CN108487255B - Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method - Google Patents
Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method Download PDFInfo
- Publication number
- CN108487255B CN108487255B CN201810104974.2A CN201810104974A CN108487255B CN 108487255 B CN108487255 B CN 108487255B CN 201810104974 A CN201810104974 A CN 201810104974A CN 108487255 B CN108487255 B CN 108487255B
- Authority
- CN
- China
- Prior art keywords
- board wall
- prefabricated board
- profile steel
- anchor pole
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 103
- 239000010959 steel Substances 0.000 title claims abstract description 103
- 238000010276 construction Methods 0.000 title claims abstract description 61
- 239000002131 composite material Substances 0.000 title claims abstract description 15
- 238000007569 slipcasting Methods 0.000 claims abstract description 41
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 35
- 239000004567 concrete Substances 0.000 claims abstract description 26
- 238000000034 method Methods 0.000 claims abstract description 26
- 230000008569 process Effects 0.000 claims abstract description 7
- 238000005516 engineering process Methods 0.000 claims abstract description 6
- 238000009415 formwork Methods 0.000 claims abstract description 4
- 238000012545 processing Methods 0.000 claims abstract description 4
- 239000002689 soil Substances 0.000 claims description 30
- 238000009412 basement excavation Methods 0.000 claims description 14
- 238000013461 design Methods 0.000 claims description 13
- 238000004364 calculation method Methods 0.000 claims description 9
- 239000002002 slurry Substances 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 238000004140 cleaning Methods 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 3
- 230000002708 enhancing effect Effects 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims description 3
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 1
- 239000003351 stiffener Substances 0.000 claims 1
- 238000005728 strengthening Methods 0.000 claims 1
- 210000002435 tendon Anatomy 0.000 claims 1
- 230000009471 action Effects 0.000 abstract description 4
- 238000007789 sealing Methods 0.000 abstract description 4
- 210000003205 muscle Anatomy 0.000 description 4
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/10—Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/76—Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810104974.2A CN108487255B (en) | 2018-02-02 | 2018-02-02 | Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810104974.2A CN108487255B (en) | 2018-02-02 | 2018-02-02 | Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108487255A CN108487255A (en) | 2018-09-04 |
CN108487255B true CN108487255B (en) | 2019-11-26 |
Family
ID=63344415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810104974.2A Active CN108487255B (en) | 2018-02-02 | 2018-02-02 | Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108487255B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11222861A (en) * | 1998-02-04 | 1999-08-17 | Shimizu Corp | Execution of retaining wall to existing banking and retaining wall executed by the same |
CN201228356Y (en) * | 2008-06-10 | 2009-04-29 | 北京六建集团公司 | Pit anchored pile-anchor breast wall concrete middle beam structure |
WO2010002076A1 (en) * | 2008-07-01 | 2010-01-07 | Dongjin Construction Co., Ltd. | Caisson structures for underground soil blocking and manufacturing method of anti-noise non-vibration caisson structures using thereof |
CN103266604A (en) * | 2013-05-03 | 2013-08-28 | 中冶集团武汉勘察研究院有限公司 | Hoop-type circular-section anchor-rod slide-resistant pile and construction method thereof |
CN106498950A (en) * | 2016-12-21 | 2017-03-15 | 大连交通大学 | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body |
CN206408630U (en) * | 2016-12-21 | 2017-08-15 | 大连交通大学 | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body |
-
2018
- 2018-02-02 CN CN201810104974.2A patent/CN108487255B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11222861A (en) * | 1998-02-04 | 1999-08-17 | Shimizu Corp | Execution of retaining wall to existing banking and retaining wall executed by the same |
CN201228356Y (en) * | 2008-06-10 | 2009-04-29 | 北京六建集团公司 | Pit anchored pile-anchor breast wall concrete middle beam structure |
WO2010002076A1 (en) * | 2008-07-01 | 2010-01-07 | Dongjin Construction Co., Ltd. | Caisson structures for underground soil blocking and manufacturing method of anti-noise non-vibration caisson structures using thereof |
CN103266604A (en) * | 2013-05-03 | 2013-08-28 | 中冶集团武汉勘察研究院有限公司 | Hoop-type circular-section anchor-rod slide-resistant pile and construction method thereof |
CN106498950A (en) * | 2016-12-21 | 2017-03-15 | 大连交通大学 | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body |
CN206408630U (en) * | 2016-12-21 | 2017-08-15 | 大连交通大学 | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body |
Also Published As
Publication number | Publication date |
---|---|
CN108487255A (en) | 2018-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106907161B (en) | A kind of tunnel slope caunches special construction method | |
CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
CN107605489B (en) | Three line Large span tunnel inclined shafts are into positive cavity construction method | |
CN112127900B (en) | Construction method for hidden half-wall and half-arch protection structure of exposed arch of shallow-buried bias tunnel penetrating through accumulation body | |
CN109026064B (en) | Construction method for large-span multi-arch tunnel with semi-bright and semi-dark | |
CN106194196B (en) | A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method | |
CN104989425B (en) | A kind of tunneling is into hole supporting construction and its method for protecting support | |
CN110017144B (en) | Loess tunnel three-step construction method considering substrate reinforcement treatment | |
CN106703814A (en) | Mined metro station hole pile construction method | |
CN102606162A (en) | Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel | |
CN102966108A (en) | Construction method of deep foundation pit close to building and adopting underground structure as internal support | |
CN209510334U (en) | A kind of soft lower hard large cross-section tunnel bilateral hole core local method constructing structure | |
CN108842819A (en) | A kind of urban track traffic cable run method for tunnel construction | |
CN106121675A (en) | Small-sized solution cavity is positioned at tunnel excavation and karst cave treatment method time at the bottom of tunneling inverted arch | |
CN103306289A (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN211144503U (en) | High steep topography bridge tunnel meets section open cut tunnel and connects long structure | |
CN107859523A (en) | A kind of asymmetric supporting construction of Unevenly-pressured shallow tunnel and construction method | |
CN109209389A (en) | Hazy tunnel construction method | |
CN107939415A (en) | Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span | |
CN115539048A (en) | Construction method for shallow-buried bias tunnel portal | |
CN213574100U (en) | Pass shallow dark half-wall semi-arch protection structure of making of bias voltage tunnel of burying of accumulation body | |
CN107191206B (en) | A kind of six step construction method of Shallow-buried Large-span Tunnel Unit two | |
CN206800370U (en) | It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove | |
CN206888994U (en) | A kind of inclined shaft two serves as a contrast and pilot tunnel caunches device | |
CN100473787C (en) | Connecting structure for use in piled anchor supporting system and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231010 Address after: 230000 B-2704, wo Yuan Garden, 81 Ganquan Road, Shushan District, Hefei, Anhui. Patentee after: HEFEI LONGZHI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd. Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee before: Dragon totem Technology (Hefei) Co.,Ltd. Effective date of registration: 20231010 Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee after: Dragon totem Technology (Hefei) Co.,Ltd. Address before: 226000 No. 87 Youth Middle Road, Nantong City, Jiangsu Province Patentee before: JIANGSU College OF ENGINEERING AND TECHNOLOGY |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240202 Address after: No. 39, 30 meters east of the intersection of Township Road 007 and East Section of Yinghe North Road, Lidazhuang Township, Xihua County, Zhoukou City, Henan Province, 466000 Patentee after: Henan Ruicai Construction Engineering Co.,Ltd. Country or region after: China Address before: 230000 B-2704, wo Yuan Garden, 81 Ganquan Road, Shushan District, Hefei, Anhui. Patentee before: HEFEI LONGZHI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd. Country or region before: China |
|