CN108520102A - A kind of facing based on BIM build fast method of construction - Google Patents

A kind of facing based on BIM build fast method of construction Download PDF

Info

Publication number
CN108520102A
CN108520102A CN201810205174.XA CN201810205174A CN108520102A CN 108520102 A CN108520102 A CN 108520102A CN 201810205174 A CN201810205174 A CN 201810205174A CN 108520102 A CN108520102 A CN 108520102A
Authority
CN
China
Prior art keywords
race
construction
project
bim
library
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810205174.XA
Other languages
Chinese (zh)
Inventor
赵向东
巨鹏
赵军华
陈泽淼
白腾飞
孙红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Yun Cang Building Materials Technology Co Ltd
Zhongtian Northwest Construction Investment Group Co Ltd
Original Assignee
Xi'an Yun Cang Building Materials Technology Co Ltd
Zhongtian Northwest Construction Investment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Yun Cang Building Materials Technology Co Ltd, Zhongtian Northwest Construction Investment Group Co Ltd filed Critical Xi'an Yun Cang Building Materials Technology Co Ltd
Priority to CN201810205174.XA priority Critical patent/CN108520102A/en
Publication of CN108520102A publication Critical patent/CN108520102A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to fast method of construction is built facing based on BIM, include the classification and marshalling in Lin Jian modularizations race library, structure and the information addition in race library are filtered identical material using shared parameter, extract quantities and go out figure;It is an advantage of the invention that, it will face to build construction node full-page proof way and be built into race and form componentization race, after placing structureization race, according to the setting in race and project, it can check deployment scenarios of the unlike material in place, model accuracy can be greatly improved on the basis of promoting BIM and modeling teacher's working efficiency, to reach precise positioning, interspersed construction, the one-time formed purpose of same material.

Description

A kind of facing based on BIM build fast method of construction
Technical field
The present invention relates to face to build construction method, and in particular to a kind of facing based on BIM builds fast method of construction.
Background technology
Face and build, refer to construction enterprises for carry out life and production that engineering construction must be set up temporay building, Structures and other temporary facilities.Refer to necessary time limit dismounting structure simple, provisional building, structures and other facilities, Temporary building has defined service life.
In the prior art, it is first to prepare construction material to face the building method built, and resettles the peripheral structure for facing and building, according to: The sequence of pedestal-enclosure wall-column-ground construction goes to build, ununified design, so there is inconvenience tune when temporary condition Whole, relatively more to the waste of material, same construction team marches into the arena repeatedly, low construction efficiency.
Existing Chinese patent document CN105569378A, which discloses a kind of steel construction and faces, builds board house structure and construction work Skill, mainly solve the problems, such as be:The position stabilities such as the home equipment inside board house are poor, caused to normal use larger Difficulty, meanwhile, current steel construction board house itself does not have any safety prevention measure and board house self structure intensity also Also relatively poor, it is especially very poor to the protective capacities of fire, therefore also result in the safe to use of current steel construction board house Property and stability are relatively low, seriously threaten the personal safety of user.It is solved the problems, such as from the present invention program different.
Invention content
Present invention aim to address the above problem, provides and a kind of facing based on BIM build fast method of construction, will face and build construction Node full-page proof way, which is built into race, forms componentization race, after placing structureization race, according to the setting in race and project, can check Deployment scenarios of the unlike material in place.Model can be greatly improved on the basis of promoting BIM and modeling teacher's working efficiency Precision, to reach precise positioning, interspersed construction, the one-time formed purpose of same material.
To achieve the above object, the present invention provides the following technical solutions:
A kind of facing based on BIM fast method of construction is built, included the following steps:
A) Lin Jian modularizations race library is sorted out and is organized into groups:Modularization race is successively decomposed according to field combinations mode, until Sub-unit inseparable, with independence is formed, is usually one point according to the object of a kind of material or a standalone feature Component;Decomposition marshalling is carried out according to the building form of product:One set of product is highest (rank 1), is named as " classification upper-case first letters _ 1 Praenomen claim ";Then primary small decomposition is carried out to it according to live practical combinations situation, is ordered Entitled " J classifications upper-case first letters _ 2 race's constituting parts title ", the presence of this level (rank 2) mainly considers sub-assembly in rank 1 May individually occur as a product;It will be finally split as one by one with standalone feature or identical material in rank 2 Sub-unit is named as " J classifications upper-case first letters _ 3 race's constituting parts title ".If being not required to decompose, can without rank 2 and The layering of rank 3;If it is individual components that level 3 is also undecomposed, next layer of decomposition can be carried out again.This organizational systems is mainly Individual components are combined to form modularization race library, consider various forms of construction combined situations, is formed and models teacher for BIM The modularization race library of effective use.
B) addition of the component in race library and information:Initially set up the sub-unit race of lowest hierarchical level, necessary race in addition Type parameter and instance parameter;Then according to site operation combined situation, sub-unit is combined, and adds necessary parameter It is associated with so far race;It needs to combine again, can be combined again until forming final product family.
Carry out control display race name should be needed with the controlling element of project filter it is corresponding, otherwise be not required to control Race should avoid overlapping with the controlling element of filter when naming.
For convenience of Material Takeoff, no matter the race of which level, be both needed to open it is shared, if family parameter need to enter detail list need by It is set as shared parameter.
C) project model is arranged:Identical material is filtered using shared parameter;Well-established race is loaded into item In mesh, New filter is edited in project, sets filter rules according to governing factor, all materials that need to be controlled all are edited Filter is added to be controlled;According to material and construction process, view model attribute is set, so that material is according to construction Flow sequence is shown, is realized " construction area that a key shows same material ".
D) project is established, goes out figure and guiding construction:
Project is established:It is raw to items according to scene and condition of construction within the scope of construction land tenure using project boilerplate Production, living facilities and other auxiliary equipment etc. are planned and are arranged;In this project model, it is only necessary to create according to demand Race, race, which places, to complete, and project is arranged and completed.
Go out figure and guiding construction:Material requested when because in race's early period library having included construction, project model pass through view sample Required material is configured display by plate according to construction process, when going out figure, it is only necessary to which carrying out " application view model " can be intuitive It shows that the clear earthwork is accurately filled out and digs material requested in region and corresponding construction process.
E) actual items application:
Prepare because having carried out " the structure race for having construction details " and " view model " these two aspects early period, in actual items In mesh implementation process, to realize check construction node, realize same material view show it is just very convenient.Realization process is as follows:
1. establishing original place shape according to project field condition;
2. placing the well-established construction of facing for having construction details according to scene planning applies race;
3. using " application view model " in 3-D view, the view set is called;
4. going out figure.
Further, the present invention put down, stand, cuing open using Revit software realizations, three-dimensional synchronous interaction.
The beneficial effects of the present invention are:
Using BIM tool face and build arrangement, have certain technology perspective, at the same Revit softwares can realize it is flat, Stand, cut open, three-dimensional synchronous interaction, it is only necessary to it is arranged in the planes, so that it may with directly generate required plane, section and 3-D view.In the present invention, detail treatment way is added into race library, having carried out certain setting to race and project realizes " key shows the construction area of same material " only need to simply carry out the placement of race in course of planning of constructing, that is, generating can Instruct the drawing of site operation.Because having done a large amount of previous work, the designs of tradition cad relatively not only can avoid in programming phase The limitation of conventional two-dimensional design, and can largely improve BIM technology by the invention and face the application built in arrangement Plan efficiency.
The construction way that " same material one-pass molding " is proposed in the present invention carries out infrastructural support, soft by BIM to it It can understand that the distributed areas for viewing certain material, Field Force can have perspective carry out accurate according to three-dimensional drawing in part Stock carries out unified construction to identical material, can avoid waste of material, avoids marching into the arena repeatedly for same construction team, improves construction Efficiency.Particularly with the earth excavation stage, region is dug in filling out for the invention support pair, absolute altitude carries out precise positioning and goes out figure, Cost caused by largely avoiding the secondary excavation of the earthwork wastes.It is opposite in the construction deployment stage using revit softwares Traditional mode saving construction cost nearly 60%;The present invention proposes the construction method of " realizing identical material one-pass molding " simultaneously, is constructing Also there is a degree of decline in labour cost and material.
Description of the drawings
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to needed in embodiment description Attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is only the present invention in order to illustrate more clearly of this hair Bright embodiment or technical solution in the prior art are not making the creative labor for those of ordinary skill in the art Under the premise of, other drawings may also be obtained based on these drawings.
Fig. 1 is the work flow diagram of the present invention;
Fig. 2 is classification and the marshalling schematic diagram in modularization race of the present invention library;
Fig. 3 is editor's present invention filter schematic diagram;
Fig. 4 is present invention setting view model attribute schematic diagram;
Fig. 5 is that the earthwork of the embodiment of the present invention and basement process position full figure;
Fig. 6 is door zone of embodiment of the present invention three-dimensional absolute altitude relational graph;
Fig. 7 is Office Area of embodiment of the present invention three-dimensional absolute altitude relational graph;
Fig. 8 is living area of embodiment of the present invention three-dimensional absolute altitude relational graph;
Fig. 9 is Ground arrangement design sketch of the embodiment of the present invention;
Figure 10 is 1 Office Area schematic diagram of Ground arrangement stage of the embodiment of the present invention;
Figure 11 is 1 living area schematic diagram of Ground arrangement stage of the embodiment of the present invention;
Figure 12 is 2 corridor brick of Ground arrangement stage of the embodiment of the present invention and steel springboard construction drawing;
Figure 13 is 2 gutter of Ground arrangement stage of the embodiment of the present invention and aisle brick detail of construction;
Figure 14-Figure 15 is the displaying for carrying out identical material in Vanke Run Yuan project of the embodiment of the present invention according to construction process Figure.
Specific implementation mode
As shown in Figure 1 builds fast method of construction a kind of facing based on BIM, includes the following steps:
A) Lin Jian modularizations race library is sorted out and is organized into groups:Modularization race is successively decomposed according to field combinations mode, until Sub-unit inseparable, with independence is formed, is a sub-unit according to the object of a kind of material or a standalone feature;Root Decomposition marshalling is carried out according to the building form of product;It is classification and the organizational systems in modularization race library such as Fig. 2.
B) addition of the component in race library and information:The sub-unit race of lowest hierarchical level is established, necessary same clan's type is joined in addition Number and instance parameter are combined sub-unit according to site operation combined situation, and add necessary parameter association so far Race;Carry out control display race name should be needed with the controlling element of project filter it is corresponding, otherwise be not required to control race name When, it should avoid overlapping with the controlling element of filter;
C) project model is arranged:Identical material is filtered using shared parameter;Well-established race is loaded into item In mesh, such as Fig. 3, New filter is edited in project, filter rules, all materials that will need to be controlled are set according to governing factor All editor is added to filter and is controlled.
As according to material and construction process view model attribute is arranged, so that material is suitable according to construction process in Fig. 4 Sequence is shown, is realized " construction area that a key shows same material ";
D) project is established, goes out figure and guiding construction:Using project boilerplate, used in construction according to scene and condition of construction Within the scope of ground, items production, living facilities and other auxiliary equipment etc. are planned and arranged;Race's early period has included to apply in library Required material is configured display according to construction process by view model, goes out figure by working hour material requested, project model When, it is only necessary to carrying out " application view model " can intuitively show that digging region and corresponding construction process are accurately filled out in the clear earthwork Middle material requested;
E) actual items application:
1. establishing original place shape according to project field condition;
2. placing the well-established construction of facing for having construction details according to scene planning applies race;
3. using " application view model " in 3-D view, the view set is called;
4. going out figure.
Embodiment:
If Fig. 5-8 is that Vanke Run Yuan project faces and builds construction and instruct drawing, with material boundary of works area schematic diagram, plane positioning figure The mode of three-dimensional nodes detail drawing is added to be described.
As Fig. 9-15 construction personnel according to drawing face build in work progress realize precise positioning, orderly stock, same material The target once survived.
Fig. 9 is Ground arrangement design sketch;
Figure 10 is the stage 1:Full-page proof before the container of Office Area;
Figure 11 is full-page proof before 1 living area container of section;
Figure 12 stages 2:Corridor brick and steel springboard construction full-page proof;
Figure 13 stages 2:Gutter and aisle brick detail of construction;
It is the displaying for carrying out identical material in Vanke Run Yuan project according to construction process such as Figure 14-15.
It follows the steps below:
1. Figure 14:The earth excavation stage;
2. Figure 15:Backfill and soil removal and replacement;
3. carrying out concrete laying on the basis of step 2;
4. carrying out mortar laying on the basis of step 3;
5. carrying out brick laying on the basis of step 4;
6. carrying out the arrangements such as kerbstone, steel springboard, gutter on the basis of step 5;
7. on the basis of step 6 carry out container, movable plank house main body arrangement;
8. carrying out greening and other arrangements on the basis of step 7.
It summarizes:
Using BIM tool face first and build arrangement, has certain technology perspective, while Revit softwares can be realized It puts down, stand, cuing open, three-dimensional synchronous interaction, it is only necessary to it is arranged in the planes, so that it may to directly generate required plane, cut open Face and 3-D view.In the present invention, detail treatment way is added into race library, having carried out certain setting to race and project realizes " key shows the construction area of same material " need to simply carry out the placement of race, that is, generate in course of planning of construct It can instruct the drawing of site operation.Because having done a large amount of previous work, the designs of tradition cad relatively can not only be kept away in programming phase Exempt from conventional two-dimensional design limitation, and by the invention can largely improve BIM technology face build arrangement on answering With planning efficiency.
Secondly, the construction way that " same material one-pass molding " is proposed in the present invention, basic branch is carried out by BIM to it Hold, can understand view the distributed areas of certain material in software, Field Force according to three-dimensional drawing, can have it is perspective into Row precisely stocks up, carries out unified construction to identical material, can avoid waste of material, avoids marching into the arena repeatedly for same construction team, carries High construction efficiency.Particularly with the earth excavation stage, region is dug in filling out for the invention support pair, absolute altitude carries out precise positioning and goes out Figure, cost caused by largely avoiding the secondary excavation of the earthwork waste.
Note:1. the data do not include such as container, steel springboard can almost lossless recycling material;
2. other expenditures include materials dumping, large-scale instrument, necessary administration fee etc..
Upper table is Economic and Efficiency Analysis table.As can be seen from the above table, it because having set boilerplate and race library, uses Revit softwares are in the construction deployment stage with respect to traditional mode saving construction cost nearly 60%;The present invention proposes " to realize identical material simultaneously The construction method of one-pass molding " also has a degree of decline in construction labour cost and material.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (3)

1. a kind of facing based on BIM builds fast method of construction, which is characterized in that include the following steps:
A) Lin Jian modularizations race library is sorted out and is organized into groups:Modularization race is successively decomposed according to field combinations mode, until being formed Sub-unit inseparable, with independence is a sub-unit according to the object of a kind of material or a standalone feature;According to production The building form of product carries out decomposition marshalling;
B) addition of the component in race library and information:Establish the sub-unit race of lowest hierarchical level, in addition necessary same clan's shape parameter and Instance parameter is combined sub-unit according to site operation combined situation, and adds necessary parameter association so far race;It needs Carry out control display race name should be needed with the controlling element of project filter it is corresponding, otherwise be not required to control race name, answer It avoids overlapping with the controlling element of filter;
C) project model is arranged:Identical material is filtered using shared parameter;Well-established race is loaded into project, New filter is edited in project, sets filter rules according to governing factor, all materials that need to be controlled all are edited into addition It is controlled to filter;According to material and construction process, view model attribute is set, so that material is according to construction process Sequence is shown, is realized " construction area that a key shows same material ";
D) project is established, goes out figure and guiding construction:Using project boilerplate, according to scene and condition of construction in construction land tenure model In enclosing, items production, living facilities and other auxiliary equipment etc. are planned and arranged;When in race's early period library having included construction Required material is configured display by material requested, project model by view model according to construction process, when going out figure, only It needs progress " application view model " that can intuitively show that the clear earthwork is accurately filled out and digs institute in region and corresponding construction process Need material;
E) actual items application:
1. establishing original place shape according to project field condition;
2. placing the well-established construction of facing for having construction details according to scene planning applies race;
3. using " application view model " in 3-D view, the view set is called;
4. going out figure.
2. a kind of facing based on BIM according to claim 1 builds fast method of construction, which is characterized in that in the step a) According to the building form of product carry out decompose marshalling mode be:One set of product is highest (rank 1), is named For " classification upper-case first letters _ 1 Praenomen claim ";Then primary small decomposition is carried out to it according to live practical combinations situation, by it " J classifications upper-case first letters _ 2 race's constituting parts title " are named as, the presence of this level (rank 2) mainly considers to combine in rank 1 Part may individually occur as a product;It will be finally split as one by one with standalone feature or identical material in rank 2 Sub-unit, be named as " J classifications upper-case first letters _ 3 race's constituting parts title ", formed and model teacher's effective use for BIM Modularization race library.
3. a kind of facing based on BIM according to claim 1 or 2 builds fast method of construction, which is characterized in that it is used Revit software realizations put down, stand, cuing open, three-dimensional synchronous interaction.
CN201810205174.XA 2018-03-13 2018-03-13 A kind of facing based on BIM build fast method of construction Pending CN108520102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810205174.XA CN108520102A (en) 2018-03-13 2018-03-13 A kind of facing based on BIM build fast method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810205174.XA CN108520102A (en) 2018-03-13 2018-03-13 A kind of facing based on BIM build fast method of construction

Publications (1)

Publication Number Publication Date
CN108520102A true CN108520102A (en) 2018-09-11

Family

ID=63433184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810205174.XA Pending CN108520102A (en) 2018-03-13 2018-03-13 A kind of facing based on BIM build fast method of construction

Country Status (1)

Country Link
CN (1) CN108520102A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490976A (en) * 2019-07-29 2019-11-22 兰州容大信息科技有限公司 Four electric equipment race library modeling methods and device based on BIM technology
CN110543708A (en) * 2019-08-21 2019-12-06 中国中材国际工程股份有限公司 Factory non-standard part material statistical method based on Revit
CN110543707A (en) * 2019-08-21 2019-12-06 中国中材国际工程股份有限公司 Plotting method for creating factory nonstandard parts based on Revit
CN110543710A (en) * 2019-08-23 2019-12-06 中国中材国际工程股份有限公司 Cement engineering three-dimensional nonstandard part design method based on Revit
CN110737932A (en) * 2019-08-29 2020-01-31 中建一局集团第二建筑有限公司 method for analyzing engineering temporary facility cost by using BIM model
CN112464341A (en) * 2020-11-25 2021-03-09 北京构力科技有限公司 Method and electronic device for arranging component subgraphs based on definable layout templates
CN116167728A (en) * 2023-04-26 2023-05-26 中国建筑西南设计研究院有限公司 BIM project information linkage realization method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104915524A (en) * 2015-07-07 2015-09-16 南通大学 BIM-based interior module group library construction method for building interior design
US20170053244A1 (en) * 2015-08-22 2017-02-23 Salim B. KHALIL Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
CN106777748A (en) * 2016-12-29 2017-05-31 天津市建筑设计院 The preparation method for going out figure project model based on Revit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104915524A (en) * 2015-07-07 2015-09-16 南通大学 BIM-based interior module group library construction method for building interior design
US20170053244A1 (en) * 2015-08-22 2017-02-23 Salim B. KHALIL Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
CN106777748A (en) * 2016-12-29 2017-05-31 天津市建筑设计院 The preparation method for going out figure project model based on Revit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘尚蔚等: "基于建筑信息模型技术的水电工程族库的构建", 《华北水利水电大学学报(社会科学版)》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490976A (en) * 2019-07-29 2019-11-22 兰州容大信息科技有限公司 Four electric equipment race library modeling methods and device based on BIM technology
CN110490976B (en) * 2019-07-29 2023-04-18 兰州容大信息科技有限公司 Four-electrical equipment family library modeling method and device based on BIM technology
CN110543708A (en) * 2019-08-21 2019-12-06 中国中材国际工程股份有限公司 Factory non-standard part material statistical method based on Revit
CN110543707A (en) * 2019-08-21 2019-12-06 中国中材国际工程股份有限公司 Plotting method for creating factory nonstandard parts based on Revit
CN110543707B (en) * 2019-08-21 2024-02-13 中国中材国际工程股份有限公司 Plotting method for creating factory non-standard components based on Revit
CN110543710A (en) * 2019-08-23 2019-12-06 中国中材国际工程股份有限公司 Cement engineering three-dimensional nonstandard part design method based on Revit
CN110737932A (en) * 2019-08-29 2020-01-31 中建一局集团第二建筑有限公司 method for analyzing engineering temporary facility cost by using BIM model
CN112464341A (en) * 2020-11-25 2021-03-09 北京构力科技有限公司 Method and electronic device for arranging component subgraphs based on definable layout templates
CN112464341B (en) * 2020-11-25 2024-02-02 北京构力科技有限公司 Method and electronic device for arranging component subgraphs based on definable layout templates
CN116167728A (en) * 2023-04-26 2023-05-26 中国建筑西南设计研究院有限公司 BIM project information linkage realization method and device
CN116167728B (en) * 2023-04-26 2023-09-15 中国建筑西南设计研究院有限公司 BIM project information linkage realization method and device

Similar Documents

Publication Publication Date Title
CN108520102A (en) A kind of facing based on BIM build fast method of construction
EP4044060A1 (en) Artificial intelligence-based method for generating multiple urban design solutions for regulatory plan plot
CN106960410A (en) Underground pipe gallery approaches to IM based on BIM and GIS technology
CN106844977A (en) A kind of town road BIM designs a model and GIS data integrated approach
CN113221224B (en) Forward design method and system for foundation pit support based on information model technology
CN205262429U (en) Job site earth volume survey system
CN108022296A (en) A kind of BIM interior decorations current floor and region design system and method
CN109886838A (en) Smart city operation management platform based on CIM
CN111125820A (en) BIM + GIS-based construction site space virtual construction method
Honcharenko et al. Information Tools for Project Management of the Building Territory at the Stage of Urban Planning.
Cao [Retracted] Application Research and Case Analysis of Landscape Design in Artificial Intelligence Platform
CN103699712A (en) Method for making mining extraction plan based on explosion unit bodies
Naik et al. GIS based 4D model development for planning and scheduling of a construction project
CN109145044A (en) One kind being based on many body system Fundamental Geographic Information Data benchmark model
Khronusov et al. Engineering geology software database for urban areas
CN105843975A (en) System and method for automatic processing of transformer station vertical design
CN116070311A (en) BIM forward design method for long and large bridge
CN112990866A (en) Method for controlling construction progress of slope engineering of water conservancy and hydropower engineering
Dorosh et al. Development of land management science in Ukraine: history, modernity, prospects
CN105259783A (en) Visual preview system for water-and-power engineering construction process
Turrina et al. The reconstruction of a dynamic inventory model toward shared HBIM libraries for vaulted systems
Rokos Conceptual modeling of real property objects for the Hellenic Cadastre
CN116630095B (en) Overall planning and planning method and system for automatic engineering construction total tasks
El Ayachi et al. Digital cadastral map, a multipurpose tool for sustainable development
Saputra et al. Digital Transformation: Elevating Landscape Architecture through Building Information Modeling (BIM)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180911