, and the lower end of the fixation wire lever 32 is welded on fixinig plate 31 upper surface centre position, the threaded upper ends of the fixation wire lever 32 are connected to the inner lower position for adjusting long nut 33 It sets;The adjusting long nut 33 is threaded in the outer surface lower position for holding out against wire lever 35;The adjusting bolt 34 It is bolted to two centre positions of the front surface for adjusting long nut 33 or more respectively;The sucker 36, which is glued to, holds out against leading screw The upper end of bar 35.
In above-described embodiment, specifically, the anti-falling object from high altitude mesh-plate structure 4 includes hook 41, oil thread rope 42, pull Slot 43, block 44, clamping screw 45 and backgauge web plate 46, the hook 41 are welded on the left end of oil thread rope 42;The oil Cord 42 is welded on the upper surface right positions of backgauge web plate 46;The pull slot 43 is opened in bridge construction operation console respectively At left and right sides of 1 inside;44 screw of block is connected to the leftward position of backgauge web plate 46;The clamping screw 45 divides It is not threaded in position at left and right sides of the lower surface of bridge construction operation console 1;The backgauge web plate 46 is plugged on pull slot 43 inside.
In above-described embodiment, specifically, the hand extract winding wheel construction 5 includes fixed frame 51, extract basket 52 is hung Ring 53, rope 54, winding wheel 55, rocking bar 56 and rocking handle 57, the hanging ring 53 are welded among the upper surface of extract basket 52 Position;54 one end system of rope is connected on the outer surface upper position of hanging ring 53, and the other end is welded on a left side for winding wheel 55 Side centre position;55 axis of winding wheel is connected on the rear surface upper position of fixed frame 51;The rocking bar 56, which is plugged on, to be twined Around the front surface upper position of wheel 55;57 screw of rocking handle is connected to the front surface upper position of rocking bar 56.
In above-described embodiment, specifically, the removable staircase structure 6 up and down includes montant 61, pedal 62 is anti-skidding Mat 63, hanger 64 and Anti-slip cover 65,62 cross screw of pedal are connected between montant 61 and the inside of montant 61; The anti-skidding mat 63 is glued to the upper surface centre position of pedal 62;64 screw of hanger is connected to montant 61 Upper end;The Anti-slip cover 65 is socketed in the outer surface of montant 61.
In above-described embodiment, specifically, offering threaded hole respectively at left and right sides of the inside of the support base 21 212;The internal whorl of the threaded hole 212 is connected with fixed iron thorn 213;The upper end of the fixation iron thorn 213 is welded with Rotating handle 211.
In above-described embodiment, specifically, the leftward position in fixinig plate 31 is arranged in the fixed frame 51.
In above-described embodiment, specifically, the reinforcing cross bar 8 is connected in card slot 25;The reinforcing cross bar 8 and vertical The intersection of fixed link 9 is provided with fastening bolt.
In above-described embodiment, specifically, the protective fence 10 specifically uses stainless steel wire net;The protective fence 10 is set It sets in the outside of fixinig plate 31.
In above-described embodiment, specifically, the fixation iron thorn 213 is specifically pierced using conical iron;The fixation iron The outer surface of thorn 213 is provided with screw thread.
In above-described embodiment, specifically, the extract basket 52 specifically uses rectangle stainless steel basket.
In above-described embodiment, specifically, the hanger 64 is articulated in the outer surface for reinforcing cross bar 8.
In above-described embodiment, specifically, the rope 54 is through the logical of 1 inner right side of bridge construction operation console setting The inside in hole.
In above-described embodiment, specifically, the hook 41 is articulated in the outer surface of link 11.
In above-described embodiment, specifically, the backgauge web plate 46 specifically uses stainless steel web plate.
In above-described embodiment, specifically, the movable pulley 22 is specifically using the universal wheel with brake block.
In above-described embodiment, specifically, the hydraulic top 23 specifically uses the hydraulic top of model S-8.
Operation principle
In the present invention, when in use, by pushing support column 24 under the action of movable pulley 22, supporting rack is moved to needs and is applied The bridge of work is in the following, adjust the height of hydraulic top 23 by hydraulic operation pipe 26, and then adjust the height of support column 24, to adjust The height for saving bridge construction operation console 1, meets the needs of practice of construction height;In height adjustment, convert as needed Reinforce the quantity of cross bar 8;After height is adjusted, turns rotating handle 211 and fixed iron thorn 213 is inserted into underground, play fixation Effect;Staff moves position of the hanger 64 on reinforcing cross bar 8, is conveniently operated the upper lower bracing frame of personnel;Turn adjusting Long nut 33 adjusts fixed wire lever 32 and holds out against the distance between wire lever 35 so that sucker 36 can be tightly is adsorbed on The lower surface of bridge, and adjusting bolt 34 is tightened, play the role of secondary fixed;In the construction process, to prevent falling object from missing The person of hurting sb.'s feelings extracts backgauge web plate 46 out from pull slot 43, and hook 41 is articulated in the outer surface of link 11, plays support and makees With;Construction equipment is placed on to the inside of extract basket 52, rotation crank 57 and rocking bar 56, winding wheel 55 is driven to be rotated, from And rope 54 is wrapped in the outer surface of winding wheel 55, and then by the lifting of extract basket 52 to the top of supporting rack, conveniently to making With fetching for tool, manpower is saved, improves efficiency.
Using technical solutions according to the invention or those skilled in the art under the inspiration of technical solution of the present invention, Similar technical solution is designed, and reaches above-mentioned technique effect, is to fall into protection scope of the present invention.

Claims (10)

1. a kind of multi-functional bridge support frame for construction facilitating adjusting, which is characterized in that this facilitates the multi-functional bridge of adjusting Support frame for construction includes bridge construction operation console(1), mobile support column arrangement is adjusted(2), roof reinforcement structure(3), prevent Falling object from high altitude mesh-plate structure(4), hand extract winding wheel construction(5), move staircase structure up and down(6), glove tool box (7), reinforce cross bar(8), longitudinally fixed bar(9), protective fence(10), link(11), fixed plate(12), glove hook(13), reinforce Triangle pole(14)And snap ring(15), the adjustable mobile support column arrangement(2)It is bolted to bridge construction operation respectively Platform(1)Lower surface corner location;The roof reinforcement structure(3)It is bolted to bridge construction operation console respectively(1)'s At left and right sides of upper surface;The anti-falling object from high altitude mesh-plate structure(4)It is plugged on bridge construction operation console respectively(1)Inside it is left Right both sides;The hand extract winds wheel construction(5)It is bolted to bridge construction operation console(1)Upper surface right lateral position It sets;The removable staircase structure up and down(6)It is articulated in lower part and reinforces cross bar(8)Upper surface leftward position;Described sets Object tool box(7)It is placed on bridge construction operation console(1)Upper surface leftward position;The reinforcing cross bar(8)It is transversely mounted In adjustable mobile support column arrangement(2)With adjustable mobile support column arrangement(2)Upper inside position;The longitudinal direction is solid Fixed pole(9)Longitudinal bolt is connected to bridge construction operation console(1)Front surface centre position;The protective fence(10)Spiral shell respectively It tethers and is connected on bridge construction operation console(1)Upper surface at left and right sides of;The link(11)It is welded on protective fence(10)It is outer Upper lateral part position;The fixed plate(12)It is bolted to bridge construction operation console(1)Lower surface leftward position;Described Glove hook(13)It is welded on fixed plate(12)Lower surface;The reinforcing triangle pole(14)One end is bolted to bridge construction Operation console(1)Lower surface outer fix, the other end is bolted to adjustable mobile support column arrangement(2)Outer upper position It sets;The snap ring(15)It is glued to the protective fence that left side is arranged(10)Upper surface;The adjustable mobile support column knot Structure(2)Including support base(21), movable pulley(22), hydraulic top(23), support column(24), card slot(25)With hydraulic operation pipe (26), the movable pulley(22)It is bolted to support base respectively(21)Lower surface corner location;The hydraulic top (23)It is bolted to support base(21)Upper surface centre position;The support column(24)It is plugged on hydraulic top(23)'s Upper inside position;The card slot(25)It is opened in support column(24)Inner right side position;The hydraulic operation pipe (26)Integrated setting is in hydraulic top(23)Left side centre position.
2. the multi-functional bridge support frame for construction as described in claim 1 for facilitating adjusting, which is characterized in that the top Ruggedized construction(3)Including fixinig plate(31), fixed wire lever(32), adjust long nut(33), adjusting bolt(34), hold out against leading screw Bar(35)And sucker(36), the fixation wire lever(32)Lower end be welded on fixinig plate(31)Upper surface centre position, The fixation wire lever(32)Threaded upper ends be connected to adjusting long nut(33)Inner lower position;The adjusting is grown Nut(33)It is threaded in and holds out against wire lever(35)Outer surface lower position;The adjusting bolt(34)Bolt connects respectively It is connected on adjusting long nut(33)Front surface up and down two centre positions;The sucker(36)It is glued to and holds out against wire lever(35) Upper end.
3. the multi-functional bridge support frame for construction as described in claim 1 for facilitating adjusting, which is characterized in that the anti-height Sky pendant object mesh-plate structure(4)Including hook(41), oil thread rope(42), pull slot(43), block(44), clamping screw(45)And gear Expect web plate(46), the hook(41)It is welded on oil thread rope(42)Left end;The oil thread rope(42)It is welded on material retaining net Plate(46)Upper surface right positions;The pull slot(43)It is opened in bridge construction operation console respectively(1)Inside or so Both sides;The block(44)Screw is connected to backgauge web plate(46)Leftward position;The clamping screw(45)Spiral shell respectively Line is connected to bridge construction operation console(1)Lower surface at left and right sides of position;The backgauge web plate(46)It is plugged on pull slot (43)Inside.
4. the multi-functional bridge support frame for construction as described in claim 1 for facilitating adjusting, which is characterized in that described is hand Extract winds wheel construction(5)Including fixed frame(51), extract basket(52), hanging ring(53), rope(54), winding wheel(55), shake Bar(56)And rocking handle(57), the hanging ring(53)It is welded on extract basket(52)Upper surface centre position;The rope (54)One end system is connected on hanging ring(53)Outer surface upper position, the other end is welded on winding wheel(55)Left side centre position; The winding wheel(55)Axis is connected on fixed frame(51)Rear surface upper position;The rocking bar(56)It is plugged on winding wheel (55)Front surface upper position;The rocking handle(57)Screw is connected to rocking bar(56)Front surface upper position.
5. the multi-functional bridge support frame for construction as described in claim 1 for facilitating adjusting, which is characterized in that described is removable Dynamic staircase structure up and down(6)Including montant(61), pedal(62), anti-skidding mat(63), hanger(64)And Anti-slip cover(65), institute The pedal stated(62)Cross screw is connected to montant(61)And montant(61)Inside between;The anti-skidding mat(63)Glue It is connected on pedal(62)Upper surface centre position;The hanger(64)Screw is connected to montant(61)Upper end;Described Anti-slip cover(65)It is socketed in montant(61)Outer surface.
6. the multi-functional bridge support frame for construction as described in claim 1 for facilitating adjusting, which is characterized in that the support Pedestal(21)Inside at left and right sides of offer threaded hole respectively(212);The threaded hole(212)Internal whorl be connected with Fixed iron thorn(213);The fixation iron thorn(213)Upper end be welded with rotating handle(211).
7. the multi-functional bridge support frame for construction as claimed in claim 4 for facilitating adjusting, which is characterized in that the lifting Rope(54)Through bridge construction operation console(1)The inside of the through-hole of inner right side setting.
8. the multi-functional bridge support frame for construction as described in claim 1 for facilitating adjusting, which is characterized in that the reinforcing Cross bar(8)It is connected to card slot(25)It is interior;The reinforcing cross bar(8)With longitudinally fixed bar(9)Intersection be provided with fastening spiral shell Bolt.
9. the multi-functional bridge support frame for construction as claimed in claim 2 for facilitating adjusting, which is characterized in that the protection Column(10)Specifically use stainless steel wire net;The protective fence(10)It is arranged in fixinig plate(31)Outside.
10. the multi-functional bridge support frame for construction as claimed in claim 6 for facilitating adjusting, which is characterized in that described consolidates Determine iron thorn(213)It is specific to be pierced using conical iron;The fixation iron thorn(213)Outer surface be provided with screw thread.
CN201810430442.8A 2018-05-08 2018-05-08 A kind of multi-functional bridge support frame for construction facilitating adjusting Pending CN108532468A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810430442.8A CN108532468A (en) 2018-05-08 2018-05-08 A kind of multi-functional bridge support frame for construction facilitating adjusting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810430442.8A CN108532468A (en) 2018-05-08 2018-05-08 A kind of multi-functional bridge support frame for construction facilitating adjusting

Publications (1)

Publication Number Publication Date
CN108532468A true CN108532468A (en) 2018-09-14

Family

ID=63476634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810430442.8A Pending CN108532468A (en) 2018-05-08 2018-05-08 A kind of multi-functional bridge support frame for construction facilitating adjusting

Country Status (1)

Country Link
CN (1) CN108532468A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110716023A (en) * 2019-10-24 2020-01-21 滨州市马士滨生物科技有限公司 Water quality environment monitoring device for aquaculture

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130168186A1 (en) * 2010-09-14 2013-07-04 W-M Engineering Oy Hoisting device and a component module for a hoisting or transferring device
CN204876513U (en) * 2015-07-10 2015-12-16 南通四建集团有限公司 Scaffold is used to fitment
CN205348720U (en) * 2015-11-20 2016-06-29 中国建筑一局(集团)有限公司 Take hoisting device's removal scaffold
CN206205404U (en) * 2016-10-20 2017-05-31 李杨俊 A kind of new type scaffold
CN206693595U (en) * 2017-04-19 2017-12-01 天津鑫裕建设发展股份有限公司 A kind of scaffold car for building
CN107795193A (en) * 2017-11-11 2018-03-13 李仲来 A kind of environment-friendly type road bridge construction guard rail

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130168186A1 (en) * 2010-09-14 2013-07-04 W-M Engineering Oy Hoisting device and a component module for a hoisting or transferring device
CN204876513U (en) * 2015-07-10 2015-12-16 南通四建集团有限公司 Scaffold is used to fitment
CN205348720U (en) * 2015-11-20 2016-06-29 中国建筑一局(集团)有限公司 Take hoisting device's removal scaffold
CN206205404U (en) * 2016-10-20 2017-05-31 李杨俊 A kind of new type scaffold
CN206693595U (en) * 2017-04-19 2017-12-01 天津鑫裕建设发展股份有限公司 A kind of scaffold car for building
CN107795193A (en) * 2017-11-11 2018-03-13 李仲来 A kind of environment-friendly type road bridge construction guard rail

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110716023A (en) * 2019-10-24 2020-01-21 滨州市马士滨生物科技有限公司 Water quality environment monitoring device for aquaculture

Similar Documents

Publication Publication Date Title
CN103630416B (en) The test platform of hoisting mechanism
CN208120594U (en) A kind of section of jurisdiction for subway work vertical transport system automatically grabs handler
CN110881391B (en) Forestry trees transplanting device
CN108532468A (en) A kind of multi-functional bridge support frame for construction facilitating adjusting
CN110805249A (en) Indoor scaffold with protection structure
CN209081299U (en) A kind of trees boom hoisting of Garden Engineering
CN107215799A (en) A kind of auxiliary lifting device and the descending operation method for treating operation part
CN105883645B (en) The method for dismounting of tower crane attachment device
CN208006992U (en) A kind of construction material transport auxiliary holding device
CN209554750U (en) Cable well lid Operation Van
CN106495061B (en) Stable lifting device for steel structure machining
CN205998901U (en) Tower crane and its gin-pole truck being used
CN206359210U (en) A kind of processing of steel construction is with stablizing lowering or hoisting gear
CN206318647U (en) Hoist bridge motor dismantling device
CN2801745Y (en) Small hoist for flat house grain sunning
CN107253487A (en) Fold mountain region derrick car and detection folds mountain region derrick car
CN208776208U (en) A kind of handling apparatus
CN208802750U (en) A kind of transplanting tree sling handling device
CN208501499U (en) A kind of bent cap bracket installation jacking system
CN209618759U (en) A kind of height-adjustable mobile boom hoisting
CN209653451U (en) A kind of construction anti-falling bracket
CN106081913B (en) Gin-pole truck control method
CN208120593U (en) Intelligent remote controls full-automatic subway work vertical conveying device
CN107821082B (en) Tree mover
CN217205489U (en) High altitude faces limit post construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180914