CN108516472A - A kind of jack up unit for Multifunctional container carrying implement - Google Patents

A kind of jack up unit for Multifunctional container carrying implement Download PDF

Info

Publication number
CN108516472A
CN108516472A CN201810593375.1A CN201810593375A CN108516472A CN 108516472 A CN108516472 A CN 108516472A CN 201810593375 A CN201810593375 A CN 201810593375A CN 108516472 A CN108516472 A CN 108516472A
Authority
CN
China
Prior art keywords
fixed pulley
steel wire
wire rope
bend wheel
portal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810593375.1A
Other languages
Chinese (zh)
Other versions
CN108516472B (en
Inventor
冯尚宣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Peace Development Hoisting Equipment Factory Co Ltd
Original Assignee
Shanghai Peace Development Hoisting Equipment Factory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Peace Development Hoisting Equipment Factory Co Ltd filed Critical Shanghai Peace Development Hoisting Equipment Factory Co Ltd
Priority to CN201810593375.1A priority Critical patent/CN108516472B/en
Priority claimed from CN201810593375.1A external-priority patent/CN108516472B/en
Publication of CN108516472A publication Critical patent/CN108516472A/en
Application granted granted Critical
Publication of CN108516472B publication Critical patent/CN108516472B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/002Container cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/08Runners; Runner bearings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C9/00Travelling gear incorporated in or fitted to trolleys or cranes
    • B66C9/14Trolley or crane travel drives

Abstract

The invention discloses a kind of jack up units for Multifunctional container carrying implement, including two groups of jacking cylinders and steel wire rope, the installation opposed vertical axial symmetry of two groups of jacking cylinders and steel wire rope, the cylinder barrel of the jacking cylinder of one of which by fixed frame is fixedly connected on portal frame top right side and towards portal frame length direction, the cylinder rod end of jacking cylinder is connected with the fixed pulley one of horizontal rotation, steel wire rope bypasses wound by leading block group after fixed pulley one after be symmetrically attached to suspender left end before and after both ends, leading block group is mounted on portal frame left end, the steel wire rope of another set is connected to suspender right end.The present invention connects the independent-lifting at two steel wire ropes control suspender both ends using two groups of jacking cylinders, it can realize highly adjustment while elevating control and inclination control, tiltedly control is cut to be easy to implement container cargo and topple over, the linkage of side before and after suspender one end is realized using a steel wire and leading block group, it is simple in structure, at low cost, lifting is fast.

Description

A kind of jack up unit for Multifunctional container carrying implement
Technical field
The invention belongs to terminal transfer machine technical fields, and in particular to a kind of raising for Multifunctional container carrying implement Device.
Background technology
With the development of the urbanization process and high-speed railway of China, expands in Urbanization Construction and consume increasing of expanding domestic demand The revolution that this long macroscopical theory will also push Chinese logistics stockyard, port and pier shipping new, traditional logistics stockyard, harbour Harbour cargo transport also with new logistics demand to containerzation, diversified development.
Existing wharf crane generally use steel wire rope winding apparatus carries out raising and cannot achieve inclination batch turning, needs to match Standby individual equipment carries out Tilting, complicated, of high cost.
Invention content
Present invention solves the technical problem that being:A kind of jack up unit for Multifunctional container carrying implement is provided, with solution Certainly above-mentioned problems of the prior art.
The technical solution that the present invention takes is:A kind of jack up unit for Multifunctional container carrying implement, including two groups The installation opposed vertical axial symmetry of jacking cylinder and steel wire rope, two groups of jacking cylinders and steel wire rope, the jacking cylinder of one of which Cylinder barrel portal frame top right side is fixedly connected on by fixed frame and towards portal frame length direction, the cylinder rod end of jacking cylinder Portion is connected with the fixed pulley one of horizontal rotation, steel wire rope bypasses wound by leading block group after fixed pulley one after it is right before and after both ends It is connected to suspender left end with claiming, leading block group is mounted on portal frame left end, and the steel wire rope of another set is connected to suspender right end.
Preferably, above-mentioned leading block group includes fixed pulley two and fixed pulley three and the two symmetrical changed courses of horizontal symmetrical Wheel one and bend wheel two, two left side of fixed pulley and fixed pulley three are connected at the top of portal frame left end in which can horizontally rotate, bend wheel One and bend wheel two is longitudinal is rotatably connected to portal frame left end, fixed pulley two is passed through in one end after steel wire rope bypasses fixed pulley one It is connected to bend wheel one with after three Stagger-wrap of fixed pulley, downward through one reverse hang of bend wheel, the steel wire rope other end is through bend wheel Two reverse hangs are downward, and fixed pulley one, fixed pulley two, fixed pulley three, bend wheel one and bend wheel two keep steel wire rope in horizontal segment Keep horizontal.
Preferably, above-mentioned fixed pulley one, fixed pulley two, fixed pulley three, bend wheel one and bend wheel two are both provided with two steel Cord anti-dropping device, two preventing wire rope from falling devices are respectively mounted on fixed pulley one, fixed pulley two, fixed pulley three, bend wheel one or change To at the steel wire rope entrance and exit of wheel two.
Preferably, above-mentioned fixed pulley one, fixed pulley two, fixed pulley three, bend wheel one and bend wheel two are fixedly connected with On sleeve, sleeve can be socketed in axial stretching at the top of portal frame on longitudinal beam, and sleeve surface is hinged to the traversing of traversing oil cylinder The traversing cylinder barrel of lever, traversing oil cylinder is hinged at the top of portal frame in transverse beam, and two top longitudinal beams of portal frame are mounted on Sleeve and traversing oil cylinder.
Preferably, it is provided with wear-resistant piece on above-mentioned sleeve lining.
Beneficial effects of the present invention:Compared with prior art, effect of the invention is as follows:
(1)The present invention connects the independent-lifting at two steel wire ropes control suspender both ends using two groups of jacking cylinders, can realize height Adjustment while elevating control and inclination control, inclination control, which is easy to implement container cargo, topples over, using a steel wire and guiding Pulley blocks realize the linkage of side before and after suspender one end, simple in structure, at low cost, and lifting is fast;
(2)Using two fixed pulleys and two bend wheels, piece steel wire of realization is arranged symmetrically, and changed course is easy, simple in structure, installation side Just, and steel wire rope horizontal segment keeps horizontal, stress equalization;
(3)Preventing wire rope from falling device is set, it is ensured that steel wire rope connection reliability improves safety in utilization;
(4)It is moved axially using traversing hydraulic oil cylinder driving sleeve, is easy to implement the front and back deflection of the container spreader of steel wire rope connection, Docking container is positioned conducive to adjusting, it is easy to adjust quick;
(5)It is arranged wear-resistant piece, increases wearability, improves service life.
Description of the drawings
Fig. 1 is container spreader structural schematic diagram;
Fig. 2 is container spreader left view structural representation;
Fig. 3 is container spreader overlooking structure diagram;
Fig. 4 is the carrying implement structural schematic diagram of connecting shackle suspender;
Fig. 5 is the left view structural representation of Fig. 4;
Fig. 6 is the carrying implement structural schematic diagram for connecting special lockset;
Fig. 7 is the left view structural representation of Fig. 6;
Fig. 8 is the carrying implement structural schematic diagram of connection grab bucket suspender;
Fig. 9 is the left view structural representation of Fig. 8;
Figure 10 is the carrying implement structural schematic diagram for connecting C-shaped hook;
Figure 11 is the left view structural representation of Figure 10;
Figure 12 is the carrying implement structural schematic diagram for connecting electromagnetic suspended beam suspender;
Figure 13 is the left view structural representation of Figure 12;
Figure 14 is structural representation at sleeve connection(Transverse-moving mechanism);
Figure 15 is sleeve cross section structure schematic diagram;
Figure 16 is portal frame connection jacking cylinder structural schematic diagram;
Figure 17 is the left view structural representation of Figure 16;
Figure 18 is wear-resistant positioning and guiding loop bar junction structural schematic diagram;
Figure 19 is transfer attachment structure schematic diagram;
Figure 20 is transfer side structure schematic view;
Figure 21 is the portions the A enlarged structure schematic diagram of Figure 19;
Figure 22 is traveling wheel advance overlooking structure diagram;
Figure 23 is that traveling wheel is rotated by 90 ° overlooking structure diagram;
Figure 24 is skate rotation minute angle overlooking structure diagram before traveling wheel;
Figure 25 is carrying implement to container tilt batch turning structural schematic diagram.
Specific implementation mode
Below in conjunction with the accompanying drawings and the present invention is described further in specific embodiment.
Embodiment 1:As shown in Fig. 1-Figure 25, a kind of jack up unit for Multifunctional container carrying implement, including two groups The installation opposed vertical axial symmetry of jacking cylinder 201 and steel wire rope 202, two groups of jacking cylinders 201 and steel wire rope 202, wherein one The cylinder barrel 204 of the jacking cylinder 201 of group is fixedly connected on 1 top right side of portal frame by fixed frame 203 and is grown towards portal frame 1 Direction is spent, 204 left end of cylinder barrel is socketed with limited support set 219, and limited support set 219 is fixedly connected on portal frame 1, plays limit The effect of the fixed jacking cylinder of position support, 205 end of cylinder rod of jacking cylinder 201 are connected with the fixed pulley 1 of horizontal rotation, Steel wire rope 202 bypasses wound by leading block group after fixed pulley 1 after be symmetrically attached to 3 left end of suspender before and after both ends, Leading block group is mounted on 1 left end of portal frame, and the jacking cylinder 201 of another set is mounted on left end, steel wire rope connected to it 202 are connected to suspender right end, and two groups of jacking cylinders act simultaneously, realize with the same drop raising cargo of liter, one group of jacking cylinder action, Another group of jacking cylinder is motionless, realizes container tilt batch turning.
Preferably, above-mentioned leading block group includes the fixed pulley 2 207 and fixed pulley 3 208 and two symmetrical of horizontal symmetrical Bend wheel 1 and bend wheel 2 210, fixed pulley 2 207 and fixed pulley 3 208 be connected to portal frame 1 with can horizontally rotating At the top of left end, bend wheel 1 and 2 210 longitudinal direction of bend wheel are rotatably connected to 1 left end of portal frame, and steel wire rope 202 bypasses One end is connected to bend wheel 1 after 3 208 Stagger-wrap of fixed pulley 2 207 and fixed pulley after fixed pulley 1, through changing Downward to one 209 reverse hangs of wheel, 202 other end of steel wire rope is downward through 2 210 reverse hang of bend wheel, fixed pulley 1, fixed pulley 2 207, fixed pulley 3 208, bend wheel 1 and bend wheel 2 210 keep steel wire rope 202 to keep horizontal in horizontal segment.
Preferably, above-mentioned fixed pulley 1, fixed pulley 2 207, fixed pulley 3 208, bend wheel 1 and bend wheel two 210 are both provided with two preventing wire rope from falling devices 211, and two preventing wire rope from falling devices 211 are respectively mounted on fixed pulley 1, fixed pulley 2 207, at 202 entrance and exit of steel wire rope of fixed pulley 3 208, bend wheel 1 or bend wheel 2 210.
Preferably, above-mentioned fixed pulley 1, fixed pulley 2 207, fixed pulley 3 208, bend wheel 1 and bend wheel two 210 are fixedly connected on sleeve 212, and sleeve 212 can be socketed in axial stretching on 1 top longitudinal beam 217 of portal frame, sleeve 212 surfaces are hinged to the traversing lever 214 of traversing oil cylinder 213, and the traversing cylinder barrel 215 of traversing oil cylinder 213 is hinged on the top of portal frame 1 In portion's transverse beam 216, two top longitudinal beams 217 of portal frame 1 are mounted on sleeve 212 and traversing oil cylinder 213, two traversing oil cylinders One pushes away the respective sleeve of a drawing, realizes that container ± 5 degree~15 degree adjusting of verting positions case.
Preferably, 212 inner wall of above-mentioned sleeve is fixedly connected with wear-resistant piece 218 by screw, and wear-resistant piece 218 of material is height Molecule wear-resistant material.
Suspender jack up unit:It is solid using double groups of jacking cylinders, lay winding wire ropes, steel wire rope lockset, leading block group, oil cylinder Determine device and be combined into lifting mechanism, there is following function:
Function one:Double groups of jacking cylinders, which work at the same time, pulls steel wire rope, leading block group, and realization has with liter with drop raising goods Object;
Function two:Double groups of jacking cylinders, which respectively work independently, pulls steel wire rope, leading block group, and lifting mechanism Dan Shengdan drops are real 45 degree of inclination batch turning functions of existing container.
Embodiment 2:As shown in Fig. 1-Figure 25, a kind of Multifunctional container carrying implement, including portal frame 1,2 and of lifting mechanism Suspender 3,1 bottom of portal frame are provided with walking mechanism 4, and lifting mechanism 2 is mounted on 1 top of portal frame, and lifting mechanism 2 is removably It is connected with suspender 3, suspender 3 is located in portal frame 1, and suspender 3 includes container spreader 5, suspension hook 6, special lockset 7, grab bucket 8, C-shaped Hook 9 and electromagnetic suspended beam 10,1 bottom sides of portal frame are equipped with driver's cabin 11, diesel-driven generator 12 and hydraulic power station 13, diesel oil Generator 12 connects hydraulic power station 13, and power is provided for hydraulic power station 13.
Container spreader:1)The open locking action of 20 ruler rigid container suspenders, suspender can be passed through by driver operation Suspender lifts by crane the 20ft containers for meeting ISO international standards;2)The machine is equipped with 20 ruler rigid container suspender quadrangle twist locks can With 40 ruler rigid container suspenders, the open locking action for interlocking suspender can be hung by driver operation by 40 rulers after interlocking Tool lifting meets the 40ft containers of ISO international standards;3) the machine is equipped with -40 ruler retractable sling for container of 20 ruler, suspender Flexible, open locking action can meet 20ft, 40ft container of ISO international standards by suspender lifting by driver operation;4) It is equipped with -40 ruler container spreader of 20 ruler.By the mutual cooperation of lifting mechanism, lifting body, realize in 20ft, 40ft container Particle bulk goods is poured into logistics goods yard or pier storage yard.
Suspension hook and special lockset, can lifting capacity 20-80t, be convenient for operation area handling steel and break bulk cargo operation, suspension hook handling Break bulk cargo, special lockset handling break bulk cargo.
Grab bucket:Quick assembling is grabbed bucket, and operation area handling ore operation is convenient for.
C-shaped hook or clamp specially are convenient for steel coil lifting operation.
Electromagnetic suspended beam, shaped steel of unloading, screw-thread steel control hanger by operating personnel and couple with drop in beam, realize magnechuck Unload the function of steel plate or screw-thread steel, using magnechuck have multiple suctions put with individual suction playing function, to reduce loader Steel cable is hung in goods yard and takes out the operation danger of steel cable, is promoted safety in production, is protected people life property safety.
In the operation of this carrying implement, by the stopping power of cart.20m/s fitful winds can be resisted and do not generate cart movement.Non- Under working condition 55m/s wind speed, by anchoring device, moving and toppling for cart direction is not generated, complete machine structure and component are not It is destroyed.
Preferably, above-mentioned lifting mechanism 2(Jack up unit)Including two groups of jacking cylinders 201 and steel wire rope 202, two groups of jackings The installation opposed vertical axial symmetry of oil cylinder 201 and steel wire rope 202, the cylinder barrel 204 of the jacking cylinder 201 of one of which pass through fixation Frame 203 is fixedly connected on 1 top right side of portal frame and towards 1 length direction of portal frame, and 204 left end of cylinder barrel is socketed with limited support Set 219, limited support set 219 are fixedly connected on portal frame 1, are played the role of limited support and are fixed jacking cylinder, jacking oil 205 end of cylinder rod of cylinder 201 is connected with the fixed pulley 1 of horizontal rotation, and steel wire rope 202 passes through after bypassing fixed pulley 1 3 left end of suspender is symmetrically attached to after the winding of leading block group before and after both ends, leading block group is mounted on 1 left end of portal frame, separately Outer one group of jacking cylinder 201 is mounted on left end, and steel wire rope 202 connected to it is connected to suspender right end, two groups of jacking cylinders It acts simultaneously, realizes that one group of jacking cylinder action, another group of jacking cylinder is motionless, realizes container with rising with drop raising cargo Tilt batch turning.
Preferably, above-mentioned leading block group includes the fixed pulley 2 207 and fixed pulley 3 208 and two symmetrical of horizontal symmetrical Bend wheel 1 and bend wheel 2 210, fixed pulley 2 207 and fixed pulley 3 208 be connected to portal frame 1 with can horizontally rotating At the top of left end, bend wheel 1 and 2 210 longitudinal direction of bend wheel are rotatably connected to 1 left end of portal frame, and steel wire rope 202 bypasses One end is connected to bend wheel 1 after 3 208 Stagger-wrap of fixed pulley 2 207 and fixed pulley after fixed pulley 1, through changing Downward to one 209 reverse hangs of wheel, 202 other end of steel wire rope is downward through 2 210 reverse hang of bend wheel, fixed pulley 1, fixed pulley 2 207, fixed pulley 3 208, bend wheel 1 and bend wheel 2 210 keep steel wire rope 202 to keep horizontal in horizontal segment.
Preferably, above-mentioned fixed pulley 1, fixed pulley 2 207, fixed pulley 3 208, bend wheel 1 and bend wheel two 210 are both provided with two preventing wire rope from falling devices 211, and two preventing wire rope from falling devices 211 are respectively mounted on fixed pulley 1, fixed pulley 2 207, at 202 entrance and exit of steel wire rope of fixed pulley 3 208, bend wheel 1 or bend wheel 2 210.
Preferably, above-mentioned fixed pulley 1, fixed pulley 2 207, fixed pulley 3 208, bend wheel 1 and bend wheel two 210 are fixedly connected on sleeve 212, and sleeve 212 can be socketed in axial stretching on 1 top longitudinal beam 217 of portal frame, sleeve 212 surfaces are hinged to the traversing lever 214 of traversing oil cylinder 213, and the traversing cylinder barrel 215 of traversing oil cylinder 213 is hinged on the top of portal frame 1 In portion's transverse beam 216, two top longitudinal beams 217 of portal frame 1 are mounted on sleeve 212 and traversing oil cylinder 213, two traversing oil cylinders One pushes away the respective sleeve of a drawing, realizes that container ± 5 degree~15 degree adjusting of verting positions case.
Preferably, 212 inner wall of above-mentioned sleeve is fixedly connected with wear-resistant piece 218 by screw, and wear-resistant piece 218 of material is height Molecule wear-resistant material.
Preferably, above-mentioned portal frame 1 is vertical retractable structure, including top frame 101, telescopic support legs 102 and top stretch Oil cylinder 103, four telescopic support legs 102 are fixedly connected at 101 bottom four corners of top frame, and telescopic support legs 102 include mutual The lower guiding loop bar 104 and upper guidings loop bar 105 of movable telescopic socket are fixed between twice of front two rows guiding loop bars 104 Be connected with bottom end rail 108, front two rows two on be oriented between loop bar 105 and be fixedly connected with transverse beam 216 and middle cross beam 14, on It is oriented to 105 upper end of loop bar to be fixedly connected on portal frame 1,106 upper end of cylinder tube of top-entering oil cylinder 103 is cut with scissors by hinged seat 109 It is connected in transverse beam 216,107 lower end of cylinder rod of top-entering oil cylinder 103 is hinged on bottom end rail 108, and 106 lower end of cylinder tube is set It is equipped with guide sleeve 114, plays position-limiting action, guide sleeve 114 is fixedly connected in telescopic support legs 102, before and after top-entering oil cylinder 103 Each setting two is arranged, four jacking cylinders work at the same time jacking and pull telescopic portal frame, ensure while jacking or declining Container hoisting 1.5m~3.5m lifting altitude functions are realized in operation.
Preferably, above-mentioned upper 105 lower end of guiding loop bar is fixedly connected with wear-resistant positioning and guiding loop bar 110, and wear-resistant positioning is led It is socketed on lower guiding loop bar 104 to loop bar 110, internal four sides are provided with wear-resistant locating piece 111, and wear-resistant locating piece 111 passes through Housing screw 112 is connected on wear-resistant positioning and guiding loop bar 110, and wear-resistant locating piece 111 is fixedly connected on adjustable plate by screw On 113, housing screw 112 screws on adjustable plate 113, and wear-resistant locating piece 111 uses high molecular abrasion-proof material.
Preferably, above-mentioned walking mechanism 4 includes traveling wheel 401, walker 402 and transfer, and traveling wheel 401 is by turning Moving axis 411 is rotatably connected on the walker 402 of handstand U-shaped, and rotation axis 411 is connected with the output shaft of drive motor 412 On, drive motor 412 is fixedly connected on walker 402, and walker 402 is connected to 1 bottom end of portal frame by transfer, row It walks to take turns and uses rubber wheel, encapsulated abrasive rubber on iron core.Normal use ensures do not occur degumming or damage in 2000 hours.
Preferably, above-mentioned transfer includes hydraulic steering cylinder 403, steering shaft 404, turns to shell 405, under steering shaft 404 End is fixedly connected on walker 402, and is connected to by thrust bearing 406 and ball bearing 407 and is turned to shell 405, and shell 405 is turned to Upper end is fixedly connected on 1 top of portal frame, and the lever 408 of hydraulic steering cylinder 403 is hinged on 402 upper surface of walker, turns to liquid The cylinder barrel 409 of cylinder pressure 403 is horizontally hinged on oil cylinder seat 410, and oil cylinder seat 410 is fixedly connected on the bottom end rail 108 on portal frame 1 On, hydraulic steering cylinder 403 can drive walker 402 to rotate horizontally 180 °.
Walking mechanism function:
One:Four groups of hydraulic steering cylinders being connected on four traveling wheels while work being pulled to go to transfer, realizes four groups of complete machines Wheel turn 90 degrees direction, and realizing carrying implement, laterally walking is transported goods, and turns to maximum angle:0 degree~180 degree;
Two:Preceding two groups of hydraulic steering cylinders pull walker to rotate simultaneously, before two groups of traveling wheels as active steering wheel group, after Two groups of face big wheel realizes that carrying implement is walked fine adjustment function as driven wheel group, can more convenient handling container or part it is miscellaneous Goods carries out turning function in very big place, and fine tuning turns to maximum angle:0 degree~45 degree.
Suspender lifting mechanism:It is solid using double groups of jacking cylinders, lay winding wire ropes, steel wire rope lockset, leading block group, oil cylinder Determine device and be combined into lifting mechanism, there is following function:
Function one:Double groups of jacking cylinders, which work at the same time, pulls steel wire rope, leading block group, and realization has with liter with drop raising goods Object;
Function two:Double groups of jacking cylinders, which respectively work independently, pulls steel wire rope, leading block group, and lifting mechanism Dan Shengdan drops are real 45 degree of inclination batch turning functions of existing container.
Portal frame height is flexible to realize container hoisting 1.5m~3.5m lifting altitude functions.
The advantages of carrying implement, is as follows:
(1)Using dismountable suspender, realize that container spreader, suspension hook, special lockset, grab bucket, C-shaped hook or electromagnetic suspended beam are different The replacement of suspender greatly improves the functionality of container lifting device, and detachable structure, conversion flexibility is high, may be implemented not With the carrying of material or cargo, for carrying implement without walking to track designation, walking is convenient, reduces artificial handling time, More time saving and energy saving, handling goods efficiency greatly improves;
(2)The independent-lifting that two steel wire ropes control suspender both ends are connected using two groups of jacking cylinders can realize that height adjusts, is same When elevating control and inclination control, inclination control, which is easy to implement container cargo, topples over, using a steel wire and leading block group The linkage of side, simple in structure before and after realization suspender one end, at low cost, and lifting is fast;
(3)Using two fixed pulleys and two bend wheels, piece steel wire of realization is arranged symmetrically, and changed course is easy, simple in structure, installation side Just, and steel wire rope horizontal segment keeps horizontal, stress equalization;
(4)Preventing wire rope from falling device is set, it is ensured that steel wire rope connection reliability improves safety in utilization;
(5)It is moved axially using traversing hydraulic oil cylinder driving sleeve, is easy to implement the front and back deflection of the container spreader of steel wire rope connection, Docking container is positioned conducive to adjusting, it is easy to adjust quick;
(6)It is arranged wear-resistant piece, increases wearability, improves service life;
(7)The portal frame to be stretched vertically using hydraulic cylinder, be easy to implement portal frame height adjusting, be conducive to different cargos transport with And the avoidance of barrier is played, the application range of equipment is improved, also allows for improving processing safety, is oriented to loop bar and jacking up and down The regulating mechanism of hydraulic oil cylinder driving, it is easy to adjust quick;
(8)Setting connects wear-resistant positioning and guiding loop bar in upper guiding loop bar lower end, and the built-in guiding of wear-resistant positioning and guiding loop bar is wear-resistant Block increases wearability, and guidance quality is more preferable, improves service life of equipment, and modular construction is conveniently replaceable maintenance;
(9)Using the walking mechanism of turning function, it is easy to implement the flexible variety of walking process, can be carried out according to site requirement Walking or transition are carried;
(10)Transfer is simple in structure, turns to and is easy, the walking that can be realized four wheels while be rotated by 90 °, if need to only turn It is curved, the deflection angle of two-wheeled before only adjusting.
The above description is merely a specific embodiment example, scope of protection of the present invention is not limited thereto.It is ripe It knows the those skilled in the art in the technical scope disclosed by the present invention, change or replacement mode can be easily found, these It should be covered by the protection scope of the present invention.For this purpose, protection scope of the present invention should be with the protection model of the claim Subject to enclosing.

Claims (5)

1. a kind of jack up unit for Multifunctional container carrying implement, it is characterised in that:Including two groups of jacking cylinders(201)With Steel wire rope(202), two groups of jacking cylinders(201)And steel wire rope(202)Installation opposed vertical axial symmetry, the jacking of one of which Oil cylinder(201)Cylinder barrel(204)Pass through fixed frame(203)It is fixedly connected on portal frame(1)Top right side and towards portal frame(1) Length direction, jacking cylinder(201)Cylinder rod(205)End is connected with the fixed pulley one of horizontal rotation(206), steel wire rope (202)Around fixed pulley one(206)After being wound afterwards by leading block group suspender is symmetrically attached to before and after both ends(3)Left end, Leading block group is mounted on portal frame(1)Left end, the jacking cylinder of another set(201)Mounted on left end, steel connected to it Cord(202)It is connected to suspender right end.
2. a kind of jack up unit for Multifunctional container carrying implement according to claim 2, it is characterised in that:It is oriented to Pulley blocks include the fixed pulley two of horizontal symmetrical(207)With fixed pulley three(208)And two symmetrical bend wheel one(209)With change To wheel two(210), fixed pulley two(207)Left side and fixed pulley three(208)It is connected to portal frame with can horizontally rotating(1)Left end top Portion, bend wheel one(209)With bend wheel two(210)Longitudinal direction is rotatably connected to portal frame(1)Left end, steel wire rope(202)Around Cross fixed pulley one(206)Fixed pulley two is passed through in one end afterwards(207)With fixed pulley three(208)Bend wheel one is connected to after Stagger-wrap (209), through bend wheel one(209)Reverse hang is downward, steel wire rope(202)The other end is through bend wheel two(210)Reverse hang is downward, fixed Pulley one(206), fixed pulley two(207), fixed pulley three(208), bend wheel one(209)With bend wheel two(210)Keep steel wire Rope(202)Keep horizontal in horizontal segment.
3. a kind of jack up unit for Multifunctional container carrying implement according to claim 2, it is characterised in that:It is fixed sliding Wheel one(206), fixed pulley two(207), fixed pulley three(208), bend wheel one(209)With bend wheel two(210)It is both provided with two Preventing wire rope from falling device(211), two preventing wire rope from falling devices(211)Respectively it is mounted on fixed pulley one(206), fixed pulley two(207)、 Fixed pulley three(208), bend wheel one(209)Or bend wheel two(210)Steel wire rope(202)At entrance and exit.
4. a kind of jack up unit for Multifunctional container carrying implement according to claim 2, it is characterised in that:It is fixed sliding Wheel one(206), fixed pulley two(207), fixed pulley three(208), bend wheel one(209)With bend wheel two(210)It is fixedly connected with In sleeve(212)On, sleeve(212)Axial stretching it can be socketed in portal frame(1)Top longitudinal beam(217)On, sleeve(212) Surface is hinged to traversing oil cylinder(213)Traversing lever(214), traversing oil cylinder(213)Traversing cylinder barrel(215)It is hinged on gantry Frame(1)Top transverse beam(216)On, portal frame(1)Two top longitudinal beams(217)It is mounted on sleeve(212)With traversing oil Cylinder(213).
5. a kind of jack up unit for Multifunctional container carrying implement according to claim 4, it is characterised in that:Sleeve (212)Wear-resistant piece is provided on inner wall(218).
CN201810593375.1A 2018-06-11 Lifting device for multifunctional container carrier Active CN108516472B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810593375.1A CN108516472B (en) 2018-06-11 Lifting device for multifunctional container carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810593375.1A CN108516472B (en) 2018-06-11 Lifting device for multifunctional container carrier

Publications (2)

Publication Number Publication Date
CN108516472A true CN108516472A (en) 2018-09-11
CN108516472B CN108516472B (en) 2024-04-30

Family

ID=

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6286696B1 (en) * 2000-01-07 2001-09-11 Mi-Jack Products, Inc. Hoist system anti-drift device
JP2002167162A (en) * 2000-11-29 2002-06-11 Kawasaki Heavy Ind Ltd Cargo handling gear for container
WO2014207315A1 (en) * 2013-06-27 2014-12-31 Konecranes Plc Mobile crane
CN106927371A (en) * 2017-05-05 2017-07-07 中淮集装箱装备科技(天津)有限公司 Descaling gantry crane
CN208561488U (en) * 2018-06-11 2019-03-01 上海和平发展起重设备厂有限公司 A kind of erecting equipment for Multifunctional container carrying implement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6286696B1 (en) * 2000-01-07 2001-09-11 Mi-Jack Products, Inc. Hoist system anti-drift device
JP2002167162A (en) * 2000-11-29 2002-06-11 Kawasaki Heavy Ind Ltd Cargo handling gear for container
WO2014207315A1 (en) * 2013-06-27 2014-12-31 Konecranes Plc Mobile crane
CN106927371A (en) * 2017-05-05 2017-07-07 中淮集装箱装备科技(天津)有限公司 Descaling gantry crane
CN208561488U (en) * 2018-06-11 2019-03-01 上海和平发展起重设备厂有限公司 A kind of erecting equipment for Multifunctional container carrying implement

Similar Documents

Publication Publication Date Title
CN106744257B (en) A kind of kiloton adjustable combined sling, assemble method and the method for lifting caisson
CN102180362B (en) Oomnibearing baggy-material car loader
CN107311046A (en) Vehicular transformer handler
CN111017734A (en) Running mechanism of monorail hoisting and transporting equipment
WO2015042945A1 (en) An assembled tower type crane with movable counter-weight system
CN208561488U (en) A kind of erecting equipment for Multifunctional container carrying implement
CN208440166U (en) A kind of flexible gantry frame structure for Multifunctional container carrying implement
CN207415657U (en) A kind of distribution device
CN108516460A (en) A kind of flexible portal frame for Multifunctional container carrying implement
CN203359893U (en) Portable lift
CN208500169U (en) A kind of Multifunctional container haulage equipment
CN210117190U (en) Small material hoister
CN208439881U (en) A kind of traverse displacement unit for Multifunctional container carrying implement
CN108516472A (en) A kind of jack up unit for Multifunctional container carrying implement
CN208440170U (en) A kind of transfer for Multifunctional container carrying implement
CN108466937A (en) A kind of Multifunctional container carrying implement
CN216038231U (en) General gantry crane
CN216476385U (en) Tire formula subway station construction concrete placement cloth system
CN108083130A (en) A kind of container crane and its handling method with double luffing mechanisms
CN209939952U (en) Grain slag ship loader
CN213037278U (en) Bridge crane wire rope securing device
CN209567730U (en) A kind of small-sized lattice dead man steel construction
CN209428969U (en) A kind of outer working vehicle of viaduct bridge guardrail
CN108466937B (en) Multifunctional container carrier
CN108516472B (en) Lifting device for multifunctional container carrier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant