CN108517884A - 一种桥梁基础钢板桩围堰施工方法及其临时支撑结构 - Google Patents
一种桥梁基础钢板桩围堰施工方法及其临时支撑结构 Download PDFInfo
- Publication number
- CN108517884A CN108517884A CN201810240033.1A CN201810240033A CN108517884A CN 108517884 A CN108517884 A CN 108517884A CN 201810240033 A CN201810240033 A CN 201810240033A CN 108517884 A CN108517884 A CN 108517884A
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- pile
- steel
- temporary support
- sheet pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明公开了一种桥梁基础钢板桩围堰施工方法及其临时支撑结构,属于桥梁工程领域,方法具体步骤为:安装钢板桩围堰与结构支撑;基坑抽水至底板以上约20cm位置;安装支撑于钢护筒上的临时支撑;基坑继续抽水至泥面,清理至封底混凝土底标高;浇筑封底混凝土;待封底混凝土达到设计强度后,拆除支撑于钢护筒上的临时支撑;割除承台范围内多余钢护筒,清理桩头,施工承台。临时支撑结构,包括钢板桩与结构支撑,还包括若干根支撑梁,各支撑梁分别连接支撑于最外圈的各钢护筒与钢板桩内壁之间,支撑梁水平垂直于钢护筒与钢板桩内壁之间。本发明可以有效地在桥梁基础钢板桩围堰施工中,便于围堰干封底,控制围堰底部变形。
Description
技术领域
本发明属于桥梁工程领域,具体涉及桥梁基础钢板桩围堰施工。
背景技术
在水上桥梁施工中,在水深3m-8m间,采用钢板桩围堰作为承台施工挡水结构的施工方法非常常见。围堰封底有水下封底和干封底两种,就水下封底而言,在不抽水条件下,进行水下封底混凝土灌注,待封底混凝土达到设计强度后抽水,该方法的缺点是“需要搭设大规模的水下封底施工平台,且需要耗用较长的工期,施工组织难度大,施工周期长,施工成本高”。就干封底而言,需要抽水到泥面,后进行清泥处理,一般施工方法条件下,若不设置多道支撑结构,因钢板桩围堰在抽水过程中会发生较大变形,导致钢板桩锁口漏水,而难以顺利抽水到泥面,进而使得干封底方案无法成功实施,而若设置多道结构支撑,则临时材料投入量较大,施工成本较高。
发明内容
本发明的目的在于:提出一种桥梁基础钢板桩围堰施工方法及其临时支撑结构,可以有效地在桥梁基础钢板桩围堰施工中,便于围堰干封底,控制围堰底部变形。
本发明目的通过下述技术方案来实现:
一种桥梁基础钢板桩围堰施工方法,具体步骤为:
第一步:安装钢板桩围堰与结构支撑;
第二步:基坑抽水至底板以上20cm±10cm位置;安装支撑于钢护筒上的临时支撑;
第三步:基坑继续抽水至泥面,清理至封底混凝土底标高;浇筑封底混凝土;
第四步:待封底混凝土达到设计强度后,拆除支撑于钢护筒上的临时支撑;
第五步:割除承台范围内多余钢护筒,清理桩头,施工承台。
作为选择,临时支撑包括若干根支撑梁,各支撑梁分别连接支撑于最外圈的各钢护筒与钢板桩内壁之间,支撑梁水平垂直于钢护筒与钢板桩内壁之间。
作为选择,临时支撑设于封底混凝土顶面50-80cm位置。
一种用于前述桥梁基础钢板桩围堰施工方法的临时支撑结构,包括钢板桩与结构支撑,还包括若干根支撑梁,各支撑梁分别连接支撑于最外圈的各钢护筒与钢板桩围堰之间,支撑梁水平垂直于钢护筒与钢板桩内壁之间。
作为选择,临时支撑设于封底混凝土顶面50-80cm位置。
前述本发明主方案及其各进一步选择方案可以自由组合以形成多个方案,均为本发明可采用并要求保护的方案;且本发明,(各非冲突选择)选择之间以及和其他选择之间也可以自由组合。本领域技术人员在了解本发明方案后根据现有技术和公知常识可明了有多种组合,均为本发明所要保护的技术方案,在此不做穷举。
本发明的有益效果:本发明中,根据钢板桩围堰施工阶段特点,为便于围堰干封底,控制围堰底部变形,在封底混凝土顶面约50-80cm左右位置设置一道支撑于钢护筒上的临时支撑,该临时支撑在抽水到该位置后进行安装,以阻止钢板桩围堰在继续抽水过程中发生进一步的变形,防止围堰变形过大而导致锁口漏水,同时提高钢板桩围堰结构的安全可靠性。该支撑于钢护筒上的临时支撑,在钢板桩围堰干封底施工完成后拆除,相当于“临时起到代替围堰封底混凝土支撑”的效果。
附图说明
图1是本发明实施例的施工方法的步骤一示意图;
图2是本发明实施例的施工方法的步骤二示意图;
图3是本发明实施例的施工方法的步骤三示意图;
图4是本发明实施例的施工方法的步骤四示意图;
图5是本发明实施例的施工方法的步骤五示意图;
图6是本发明实施例的临时支撑结构的立面结构示意图;
图7是图6的A-A视图;
图8是图6的B-B视图;
其中1为钢板桩、2为结构支撑、3为基坑、4为底板、5为钢护筒、6为临时支撑、7为封底混凝土、8为承台。
具体实施方式
下列非限制性实施例用于说明本发明。
一种桥梁基础钢板桩围堰施工方法,具体步骤为:
参考图1所示,第一步:安装钢板桩1围堰与结构支撑2;
参考图2所示,第二步:基坑3抽水至底板4以上20cm±10cm位置;安装支撑于钢护筒5上的临时支撑6;
参考图3所示,第三步:基坑3继续抽水至泥面,清理至封底混凝土7底标高;浇筑封底混凝土7;
参考图4所示,第四步:待封底混凝土7达到设计强度后,拆除支撑于钢护筒5上的临时支撑6;
参考图5所示,第五步:割除承台8范围内多余钢护筒5,清理桩头,施工承台8。
参考图6-8所示,一种用于前述桥梁基础钢板桩围堰施工方法的临时支撑结构,包括钢板桩1与结构支撑2,还包括临时支撑6,临时支撑6设于封底混凝土7顶面50-80cm位置,临时支撑6包括若干根支撑梁,各支撑梁分别连接支撑于最外圈的各钢护筒5与钢板桩1内壁之间,支撑梁水平垂直于钢护筒5与钢板桩1内壁之间。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (5)
1.一种桥梁基础钢板桩围堰施工方法,其特征在于具体步骤为:
第一步:安装钢板桩围堰与结构支撑;
第二步:基坑抽水至底板以上20cm±10cm位置;安装支撑于钢护筒上的临时支撑;
第三步:基坑继续抽水至泥面,清理至封底混凝土底标高;浇筑封底混凝土;
第四步:待封底混凝土达到设计强度后,拆除支撑于钢护筒上的临时支撑;
第五步:割除承台范围内多余钢护筒,清理桩头,施工承台。
2.如权利要求1所述的桥梁基础钢板桩围堰施工方法,其特征在于:临时支撑包括若干根支撑梁,各支撑梁分别连接支撑于最外圈的各钢护筒与钢板桩内壁之间,支撑梁水平垂直于钢护筒与钢板桩内壁之间。
3.如权利要求1所述的桥梁基础钢板桩围堰施工方法,其特征在于:临时支撑设于封底混凝土顶面50-80cm位置。
4.一种用于权利要求1、2或3中所述的桥梁基础钢板桩围堰施工方法的临时支撑结构,包括钢板桩与结构支撑,其特征在于:还包括若干根支撑梁,各支撑梁分别连接支撑于最外圈的各钢护筒与钢板桩内壁之间,支撑梁水平垂直于钢护筒与钢板桩内壁之间。
5.如权利要求4所述的临时支撑结构,其特征在于:临时支撑设于封底混凝土顶面50-80cm位置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810240033.1A CN108517884A (zh) | 2018-03-22 | 2018-03-22 | 一种桥梁基础钢板桩围堰施工方法及其临时支撑结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810240033.1A CN108517884A (zh) | 2018-03-22 | 2018-03-22 | 一种桥梁基础钢板桩围堰施工方法及其临时支撑结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108517884A true CN108517884A (zh) | 2018-09-11 |
Family
ID=63432943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810240033.1A Pending CN108517884A (zh) | 2018-03-22 | 2018-03-22 | 一种桥梁基础钢板桩围堰施工方法及其临时支撑结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108517884A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112482413A (zh) * | 2020-11-11 | 2021-03-12 | 江苏玖沐精工装备科技有限公司 | 一种基于拉森钢板桩的新型钢吊箱围堰制造工艺 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10168890A (ja) * | 1996-12-13 | 1998-06-23 | Toa Harbor Works Co Ltd | 構造物の水中部周囲の止水方法及び装置 |
CN202194143U (zh) * | 2011-09-02 | 2012-04-18 | 中铁上海工程局有限公司 | 深水中围堰钢板桩插打导向结构 |
CN104196042A (zh) * | 2014-08-15 | 2014-12-10 | 中国建筑第六工程局有限公司 | 一种钢板桩围堰结构施工方法 |
CN104805854A (zh) * | 2015-04-29 | 2015-07-29 | 中铁四局集团第二工程有限公司 | 一种潮汐环境下深水超长钢板桩围堰施工方法 |
-
2018
- 2018-03-22 CN CN201810240033.1A patent/CN108517884A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10168890A (ja) * | 1996-12-13 | 1998-06-23 | Toa Harbor Works Co Ltd | 構造物の水中部周囲の止水方法及び装置 |
CN202194143U (zh) * | 2011-09-02 | 2012-04-18 | 中铁上海工程局有限公司 | 深水中围堰钢板桩插打导向结构 |
CN104196042A (zh) * | 2014-08-15 | 2014-12-10 | 中国建筑第六工程局有限公司 | 一种钢板桩围堰结构施工方法 |
CN104805854A (zh) * | 2015-04-29 | 2015-07-29 | 中铁四局集团第二工程有限公司 | 一种潮汐环境下深水超长钢板桩围堰施工方法 |
Non-Patent Citations (1)
Title |
---|
中国水利水电第十一工程局有限公司编著: "《高速铁路工程项目手册》", 31 October 2012, 中国铁道出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112482413A (zh) * | 2020-11-11 | 2021-03-12 | 江苏玖沐精工装备科技有限公司 | 一种基于拉森钢板桩的新型钢吊箱围堰制造工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203320532U (zh) | 一种紧邻深基坑附近桩基防护装置 | |
CN103255772A (zh) | 优化深基坑换撑施工顺序的施工方法 | |
CN102653945A (zh) | 基础托换结构及其施工方法 | |
CN204738302U (zh) | 一种多层框架式双排桩支护结构 | |
CN103485805B (zh) | 钢管混凝土支架断面及注浆口和排气孔结构 | |
CN102888848A (zh) | 一种控制基坑稳定性的支护结构 | |
CN108517884A (zh) | 一种桥梁基础钢板桩围堰施工方法及其临时支撑结构 | |
CN105926630B (zh) | 一种加快深大地下结构施工的环形换撑及跳仓施工方法 | |
CN204825923U (zh) | 一种接力式基坑支护结构 | |
CN207525758U (zh) | 一种加强型基坑排桩支护结构 | |
CN202416324U (zh) | 基坑工程逆梁顺板施工叠加梁板结构 | |
CN212175798U (zh) | 一种深基坑整体支撑装置 | |
CN101979777B (zh) | 一种现浇空芯方桩的组合型地下连续墙板的施工方法 | |
CN103437360B (zh) | 一种深基坑工程中的不换撑施工方法 | |
JP2009127251A (ja) | 建造物の建て替え方法 | |
JP2002364006A (ja) | 水中基礎の構築工法 | |
CN211287583U (zh) | 一种钻孔桩沉渣盘 | |
JP2004339695A (ja) | スカート・サクション基礎構造体 | |
CN211340879U (zh) | 一种室内回填土底板堵漏结构 | |
CN103993612B (zh) | 一种水下混凝土承台的建造方法 | |
CN208792356U (zh) | 一种具有星状通孔的群桩基础 | |
CN202644590U (zh) | 一种用于地下工程的基坑抗浮结构 | |
CN207176687U (zh) | 一种防渗墙预埋注浆管定位装置 | |
CN215562796U (zh) | 一种地下室外墙顺做和梁板柱逆作的混凝土结构体系 | |
CN216339466U (zh) | 一种循环水泵房地下深基坑的坑壁模板支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180911 |