CN108487417A - A kind of semi-flexible Quick drainage system administered applied to hillock - Google Patents
A kind of semi-flexible Quick drainage system administered applied to hillock Download PDFInfo
- Publication number
- CN108487417A CN108487417A CN201810343747.5A CN201810343747A CN108487417A CN 108487417 A CN108487417 A CN 108487417A CN 201810343747 A CN201810343747 A CN 201810343747A CN 108487417 A CN108487417 A CN 108487417A
- Authority
- CN
- China
- Prior art keywords
- drainage
- hillock
- canal
- transverse
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
The present invention is directed to hillock drainage ditch not anti-settling, easy shoal materials, drain the deficiencies of slow, devise a kind of semi-flexible Quick drainage system administered applied to hillock, drainage ditch uses half-flexible water drainage canal, destruction of the hillock sedimentation to water channel can be resisted, Quick drainage, a variety of optimization designs of drainage system develop simultaneously simultaneously, the U-shaped section of transverse drainage canal, intermediate high both sides are low and counter-slope design enable rainwater faster, more enter transverse drainage canal, and faster from the over-the-counter longitudinal drainage canal discharge of hillock, effectively solve the problems, such as drainage ditch sediment siltation, reduce immersion of the rainwater to slope surface and riding track, drainage ditch has high-strength simultaneously, it is corrosion-resistant, long lifespan, it is freeze proof, installation, replace the features such as facilitating, strong guarantee is provided for being used for a long time for drainage ditch.
Description
Technical field
The invention belongs to technical field of drainage, and in particular to a kind of semi-flexible Quick drainage system administered applied to hillock
System.
Background technology
Gangue is the maximum industrial solid castoff of coal mine drainage amount, accounts for about the 10~20% of raw coal output.The whole nation at present
There are thousands of hillocks not yet to administer, also increases several hundred million tons of spoils newly every year.Hillock does not only take up a large amount of soils, destroys periphery
Ecoscape, while a large amount of toxic and harmful gas, dust are discharged into air, and generate a large amount of leaching liquors.Therefore to cash
The ecological environment treatment of Stone Mountain, has a great responsibility, arduous task.
The conventional method that hillock is administered:It cuts slope arrangement → earthing → and constructs drainage ditch → vegetation.Due to hillock from
Characteristic is fired, drainage ditch apolegamy and setting therein are most important to hillock improvement, directly influence the success or failure of hillock improvement.
Traditional hillock drainage ditch generally uses concrete or stone masonry to construct, and is commonly called as rigid water channel, the water channel is most
Big defect is not anti-settling, the i.e. differential settlement of hillock, easily water channel is caused to be broken, not only influences the normal of drainage system
Operation, and lead to rainwater infiltration, channel of leaking out is formed, leads to hillock spontaneous fire, or even cause just in the spoil of spontaneous combustion
It explodes on mountain.
The shortcomings that for hillock rigid drainage canal and deficiency, patent CN202672119U《Gangue flexible water drainage canal》It is public
A kind of flexible water drainage canal has been opened, that is, has excavated trapezoidal ditch, loess formation has been covered on ditch side and bottom surface, geotechnique is laid on loess formation
Film is piled up into step slope surface on geomembrane with soil engineering bag, forms flexible water drainage canal, and hillock sedimentation is coped with to water channel with this
It destroys;Patent CN202652889U《Self-ignition coal gangue hill comprehensive treatment system》Previous patent is applied in hillock comprehensive treatment
On, meanwhile, between riding track drainage ditch and slope surface and it is heavy to cope with hillock to reduce rain drop erosion for the flexible bank protection of slope foot setting
Drop, firm slope surface, reduce soil erosion.
The defect one of above-mentioned flexible water drainage canal is that resistance is big, and draining is slow, and a large amount of silts are easy siltation in water channel, cause to arrange
Water system is paralysed quickly;Second is that contacting not tight between soil engineering bag, gap is big, causes rainwater cross flow, necessarily leads to following consequence:
1. forming gully erosion on slope, rill erosion the more rushes the more deep, forms the channel of leaking out of hillock gradually, causes hillock certainly
Combustion.
2. a large amount of rainwater directly rush at slope surface and riding track, soil erosion is caused, or even vegetation on slope of destroying by rush of water.
3. rainwater infiltration generates percolate, polluted underground water and soil to spoil area.
4. the soil on riding track impregnates for a long time, easily causes landslide, collapses and settle, then drainage system is caused more
Havoc, vicious circle.
5. the rainwater on riding track cannot flow directly into water channel, riding track is gently then impregnated, it is heavy then wash away slope surface.
Patent CN101011009A《A kind of greening method of self-ignition coal gangue hill》In set up longitudinal drainage ditch from top to bottom
With flood discharge, gutter grouts construction, and riding track sets up soil property gutter, and terraced fields gutter assembles retaining wall at the wall of slope.The patent
Defect:First, top-down longitudinal drainage ditch is arranged in the middle part of hillock, since slope surface earthing is relatively thin, easily with hillock
Internal run-through, initiation are leaked out, and hillock spontaneous fire is caused.Second is that soil property gutter is arranged on riding track, gear is assembled at the wall of slope
Cob wall, rainwater gets off on wall, directly impacts drainage ditch, and soil property water channel is washed away intolerant to water, is washed away quickly, when in addition rainwater is big,
Rainwater is directed across drainage ditch and rushes to riding track, threatens to riding track.
Other related flexible water channels also have a large amount of technical literature, and content is also similar, numerous to list herein.
Invention content
To solve the above-mentioned problems, the present invention provides it is a kind of be exclusively used in hillock administer in anti-settling drainage system,
Can either anti-settling, and can sediment prevention siltation, in conjunction with a variety of optimization designs, quickly the rainwater on hillock can be discharged it is over-the-counter,
Rainwater is avoided to constitute a threat to hillock, it is ensured that hillock safety.
The technical scheme is that:The hillock slope surface is that counter-slope tilts terraced fields from top to bottom, and the counter-slope tilts
Terraced fields include multiple sequentially connected slopes and riding track, and wherein slope and riding track includes spoil layer and overburden layer, in overburden layer
Upper structure drainage ditch.
The overburden layer of each riding track is respectively provided with transverse drainage canal, transverse drainage canal both sides respectively with over-the-counter longitudinal direction
Drainage ditch is connected to;Thus rainwater flows to over-the-counter longitudinal drainage canal by transverse drainage canal on slope surface and riding track, to which spoil be discharged
Mountain area domain.
The transverse drainage canal is arranged on the inside of the riding track at 1/3 or is disposed at the 1.0~1.5m at slope bottom, makes
It obtains the water to get off from slope to be buffered, reduces the rainwater flow velocity that slope surface is got off, rainwater will not be flushed to because of inertia on riding track, simultaneously
Silt is blocked in slope bottom by settlement or by grass, reduces the silt that slope rainwater is mingled with and is directly entered transverse drainage
Canal causes to deposit, and influences to drain, while considering transverse drainage canal position frequently rolling due to construction machinery, locates this most
Closely knit, sedimentation possibility is minimum, and stability is best.
Riding track is divided into inside platform and outside platform by the transverse drainage canal, and the inside platform exists with transverse drainage canal
One horizontal plane, the outside platform are counter-slope type, and gradient α is 2~6%;Ensure what rainwater and upper ramps on riding track flowed down
Rainwater smoothly flows into riding track transverse drainage canal, and the rainwater avoided on riding track washes away lower ramps slope surface.
The transverse drainage canal uses half-flexible water drainage canal, the intensity of existing rigidity water channel, and the toughness of flexible water channel,
Realize the dual function of anti-settling and Quick drainage.
Further, the HDPE materials or resin that the half-flexible water drainage canal selection high-density polyethylene material is polymerized
The drainage ditch of concrete material, inner wall smooth is anticorrosive, and draining is rapid.Its antifreeze properties, cope with high and cold weather to its
It influences.
Further, in order to reduce resistance of water drainage, accelerate drainage speed, the transverse drainage canal section is U-shaped, is had
Larger water delivery, transportability of sediments;High among the transverse drainage canal transverse direction bottom surface, both sides are low, facilitate rainwater in transverse drainage canal
It can be discharged as early as possible from over-the-counter longitudinal drainage canal.
Preferably, the drainage grade of transverse drainage canal bottom surface is 2~5 ‰.
Further, the transverse drainage canal by multiple HDPE or resin concrete material the U-shaped drainage ditch of linear finished product
It is formed by connecting, specification is 200~300mm wide, 300~450mm high, single-unit length 500mm.
Preferably, it is connected by primary and secondary card slot between the U-shaped drainage ditch of the linear finished products of the multiple HDPE.
Further, in order to strictly prevent from oozing under draining, the card slot seam between the U-shaped drainage ditch of the linear finished products of HDPE makes
Use waterproof gasket cement(Such as pitch silica gel)Uniformly smear.
Further, it in order to make water channel be built on the rock, is contacted with surrounding tightly, water channel basis uses 100mm plain concretes
Bed course, side wall fill plain concrete, and the two sides wing is filled with plain concrete in the transverse drainage canal so that the transverse drainage
Joint face between canal and riding track is flushed with riding track surface.
Further, sediment siltation, the transverse drainage canal are interior heavy every 40~50m settings along water (flow) direction in order to prevent
Sand basin.
The present invention has the following advantages:
1. overcome the deficiency of existing drainage system, can grafting group it is integral, the toughness of half-flexible water drainage canal is utilized, resists
Hillock settles the destruction to water channel;Simultaneously using the slickness of HDPE materials and resin concrete material, drainage ditch mud is solved
Husky siltation problem;Using the tightness of HDPE material seams, rain leakage is prevented;The high-strength, corrosion-resistant of HDPE materials, longevity simultaneously
Life is long, freeze proof, installs, replaces the features such as facilitating, and is provided a strong guarantee for being used for a long time for drainage ditch.
2. the optimization design and many kinds of measures of drainage system develop simultaneously.The U-shaped section of transverse drainage canal, intermediate high both sides it is low and
Counter-slope design enables rainwater faster, more to reduce sediment siltation to which discharge is over-the-counter into transverse drainage canal, subtract
Soil erosion is lacked, has reduced immersion of the rainwater to slope surface and riding track, has laid a good foundation for hillock safety and stablization.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the sectional view of transverse drainage canal of the present invention.
Specific implementation mode
Present disclosure is further elaborated with reference to specific embodiment, but embodiment is only of the invention
Better embodiment, therefore the equivalence changes that all features and principle according to described in present patent application range are done, are included in
Within the scope of present patent application.
Embodiment one
Changzhi branch company of Shanxi energy group Wang Zhuan Gangue Hills administer drainage system embodiment
Wang Zhuan Gangue Hills administration project sets six slopes and six riding tracks altogether, and the riding track width 5m, hang down high 5m, and slope is than 1:
2, the slope thickness of earth covering 0.3m, the thickness of earth covering 1m of riding track.
Water drainage system design is:Such as Fig. 1, shown in 2, in each riding track(2)Hillock(5)Overburden layer(4)Upper design is horizontal
To drainage ditch(3), hillock riding track(2)Inside platform(201)With transverse drainage canal(3)In a horizontal plane, outside platform
(202)For counter-slope type, gradient α is 5%, transverse drainage canal(3)High among lateral bottom surface, both sides are low, and drainage grade β is 3 ‰, horizontal
To drainage ditch(3)Positioned at away from top slope(1)At bottom of slope 1.2m.The transverse drainage canal(3)For linear type, section is U-shaped, institute
State transverse drainage canal(3)Interior laying and the drainage ditch of identical HDPE materials or resin concrete material in transverse drainage canal.Institute
State transverse drainage canal(3)It is interior that sand sediment trap is set every 45m along water (flow) direction(6).
Transverse drainage canal(3)Basic bottom uses plain concrete cushion layer, and the U-shaped row of the linear finished products of HDPE is laid with using grafting one by one
Water channel, specification are 300 × 350mm, often save 500mm, and connection type is primary and secondary card slot type.The transverse drainage canal(3)Side wall fills
Fill out plain concrete so that the transverse drainage canal(3)With riding track(2)Between joint face and riding track(2)Surface flushes.
To keep water channel more tight, pitch silica gel is used(Waterproof gasket cement)Uniformly it is applied to adjacent row water channel interface card slot
At seam, after the completion of smearing, sealant extra at card seam is cleaned out.Drainage system it is formal before use, cleaning drainage ditch and
Sundries in well, it is ensured that ditch body is unblocked.
The hillock is collected to transverse drainage canal and rapidly flows toward field after several heavy rain, slope rainwater and platform rainwater
Outer drainage ditch.Rain rear platform surface does not have ponding.
Embodiment two
Shanxi Gangue Hill administers drainage system embodiment
Shanxi Gangue Hill administration project sets four slopes and four riding tracks altogether, and the riding track width 4.5m, hang down high 6m, slope
Than 1:2, the slope thickness of earth covering 0.5m, the thickness of earth covering 1.0m of riding track.
Water drainage system design is:Such as Fig. 1, shown in 2, in each riding track(2)Hillock(5)Overburden layer(4)Upper design is horizontal
To drainage ditch(3), hillock riding track(2)Inside platform(201)With transverse drainage canal(3)In a horizontal plane, outside platform
(202)For counter-slope type, gradient α is 3%, transverse drainage canal(3)High among lateral bottom surface, both sides are low, and drainage grade β is 5 ‰, horizontal
To drainage ditch(3)Positioned at away from top slope(1)At bottom of slope 1m.The transverse drainage canal(3)For linear type, section be it is U-shaped, it is described
Transverse drainage canal(3)Interior laying and the drainage ditch of identical HDPE materials or resin concrete material in transverse drainage canal.It is described
Transverse drainage canal(3)It is interior that sand sediment trap is set every 48m along water (flow) direction(6).
Transverse drainage canal(3)Basic bottom uses plain concrete cushion layer, and the U-shaped row of the linear finished products of HDPE is laid with using grafting one by one
Water channel, specification are 300 × 300mm, often save 500mm, and connection type is primary and secondary card slot type.The transverse drainage canal(3)Side wall fills
Fill out plain concrete so that the transverse drainage canal(3)With riding track(2)Between joint face and riding track(2)Surface flushes.
It to keep water channel more tight, is uniformly applied at adjacent row water channel interface card slot seam, is smeared using waterproof gasket cement
After the completion, sealant extra at card seam is cleaned out.Drainage system is formal before use, in cleaning drainage ditch and sand sediment trap
Sundries, it is ensured that ditch body is unblocked.
The hillock is collected to transverse drainage canal after several heavy rain, slope rainwater and platform rainwater, and rapidly flows toward
Over-the-counter drainage ditch.Rain rear platform surface does not have ponding.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features.
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's
Within protection domain.
Claims (9)
1. a kind of semi-flexible Quick drainage system administered applied to hillock, including hillock slope surface, it is characterised in that:It is described
Hillock slope surface is that counter-slope tilts terraced fields from top to bottom, and it includes multiple sequentially connected slopes that the counter-slope, which tilts terraced fields,(1)With
Riding track(2);
Each riding track(2)It is respectively provided with transverse drainage canal(3), the transverse drainage canal(3)It is arranged respectively with over-the-counter longitudinal direction both sides
Water channel is connected to;
The transverse drainage canal(3)It is arranged in riding track(2)At upper inside 1/3 or away from slope(1)At 1.0~1.5m of bottom of slope;
The transverse drainage canal(3)By riding track(2)It is divided into inside platform(201)With outside platform(202), the inside platform
(201)With transverse drainage canal(3)In a horizontal plane, the outside platform(202)For counter-slope type, gradient α is 2~6%;
The transverse drainage canal(3)For half-flexible water drainage canal.
2. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 1, it is characterised in that:
The half-flexible water drainage canal is the drainage ditch of HDPE materials or resin concrete material.
3. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 1, it is characterised in that:
The transverse drainage canal(3)Section is U-shaped, the transverse drainage canal(3)High, the low laying in both sides among lateral bottom surface.
4. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 3, it is characterised in that:
The transverse drainage canal(3)The drainage grade β of bottom surface is 2 ‰~5 ‰.
5. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 1, it is characterised in that:
The transverse drainage canal(3)The interior U-shaped drainage ditch of linear finished product for being laid with multiple HDPE or resin concrete material, specification are(200
~300)Wide ×(300~450)Height, single-unit length 500mm.
6. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 5, it is characterised in that:
It is connected by primary and secondary card slot between the U-shaped drainage ditch of the multiple linear finished products of HDPE.
7. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 6, it is characterised in that:
Card seam between the U-shaped drainage ditch of the linear finished products of HDPE is uniformly smeared using waterproof gasket cement.
8. a kind of semi-flexible Quick drainage system administered applied to hillock according to any one of claims 1 to 7, special
Sign is:The transverse drainage canal(3)The two sides wing is filled with plain concrete, the transverse drainage canal(3)With riding track(2)Between
Joint face and riding track(2)Surface flushes.
9. a kind of semi-flexible Quick drainage system administered applied to hillock according to claim 1, it is characterised in that:
The transverse drainage canal(3)It is interior that every 40~50m, sand sediment trap is set(6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810343747.5A CN108487417A (en) | 2018-04-17 | 2018-04-17 | A kind of semi-flexible Quick drainage system administered applied to hillock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810343747.5A CN108487417A (en) | 2018-04-17 | 2018-04-17 | A kind of semi-flexible Quick drainage system administered applied to hillock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108487417A true CN108487417A (en) | 2018-09-04 |
Family
ID=63316305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810343747.5A Pending CN108487417A (en) | 2018-04-17 | 2018-04-17 | A kind of semi-flexible Quick drainage system administered applied to hillock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108487417A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680657A (en) * | 2019-01-15 | 2019-04-26 | 中国水利水电科学研究院 | Spillway and its construction method |
CN113250301A (en) * | 2021-05-21 | 2021-08-13 | 吉林省大洋高新材料科技有限公司 | Resin concrete prefabricated linear drainage system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203270403U (en) * | 2013-05-19 | 2013-11-06 | 鞍钢集团矿业公司 | Drainage device of surface mine transportation road |
WO2014201742A1 (en) * | 2013-06-20 | 2014-12-24 | 中国科学院、水利部成都山地灾害与环境研究所 | Debris flow drainage trough planning and designing method and application thereof |
CN104746628A (en) * | 2015-04-16 | 2015-07-01 | 芜湖弛科排水材料贸易有限公司 | Drainage system based on HDPE (high-density polyethylene) finished drainage ditches |
CN106522247A (en) * | 2016-11-25 | 2017-03-22 | 广东中联兴环保科技有限公司 | Water and soil conservation method for ion-adsorbed type rare earth ore in-situ leaching abandoned mining land |
CN107119539A (en) * | 2017-06-19 | 2017-09-01 | 合肥元康环境科技有限公司 | A kind of Quick drainage linear drainage ditch |
CN208088470U (en) * | 2018-04-17 | 2018-11-13 | 山西智德安全技术股份有限公司 | A kind of semi-flexible Quick drainage system administered applied to hillock |
-
2018
- 2018-04-17 CN CN201810343747.5A patent/CN108487417A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203270403U (en) * | 2013-05-19 | 2013-11-06 | 鞍钢集团矿业公司 | Drainage device of surface mine transportation road |
WO2014201742A1 (en) * | 2013-06-20 | 2014-12-24 | 中国科学院、水利部成都山地灾害与环境研究所 | Debris flow drainage trough planning and designing method and application thereof |
CN104746628A (en) * | 2015-04-16 | 2015-07-01 | 芜湖弛科排水材料贸易有限公司 | Drainage system based on HDPE (high-density polyethylene) finished drainage ditches |
CN106522247A (en) * | 2016-11-25 | 2017-03-22 | 广东中联兴环保科技有限公司 | Water and soil conservation method for ion-adsorbed type rare earth ore in-situ leaching abandoned mining land |
CN107119539A (en) * | 2017-06-19 | 2017-09-01 | 合肥元康环境科技有限公司 | A kind of Quick drainage linear drainage ditch |
CN208088470U (en) * | 2018-04-17 | 2018-11-13 | 山西智德安全技术股份有限公司 | A kind of semi-flexible Quick drainage system administered applied to hillock |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680657A (en) * | 2019-01-15 | 2019-04-26 | 中国水利水电科学研究院 | Spillway and its construction method |
CN109680657B (en) * | 2019-01-15 | 2024-03-19 | 中国水利水电科学研究院 | Spillway and construction method thereof |
CN113250301A (en) * | 2021-05-21 | 2021-08-13 | 吉林省大洋高新材料科技有限公司 | Resin concrete prefabricated linear drainage system |
CN113250301B (en) * | 2021-05-21 | 2022-12-27 | 吉林省大洋高新材料科技有限公司 | Resin concrete prefabricated linear drainage system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103953008B (en) | A kind of modified mixed dam being applicable to Tailings Dam | |
CN109371918B (en) | Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof | |
CN103233446A (en) | Composite panel earth and rockfill dam and anti-seepage body construction method | |
CN104652581B (en) | Multi-stage slope anchoring structure for realizing rainwater and sewage separation | |
EP1067241B1 (en) | Basin construction for catchment of a traffic road | |
CN101914882B (en) | Low embankment structure in phreatic high slity soil region and construction method thereof | |
CN210177294U (en) | Mountain area highway subgrade | |
CN108487417A (en) | A kind of semi-flexible Quick drainage system administered applied to hillock | |
CN108843386A (en) | Tunnel roof waterproof flow guiding structure and its water seepage treatment method | |
CN111119154A (en) | River valley type debris flow ditch waste slag land-making structure and construction method | |
CN208088470U (en) | A kind of semi-flexible Quick drainage system administered applied to hillock | |
CN108086255B (en) | Seepage-proofing method for midline-type tailing damming dam body and midline-type tailing dam | |
CN113186955A (en) | Compound side slope reinforced structure | |
CN105839653B (en) | A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system | |
CN112281912A (en) | Protective system for abandoned river soil field on river beach in steep mountain area and construction method of protective system | |
CN208619166U (en) | Tunnel roof waterproof flow guiding structure | |
CN113622233B (en) | Construction method of strip mine double-arch road capable of avoiding influence of water impact | |
CN206298869U (en) | A kind of concrete guard wall structure of free drainage | |
CN211523176U (en) | River valley type debris flow ditch waste slag and land making structure | |
CN103898844B (en) | A kind of slabstone buttress reinforced earth compound embankment culvert pipe structure | |
CN207297090U (en) | A kind of sewer structure for expansive stratum Tunnel Base draining | |
CN208266895U (en) | Cofferdam is built in returning for seabed tunnel point storehouse construction | |
CN114775620B (en) | Construction method for progressive excavation of plain riverbank under mucky soil condition | |
CN220318282U (en) | Soft soil region ash soil roadbed structure | |
CN214143756U (en) | High-sensitivity soil foundation pit supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |