CN108501201A - A method of prefabricated case beam reinforcing bar is installed using standard frame - Google Patents
A method of prefabricated case beam reinforcing bar is installed using standard frame Download PDFInfo
- Publication number
- CN108501201A CN108501201A CN201810250092.7A CN201810250092A CN108501201A CN 108501201 A CN108501201 A CN 108501201A CN 201810250092 A CN201810250092 A CN 201810250092A CN 108501201 A CN108501201 A CN 108501201A
- Authority
- CN
- China
- Prior art keywords
- standard frame
- case beam
- reinforcing bar
- prefabricated case
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Abstract
The invention discloses a kind of method for installing prefabricated case beam reinforcing bar using standard frame, installation steps are:Making standard frame → fixed standard frame → installation steel bar stress → installation horizontal distribution reinforcing bar → installation bottom web reinforcement → standard frame moves to next prefabricated case beam pedestal.The installation method step of the present invention is simply easy to operation, standard frame is easy to make, method using the present invention installs prefabricated case beam reinforcing bar, the quality of efficiency and reinforcement installation for prefabricated case beam reinforcement installation all improves a lot, shorten the construction period simultaneously, labour cost has been saved, there is good economic and social benefit.
Description
Technical field
The invention belongs to bridge engineering construction fields, and in particular to a kind of to install prefabricated case beam reinforcing bar using standard frame
Method.
Background technology
Prefabricated case beam reinforcement installation at this stage is routinely to rely on worker on the good graticule prefabricated case beam pedestal of marking, is passed through
The method that auxiliary bar is fixed temporarily is bound.For being fixed temporarily the side of installation prefabricated case beam reinforcing bar using auxiliary bar
Formula, in reinforcing bar process of binding, bar spacing is not easily controlled, and is often done over again caused by spacing is beyond code requirement, reinforcing bar rule
Often there is buckling phenomenon during the installation process in the smaller horizontal distribution reinforcing bar of lattice, can not meet design drawing and code requirement.
Speed is relatively slow during the installation process and usually deviation, especially horizontal reinforcement are bent serious for steel bar stress and horizontal distribution reinforcing bar, sternly
Ghost image rings bottom web reinforcement installation quality.How more rapidly accurately installation prefabricated case beam reinforcing bar is urgent problem.
Invention content
The present invention provides a kind of methods for installing prefabricated case beam reinforcing bar using standard frame, not only realize precast box joist steel
Muscle installation standardization, more improves the efficiency of prefabricated case beam reinforcement installation, effectively accelerates construction speed, saved and be constructed into
This.
The specific technical solution of the present invention is as follows:
A method of prefabricated case beam reinforcing bar being installed using standard frame, steps are as follows:
1) it is required according to design drawing, determines prefabricated case beam web gradient, standard frame frame body is made using angle steel;Frame body system
After the completion of work, the steel pipe for placing horizontal hack lever is welded on frame body according to design drawing horizontal distribution bar spacing, according to web
Oblique angle penetrates horizontal hack lever in steel pipe, completes standard frame and makes.
2) fixed standard frame:According to the good bottom web reinforcement groove of marking on prefabricated case beam pedestal, with 1m between left and right away from solid
Calibrate quasi- frame;
3) steel bar stress is installed:Bottom web stress reinforcing bar is installed according to the position marked, and is bound temporarily with standard frame,
Ensure that principal rod and standard frame are stablized;
4) rely on standard frame horizontal hack lever that horizontal distribution reinforcing bar is installed;
5) it checks adjustment reinforcement installation situation, completes the installation of bottom web reinforcement;
6) standard frame moves to next prefabricated case beam pedestal.
Further, step 1) Plays frame bottom is additionally provided with standard frame pedestal, and pedestal is made of 5-8mm steel plates.
Further, step 2) fixed standard frame frame body, you can be connected and fixed, can also be adopted using reinforcing bar and horizontal hack lever
The standard frame spot welding for determining riding position is stablized on prefabricated case beam pedestal with the mode of spot welding.
Further, the spacing of step 2) standard frame is disposed with the integral multiple of steel bar stress spacing.
Compared with prior art, beneficial effects of the present invention are:
Under the premise of ensuring construction quality, construction is greatly shortened using the method installation prefabricated case beam reinforcing bar of the present invention
Duration has saved labour cost, improves the installation quality of prefabricated case beam reinforcing bar, has good economic and social benefit.
Description of the drawings
Attached drawing is used to provide further understanding of the present invention, and a part for constitution instruction, the reality with the present invention
It applies example to be used to explain the present invention together, not be construed as limiting the invention.
Fig. 1 is that Plays frame of the present invention makes schematic diagram;
Fig. 2 is prefabricated case beam reinforcement installation schematic diagram in the present invention;
Fig. 3 is prefabricated case beam reinforcing bar schematic diagram in the present invention;
In figure:1, the horizontal hack lever of standard frame;2, standard frame frame body;3, standard frame pedestal;4, prefabricated case beam pedestal;5, bottom abdomen
Slab tendons skeleton.
Specific implementation mode
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein
Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Embodiment 1
Before construction, standard frame is first made.As shown in Figure 1, standard frame is by the horizontal hack lever 1 of standard frame, 2 and of standard frame frame body
Standard frame pedestal 3 forms.
According to horizontal distribution bar spacing processing criterion frame in design drawing.2 main material of standard frame frame body can be used and use angle steel
It makes, frame body can be met and do not occured bending and deformation;The horizontal hack lever 1 of standard frame is made of 10~Ф of Ф, 12 round steel.Frame body makes
After the completion, 20 steel pipes of Ф are welded on frame body according to horizontal distribution bar spacing on design drawing, facilitate horizontal hack lever reinforcing bar energy
It penetrates.Installation steel pipe is that the length that is put in for horizontal 1 reinforcing bar of hack lever of standard frame is adjustable, can meet all types of precast box joist steels
Muscle is installed and used, cost-effective.Standard frame pedestal 3 is made of 5~10mm steel plates, and plate size, which should not be too large, can make standard
Frame frame body is firm to be placed.
Embodiment 2
Such as Fig. 2, shown in Fig. 3, when prefabricated case beam reinforcing bar being installed using the standard frame in embodiment 1, it is as follows:
1) it is required according to design drawing, determines prefabricated case beam web gradient, standard frame frame body 2 is made using angle steel;Frame body
After completing, the steel pipe of the horizontal hack lever of placement standard frame 1 is welded on frame body according to design drawing horizontal distribution bar spacing,
Horizontal hack lever is penetrated in steel pipe according to web oblique angle, is completed standard frame and is made.
2) fixed standard frame:According to the good bottom web reinforcement groove of marking on prefabricated case beam pedestal 4, with 1m between left and right away from solid
Calibrate quasi- frame.
The spacing of standard frame is disposed with the integral multiple of steel bar stress spacing, can effectively control steel bar stress binding spacing, mark
The horizontal hack lever of quasi- frame 1 can also play the role of horizontal distribution reinforcing bar rest, and horizontal distribution reinforcing bar can be placed on standard frame water
It is directly bound on flatrack bar, the process that binding horizontal distribution reinforcing bar is fixed temporarily both has been omitted, it is thus also avoided that horizontal distribution reinforcing bar
There is buckling phenomenon.
When fixed standard frame frame body, you can it is connected and fixed using reinforcing bar and horizontal hack lever 1, it can also be by the way of spot welding
The standard frame spot welding for determining riding position is stablized on prefabricated case beam pedestal 4.
3) steel bar stress is installed:Bottom web stress reinforcing bar is installed according to the position marked, and is bound temporarily with standard frame,
Ensure that principal rod and standard frame are stablized.
4) rely on standard frame horizontal hack lever 1 that horizontal distribution reinforcing bar is installed.
5) it checks adjustment reinforcement installation situation, completes the installation of bottom web reinforcement.
6) standard frame moves to next prefabricated case beam pedestal 4.
In conjunction with the above embodiments, the installation of bottom web reinforcement is carried out by the way of standard frame, effectively increases reinforcing bar
Bottom web reinforcement installation effectiveness, also solves the problems, such as horizontal distribution bar bending;It is improved using standard frame prefabricated case beam reinforcing bar
Bottom web reinforcement installation quality accelerates construction speed, reduces recruitment, reduces construction cost.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (4)
1. a kind of method for installing prefabricated case beam reinforcing bar using standard frame, which is characterized in that steps are as follows:
Step 1) is required according to design drawing, determines prefabricated case beam web gradient, and standard frame frame body (2) is made using angle steel;Frame
After body completes, the steel of the horizontal hack lever of placement standard frame 1 is welded on frame body according to design drawing horizontal distribution bar spacing
Pipe penetrates horizontal hack lever according to web oblique angle in steel pipe, completes standard frame and makes.
Step 2) fixed standard frame:According to the good bottom web reinforcement groove of marking on prefabricated case beam pedestal (4), with 1m between left and right away from
Fixed standard frame;
Step 3) installs steel bar stress:Bottom web stress reinforcing bar is installed according to the position marked, and is bound temporarily with standard frame,
Ensure that principal rod and standard frame are stablized;
Step 4) relies on the horizontal hack lever of standard frame (1) to install horizontal distribution reinforcing bar;
Step 5) checks adjustment reinforcement installation situation, completes the installation of bottom web reinforcement;
Step 6) standard frame moves to next prefabricated case beam pedestal (4).
2. a kind of method for installing prefabricated case beam reinforcing bar using standard frame according to claim 1, which is characterized in that step
1) Plays frame bottom is additionally provided with standard frame pedestal (3), and pedestal is made of 5-8mm steel plates.
3. a kind of method for installing prefabricated case beam reinforcing bar using standard frame according to claim 1, which is characterized in that step
2) fixed standard frame frame body, you can it is connected and fixed with the horizontal hack lever of standard frame (1) using reinforcing bar, it can also be by the way of spot welding
The standard frame spot welding for determining riding position is stablized on prefabricated case beam pedestal (4).
4. a kind of method for installing prefabricated case beam reinforcing bar using standard frame according to claim 1, which is characterized in that step
2) spacing of standard frame is disposed with the integral multiple of steel bar stress spacing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810250092.7A CN108501201A (en) | 2018-03-26 | 2018-03-26 | A method of prefabricated case beam reinforcing bar is installed using standard frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810250092.7A CN108501201A (en) | 2018-03-26 | 2018-03-26 | A method of prefabricated case beam reinforcing bar is installed using standard frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108501201A true CN108501201A (en) | 2018-09-07 |
Family
ID=63378368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810250092.7A Pending CN108501201A (en) | 2018-03-26 | 2018-03-26 | A method of prefabricated case beam reinforcing bar is installed using standard frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108501201A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115070935A (en) * | 2022-06-30 | 2022-09-20 | 上海东华建设管理有限公司 | Prefabricated bridge approach box girder reinforcement binding positioner of high pile pier |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001342685A (en) * | 2000-03-28 | 2001-12-14 | Hotsuma Kobo Kk | Recycling type environmental protection construction method in restriction type discrete body arch (or dome) structure |
CN201857570U (en) * | 2010-09-08 | 2011-06-08 | 上海市建筑构件制品有限公司 | Groove-shaped steel reinforcement cage for binding tire film frame |
CN202225295U (en) * | 2011-07-29 | 2012-05-23 | 浙江天晟梁板有限公司 | Integrally-forming mold base of steel reinforcement framework |
CN204019724U (en) * | 2014-08-28 | 2014-12-17 | 中国建筑土木建设有限公司路桥分公司 | Make the mold of prefabricated case beam framework of steel reinforcement |
CN204339984U (en) * | 2014-12-15 | 2015-05-20 | 中铁四局集团第三建设有限公司 | A kind of highway prefabricated case beam reinforcing bar fixture clamping fixture |
CN205134199U (en) * | 2015-11-12 | 2016-04-06 | 科达集团股份有限公司 | Case roof beam reinforcement die carrier equipment |
CN105821768A (en) * | 2016-03-24 | 2016-08-03 | 浙江大学城市学院 | Box girder bottom web reinforcing steel bar integral forming formwork and construction method |
CN206625130U (en) * | 2017-03-01 | 2017-11-10 | 浙江大学城市学院 | Box beam steel reinforcement cage sizing mould bases |
-
2018
- 2018-03-26 CN CN201810250092.7A patent/CN108501201A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001342685A (en) * | 2000-03-28 | 2001-12-14 | Hotsuma Kobo Kk | Recycling type environmental protection construction method in restriction type discrete body arch (or dome) structure |
CN201857570U (en) * | 2010-09-08 | 2011-06-08 | 上海市建筑构件制品有限公司 | Groove-shaped steel reinforcement cage for binding tire film frame |
CN202225295U (en) * | 2011-07-29 | 2012-05-23 | 浙江天晟梁板有限公司 | Integrally-forming mold base of steel reinforcement framework |
CN204019724U (en) * | 2014-08-28 | 2014-12-17 | 中国建筑土木建设有限公司路桥分公司 | Make the mold of prefabricated case beam framework of steel reinforcement |
CN204339984U (en) * | 2014-12-15 | 2015-05-20 | 中铁四局集团第三建设有限公司 | A kind of highway prefabricated case beam reinforcing bar fixture clamping fixture |
CN205134199U (en) * | 2015-11-12 | 2016-04-06 | 科达集团股份有限公司 | Case roof beam reinforcement die carrier equipment |
CN105821768A (en) * | 2016-03-24 | 2016-08-03 | 浙江大学城市学院 | Box girder bottom web reinforcing steel bar integral forming formwork and construction method |
CN206625130U (en) * | 2017-03-01 | 2017-11-10 | 浙江大学城市学院 | Box beam steel reinforcement cage sizing mould bases |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115070935A (en) * | 2022-06-30 | 2022-09-20 | 上海东华建设管理有限公司 | Prefabricated bridge approach box girder reinforcement binding positioner of high pile pier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101324117B (en) | Method for positioning reinforced steel bar or hoop reinforcement in reinforced concrete construction as well as positioner | |
CN206396913U (en) | A kind of built-in fitting positioning and mounting structure | |
CN108501201A (en) | A method of prefabricated case beam reinforcing bar is installed using standard frame | |
CN208502075U (en) | A kind of constructional column upper reinforcement connection pre-embedded device | |
CN107083840A (en) | A kind of anti-bank one-shot forming formwork erection method in toilet | |
CN208280453U (en) | Girder with rolled steel section en cased in concrete lacing wire constructing device | |
CN218061511U (en) | Beam rib positioning device | |
CN206681366U (en) | Negative and positive Angle formwork bracing means | |
CN211164594U (en) | Jig frame for binding steel bar framework of T-shaped beam | |
CN207920076U (en) | The stair tread formwork that both sides are provided with shear wall installs device | |
CN102092096A (en) | Method for fixing pre-stressed hose of precast beam | |
CN205476083U (en) | Concrete beam's cover to reinforcement structure | |
CN205874988U (en) | Case back board prestressing tendons positioner | |
CN109914800A (en) | A kind of civil buildings townhouse wire box accurately pre-installs structure and construction method | |
CN217420255U (en) | Steel bar positioning device | |
CN201850700U (en) | Secondary beam of corrugated web H-shaped steel floor and supporting support rod | |
CN108798008A (en) | Fixing device and application method for service sleeve, preformed hole | |
CN106192752B (en) | Beam sections external prestressing anchor plate replaces localization method | |
CN109083418A (en) | A kind of construction method of inner support outer hoop posting trestle framework of steel reinforcement joint bar | |
CN205242236U (en) | Install T type roof beam of RPC leveling board | |
CN209891562U (en) | Steel bar positioning tool structure | |
CN105649274B (en) | Internal overarm support, using beam column steel bar framework and its construction technology made of the internal overarm support | |
CN109025072A (en) | A kind of construction method of plate above formula beam bottom cover to reinforcement | |
CN109457956A (en) | A kind of die-filling method and structure of the construction of deformation joint | |
CN102720361A (en) | Wide-span steel pipe hollow concrete floor plate lower suspending type truss moulding board construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180907 |
|
RJ01 | Rejection of invention patent application after publication |