CN113622233B - Construction method of strip mine double-arch road capable of avoiding influence of water impact - Google Patents

Construction method of strip mine double-arch road capable of avoiding influence of water impact Download PDF

Info

Publication number
CN113622233B
CN113622233B CN202110850624.2A CN202110850624A CN113622233B CN 113622233 B CN113622233 B CN 113622233B CN 202110850624 A CN202110850624 A CN 202110850624A CN 113622233 B CN113622233 B CN 113622233B
Authority
CN
China
Prior art keywords
road
water collecting
ditch
drainage
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110850624.2A
Other languages
Chinese (zh)
Other versions
CN113622233A (en
Inventor
陈树召
肖藏岩
韩流
杨猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN202110850624.2A priority Critical patent/CN113622233B/en
Publication of CN113622233A publication Critical patent/CN113622233A/en
Application granted granted Critical
Publication of CN113622233B publication Critical patent/CN113622233B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a construction method of a strip mine double-arch road capable of avoiding the influence of water impact, which comprises the following steps: s1: piling stripped sandstone road arches along the central line of each lane at the middle position of each lane; s2: building a retaining wall, excavating a main drainage ditch, excavating an outer ditch on the inner side of the retaining wall, and building a middle drainage ditch in the middle of the whole road; s3: a water collecting well is arranged at the position of the strip mine, which is farthest from the power supply area; s4: excavating a plurality of water collecting ditches along a direction vertical to the transportation road, wherein each water collecting ditch is sequentially communicated with a middle drainage ditch, an outer side ditch and a main drainage ditch at the slope surface of the lower-layer step from left to right, a water collecting pipeline is arranged in each water collecting ditch, and then the water collecting ditches are filled; s5: the water collecting funnels are installed in the drainage ditches and are connected into a whole through a tee joint. The invention shortens the retention time of rainwater on the road surface, thereby reducing infiltration and erosion and improving the road drainage effect.

Description

Construction method of strip mine double-arch road capable of avoiding influence of water impact
Technical Field
The invention particularly relates to a construction method of a strip mine double-arch road capable of avoiding the influence of water impact, and belongs to the field of coal mining.
Background
For strip mines that employ discontinuous or semi-continuous processes for coal mining, the road surface quality of the haul road is directly related to the transport efficiency and the transport cost, and has a significant impact on the strip mine benefits.
The width of a transport road of an open pit, particularly a domestic large open pit, is limited by the volume of transport equipment, and the width of the transport road of the open pit is wider, and some transport roads even reach 40-50m, so that the road is difficult to drain in rainy days, accumulated water is easily formed to corrode the road surface and a roadbed, the road surface is muddy, the vehicle falls or a large gully appears, the driving safety and the transport efficiency are seriously influenced, and the condition is more obvious and the influence is more serious on a refuse dump transport road built by loose materials.
Disclosure of Invention
Aiming at the problems in the prior art, the invention aims to provide a construction method of a double-arch road of a strip mine, which can avoid the influence of water impact, so as to solve the problems that the driving safety is influenced and the transportation efficiency is reduced due to the fact that the road condition is poor when the existing transportation road of the strip mine meets the problem of water accumulation.
In order to achieve the purpose, the invention adopts the technical scheme that:
a construction method of a strip mine double-arch road capable of avoiding the influence of water impact comprises the following steps:
s1: on a step-shaped road surface formed in the process of mining strip mines, dividing the road surface into two parts of lanes with the same width on the left and the right, stacking stripped gravel road arches at the middle position of each lane along the central line of the lane, paving gravel by using a road grader or a front loader to form an inverted V shape, forming the road surface at one step, and forming the cross section of the whole road into an M shape;
s2: constructing a retaining wall on one side of the road plane far away from the upper step slope, excavating a main drainage ditch on one side of the road near the upper step slope by using a ditcher, wherein the main drainage ditch comprises an impermeable layer and a surface layer, then excavating an outer ditch on the inner side of the retaining wall, constructing a middle drainage ditch in the middle of the whole road, and all the drainage ditches are V-shaped or rectangular, and are all coated with cement to improve the flatness and construct the impermeable layer, and the depth is set to be 0.5-1.0 m;
s3: a water collecting well is arranged at the position of the strip mine, which is farthest from the power supply area;
s4: excavating a plurality of water collecting ditches at intervals of 100-150 m in the direction perpendicular to the transportation road, wherein each water collecting ditch is sequentially communicated with a middle drainage ditch, an outer side ditch and a main drainage ditch at the slope surface of the lower step from left to right, a steel water collecting pipeline with the diameter of 20-40cm is arranged in each water collecting ditch, and then the water collecting ditches are filled;
s5: the water collecting funnels are installed in the drainage ditches, the vertical middle drainage ditch, the outer ditch, the main drainage ditch on the slope surface of the lower step and the horizontal water collecting pipeline are connected into a whole through the tee joint, water in the drainage ditches is led to the water collecting pipeline, and finally flows into the water collecting well in the step S3.
Furthermore, the slope of the road arch formed by sand and stone accumulation in the step S1 is set to be 1% -3%, and the thinnest part is not less than 30 cm.
Further, all the drainage ditches are set to be inclined by 1 to 3 degrees in the direction of the water collection well in step S2.
Furthermore, filter screens are arranged in the drainage ditches.
The invention has the beneficial effects that: the road construction method of the invention can shorten the retention time of rainwater on the road surface, thereby reducing infiltration and erosion. Compared with the cross section of the road with the same transverse gradient, the amount of road foundations or road surface engineering caused by road arches is reduced by more than 3/4. The heavy truck runs across the center of the lane, so that the gravity center offset of the truck caused by road arch is avoided, the loss of the truck is reduced, and the road drainage effect can be improved by adopting a larger road cross slope. When the heavy truck runs on the ramp, the influence of the cross slope of the road can be avoided, and the longitudinal slope is equal to the synthetic slope, so that the effective slope of the ramp is improved, and the length of the ramp is shortened.
Drawings
FIG. 1 is a side view of a roadway after construction;
FIG. 2 is a top view of the roadway after construction;
in the figure, 1-road surface, 2-road arch, 3-upper step slope, 4-main drainage ditch, 5-retaining wall, 6-outer ditch, 7-middle drainage ditch, 8-water collecting ditch and 9-lower step slope.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
A construction method of a strip mine double-arch road capable of avoiding the influence of water impact, as shown in figures 1 and 2, comprises the following steps:
s1: on a step-shaped road surface 1 formed in the process of mining open mines, the section is a horizontal plane, the road surface 1 is divided into two lanes with the same width on the left and right sides, the lanes are used as normal mine transportation roads, two lanes with one lane for one time are needed, sand stone road arches 2 stripped off are accumulated at the middle positions of the left lane and the right lane along the central lines of the lanes, sand stones are paved by a road grader or a front loader to form an inverted V shape, the road surface is formed in one step, the cross section of the whole road is M-shaped, in order to better achieve the effect of evacuating water and not influence the normal running of vehicles, the gradient of the road arch 2 formed by the sand stone accumulation is set to be 1% -3%, the thinnest position is not less than 30cm, the height of the road arch 2 is too low to be easily submerged by water, and the effect of evacuating accumulated water is not achieved.
S2: a retaining wall 5 is constructed on one side of the road plane far away from the upper-layer step slope surface 3, a main drainage ditch 4 is excavated on one side of the road near the upper-layer step slope surface 3 in a way of being parallel to the lane direction, and the main drainage ditch 4 comprises an impermeable layer and a surface layer. Then, an outer side ditch 6 parallel to the retaining wall 5 is excavated on the inner side of the retaining wall 5, a middle drainage ditch 7 parallel to the main drainage ditch 4 is built in the middle of the whole road surface 1, the drainage ditches are all V-shaped or rectangular, cement is adopted for plastering to improve the flatness and construct an impermeable layer, the flow rate of water flow can be accelerated, and erosion is reduced. The depth is set to be 0.5-1.0 m, and the depth is the most appropriate depth, and the flow of the matched drainage is enough for the road condition of the accumulated water in the mining area. Meanwhile, in order to play a role of faster drainage, all the drainage ditches are arranged to be inclined for 1-3 degrees along the direction of the water collecting well, and the inclination is more favorable for promoting the drainage by utilizing the action of the gravity of water.
S3: a water collecting well is arranged at the position of the strip mine, which is farthest from the power supply area;
s4: excavating a plurality of water collecting ditches 8 at intervals of 100-150 m along the direction vertical to the transportation road, wherein each water collecting ditch 8 is sequentially communicated with a middle drainage ditch 7, an outer side ditch 6 and a main drainage ditch 4 at the lower-layer step slope 9 from left to right, a steel water collecting pipeline with the diameter of 20-40cm is arranged in each water collecting ditch 8, and then the water collecting ditches 8 are filled;
s5: the water collecting funnels are arranged in the drainage ditches, the vertical middle drainage ditch 7, the outer edge ditch 6, the main drainage ditch 4 on the lower-layer step slope surface 9 and the transverse water collecting pipeline are connected into a whole through the tee joint, water in the drainage ditches is led to the water collecting pipeline, and finally flows into the water collecting well in the step S3. In order to prevent the water collecting pipeline from being blocked, filter screens are also arranged in all the drainage ditches to prevent sundries such as stones, plant branches and the like from entering the water collecting pipeline.
The method of the invention reforms the coal mining area step section, the accumulated water is collected in the water collecting well by digging the drainage ditch and guiding the water to the water collecting pipeline of the water collecting ditch 8, the influence of the erosion of the accumulated water on the road surface 1 to the road surface and the roadbed on the running of the transport vehicle is reduced, thereby reducing the problem of transport efficiency in the mining area, and the construction process is simple and the drainage effect is excellent.

Claims (4)

1. A construction method of a strip mine double-arch road capable of avoiding the influence of water impact is characterized by comprising the following steps:
s1: on a step-shaped road surface (1) formed in the process of mining strip mines, dividing the road surface (1) into two lanes with the same width at left and right, piling up stripped gravel road arches (2) along the central line of each lane at the middle position of each lane, paving gravel by using a road grader or a front loader to form an inverted V shape, forming the road surface at one time, and making the cross section of the whole road into an M shape;
s2: constructing a retaining wall (5) on one side of the road plane far away from the upper step slope surface (3), excavating a main drainage ditch (4) on one side of the road near the upper step slope surface (3) by using a ditcher, wherein the main drainage ditch (4) comprises an impermeable layer and a surface layer, then excavating an outer ditch (6) on the inner side of the retaining wall (5), constructing a middle drainage ditch (7) in the middle of the whole road, and all the drainage ditches are V-shaped or rectangular, adopting cement to wipe the surface to improve the flatness and construct the impermeable layer, and setting the depth to be 0.5-1.0 m;
s3: a water collecting well is arranged at the position of the strip mine, which is farthest from the power supply area;
s4: excavating a plurality of water collecting ditches (8) at intervals of 100-150 m along the direction vertical to the transportation road, sequentially communicating each water collecting ditch (8) with a middle drainage ditch (7), an outer drainage ditch (6) and a main drainage ditch (4) at the lower-layer step slope (9) from left to right, arranging a steel water collecting pipeline with the diameter of 20-40cm in each water collecting ditch (8), and filling up the water collecting ditches (8);
s5: the water collecting funnels are arranged in the drainage ditches, the vertical middle drainage ditch (7), the outer edge ditch (6), the main drainage ditch (4) on the lower-layer step slope surface (9) and the transverse water collecting pipeline are connected into a whole through the tee joint, water in the drainage ditches is led to the water collecting pipeline, and finally flows into the water collecting well in the step S3.
2. The method for constructing a double-arch road for an open-pit mine capable of avoiding the impact of water impact according to claim 1, wherein the slope of the sand-piled crown (2) in step S1 is set to be 1% to 3% and the thinnest point is not less than 30 cm.
3. The method for constructing a double-arched road for open-pit mines according to claim 2, wherein the inclination of all the drainage ditches along the direction of the water collection well is set to 1-3 ° in step S2.
4. The method for constructing a double-arch road for an open-pit mine capable of avoiding the impact of water according to claim 1 or 2, wherein filter screens are arranged in the drainage ditches.
CN202110850624.2A 2021-07-27 2021-07-27 Construction method of strip mine double-arch road capable of avoiding influence of water impact Active CN113622233B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110850624.2A CN113622233B (en) 2021-07-27 2021-07-27 Construction method of strip mine double-arch road capable of avoiding influence of water impact

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110850624.2A CN113622233B (en) 2021-07-27 2021-07-27 Construction method of strip mine double-arch road capable of avoiding influence of water impact

Publications (2)

Publication Number Publication Date
CN113622233A CN113622233A (en) 2021-11-09
CN113622233B true CN113622233B (en) 2022-06-10

Family

ID=78381121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110850624.2A Active CN113622233B (en) 2021-07-27 2021-07-27 Construction method of strip mine double-arch road capable of avoiding influence of water impact

Country Status (1)

Country Link
CN (1) CN113622233B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232766A (en) * 2022-01-06 2022-03-25 国家能源集团国源电力有限公司 Open-pit mine field

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005282283A (en) * 2004-03-30 2005-10-13 Showa Concrete Ind Co Ltd Retaining wall structure
US8328499B2 (en) * 2010-09-02 2012-12-11 G.U. Green Group, LLC Road with inlayed wind harnessing technology
CN106400649B (en) * 2016-11-29 2018-12-28 天津大学前沿技术研究院有限公司 A kind of permeable silting blocking pavement structure
CN207633158U (en) * 2017-11-24 2018-07-20 警通建设(集团)有限公司 A kind of urban road drainage system
CN108797266B (en) * 2018-06-08 2020-07-31 温州宇鑫建设有限公司 Road drainage structure
CN209779381U (en) * 2019-04-10 2019-12-13 缙云县科耳沃自动化科技有限公司 Road with rainwater recycling function
CN211395233U (en) * 2019-11-28 2020-09-01 四川鸥鹏建筑工程公司 Drainage system for mountain road
CN212294225U (en) * 2020-03-11 2021-01-05 中路交建(北京)工程材料技术有限公司 Super-high section transverse drainage structure for drainage asphalt pavement

Also Published As

Publication number Publication date
CN113622233A (en) 2021-11-09

Similar Documents

Publication Publication Date Title
CN110409359B (en) Segmented construction method for bottom reservoir of inner-drainage open pit
CN105256876A (en) Siphon type draining system of superhigh excavation section of road
CN210177294U (en) Mountain area highway subgrade
CN113622233B (en) Construction method of strip mine double-arch road capable of avoiding influence of water impact
CN210857182U (en) Roadbed drainage structure
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN110984193A (en) Severe cold mountain area highway cutting side slope ecological protection system
CN106759778A (en) For the scattered collection mating type waterproof and water drainage system of highway median strip
CN112112657B (en) New construction method for digging and building inclined shaft of coal mine
CN110952506B (en) Self-conveying water-stone separated type flood discharge aqueduct and construction method
CN110172884B (en) Mountain highway subgrade and construction method
US20120269573A1 (en) Systems and Methods for Diverting Sub-surface Water
CN101555803B (en) Method for preventing accumulation of downhole floating coal of coal mine
CN206916686U (en) A kind of subgrade protection system in debris flow gully
CN206503213U (en) Scattered collection mating type waterproof and water drainage system for highway median strip
CN215057564U (en) Visual and maintainable type anti-clogging drainage system for highway tunnel
CN112281872B (en) In-situ retaining dam for dumping in mining pit of sunken open-pit mine and construction method
CN212427186U (en) Slide-resistant plate retaining wall for slope protection
CN109811612B (en) Gutter treatment permanent-temporary combined channel structure and construction method thereof
CN211523176U (en) River valley type debris flow ditch waste slag and land making structure
CN208088470U (en) A kind of semi-flexible Quick drainage system administered applied to hillock
CN103898824B (en) The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board
CN209586442U (en) Disposal structure for water burst of underground river next to tunnel
RU2114307C1 (en) Method for opencast mining of flooded mineral deposits
CN114263460B (en) Stoping method for mountain-side tailing pond

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant