CN108505553A - The method for correcting error of strip footing brick-concrete building - Google Patents

The method for correcting error of strip footing brick-concrete building Download PDF

Info

Publication number
CN108505553A
CN108505553A CN201810347608.XA CN201810347608A CN108505553A CN 108505553 A CN108505553 A CN 108505553A CN 201810347608 A CN201810347608 A CN 201810347608A CN 108505553 A CN108505553 A CN 108505553A
Authority
CN
China
Prior art keywords
cushion cap
jacking
concrete
building
bar shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810347608.XA
Other languages
Chinese (zh)
Other versions
CN108505553B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Chuangming Architectural Design Consulting Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810347608.XA priority Critical patent/CN108505553B/en
Publication of CN108505553A publication Critical patent/CN108505553A/en
Application granted granted Critical
Publication of CN108505553B publication Critical patent/CN108505553B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • E02D35/005Lowering or lifting of foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of method for correcting error of strip footing brick-concrete building, it is characterized in that construction procedure includes:(1) forced landing area and jacking area are determined;The center of gravity that building is calculated according to load assignment situation divides forced landing area and jacking area after determining the center of gravity of building;(2) load wall is reinforced;(3) concrete bar shaped cushion cap is reinforced;(4) building is jacked;(5) it force-lands to building;Structure of the invention performance is good, securely and reliably.

Description

The method for correcting error of strip footing brick-concrete building
Technical field
The present invention relates to a kind of method for correcting error, more particularly to a kind of method for correcting error of strip footing brick-concrete building.
Background technology
Strip footing brick-concrete building will rectify a deviation after tilting, but construction risk is larger during rectifying a deviation.Tradition side Method is to use single forced landing or jack-up construction method, and no matter the stress that generates is all very big in the construction of that method, it is necessary to right Conventional method is adjusted.Since the load wall rigidity and intensity of brick mix structure want far short of what is expected relative to frame structure, force-landing Or larger secondary stress is will produce during jack-up construction, and if do not reinforced to it, it is possible to structure can be caused to destroy, Generate safety problem.Building force-lands or jack-up construction can generate concrete foundation larger secondary stress in the process, also right Concrete bar shaped cushion cap may damage.
Invention content
The present invention is to provide a kind of method for correcting error of strip footing brick-concrete building, solves the problems, such as Deviation Correction Construction safety.
Construction procedure of the present invention includes:
(1) forced landing area and jacking area are determined;
The center of gravity that building is calculated according to load assignment situation divides forced landing area and jacking after determining the center of gravity of building Area;Forced landing or jack-up construction are using laterally basic axis as operating unit, and laterally basis axis refers to short side basis axis, The forced landing amount or jacking amount of same lateral basis axis are identical, and forced landing amount or jacking amount are according to every lateral basic axis Average correction amount determine;8~10 settlement observation points are arranged in every lateral basic axis, according to 8-10 settlement observation The average value of point determines average correction amount.
(2) load wall is reinforced;
Step is reinforced using as follows:The painting of load wall is removed first, then the brick surface of load wall hangs rinforcement bar again, A diameter of 14~the 16mm of rinforcement bar, rinforcement bar spacing are 350~400mm, and rinforcement bar welds anchor rib, anchor every 400~500mm Gu a diameter of 14~16mm of muscle, the brick dust seam that anchor rib stretches into load wall is anchored;Rinforcement bar is carried out after anchoring pre- Stress tension;Rinforcement bar after prestressed stretch-draw becomes fold-line-shaped;Adjacent rinforcement bar is fixed with fixing muscle.
(3) concrete bar shaped cushion cap is reinforced;
Strengthening of foundation is using as follows:Concrete bar shaped cushion cap side is implanted into reinforcing bar, and implantation bar diameter is 25~32mm, is planted It is 400~450mm to enter reinforcing bar distribution spacing;Be implanted into reinforcing bar the specific steps are:It is drilled with preformed hole in concrete bar shaped cushion cap side, Reserved hole depth is 300~350mm, a diameter of 27~34mm of preformed hole, is then inserted into reinforcing bar, preformed hole and reinforcing bar in preformed hole Between gap closed using high strength epoxy resin glue;Concrete bar shaped cushion cap is added after implantation reinforcement construction Gu concrete bar shaped cushion cap ruggedized construction uses rectangular cushion cap, rectangular cushion cap to widen and increase concrete bar shaped cushion cap, Concrete bar shaped cushion cap is wrapped in the inside by rectangular cushion cap, and Widening is determined according to forced landing amount or jacking amount, when forced landing amount or top Rising amount is less than or equal to 30mm, and concrete bar shaped cushion cap widens 200mm per side, and the concrete bar shaped cushion cap amount of increasing is 100mm;When Forced landing amount or jacking amount are more than 30mm and are less than or equal to 50mm, and concrete bar shaped cushion cap widens 400mm, concrete bar shaped per side The cushion cap amount of increasing is 200mm;When forced landing amount or jacking amount are more than 50mm and are less than or equal to 70mm, concrete bar shaped cushion cap is per side Widen 600mm, the concrete bar shaped cushion cap amount of increasing is 300mm;When forced landing amount or jacking amount are more than 70mm, concrete bar shaped cushion cap Widen 800mm per side, the concrete bar shaped cushion cap amount of increasing is 400mm.Rectangular cushion cap concrete strength uses C30 or more.
(4) building is jacked;
Structure foundation local products can be given birth to disturbance to influence to jack effect when due to force-landing on building, thus it is first right Building is jacked, and is then force-landed again to building.
Minimum Jacking point quantity determines according to the following formula:N=kP/N, n are Jacking point quantity;K is safety coefficient, and value is 1.5;P is top total load head;N is the design load for jacking supporting-point, takes 0.8 times of jack nominal operation load.It determines After going out minimum Jacking point quantity, Jacking point is configured further according to building load deployment scenarios, Jacking point spacing is 0.8~ 1.5m increases Jacking point quantity when minimum Jacking point quantity is not enough arranged.Jacking point arrangement will avoid door-window opening, work as door Increase concrete lintel when window hole width is more than 1.2m, below door-window opening to be reinforced.
(5) it force-lands to building;
From vertical drilling at concrete bar shaped cushion cap edge 200mm, drilling depth is 20~30m, bore diameter is 150~ 200mm.Drilling rod is connected with high-pressure rubber pipe with high-pressure pump, clear water is conveyed into hole by high-pressure pump.Clear water is from sprayer body Sprayed in the form of high-pressure water jet in nozzle, cutting damage effect formed to foundation soil, high-pressure water pressure control 1.5~ 2.5MPa, flow control is in 40~45L/min.The foundation soil cut mixes together with water, and ground is returned to after forming mud.Through After high pressure jer cutting, a mud column is just formd under basis.
Structure of the invention performance is good, securely and reliably.
Description of the drawings
Fig. 1 is that load wall reinforces schematic diagram, and Fig. 2 is that concrete bar shaped cushion cap reinforces schematic diagram.
In each attached drawing:1, rinforcement bar, 2, the rinforcement bar after prestressed stretch-draw, 3, fixing muscle, 4, implantation reinforcing bar, 5, rectangular hold Platform, 6, concrete bar shaped cushion cap.
Specific implementation mode
The present embodiment construction procedure includes:
(1) forced landing area and jacking area are determined;
The center of gravity that building is calculated according to load assignment situation divides forced landing area and jacking after determining the center of gravity of building Area;Forced landing or jack-up construction are using laterally basic axis as operating unit, and laterally basis axis refers to short side basis axis, The forced landing amount or jacking amount of same lateral basis axis are identical, and forced landing amount or jacking amount are according to every lateral basic axis Average correction amount determine;8~10 settlement observation points are arranged in every lateral basic axis, according to 8-10 settlement observation The average value of point determines average correction amount.
(2) load wall is reinforced;
Step is reinforced using as follows:The painting of load wall is removed first, then the brick surface of load wall hangs rinforcement bar again, A diameter of 14~the 16mm of rinforcement bar, rinforcement bar spacing are 350~400mm, and rinforcement bar welds anchor rib, anchor every 400~500mm Gu a diameter of 14~16mm of muscle, the brick dust seam that anchor rib stretches into load wall is anchored;Rinforcement bar is carried out after anchoring pre- Stress tension;Rinforcement bar after prestressed stretch-draw becomes fold-line-shaped;Adjacent rinforcement bar is fixed with fixing muscle.
(3) concrete bar shaped cushion cap is reinforced;
Strengthening of foundation is using as follows:Concrete bar shaped cushion cap side is implanted into reinforcing bar, and implantation bar diameter is 25~32mm, is planted It is 400~450mm to enter reinforcing bar distribution spacing;Be implanted into reinforcing bar the specific steps are:It is drilled with preformed hole in concrete bar shaped cushion cap side, Reserved hole depth is 300~350mm, a diameter of 27~34mm of preformed hole, is then inserted into reinforcing bar, preformed hole and reinforcing bar in preformed hole Between gap closed using high strength epoxy resin glue;Concrete bar shaped cushion cap is added after implantation reinforcement construction Gu concrete bar shaped cushion cap ruggedized construction uses rectangular cushion cap, rectangular cushion cap to widen and increase concrete bar shaped cushion cap, Concrete bar shaped cushion cap is wrapped in the inside by rectangular cushion cap, and Widening is determined according to forced landing amount or jacking amount, when forced landing amount or top Rising amount is less than or equal to 30mm, and concrete bar shaped cushion cap widens 200mm per side, and the concrete bar shaped cushion cap amount of increasing is 100mm;When Forced landing amount or jacking amount are more than 30mm and are less than or equal to 50mm, and concrete bar shaped cushion cap widens 400mm, concrete bar shaped per side The cushion cap amount of increasing is 200mm;When forced landing amount or jacking amount are more than 50mm and are less than or equal to 70mm, concrete bar shaped cushion cap is per side Widen 600mm, the concrete bar shaped cushion cap amount of increasing is 300mm;When forced landing amount or jacking amount are more than 70mm, concrete bar shaped cushion cap Widen 800mm per side, the concrete bar shaped cushion cap amount of increasing is 400mm.Here the concrete bar shaped cushion cap amount of increasing is exactly in attached drawing Dash area height.Rectangular cushion cap concrete strength uses C30 or more.
(4) building is jacked;
Minimum Jacking point quantity determines according to the following formula:N=kP/N, n are Jacking point quantity;K is safety coefficient, and value is 1.5;P is top total load head;N is the design load for jacking supporting-point, takes 0.8 times of jack nominal operation load.It determines After going out minimum Jacking point quantity, Jacking point is configured further according to building load deployment scenarios, Jacking point spacing is 0.8~ 1.5m increases Jacking point quantity when minimum Jacking point quantity is not enough arranged.Jacking point arrangement will avoid door-window opening, work as door Increase concrete lintel when window hole width is more than 1.2m, below door-window opening to be reinforced.
(5) it force-lands to building;
From vertical drilling at concrete bar shaped cushion cap edge 200mm, drilling depth is 20~30m, bore diameter is 150~ 200mm.Drilling rod is connected with high-pressure rubber pipe with high-pressure pump, clear water is conveyed into hole by high-pressure pump.Clear water is from sprayer body Sprayed in the form of high-pressure water jet in nozzle, cutting damage effect formed to foundation soil, high-pressure water pressure control 1.5~ 2.5MPa, flow control is in 40~45L/min.The foundation soil cut mixes together with water, and ground is returned to after forming mud.Through After high pressure jer cutting, a mud column is just formd under basis.

Claims (1)

1. a kind of method for correcting error of strip footing brick-concrete building, it is characterized in that construction procedure includes:
(1) forced landing area and jacking area are determined;
The center of gravity that building is calculated according to load assignment situation divides forced landing area and jacking area after determining the center of gravity of building;Compel Drop or jack-up construction are so that laterally basic axis is as operating unit, and on same lateral basis, the forced landing amount or jacking amount of axis are Identical, forced landing amount or jacking amount are determined according to the average correction amount of every lateral basic axis;Every laterally basic 8~10 settlement observation points are arranged in axis, and average correction amount is determined according to the average value of 8-10 settlement observation point;
(2) load wall is reinforced;
Load wall reinforces step using as follows:The painting for removing load wall first, then hangs reinforcing on the brick surface of load wall Muscle, a diameter of 14~16mm of rinforcement bar, rinforcement bar spacing are 350~400mm, and rinforcement bar is welded every 400~500mm and anchored Muscle, a diameter of 14~16mm of anchor rib, the brick dust seam that anchor rib stretches into load wall are anchored;After anchoring to rinforcement bar into Row prestressed stretch-draw;Rinforcement bar after prestressed stretch-draw becomes fold-line-shaped;Adjacent rinforcement bar is fixed with fixing muscle;
(3) concrete bar shaped cushion cap is reinforced;
Strengthening of foundation is using as follows:Concrete bar shaped cushion cap side is implanted into reinforcing bar, and implantation bar diameter is 25~32mm, is implanted into steel It is 400~450mm that muscle, which is distributed spacing,;Be implanted into reinforcing bar the specific steps are:It is drilled with preformed hole in concrete bar shaped cushion cap side, is reserved Hole depth is 300~350mm, a diameter of 27~34mm of preformed hole, then reinforcing bar is inserted into preformed hole, between preformed hole and reinforcing bar It is closed using high strength epoxy resin glue in gap;Concrete bar shaped cushion cap is reinforced after implantation reinforcement construction, Concrete bar shaped cushion cap ruggedized construction uses rectangular cushion cap, rectangular cushion cap to widen and increase concrete bar shaped cushion cap, side Concrete bar shaped cushion cap is wrapped in the inside by shape cushion cap, and rectangular cushion cap concrete strength uses C30 or more;
(4) building is jacked;
Minimum Jacking point quantity determines according to the following formula:N=kP/N, n are Jacking point quantity;K is safety coefficient, value 1.5; P is top total load head;N is the design load for jacking supporting-point, takes 0.8 times of jack nominal operation load;It determines most After few Jacking point quantity, it is configured Jacking point further according to building load deployment scenarios, Jacking point spacing is 0.8~1.5m, When minimum Jacking point quantity is not enough arranged, increase Jacking point quantity;
(5) it force-lands to building;
From vertical drilling at concrete bar shaped cushion cap edge 200mm, drilling depth is 20~30m, bore diameter is 150~ 200mm;Drilling rod is connected with high-pressure rubber pipe with high-pressure pump, clear water is conveyed into hole by high-pressure pump;Clear water is from sprayer body Sprayed in the form of high-pressure water jet in nozzle, cutting damage effect formed to foundation soil, high-pressure water pressure control 1.5~ 2.5MPa, flow control is in 40~45L/min;The foundation soil cut mixes together with water, and ground is returned to after forming mud;Through After high pressure jer cutting, a mud column is just formd under basis;
Jacking point arrangement will avoid door-window opening, when door-window opening width is more than 1.2m, increase concrete below door-window opening Lintel is reinforced.
CN201810347608.XA 2017-01-21 2017-01-21 The method for correcting error of strip footing brick-concrete building Active CN108505553B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810347608.XA CN108505553B (en) 2017-01-21 2017-01-21 The method for correcting error of strip footing brick-concrete building

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810347608.XA CN108505553B (en) 2017-01-21 2017-01-21 The method for correcting error of strip footing brick-concrete building
CN201710072383.7A CN106836323B (en) 2017-01-21 2017-01-21 The deviation rectification construction method of strip footing brick-concrete building

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201710072383.7A Division CN106836323B (en) 2017-01-21 2017-01-21 The deviation rectification construction method of strip footing brick-concrete building

Publications (2)

Publication Number Publication Date
CN108505553A true CN108505553A (en) 2018-09-07
CN108505553B CN108505553B (en) 2019-12-03

Family

ID=59122296

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810347651.6A Active CN108532655B (en) 2017-01-21 2017-01-21 The deviation rectification construction method of brick-concrete building
CN201710072383.7A Expired - Fee Related CN106836323B (en) 2017-01-21 2017-01-21 The deviation rectification construction method of strip footing brick-concrete building
CN201810347608.XA Active CN108505553B (en) 2017-01-21 2017-01-21 The method for correcting error of strip footing brick-concrete building

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201810347651.6A Active CN108532655B (en) 2017-01-21 2017-01-21 The deviation rectification construction method of brick-concrete building
CN201710072383.7A Expired - Fee Related CN106836323B (en) 2017-01-21 2017-01-21 The deviation rectification construction method of strip footing brick-concrete building

Country Status (1)

Country Link
CN (3) CN108532655B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913416A (en) * 1995-06-27 1997-01-14 Daito Kogyo Kk Correcting method for sunk building
CN1725258A (en) * 2005-07-12 2006-01-25 范晓征 Intercom remote control device with identity code function
CN101994325A (en) * 2010-12-22 2011-03-30 建研地基基础工程有限责任公司 Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN105625742A (en) * 2016-02-17 2016-06-01 朱奎 Brick wall reinforcing structure
CN106320403A (en) * 2016-09-20 2017-01-11 武汉理工大学 Inclination rectification and reinforcement method for existing building

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3455861B2 (en) * 1995-03-03 2003-10-14 清水建設株式会社 Foundation structure and foundation construction method
CN1099515C (en) * 1998-07-16 2003-01-22 赵启 Integral building-translating equipment and method
JP3804063B2 (en) * 2001-10-15 2006-08-02 株式会社佐藤住建 Reinforcement structure and reinforcement method of foundation structure in building
CN101725258B (en) * 2008-10-30 2012-09-19 上海天演建筑物移位工程有限公司 Integral jacking method of heritage buildings
CN101691765B (en) * 2009-09-21 2011-01-26 唐业清 Double-ash well pole stress relief coordination and rectification method for complex foundation
CN106120811A (en) * 2016-08-24 2016-11-16 中天建设集团有限公司天津分公司 A kind of foundation ditch periphery distortion preventing and deviation rectification construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913416A (en) * 1995-06-27 1997-01-14 Daito Kogyo Kk Correcting method for sunk building
CN1725258A (en) * 2005-07-12 2006-01-25 范晓征 Intercom remote control device with identity code function
CN101994325A (en) * 2010-12-22 2011-03-30 建研地基基础工程有限责任公司 Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN105625742A (en) * 2016-02-17 2016-06-01 朱奎 Brick wall reinforcing structure
CN106320403A (en) * 2016-09-20 2017-01-11 武汉理工大学 Inclination rectification and reinforcement method for existing building

Also Published As

Publication number Publication date
CN108532655A (en) 2018-09-14
CN108505553B (en) 2019-12-03
CN106836323A (en) 2017-06-13
CN108532655B (en) 2019-11-29
CN106836323B (en) 2018-09-18

Similar Documents

Publication Publication Date Title
CN108343260B (en) Inclined building deviation rectifying and reinforcing structure and construction method thereof
CN107435346A (en) A kind of grouting and reinforcing method for correcting error suitable for high building structure
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN103603358B (en) A kind of multi-platform building enclosure and constructional method
CN104195911A (en) Widened embankment structure with beside-water cliff high retaining wall fill section and construction method of widened embankment structure
CN203795446U (en) Steel-plate concrete caisson
CN101250878A (en) Method for supporting deep building pit using non bulit-in end pile anchor in combination with anchor slab wall
CN112411610A (en) Pile foundation underpinning construction method
CN107100160B (en) A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column
JP6934697B2 (en) Ground improvement method
CN205954638U (en) Half semi -rigid flexible supporting construction of deep basal pit lateral wall
CN103603357B (en) A kind of multi-platform without inner support self waterproofing foundation pit enclosure structure and constructional method thereof
CN108797323B (en) Steel trestle suitable for hard stratum
CN110387886A (en) Civil air defense constructions and installations foundation pit supporting construction and its construction method
CN106836323B (en) The deviation rectification construction method of strip footing brick-concrete building
CN107503355B (en) Externally-arranged rear-inserted steel type double-row pile foundation pit supporting system and construction method thereof
CN109056710A (en) A kind of hardpan steel-pipe pile and its construction method
CN211448697U (en) Single-line tunnel supporting device for soft rock slight large deformation in plateau area
CN104153355B (en) The constructing device of concrete-pile and construction method thereof
CN110924404A (en) Construction method for deep backfill filling wall foundation
CN110565709A (en) Method for correcting inclination of composite foundation building by taking soil from mattress layer and forcing to land
CN113266019B (en) Construction method of foundation pit steel pipe support system
CN105156017B (en) A kind of impacting with high pressure whitewashing rig for applying to collapse hole stratum and construction method
CN208933954U (en) A kind of hardpan steel-pipe pile
CN108396794B (en) Deviation rectifying method for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230524

Address after: Room 410, 4th Floor, No. 31 Tiyuan Road, Yuhua District, Changsha City, Hunan Province, 410000

Patentee after: Hunan Chuangming Architectural Design Consulting Co.,Ltd.

Address before: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, 4

Patentee before: Ye Changqing

TR01 Transfer of patent right