CN208933954U - A kind of hardpan steel-pipe pile - Google Patents
A kind of hardpan steel-pipe pile Download PDFInfo
- Publication number
- CN208933954U CN208933954U CN201821373950.9U CN201821373950U CN208933954U CN 208933954 U CN208933954 U CN 208933954U CN 201821373950 U CN201821373950 U CN 201821373950U CN 208933954 U CN208933954 U CN 208933954U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel pipe
- hardpan
- pipe
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to the realm of building construction, in particular to a kind of hardpan steel-pipe pile, including at least two steel pipes, the steel pipe bottom is abutted against with hardpan, drilling is provided on the corresponding hardpan in the steel duct space, concrete is perfused in the drilling, the concreting continues to upwardly extend after expiring the drilling, and the part for making the concrete form cylinder is located in the steel pipe.The hardpan steel-pipe pile of the application, when construction, when steel pipe, which sinks down into hardpan, further to sink, it is protruded into and is drilled by drilling machine, then in drilling and pouring concrete within steel pipe, for traditional approach, form of construction work is simple, working procedure is not only significantly simplified, but also can be by drilling depth and the height of steel pipe inner concrete come the structural strength and stability progress coordinated control to steel-pipe pile, convenient for guaranteeing the stability and reliability of steel-pipe pile.
Description
Technical field
The utility model relates to the realm of building construction, in particular to a kind of hardpan steel-pipe pile.
Background technique
In construction engineering technical field, when being related to across the river engineering of cross a river, if river does not allow large vessel carrier equipment
It marches into the arena or marches into the arena as auxiliary construction equipment, it usually needs auxiliary construction channel is set on river, ensures to construct with this
It goes on smoothly.
Current auxiliary construction channel generally includes pontoon bridge, steel trestle and manually builds island etc., is directed to and different actually applies
Work situation carries out the selection of corresponding construction, for example, it is more rapid for water flow, it should not select and manually build island and pontoon structure conduct
The river in auxiliary construction channel, steel trestle structure just become relatively conventional selection.
For current steel trestle structure, mainly including pier stake and the beam body being arranged in pier stake, beam body is usual
It is spliced using several beret slices, and pier stake is usually to use steel-pipe pile, in construction, needs steel-pipe pile squeezing into soil property
Layer, the length that steel-pipe pile enters soil layer have to reach design length, but are sand below steel-pipe pile in practice of construction
When the hardpans such as boulder bed, steel-pipe pile is difficult to continue to squeeze into, and causes steel-pipe pile insertion depth inadequate, in order to ensure steel-pipe pile branch
The reliability of support, current usual way is that the periphery of Design of Steel-tube Piles position is first arranged in the steel pipe being relatively large in diameter, then
It drills on sand pebble layer in steel pipe, then the casting concrete in drilling, steel-pipe pile is inserted into coagulation before concrete initial set
In soil, although such steel tube pile structure also can be consolidated more, it needs first to be arranged compared with large steel pipe, then in larger steel
Drilled in pipe, casting concrete and be inserted into steel-pipe pile operation, such mode, on the one hand be installation and remove apply
Work process is various, is added significantly to construction cost and duration, also, since the insertion of steel-pipe pile is carried out in large steel pipe, steel
The insertion contraposition of tubular pole bottom is difficult to accurately guarantee, so being difficult to control the construction precision of steel-pipe pile;In another aspect, at the beginning of concrete
Steel-pipe pile is inserted into before solidifying, the insertion depth of steel-pipe pile is more difficult to control, is easy to appear the problems such as insertion is too deep.
It is suitable for the hardpans such as sand pebble layer so needing to design one kind at present, and facilitates guarantee construction quality, drops
The steel tube pile structure of low construction cost.
Utility model content
The purpose of this utility model is that: in current steel trestle structure, the existing above problem provides a kind of be applicable in
In firm hard formations such as sand pebble layers, and facilitate guarantee construction quality, reduces the steel tube pile structure of construction cost.
To achieve the goals above, the technical solution adopted in the utility model are as follows:
A kind of hardpan steel-pipe pile, including at least two steel pipes, the steel pipe bottom is abutted against with hardpan, described
It is provided with drilling on the corresponding hardpan in steel duct space, concrete, the concreting are perfused in the drilling
Continue to upwardly extend after the full drilling, the part for making the concrete form cylinder is located in the steel pipe.
The hardpan steel-pipe pile of the application, when construction, when steel pipe, which sinks down into hardpan, further to sink,
It is protruded into and is drilled by drilling machine, then the concrete perfusion in drilling, behind filling concrete fully-jewelled hole, continue to be perfused, so that
Concrete column a part that hardening is formed is located in drilling, and a part is located in steel pipe, in this way, realize the fixation to steel pipe,
For traditional approach, form of construction work is simple, has not only significantly simplified working procedure, and can by drilling depth and
The height of steel pipe inner concrete to carry out coordinated control to the structural strength and stability of steel-pipe pile, convenient for guaranteeing the steady of steel-pipe pile
Qualitative and reliability.
Preferably, the steel pipe lower end is embedded in the hardpan, makes lower end and the end portion of the steel pipe
Lateral wall fits with the hardpan.This kind of mode makes in steel pipe end portion insertion hardpan, steel pipe end portion
Hardpan in step-like so that hardpan also acts as good support action, a side to steel pipe lower end and peripheral sidewall
Face is the structural strength and stability for further improving steel-pipe pile, on the other hand, the effect of positioning steel tube is also acted as, rear
In continuous construction, steel pipe is avoided to shift.So the construction quality of steel-pipe pile is also improved, in another aspect, each end portion is hard
Quality layer also acts as the effect of hoop, avoids each internal pressure excessive and causes steel pipe lower end by spalling, so, also further
The structural stability for improving the application steel-pipe pile.
Preferably, the concrete height in the steel pipe is the 1/4~1/3 of the length of steel pipe.Inventors have found that
It, being capable of good stable steel pipe when steel pipe inner concrete uses above-mentioned height.
Preferably, sealing plate is additionally provided in the steel pipe top.It is on the one hand to make steel pipe top flat by the way that sealing plate is arranged
Whole, convenient to carry out secure support to superstructure, on the other hand, sealing plate can also prevent building waste and rainwater etc. from falling into steel
Pipe, it is ensured that steel pipe inner wall and inner concrete are not damaged.
Preferably, it is fixedly connected by the way of being fully welded between the sealing plate and the steel pipe.In this way, sealing plate also rises
To the effect for reinforcing steel pipe top, reduce steel pipe top risk of distortion.
Preferably, the sealing plate outer rim forms flange plate beyond the outer wall of steel pipe, in the flange plate and the steel pipe
Several stiffeners are provided between lateral wall.By this kind of mode, the further area for expanding sealing plate, and added by setting
Strength plate also improves the reliability connected between sealing plate and steel pipe, and improves the reliability and stabilization supported to superstructure
Property.
Preferably, bridging is also connected between adjacent steel pipe, the bridging is to be made using profile in X-type cross.
By the way that bridging is arranged, improve the stability of relative position between steel pipe, also improve the structural stability of steel-pipe pile entirety with
Reliability.
As a preferred mode, cooperated by the way of on-fixed connection between the profile of the bridging.Work as steel
When tubular pole is hit, such as when earthquake, the stress of each steel pipe is had differences, so in this application, between the profile of bridging
Using revocable connection type, relatively flexible connection is formed between steel pipe, in this way, further improving the support of steel-pipe pile
Reliability.
Preferably, lateral is additionally provided on the sealing plate, the lateral connects each steel of same steel-pipe pile along direction across bridge
Pipe.
Preferably, the lateral includes at least two I-steel mutually spliced along direction across bridge.
By the setting of lateral, each steel pipe of same steel-pipe pile is connected, forms the support platform of support superstructure.
Preferably, steel reinforcement cage is additionally provided in the concrete, the steel reinforcement cage bottom is located in the drilling, top
In the steel pipe.The structural strength that steel pipe inner concrete column is improved by setting steel reinforcement cage, further improves to steel
The reliability that pipe is reinforced.
Preferably, the steel reinforcement cage includes several main reinforcement and several hoops of being vertically provided in the stirrup in main ribs,
Main ribs lower end is tip shape and exceeds the hoop, is embedded in the hardpan of the foot of hole.The application's
In scheme, tip shape is set by vertical main reinforcement lower end, after steel reinforcement cage is packed into drilling, main reinforcement lower end is facilitated to be inserted into hardpan
It is interior, in this way, be on the one hand further to improve the support reliability of steel pipe inner concrete column, also, in concreting,
The risk for causing steel reinforcement cage to shift because of concrete impact is also reduced, further ensure steel pipe inner concrete column pours matter
Amount.
Preferably, it is the reinforcing bar of 16mm as main reinforcement and stirrup that the steel reinforcement cage, which uses diameter, and main reinforcement spacing is 10cm, hoop
Muscle spacing is 20cm.
Preferably, the concrete is C30 concrete.
Disclosed herein as well is a kind of construction methods of hardpan steel-pipe pile, include the following steps:
A, it lifts: steel pipe is lifted to by design position using hanging apparatus;
B, sink: steel pipe being hammered using vibration hammer, steel pipe is made to be inserted into soil layer, up to steel pipe lower end to hardpan;
C, it drills: being drilled using drilling device to the hardpan below steel duct space, drilling depth is greater than
Or the projected depth equal to steel pipe insert into stratum;
D, concreting: the concrete perfusion in the drilling that step c is formed, concreting continue after expiring the drilling
It pours, makes in filling concrete to steel pipe, and reach design height.
It is compared under the premise of ensuring to be formed steel-pipe pile with excellent support reliability using the construction method of the application
In conventional steel pilework, construction more simplifies, and construction cost can not only be greatly reduced, and can also substantially shorten construction
Duration;Moreover, also can easily ensure the position precision of steel pipe construction, steel-pipe pile construction quality is improved.
Preferably, in the step c, before drilling, steel pipe is connected with the front end of overhanging Bailey beam, it is ensured that steel pipe
It is in a vertical state in drilling.On the one hand it is to ensure that the infusion of steel pipe, guarantees steel-pipe pile construction quality, on the other hand, steel pipe
It is in a vertical state, can be using steel pipe as benchmark in drilling, and then easily guarantee the vertical of drilling.
When preferably, at drilling to steel pipe lower end, drilling progress, and the cement being added are reduced, at steel pipe base opening
After stratum side wall carries out retaining wall, then normal drilling.It is herein the boundary of soil layer and hardpan when drilling to steel pipe lower end
Place, so, drilling progress is reduced here, and stratum is avoided to be mutated and cause to damage to drilling equipment, meanwhile, reinforce concentration of hydraulic mixture
Detection, heating cement carry out retaining wall, on the one hand be reduce friction, reduce bit wear, be on the other hand also prevented from drilling and collapse
Danger.
Preferably, steel reinforcement cage is additionally provided in the drilling, the steel reinforcement cage bottom is located in the drilling, and top is located at
In the steel pipe, in the step d, before concreting, first by the reinforcement cage hoisting to the drilling, then carry out
Concrete pours work.By the way that steel reinforcement cage is arranged, the structural strength of steel pipe inner concrete is improved, and then improve the knot of steel-pipe pile
Structure strength and stability.
Preferably, in the step d, after the steel reinforcement cage is placed into drilling, steel reinforcement cage is hammered using vibration hammer, is made
In the stratum of the end portion insertion drilling lower section of the steel reinforcement cage.By the hardpan of the end portion insertion lower section of steel reinforcement cage
In, it is on the one hand the structural stability for improving the stake of steel pipe inner concrete, on the other hand, it is thus also avoided that in subsequent construction, for example (,) it is mixed
When solidifying soil pours, the risk that steel reinforcement cage is shifted because being impacted so improves the construction quality of steel pipe inner concrete column.
Preferably, in the step c, after drilling, steel pipe is hammered using vibration hammer, makes the end portion of steel pipe
It is embedded into hardpan.Steel pipe end portion is embedded into hardpan, makes in steel pipe end portion insertion hardpan, steel
The hardpan of pipe end portion is in step-like, so that hardpan also acts as good supporting to steel pipe lower end and peripheral sidewall
Effect, is on the one hand the structural strength and stability for further improving steel-pipe pile, on the other hand, also acts as positioning steel tube
Effect, in subsequent construction, avoids steel pipe from shifting.So the construction quality of steel-pipe pile is also improved, in another aspect, each lower end
Partial hardpan also acts as the effect of hoop, avoids each internal pressure excessive and causes steel pipe lower end by spalling, so,
Also the structural stability of the application steel-pipe pile is further improved;Also, it is further, due in boring procedure, drilling machine
Hardpan is impacted, after the completion of drilling, hardpan topmost edge part is more loose because of impact, so at this
In application, after the completion of drilling, steel pipe is further impacted, steel pipe is made further to sink, across hardpan top section
On the one hand weaker zone is to make hardpan form step to carry out supporting to steel pipe bottom end side wall, on the other hand but also hard
Layer can provide reliable support for steel pipe in the vertical direction, in this way, further ensure the stability of steel-pipe pile with can
By property.
It is further preferred that the depth that the steel pipe end portion is embedded into hardpan is the 1/10~1/ of drilling depth
9。
It preferably, further include step e, the construction of steel pipe top in the construction method of the hardpan steel-pipe pile: to steel pipe
After interior concreting is complete, steel pipe tip height is measured,
When steel pipe top is lower than design height, the steel pipe segment for lifting by crane appropriate length is docked, and steel pipe top is reached
To design height;
When steel pipe top is higher than design height, pipe cutting top makes steel pipe top reach design height.In the application
Process in, steel pipe impact process after carry out again steel pipe top cutting or welding splicing, avoid in impact process
Splicing construction bring is adversely affected, while but also steel pipe top is more smooth, avoiding steel pipe top due to blastic deformation
Adverse effect is brought to subsequent construction.
Preferably, in the step e, when steel pipe top reaches design height, sealing plate is set on steel pipe top, is then existed
It is fully welded stiffener between the flange plate and steel pipe lateral wall of sealing plate, then is also connected with bridging between adjacent steel pipe, then on sealing plate
I-steel is also set up as lateral.
Preferably, the steel-pipe pile includes several steel pipes, by carry out the step a and b of root, is then set up between steel pipe
For carrying the carrying platform of drilling machine.In the construction method of application itself, carrying platform is arranged between steel pipe, is facilitated
It while drilling construction, has also further ensured that in boring procedure, the stabilization of steel pipe.
Preferably, the carrying platform is built using beret slice.
Disclosed herein as well is a kind of steel trestle,
A kind of steel trestle, including several steel-pipe piles and the beam body that is arranged on the steel-pipe pile, the beam body along bridge to
The corresponding riverbank in both ends or build and be provided with the abutment for being used to support beam body on island, be provided with and be used to support on the abutment
The support profile of beam body end.
The steel trestle of the application, the setting support profile on abutment, increases abutment forced area, and then improves abutment support
Reliability, and can be by selecting the profile of suitable dimension to realize adjustment to bearing height, and then realize, Abutment beam
The adjustment of body height;
Particularly, the bonding strength between the beam body and support profile is less than what the beam body was occurred damaging by impact
Intensity, when beam body be hit power it is larger when, beam body is detached from profile, is overlapped on abutment, in this way, when the beam body power that is hit is larger
When, beam body damage is avoided, also, when impact force is especially big, beam body is overlapped on abutment, is provided by abutment further slow
Punching support reduces construction loss to ensure the safety of worker and structural device on beam.
Preferably, the support profile includes at least two I-steel arranged side by side, the lower side wing of the I-steel
It is fixedly connected with the abutment, is fixedly connected between the upper side wing of the I-steel.Form support side by side using I-steel
Profile, structure is simple, facilitates acquisition, and can also reuse;
Particularly, i-beam structure vertically has web support, and web is vertical plate-like, when beam body by along bridge to load
When lotus, web can be improved certain elastic deformation space, reduce beam body by along bridge to there is the risk of blastic deformation when impact.
Preferably, the beam body is along to the beam body segment at both ends being to be obliquely installed along bridge, the support profile with it is described
Wedge cushion block is additionally provided between beam body, the upside of the correcting wedge is to match skewed, wedge piece with the beam body
The downside of block is connected with the support profile.The beam body segment at beam body both ends is obliquely installed, when beam body is overlapped on abutment
Be it is skewed, be more advantageous to abutment and the support force that incrementally increases formed to beam body, the cushioning supportive being gradually increased is provided, with this into
The reduction beam body of one step is damaged, and ensures the safety of worker and structural device on beam, reduces construction loss.
Preferably, protection against erosion sandbag is covered on the soil body below the abutment.By the way that protection against erosion sandbag is arranged, it is ensured that
The safety of the soil body below abutment.
Preferably, the beam body includes several beam body segments, and the beam body segment is spliced using beret slice, the shellfish
Thunder piece is arranged in the lateral of the steel-pipe pile, and connecting cross beam corresponding with the lateral is provided on the beret slice, described
Connecting cross beam is arranged along direction across bridge, and is pressed together on the upside of the beret slice lower boom, in the connecting cross beam and the lateral
Between be also connected with vertical bar.Beam body segment is formed using beret slice assembly, beam body is being formed by beam body section assembling, in this way, side
Just the spelling of beam body.
Preferably, bridge deck structure is provided on the beam body segment, the bridge deck structure includes being laid in the beam body
Several first distribution beams, and several second distribution beams being arranged in first distribution beam, first distribution beam and the
Two distribution beams are perpendicular, and the bridge deck structure further includes the bridge surface armor plate being laid in second distribution beam.Pass through first point
On the one hand setting with beam and the second distribution beam is to carry out secure support to superstructure and load, on the other hand, also further
The structural strength for strengthening beam body itself.
Preferably, between the beam body and first distribution beam, first distribution beam and second distribution beam it
Between and second distribution beam and the bridge surface armor plate between to be fixedly connected.
Preferably, first distribution beam is to be arranged along direction across bridge in I-steel, the lower side wing of first distribution beam
It being fixedly connected with the beam body, the upper side wing of first distribution beam is fixedly connected with second distribution beam, and described second
Distribution beam is along bridge, to being arranged in channel steel, the web of second distribution beam is vertically arranged.
Preferably, be spaced apart of adjacent second distribution beam has distance, the opening direction of the second distribution beam channel steel
The middle part of beam body direction across bridge.The opening of channel steel can effectively avoid in the groove of the insertions such as sundries all notches towards beam body middle part.
Preferably, when Design of Steel-tube Piles position is hardpan, when steel pipe is difficult to be inserted into projected depth, using above-mentioned
Hardpan steel-pipe pile.The steel trestle of the application is stablized using above-mentioned hardpan steel-pipe pile so that being formed by steel-pipe pile
Reliably, and working procedure has been significantly simplified, has reduced construction cost.
Disclosed herein as well is a kind of steel trestle construction method,
A kind of steel trestle construction method, includes the following steps:
A, lifting first across with second across steel-pipe pile: first across with second across Design of Steel-tube Piles position carry out steel pipe
The construction of stake;
B, build first across with the second bridge body: step A formed steel-pipe pile on build first across with the second bridge body;
C, build next bridge body: hanging device lifts by crane next bridge body section in the beam body put up, after contraposition
It is installed, forms overhanging girder construction;
D, steel pipe pile driving construction: hanging device is moved in the overhanging girder construction of step C, and carries out the construction of steel-pipe pile;
Step C and D are repeated, until last bridge body section is built and finished.
The construction method of the application, hanging device carry out by cross subsequent beam body and steel-pipe pile in the beam body put up
Construction, avoids the process for building operation platform in river, and then significantly simplified construction, shortens the construction period, reduces
Construction cost.
Preferably, in the step A and step D, when Design of Steel-tube Piles position is hardpan, steel pipe is difficult to be inserted into and set
When counting depth, using the construction method of hardpan steel-pipe pile.
The steel trestle construction method of the application, when Design of Steel-tube Piles position is hardpan, using above-mentioned hardpan
The construction method of steel-pipe pile, in this way, also further ensuring the safety and reliability that steel-pipe pile is supported;Also, also substantially
Working procedure is simplified, the construction period is shortened, reduces construction cost.
Preferably, in the step A, further include abutment construction, first across with before the second across steel pipe pile driving construction or
When construction, construct to abutment.In this way, also further shortening the construction period.
In conclusion by adopting the above-described technical solution, the beneficial effects of the utility model are:
The hardpan steel-pipe pile of the application, when construction, when steel pipe, which sinks down into hardpan, further to sink,
It is protruded into and is drilled by drilling machine, then the concrete perfusion in drilling, behind filling concrete fully-jewelled hole, continue to be perfused, so that
Concrete column a part that hardening is formed is located in drilling, and a part is located in steel pipe, in this way, realize the fixation to steel pipe,
For traditional approach, form of construction work is simple, has not only significantly simplified working procedure, and can by drilling depth and
The height of steel pipe inner concrete to carry out coordinated control to the structural strength and stability of steel-pipe pile, convenient for guaranteeing the steady of steel-pipe pile
Qualitative and reliability.
Detailed description of the invention
Fig. 1 is the partial structural diagram of hardpan steel-pipe pile steel pipe end portion;
Fig. 2 is the structural schematic diagram of steel-pipe pile and beam body cooperation
Fig. 3 is the structural schematic diagram at another visual angle of steel-pipe pile and beam body cooperation,
Fig. 4 is the partial enlarged view in Fig. 3 at A,
Fig. 5 is the structural schematic diagram of steel trestle,
Fig. 6 is the structural schematic diagram of steel trestle Abutment,
Fig. 7 is the partial enlarged view in Fig. 6 at B,
Fig. 8 is the step schematic diagram of steel trestle steel trestle construction method,
Fig. 9 is the step block diagram of hardpan steel pipe pile construction method,
Marked in the figure: 1- steel pipe, 2- hardpan, 3- soil layer, 4- concrete column, 5- sealing plate, 6- stiffener, 7- are cut
Knife support, 8- lateral, 9- steel reinforcement cage, 10- beam body, 11- abutment, 12- support profile, the first distribution beam of 13-, the second distribution beam of 14-,
15- hanging device.
Specific embodiment
With reference to the accompanying drawing, the utility model is described in detail.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this
Utility model is not used to limit the utility model.
Embodiment 1, as shown in figs 1-9,
A kind of hardpan steel-pipe pile, including at least two steel pipes 1,1 bottom of steel pipe are abutted against with hardpan 2,
It is provided with drilling on the corresponding hardpan 2 in 1 inner space of steel pipe, concrete, the coagulation are perfused in the drilling
Soil continues to upwardly extend after pouring the completely described drilling, and the part for making the concrete form cylinder is located in the steel pipe 1.
The hardpan steel-pipe pile of the present embodiment, when construction, when steel pipe 1 sink down into hardpan 2 can not further under
It when heavy, protruded into and is drilled by drilling machine, then the concrete perfusion in drilling, behind filling concrete fully-jewelled hole, continue to be perfused,
So that 4 a part of concrete column that hardening is formed is located in drilling, a part is located in steel pipe 1, in this way, realizing to steel pipe 1
Fixation, for traditional approach, form of construction work is simple, has not only significantly simplified working procedure, but also can pass through brill
The height of 1 inner concrete of hole depth and steel pipe to carry out coordinated control to the structural strength and stability of steel-pipe pile, convenient for guaranteeing
The stability and reliability of steel-pipe pile.
Mode as a further preference, 1 lower end of steel pipe are embedded in the hardpan 2, make under the steel pipe 1
The lateral wall of end and end portion fits with the hardpan 2.This kind of mode makes 1 end portion of steel pipe be embedded in hard
In stratum 2, the hardpan 2 of 1 end portion of steel pipe in step-like so that hardpan 2 to 1 lower end of steel pipe and peripheral sidewall also
Good support action is played, is on the one hand the structural strength and stability for further improving steel-pipe pile, on the other hand, also
Play the role of positioning steel tube 1, in subsequent construction, steel pipe 1 is avoided to shift.So the construction quality of steel-pipe pile is also improved,
In another aspect, the hardpan 2 of each end portion also acts as the effect of hoop, avoids each internal pressure excessive and cause steel
1 lower end of pipe by spalling, so, also further improve the structural stability of the present embodiment steel-pipe pile.
Mode as a further preference, the concrete height in the steel pipe 1 are the 1/4 of 1 length of steel pipe
~1/3.Inventors have found that when 1 inner concrete of steel pipe uses above-mentioned height, it being capable of good stable steel pipe 1.
Mode as a further preference is additionally provided with sealing plate 5 at the top of the steel pipe 1.By the way that sealing plate 5, a side is arranged
Face is to keep 1 top of steel pipe smooth, convenient to carry out secure support to superstructure, and on the other hand, sealing plate 5 can also prevent building rubbish
Rubbish and rainwater etc. fall into steel pipe 1, it is ensured that 1 inner wall of steel pipe and inner concrete are not damaged.
Mode as a further preference, between the sealing plate 5 and the steel pipe 1 by the way of being fully welded the company of being fixed
It connects.In this way, sealing plate 5 also acts as the effect for reinforcing 1 top of steel pipe, reduce 1 top risk of distortion of steel pipe.
Mode as a further preference, 5 outer rim of sealing plate forms flange plate beyond 1 outer wall of steel pipe, described
Several stiffeners 6 are provided between 1 lateral wall of flange plate and the steel pipe.By this kind of mode, further expansion sealing plate 5
Area, and by setting stiffener 6, the reliability connected between sealing plate 5 and steel pipe 1 is also improved, and improve to top
The reliability and stability of structural support.
Mode as a further preference, bridging 7 is also connected between adjacent steel pipe 1, and the bridging 7 is using type
Material is made in X-type cross.By the way that bridging 7 is arranged, the stability of relative position between steel pipe 1 is improved, steel-pipe pile is also improved
Whole structural stability and reliability.
As a kind of mode mode as a further preference, connected between the profile of the bridging 7 using on-fixed
Mode cooperate.When steel-pipe pile is hit, such as when earthquake, the stress of each steel pipe 1 is had differences, so in the present embodiment
In, revocable connection type is used between the profile of bridging 7, forms relatively flexible connection between steel pipe 1, in this way, into
The support reliability of the raising steel-pipe pile of one step.
Mode as a further preference, lateral 8 is additionally provided on the sealing plate 5, and the lateral 8 is same along direction across bridge connection
Each steel pipe 1 of one steel-pipe pile.
Mode as a further preference, the lateral 8 include at least two I-steel mutually spliced along direction across bridge.
By the setting of lateral 8, each steel pipe 1 of same steel-pipe pile is connected, forms the support platform of support superstructure.
Mode as a further preference is additionally provided with steel reinforcement cage 9, the 9 bottom position of steel reinforcement cage in the concrete
In in the drilling, top is located in the steel pipe 1.The structure for improving 1 inner concrete column of steel pipe by setting steel reinforcement cage 9 is strong
Degree further improves the reliability reinforced to steel pipe 1.
Mode as a further preference, the steel reinforcement cage 9 include several main reinforcements and several hoops of being vertically provided in institute
The stirrup in main reinforcement is stated, main ribs lower end is tip shape and exceeds the hoop, with being embedded in the hard of the foot of hole
In layer 2.In the scheme of the present embodiment, tip shape is set by vertical main reinforcement lower end, it is convenient after steel reinforcement cage 9 is packed into drilling
Main reinforcement lower end be inserted into hardpan 2 in, in this way, on the one hand be further improve 1 inner concrete column of steel pipe support it is reliable
Property, also, in concreting, the risk for causing steel reinforcement cage 9 to shift because of concrete impact is also reduced, is further ensured that
The pouring quality of 1 inner concrete column of steel pipe.
Mode as a further preference, it is the reinforcing bar of 16mm as main reinforcement and stirrup that the steel reinforcement cage 9, which uses diameter, main
Muscle spacing is 10cm, stirrup spacing 20cm.
Mode as a further preference, the concrete are C30 concrete.
Embodiment 2, as shown in figs 1-9:
A kind of construction method of hardpan steel-pipe pile, includes the following steps:
A, it lifts: steel pipe 1 is lifted to by design position using hanging apparatus;
B, sink: steel pipe 1 being hammered using vibration hammer, steel pipe 1 is made to be inserted into soil layer, up to 1 lower end of steel pipe to hardpan
2;
C, it drills: being drilled using drilling device to the hardpan 2 below 1 inner space of steel pipe, drilling depth is big
In or equal to 1 insert into stratum of steel pipe projected depth;
D, concreting: the concrete perfusion in the drilling that step c is formed, concreting continue after expiring the drilling
It pours, makes in filling concrete to steel pipe 1, and reach design height.
Using the construction method of the present embodiment, under the premise of ensuring to be formed steel-pipe pile with excellent support reliability, phase
Compared with conventional steel pilework, construction more simplifies, and construction cost can not only be greatly reduced, and can also substantially shorten and apply
The work duration;Moreover, also can easily ensure the position precision that steel pipe 1 is constructed, steel-pipe pile construction quality is improved.
Mode as a further preference, in the step c, before drilling, by the front end of steel pipe 1 and overhanging Bailey beam
It is connected, it is ensured that steel pipe 1 is in a vertical state in drilling.On the one hand it is to ensure that the infusion of steel pipe 1, guarantees steel pipe pile driving construction matter
Amount, on the other hand, steel pipe 1 is in a vertical state, can be using steel pipe 1 as benchmark in drilling, and then easily guarantees to drill
It is vertical.
Mode as a further preference when at drilling to 1 lower end of steel pipe, reduces drilling progress, and the cement being added,
After carrying out retaining wall to the stratum side wall at 1 base opening of steel pipe, then normal drilling.It is herein soil layer when drilling to 1 lower end of steel pipe
3 with the intersection of hardpan 2, so, reduce drilling progress here, stratum avoided to be mutated and cause to damage to drilling equipment
Wound, meanwhile, reinforce the detection of concentration of hydraulic mixture, heating cement carries out retaining wall, is on the one hand to reduce friction, reduces bit wear, separately
On the one hand it is also prevented from the danger that drilling is collapsed.
Mode as a further preference is additionally provided with steel reinforcement cage 9 in the drilling, and 9 bottom of steel reinforcement cage is located at institute
It states in drilling, top is located in the steel pipe 1, in the step d, before concreting, first lifts by crane the steel reinforcement cage 9
To in the drilling, then carry out concrete pour work.By the way that steel reinforcement cage 9 is arranged, the structure for improving 1 inner concrete of steel pipe is strong
Degree, and then improve the structural strength and stability of steel-pipe pile.
Mode as a further preference, in the step d, after the steel reinforcement cage 9 is placed into drilling, using vibration
Hammer hammering steel reinforcement cage 9, is embedded in the end portion of the steel reinforcement cage 9 in the stratum of drilling lower section.By the end portion of steel reinforcement cage 9
It is embedded in the hardpan 2 of lower section, is on the one hand on the other hand the structural stability for improving 1 inner concrete stake of steel pipe also avoids
In subsequent construction, such as when concreting, the risk that steel reinforcement cage 9 is shifted because being impacted so is improved in steel pipe 1 and is mixed
The construction quality of solidifying earth pillar.
Mode as a further preference after drilling, hammers steel pipe 1 using vibration hammer in the step c,
It is embedded into the end portion of steel pipe 1 in hardpan 2.1 end portion of steel pipe is embedded into hardpan 2, makes 1 lower end of steel pipe
It is partially submerged into hardpan 2, the hardpan 2 of 1 end portion of steel pipe is in step-like, so that hardpan 2 is to 1 lower end of steel pipe
Good support action is also acted as with peripheral sidewall, is on the one hand the structural strength and stabilization for further improving steel-pipe pile
Property, on the other hand, the effect of positioning steel tube 1 is also acted as, in subsequent construction, steel pipe 1 is avoided to shift.So also improving steel pipe
The construction quality of stake avoids each internal pressure in another aspect, the hardpan 2 of each end portion also acts as the effect of hoop
Power is excessive and causes 1 lower end of steel pipe by spalling, so, also further improve the structural stability of the present embodiment steel-pipe pile;
Also, it is further, since in boring procedure, drilling machine impacts hardpan 2, after the completion of drilling, hardpan 2
Topmost edge part is more loose because of impact, so in the present embodiment, after the completion of drilling, further impacting steel pipe 1, making
Steel pipe 1 further sinks, and is on the one hand that hardpan 2 is made to form step pair across the weaker zone of 2 top section of hardpan
1 bottom end side wall of steel pipe carries out supporting, on the other hand but also hardpan 2 can provide reliably for steel pipe 1 in the vertical direction
Support, in this way, further ensuring the stability and reliability of steel-pipe pile.
It is further used as further preferred embodiment, 1 end portion of steel pipe is embedded into the depth of hardpan 2 to bore
The 1/10~1/9 of hole depth.
Mode as a further preference further includes step e, steel pipe 1 in the construction method of the hardpan steel-pipe pile
Top construction: after the concreting in steel pipe 1 is complete, measuring 1 tip height of steel pipe,
When 1 top of steel pipe is lower than design height, 1 segment of steel pipe for lifting by crane appropriate length is docked, and 1 top of steel pipe is made
Reach design height;
When 1 top of steel pipe is higher than design height, 1 top of pipe cutting makes 1 top of steel pipe reach design height.At this
In the process of embodiment, steel pipe 1 carries out the cutting or welding splicing on 1 top of steel pipe again after impacting process, avoids punching
Splicing construction bring is adversely affected during hitting, while but also 1 top of steel pipe is more smooth, avoid 1 top of steel pipe because
Blastic deformation and bring adverse effect to subsequent construction.
Mode as a further preference in the step e, when 1 top of steel pipe reaches design height, is pushed up in steel pipe 1
End setting sealing plate 5, is then fully welded stiffener 6, then between adjacent steel pipe 1 also between 1 lateral wall of the flange plate of sealing plate 5 and steel pipe
Bridging 7 is connected, then also sets up I-steel as lateral 8 on sealing plate 5.
Mode as a further preference, the steel-pipe pile include several steel pipes 1, by carry out the step a and b of root, so
The carrying platform for carrying drilling machine is set up between steel pipe 1 afterwards.In the construction method of application itself, carrying platform is arranged
It between steel pipe 1, while facilitating drilling construction, has also further ensured that in boring procedure, the stabilization of steel pipe 1.
Mode as a further preference, the carrying platform are built using beret slice.
Embodiment 3, as shown in figs 1-9,
A kind of steel trestle, including several steel-pipe piles and the beam body 10 that is arranged on the steel-pipe pile, the beam body 10 is along suitable
Bridge to the corresponding riverbank in both ends or build and be provided with the abutment 11 for being used to support beam body 10 on island, be arranged on the abutment 11
There is the support profile 12 for 10 end of supporting beam body.
The steel trestle of the present embodiment, the setting support profile 12 on abutment 11, increases 11 forced area of abutment, and then improve
The reliability that abutment 11 supports, and can be by selecting the profile of suitable dimension to realize the adjustment to bearing height, Jin Ershi
It is existing, the adjustment of 10 height of beam body at abutment 11;
Particularly, the bonding strength between the beam body 10 and support profile 12 is less than the beam body 10 and is occurred by impact
The intensity of damage, when beam body 10 be hit power it is larger when, beam body 10 be detached from profile, be overlapped on abutment 11, in this way, work as beam body 10
When the power that is hit is larger, the damage of beam body 10 is avoided, also, when impact force is especially big, beam body 10 is overlapped on abutment 11, by
Abutment 11 provides further cushioning supportive, to ensure the safety of worker and structural device on beam, reduces construction loss.
Mode as a further preference, the support profile 12 includes at least two I-steel arranged side by side, described
The lower side wing of I-steel is fixedly connected with the abutment 11, is fixedly connected between the upper side wing of the I-steel.Using
I-steel forms support profile 12 side by side, and structure is simple, facilitates acquisition, and can also reuse;
Particularly, i-beam structure vertically has web support, and web is vertical plate-like, when beam body 10 by along bridge to
When load, web can be improved certain elastic deformation space, reduce beam body 10 by along bridge to there is blastic deformation when impact
Risk.
Mode as a further preference, the beam body 10 is obliquely installed along bridge to the beam body segment at both ends, in institute
It states and is additionally provided with wedge cushion block between support profile 12 and the beam body 10, the upside of the correcting wedge is and the beam body 10
What is matched is skewed, and the downside of correcting wedge is connected with the support profile 12.The beam body segment at 10 both ends of beam body tilts
Setting is more advantageous to abutment 11 and forms the branch incrementally increased to beam body 10 when beam body 10 is overlapped on abutment 11 to be skewed
Support force provides the cushioning supportive being gradually increased, and is damaged with this further beam body 10 that reduces, and ensure worker and structure on beam
The safety of equipment reduces construction loss.
Mode as a further preference is covered with protection against erosion sandbag on the soil body below the abutment 11.By setting
Set protection against erosion sandbag, it is ensured that the safety of the 11 lower section soil body of abutment.
Mode as a further preference, the beam body 10 include several beam body segments, and the beam body segment uses shellfish thunder
Piece is spliced, and the beret slice is arranged in the lateral 8 of the steel-pipe pile, is provided on the beret slice and the lateral 8
Corresponding connecting cross beam, the connecting cross beam is arranged along direction across bridge, and is pressed together on the upside of the beret slice lower boom, described
Vertical bar is also connected between connecting cross beam and the lateral 8.Beam body segment is formed using beret slice assembly, is spelled by beam body segment
Dress forms beam body 10, in this way, facilitating the spelling of beam body 10.
Mode as a further preference, bridge deck structure is provided on the beam body segment, and the bridge deck structure includes paving
Several first distribution beams 13 being located in the beam body 10, and several second distribution beams being arranged in first distribution beam 13
14, first distribution beam 13 and the second distribution beam 14 are perpendicular, and the bridge deck structure further includes being laid on second distribution
Bridge surface armor plate on beam 14.It is on the one hand to superstructure and load by the setting of the first distribution beam 13 and the second distribution beam 14
Lotus carries out secure support and on the other hand also further strengthens the structural strength of beam body 10 itself.
Mode as a further preference, between the beam body 10 and first distribution beam 13, first distribution beam
It between 13 and second distribution beam 14 and is to be fixedly connected between second distribution beam 14 and the bridge surface armor plate.
Mode as a further preference, first distribution beam 13 are along direction across bridge setting in I-steel, described first
The lower side wing of distribution beam 13 is fixedly connected with the beam body 10, the upper side wing of first distribution beam 13 with described second point
It is fixedly connected with beam 14, second distribution beam 14 is along bridge, to being arranged in channel steel, the web of second distribution beam 14 is
It is vertically arranged.
Mode as a further preference, adjacent be spaced apart of second distribution beam 14 have distance, second distribution
The opening of 14 channel steel of beam is towards the middle part of 10 direction across bridge of beam body.The opening of channel steel can be avoided effectively miscellaneous towards 10 middle part of beam body
In the groove of the insertions such as object all notches.
Mode as a further preference, when Design of Steel-tube Piles position is hardpan 2, steel pipe 1 is difficult to be inserted into design
When depth, using hardpan steel-pipe pile.The steel trestle of the present embodiment, using above-mentioned hardpan steel-pipe pile, so that institute's shape
At steel-pipe pile it is reliable and stable, and significantly simplified working procedure, reduced construction cost.
The hardpan steel-pipe pile, including at least two steel pipes 1,1 bottom of steel pipe are abutted against with hardpan 2,
It is provided with drilling on the corresponding hardpan 2 in 1 inner space of steel pipe, concrete, the coagulation are perfused in the drilling
Soil continues to upwardly extend after pouring the completely described drilling, and the part for making the concrete form cylinder is located in the steel pipe 1.
The hardpan steel-pipe pile of the present embodiment, when construction, when steel pipe 1 sink down into hardpan 2 can not further under
It when heavy, protruded into and is drilled by drilling machine, then the concrete perfusion in drilling, behind filling concrete fully-jewelled hole, continue to be perfused,
So that 4 a part of concrete column that hardening is formed is located in drilling, a part is located in steel pipe 1, in this way, realizing to steel pipe 1
Fixation, for traditional approach, form of construction work is simple, has not only significantly simplified working procedure, but also can pass through brill
The height of 1 inner concrete of hole depth and steel pipe to carry out coordinated control to the structural strength and stability of steel-pipe pile, convenient for guaranteeing
The stability and reliability of steel-pipe pile.
Mode as a further preference, 1 lower end of steel pipe are embedded in the hardpan 2, make under the steel pipe 1
The lateral wall of end and end portion fits with the hardpan 2.This kind of mode makes 1 end portion of steel pipe be embedded in hard
In stratum 2, the hardpan 2 of 1 end portion of steel pipe in step-like so that hardpan 2 to 1 lower end of steel pipe and peripheral sidewall also
Good support action is played, is on the one hand the structural strength and stability for further improving steel-pipe pile, on the other hand, also
Play the role of positioning steel tube 1, in subsequent construction, steel pipe 1 is avoided to shift.So the construction quality of steel-pipe pile is also improved,
In another aspect, the hardpan 2 of each end portion also acts as the effect of hoop, avoids each internal pressure excessive and cause steel
1 lower end of pipe by spalling, so, also further improve the structural stability of the present embodiment steel-pipe pile.
Mode as a further preference, the concrete height in the steel pipe 1 are the 1/4 of 1 length of steel pipe
~1/3.Inventors have found that when 1 inner concrete of steel pipe uses above-mentioned height, it being capable of good stable steel pipe 1.
Mode as a further preference is additionally provided with sealing plate 5 at the top of the steel pipe 1.By the way that sealing plate 5, a side is arranged
Face is to keep 1 top of steel pipe smooth, convenient to carry out secure support to superstructure, and on the other hand, sealing plate 5 can also prevent building rubbish
Rubbish and rainwater etc. fall into steel pipe 1, it is ensured that 1 inner wall of steel pipe and inner concrete are not damaged.
Mode as a further preference, between the sealing plate 5 and the steel pipe 1 by the way of being fully welded the company of being fixed
It connects.In this way, sealing plate 5 also acts as the effect for reinforcing 1 top of steel pipe, reduce 1 top risk of distortion of steel pipe.
Mode as a further preference, 5 outer rim of sealing plate forms flange plate beyond 1 outer wall of steel pipe, described
Several stiffeners 6 are provided between 1 lateral wall of flange plate and the steel pipe.By this kind of mode, further expansion sealing plate 5
Area, and by setting stiffener 6, the reliability connected between sealing plate 5 and steel pipe 1 is also improved, and improve to top
The reliability and stability of structural support.
Mode as a further preference, bridging 7 is also connected between adjacent steel pipe 1, and the bridging 7 is using type
Material is made in X-type cross.By the way that bridging 7 is arranged, the stability of relative position between steel pipe 1 is improved, steel-pipe pile is also improved
Whole structural stability and reliability.
As a kind of mode mode as a further preference, connected between the profile of the bridging 7 using on-fixed
Mode cooperate.When steel-pipe pile is hit, such as when earthquake, the stress of each steel pipe 1 is had differences, so in the present embodiment
In, revocable connection type is used between the profile of bridging 7, forms relatively flexible connection between steel pipe 1, in this way, into
The support reliability of the raising steel-pipe pile of one step.
Mode as a further preference, lateral 8 is additionally provided on the sealing plate 5, and the lateral 8 is same along direction across bridge connection
Each steel pipe 1 of one steel-pipe pile.
Mode as a further preference, the lateral 8 include at least two I-steel mutually spliced along direction across bridge.
By the setting of lateral 8, each steel pipe 1 of same steel-pipe pile is connected, forms the support platform of support superstructure.
Mode as a further preference is additionally provided with steel reinforcement cage 9, the 9 bottom position of steel reinforcement cage in the concrete
In in the drilling, top is located in the steel pipe 1.The structure for improving 1 inner concrete column of steel pipe by setting steel reinforcement cage 9 is strong
Degree further improves the reliability reinforced to steel pipe 1.
Mode as a further preference, the steel reinforcement cage 9 include several main reinforcements and several hoops of being vertically provided in institute
The stirrup in main reinforcement is stated, main ribs lower end is tip shape and exceeds the hoop, with being embedded in the hard of the foot of hole
In layer 2.In the scheme of the present embodiment, tip shape is set by vertical main reinforcement lower end, it is convenient after steel reinforcement cage 9 is packed into drilling
Main reinforcement lower end be inserted into hardpan 2 in, in this way, on the one hand be further improve 1 inner concrete column of steel pipe support it is reliable
Property, also, in concreting, the risk for causing steel reinforcement cage 9 to shift because of concrete impact is also reduced, is further ensured that
The pouring quality of 1 inner concrete column of steel pipe.
Mode as a further preference, it is the reinforcing bar of 16mm as main reinforcement and stirrup that the steel reinforcement cage 9, which uses diameter, main
Muscle spacing is 10cm, stirrup spacing 20cm.
Mode as a further preference, the concrete are C30 concrete
Embodiment 4, as shown in figs 1-9:
A kind of steel trestle construction method, includes the following steps:
A, lifting first across with second across steel-pipe pile: first across with second across Design of Steel-tube Piles position carry out steel pipe
The construction of stake;
B, build first across with the second bridge body 10: step A formed steel-pipe pile on build first across with the second bridge
Body 10;
C, build next bridge body 10: hanging device 15 lifts by crane next bridge body section in the beam body 10 put up,
It is installed after contraposition, forms overhanging girder construction;
D, steel pipe pile driving construction: hanging device 15 is moved in the overhanging girder construction of step C, and carries out the construction of steel-pipe pile;
Step C and D are repeated, until last bridge body section is built and finished.
The construction method of the present embodiment, hanging device 15 is in the beam body 10 put up to subsequent beam body 10 and steel-pipe pile
It is constructed by cross, avoids the process for building operation platform in river, and then significantly simplified construction, shorten construction work
Phase reduces construction cost.
Mode as a further preference, in the step A and step D, when Design of Steel-tube Piles position is hardpan 2,
When steel pipe 1 is difficult to be inserted into projected depth, using the construction method of hardpan steel-pipe pile.
The steel trestle construction method of the present embodiment, when Design of Steel-tube Piles position is hardpan 2, using hardpan steel pipe
The construction method of stake, in this way, also further ensuring the safety and reliability that steel-pipe pile is supported;Also, it also significantly simplifies
Working procedure, shortens the construction period, reduces construction cost.
The construction method of the hardpan steel-pipe pile, includes the following steps:
A, it lifts: steel pipe 1 is lifted to by design position using hanging apparatus;
B, sink: steel pipe 1 being hammered using vibration hammer, steel pipe 1 is made to be inserted into soil layer, up to 1 lower end of steel pipe to hardpan
2;
C, it drills: being drilled using drilling device to the hardpan 2 below 1 inner space of steel pipe, drilling depth is big
In or equal to 1 insert into stratum of steel pipe projected depth;
D, concreting: the concrete perfusion in the drilling that step c is formed, concreting continue after expiring the drilling
It pours, makes in filling concrete to steel pipe 1, and reach design height.
Using the construction method of the present embodiment, under the premise of ensuring to be formed steel-pipe pile with excellent support reliability, phase
Compared with conventional steel pilework, construction more simplifies, and construction cost can not only be greatly reduced, and can also substantially shorten and apply
The work duration;Moreover, also can easily ensure the position precision that steel pipe 1 is constructed, steel-pipe pile construction quality is improved.
Mode as a further preference, in the step c, before drilling, by the front end of steel pipe 1 and overhanging Bailey beam
It is connected, it is ensured that steel pipe 1 is in a vertical state in drilling.On the one hand it is to ensure that the infusion of steel pipe 1, guarantees steel pipe pile driving construction matter
Amount, on the other hand, steel pipe 1 is in a vertical state, can be using steel pipe 1 as benchmark in drilling, and then easily guarantees to drill
It is vertical.
Mode as a further preference when at drilling to 1 lower end of steel pipe, reduces drilling progress, and the cement being added,
After carrying out retaining wall to the stratum side wall at 1 base opening of steel pipe, then normal drilling.It is herein soil layer when drilling to 1 lower end of steel pipe
3 with the intersection of hardpan 2, so, reduce drilling progress here, stratum avoided to be mutated and cause to damage to drilling equipment
Wound, meanwhile, reinforce the detection of concentration of hydraulic mixture, heating cement carries out retaining wall, is on the one hand to reduce friction, reduces bit wear, separately
On the one hand it is also prevented from the danger that drilling is collapsed.
Mode as a further preference is additionally provided with steel reinforcement cage 9 in the drilling, and 9 bottom of steel reinforcement cage is located at institute
It states in drilling, top is located in the steel pipe 1, in the step d, before concreting, first lifts by crane the steel reinforcement cage 9
To in the drilling, then carry out concrete pour work.By the way that steel reinforcement cage 9 is arranged, the structure for improving 1 inner concrete of steel pipe is strong
Degree, and then improve the structural strength and stability of steel-pipe pile.
Mode as a further preference, in the step d, after the steel reinforcement cage 9 is placed into drilling, using vibration
Hammer hammering steel reinforcement cage 9, is embedded in the end portion of the steel reinforcement cage 9 in the stratum of drilling lower section.By the end portion of steel reinforcement cage 9
It is embedded in the hardpan 2 of lower section, is on the one hand on the other hand the structural stability for improving 1 inner concrete stake of steel pipe also avoids
In subsequent construction, such as when concreting, the risk that steel reinforcement cage 9 is shifted because being impacted so is improved in steel pipe 1 and is mixed
The construction quality of solidifying earth pillar.
Mode as a further preference after drilling, hammers steel pipe 1 using vibration hammer in the step c,
It is embedded into the end portion of steel pipe 1 in hardpan 2.1 end portion of steel pipe is embedded into hardpan 2, makes 1 lower end of steel pipe
It is partially submerged into hardpan 2, the hardpan 2 of 1 end portion of steel pipe is in step-like, so that hardpan 2 is to 1 lower end of steel pipe
Good support action is also acted as with peripheral sidewall, is on the one hand the structural strength and stabilization for further improving steel-pipe pile
Property, on the other hand, the effect of positioning steel tube 1 is also acted as, in subsequent construction, steel pipe 1 is avoided to shift.So also improving steel pipe
The construction quality of stake avoids each internal pressure in another aspect, the hardpan 2 of each end portion also acts as the effect of hoop
Power is excessive and causes 1 lower end of steel pipe by spalling, so, also further improve the structural stability of the present embodiment steel-pipe pile;
Also, it is further, since in boring procedure, drilling machine impacts hardpan 2, after the completion of drilling, hardpan 2
Topmost edge part is more loose because of impact, so in the present embodiment, after the completion of drilling, further impacting steel pipe 1, making
Steel pipe 1 further sinks, and is on the one hand that hardpan 2 is made to form step pair across the weaker zone of 2 top section of hardpan
1 bottom end side wall of steel pipe carries out supporting, on the other hand but also hardpan 2 can provide reliably for steel pipe 1 in the vertical direction
Support, in this way, further ensuring the stability and reliability of steel-pipe pile.
It is further used as further preferred embodiment, 1 end portion of steel pipe is embedded into the depth of hardpan 2 to bore
The 1/10~1/9 of hole depth.
Mode as a further preference further includes step e, steel pipe 1 in the construction method of 2 steel-pipe pile of hardpan
Top construction: after the concreting in steel pipe 1 is complete, measuring 1 tip height of steel pipe,
When 1 top of steel pipe is lower than design height, 1 segment of steel pipe for lifting by crane appropriate length is docked, and 1 top of steel pipe is made
Reach design height;
When 1 top of steel pipe is higher than design height, 1 top of pipe cutting makes 1 top of steel pipe reach design height.At this
In the process of embodiment, steel pipe 1 carries out the cutting or welding splicing on 1 top of steel pipe again after impacting process, avoids punching
Splicing construction bring is adversely affected during hitting, while but also 1 top of steel pipe is more smooth, avoid 1 top of steel pipe because
Blastic deformation and bring adverse effect to subsequent construction.
Mode as a further preference in the step e, when 1 top of steel pipe reaches design height, is pushed up in steel pipe 1
End setting sealing plate 5, is then fully welded stiffener 6, then between adjacent steel pipe 1 also between 1 lateral wall of the flange plate of sealing plate 5 and steel pipe
Bridging 7 is connected, then also sets up I-steel as lateral 8 on sealing plate 5.
Mode as a further preference, the steel-pipe pile include several steel pipes 1, by carry out the step a and b of root, so
The carrying platform for carrying drilling machine is set up between steel pipe 1 afterwards.In the construction method of application itself, carrying platform is arranged
It between steel pipe 1, while facilitating drilling construction, has also further ensured that in boring procedure, the stabilization of steel pipe 1.
Mode as a further preference, the carrying platform are built using beret slice
Mode as a further preference, in the step A, further include abutment 11 construct, first across with second across
Before steel pipe pile driving construction or when constructing, construct to abutment 11.In this way, also further shortening the construction period.
Above embodiments are only to illustrate the utility model and not limit technical solution described in the utility model, to the greatest extent
Pipe this specification has been carried out detailed description to the utility model referring to above-mentioned each embodiment, but the utility model not office
It is limited to above-mentioned specific embodiment, therefore any pair of the utility model is modified or equivalent replacement;And all do not depart from invention
Spirit and scope technical solution and its improvement, should all cover in the scope of the claims of the utility model.
Claims (9)
1. a kind of hardpan steel-pipe pile, it is characterised in that: including at least two steel pipes, the steel pipe bottom and hardpan phase
It abuts, is provided with drilling on the corresponding hardpan in the steel duct space, concrete is perfused in the drilling, it is described to mix
Solidifying soil continues to upwardly extend after pouring the completely described drilling, and the part for making the concrete form cylinder is located at the steel pipe
It is interior, steel reinforcement cage is additionally provided in the concrete, the steel reinforcement cage bottom is located in the drilling, and top is located at the steel pipe
It is interior.
2. hardpan steel-pipe pile according to claim 1, it is characterised in that: the steel pipe lower end is with being embedded in the hard
In layer, the lateral wall of the lower end and end portion that make the steel pipe fits with the hardpan.
3. hardpan steel-pipe pile according to claim 2, it is characterised in that: be additionally provided with envelope in the steel pipe top
Plate.
4. hardpan steel-pipe pile according to claim 3, it is characterised in that: the sealing plate outer rim is beyond outside the steel pipe
Wall forms flange plate, is provided with several stiffeners between the flange plate and the steel pipe lateral wall.
5. hardpan steel-pipe pile according to claim 4, it is characterised in that: be additionally provided with lateral, institute on the sealing plate
State each steel pipe that lateral connects same steel-pipe pile along direction across bridge.
6. hardpan steel-pipe pile according to claim 5, it is characterised in that: the lateral includes at least two along cross-bridges
To the I-steel mutually spliced.
7. hardpan steel-pipe pile described in -6 any one according to claim 1, it is characterised in that: if the steel reinforcement cage includes
In the stirrup in main ribs, main ribs lower end is tip shape and exceeds the ring dry main reinforcement and several hoops of being vertically provided at
Hoop, is embedded in the hardpan of the foot of hole.
8. hardpan steel-pipe pile described in -6 any one according to claim 1, it is characterised in that: the steel reinforcement cage is using straight
For the reinforcing bar that diameter is 16mm as main reinforcement and stirrup, main reinforcement spacing is 10cm, stirrup spacing 20cm.
9. hardpan steel-pipe pile described in -6 any one according to claim 1, it is characterised in that: the concrete is C30
Concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821373950.9U CN208933954U (en) | 2018-08-24 | 2018-08-24 | A kind of hardpan steel-pipe pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821373950.9U CN208933954U (en) | 2018-08-24 | 2018-08-24 | A kind of hardpan steel-pipe pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208933954U true CN208933954U (en) | 2019-06-04 |
Family
ID=66718733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821373950.9U Active CN208933954U (en) | 2018-08-24 | 2018-08-24 | A kind of hardpan steel-pipe pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208933954U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114232702A (en) * | 2021-12-06 | 2022-03-25 | 天津市政工程设计研究总院有限公司 | Steel pipe pile combined reinforcement method and reinforcement structure |
-
2018
- 2018-08-24 CN CN201821373950.9U patent/CN208933954U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114232702A (en) * | 2021-12-06 | 2022-03-25 | 天津市政工程设计研究总院有限公司 | Steel pipe pile combined reinforcement method and reinforcement structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101614125B (en) | Construction method of V-level surrounding rock tunnel | |
CN106930321B (en) | The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole | |
CN103696784A (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN109610305A (en) | Old pier column combined type reinforcement system and construction method | |
CN109056710A (en) | A kind of hardpan steel-pipe pile and its construction method | |
CN109024236A (en) | A kind of steel trestle and its construction method | |
CN110499772A (en) | A kind of rock matter riverbed double-layer plate pile cofferdam construction method | |
CN108797323A (en) | A kind of steel trestle suitable for hardpan | |
CN208088288U (en) | The big areas grain size shiver stone Gao Tian pile foundation fast pore-creating structure | |
CN109667273A (en) | A kind of construction method of deep foundation pit supporting structure | |
CN113482011B (en) | Large-diameter PHC pipe pile and cast-in-situ bored pile combined foundation pit supporting structure and method | |
CN208933954U (en) | A kind of hardpan steel-pipe pile | |
CN107013046B (en) | A kind of antidote of big section steel pipe concrete combination column | |
CN101725147B (en) | Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space | |
CN112726591A (en) | Construction method of engineering pile shallow layer broken pile reinforcing structure and reinforcing structure thereof | |
CN208649910U (en) | A kind of lock steel pipe splicing pile cofferdam | |
CN107740419A (en) | Foundation pit supporting method and raked pile | |
CN208685435U (en) | A kind of steel trestle with secure support system | |
CN105370306B (en) | The massif tunnel excavation construction method of vertical pre-reinforcement processing | |
CN108660941A (en) | A kind of lock steel pipe splicing pile cofferdam and construction method | |
CN209958372U (en) | Railway newly-added second-line platform back way foundation pile pipe curtain supporting structure | |
CN107574825A (en) | Foundation pit supporting method and raked pile | |
CN107366290A (en) | Foundation pit supporting method and raked pile | |
CN113882431A (en) | Construction method for dismantling end cofferdam | |
CN213448531U (en) | A river course cofferdam structure for ground wall protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |