- CN208120593U CN208120593U CN201820410922.3U CN201820410922U CN208120593U CN 208120593 U CN208120593 U CN 208120593U CN 201820410922 U CN201820410922 U CN 201820410922U CN 208120593 U CN208120593 U CN 208120593U
- Authority
- CN
- China
- Prior art keywords
- conveying device
- trolley
- subway work
- vertical conveying
- intelligent remote
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The utility model discloses intelligent remotes to control full-automatic subway work vertical conveying device, including portal frame, running gear for trolley is provided at the top of portal frame, bottom is provided with cart walking mechanism, hoisting mechanism is installed on running gear for trolley and turns over slag device, the detachably connected dregs case of hoisting mechanism turns over slag device driving dregs case stirring.The utility model is arranged the hoisting mechanism having suspender across hook in running gear for trolley and turns over slag device, it can be realized mounting walking and the slag dumping of dregs case, handling scene is not necessarily to any artificial less important work, it is not required to any auxiliary equipment in ground, construction site is saved, it changes in subway work because space narrow space influences construction speed and increases the highly energy-consuming campaign of mechanical facility, middle control duty room can two or more vertical transport equipment of one man operation, reduce execute-in-place and ground cooperation personnel, reduce the labor intensity of worker, promote safety in production, tunnel safety of slagging tap is higher, reduce labor intensity.
Description
Technical field
The utility model belongs to crane technical field, and it is vertically defeated to be related to a kind of full-automatic subway work of intelligent remote control
Send device.
Background technique
City makes life finer, and in recent years, the subway construction of China big and medium-sized cities is a dark horse, the weight in subway work
Want the equipment full shield development machine production domesticization tunnel that has moved to maturity, but directly affected shield driving progress slag tap and
The Backup system of section of jurisdiction transportation system is still aobvious to fall behind.
During existing subway work, construction site is needed to realize dress dregs, but during subway work, space is narrow
It is narrow, to largely effect on construction speed, and increase the highly energy-consuming campaign of mechanical facility, the safety that tunnel is slagged tap with section of jurisdiction conveying
Difference, the large labor intensity of worker, safety production efficiency are low.
Summary of the invention
The technical problems to be solved in the utility model is:It is vertically defeated to provide a kind of full-automatic subway work of intelligent remote control
Device is sent, it is of the existing technology to overcome the problems, such as.
The technical solution that the utility model is taken is:Intelligent remote controls full-automatic subway work vertical conveying device, packet
Portal frame is included, is provided with running gear for trolley at the top of portal frame, bottom is provided with cart walking mechanism, pacifies on running gear for trolley
Equipped with hoisting mechanism and slag device is turned over, the detachably connected dregs case of hoisting mechanism turns over slag device driving dregs case stirring.
Preferably, above-mentioned hoisting mechanism includes hoist engine, wirerope, crossbeam and suspender across hook, and hoist engine is fixedly connected on
On running gear for trolley, crossbeam is connected on hoist engine by the fixed pulley of steel wire penetrating thereon, crossbeam and carriage walking machine
Structure moving direction is vertical, and both ends are mounted with suspender across hook, and across the hook lower end of suspender is removably articulated in the top of dregs case both ends
On the hanging scroll of the heart.
Preferably, the above-mentioned slag device that turns over includes turning over slag hook, connecting rod, rocking lever and driving hydraulic cylinder, and turning over slag hook can hang
It is connected on the torsion shaft of dregs case bottom side, turns over slag hook upper end and be fixedly connected with connecting rod, the connecting rod other end is hinged on rocking lever
Lower end, rocking lever middle part are hinged on the support frame of running gear for trolley, and rocking lever upper end is hinged on the lever of driving hydraulic cylinder
On, driving hydraulic cylinder is fixedly connected on running gear for trolley by the fixed frame hinged with it.
Preferably, the above-mentioned slag hook that turns over is provided with two symmetrical hooks.
Preferably, for the above-mentioned slag device that turns over using two sets, two connecting rods are fixed by the connecting rod connection, and it is hydraulic to share a driving
Cylinder.
Preferably, above-mentioned intelligent remote controls full-automatic subway work vertical conveying device, further includes that section of jurisdiction automatically grabs
Handler, section of jurisdiction automatically grab handler upper end and are removably articulated on hoisting mechanism, and lower end clamps section of jurisdiction.
Preferably, above-mentioned section of jurisdiction automatically grab handler include symmetrical two clamping jaw, paralell and promoted cross beam frame, two
Clamping jaw is L-shaped structure, and relative symmetry is hinged on paralell, and two rows of U-shaped engaging lugs that stand upside down are equipped on paralell, are promoted horizontal
Roof beam structure is strip-shaped frame structure, and two opposite crossbeams are actively placed in two engaging lugs and can move up and down, promoted cross beam frame with
It is hinged with opening and closing connecting rod between two clamping jaws, promotes cross beam frame top and is provided with wirerope hanging buckle.
Preferably, stretching reset spring is provided between above-mentioned promotion cross beam frame both ends and paralell.
Preferably, two symmetrical limit plates are provided on above-mentioned promotion cross beam frame to be located on the promotion same crossbeam of cross beam frame
Between two engaging lugs.
Preferably, above-mentioned paralell bottom is provided with supporting leg.
The beneficial effects of the utility model:Compared with prior art, the effect of the utility model is as follows:
(1)The utility model is arranged the hoisting mechanism having suspender across hook in running gear for trolley and turns over slag device, energy
Enough realize mounting walking and the slag dumping of dregs case, handling scene is not necessarily to any artificial less important work, is also not required to any auxiliary in ground
Facility has saved construction site, changes in Urban Metro Construction because space narrow space influences construction speed and increases mechanical
The highly energy-consuming campaign of facility, middle control duty room can two or more vertical transport equipment of one man operation, reduce live behaviour
Make and ground cooperates personnel, reduce the labor intensity of worker, promote safety in production, tunnel safety of slagging tap is higher, reduction
Labor intensity;
2)The both arms suspender of self-balancing has across hitcher securely and reliably to be saved significantly with muddy water slag car automatic coupling decoupling device function
Labour has been saved, safety in production is promoted;
3)Hanger beam in hoisting mechanism is installed into hook, mounting section of jurisdiction automatically grabs handler, and section of jurisdiction is grabbed automatically
Handler is taken to run by running gear for trolley to section of jurisdiction loading place, the dedicated loading and unloading clamp in section of jurisdiction automatically grabs section of jurisdiction, then
It running to the stockpiling of section of jurisdiction storage area or conveying is gone into the well to tunnel, automatic loading and unloading scene is not necessarily to any artificial dislodging hook operation,
It is not required to any auxiliary equipment in ground, has saved construction site, manually upper and lower vehicle is fastened when changing section of jurisdiction handling in subway work
The work pattern for hanging the unfavorable safety in production of suspender belt reduces because cancelling artificial dislodging suspender belt operation because its yin rains or space
Narrow space handling section of jurisdiction is tied the security risk that suspender belt lifting is gone into the well, meanwhile, because realizing long-range control, in middle control value
Class room can two or more vertical transport equipment of one man operation, reduce execute-in-place and ground cooperation personnel, reduce work
The labor intensity of people promotes safety in production.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the left view structural representation of the utility model;
Fig. 3 is that the section of jurisdiction of the utility model automatically grabs handler structural schematic diagram;
Fig. 4 is that the section of jurisdiction of the utility model automatically grabs handler overlooking structure diagram;
Fig. 5 is that the slag device that turns over of the utility model turns over slag dynamic flow figure structure schematic representation;
Fig. 6 is to turn over slag apparatus structure schematic diagram.
Specific embodiment
Embodiment 1:As shown in figs 1 to 6, intelligent remote controls full-automatic subway work vertical conveying device, including gantry
Frame 1 is provided with running gear for trolley 2 at the top of portal frame 1, and bottom is provided with cart walking mechanism 3, pacifies on running gear for trolley 2
Equipped with hoisting mechanism 4 and slag device 5 is turned over, the detachably connected dregs case 6 of hoisting mechanism 4 turns over slag device 5 and dregs case 6 is driven to turn over
Material.
Preferably, above-mentioned hoisting mechanism 4 includes hoist engine 7, wirerope 8, crossbeam 9 and suspender across hook 10, and hoist engine 7 is fixed
Be connected on running gear for trolley 2, crossbeam 9 passes through fixed pulley thereon by wirerope 8 and is connected on hoist engine 7, crossbeam 9 with
2 moving direction of running gear for trolley is vertical, and both ends are mounted with suspender across hook 10, and suspender is removably articulated to slag across 10 lower end of hook
On the hanging scroll 11 of native 6 both ends central upper portion of case.
Preferably, the above-mentioned slag device 5 that turns over includes turning over slag hook 12, connecting rod 13, rocking lever 14 and driving hydraulic cylinder 15, turns over slag
Hook 12 can be articulated on the torsion shaft 16 of 6 bottom side of dregs case, turned over 12 upper ends of slag hook and be fixedly connected with connecting rod 13, connecting rod 13
The other end is hinged on 14 lower end of rocking lever, is hinged on the support frame of running gear for trolley 2 in the middle part of rocking lever 14, on rocking lever 14
End is hinged on the lever of driving hydraulic cylinder 15, and driving hydraulic cylinder 15 is fixedly connected on trolley by the fixed frame 17 hinged with it
In walking mechanism 2, it can be realized by driving hydraulic cylinder and turn over exiting and mounting for slag hook, the slag that turns over by turning over slag device is linked up with
After mounting, hoisting mechanism is transferred, in the case where filling the gravity of dregs case of dregs, dregs case is clicked through around slag hook mounting is turned over
Row rotation, the dregs in dregs case is poured out, is lifted hoisting mechanism after pouring out, and guidance turns over slag hook and falls off.
Preferably, the above-mentioned slag hook 12 that turns over is provided with two symmetrical hooks, carries out turning over slag convenient for bilateral, improves equipment utilization
Rate.
Preferably, the above-mentioned slag device 5 that turns over uses two sets, and two connecting rods 13 are fixed by the connecting rod connection, shares a driving
Hydraulic cylinder, it is reliable and stable to turn over slag, shares a driving hydraulic cylinder, and synchronism is high.
Preferably, above-mentioned intelligent remote controls full-automatic subway work vertical conveying device, further includes that section of jurisdiction automatically grabs
Handler, section of jurisdiction automatically grab handler upper end and are removably articulated on hoisting mechanism 4, and lower end clamps section of jurisdiction.
Preferably, it includes symmetrical two clamping jaw 18, paralell 19 and promotion crossbeam that above-mentioned section of jurisdiction, which automatically grabs handler,
Frame 20, two clamping jaws 18 are L-shaped structure, and relative symmetry is hinged on paralell 19, and it is U-shaped that two rows of handstand are equipped on paralell 19
Engaging lug 21, promotion cross beam frame 20 are strip-shaped frame structure, two opposite crossbeams be actively placed in two engaging lugs 21 and can on
Lower movement is promoted and is hinged with opening and closing connecting rod 22 between cross beam frame 20 and two clamping jaws 18, is promoted 20 top of cross beam frame and is provided with steel wire
Rope hanging buckle.
Preferably, it is provided between above-mentioned 20 both ends of promotion cross beam frame and paralell 19 and stretches reset spring 23, Neng Gouti
Height promotes cross beam frame 20 and moves down power, convenient for opening two clamping jaws, stretches 23 both ends of reset spring by screw rod and is connected to two supports
On plate, two support plates, which are respectively fixedly connected with, is connected with fixture nut, fixture nut in promotion cross beam frame 20 and paralell 19, screw rod
On the outside of support plate, installation and dismantling are adjusted and pacified by the pulling force that screw rod and fixture nut are convenient for stretching reset spring
It unloads.
Preferably, it is provided with two symmetrical limit plates 24 on above-mentioned promotion cross beam frame 20 and is located at the promotion same cross of cross beam frame 20
Between two engaging lugs 21 on beam, play the role of limition orientation during engaging lug moves up and down to cross beam frame 20 is promoted.
Preferably, above-mentioned 19 bottom of paralell is provided with supporting leg 25, and the support of supporting leg 25 is placed on section of jurisdiction, is promoted horizontal
Roof beam structure glides from engaging lug in the case where being self-possessed and stretching action of reset spring, and opening and closing connecting rod 22 is pushed to automatically open two clamping jaws,
During promotion cross beam frame moves up, two clamping jaws are moved inward to fix section of jurisdiction bottom clamping, realizes that the suspension of section of jurisdiction moves
Dynamic and handling.
Hoisting mechanism is equipped with raising and falling head intelligent monitoring display instrument, can accurately show the muddy water slag car in control room
Decline and hoisting depth, provide real-time monitoring data information for intelligent control.
Hoisting mechanism is equipped with lifting capacity detection weighing limiter, can accurately show lifting weight in control room and have certainly
Dynamic printing function leaves accurate recording for safety in production, while having the function of that 5% alarm of overload, overload 10% are automatically cut off the power,
When the belt conveyer in full shield development machine continuously conveys the dregs that the mud, stone, water in front mix
Horizontal feed dregs case arrival into tunnel is slagged tap after well head, and fully loaded dregs case is continuously into slag notch.
The double shoulder pole special hangers of self-balancing have the function of securely and reliably to greatly save with the automatic coupling decoupling device of the muddy water slag car
Labour promotes safety in production.
Running gear for trolley is equipped with trailing type automatic turning slag device, be not required to that any external force is artificial or ground auxiliary device i.e.
It may be implemented in aerial any section and turn over slag slag dumping, the working cycles that achievable 14 section muddy water slag car underground is slagged tap per hour mention
High construction site utilization rate, promotes production operation efficiency, promotes safety in production.
Hoisting mechanism and the big carriage walking of operation are equipped with the absolute value controller of range ability, and controller signals feed back to PLC,
Complete machine is helped to realize intellectual remote controlling safe operation.
According to subway construction site different spaces, main beam structure special designing has the more fulcrums that can be assemblied into different spans living
Dynamic section, can meet the construction demand of different cities construction site, reduce the transformation of equipment secondary structure, save national iron and steel resource,
It contributes for protection environment energy-saving and emission-reduction.
Hoisting mechanism on running gear for trolley drops to shaft bottom of slagging tap, elevator according to the operative signals that control room is set
Structure design has across the hook whereabouts of autobalance sister block suspender for being particularly developed manufacture, takes muddy water dregs case, hoisting mechanism automatically
Promotion dregs case, which is completed, according to promotion signal goes out slag dumping point of the well head to setting height, level run to setting, carriage walking machine
Special turning slag mechanism on structure brings into operation, completes aerial slag dumping, running gear for trolley after slag dumping with hoisting mechanism linkage operation
According to the duty cycle command that control system is set, automatic running to tunnel well head hoisting mechanism drops to shaft bottom automatically and promotes slag
Native case is lifted out well head, and to dregs hole after slag-soil truck, fall slag for operation to slag dumping point.Subsequently into next working cycles, entirely
Work system is not necessarily to manual control, it can be achieved that under free position, aerial or ground slag dumping;It is unloaded high in entire work system operation
Speed, heavy-duty low-speed are promoted, decline, it is aerial fall slag dumping by according to the working cycles program of control default in Central Control Room
The entire program automatic job of display operation is monitored, to realize intelligent control, automatic loading and unloading scene is not necessarily to any human assistance
Operation is also not required to any auxiliary equipment in ground, has saved construction site, changes in Urban Metro Construction because of space narrow space
It influences construction speed and increases the highly energy-consuming campaign of mechanical facility, meanwhile, because realizing long-range control, it is in middle control duty room
Can two or more vertical transport equipment of one man operation, reduce execute-in-place and ground cooperation personnel, reduce the labor of worker
Fatigue resistance promotes safety in production.
The utility model is slagged tap in addition to completing underground handling, can also be automatically performed the handling of tunnel duct piece, is stored and defeated
Tunnel under section of jurisdiction is sent, tunnel duct piece lifting conveying device is additionally provided on running gear for trolley, when tunnel duct piece has outside to be transported to
Up to scene, the another set of operating mechanism of the vertical transport system starts to work, and the dedicated loading and unloading clamp in section of jurisdiction refers to according to program work
Enable operation to section of jurisdiction loading place, the dedicated loading and unloading clamp in section of jurisdiction automatically grabs section of jurisdiction, then runs to pipe according to program work instruction
The stockpiling of piece storage area or conveying are gone into the well to tunnel, and automatic loading and unloading scene is not necessarily to any artificial dislodging hook operation, are also not required to ground
Any auxiliary equipment, has saved construction site, and manually upper and lower vehicle is tied suspender belt not when changing section of jurisdiction handling in subway work
The work pattern of benefit safety in production reduces because cancelling artificial dislodging suspender belt operation because its yin rains or space narrow space
Handling section of jurisdiction is tied the security risk that suspender belt lifting is gone into the well, meanwhile, because realizing long-range control, in middle control duty room
Two or more vertical transport equipment of one man operation reduce execute-in-place and ground cooperation personnel, reduce the labour of worker
Intensity promotes safety in production.
This crane uses laser positioning, and absolute value encoder acquires speed of service range data, screen scanning monitoring skill
Art is concentrated using PLC programmable controller using optical fiber or ground remote control or ground Central Control Room in conjunction with computer control system
Intelligent control, from hoisting mechanism, the double shoulder poles of self-balancing across hook, aerial automatic turning slag device, it is complete that section of jurisdiction automatically grabs handler
Portion is controlled using AC vector variable frequency drives and full energy feedback, and is kept to the driver of whole system, controller, each fortune
The monitoring locating and displaying of the multistage limit of row mechanism, Central Control Room are equipped with handling section of jurisdiction cycle operation record, and the muddy water slag car is vertically defeated
The working cycles of falling slag meter is sent to record, black box failure monitoring system, entire work system is safe and reliable, speed no-load and high heavy-duty low-speed,
And can be required to realize that downloading potential energy energy regenerating storage is recycled according to user, to realize that energy-saving low-carbon is run.This is current
State-of-the-art intelligent control technology in the world.
The utility model improve subway work speed, guarantee tunnel slag tap it is safe and reliable with section of jurisdiction transportation system, mitigate
Labor intensity improves safety production efficiency,
Cart walking mechanism includes motor two and retarder two, and motor two is connected to big wheel by retarder two,
Brake one is provided on big wheel, cart walking mechanism, which is provided with, prevents rapid wind apparatus(Power hydraulic pressure radix saposhnikoviae skate), prevent rapid wind
Device can guarantee crane in off working state strong wind(6 grades)Under speed, moving and toppling for cart and trolley direction is not generated,
Complete machine structure and component are not destroyed, and big wheel uses 45# material, are used 3mm stainless steel at tyre tread and wheel rim, are avoided wheel
Tyre tread corrodes and generates spark, and wheel shaft is supported with rolling bearing, and is fixed with end cap, and speed reducer uses the three-in-one power of SEW
Device, guarantee crane is in the case where encountering the wind speed and 0.5% gradient of 25 meter per seconds, at the security row to anchoring that can also climb against the wind, greatly
Vehicle walking mechanism is equipped with the buffer to match, and is furnished with rail cleaner, is mounted in trolley end positions, and clear rail lower part cleans dress
It sets using rubber or nylon material, buffer selects polyurethane bumper absorber, and hand is respectively arranged at the lower beam of two heel post of crane
Dynamic anchoring device is a set of, sets touching switch on manual anchoring device, when manual anchoring device is put down, cart walking mechanism without
Method is mobile, while the signal being transmitted on the display screen of connection controller.
Preferably, above-mentioned running gear for trolley includes driving mechanism and small car crossbeam, and driving mechanism is distributed in small car crossbeam
Both ends, including motor three and retarder three, the motor three are vertically installed in small car crossbeam, and output shaft passes through retarder
Three are connected to trundle, and brake two is provided on trundle, and small tramcar motor three uses SEW motor, and speed reducer three uses SEW
Three-in-one power device, carriage walking end set car bumper and buffer, and their combination should can bear trolley and be fully loaded with hitting for full speed
It hits, the nearly boarding position of trolley sets bolt-type radix saposhnikoviae locking device, and has safety limit switch, the electricity of trolley and crane support frame
Gas connection, which uses to drag, enables trolley type, is arranged on the inside of trolley span.
Preferably, it is additionally provided with drivers' cab on the left of above-mentioned portal frame, drivers' cab looks around window face lifting mechanism, drivers' cab
Lower setting camera monitoring device, monitor are popped one's head in using zoom, and monitoring device display screen is arranged in drivers' cab, and driver can be clear
See suspender and lock box situation.
Hoist engine includes motor one, retarder one, reel and steel cable winding system, and motor one is connected to retarder
One input shaft is fixedly attached in small car crossbeam, and the output shaft of retarder one is connected to reel, the reel other end connection
On bearing block, and it is connected with the steel cable winding system of connection sling upper rack, the steel wire wound on steel cable winding system is adopted
With line contact type wirerope, check weighing system is installed on hoisting mechanism, check weighing system includes controller and is connected with controller
Pair tension sensor and alarm device, total detection error is less than 5%, and load >=90% load was up to 3 seconds under suspender, intermittent type sound equipment
Warning;Load >=90% load was up to 3 seconds under suspender, continous way audible warning sound;Load >=105% load must stop being promoted under suspender,
Only descending at slow speed.The check weighing system has unbalance loading sensor detection function.
Preferably, above-mentioned portal frame includes that four columns are fixedly connected with bar shaped square bearer, front and back face two with column top
Lower beam is set close to bottom end between column, bar shaped square bearer extends to the right column.
Preferably, monolithic flanged joint is arranged in above-mentioned column and bar shaped square bearer bottom side junction.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to
In this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in variation
Or replacement, it should be covered within the scope of the utility model, therefore, the protection scope of the utility model should be with the power
Subject to the protection scope that benefit requires.
Claims (10)
1. intelligent remote controls full-automatic subway work vertical conveying device, it is characterised in that:Including portal frame(1), portal frame
(1)Top is provided with running gear for trolley(2), bottom is provided with cart walking mechanism(3), running gear for trolley(2)Upper installation
There is hoisting mechanism(4)With turn over slag device(5), hoisting mechanism(4)Detachably connected dregs case(6), turn over slag device(5)Drive slag
Native case(6)Stirring.
2. intelligent remote according to claim 1 controls full-automatic subway work vertical conveying device, it is characterised in that:It mentions
Rise mechanism(4)Including hoist engine(7), wirerope(8), crossbeam(9)With suspender across hook(10), hoist engine(7)It is fixedly connected on small
Vehicle walking mechanism(2)On, crossbeam(9)Pass through wirerope(8)Fixed pulley across thereon is connected to hoist engine(7)On, crossbeam(9)
With running gear for trolley(2)Moving direction is vertical, and both ends are mounted with suspender across hook(10), suspender is across hook(10)Lower end is removably
It is articulated to dregs case(6)The hanging scroll of both ends central upper portion(11)On.
3. intelligent remote according to claim 1 controls full-automatic subway work vertical conveying device, it is characterised in that:It turns over
Slag device(5)Including turning over slag hook(12), connecting rod(13), rocking lever(14)And driving hydraulic cylinder(15), turn over slag hook(12)It can
It is articulated to dregs case(6)The torsion shaft of bottom side(16)On, turn over slag hook(12)Upper end is fixedly connected with connecting rod(13), connecting rod
(13)The other end is hinged on rocking lever(14)Lower end, rocking lever(14)Middle part is hinged on running gear for trolley(2)Support frame on,
Rocking lever(14)Upper end is hinged on driving hydraulic cylinder(15)Lever on, driving hydraulic cylinder(15)Pass through the fixed frame hinged with it
(17)It is fixedly connected on running gear for trolley(2)On.
4. intelligent remote according to claim 3 controls full-automatic subway work vertical conveying device, it is characterised in that:It turns over
Slag hook(12)It is provided with two symmetrical hooks.
5. intelligent remote according to claim 3 controls full-automatic subway work vertical conveying device, it is characterised in that:It turns over
Slag device(5)Using two sets, two connecting rods(13)It is fixed by the connecting rod connection, shares a driving hydraulic cylinder.
6. intelligent remote according to claim 1 controls full-automatic subway work vertical conveying device, it is characterised in that:Also
Handler is automatically grabbed including section of jurisdiction, section of jurisdiction automatically grabs handler upper end and is removably articulated in hoisting mechanism(4)On,
Lower end clamps section of jurisdiction.
7. intelligent remote according to claim 6 controls full-automatic subway work vertical conveying device, it is characterised in that:Pipe
It includes symmetrical two clamping jaw that piece, which automatically grabs handler,(18), paralell(19)With promotion cross beam frame(20), two clamping jaws(18)
For L-shaped structure, relative symmetry is hinged on paralell(19)On, paralell(19)On two rows of U-shaped engaging lugs that stand upside down are installed
(21), promote cross beam frame(20)For strip-shaped frame structure, two opposite crossbeams are actively placed in two engaging lugs(21)In and can on
Lower movement promotes cross beam frame(20)With two clamping jaws(18)Between be hinged with opening and closing connecting rod(22), promote cross beam frame(20)Top is set
It is equipped with wirerope hanging buckle.
8. intelligent remote according to claim 7 controls full-automatic subway work vertical conveying device, it is characterised in that:It mentions
Rise cross beam frame(20)Both ends and paralell(19)Between be provided with stretching reset spring(23).
9. intelligent remote according to claim 7 controls full-automatic subway work vertical conveying device, it is characterised in that:It mentions
Rise cross beam frame(20)On be provided with two symmetrical limit plates(24)Positioned at promotion cross beam frame(20)Two engaging lugs on same crossbeam
(21)Between.
10. intelligent remote according to claim 7 controls full-automatic subway work vertical conveying device, it is characterised in that:
Paralell(19)Bottom is provided with supporting leg(25).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820410922.3U CN208120593U (en) | 2018-03-26 | 2018-03-26 | Intelligent remote controls full-automatic subway work vertical conveying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820410922.3U CN208120593U (en) | 2018-03-26 | 2018-03-26 | Intelligent remote controls full-automatic subway work vertical conveying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208120593U true CN208120593U (en) | 2018-11-20 |
Family
ID=64198394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820410922.3U Active CN208120593U (en) | 2018-03-26 | 2018-03-26 | Intelligent remote controls full-automatic subway work vertical conveying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208120593U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108249315A (en) * | 2018-03-26 | 2018-07-06 | 上海和平发展起重设备厂有限公司 | Intelligent remote controls full-automatic subway work vertical transport system |
-
2018
- 2018-03-26 CN CN201820410922.3U patent/CN208120593U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108249315A (en) * | 2018-03-26 | 2018-07-06 | 上海和平发展起重设备厂有限公司 | Intelligent remote controls full-automatic subway work vertical transport system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208120594U (en) | A kind of section of jurisdiction for subway work vertical transport system automatically grabs handler | |
CN108249315A (en) | Intelligent remote controls full-automatic subway work vertical transport system | |
CN208120584U (en) | It is a kind of to turn over slag device for subway work vertical transport system | |
CN103086279B (en) | Vertical transportation construction method for building construction | |
CN102285581B (en) | Special suspender to replace vertical mill universal connecting shafts and use method thereof | |
CN100519396C (en) | Gin pole integrated dismounting method for tower crane | |
CN105621280A (en) | Device and method for mounting and dismounting crane boom | |
CN208120593U (en) | Intelligent remote controls full-automatic subway work vertical conveying device | |
CN206203720U (en) | A kind of roofing device for hoisting | |
CN201214598Y (en) | Column crane special for movable arm type tower erection | |
CN107881907B (en) | Inspection vehicle for bridge main arch | |
CN208054764U (en) | Construction material is vertical and horizontal transporter | |
CN213085256U (en) | Single-beam portal crane with suspended trolley | |
CN204198225U (en) | A kind of suspension bracket of lifting for prefabricated U-shaped aqueduct and device | |
CN108016986A (en) | A kind of swing arm underhung crane | |
CN202390116U (en) | High-intensity small-tonnage hoist | |
CN205998901U (en) | Tower crane and its gin-pole truck being used | |
CN105883645B (en) | The method for dismounting of tower crane attachment device | |
CN213834245U (en) | Automatic hoisting device of section of track | |
CN204251234U (en) | For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance | |
CN206070370U (en) | A kind of bridge maintenance equipment of automatically walk | |
CN208200158U (en) | A kind of goliath equipment for realizing control based on Internet of Things | |
CN209721367U (en) | A kind of Anti-side-turning device of crane | |
CN208700131U (en) | A kind of wind-screening dust-suppressing device for coal mine bridge-type grab ship unloader funnel | |
CN208980209U (en) | The outer lifting device of transformer of household portable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |