CN208830680U - A kind of high-altitude wall decoration equipment replacing climbing operation - Google Patents

A kind of high-altitude wall decoration equipment replacing climbing operation Download PDF

Info

Publication number
CN208830680U
CN208830680U CN201820963536.7U CN201820963536U CN208830680U CN 208830680 U CN208830680 U CN 208830680U CN 201820963536 U CN201820963536 U CN 201820963536U CN 208830680 U CN208830680 U CN 208830680U
Authority
CN
China
Prior art keywords
bending
lifting
altitude
outside
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820963536.7U
Other languages
Chinese (zh)
Inventor
易任军
闫光
Original Assignee
易任军
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 易任军 filed Critical 易任军
Priority to CN201820963536.7U priority Critical patent/CN208830680U/en
Application granted granted Critical
Publication of CN208830680U publication Critical patent/CN208830680U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high-altitude wall decoration equipment for replacing climbing operation, including mobile base, two sides at the top of the mobile base are fixedly installed with bearing column, front and the back side of the mobile base two sides of the bottom are fixedly installed with universal wheel, middle part at the top of the mobile base is provided with prefabricated box, the middle part of two sides offers placing groove at the top of the mobile base, is related to indoor wall decoration technology field.The high-altitude wall decoration equipment of substitution climbing operation, by carrying out being gone up to the air and be bonded some column movements such as metope progress wall brick installation after grasping manipulation to wall brick at ground, on the one hand it ensure that single operation personnel are able to carry out Self-operating and complete installation task to achieve the purpose that save labour, another aspect installation personnel does not need to carry out the life security that installation exercise has ensured operator in high-altitude, it does not need to carry out the transmitting of wall brick simultaneously and carries out high-altitude storage, it is more safe and practical.

Description

A kind of high-altitude wall decoration equipment replacing climbing operation
Technical field
The utility model relates to indoor wall decoration technology field, specially a kind of high-altitude metope dress for replacing climbing operation Adorn equipment.
Background technique
Walltile (abbreviation wall brick) is suitable for the decoration for vertical face of toilet, kitchen, outdoor balcony, and Wall brick is protection metope From the effective way that water splashes, they are applied not only to metope, in the edge trim of door and window, and a kind of interesting decoration element Element.
Currently, there is miscellaneous ornament materials on the interior trim of building wall, wherein wallpaper, wall paper and wall brick etc. Comparatively common concentration using the relatively more of wallpaper and wall paper in individual family, but also has more people to use wall Brick carries out device wall, and wall brick is used not just as ornament materials, and it has many advantages, such as anti-scratch and bears dirty, big in office Building or public place still use wall brick decoration more, are on the one hand because it bears dirty and anti-scratch, are on the other hand rear It is more convenient when phase comes into operation the upkeep operations such as to be arranged and cleaned, but be when being installed early period It is relatively complicated, especially the wall brick installation of position higher position or more people cooperation is needed send brick and patch block or just It is that station is installed on higher shelf, this kind of installation method is not only that construction personnel has certain risk, higher Place stores more wall brick and is also easy to wall brick slippage occur to fall, and causes to be also easy to injure ground decoration by a crashing object while wall brick breakage, So needing one kind being capable of one man operation and the equipment suitable for eminence wall brick installation exercise at present.
As Chinese patent discloses " a kind of cladding wall brick mounting structure and the method for installing wall brick " (patent No.: CN103343604A), the wall brick for including building body in the patent and being installed on the building body, which is characterized in that The mounting structure further includes multiple mutually independent installation units, and above-mentioned technical proposal major function embodies during the fastening process Irregular compressing will not be caused to wall brick, avoided due to component error, installation carrier error, the error and work of wall brick itself The destruction of wall brick existing flatness and itself balanced internal stress, enhances entire wall brick knot caused by the factors such as part displacement Although the safety of structure and the ability for resisting external force preferably facilitate the installation of wall brick to a certain extent, but do not solve The certainly existing some column problems of higher position wall brick installation.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the high-altitude wall decoration that the utility model provides a kind of substitution climbing operation is set It is standby, solve the problems, such as that there are installation effectiveness and safeties for the installation of indoor wall finishing higher position wall brick.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of to replace climbing operation High-altitude wall decoration equipment, including mobile base, the two sides at the top of the mobile base are fixedly installed with bearing column, described Front and the back side of mobile base two sides of the bottom are fixedly installed with universal wheel, and the middle part at the top of the mobile base is provided with pre- The middle part of vanning, mobile base top two sides offers placing groove.
Preferably, the bottom of the prefabricated box two sides, which is wound off, is equipped with fortune brick slot, and the inner cavity of the fortune brick slot, which is run through, to be connected with Brick bottom plate is transported, the two sides of the fortune brick bottom plate offer sliding slot, and the inner cavity activity of the sliding slot is connected with adjusting slider, described Adjusting slider is fixedly connected to mobile side board far from the side of sliding slot, is provided with cross at the top of the mobile side board opposite side To handle, the bottom of the transverse direction handle is provided with clamping device, and connection is run through in the two sides at the prefabricated box front and the back side There is pressure ram, the side that the pressure ram is located at prepackage box cavity is fixedly connected with stripper plate, and the pressure ram is far from prefabricated box The middle part of side is provided with stressed plate through being connected with calibration bolt between two pressure rams, at the top of the fortune brick bottom plate Two sides are fixedly connected to support side plate.
Preferably, the clamping device includes lifting rod, and the bottom of the lifting rod runs through lateral handle and extends to cross To the outside of handle bottom, lifting ring is provided at the top of the lifting rod, the bottom of the lifting rod is hinged with deformed plate, Side of the deformed plate far from lifting rod is connected with clamping bottom plate by snib, is provided with and grabs at the top of the lifting ring Take device.
Preferably, the grabbing device includes crawl box, and the bottom of the crawl box has been equidistantly positioned grip axes, described The top of grip axes runs through crawl box and extends to the inner cavity of crawl box, and the bottom of the grip axes is provided with crawl sucker, institute It states grip axes and is fixedly connected with gas storage box at the top of crawl box, the middle part at the top of the gas storage box is fixedly connected with air inlet The top of pipe, the air inlet pipe through crawl box and extends to the outside at the top of crawl box, and the two sides at the top of the crawl box are equal It is fixedly connected with steering shaft, translating device is provided at the top of the steering shaft, reset bullet is socketed on the outside of the grip axes Spring.
Preferably, be fixedly connected on the outside of the top of the reset spring and grip axes, the bottom of the reset spring with The bottom of crawl box inner wall is fixedly connected, and the interface of the grip axes and gas storage box is provided with sealing ring.
Preferably, the translating device includes turning translation screw rod, is socketed with bending column on the outside of the translation screw rod, described Translation sliding slot is offered on the left of bending column, the top of the translation screw rod through translation sliding slot and extends on the left of bending column Outside is socketed with translation sleeve on the outside of the bending column, is fixedly connected on the right side of the left side of the translation sleeve and steering shaft, Bending device is provided at the top of the bending column.
Preferably, the bending device includes bending crossbeam, and the two sides of the bending cross rail outer are socketed with bending set, Bending axis is provided in the middle part of bending set inner cavity, the middle part on the outside of the bending axis is socketed with bending gear, the bending It is fixedly connected at the top of the bottom of gear and bending column, the bending set bottom and left side offer bending slot, the bending Folded sheet is provided on the left of set inner wall front and the back side, the two sides of the bending crossbeam are provided with elevating mechanism.
Preferably, the elevating mechanism includes the lifting shaft through bearing column, the outside of the lifting shaft opposite side It is socketed with lifting fluted disc, elevating chain is socketed on the outside of the lifting fluted disc, the opposite side of the top lifting shaft is fixed It is connected with transmission axle, the left side of the left bottom lifting shaft is fixedly connected with driving motor, the right side bottom by output shaft It is provided with lifting handle on the right side of portion's lifting shaft, lifting set is fixedly connected on the outside of the elevating chain.
(3) beneficial effect
The utility model provides a kind of high-altitude wall decoration equipment for replacing climbing operation.Have it is following the utility model has the advantages that
(1), the substitution climbing operation high-altitude wall decoration equipment, by ground to wall brick carry out grasping manipulation it Some column movements such as metope progress wall brick installation are being gone up to the air and be bonded afterwards, on the one hand ensure that single operation personnel can Carry out Self-operating and complete installation task achieve the purpose that save labour, another aspect installation personnel do not need high-altitude into Row installation exercise has ensured the life security of operator, while not needing to carry out the transmitting of wall brick and carrying out high-altitude storage, It is more safe and practical.
(2), the high-altitude wall decoration equipment of substitution climbing operation, by the main purpose side of being that mobile base is arranged Just carry out that position is mobile to whole equipment, at the same mobile base be provided with one fixed width main purpose be it is convenient to wall brick Storage, and wall brick can follow moving for equipment and be moved, and do not need to carry out other carrying operation, save operator The physical strength of member.
(3), the high-altitude wall decoration equipment of substitution climbing operation, the main function that prefabricated box is arranged are convenience to need The wall brick installed carries out floor treatment, corrects its position and guarantees that the wall brick of each piece of installation can keep identical shape State, while prefabricated box can function as cutting container, carries out cutting operation to wall brick wherein, decoration garbage is avoided to make fullly It is all to need secondary cleaning time-consuming and laborious.
(4), the high-altitude wall decoration equipment of substitution climbing operation, the main function that grabbing device is arranged are to process Pretreated wall brick carries out grasping manipulation, and absorption is exhausted in the main feature relatively smooth using wall brick surface, crawl with It is more smooth in the movement of release, it can effectively improve the working efficiency of operator.
(5), the high-altitude wall decoration equipment of substitution climbing operation is able to carry out crawl by the setting of bending device The change of setting position state is changed into plumbness when needing to grab wall brick, level is changed to after crawl State can be good at preventing wall brick from falling down and being crushed and make so that crawl wall brick movement does not need to carry out the change of wall brick state At loss.
(6), the high-altitude wall decoration equipment of substitution climbing operation, after the main function of elevating mechanism will grab wall brick Grabbing device carries out lifting action, it is made to carry out wall brick installation up to predetermined position, and the lifting of grabbing device replaces operator Climbing, it is relatively reliable in terms of safety.
(7), the high-altitude wall decoration equipment of substitution climbing operation, the main function of translation mechanism are grabbing device Horizontal motion is carried out together with wall brick, pushes wall brick to metope and carries out being bonded installation with metope.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model prefabricated box top view;
Fig. 3 is the utility model clamping device and subscribes schematic diagram;
Fig. 4 is the utility model grabbing device structural schematic diagram;
Fig. 5 the utility model translating device structural schematic diagram;
Fig. 6 is the utility model bending set side view;
Fig. 7 is the utility model bending set front view;
Fig. 8 is the utility model bearing column side view;
Fig. 9 is the utility model bearing column front view.
In figure: 1 mobile base, 2 bearing columns, 3 universal wheels, 4 prefabricated boxes, 401 fortune brick slots, 402 operating bottom plates, 403 are slided Slot, 404 adjusting sliders, 405 mobile side boards, 406 lateral handles, 407 clamping devices, 4071 lifting rods, 4072 lifting rings, 4073 Deformed plate, 4074 clamping bottom plates, 408 pressure rams, 409 stripper plates, 410 calibration bolts, 411 stressed plates, 412 support side plates, 5 are put Set slot, 6 grabbing devices, 601 crawl boxes, 602 grip axes, 603 crawl suckers, 604 gas storage box, 605 air inlet pipe, 606 steerings Axis, 607 reset springs, 7 translating devices, 701 translation screw rods, 702 bending columns, 703 translation sliding slots, 704 translation sleeves, 8 bendings Device, 801 bending crossbeams, 802 bending axis, 803 bending gears, 804 bending slots, 805 folded sheets, 806 bending sets, 9 elevators Structure, 901 lifting shafts, 902 lifting fluted discs, 903 elevating chains, 904 transmission axles, 905 driving motors, 906 lifting handles, 907 liters Drop set.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Examples of the embodiments are shown in the accompanying drawings, and in which the same or similar labels are throughly indicated identical or classes As element or element with the same or similar functions.The embodiments described below with reference to the accompanying drawings are exemplary, purport It is being used to explain the utility model, and should not be understood as limiting the present invention.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on the figure Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model System.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be Mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary The interaction relationship of connection or two elements inside element.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
Fig. 1-9 is please referred to, the utility model provides a kind of technical solution: a kind of high-altitude wall decoration replacing climbing operation The two sides of equipment, including mobile base 1,1 top of mobile base are fixedly installed with bearing column 2,1 two sides of the bottom of mobile base Front be fixedly installed with universal wheel 3 with the back side, the middle part at 1 top of mobile base is provided with prefabricated box 4,4 two sides of prefabricated box Bottom wind off be equipped with fortune brick slot 401, fortune brick slot 401 inner cavity through is connected with fortune brick bottom plate 402, fortune brick bottom plate 402 two Side offers sliding slot 403, and the inner cavity activity of sliding slot 403 is connected with adjusting slider 404, and adjusting slider 404 is far from sliding slot 403 Side be fixedly connected to mobile side board 405, lateral handle 406 is provided at the top of 405 opposite side of mobile side board, laterally The bottom of handle 406 is provided with clamping device 407, and the positive two sides with the back side of prefabricated box 4, which are run through, is connected with pressure ram 408, The side that pressure ram 408 is located at 4 inner cavity of prefabricated box is fixedly connected with stripper plate 409, and pressure ram 408 is far from 4 side of prefabricated box Middle part is provided with stressed plate 411 between two pressure rams 408 through calibration bolt 410 is connected with, and transports the two of 402 top of brick bottom plate Side is fixedly connected to support side plate 412, and the middle part of 1 top two sides of mobile base offers placing groove 5.
Clamping device 407 includes lifting rod 4071, and the bottom of lifting rod 4071 runs through lateral handle 406 and extends to transverse direction The outside of 406 bottom of handle, the top of lifting rod 4071 are provided with lifting ring 4072, the bottom of lifting rod 4071 be hinged with change Shape plate 4073, side of the deformed plate 4073 far from lifting rod 4071 are connected with by snib and clamp bottom plate 4074, and ring is lifted 4072 top is provided with grabbing device 6.
Grabbing device 6 includes crawl box 601, and the bottom of crawl box 601 has been equidistantly positioned grip axes 602, grip axes 602 Top through crawl box 601 and extend to crawl box 601 inner cavity, the bottom of grip axes 602 be provided with crawl sucker 603, The top that grip axes 602 are located at crawl box 601 is fixedly connected with gas storage box 604, and the middle part at 604 top of gas storage box is fixedly connected with The top of air inlet pipe 605, air inlet pipe 605 through crawl box 601 and extends to the outside at the top of crawl box 601, and crawl box 601 pushes up The two sides in portion are fixedly connected to steering shaft 606, and the top of steering shaft 606 is provided with translating device 7, the outside of grip axes 602 It is socketed with reset spring 607, the top of reset spring 607 is fixedly connected with the outside of grip axes 602, the bottom of reset spring 607 Portion is fixedly connected with the bottom of crawl 601 inner wall of box, and the interface of grip axes 602 and gas storage box 604 is provided with sealing ring.
Translating device 7 includes turning translation screw rod 701, and the outside of translation screw rod 701 is socketed with bending column 702, bends column 702 Left side offer translation sliding slot 703, the top of translation screw rod 701 is through translation sliding slot 703 and to extend to bending column 702 left The outside of side, the outside of bending column 702 are socketed with translation sleeve 704, translate the left side of sleeve 704 and the right side of steering shaft 606 It is fixedly connected, the top of bending column 702 is provided with bending device 8.
Bending device 8 includes bending crossbeam 801, and the two sides in 801 outside of bending crossbeam are socketed with bending set 806, bending It covers and is provided with bending axis 802 in the middle part of 806 inner cavities, the middle part in 802 outside of bending axis is socketed with bending gear 803, bends gear 803 bottom is fixedly connected with the top of bending column 702, and bending 806 bottoms of set and left side offer bending slot 804, bending It covers and is provided with folded sheet 805 on the left of 806 inner wall fronts and the back side, the two sides of bending crossbeam 801 are provided with elevating mechanism 9。
Elevating mechanism 9 includes the lifting shaft 901 through bearing column 2, is socketed with liter on the outside of 901 opposite side of lifting shaft Fluted disc 902 drops, and the outside of lifting fluted disc 902 is socketed with elevating chain 903, and the opposite side of top lifting shaft 901 is fixedly connected There is transmission axle 904, the left side of left bottom lifting shaft 901 is fixedly connected with driving motor 905, bottom right side liter by output shaft The right side of drop axis 901 is provided with lifting handle 906, and the outside of elevating chain 903 is fixedly connected with lifting set 907.
Working principle: equipment is moved to job location, and wall brick to be used will be needed to be placed in mobile base 1 Lifting ring 4072 is caught when needing to carry out the installation exercise of eminence wall brick in the inner cavity of placing groove 5, presses down on lifting ring 4072 drive lifting rods 4071 move downward, and lifting rod 4072, which moves downward, drives deformed plate 4073 to generate deformation, deformed plate 4073 generation shapes extruding clamping bottom plates 4074, which are moved downward, is clamped operation for fortune brick bottom plate 402, pushes lateral handle later 406, lateral handle 406 drives fortune brick bottom plate 402 mobile by mobile side board 405, operating bottom plate 402 along fortune brick slot 401 into Enter the bottom of 5 inner cavity of placing groove, while the wall brick on upper layer is supported and is mutually divided with the wall brick of bottom by support side plate 412 From, later fortune brick bottom plate 402 is retracted into the inner cavity of prefabricated box 4 again and take back one block of wall brick, adjusts calibration bolt 410 later, it is logical Crossing calibration bolt 410 drives pressure ram 48 and the movement of pressure ram 409 to be clamped fixation to wall brick, then grasps grabbing device, will grab Be bonded to each other at the top of sucker 603 and wall brick, booster air pump is inflated the inner cavity of gas storage box 604, grip axes 602 by Effect to air pressure is extruded and moves downward, grip axes 602 be pressed down against crawl sucker 603 will grab sucker 603 and wall brick it Between air empty, wall brick is subjected to crawl absorption, pulls bending device 8 again later, grabbing device 6 and wall brick are pulled to hanging down Straight state restarts driving motor 905, drives lifting fluted disc 902 to rotate by transmission axle 904, lifting fluted disc 902 drives lifting Chain 903 moves, and elevating chain 903 drives grabbing device 6 to move upwards, and wall brick is promoted to predetermined altitude, and starting is flat later Wall brick transverse translation to metope and is gradually bonded installation by moving device 7 with metope.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (8)

1. a kind of high-altitude wall decoration equipment for replacing climbing operation, including mobile base (1), it is characterised in that: the activity Two sides at the top of pedestal (1) are fixedly installed with bearing column (2), the front and the back side of mobile base (1) two sides of the bottom It is fixedly installed with universal wheel (3), the middle part at the top of the mobile base (1) is provided with prefabricated box (4), the mobile base (1) middle part of top two sides offers placing groove (5).
2. a kind of high-altitude wall decoration equipment for replacing climbing operation according to claim 1, it is characterised in that: described pre- The bottom of vanning (4) two sides, which is wound off, is equipped with fortune brick slot (401), and the inner cavity of fortune brick slot (401), which is run through, is connected with fortune brick bottom plate (402), the two sides of fortune brick bottom plate (402) offer sliding slot (403), and the inner cavity activity of the sliding slot (403) is connected with Adjusting slider (404), the adjusting slider (404) are fixedly connected to mobile side board (405) far from the side of sliding slot (403), It is provided with lateral handle (406) at the top of mobile side board (405) opposite side, the bottom of the transverse direction handle (406) is set It is equipped with clamping device (407), the two sides at prefabricated box (4) front and the back side, which are run through, to be connected with pressure ram (408), described to squeeze The side that compression bar (408) is located at prefabricated box (4) inner cavity is fixedly connected with stripper plate (409), and the pressure ram (408) is far from prepackage The middle part of case (4) side is provided with stressed plate between two pressure rams (408) through calibration bolt (410) is connected with (411), the two sides at the top of fortune brick bottom plate (402) are fixedly connected to support side plate (412).
3. a kind of high-altitude wall decoration equipment for replacing climbing operation according to claim 2, it is characterised in that: the folder Tight device (407) includes lifting rod (4071), and the bottom of the lifting rod (4071) runs through lateral handle (406) and extends to cross To the outside of handle (406) bottom, lifting ring (4072), the lifting rod are provided at the top of the lifting rod (4071) (4071) bottom is hinged with deformed plate (4073), and the deformed plate (4073) passes through snib far from the side of lifting rod (4071) It is connected with and clamps bottom plate (4074), be provided with grabbing device (6) at the top of the lifting ring (4072).
4. a kind of high-altitude wall decoration equipment for replacing climbing operation according to claim 3, it is characterised in that: described to grab Taking device (6) includes crawl box (601), and the bottom of crawl box (601) has been equidistantly positioned grip axes (602), described to grab It takes the top of axis (602) through crawl box (601) and extends to the inner cavity of crawl box (601), the bottom of the grip axes (602) It is provided with crawl sucker (603), the grip axes (602), which are located at the top of crawl box (601), is fixedly connected with gas storage box (604), the middle part at the top of the gas storage box (604) is fixedly connected with air inlet pipe (605), is passed through at the top of the air inlet pipe (605) It wears crawl box (601) and extends to the outside at the top of crawl box (601), the two sides at the top of crawl box (601) are fixed to be connected It is connected to steering shaft (606), is provided with translating device (7) at the top of the steering shaft (606), the outside of the grip axes (602) It is socketed with reset spring (607).
5. a kind of high-altitude wall decoration equipment for replacing climbing operation according to claim 4, it is characterised in that: described multiple It is fixedly connected on the outside of the top and grip axes (602) of position spring (607), the bottom of the reset spring (607) and crawl box (601) bottom of inner wall is fixedly connected, and the interface of the grip axes (602) and gas storage box (604) is provided with sealing ring.
6. a kind of high-altitude wall decoration equipment for replacing climbing operation according to claim 4, it is characterised in that: described flat Moving device (7) includes turning translation screw rod (701), and bending column (702) is socketed on the outside of the translation screw rod (701), described curved Translation sliding slot (703) is offered on the left of folding column (702), translation sliding slot (703) is run through simultaneously in the top of translation screw rod (701) The outside on the left of bending column (702) is extended to, translation sleeve (704), the translation are socketed on the outside of the bending column (702) It is fixedly connected on the right side of the left side of sleeve (704) and steering shaft (606), bending dress is provided at the top of the bending column (702) Set (8).
7. a kind of high-altitude wall decoration equipment for replacing climbing operation according to claim 6, it is characterised in that: described curved Device for folding (8) includes bending crossbeam (801), and the two sides on the outside of bending crossbeam (801) are socketed with bending set (806), institute It states and is provided with bending axis (802) in the middle part of bending set (806) inner cavity, the middle part on the outside of bending axis (802) is socketed with bending Gear (803) is fixedly connected at the top of the bottom of bending gear (803) and bending column (702), bending set (806) Bottom and left side offer bending slot (804), are provided with folding on the left of described bending set (806) inner wall front and the back side The two sides of plate (805), bending crossbeam (801) are provided with elevating mechanism (9).
8. a kind of high-altitude wall decoration equipment for replacing climbing operation according to claim 7, it is characterised in that: the liter Descending mechanism (9) includes the lifting shaft (901) through bearing column (2), is socketed on the outside of lifting shaft (901) opposite side It goes up and down fluted disc (902), is socketed with elevating chain (903) on the outside of the lifting fluted disc (902), the top lifting shaft (901) Opposite side is fixedly connected with transmission axle (904), and the left side of the left bottom lifting shaft (901) connects by the way that output shaft is fixed It is connected to driving motor (905), lifting handle (906), the lift chain is provided on the right side of the bottom right side lifting shaft (901) Lifting set (907) is fixedly connected on the outside of item (903).
CN201820963536.7U 2018-06-22 2018-06-22 A kind of high-altitude wall decoration equipment replacing climbing operation Expired - Fee Related CN208830680U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820963536.7U CN208830680U (en) 2018-06-22 2018-06-22 A kind of high-altitude wall decoration equipment replacing climbing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820963536.7U CN208830680U (en) 2018-06-22 2018-06-22 A kind of high-altitude wall decoration equipment replacing climbing operation

Publications (1)

Publication Number Publication Date
CN208830680U true CN208830680U (en) 2019-05-07

Family

ID=66305662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820963536.7U Expired - Fee Related CN208830680U (en) 2018-06-22 2018-06-22 A kind of high-altitude wall decoration equipment replacing climbing operation

Country Status (1)

Country Link
CN (1) CN208830680U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267655A (en) * 2020-11-26 2021-01-26 詹玉琼 Wall tile sticking device for building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267655A (en) * 2020-11-26 2021-01-26 詹玉琼 Wall tile sticking device for building construction

Similar Documents

Publication Publication Date Title
CN208830680U (en) A kind of high-altitude wall decoration equipment replacing climbing operation
CN201895348U (en) Automatic charging device of floor hot press
CN204455677U (en) A kind of cashmere sweater floats the quick removal device of hair
CN108487614A (en) A kind of high-altitude wall decoration equipment of substitution climbing operation
CN202942021U (en) Self-service lift for cleaning of tall building outer wall surface
CN203171225U (en) Carbon brush holder torsional spring automatic assembling machine
CN204279579U (en) A kind of self-propelled transport trolley utilizing elastic potential energy to drive
CN206395761U (en) A kind of jack lift for small building
CN107089026A (en) A kind of pressure head binder cleaning mechanism
CN204508131U (en) A kind of switching mechanism of plate turnover
CN201861551U (en) Roof synchronous window cleaning device
CN207373704U (en) The 3D printer scrap collecting tank cleaning plant being convenient to clean
CN204624716U (en) Band steel side's bag gathering-device
CN204473901U (en) Dinas brickes stacks bricks folder
CN205528415U (en) Full -automatic glass breaks a mechanism off with fingers and thumb
CN201834583U (en) Paper roller lifting mechanism for facial tissue paper folding machine
CN201873609U (en) Emergency lifting device for check curtain of seal box
CN204057258U (en) The rotating mechanism of stacker manipulator
CN203865629U (en) Paper pre-piler of glazing machine
CN208561617U (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN201209073Y (en) Unloading device for film drawer
CN2695134Y (en) Altitude cleaning machine
CN214353397U (en) Efficient cutting device for mosaic glass
CN210818543U (en) Punching structure of steel structure
CN212953026U (en) A transport mechanism for processing of high chromium composite board hammer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190507

Termination date: 20200622