CN108487417A - A kind of semi-flexible Quick drainage system administered applied to hillock - Google Patents

A kind of semi-flexible Quick drainage system administered applied to hillock Download PDF

Info

Publication number
CN108487417A
CN108487417A CN201810343747.5A CN201810343747A CN108487417A CN 108487417 A CN108487417 A CN 108487417A CN 201810343747 A CN201810343747 A CN 201810343747A CN 108487417 A CN108487417 A CN 108487417A
Authority
CN
China
Prior art keywords
drainage
hillock
canal
transverse
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810343747.5A
Other languages
Chinese (zh)
Inventor
岳新积
张银玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Wisdom German Security Technology Ltd By Share Ltd
Original Assignee
Shanxi Wisdom German Security Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Wisdom German Security Technology Ltd By Share Ltd filed Critical Shanxi Wisdom German Security Technology Ltd By Share Ltd
Priority to CN201810343747.5A priority Critical patent/CN108487417A/en
Publication of CN108487417A publication Critical patent/CN108487417A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The present invention is directed to hillock drainage ditch not anti-settling, easy shoal materials, drain the deficiencies of slow, devise a kind of semi-flexible Quick drainage system administered applied to hillock, drainage ditch uses half-flexible water drainage canal, destruction of the hillock sedimentation to water channel can be resisted, Quick drainage, a variety of optimization designs of drainage system develop simultaneously simultaneously, the U-shaped section of transverse drainage canal, intermediate high both sides are low and counter-slope design enable rainwater faster, more enter transverse drainage canal, and faster from the over-the-counter longitudinal drainage canal discharge of hillock, effectively solve the problems, such as drainage ditch sediment siltation, reduce immersion of the rainwater to slope surface and riding track, drainage ditch has high-strength simultaneously, it is corrosion-resistant, long lifespan, it is freeze proof, installation, replace the features such as facilitating, strong guarantee is provided for being used for a long time for drainage ditch.

Description

A kind of semi-flexible Quick drainage system administered applied to hillock
Technical field
The invention belongs to technical field of drainage, and in particular to a kind of semi-flexible Quick drainage system administered applied to hillock System.
Background technology
Gangue is the maximum industrial solid castoff of coal mine drainage amount, accounts for about the 10~20% of raw coal output.The whole nation at present There are thousands of hillocks not yet to administer, also increases several hundred million tons of spoils newly every year.Hillock does not only take up a large amount of soils, destroys periphery Ecoscape, while a large amount of toxic and harmful gas, dust are discharged into air, and generate a large amount of leaching liquors.Therefore to cash The ecological environment treatment of Stone Mountain, has a great responsibility, arduous task.
The conventional method that hillock is administered:It cuts slope arrangement → earthing → and constructs drainage ditch → vegetation.Due to hillock from Characteristic is fired, drainage ditch apolegamy and setting therein are most important to hillock improvement, directly influence the success or failure of hillock improvement.
Traditional hillock drainage ditch generally uses concrete or stone masonry to construct, and is commonly called as rigid water channel, the water channel is most Big defect is not anti-settling, the i.e. differential settlement of hillock, easily water channel is caused to be broken, not only influences the normal of drainage system Operation, and lead to rainwater infiltration, channel of leaking out is formed, leads to hillock spontaneous fire, or even cause just in the spoil of spontaneous combustion It explodes on mountain.
The shortcomings that for hillock rigid drainage canal and deficiency, patent CN202672119U《Gangue flexible water drainage canal》It is public A kind of flexible water drainage canal has been opened, that is, has excavated trapezoidal ditch, loess formation has been covered on ditch side and bottom surface, geotechnique is laid on loess formation Film is piled up into step slope surface on geomembrane with soil engineering bag, forms flexible water drainage canal, and hillock sedimentation is coped with to water channel with this It destroys;Patent CN202652889U《Self-ignition coal gangue hill comprehensive treatment system》Previous patent is applied in hillock comprehensive treatment On, meanwhile, between riding track drainage ditch and slope surface and it is heavy to cope with hillock to reduce rain drop erosion for the flexible bank protection of slope foot setting Drop, firm slope surface, reduce soil erosion.
The defect one of above-mentioned flexible water drainage canal is that resistance is big, and draining is slow, and a large amount of silts are easy siltation in water channel, cause to arrange Water system is paralysed quickly;Second is that contacting not tight between soil engineering bag, gap is big, causes rainwater cross flow, necessarily leads to following consequence:
1. forming gully erosion on slope, rill erosion the more rushes the more deep, forms the channel of leaking out of hillock gradually, causes hillock certainly Combustion.
2. a large amount of rainwater directly rush at slope surface and riding track, soil erosion is caused, or even vegetation on slope of destroying by rush of water.
3. rainwater infiltration generates percolate, polluted underground water and soil to spoil area.
4. the soil on riding track impregnates for a long time, easily causes landslide, collapses and settle, then drainage system is caused more Havoc, vicious circle.
5. the rainwater on riding track cannot flow directly into water channel, riding track is gently then impregnated, it is heavy then wash away slope surface.
Patent CN101011009A《A kind of greening method of self-ignition coal gangue hill》In set up longitudinal drainage ditch from top to bottom With flood discharge, gutter grouts construction, and riding track sets up soil property gutter, and terraced fields gutter assembles retaining wall at the wall of slope.The patent Defect:First, top-down longitudinal drainage ditch is arranged in the middle part of hillock, since slope surface earthing is relatively thin, easily with hillock Internal run-through, initiation are leaked out, and hillock spontaneous fire is caused.Second is that soil property gutter is arranged on riding track, gear is assembled at the wall of slope Cob wall, rainwater gets off on wall, directly impacts drainage ditch, and soil property water channel is washed away intolerant to water, is washed away quickly, when in addition rainwater is big, Rainwater is directed across drainage ditch and rushes to riding track, threatens to riding track.
Other related flexible water channels also have a large amount of technical literature, and content is also similar, numerous to list herein.
Invention content
To solve the above-mentioned problems, the present invention provides it is a kind of be exclusively used in hillock administer in anti-settling drainage system, Can either anti-settling, and can sediment prevention siltation, in conjunction with a variety of optimization designs, quickly the rainwater on hillock can be discharged it is over-the-counter, Rainwater is avoided to constitute a threat to hillock, it is ensured that hillock safety.
The technical scheme is that:The hillock slope surface is that counter-slope tilts terraced fields from top to bottom, and the counter-slope tilts Terraced fields include multiple sequentially connected slopes and riding track, and wherein slope and riding track includes spoil layer and overburden layer, in overburden layer Upper structure drainage ditch.
The overburden layer of each riding track is respectively provided with transverse drainage canal, transverse drainage canal both sides respectively with over-the-counter longitudinal direction Drainage ditch is connected to;Thus rainwater flows to over-the-counter longitudinal drainage canal by transverse drainage canal on slope surface and riding track, to which spoil be discharged Mountain area domain.
The transverse drainage canal is arranged on the inside of the riding track at 1/3 or is disposed at the 1.0~1.5m at slope bottom, makes It obtains the water to get off from slope to be buffered, reduces the rainwater flow velocity that slope surface is got off, rainwater will not be flushed to because of inertia on riding track, simultaneously Silt is blocked in slope bottom by settlement or by grass, reduces the silt that slope rainwater is mingled with and is directly entered transverse drainage Canal causes to deposit, and influences to drain, while considering transverse drainage canal position frequently rolling due to construction machinery, locates this most Closely knit, sedimentation possibility is minimum, and stability is best.
Riding track is divided into inside platform and outside platform by the transverse drainage canal, and the inside platform exists with transverse drainage canal One horizontal plane, the outside platform are counter-slope type, and gradient α is 2~6%;Ensure what rainwater and upper ramps on riding track flowed down Rainwater smoothly flows into riding track transverse drainage canal, and the rainwater avoided on riding track washes away lower ramps slope surface.
The transverse drainage canal uses half-flexible water drainage canal, the intensity of existing rigidity water channel, and the toughness of flexible water channel, Realize the dual function of anti-settling and Quick drainage.
Further, the HDPE materials or resin that the half-flexible water drainage canal selection high-density polyethylene material is polymerized The drainage ditch of concrete material, inner wall smooth is anticorrosive, and draining is rapid.Its antifreeze properties, cope with high and cold weather to its It influences.
Further, in order to reduce resistance of water drainage, accelerate drainage speed, the transverse drainage canal section is U-shaped, is had Larger water delivery, transportability of sediments;High among the transverse drainage canal transverse direction bottom surface, both sides are low, facilitate rainwater in transverse drainage canal It can be discharged as early as possible from over-the-counter longitudinal drainage canal.
Preferably, the drainage grade of transverse drainage canal bottom surface is 2~5 ‰.
Further, the transverse drainage canal by multiple HDPE or resin concrete material the U-shaped drainage ditch of linear finished product It is formed by connecting, specification is 200~300mm wide, 300~450mm high, single-unit length 500mm.
Preferably, it is connected by primary and secondary card slot between the U-shaped drainage ditch of the linear finished products of the multiple HDPE.
Further, in order to strictly prevent from oozing under draining, the card slot seam between the U-shaped drainage ditch of the linear finished products of HDPE makes Use waterproof gasket cement(Such as pitch silica gel)Uniformly smear.
Further, it in order to make water channel be built on the rock, is contacted with surrounding tightly, water channel basis uses 100mm plain concretes Bed course, side wall fill plain concrete, and the two sides wing is filled with plain concrete in the transverse drainage canal so that the transverse drainage Joint face between canal and riding track is flushed with riding track surface.
Further, sediment siltation, the transverse drainage canal are interior heavy every 40~50m settings along water (flow) direction in order to prevent Sand basin.
The present invention has the following advantages:
1. overcome the deficiency of existing drainage system, can grafting group it is integral, the toughness of half-flexible water drainage canal is utilized, resists Hillock settles the destruction to water channel;Simultaneously using the slickness of HDPE materials and resin concrete material, drainage ditch mud is solved Husky siltation problem;Using the tightness of HDPE material seams, rain leakage is prevented;The high-strength, corrosion-resistant of HDPE materials, longevity simultaneously Life is long, freeze proof, installs, replaces the features such as facilitating, and is provided a strong guarantee for being used for a long time for drainage ditch.
2. the optimization design and many kinds of measures of drainage system develop simultaneously.The U-shaped section of transverse drainage canal, intermediate high both sides it is low and Counter-slope design enables rainwater faster, more to reduce sediment siltation to which discharge is over-the-counter into transverse drainage canal, subtract Soil erosion is lacked, has reduced immersion of the rainwater to slope surface and riding track, has laid a good foundation for hillock safety and stablization.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the sectional view of transverse drainage canal of the present invention.
Specific implementation mode
Present disclosure is further elaborated with reference to specific embodiment, but embodiment is only of the invention Better embodiment, therefore the equivalence changes that all features and principle according to described in present patent application range are done, are included in Within the scope of present patent application.
Embodiment one
Changzhi branch company of Shanxi energy group Wang Zhuan Gangue Hills administer drainage system embodiment
Wang Zhuan Gangue Hills administration project sets six slopes and six riding tracks altogether, and the riding track width 5m, hang down high 5m, and slope is than 1: 2, the slope thickness of earth covering 0.3m, the thickness of earth covering 1m of riding track.
Water drainage system design is:Such as Fig. 1, shown in 2, in each riding track(2)Hillock(5)Overburden layer(4)Upper design is horizontal To drainage ditch(3), hillock riding track(2)Inside platform(201)With transverse drainage canal(3)In a horizontal plane, outside platform (202)For counter-slope type, gradient α is 5%, transverse drainage canal(3)High among lateral bottom surface, both sides are low, and drainage grade β is 3 ‰, horizontal To drainage ditch(3)Positioned at away from top slope(1)At bottom of slope 1.2m.The transverse drainage canal(3)For linear type, section is U-shaped, institute State transverse drainage canal(3)Interior laying and the drainage ditch of identical HDPE materials or resin concrete material in transverse drainage canal.Institute State transverse drainage canal(3)It is interior that sand sediment trap is set every 45m along water (flow) direction(6).
Transverse drainage canal(3)Basic bottom uses plain concrete cushion layer, and the U-shaped row of the linear finished products of HDPE is laid with using grafting one by one Water channel, specification are 300 × 350mm, often save 500mm, and connection type is primary and secondary card slot type.The transverse drainage canal(3)Side wall fills Fill out plain concrete so that the transverse drainage canal(3)With riding track(2)Between joint face and riding track(2)Surface flushes.
To keep water channel more tight, pitch silica gel is used(Waterproof gasket cement)Uniformly it is applied to adjacent row water channel interface card slot At seam, after the completion of smearing, sealant extra at card seam is cleaned out.Drainage system it is formal before use, cleaning drainage ditch and Sundries in well, it is ensured that ditch body is unblocked.
The hillock is collected to transverse drainage canal and rapidly flows toward field after several heavy rain, slope rainwater and platform rainwater Outer drainage ditch.Rain rear platform surface does not have ponding.
Embodiment two
Shanxi Gangue Hill administers drainage system embodiment
Shanxi Gangue Hill administration project sets four slopes and four riding tracks altogether, and the riding track width 4.5m, hang down high 6m, slope Than 1:2, the slope thickness of earth covering 0.5m, the thickness of earth covering 1.0m of riding track.
Water drainage system design is:Such as Fig. 1, shown in 2, in each riding track(2)Hillock(5)Overburden layer(4)Upper design is horizontal To drainage ditch(3), hillock riding track(2)Inside platform(201)With transverse drainage canal(3)In a horizontal plane, outside platform (202)For counter-slope type, gradient α is 3%, transverse drainage canal(3)High among lateral bottom surface, both sides are low, and drainage grade β is 5 ‰, horizontal To drainage ditch(3)Positioned at away from top slope(1)At bottom of slope 1m.The transverse drainage canal(3)For linear type, section be it is U-shaped, it is described Transverse drainage canal(3)Interior laying and the drainage ditch of identical HDPE materials or resin concrete material in transverse drainage canal.It is described Transverse drainage canal(3)It is interior that sand sediment trap is set every 48m along water (flow) direction(6).
Transverse drainage canal(3)Basic bottom uses plain concrete cushion layer, and the U-shaped row of the linear finished products of HDPE is laid with using grafting one by one Water channel, specification are 300 × 300mm, often save 500mm, and connection type is primary and secondary card slot type.The transverse drainage canal(3)Side wall fills Fill out plain concrete so that the transverse drainage canal(3)With riding track(2)Between joint face and riding track(2)Surface flushes.
It to keep water channel more tight, is uniformly applied at adjacent row water channel interface card slot seam, is smeared using waterproof gasket cement After the completion, sealant extra at card seam is cleaned out.Drainage system is formal before use, in cleaning drainage ditch and sand sediment trap Sundries, it is ensured that ditch body is unblocked.
The hillock is collected to transverse drainage canal after several heavy rain, slope rainwater and platform rainwater, and rapidly flows toward Over-the-counter drainage ditch.Rain rear platform surface does not have ponding.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (9)

1. a kind of semi-flexible Quick drainage system administered applied to hillock, including hillock slope surface, it is characterised in that:It is described Hillock slope surface is that counter-slope tilts terraced fields from top to bottom, and it includes multiple sequentially connected slopes that the counter-slope, which tilts terraced fields,(1)With Riding track(2);
Each riding track(2)It is respectively provided with transverse drainage canal(3), the transverse drainage canal(3)It is arranged respectively with over-the-counter longitudinal direction both sides Water channel is connected to;
The transverse drainage canal(3)It is arranged in riding track(2)At upper inside 1/3 or away from slope(1)At 1.0~1.5m of bottom of slope;
The transverse drainage canal(3)By riding track(2)It is divided into inside platform(201)With outside platform(202), the inside platform (201)With transverse drainage canal(3)In a horizontal plane, the outside platform(202)For counter-slope type, gradient α is 2~6%;
The transverse drainage canal(3)For half-flexible water drainage canal.
2. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 1, it is characterised in that: The half-flexible water drainage canal is the drainage ditch of HDPE materials or resin concrete material.
3. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 1, it is characterised in that: The transverse drainage canal(3)Section is U-shaped, the transverse drainage canal(3)High, the low laying in both sides among lateral bottom surface.
4. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 3, it is characterised in that: The transverse drainage canal(3)The drainage grade β of bottom surface is 2 ‰~5 ‰.
5. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 1, it is characterised in that: The transverse drainage canal(3)The interior U-shaped drainage ditch of linear finished product for being laid with multiple HDPE or resin concrete material, specification are(200 ~300)Wide ×(300~450)Height, single-unit length 500mm.
6. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 5, it is characterised in that: It is connected by primary and secondary card slot between the U-shaped drainage ditch of the multiple linear finished products of HDPE.
7. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 6, it is characterised in that: Card seam between the U-shaped drainage ditch of the linear finished products of HDPE is uniformly smeared using waterproof gasket cement.
8. a kind of semi-flexible Quick drainage system administered applied to hillock according to any one of claims 1 to 7, special Sign is:The transverse drainage canal(3)The two sides wing is filled with plain concrete, the transverse drainage canal(3)With riding track(2)Between Joint face and riding track(2)Surface flushes.
9. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 1, it is characterised in that: The transverse drainage canal(3)It is interior that every 40~50m, sand sediment trap is set(6).
CN201810343747.5A 2018-04-17 2018-04-17 A kind of semi-flexible Quick drainage system administered applied to hillock Pending CN108487417A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810343747.5A CN108487417A (en) 2018-04-17 2018-04-17 A kind of semi-flexible Quick drainage system administered applied to hillock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810343747.5A CN108487417A (en) 2018-04-17 2018-04-17 A kind of semi-flexible Quick drainage system administered applied to hillock

Publications (1)

Publication Number Publication Date
CN108487417A true CN108487417A (en) 2018-09-04

Family

ID=63316305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810343747.5A Pending CN108487417A (en) 2018-04-17 2018-04-17 A kind of semi-flexible Quick drainage system administered applied to hillock

Country Status (1)

Country Link
CN (1) CN108487417A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680657A (en) * 2019-01-15 2019-04-26 中国水利水电科学研究院 Spillway and its construction method
CN113250301A (en) * 2021-05-21 2021-08-13 吉林省大洋高新材料科技有限公司 Resin concrete prefabricated linear drainage system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203270403U (en) * 2013-05-19 2013-11-06 鞍钢集团矿业公司 Drainage device of surface mine transportation road
WO2014201742A1 (en) * 2013-06-20 2014-12-24 中国科学院、水利部成都山地灾害与环境研究所 Debris flow drainage trough planning and designing method and application thereof
CN104746628A (en) * 2015-04-16 2015-07-01 芜湖弛科排水材料贸易有限公司 Drainage system based on HDPE (high-density polyethylene) finished drainage ditches
CN106522247A (en) * 2016-11-25 2017-03-22 广东中联兴环保科技有限公司 Water and soil conservation method for ion-adsorbed type rare earth ore in-situ leaching abandoned mining land
CN107119539A (en) * 2017-06-19 2017-09-01 合肥元康环境科技有限公司 A kind of Quick drainage linear drainage ditch
CN208088470U (en) * 2018-04-17 2018-11-13 山西智德安全技术股份有限公司 A kind of semi-flexible Quick drainage system administered applied to hillock

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203270403U (en) * 2013-05-19 2013-11-06 鞍钢集团矿业公司 Drainage device of surface mine transportation road
WO2014201742A1 (en) * 2013-06-20 2014-12-24 中国科学院、水利部成都山地灾害与环境研究所 Debris flow drainage trough planning and designing method and application thereof
CN104746628A (en) * 2015-04-16 2015-07-01 芜湖弛科排水材料贸易有限公司 Drainage system based on HDPE (high-density polyethylene) finished drainage ditches
CN106522247A (en) * 2016-11-25 2017-03-22 广东中联兴环保科技有限公司 Water and soil conservation method for ion-adsorbed type rare earth ore in-situ leaching abandoned mining land
CN107119539A (en) * 2017-06-19 2017-09-01 合肥元康环境科技有限公司 A kind of Quick drainage linear drainage ditch
CN208088470U (en) * 2018-04-17 2018-11-13 山西智德安全技术股份有限公司 A kind of semi-flexible Quick drainage system administered applied to hillock

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680657A (en) * 2019-01-15 2019-04-26 中国水利水电科学研究院 Spillway and its construction method
CN109680657B (en) * 2019-01-15 2024-03-19 中国水利水电科学研究院 Spillway and construction method thereof
CN113250301A (en) * 2021-05-21 2021-08-13 吉林省大洋高新材料科技有限公司 Resin concrete prefabricated linear drainage system
CN113250301B (en) * 2021-05-21 2022-12-27 吉林省大洋高新材料科技有限公司 Resin concrete prefabricated linear drainage system

Similar Documents

Publication Publication Date Title
CN103953008B (en) A kind of modified mixed dam being applicable to Tailings Dam
CN109371918B (en) Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof
CN103233446A (en) Composite panel earth and rockfill dam and anti-seepage body construction method
CN104652581B (en) Multi-stage slope anchoring structure for realizing rainwater and sewage separation
EP1067241B1 (en) Basin construction for catchment of a traffic road
CN101914882B (en) Low embankment structure in phreatic high slity soil region and construction method thereof
CN210177294U (en) Mountain area highway subgrade
CN108487417A (en) A kind of semi-flexible Quick drainage system administered applied to hillock
CN108843386A (en) Tunnel roof waterproof flow guiding structure and its water seepage treatment method
CN111119154A (en) River valley type debris flow ditch waste slag land-making structure and construction method
CN208088470U (en) A kind of semi-flexible Quick drainage system administered applied to hillock
CN108086255B (en) Seepage-proofing method for midline-type tailing damming dam body and midline-type tailing dam
CN113186955A (en) Compound side slope reinforced structure
CN105839653B (en) A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system
CN112281912A (en) Protective system for abandoned river soil field on river beach in steep mountain area and construction method of protective system
CN208619166U (en) Tunnel roof waterproof flow guiding structure
CN113622233B (en) Construction method of strip mine double-arch road capable of avoiding influence of water impact
CN206298869U (en) A kind of concrete guard wall structure of free drainage
CN211523176U (en) River valley type debris flow ditch waste slag and land making structure
CN103898844B (en) A kind of slabstone buttress reinforced earth compound embankment culvert pipe structure
CN207297090U (en) A kind of sewer structure for expansive stratum Tunnel Base draining
CN208266895U (en) Cofferdam is built in returning for seabed tunnel point storehouse construction
CN114775620B (en) Construction method for progressive excavation of plain riverbank under mucky soil condition
CN220318282U (en) Soft soil region ash soil roadbed structure
CN214143756U (en) High-sensitivity soil foundation pit supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination