CN106777748A - The preparation method for going out figure project model based on Revit - Google Patents
The preparation method for going out figure project model based on Revit Download PDFInfo
- Publication number
- CN106777748A CN106777748A CN201611244364.XA CN201611244364A CN106777748A CN 106777748 A CN106777748 A CN 106777748A CN 201611244364 A CN201611244364 A CN 201611244364A CN 106777748 A CN106777748 A CN 106777748A
- Authority
- CN
- China
- Prior art keywords
- parameter
- view
- line
- project
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/451—Execution arrangements for user interfaces
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/12—Symbolic schematics
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Software Systems (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Computational Mathematics (AREA)
- Structural Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- Civil Engineering (AREA)
- Human Computer Interaction (AREA)
- Architecture (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of preparation method for going out figure project model based on Revit, comprise the following steps:I formulates naming rule, and II sets line width, and III sets line style, and IV sets the fill style, and V sets line pattern, and VI sets object style, and VII sets view model;VIII defines item argument and shared parameter, and VIII defines item argument and shared parameter, and IX presets component class race, X presets comments class race, and XI creates detail list pattern, and XII creates picture frame and title block, XIII preserves project boilerplate, and XIV is loading project boilerplate new projects are set up;The present invention is reset to elements such as line style, line widths, and convenient use person directly draws the construction drawing for meeting national standard, has unified the naming method of the elements such as component, view, facilitates using and searching for designer.The whole template design system perfect for designer provides, for the modeling of designer, work of charting provide standardization, the solution standardized.
Description
Technical field
The invention belongs to BIM areas of information technology, and in particular to the preparation method for going out figure project model based on Revit.
Background technology
BIM is BIM(Building Information Modeling), it is Building Engineering Design field
A kind of design meanses for developing rapidly in recent years, have been developed as independent educational project now.BIM is in China's construction
The three-dimensional visualization skill through the sustainable application of architectural engineering full lifetime being positioned in engineering based on digital information
Art management information assets.It is that China lives to build portion and requires the year two thousand twenty bottom major part technological means for needing to use of architectural engineering.
Used as one of BIM design softwares, Revit has the functions such as modeling, manufacture drawings.In the Revit softwares of acquiescence
In view model, the bivariate table such as line style, line width does not meet China up to the annotation pel such as related setting and linear dimension, word
Go out the code requirement of figure, it is impossible to go out standard compliant construction drawing.
The content of the invention
The present invention proposed to solve the problems, such as prior art, and a kind of figure is gone out based on Revit the purpose is to provide
The preparation method of project model.
The technical scheme is that:
A kind of preparation method for going out figure project model based on Revit, comprises the following steps:
I formulates naming rule:Name to user name, working set, race, view, view model in process of architecture design is carried out
Standardization is formulated;
II sets line width:Use " line width " in " management " interface to order the line width for setting and meeting figure demand, make the wheel of component
Profile is presented required fineness in construction drawing;
III sets line style:" line style pattern " in " management " interface is used to order newly-built line style, by setting line, point and sky
Between combination producing needed for line style;
IV sets the fill style:" the fill style " in " management " interface is used to order newly-built filling pattern, according to view, pel
Direction in the body layer of filling pattern is configured, by creating parallel lines, intersecting filling, filling line angle and line-spacing
From establishment the fill style simultaneously names preservation;
V sets line pattern:" line pattern " in " management " interface is used to order newly-built line pattern, newly-built subclass and to the son
Classification carries out the setting of line width, color and line style, completes the establishment of line pattern classification;
VI sets object style:" object style " order new Object pattern in " management " interface is used, it is newly-built and name right
Decent formula classification, is configured to projection line width, section line width, line color, line style pattern, material respectively, completes to decent
The establishment of formula;
VII sets view model:Into the view of model, ratio, view observability, code and the detailed journey of the view are set
Degree, uses from active view at " view "-" view model " interface and creates model " order New View model and name;
VIII defines item argument and shared parameter:" item argument " order add items parameter in " management " interface is used,
Defined in " parameter attribute " " parameter type ", " supplemental characteristic " and " classification ", wherein " parameter type " includes " item argument "
" shared parameter ", selects " item argument ", and " project data " includes:Title, code, parameter type, parameter packet mode, class
Type, example, alignment value mode, " classification " is the project category belonging to the item argument, and " project data " and " classification " is according to item
Mesh demand is defined respectively;Use " shared parameter " in " management " interface to order newly-built shared Parameter File, use and " edit shared
Parameter group is set up in parameter " order, the shared parameter corresponding with item argument defined in parameter group;In use " management " interface
It is fixed that " item argument " order is associated to item argument and shared parameter, wherein " parameter type " selection " shared parameter ";
IX presets component class race:Architectural discipline naming rule according to step I is respectively to architectural discipline, the system of structure discipline
Race, Wai Jian races carry out renaming and add items parameter, setting filling pattern;
X presets comments class race:To line style mark, word in System Families, axle network mark head, line symbol of deciding what is right and what is wrong in Wai Jian races, build
Building class door and window mark, structure class beam mark, structure class post mark, structure class formation base reference carries out meeting setting for figure requirement
Put.
XI creates detail list pattern:
Create detail list and the structure and information in model are entered into row-column list, inquiry is counted and built for calculation amount;In model
The detail list for architectural discipline, structure discipline is created, and item argument and shared parameter are set, make the parameter of detail list and structure
Build parameter linkage;Need to set detailed list sorting/building form according to figure is gone out;
XII creates picture frame and title block:
Create the title block of the picture frame and display project information for limiting drawing area;
XIII preserves project boilerplate;
XIV is loading project boilerplate new projects are set up, then complete design modeling, carries out out graphic operation, is conformed to
The drawing asked.
The present invention is reset to elements such as line style, line widths, and convenient use person directly draws and meets national standard
Construction drawing, unified the naming method of the elements such as component, view, facilitate using and searching for designer.Whole template is to set
Meter people provide perfect design system, for designer modeling, drawing work provide standardization, standardize solution party
Case.
Specific embodiment
Hereinafter, with reference to embodiment, the present invention is described in detail:
A kind of preparation method for going out figure project model based on Revit, comprises the following steps:
I formulates naming rule:Name to user name, working set, race, view, view model in process of architecture design is carried out
Standardization is formulated;
II sets line width:Line width represents the width of all component contour lines occurred in drawing and view, the wheel of different component
The wide fineness presented in construction drawing also can be different according to figure demand is gone out;Use " line width " in " management " interface
Order sets the line width for meeting figure demand, makes the contour line of component that required fineness be presented in construction drawing;
III sets line style:Line style represents the form in all drawings and view, such as solid line, dotted line, chain-dotted line, Yong Huke
Newly-built line style, self-defining line style pattern is used;Use " line style pattern " in " management " interface to order newly-built line style, lead to
Cross line style needed for the combination producing that line, point and space are set;
IV sets the fill style:The fill style is that the bivariate table of the surface of all of component and section in a model reaches and two dimension
The expression of the filling overlay pattern in modification, the fill style is mainly used in the display outward appearance of setting pel material, annotation filling
In the operation such as the pattern in region;" the fill style " in " management " interface is used to order newly-built filling pattern, according to view, pel
Direction in the body layer of filling pattern is configured, by creating parallel lines, intersecting filling, filling line angle and line-spacing
From establishment the fill style simultaneously names preservation;
V sets line pattern:Line pattern is the expression-form of all two dimension modification items for occurring in a model, it is stipulated that different
Virtual two-dimensional line uses which kind of line width and line style, except line width and line style, can also carry out the setting of line color, and line pattern can be
It is separately provided in view, the line being not provided with will use the global lines pattern of this step.Use " the line pattern " in " management " interface
Order newly-built line pattern, newly-built subclass simultaneously carries out the setting of line width, color and line style to the subclass, completes line pattern classification
Establishment;
VI sets object style:Object style is the expression-form of all component objects in a model, it is stipulated that all three-dimensional structures
The expression of the filling overlay pattern during the bivariate table of projection line width, line style and cutting plane corresponding to part is reached and two dimension is modified;
" object style " order new Object pattern in " management " interface is used, it is newly-built and name object style subclass, it is right respectively
Projection line width, section line width, line color, line style pattern, material are configured, and complete the establishment of object style;
VII sets view model:View is the product after model cutting, and all of component is all shown at cutting in model
Show, for the ease of display, user needs to be configured scale of view, code, the level of detail and observability etc., and these show
Show that rule can be stored as template, set is used other displays and required on consistent view, such to be shown for view
The template of setting is exactly view model;Into the view of model, the ratio of the view, view observability, code and in detail are set
Degree, uses from active view at " view "-" view model " interface and creates model " order New View model and name;
VIII defines item argument and shared parameter:Item argument is the information container of pel, can be with by defining item argument
The various characteristics of pel are defined, these characteristics can apply to the linkage of drawing picture frame and the tissue of Project browser.Definition
Item argument can be such that user is managed to pels such as view, drawings according to the plan of oneself, increased the spirit of project management
Activity.
Project information and item argument are directed to the setting that project cura specialis information in itself is organized and recorded, its
In content contain project issue date, project status, customer information, item address, project name, bullets, project
The information such as director, examination & verification, correction.This content should meet design side and go out relevant criterion in the administrative provisions of figure to be formulated.
Item argument can be only applied to inside project, if wanting for parameter to be applied to multiple projects, can be defined as altogether parameter
Enjoy parameter.The shared parameter can be imported and carry out self-defined by other projects, realize the shared of parameter.
, it is necessary to the condition such as the title of arrange parameter, type and classification in the definition procedure of item argument, and it can be item
The multiple classifications of mesh parameter selection.
Use " item argument " order add items parameter in " management " interface, " parameter defined in " parameter attribute "
Type ", " supplemental characteristic " and " classification ", wherein " parameter type " includes " item argument " and " shared parameter ", " project is joined for selection
Number ", " project data " includes:Title, code, parameter type, parameter packet mode, type, example, alignment value mode, " class
" project category belonging to the item argument is not it, " project data " and " classification " is defined respectively according to project demands;Use " pipe
" shared parameter " in reason " interface orders newly-built shared Parameter File, uses " the shared parameter of editor " order to set up parameter group,
Shared parameter corresponding with item argument defined in parameter group;Use " item argument " in " management " interface to order to join project
It is fixed that several and shared parameter is associated, wherein " parameter type " selection " shared parameter ";
IX presets component class race:Component class race refers mainly to the race of the entity pel component such as project Zhong Qiang, door, window, beam and plate.Structure
Jian Lei races are divided into System Families and Wai Jian races, and System Families are predefined and preservation race in the project, it is impossible to using loading race
Mode is loaded into project, and user can change the value of parameter in System Families, but cannot change the form and quantity of parameter.Build outward
Race is directed into project by race's file, and user can externally build race and carry out the editor of outward appearance and parameter.According to specialty
Difference, default structure class race is also different in project model.
Architectural discipline naming rule according to step I is carried out to architectural discipline, the System Families of structure discipline, Wai Jian races respectively
Renaming and add items parameter, setting filling pattern;
X presets comments class race:Comments class race mainly including linear dimension, element numeral, word and symbol etc. with draw construction drawing
Related symbol, before using comments class race, it should be understood that the purposes of each comments class race, every drawing makes on comments class race
With to there is unified standard, identical with class race is built, user can also carry out self-defined to comments class race;
To line style mark, word in System Families, axle network mark head, line symbol of deciding what is right and what is wrong, Building class the door and window mark in Wai Jian races, knot
Structure class beam mark, structure class post mark, structure class formation base reference carry out meeting the setting of figure requirement;
XI creates detail list pattern:
Detail list is used to for the component in model and required information to enter row-column list, facilitates user to carry out calculation amount statistics and component
The elements such as inquiry, content, sortord and filter condition that user can according to demand in self-defined detail list, in project model
In, can preset detail list pattern according to demand, the information that user is concerned about can be at any time checked so during model buildings, and
The work such as the change, the communication that are designed in time according to information;
Create detail list and the structure and information in model are entered into row-column list, inquiry is counted and built for calculation amount;In model
The detail list for architectural discipline, structure discipline is created, and item argument and shared parameter are set, make the parameter of detail list and structure
Build parameter linkage;Need to set detailed list sorting/building form according to figure is gone out;
XII creates picture frame and title block:
Picture frame is the figure for limiting drawing area, is made up of some lines.All drawings must be positioned within picture frame, must not
There is the situation for contacting or intersecting with picture frame line;Title block is the label of reaction project information in picture frame, such as project name, engineering name
Title, designing unit etc., title block can then realize the linkage with parameter, and the value of the settable parameter of user is simultaneously reflected in these parameters
In title block;
Create the title block of the picture frame and display project information for limiting drawing area;
XIII preserves project boilerplate;The project model that will be made by abovementioned steps saves as project boilerplate.
XIV is loaded into project boilerplate, then complete design modeling when new projects are set up, and carries out out graphic operation, is accorded with
Close desired drawing.
The naming rule of the step I includes:
A Revit user name naming rules:" specialty "-" name or soundex code ";
B working set naming rules:Architectural discipline is " specialty "-" name "-" district system "-" number of plies ", and structure discipline is for " specially
Industry "-" region and content ";
C races naming rule:
Architectural discipline System Families are " design side's title "-" component classification "-" material containing parameter ",
Architectural discipline builds race for " design side's title "-" door type title "-" size " outdoors,
Architectural discipline builds race for " design side's title "-" window typonym "-" size " outside window,
Architectural discipline hole Wai Jian races are " design side's title "-" dimension of opening ",
Structure discipline System Families are:" design side's title "-" component classification and thickness "-" material(Concrete grade)",
Structure discipline Wai Jian races are:" design side's title "-" component classification and section "-" material(Concrete grade)”;
D view naming rules:
In a " checking model " view-set:01+ " floor " is constituted, such as:The 01- first floors,
In b " working model " view-set:02+ " floor "+" remarks " are constituted, such as:The 02- first floors, or the 02- first floors -01(01 is special
Industry director or designer's code name).
In c " going out graph model " view-set:" map title ", such as " initial layer structure floor plan " " supplementary document " view-set
In:" map title ".Such as " structure design leader ", " connection detail ".
E view model naming rules:" enterprise's abbreviation "-" content and scale of view ".
The step XII creates picture frame and comprises the following steps with title block:
F sets up picture frame race;
CAD diagram frame is imported Revit by G;
H draws the housing of picture frame according to CAD base maps;
I places word with label and relevant parameter in specified location;
The newly-built drawings of J are simultaneously loaded into picture frame race.
The step XIII sets up paper organization way to manage and comprises the following steps:
K creates browser organizational form;
Drawing is positioned over assigned catalogue by L.
Classification Management can also be carried out to drawing by setting up paper organization way to manage.For some larger engineerings,
Drawing quantity is more.In this case be accomplished by carrying out Classification Management to drawing, in order to search etc. operation, drawing point
Class main " browser tissue " functional realiey by Project browser of management;By the browser tissue in Project browser
The Classification Management of drawing is realized in order.
The present invention is reset to elements such as line style, line widths, and convenient use person directly draws and meets national standard
Construction drawing, unified the naming method of the elements such as component, view, facilitate using and searching for designer.Whole template is to set
Meter people provide perfect design system, for designer modeling, drawing work provide standardization, standardize solution party
Case.
Claims (5)
1. a kind of preparation method for going out figure project model based on Revit, comprises the following steps:
I formulates naming rule:Name to user name, working set, race, view, view model in process of architecture design is carried out
Standardization is formulated;
II sets line width:Use " line width " in " management " interface to order the line width for setting and meeting figure demand, make the wheel of component
Profile is presented required fineness in construction drawing;
III sets line style:" line style pattern " in " management " interface is used to order newly-built line style, by setting line, point and sky
Between combination producing needed for line style;
IV sets the fill style:" the fill style " in " management " interface is used to order newly-built filling pattern, according to view, pel
Direction in the body layer of filling pattern is configured, by creating parallel lines, intersecting filling, filling line angle and line-spacing
From establishment the fill style simultaneously names preservation;
V sets line pattern:" line pattern " in " management " interface is used to order newly-built line pattern, newly-built subclass and to the son
Classification carries out the setting of line width, color and line style, completes the establishment of line pattern classification;
VI sets object style:" object style " order new Object pattern in " management " interface is used, it is newly-built and name right
Decent formula classification, is configured to projection line width, section line width, line color, line style pattern, material respectively, completes to decent
The establishment of formula;
VII sets view model:Into the view of model, ratio, view observability, code and the detailed journey of the view are set
Degree, uses from active view at " view "-" view model " interface and creates model " order New View model and name;
VIII defines item argument and shared parameter:" item argument " order add items parameter in " management " interface is used,
Defined in " parameter attribute " " parameter type ", " supplemental characteristic " and " classification ", wherein " parameter type " includes " item argument "
" shared parameter ", selects " item argument ", and " project data " includes:Title, code, parameter type, parameter packet mode, class
Type, example, alignment value mode, " classification " is the project category belonging to the item argument, and " project data " and " classification " is according to item
Mesh demand is defined respectively;Use " shared parameter " in " management " interface to order newly-built shared Parameter File, use and " edit shared
Parameter group is set up in parameter " order, the shared parameter corresponding with item argument defined in parameter group;In use " management " interface
It is fixed that " item argument " order is associated to item argument and shared parameter, wherein " parameter type " selection " shared parameter ";
IX presets component class race:Architectural discipline naming rule according to step I is respectively to architectural discipline, the system of structure discipline
Race, Wai Jian races carry out renaming and add items parameter, setting filling pattern;
X presets comments class race:To line style mark, word in System Families, axle network mark head, line symbol of deciding what is right and what is wrong in Wai Jian races, build
Building class door and window mark, structure class beam mark, structure class post mark, structure class formation base reference carries out meeting setting for figure requirement
Put;
XI creates detail list pattern:
Create detail list and the structure and information in model are entered into row-column list, inquiry is counted and built for calculation amount;In model
The detail list for architectural discipline, structure discipline is created, and item argument and shared parameter are set, make the parameter of detail list and structure
Build parameter linkage;Need to set detailed list sorting/building form according to figure is gone out;
XII creates picture frame and title block:
Create the title block of the picture frame and display project information for limiting drawing area;
XIII preserves project boilerplate;
XIV is loading project boilerplate new projects are set up, then complete design modeling, carries out out graphic operation, is conformed to
The drawing asked.
2. the preparation method for going out figure project model based on Revit according to claim 1, it is characterised in that:The step
The naming rule of rapid I includes:
A Revit user name naming rules:" specialty "-" name or soundex code ";
B working set naming rules:Architectural discipline is " specialty "-" name "-" district system "-" number of plies ", and structure discipline is for " specially
Industry "-" region and content ";
C races naming rule:
Architectural discipline System Families are " design side's title "-" component classification "-" material containing parameter ",
Architectural discipline builds race for " design side's title "-" door type title "-" size " outdoors,
Architectural discipline builds race for " design side's title "-" window typonym "-" size " outside window,
Architectural discipline hole Wai Jian races are " design side's title "-" dimension of opening ",
Structure discipline System Families are:" design side's title "-" component classification and thickness "-" material(Concrete grade)",
Structure discipline Wai Jian races are:" design side's title "-" component classification and section "-" material(Concrete grade)”;
D view naming rules:
In a " checking model " view-set:01+ " floor " is constituted, such as:The 01- first floors,
In b " working model " view-set:02+ " floor "+" remarks " are constituted, such as:The 02- first floors, or the 02- first floors -01(01 is special
Industry director or designer's code name);
In c " going out graph model " view-set:In " map title ", such as " initial layer structure floor plan " " supplementary document " view-set:" figure
Name ";
Such as " structure design leader ", " connection detail ";
E view model naming rules:" enterprise's abbreviation "-" content and scale of view ".
3. the preparation method for going out figure project model based on Revit according to claim 1, it is characterised in that:The step
Rapid XII creates picture frame and comprises the following steps with title block:
F sets up picture frame race;
CAD diagram frame is imported Revit by G;
H draws the housing of picture frame according to CAD base maps;
I places word with label and relevant parameter in specified location;
The newly-built drawings of J are simultaneously loaded into picture frame race.
4. the preparation method for going out figure project model based on Revit according to claim 1, it is characterised in that:The step
Rapid XIII sets up paper organization way to manage and comprises the following steps:
K creates browser organizational form;
Drawing is positioned over assigned catalogue by L.
5. the preparation method for going out figure project model based on Revit according to claim 1, it is characterised in that:Described
Preparation method also includes:Paper organization way to manage is set up, drawing is realized by the browser organizational command in Project browser
Classification Management.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611244364.XA CN106777748A (en) | 2016-12-29 | 2016-12-29 | The preparation method for going out figure project model based on Revit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611244364.XA CN106777748A (en) | 2016-12-29 | 2016-12-29 | The preparation method for going out figure project model based on Revit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106777748A true CN106777748A (en) | 2017-05-31 |
Family
ID=58927848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611244364.XA Pending CN106777748A (en) | 2016-12-29 | 2016-12-29 | The preparation method for going out figure project model based on Revit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106777748A (en) |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108268707A (en) * | 2017-12-31 | 2018-07-10 | 安徽马钢工程技术集团有限公司 | A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT |
CN108280276A (en) * | 2018-01-09 | 2018-07-13 | 上海大学 | It is created and dosage statistical method based on Revit software stair model criterias |
CN108304636A (en) * | 2018-01-25 | 2018-07-20 | 浙江东南建筑设计有限公司 | BIM family parameter systems |
CN108427785A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | A kind of method and device of the X-Y scheme automatic marking based on BIM |
CN108520102A (en) * | 2018-03-13 | 2018-09-11 | 中天西北建设投资集团有限公司 | A kind of facing based on BIM build fast method of construction |
CN109344458A (en) * | 2018-09-11 | 2019-02-15 | 羊兆亮 | Method and apparatus based on REVIT design software statistical engineering amount |
CN109597820A (en) * | 2018-12-07 | 2019-04-09 | 万翼科技有限公司 | Customer information synchronous method, device and computer readable storage medium |
CN109934894A (en) * | 2019-03-14 | 2019-06-25 | 中民筑友科技投资有限公司 | A kind of CAD goes out drawing method, device and computer readable storage medium |
CN110471892A (en) * | 2019-08-06 | 2019-11-19 | 纬衡浩建科技(深圳)有限公司 | Revit file data collection method and relevant apparatus |
CN110543707A (en) * | 2019-08-21 | 2019-12-06 | 中国中材国际工程股份有限公司 | Plotting method for creating factory nonstandard parts based on Revit |
CN110543710A (en) * | 2019-08-23 | 2019-12-06 | 中国中材国际工程股份有限公司 | Cement engineering three-dimensional nonstandard part design method based on Revit |
CN110704046A (en) * | 2019-09-23 | 2020-01-17 | 中国建筑第八工程局有限公司 | Modified method for processing Revit views and filter graphs |
CN110795784A (en) * | 2019-10-08 | 2020-02-14 | 上海建工五建集团有限公司 | Electromechanical modeling method and system |
CN111597600A (en) * | 2020-05-26 | 2020-08-28 | 广州优比建筑咨询有限公司 | BIM forward design chart system based on Revit |
CN111813738A (en) * | 2020-08-20 | 2020-10-23 | 深圳须弥云图空间科技有限公司 | Data conversion method, data downloading method and related device |
CN112365590A (en) * | 2020-12-12 | 2021-02-12 | 同济大学建筑设计研究院(集团)有限公司 | Drawing generation method and device, computer equipment and storage medium |
CN112464350A (en) * | 2020-12-14 | 2021-03-09 | 四川蓉信开工程设计有限公司 | Intelligent design method for rapidly generating three-dimensional models of column net and main beam |
CN112948940A (en) * | 2021-03-15 | 2021-06-11 | 中国建筑第八工程局有限公司 | Refined template amount calculation method based on BIM in bidding stage |
CN113326595A (en) * | 2021-06-17 | 2021-08-31 | 中铁八局集团建筑工程有限公司 | Electromechanical filter template rapid generation method, system, equipment and storage medium |
CN113392454A (en) * | 2021-06-11 | 2021-09-14 | 中国中材国际工程股份有限公司 | Method for batch signature and PDF drawing printing based on Revit |
CN113553453A (en) * | 2021-07-20 | 2021-10-26 | 广联达科技股份有限公司 | Two-dimensional drawing marking method and device and electronic equipment |
CN113742831A (en) * | 2021-09-15 | 2021-12-03 | 云南省设计院集团有限公司 | Method for creating heating and ventilation professional template file based on BIM design |
CN114297765A (en) * | 2022-01-20 | 2022-04-08 | 中建八局天津建设工程有限公司 | Method for penetrating through whole decoration design process by utilizing BIM technology |
CN115439023A (en) * | 2022-11-08 | 2022-12-06 | 壹仟零壹艺网络科技(北京)有限公司 | BIM technology-based application method of distribution box/cabinet in operation management stage |
CN115618468A (en) * | 2022-10-24 | 2023-01-17 | 广州优比建筑咨询有限公司 | Door and window thumbnail rapid plotting method based on Revit, storage medium and equipment |
CN116167728A (en) * | 2023-04-26 | 2023-05-26 | 中国建筑西南设计研究院有限公司 | BIM project information linkage realization method and device |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104252558A (en) * | 2014-07-02 | 2014-12-31 | 哈尔滨工业大学 | BIM (Building Information Modeling) platform-based numerical control machining pretreatment method of non-standard building enclosure component |
-
2016
- 2016-12-29 CN CN201611244364.XA patent/CN106777748A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104252558A (en) * | 2014-07-02 | 2014-12-31 | 哈尔滨工业大学 | BIM (Building Information Modeling) platform-based numerical control machining pretreatment method of non-standard building enclosure component |
Non-Patent Citations (6)
Title |
---|
刘涛等: "水泥工厂三维设计中创建参数化族的方法", 《水泥工程》 * |
张丹: "铝合金模板支撑体系中BIM技术的应用价值", 《四川建筑科学研究》 * |
文档分享: "revit样板文件定制", 《豆丁在线公开:HTTPS://WWW.DOCIN.COM/P-1774043136.HTML》 * |
欧特克软件(中国)有限公司上海分公司构建开发组: "《Autodesk Revit MEP 2011应用宝典》", 31 October 2010, 同济大学出版社 * |
欧特克软件(中国)有限公司构建开发组: "《Autodesk Revit 2014五天建筑达人速成》", 30 April 2014, 同济大学出版社 * |
董爱平: "基于Revit的结构平法施工图运用研究", 《土木建筑工程信息技术》 * |
Cited By (37)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108427785A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | A kind of method and device of the X-Y scheme automatic marking based on BIM |
CN108268707A (en) * | 2017-12-31 | 2018-07-10 | 安徽马钢工程技术集团有限公司 | A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT |
CN108268707B (en) * | 2017-12-31 | 2021-08-06 | 马钢集团设计研究院有限责任公司 | ReVIT-based transfer station standard template drawing method and transfer station construction method |
CN108280276A (en) * | 2018-01-09 | 2018-07-13 | 上海大学 | It is created and dosage statistical method based on Revit software stair model criterias |
CN108280276B (en) * | 2018-01-09 | 2022-02-08 | 上海大学 | Revit software based stair model standard creation and usage statistical method |
CN108304636A (en) * | 2018-01-25 | 2018-07-20 | 浙江东南建筑设计有限公司 | BIM family parameter systems |
CN108520102A (en) * | 2018-03-13 | 2018-09-11 | 中天西北建设投资集团有限公司 | A kind of facing based on BIM build fast method of construction |
CN109344458A (en) * | 2018-09-11 | 2019-02-15 | 羊兆亮 | Method and apparatus based on REVIT design software statistical engineering amount |
CN109597820A (en) * | 2018-12-07 | 2019-04-09 | 万翼科技有限公司 | Customer information synchronous method, device and computer readable storage medium |
CN109597820B (en) * | 2018-12-07 | 2022-03-15 | 万翼科技有限公司 | Client information synchronization method, device and computer readable storage medium |
CN109934894A (en) * | 2019-03-14 | 2019-06-25 | 中民筑友科技投资有限公司 | A kind of CAD goes out drawing method, device and computer readable storage medium |
CN109934894B (en) * | 2019-03-14 | 2022-11-15 | 中民筑友科技投资有限公司 | CAD (computer-aided design) drawing method and device and computer-readable storage medium |
CN110471892A (en) * | 2019-08-06 | 2019-11-19 | 纬衡浩建科技(深圳)有限公司 | Revit file data collection method and relevant apparatus |
CN110471892B (en) * | 2019-08-06 | 2023-04-07 | 纬衡浩建科技(深圳)有限公司 | Revit file data collection method and related device |
CN110543707A (en) * | 2019-08-21 | 2019-12-06 | 中国中材国际工程股份有限公司 | Plotting method for creating factory nonstandard parts based on Revit |
CN110543707B (en) * | 2019-08-21 | 2024-02-13 | 中国中材国际工程股份有限公司 | Plotting method for creating factory non-standard components based on Revit |
CN110543710A (en) * | 2019-08-23 | 2019-12-06 | 中国中材国际工程股份有限公司 | Cement engineering three-dimensional nonstandard part design method based on Revit |
CN110704046B (en) * | 2019-09-23 | 2022-11-25 | 中建八局科技建设有限公司 | Modified method for processing Revit views and filter graphs |
CN110704046A (en) * | 2019-09-23 | 2020-01-17 | 中国建筑第八工程局有限公司 | Modified method for processing Revit views and filter graphs |
CN110795784A (en) * | 2019-10-08 | 2020-02-14 | 上海建工五建集团有限公司 | Electromechanical modeling method and system |
CN111597600B (en) * | 2020-05-26 | 2021-02-02 | 广州优比建筑咨询有限公司 | BIM forward design chart system based on Revit |
CN111597600A (en) * | 2020-05-26 | 2020-08-28 | 广州优比建筑咨询有限公司 | BIM forward design chart system based on Revit |
CN111813738A (en) * | 2020-08-20 | 2020-10-23 | 深圳须弥云图空间科技有限公司 | Data conversion method, data downloading method and related device |
CN112365590A (en) * | 2020-12-12 | 2021-02-12 | 同济大学建筑设计研究院(集团)有限公司 | Drawing generation method and device, computer equipment and storage medium |
CN112464350A (en) * | 2020-12-14 | 2021-03-09 | 四川蓉信开工程设计有限公司 | Intelligent design method for rapidly generating three-dimensional models of column net and main beam |
CN112464350B (en) * | 2020-12-14 | 2023-08-25 | 四川蓉信开工程设计有限公司 | Intelligent design method for rapidly generating three-dimensional model of column net and main beam |
CN112948940A (en) * | 2021-03-15 | 2021-06-11 | 中国建筑第八工程局有限公司 | Refined template amount calculation method based on BIM in bidding stage |
CN113392454A (en) * | 2021-06-11 | 2021-09-14 | 中国中材国际工程股份有限公司 | Method for batch signature and PDF drawing printing based on Revit |
CN113326595A (en) * | 2021-06-17 | 2021-08-31 | 中铁八局集团建筑工程有限公司 | Electromechanical filter template rapid generation method, system, equipment and storage medium |
CN113553453A (en) * | 2021-07-20 | 2021-10-26 | 广联达科技股份有限公司 | Two-dimensional drawing marking method and device and electronic equipment |
CN113742831A (en) * | 2021-09-15 | 2021-12-03 | 云南省设计院集团有限公司 | Method for creating heating and ventilation professional template file based on BIM design |
CN114297765A (en) * | 2022-01-20 | 2022-04-08 | 中建八局天津建设工程有限公司 | Method for penetrating through whole decoration design process by utilizing BIM technology |
CN115618468A (en) * | 2022-10-24 | 2023-01-17 | 广州优比建筑咨询有限公司 | Door and window thumbnail rapid plotting method based on Revit, storage medium and equipment |
CN115618468B (en) * | 2022-10-24 | 2023-09-29 | 广州优比建筑咨询有限公司 | Revit-based door and window large-scale pattern rapid drawing method, storage medium and equipment |
CN115439023A (en) * | 2022-11-08 | 2022-12-06 | 壹仟零壹艺网络科技(北京)有限公司 | BIM technology-based application method of distribution box/cabinet in operation management stage |
CN116167728A (en) * | 2023-04-26 | 2023-05-26 | 中国建筑西南设计研究院有限公司 | BIM project information linkage realization method and device |
CN116167728B (en) * | 2023-04-26 | 2023-09-15 | 中国建筑西南设计研究院有限公司 | BIM project information linkage realization method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106777748A (en) | The preparation method for going out figure project model based on Revit | |
KR101909996B1 (en) | Construction Quantity take-off system based on the BIM and method therefor | |
US7200564B2 (en) | Systems and methods for dynamic pricing events in collaborative design, construction, and maintenance of fluid processing plants | |
US6542937B1 (en) | Apparatus and method for transferring and editing sheet metal part data | |
US8578262B2 (en) | Cad-interfaced, automated system for assisting the architectural process | |
US7099725B2 (en) | Alternate ply representation for composite design and manufacturing | |
US20080071562A1 (en) | Tracking and Reporting Construction, Completion, and Inspection Status | |
Ossher et al. | Flexible modeling tools for pre-requirements analysis: conceptual architecture and research challenges | |
JPH09326046A (en) | Three-dimensional cad system, three-dimensional model generating method, and storage medium for three-dimensional model generation | |
US20100114355A1 (en) | Method and system for management of manufacturing information | |
US7949690B2 (en) | Project structure | |
Staub-French et al. | Linear scheduling and 4D visualization | |
CN106844885A (en) | Picture frame title block method for designing based on BIM technology | |
Fernandes | Advantages and disadvantages of BIM platforms on construction site | |
CN111340454A (en) | Enterprise homework certificate safety management method | |
CN112989448A (en) | Collaborative design system | |
Samphaongoen | A visual approach to construction cost estimating | |
CN109344458A (en) | Method and apparatus based on REVIT design software statistical engineering amount | |
US20040236754A1 (en) | Method and system for linking data across multiple files | |
CN116485102A (en) | Building surface area material quantity accurate calculation method based on BIM technology | |
Shih | A study of 2D-and 3D-oriented architectural drawing production methods | |
CN115688232A (en) | REVIT-based woodworking sample reproduction and plotting method | |
JP4363923B2 (en) | 3D layout adjustment CAD quantity totaling device, quantity totaling program, and quantity totalizing method | |
CN113051648A (en) | Color plane scheme generation system and method based on known house type | |
US7415674B1 (en) | Method and system for editing an electronic drawing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |