CN205134199U - Case roof beam reinforcement die carrier equipment - Google Patents
Case roof beam reinforcement die carrier equipment Download PDFInfo
- Publication number
- CN205134199U CN205134199U CN201520898031.3U CN201520898031U CN205134199U CN 205134199 U CN205134199 U CN 205134199U CN 201520898031 U CN201520898031 U CN 201520898031U CN 205134199 U CN205134199 U CN 205134199U
- Authority
- CN
- China
- Prior art keywords
- support
- box girder
- bars
- steel bar
- bar binding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型涉及一种箱梁钢筋绑扎模架设备,包括由前侧的多根支架前斜杆、后侧的多根支架竖杆以及二者之间设有的多根横向间隔布置的支架横杆组成的框式支架;多根支架前斜杆构成的前侧面自上而下横向间隔分布至少两根方钢管以及多层水平支撑,方钢管沿长度方向上间隔开有多个竖向槽口;框式支架的底部设有支腿。本实用新型的有益效果是:设备结构简单,设计合理,易于实现;且移动方便,操作简单,绑扎标准容易统一,钢筋笼绑扎效果较好;采用本实用新型的设备绑扎的钢筋笼间钢筋距均匀、位置准确,笼体平整、直顺,能够有效绑扎钢筋保护层厚度,提高公路的使用寿命。
The utility model relates to a box girder steel bar binding formwork equipment, which comprises a plurality of support front inclined bars on the front side, a plurality of support vertical bars on the rear side, and a plurality of support horizontal bars arranged at intervals in a transverse direction between the two. A frame-type bracket composed of rods; the front side composed of multiple bracket front slanting rods is distributed at least two square steel pipes and multi-layer horizontal supports at intervals from top to bottom, and the square steel pipes are spaced with multiple vertical slots along the length direction ; The bottom of the frame support is provided with outriggers. The beneficial effects of the utility model are: the equipment is simple in structure, reasonable in design, easy to realize; convenient to move, easy to operate, easy to unify the binding standards, and the binding effect of the steel cage is better; Uniform and accurate position, the cage is flat and straight, which can effectively bind the thickness of the protective layer of steel bars and improve the service life of the road.
Description
技术领域 technical field
本实用新型涉及一种路桥施工用钢筋绑扎模架设备,特别涉及一种预制箱梁钢筋绑扎模架设备。 The utility model relates to a steel bar binding formwork equipment for road and bridge construction, in particular to a prefabricated box girder steel bar binding formwork equipment.
背景技术 Background technique
目前,桥梁工程施工已全面实施标准化,对预制箱梁钢筋绑扎质量的要求尤其重视。工程建设中预制箱梁钢筋绑扎质量主要取决于现场钢筋工人的技术水平,而现在劳动市场上优秀的钢筋技术工人越来越少,技术水平参差不齐,且人员流动性大,更换频繁,致使钢筋笼绑扎质量难以得到保障。所以市面上需要一种技术来弥补这一不足。 At present, the standardization of bridge engineering construction has been fully implemented, and the requirements for the binding quality of prefabricated box girder reinforcement are especially emphasized. The quality of prefabricated box girder steel bar binding in engineering construction mainly depends on the technical level of on-site steel bar workers, but now there are fewer and fewer excellent steel bar technical workers in the labor market, and the technical level is uneven. The quality of steel cage binding is difficult to be guaranteed. Therefore, a technology is needed on the market to make up for this deficiency.
发明内容 Contents of the invention
本实用新型的目的就是针对现有技术存在的上述缺陷,提供一种预制箱梁钢筋笼绑扎模架设备,能够保证绑扎的箱梁钢筋笼的捆扎质量符合设计要求,提高公路的使用寿命。 The purpose of this utility model is to provide a prefabricated box girder steel cage binding formwork equipment for the above-mentioned defects in the prior art, which can ensure that the binding quality of the bound box girder steel cage meets the design requirements and improve the service life of the road.
本实用新型技术方案是:包括由前侧的多根支架前斜杆、后侧的多根支架竖杆以及二者之间设有的多根横向间隔布置的支架横杆组成的框式支架;所述多根支架前斜杆构成的前侧面自上而下横向间隔分布至少两根方钢管以及多层水平支撑,每根方钢管沿长度方向上均间隔开有多个竖向槽口,且各根方钢管上的竖向槽口上下相互对应;所述框式支架的底部设有支腿。 The technical scheme of the utility model is: a frame-type support composed of a plurality of support front slanting bars on the front side, a plurality of support vertical bars on the rear side, and a plurality of support cross bars arranged at intervals in the transverse direction; At least two square steel pipes and multi-layer horizontal supports are distributed laterally from top to bottom on the front side formed by the plurality of bracket front slant bars, and each square steel pipe is spaced with a plurality of vertical notches along the length direction, and The vertical notches on the square steel pipes correspond to each other up and down; the bottom of the frame-type support is provided with supporting legs.
上述方案进一步优选为: The above scheme is further preferably:
优选的,所述框式支架包含有多节重复单元,且多节重复单元之间通过连接销连接为一体。模架根据施工强度和重量要求自由分节制作,以不发生变形且方便人工搬移为原则。 Preferably, the frame-type bracket includes multi-section repeating units, and the multi-section repeating units are connected as a whole through connecting pins. The formwork is freely divided into sections according to the construction strength and weight requirements, and the principle is to avoid deformation and facilitate manual movement.
优选的,所述框式支架前侧底端设有横向的前端底支撑,所述前端底支撑的厚度与底板钢筋保护层厚度一致。安装时,前端底支撑直接安放在箱梁预制台座顶面上,且前端底支撑的厚度与底板钢筋保护层厚度设计为一致,还可兼起控制箱梁板底保护层厚度的作用。 Preferably, a transverse front end bottom support is provided at the front bottom end of the frame support, and the thickness of the front end bottom support is consistent with the thickness of the steel bar protective layer of the bottom plate. During installation, the front end bottom support is directly placed on the top surface of the box girder prefabricated pedestal, and the thickness of the front end bottom support is designed to be consistent with the thickness of the bottom plate steel protection layer, and it can also control the thickness of the bottom protection layer of the box girder slab.
优选的,所述支架前斜杆构成的前侧面的坡度与箱梁腹板坡度一致。 Preferably, the slope of the front side formed by the front diagonal bars of the bracket is consistent with the slope of the web of the box girder.
优选的,所述支腿高度小于箱梁预制台座高度。 Preferably, the height of the outrigger is smaller than the height of the prefabricated pedestal of the box girder.
本实用新型的有益效果是:设备结构简单,设计合理,易于实现;且移动方便,操作简单,绑扎标准容易统一,钢筋笼绑扎效果较好;采用本实用新型的设备绑扎的钢筋笼间钢筋距均匀、位置准确,笼体平整、直顺,能够有效绑扎钢筋保护层厚度,提高公路的使用寿命。 The beneficial effects of the utility model are: the equipment is simple in structure, reasonable in design, easy to implement; convenient to move, easy to operate, easy to unify the binding standards, and the binding effect of the steel cage is better; Uniform and accurate position, the cage is flat and straight, which can effectively bind the thickness of the protective layer of steel bars and improve the service life of the road.
附图说明 Description of drawings
图1是本实用新型的结构示意图; Fig. 1 is a structural representation of the utility model;
图2是图1的左视图; Fig. 2 is the left view of Fig. 1;
上图中:1、后支腿,2、前肢腿,3、支架横杆,4、支架竖杆,5、支架前斜杆,6、水平支撑,7、上开槽方钢管,8、下开槽方钢管,9、前端底支撑,10、连接销。 In the picture above: 1. Rear outrigger, 2. Forelimb leg, 3. Bracket crossbar, 4. Bracket vertical bar, 5. Bracket front slant bar, 6. Horizontal support, 7. Upper slotted square steel pipe, 8. Lower Slotted square steel pipe, 9, front end bottom support, 10, connecting pin.
具体实施方式 detailed description
结合附图1,对本实用新型作进一步的描述: In conjunction with accompanying drawing 1, the utility model is further described:
本实用新型包括:后支腿1、前肢腿2、支架横杆3、支架竖杆4、支架前斜杆5、水平支撑6、上开槽方钢管7、下开槽方钢管钢8、前端底支撑9、连接销10。其中前侧的多根支架前斜杆5、后侧的多根支架竖杆4以及二者之间设有的多根横向间隔布置的支架横杆3组成框式支架;多根支架前斜杆5构成的前侧面自上而下横向间隔分布两根方钢管(即上开槽方钢管7、下开槽方钢管钢8)以及多层水平支撑6,上开槽方钢管7、下开槽方钢管钢8均沿长度方向上间隔开有多个竖向槽口,且各根方钢管上的竖向槽口上下相互对应;槽口宽度略大于待捆扎钢筋的直径,上、下方开槽钢管的开槽间距、大小和水平支撑布置的间距严格按照箱梁腹板纵横向钢筋的设计位置和间距制作;框式支架的底部设有前支腿2、后支腿1,且后支腿1和前肢腿2的高度必须小于箱梁预制台座高度;框式支架前侧底端设有横向的前端底支撑9,前端底支撑9的厚度与底板钢筋保护层厚度一致,兼起控制箱梁板底保护层厚度的作用。模架根据施工强度和重量要求自由分节制作,以不发生变形且方便人工搬移为原则,各节段按顺序编号,采用连接销10连接。同时注意上、下开槽方钢管的槽口间距在节段连接处也应符合箱梁的设计钢筋间距要求。 The utility model comprises: rear outrigger 1, forelimb leg 2, bracket cross bar 3, bracket vertical bar 4, bracket front oblique bar 5, horizontal support 6, upper slotted square steel tube 7, lower slotted square steel tube steel 8, front end Bottom support 9, connecting pin 10. Wherein a plurality of support front slant bars 5 on the front side, a plurality of support vertical bars 4 on the rear side and a plurality of support cross bars 3 arranged at intervals horizontally between the two form a frame support; a plurality of support front slant bars The front side composed of 5 is distributed horizontally from top to bottom with two square steel pipes (that is, upper slotted square steel tube 7, lower slotted square steel tube steel 8) and multi-layer horizontal support 6, upper slotted square steel tube 7, lower slotted square steel tube The square steel pipe steel 8 has a plurality of vertical notches at intervals along the length direction, and the vertical notches on each square steel pipe correspond to each other up and down; the width of the notch is slightly larger than the diameter of the steel bar to be bound, and the upper and lower sides The groove spacing and size of the steel pipes and the spacing of the horizontal support arrangement are made in strict accordance with the design position and spacing of the longitudinal and transverse steel bars of the box girder web; 1 and the height of the forelimb legs 2 must be less than the height of the prefabricated pedestal of the box girder; the front bottom of the frame support is provided with a horizontal front end bottom support 9, the thickness of the front end bottom support 9 is consistent with the thickness of the steel reinforcement protective layer of the bottom plate, and it also controls the box girder The effect of the thickness of the protective layer on the bottom of the board. The formwork is freely divided into sections according to the construction strength and weight requirements. The principle is to avoid deformation and facilitate manual movement. Each section is numbered in sequence and connected by connecting pins 10. At the same time, it should be noted that the notch spacing of the upper and lower slotted square steel pipes should also meet the design steel bar spacing requirements of the box girder at the segment connection.
使用时,前肢腿2和前端底支撑9紧贴箱梁台座安放,通过调整后支腿1的高度,使得支架竖杆4保持竖直,从而达到支架前斜杆5与箱梁腹板面的角度一致。将模架在台座两侧按顺序利用连接销10将多个重复单元(多节)连接成整体,将箱梁腹板竖向钢筋沿上开槽方钢管7和下开槽方钢管钢8的槽口安放,然后将箱梁腹板纵向水平钢筋沿水平支撑6从下向上依次安放,并将各钢筋交叉点绑扎牢固,形成标准钢筋笼。 During use, the forelimb leg 2 and the front end bottom support 9 are placed close to the box girder pedestal, and the height of the rear support leg 1 is adjusted to keep the vertical bar 4 of the support vertical, so as to achieve the contact between the front inclined bar 5 of the support and the web surface of the box girder. The angles are consistent. Connect the formwork on both sides of the pedestal in sequence using connecting pins 10 to connect multiple repeating units (multi-sections) into a whole, and connect the vertical steel bars of the box girder web along the upper grooved square steel pipe 7 and the lower grooved square steel pipe steel 8 Place the notch, and then place the longitudinal horizontal steel bars of the box girder web along the horizontal support 6 from bottom to top, and bind the cross points of the steel bars firmly to form a standard steel cage.
以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内,本实用新型要求保护范围由所附的权利要求书及其等效物界定。 The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model, and the claimed protection scope of the utility model is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520898031.3U CN205134199U (en) | 2015-11-12 | 2015-11-12 | Case roof beam reinforcement die carrier equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520898031.3U CN205134199U (en) | 2015-11-12 | 2015-11-12 | Case roof beam reinforcement die carrier equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205134199U true CN205134199U (en) | 2016-04-06 |
Family
ID=55620007
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520898031.3U Expired - Lifetime CN205134199U (en) | 2015-11-12 | 2015-11-12 | Case roof beam reinforcement die carrier equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205134199U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108501201A (en) * | 2018-03-26 | 2018-09-07 | 中国十七冶集团有限公司 | A method of prefabricated case beam reinforcing bar is installed using standard frame |
-
2015
- 2015-11-12 CN CN201520898031.3U patent/CN205134199U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108501201A (en) * | 2018-03-26 | 2018-09-07 | 中国十七冶集团有限公司 | A method of prefabricated case beam reinforcing bar is installed using standard frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104175398B (en) | Make the mold and method of prefabricated case beam framework of steel reinforcement | |
| CN106088662B (en) | Concrete frame structure Vierendeel girder, superimposed sheet Construction of Supporting method | |
| CN204019724U (en) | Make the mold of prefabricated case beam framework of steel reinforcement | |
| CN103696440A (en) | Movable reinforcement cage binding jig | |
| CN203684526U (en) | PBL stiffened rectangular steel tube concrete space truss | |
| CN203334664U (en) | Ultra-long cantilever truss structure high formwork supporting system | |
| CN108252504A (en) | Tube shear wall concrete structure large form hoisting type construction method and constructing device | |
| CN202831751U (en) | Two-way dense rib type storage pocket barricade | |
| CN205134199U (en) | Case roof beam reinforcement die carrier equipment | |
| CN205259592U (en) | Template structure of steel construction floor | |
| CN204040515U (en) | Cat ladder | |
| CN206554500U (en) | Steel structure concrete, which is poured, uses adjustable transverse support bar | |
| CN204510806U (en) | The longitudinal edge cover bracket of building plain form rack system | |
| CN205134664U (en) | A upper and lower double -deck concrete slab structure for girder steel | |
| CN204662954U (en) | The transverse edge cover bracket of building plain form rack system | |
| CN207392768U (en) | A kind of Multi-section slippage device in irregular large-span space structure of constructing | |
| CN206189848U (en) | Early tear horizontal mold sheet composition bearing structure open | |
| CN204826727U (en) | Reinforcing bar processing protection canopy that can dismantle, has enough to meet need | |
| CN205153321U (en) | Raft board steel bar support rod frame | |
| CN205282953U (en) | Assembled goods shelves of spatial structure of transformer substation | |
| CN204826620U (en) | Construction roof beam structure | |
| CN205205681U (en) | Hollow thin wall rectangle mound top application worker uses bracket | |
| CN211377449U (en) | Inter-column supporting structure capable of placing cable | |
| CN203175042U (en) | Large template hoisting device | |
| CN205600196U (en) | Rack of welding section of jurisdiction steel construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CB03 | Change of inventor or designer information | ||
| CB03 | Change of inventor or designer information |
Inventor after: Liu Zhisheng Inventor after: Li Lei Inventor after: Cao Zhenqing Inventor after: Zhu Xiaozhong Inventor after: Zeng Xianglong Inventor after: Han Jinliang Inventor before: Li Yutao Inventor before: Wu Yanbing Inventor before: Li Xingtang Inventor before: Zhu Xiaozhong Inventor before: Li Lei Inventor before: Cao Zhenqing Inventor before: Zeng Xianglong Inventor before: Han Jinliang |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20170628 Address after: 257000, the Yellow River Road, Dongying District, Shandong City, Dongying Province, planning five West Road Science and technology enterprise accelerator E2-4-403 Patentee after: SHANDONG KEDA INFRASTRUCTURE Co.,Ltd. Address before: 257091 Shandong city of Dongying province Dongying District Front Street No. 65 Patentee before: KEDA GROUP Co.,Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |