CN108487614A CN201810647543.0A CN201810647543A CN108487614A CN 108487614 A CN108487614 A CN 108487614A CN 201810647543 A CN201810647543 A CN 201810647543A CN 108487614 A CN108487614 A CN 108487614A
Authority
CN
China
Prior art keywords
bending
lifting
outside
substitution
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810647543.0A
Other languages
Chinese (zh)
Inventor
闫光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810647543.0A priority Critical patent/CN108487614A/en
Publication of CN108487614A publication Critical patent/CN108487614A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements

Abstract

The invention discloses a kind of high-altitude wall decoration equipment of substitution climbing operation, including mobile base, both sides at the top of the mobile base are installed with bearing column, front and the back side of the mobile base two bottom sides are installed with universal wheel, middle part at the top of the mobile base is provided with prefabricated box, the middle part of both sides offers placing groove at the top of the mobile base, is related to indoor wall decoration technology field.The high-altitude wall decoration equipment of operation is climbed in the substitution, by carrying out being gone up to the air and be bonded some row actions such as metope progress wall brick installation after grasping manipulation to wall brick at ground, on the one hand it ensure that single operation personnel can carry out Self-operating and complete installation task to achieve the purpose that save labour, another aspect installation personnel need not carry out the life security that installation exercise has ensured operating personnel in high-altitude, the transmission of wall brick need not be carried out simultaneously and carries out high-altitude storage, it is more safe and practical.

Description

A kind of high-altitude wall decoration equipment of substitution climbing operation
Technical field
The present invention relates to indoor wall decoration technology field, specially a kind of high-altitude wall decoration of substitution climbing operation is set It is standby.
Background technology
Walltile (abbreviation wall brick) is suitable for the decoration for vertical face of toilet, kitchen, outdoor balcony, and Wall brick is protection metope From the effective way that water splashes, they are applied not only to metope, in the edge trim of door and window and a kind of interesting decoration element Element.
Currently, there is miscellaneous ornament materials on the interior trim of building wall, wherein wallpaper, wall paper and wall brick etc. Comparatively common concentration using the relatively more of wallpaper and wall paper in individual family, but also has more people using wall Brick carries out device wall, and wall brick is used not just as ornament materials, and it has many advantages, such as anti-scratch and bears dirty, big in office It is more that building or public place still use wall brick to decorate, and is on the one hand because it bears dirty and anti-scratch, is on the other hand rear It is more convenient when phase comes into operation the upkeep operations such as to be arranged and cleaned, but be when being installed early period It is relatively complicated, especially the wall brick installation of position higher position or more people cooperation is needed send brick and patch block or just It is that station is installed on higher shelf, this kind of installation method, which is not only construction personnel, has certain risk, higher Place stores more wall brick and is also easy to wall brick slippage occur to fall, and causes to be also easy to injure ground decoration by a crashing object while wall brick breakage, So need at present it is a kind of can one man operation and suitable for eminence wall brick installation exercise equipment.
Such as a kind of Chinese patent discloses " cladding wall brick mounting structure and the method for installing the wall brick " (patent No.: CN103343604A), which includes building body and the wall brick that is installed on the building body, which is characterized in that The mounting structure further includes multiple mutually independent installation units, and above-mentioned technical proposal major function is embodied in fastener cycle Irregular compressing will not be caused to wall brick, avoided due to component error, installation carrier error, the error and work of wall brick itself The destruction of the existing flatness of wall brick and itself balanced internal stress, enhances entire wall brick knot caused by the factors such as part displacement Although the safety of structure and the ability for resisting external force preferably facilitate the installation of wall brick to a certain extent, but do not connect Touch some existing row problems of higher position wall brick installation.
Invention content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of high-altitude wall decoration equipment of substitution climbing operation, solutions There is installation effectiveness and safety in indoor wall of having determined finishing higher position wall brick installation.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:A kind of high-altitude of substitution climbing operation Wall decoration equipment, including mobile base, the both sides at the top of the mobile base are installed with bearing column, the activity Front and the back side of base bottom both sides are installed with universal wheel, and the middle part at the top of the mobile base is provided with prepackage The middle part of case, mobile base top both sides offers placing groove.
Preferably, the bottom of the prefabricated box both sides is wound off equipped with fortune brick slot, and the inner cavity of the fortune brick slot, which is run through, to be connected with Brick bottom plate is transported, the both sides of the fortune brick bottom plate offer sliding slot, and the inner cavity activity of the sliding slot is connected with adjusting slider, described Side of the adjusting slider far from sliding slot has been fixedly connected with mobile side board, and cross is provided at the top of the mobile side board opposite side To handle, the bottom of the transverse direction handle is provided with clamping device, and connection is run through in the both sides at the prefabricated box front and the back side There are pressure ram, the side that the pressure ram is located at prepackage box cavity to be fixedly connected with stripper plate, the pressure ram is far from prefabricated box The middle part of side is provided with stressed plate through being connected with calibration bolt between two pressure rams, at the top of the fortune brick bottom plate Both sides have been fixedly connected with support side plate.
Preferably, the clamping device includes lifting rod, and the bottom of the lifting rod runs through lateral handle and extends to cross To the outside of spanner bottom, lifting ring is provided at the top of the lifting rod, the bottom of the lifting rod is hinged with deformed plate, Side of the deformed plate far from lifting rod is connected with clamping bottom plate by snib, is provided with and grabs at the top of the lifting ring Take device.
Preferably, the grabbing device includes crawl box, and the bottom of the crawl box has been equidistantly positioned grip axes, institute The top of grip axes to be stated through crawl box and extends to the inner cavity of crawl box, the bottom of the grip axes is provided with crawl sucker, The grip axes, which are located at the top of crawl box, is fixedly connected with gas storage box, and the middle part at the top of the gas storage box is fixedly connected with air inlet The top of pipe, the air inlet pipe through crawl box and extends to the outside at the top of crawl box, and the both sides at the top of the crawl box are equal It is fixedly connected with steering shaft, translating device is provided at the top of the steering shaft, reset bullet is socketed on the outside of the grip axes Spring.
Preferably, be fixedly connected on the outside of the top of the resetting spring and grip axes, the bottom of the resetting spring with The bottom of crawl box inner wall is fixedly connected, and the interface of the grip axes and gas storage box is provided with sealing ring.
Preferably, the translating device includes turning translation lead screw, and bending column is socketed on the outside of the translation lead screw, described Translation sliding slot is offered on the left of bending column, the top of the translation lead screw through translation sliding slot and extends on the left of bending column Outside is socketed with translation sleeve on the outside of the bending column, is fixedly connected on the right side of the left side of the translation sleeve and steering shaft, It is provided with bending device at the top of the bending column.
Preferably, the bending device includes bending crossbeam, and the both sides of the bending cross rail outer are socketed with bending set, Bending axis is provided in the middle part of bending set inner cavity, the middle part on the outside of the bending axis is socketed with bending gear, the bending It is fixedly connected at the top of the bottom of gear and bending column, the bending set bottom offers bending slot, the bending with left side Folded sheet is both provided on the left of set inner wall front and the back side, the both sides of the bending crossbeam are both provided with elevating mechanism.
Preferably, the elevating mechanism includes the lifting shaft through bearing column, the outside of the lifting shaft opposite side It is socketed with lifting fluted disc, elevating chain is socketed on the outside of the lifting fluted disc, the opposite side of the top lifting shaft is fixed It is connected with transmission axle, the output shaft that passes on left of the left bottom lifting shaft is fixedly connected with driving motor, the right side bottom It is provided with lifting handle on the right side of portion's lifting shaft, lifting set is fixedly connected on the outside of the elevating chain.
(3) advantageous effect
The present invention provides a kind of high-altitude wall decoration equipment of substitution climbing operation.Has following advantageous effect:
(1), the substitution climbing operation high-altitude wall decoration equipment, by ground to wall brick carry out grasping manipulation it Some row actions such as metope progress wall brick installation are being gone up to the air and be bonded afterwards, on the one hand ensure that single operation personnel can Carry out Self-operating and complete installation task achieve the purpose that save labour, another aspect installation personnel need not high-altitude into Row installation exercise has ensured the life security of operating personnel, while need not carry out the transmission of wall brick and carry out high-altitude storage, It is more safe and practical.
(2), the high-altitude wall decoration equipment of substitution climbing operation, by the main purpose side of being that mobile base is arranged Just position movement carried out to whole equipment, at the same mobile base be provided with one fixed width main purpose be it is convenient to wall brick Storage, and wall brick can follow moving for equipment and be moved, and need not carry out other carrying operation, save operator The muscle power of member.
(3), the high-altitude wall decoration equipment of substitution climbing operation, the main function that prefabricated box is arranged are conveniently to needing The wall brick installed carries out floor treatment, corrects its position and ensures that the wall brick of each piece of installation can keep identical shape State, while prefabricated box can function as cutting container, carries out cutting operation to wall brick wherein, decoration garbage is avoided to make fullly All it is to need secondary cleaning time-consuming and laborious.
(4), the high-altitude wall decoration equipment of substitution climbing operation, the main function that grabbing device is arranged are to passing through Pretreated wall brick carries out grasping manipulation, and absorption is exhausted in the main feature relatively smooth using wall brick surface, crawl with It is more smooth in the action of release, it can effectively improve the working efficiency of operating personnel.
(5), the high-altitude wall decoration equipment of substitution climbing operation can be captured by the setting of bending device The change of setting position state is changed to level when needing the when of capturing wall brick to be changed into plumbness after crawl State so that crawl wall brick action need not carry out the change of wall brick state, can be good at preventing wall brick from falling down and being crushed and make At loss.
(6), the high-altitude wall decoration equipment of substitution climbing operation, after the main function of elevating mechanism will capture wall brick Grabbing device carries out lifting action, it is made to carry out wall brick installation up to precalculated position, and the lifting of grabbing device replaces operating personnel Climbing, it is relatively reliable in terms of safety.
(7), the high-altitude wall decoration equipment of substitution climbing operation, the main function of translation mechanism are grabbing device Horizontal motion is carried out together with wall brick, pushing wall brick to metope carries out with metope being bonded installation.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is prefabricated box vertical view of the present invention;
Fig. 3 is clamping device of the present invention and subscribes schematic diagram;
Fig. 4 is grabbing device structural schematic diagram of the present invention;
Fig. 5 translating device structural schematic diagrams of the present invention;
Fig. 6 is that present invention bending covers side view;
Fig. 7 is that present invention bending covers front view;
Fig. 8 is bearing column side view of the present invention;
Fig. 9 is bearing column front view of the present invention.
In figure:1 mobile base, 2 bearing columns, 3 universal wheels, 4 prefabricated boxes, 401 fortune brick slots, 402 operating bottom plates, 403 are slided Slot, 404 adjusting sliders, 405 mobile side boards, 406 lateral handles, 407 clamping devices, 4071 lifting rods, 4072 lifting rings, 4073 Deformed plate, 4074 clamp bottom plate, 408 pressure rams, 409 stripper plates, 410 calibration bolts, 411 stressed plates, 412 support side plates, 5 placements Slot, 6 grabbing devices, 601 crawl boxes, 602 grip axes, 603 crawl suckers, 604 gas storage box, 605 air inlet pipe, 606 steering shafts, 607 resetting springs, 7 translating devices, 701 translation lead screws, 702 bending columns, 703 translation sliding slots, 704 translation sleeves, 8 bending dresses Set, 801 bending crossbeams, 802 bending axis, 803 bending gears, 804 bending slots, 805 folded sheets, 806 bending sets, 9 elevating mechanisms, 901 lifting shafts, 902 lifting fluted discs, 903 elevating chains, 904 transmission axles, 905 driving motors, 906 lifting handles, 907 liftings Set.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Examples of the embodiments are shown in the accompanying drawings, and in which the same or similar labels are throughly indicated identical or classes As element or element with the same or similar functions.The embodiments described below with reference to the accompanying drawings are exemplary, purport For explaining the present invention, and it is not considered as limiting the invention.
In the description of the present invention, it is to be understood that, term "center", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be orientation based on ... shown in the drawings or Position relationship is merely for convenience of description of the present invention and simplification of the description, and does not indicate or imply the indicated device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be that machinery connects It connects, can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary in two elements The interaction relationship of the connection in portion or two elements.It for the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
- 9 are please referred to Fig.1, the present invention provides a kind of technical solution:It is a kind of that the high-altitude wall decoration for climbing operation is replaced to set Standby, including mobile base 1, the both sides at 1 top of mobile base are installed with bearing column 2,1 two bottom sides of mobile base Front is installed with universal wheel 3 with the back side, and the middle part at 1 top of mobile base is provided with prefabricated box 4,4 both sides of prefabricated box Bottom is wound off equipped with fortune brick slot 401, and the inner cavity of fortune brick slot 401, which is run through, is connected with fortune brick bottom plate 402, the both sides of fortune brick bottom plate 402 Offer sliding slot 403, the inner cavity activity of sliding slot 403 is connected with adjusting slider 404, adjusting slider 404 far from sliding slot 403 one Side has been fixedly connected with mobile side board 405, and lateral handle 406, lateral handle are provided at the top of 405 opposite side of mobile side board 406 bottom is provided with clamping device 407, and the positive both sides with the back side of prefabricated box 4, which are run through, is connected with pressure ram 408, squeezes The side that bar 408 is located at 4 inner cavity of prefabricated box is fixedly connected with stripper plate 409, middle part of the pressure ram 408 far from 4 side of prefabricated box Through calibration bolt 410 is connected with, stressed plate 411 is provided between two pressure rams 408, the both sides at 402 top of fortune brick bottom plate are equal It is fixedly connected with support side plate 412, the middle part of 1 top both sides of mobile base offers placing groove 5.
Clamping device 407 includes lifting rod 4071, and the bottom of lifting rod 4071 runs through lateral handle 406 and extends to transverse direction The outside of 406 bottom of spanner, the top of lifting rod 4071 are provided with lifting ring 4072, the bottom of lifting rod 4071 be hinged with change Shape plate 4073, side of the deformed plate 4073 far from lifting rod 4071 are connected with by snib and clamp bottom plate 4074, and ring is lifted 4072 top is provided with grabbing device 6.
Grabbing device 6 includes crawl box 601, and the bottom of crawl box 601 has been equidistantly positioned grip axes 602, grip axes 602 top runs through crawl box 601 and extends to the inner cavity of crawl box 601, and the bottom of grip axes 602 is provided with crawl sucker 603, the top that grip axes 602 are located at crawl box 601 is fixedly connected with gas storage box 604, and the middle part at 604 top of gas storage box, which is fixed, to be connected It is connected to air inlet pipe 605, the top of air inlet pipe 605 through crawl box 601 and extends to the outside at the top of crawl box 601, captures box The both sides at 601 tops have been fixedly connected with steering shaft 606, and the top of steering shaft 606 is provided with translating device 7, grip axes 602 Outside is socketed with resetting spring 607, and the top of resetting spring 607 is fixedly connected with the outside of grip axes 607, resetting spring 607 Bottom be fixedly connected with the bottom of crawl 601 inner wall of box, the interface of grip axes 602 and gas storage box 604 is provided with sealing ring.
Translating device 7 includes turning translation lead screw 701, and the outside of translation lead screw 701 is socketed with bending column 702, bends column 702 Left side offer translation sliding slot 703, the top of translation lead screw 701 through translation sliding slot 703 and extends to bending column 702 left side Outside, the outside of bending column 702 is socketed with translation sleeve 704, and the right side for translating left side and the steering shaft 606 of sleeve 704 is solid The top of fixed connection, bending column 702 is provided with bending device 8.
Bending device 8 includes bending crossbeam 801, and the both sides in 801 outside of bending crossbeam are socketed with bending set 806, bending It covers and is provided with bending axis 802 in the middle part of 801 inner cavities, the middle part in 802 outside of bending axis is socketed with bending gear 803, bends gear 803 bottom is fixedly connected with the top of bending column 702, and bending 801 bottoms of set offer bending slot 804, bending with left side It covers and is both provided with folded sheet 805 on the left of 801 inner wall fronts and the back side, the both sides of bending crossbeam 801 are both provided with elevating mechanism 9。
Elevating mechanism 9 includes the lifting shaft 901 through bearing column 2, and liter is socketed on the outside of 901 opposite side of lifting shaft Fluted disc 902 drops, and the outside of lifting fluted disc 902 is socketed with elevating chain 903, and the opposite side of top lifting shaft 901 is fixedly connected There are transmission axle 904, the output shaft that passes on left of left bottom lifting shaft 901 to be fixedly connected with driving motor 905, bottom right side liter The right side of drop axis 901 is provided with lifting handle 906, and the outside of elevating chain 903 is fixedly connected with lifting set 907.
Operation principle:Equipment is moved to job location, and wall brick to be used will be needed to be placed in mobile base 1 Lifting ring 4072 is caught in the inner cavity of placing groove 5 when needing to carry out the installation exercise of eminence wall brick, presses down on lifting ring 4072 drive lifting rods 4071 move downward, and lifting rod 4072, which moves downward, drives deformed plate 4073 to generate deformation, deformed plate 4073 generation shapes extruding clamping bottom plates 4074 are moved downward is clamped operation by fortune brick bottom plate 402, pushes lateral handle later 406, lateral handle 406 drives fortune brick bottom plate 402 to move by mobile side board 405, operating bottom plate 402 along fortune brick slot 401 into The bottom for entering 5 inner cavity of placing groove simultaneously supports side plate 412 and is supported the wall brick on upper layer and mutually divided with the wall brick of bottom From, fortune brick bottom plate 402 is retracted into the inner cavity of prefabricated box 4 again later and takes back one block of wall brick, adjusts calibration bolt 410 later, it is logical Crossing calibration bolt 410 drives pressure ram 48 and the movement of pressure ram 409 to be clamped fixation to wall brick, then grasps grabbing device, will capture Be bonded to each other at the top of sucker 603 and wall brick, booster air pump is inflated the inner cavity of gas storage box 604, grip axes 603 by Effect to air pressure is extruded and moves downward, grip axes 603 be pressed down against crawl sucker 603 will capture sucker 603 and wall brick it Between air empty, wall brick is subjected to crawl absorption, pulls bending device 8 again later, grabbing device 6 and wall brick are pulled to hanging down Straight state restarts driving motor 905, drives lifting fluted disc 902 to rotate by transmission axle 904, lifting fluted disc 902 drives lifting Chain 903 moves, and elevating chain 903 drives grabbing device 6 to move upwards, and wall brick is promoted to predetermined altitude, starts later flat Wall brick transverse translation is gradually bonded to metope and with metope installation by moving device 7.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. a kind of high-altitude wall decoration equipment of substitution climbing operation, including mobile base (1), it is characterised in that:The activity Both sides at the top of pedestal (1) are installed with bearing column (2), the front and the back side of mobile base (1) two bottom sides It is installed with universal wheel (3), the middle part at the top of the mobile base (1) is provided with prefabricated box (4), the mobile base (1) middle part of top both sides offers placing groove (5).
2. a kind of high-altitude wall decoration equipment of substitution climbing operation according to claim 1, it is characterised in that:It is described pre- The bottom of vanning (4) both sides is wound off equipped with fortune brick slot (401), and the inner cavity of the fortune brick slot (401), which is run through, is connected with fortune brick bottom plate (402), the both sides of the fortune brick bottom plate (402) offer sliding slot (403), and the inner cavity activity of the sliding slot (403) is connected with Adjusting slider (404), side of the adjusting slider (404) far from sliding slot (403) have been fixedly connected with mobile side board (405), Lateral handle (406) is provided at the top of mobile side board (405) opposite side, the bottom of the transverse direction handle (406) is set It is equipped with clamping device (407), the positive both sides with the back side of the prefabricated box (4), which are run through, is connected with pressure ram (408), described to squeeze The side that compression bar (408) is located at prefabricated box (4) inner cavity is fixedly connected with stripper plate (409), and the pressure ram (408) is far from prepackage The middle part of case (4) side is provided with stressed plate through calibration bolt (410) is connected between two pressure rams (408) (411), the both sides at the top of the fortune brick bottom plate (402) have been fixedly connected with support side plate (412).
3. a kind of high-altitude wall decoration equipment of substitution climbing operation according to claim 2, it is characterised in that:The folder Tight device (407) includes lifting rod (4071), and the bottom of the lifting rod (4071) runs through lateral handle (406) and extends to cross To the outside of spanner (406) bottom, lifting ring (4072), the lifting rod are provided at the top of the lifting rod (4071) (4071) bottom is hinged with deformed plate (4073), and side of the deformed plate (4073) far from lifting rod (4071) passes through snib It is connected with and clamps bottom plate (4074), grabbing device (6) is provided at the top of the lifting ring (4072).
4. a kind of high-altitude wall decoration equipment of substitution climbing operation according to claim 3, it is characterised in that:It is described to grab It includes crawl box (601) to take device (6), and the bottom of the crawl box (601) has been equidistantly positioned grip axes (602), described The top of grip axes (602) runs through crawl box (601) and extends to the inner cavity of crawl box (601), the bottom of the grip axes (602) Portion is provided with crawl sucker (603), and the grip axes (602), which are located at the top of crawl box (601), is fixedly connected with gas storage box (604), the middle part at the top of the gas storage box (604) is fixedly connected with air inlet pipe (605), is passed through at the top of the air inlet pipe (605) It wears crawl box (601) and extends to the outside at the top of crawl box (601), the both sides at the top of the crawl box (601) are fixed to be connected It is connected to steering shaft (606), translating device (7), the outside of the grip axes (602) are provided at the top of the steering shaft (606) It is socketed with resetting spring (607).
5. a kind of high-altitude wall decoration equipment of substitution climbing operation according to claim 4, it is characterised in that:It is described multiple It is fixedly connected on the outside of the top of position spring (607) and grip axes (607), bottom and the crawl box of the resetting spring (607) (601) bottom of inner wall is fixedly connected, and the grip axes (602) and the interface of gas storage box (604) are provided with sealing ring.
6. a kind of high-altitude wall decoration equipment of substitution climbing operation according to claim 4, it is characterised in that:It is described flat Moving device (7) includes turning translation lead screw (701), and bending column (702) is socketed on the outside of the translation lead screw (701), described curved Translation sliding slot (703) is offered on the left of folding column (702), translation sliding slot (703) is run through simultaneously in the top of the translation lead screw (701) The outside on the left of bending column (702) is extended to, translation sleeve (704), the translation are socketed on the outside of the bending column (702) It is fixedly connected on the right side of the left side of sleeve (704) and steering shaft (606), bending dress is provided at the top of the bending column (702) It sets (8).
7. a kind of high-altitude wall decoration equipment of substitution climbing operation according to claim 6, it is characterised in that:It is described curved Device for folding (8) includes bending crossbeam (801), and the both sides on the outside of the bending crossbeam (801) are socketed with bending set (806), institute It states and is provided with bending axis (802) in the middle part of bending set (801) inner cavity, the middle part on the outside of the bending axis (802) is socketed with bending Gear (803) is fixedly connected at the top of the bottom of the bending gear (803) and bending column (702), the bending set (801) Bottom offers bending slot (804) with left side, and folding is both provided on the left of described bending set (801) inner wall front and the back side The both sides of plate (805), the bending crossbeam (801) are both provided with elevating mechanism (9).
8. a kind of high-altitude wall decoration equipment of substitution climbing operation according to claim 7, it is characterised in that:The liter Descending mechanism (9) includes the lifting shaft (901) through bearing column (2), is socketed on the outside of lifting shaft (901) opposite side Fluted disc (902) is lifted, elevating chain (903), the top lifting shaft (901) are socketed on the outside of the lifting fluted disc (902) Opposite side is fixedly connected with transmission axle (904), and the output shaft that passes on left of the left bottom lifting shaft (901) fixes company It is connected to driving motor (905), lifting handle (906), the lift chain are provided on the right side of the bottom right side lifting shaft (901) Lifting set (907) is fixedly connected on the outside of item (903).
CN201810647543.0A 2018-06-22 2018-06-22 A kind of high-altitude wall decoration equipment of substitution climbing operation Withdrawn CN108487614A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810647543.0A CN108487614A (en) 2018-06-22 2018-06-22 A kind of high-altitude wall decoration equipment of substitution climbing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810647543.0A CN108487614A (en) 2018-06-22 2018-06-22 A kind of high-altitude wall decoration equipment of substitution climbing operation

Publications (1)

Publication Number Publication Date
CN108487614A true CN108487614A (en) 2018-09-04

Family

ID=63342858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810647543.0A Withdrawn CN108487614A (en) 2018-06-22 2018-06-22 A kind of high-altitude wall decoration equipment of substitution climbing operation

Country Status (1)

Country Link
CN (1) CN108487614A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576818A (en) * 2020-06-09 2020-08-25 古敬青 Multifunctional brick paving device
CN113719089A (en) * 2021-09-29 2021-11-30 嘉兴市天坤营造工程设计有限公司 Wall brick attaching method and device for building construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576818A (en) * 2020-06-09 2020-08-25 古敬青 Multifunctional brick paving device
CN111576818B (en) * 2020-06-09 2021-12-31 乐陵市卓亚新型建材有限公司 Multifunctional brick paving device
CN113719089A (en) * 2021-09-29 2021-11-30 嘉兴市天坤营造工程设计有限公司 Wall brick attaching method and device for building construction

Similar Documents

Publication Publication Date Title
CN107060355A (en) A kind of light dismantled and assembled bricklaying robot
CN108487614A (en) A kind of high-altitude wall decoration equipment of substitution climbing operation
CN208830680U (en) A kind of high-altitude wall decoration equipment replacing climbing operation
CN105460547A (en) Transferring and conveying device for aluminum plate production line
CN107244547A (en) A kind of brick holding machine chuck and brick holding machine
CN203529440U (en) Rotating material-taking device
CN205966574U (en) Automatic dust -collecting equipment of solar cell panel
CN116145975A (en) Quick paving device for self-adhesive waterproof coiled material
CN111632868B (en) Sampling detection device is used in energy-conserving building's heat preservation surface course furring brick production
CN206801063U (en) A kind of light dismantled and assembled bricklaying robot
CN103287051B (en) A kind of composite pressure plate system of honeycomb composite light partition wall and manufacture method
CN204624716U (en) Band steel side's bag gathering-device
CN214980130U (en) Decorate panel burnishing device for engineering
CN205416924U (en) Automatic panel coining mill
CN209613594U (en) A kind of plate delivery track of sheet fabrication
CN204473901U (en) Dinas brickes stacks bricks folder
CN113579963A (en) Curtain wall aluminum veneer forming equipment
CN208495316U (en) A kind of flat glass plate surface dust cleaning apparatus
CN219325385U (en) Prefabricated superimposed sheet trompil device
CN207404511U (en) A kind of double gantry cardboards for paper stacker collect charging crane
CN207373704U (en) The 3D printer scrap collecting tank cleaning plant being convenient to clean
CN210818543U (en) Punching structure of steel structure
CN112196282B (en) Auxiliary installation equipment for environment-friendly curtain wall for building
CN216846324U (en) Protection casing with structure is dismantled in convenient to remove
CN212917803U (en) Cutting device for contour plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180904