CN108487255B - Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method - Google Patents

Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method Download PDF

Info

Publication number
CN108487255B
CN108487255B CN201810104974.2A CN201810104974A CN108487255B CN 108487255 B CN108487255 B CN 108487255B CN 201810104974 A CN201810104974 A CN 201810104974A CN 108487255 B CN108487255 B CN 108487255B
Authority
CN
China
Prior art keywords
board wall
prefabricated board
profile steel
anchor pole
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810104974.2A
Other languages
Chinese (zh)
Other versions
CN108487255A (en
Inventor
高路恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Ruicai Construction Engineering Co ltd
Original Assignee
Nantong Textile Vocational Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Textile Vocational Technology College filed Critical Nantong Textile Vocational Technology College
Priority to CN201810104974.2A priority Critical patent/CN108487255B/en
Publication of CN108487255A publication Critical patent/CN108487255A/en
Application granted granted Critical
Publication of CN108487255B publication Critical patent/CN108487255B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Abstract

The invention discloses a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method, construction technology process includes: (1) surveying setting-out fixed pile;(2) it is in place to hang stake, corrects;(3) H profile steel stake is set;(4) layer and section excavates, pile body processing;(5) anchor pole is set " successively, paragraph by paragraph, by root " from top to bottom;(6) it is in place to hang stake for prefabricated board wall;(7) it is inserted into reinforcing rib, and secured with the binding of prefabricated board wall protruding bar;(8) " layer and section " high-pressure slip-casting is constructed;(9) node slightly expanded concrete is perfused;(10) step (4)-(9) construction is repeated;(11) waist beam steel bar colligation, formwork erection, filling concrete;(12) acceptance.The present invention realizes foundation pit enclosure structure system prefabricated construction, can effectively save a certain amount of duration, securely and reliably, the double action with earth-retaining and sealing.

Description

Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method
Technical field
The present invention relates to a kind of foundation pit enclosure structure construction methods, and in particular to a kind of modified H profile steel anchor pole composite pile- Prefabricated board wall base pit enclosure construction method.
Background technique
In deep basal pit and other underground engineering constructions, it is commonly encountered deep foundation pit support problem, excavates that difficulty is big, the duration It is long, costly, the 10%-20% of basic civil engineering total cost is typically constituted from, the cost of big deep-foundation pit engineering becomes up to 30%-40% A critically important research topic in urban construction.Cause Construction of Deep Excavation Engineering cost high the type selecting of building enclosure How one of key factor, can be under the premise of guaranteeing deep basal pit safe construction, and saving construction cost to the greatest extent is The important directions that we need to study can be recycled all or part of building enclosure and recycle, from new technical measures and work Skill novel aspects, which are broken through, has certain realistic meaning to reduction Construction of Deep Excavation Engineering cost and duration.
Summary of the invention
Goal of the invention: the present invention aiming at the shortcomings in the prior art, proposes that one kind is simple to operate, realizes foundation pit and enclose Protection structure system prefabricated construction can effectively save a certain amount of duration, the modified H-type of the double action with earth-retaining and sealing Steel anchor rod composite pile-prefabricated board wall base pit enclosure construction method.
Technical solution: a kind of modified H profile steel anchor pole composite pile-prefabricated board wall foundation pit enclosure structure of the present invention is applied Work method, including following below scheme step:
(1) surveying setting-out fixed pile: accurate to survey the plan-position for setting H profile steel stake before foundation pit system construction, plane is missed Within 5mm, every pile position is surveyed to set and be finished, and the safeguard measure in site is carried out for difference control, prevents human factor from influencing later period stake Body set after position deviation;
(2) it is in place to hang stake, corrects: before H profile steel stake is set, pile body being hung according to the pile cutoff that plant design makes rise just first Position, and the plan-position in site is checked, it waits pile body to set, the stake site for occurring more than design and code requirement is rectified in time Overgauge;
(3) H profile steel stake is set: the H profile steel stake of use makes in factory's centralized production, when live H profile steel stake is set, uses Static piling construction, pile body set often set that 2m checks pile body set plane and perpendicularity deviation, wherein verticality Deviation controls within 1%, is corrected to there is the pile body that perpendicularity deviation is more than 1%, the pile pulling grout weight if being difficult to correct It beats;
(4) layer and section excavates, and pile body processing: H profile steel stake, which is set, to be finished, layer and section excavation pit soil layer, every layer of digging Native depth is 2-3m, and sand biggish for moisture content, silt, every layer of excavation thickness control is within 2m, soil layer stage excavation In the process, pile body is reinforced anchor pole and is also set immediately, and side is cut the earth, while anchor pole is set, to reinforce the entirety between pile body and soil layer Property;On the other hand, anchor pole need to clean out in time the attached soil of pile body, with cutting the earth before pile body is set to ala lateralis in H profile steel stake The soil body in reserved bolthole on listrium is removed completely, in the case where there is boulder subcase, need to be removed completely, be used when necessary Drilling machine auxiliary cleaning;
(5) " successively, paragraph by paragraph, by root " sets anchor pole from top to bottom: anchor pole set follow from top to bottom " successively, paragraph by paragraph, by Root " is set, and in work progress, soil layer, which is excavated, sets two good harmony of work holding, strict control soil with pile body anchor pole The depth that layer excavates, there is not allowed that phenomenon of backbreaking;
(6) it is in place to hang stake for prefabricated board wall: prefabricated board wall is prefabricated using producing in factory's centrality, effectively realizes assembled Application of the building technology in foundation pit enclosure, the prefabricated board wall lifting of bottom of foundation ditch first segment can be in place from top vertical lifting, under The prefabricated board wall of human assistance is needed to nest into adjacent two H profile steels stake when the prefabricated board wall lifting of other sections of portion;If foundation excavation When depth is less than or equal to 6m, in the case where ensuring to design H profile steel stake earth-retaining bearing capacity, by all sections of prefabricated board wall from top Portion's lifting construction, prefabricated board wall are excavated with soil layer, are sunk paragraph by paragraph in place by self weight and the heavy load set of upper end board wall lifting; Stay the rear pouring concrete section of 250-350mm between the two sections of prefabricated board walls in left and right, after pour the adjacent two prefabricated board wall steel in left and right in section Muscle is fixedly connected;
(7) it is inserted into reinforcing rib, and secured with the binding of prefabricated board wall protruding bar: for the globality for enhancing building enclosure, to After prefabricated board wall lifting construction in foundation pit, steel is reinforced in insertion at the connecting node between prefabricated board wall and H profile steel stake Muscle, reinforcing rib and the binding of prefabricated board wall protruding bar are secured;
(8) " layer and section " high-pressure slip-casting is constructed: when construction, high-pressure slip-casting is from the high-pressure slip-casting hole of prefabricated board wall bottom Successively construction paragraph by paragraph, every section of prefabricated board wall slip casting symmetrical two direction to the left and right from the middle part high-pressure slip-casting hole of prefabricated board wall bottom Carry out slip casting work, i.e. the symmetrical slip casting " from middle part to two sides ", grouting pressure is not less than 0.6MPa, and slip casing by pressure is using multiple Method that ftercompction is pressurizeed step by step carries out slip casting, and slurry is closely knit between the prefabricated board wall of final slip casting guarantee and soil layer, makes slurry It can penetrate into soil layer not less than 100mm;
(9) node slightly expanded concrete is perfused: in work progress, being filled at the node between H profile steel stake and prefabricated board wall Node slightly expanded concrete is infused, node slightly expanded concrete intensity is not less than C40, while at least than prefabricated board wall concrete strength A high grade;
(10) step (4)-(9) construction is repeated;
(11) waist beam steel bar colligation, formwork erection, filling concrete: when the prefabricated board wall construction of two sections finishes, upper One cast-in-situ steel reinforced concrete waist rail is set between lower two sections of prefabricated board walls, and waist rail reinforcing bar is connect with prefabricated board wall protruding bar, waist Beam longitudinal reinforcement uses the above reinforcing bar of second level of diameter 8mm using the above reinforcing bar of three-level for being no less than 4 diameter 20mm, stirrup, Stirrup spacing is not more than 200mm, and in waist rail reinforcing bar process of binding, upper and lower two prefabricated board wall protruding bar anchors into the length in waist rail Not less than 1.5LaE, waist rail reinforcing bar is welded at H profile steel stake using welding method and H profile steel stake web;
(12) acceptance.
Further, in step (3) under the premise of meeting foundation pit bearing capacity calculation, the edge of a wing board width of H profile steel stake is not It obtains and is less than 350mm, edge of a wing plate thickness is not less than 20mm, and the web height of H profile steel stake is bigger than the thickness of the prefabricated board wall of use 60mm, in order to the piecewise lifting construction of prefabricated board wall, while the web thickness of H profile steel stake is not less than 30mm.
Further, pile cutoff connection uses welded connecting in step (3).
It further, is the construction convenient for anchor pole in step (5), anchor pole replaces conventional anchor using steel strand wires, and anchor pole is straight Diameter is at least 10mm smaller than the preformed hole on flange plate on the inside of H profile steel stake, or using the opposite position of outer side wing edge plate in H profile steel stake The preformed hole for setting anchor bolt construction is stayed at the place of setting, and facilitates setting for later period anchor pole, and the preformed hole on interior outer side wing edge plate also at least compares The big 10mm of bolt diameter;Wherein, bolt diameter is not less than 12mm, and rock-bolt length is determined according to load capacity calculation, is set to H profile steel stake The every middle side part of edge of a wing plate face, along H profile steel pile length direction arrange, spacing be no more than 1.5m, above and below every section of prefabricated board wall Anchor pole encrypts in 2000mm at the pile body of junction, and encrypted section spacing is no more than 0.6m.
Further, the design thickness of prefabricated board wall is not less than 100mm in step (6), and every section of board wall design width should compare Small (0.5 × H profile steel stake edge of a wing board width+50) mm of spacing between two neighboring H profile steel stake web.
Further, reinforcing rib diameter is not less than 20mm, and no less than 2 in step (7).
Further, step (8) middle-high pressure grouting hole is arranged at every section of prefabricated above 300mm in board wall bottom, every 1.2m One high-pressure slip-casting hole is set, and every section of prefabricated board wall bottom is no less than 2 high-pressure slip-casting holes, and high-pressure slip-casting hole uses steel bushing system Make, is integrated into factory's centralization production with prefabricated board wall, the diameter in high-pressure slip-casting hole is preferably 20mm.
Further, in step (11) after the adjacent two prefabricated board wall in left and right at pouring concrete, the encryption of waist rail stirrup, encryption Area is not less than 600mm, and encrypted area stirrup spacing is not more than 100mm.
Further, in step (11) waist rail reinforcing bar at H profile steel stake using on H profile steel stake web preformed hole side Method, setting diameter are connected and fixed not less than the perforation reinforcing bar of 16mm with prefabricated board wall protruding bar, the radical of reinforcing bar of perforating according to Practical Project concrete condition is determined by calculation.
The utility model has the advantages that operation of the present invention is simple and convenient, and it is safe and reliable secured, realize foundation pit enclosure structure system assembling Construction, can effectively save a certain amount of duration, the double action with earth-retaining and sealing.
Specific embodiment
The present invention is further explained in the light of specific embodiments.
Embodiment
A kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method, including following below scheme step It is rapid:
(1) surveying setting-out fixed pile: accurate to survey the plan-position for setting H profile steel stake before foundation pit system construction, plane is missed Within 5mm, every pile position is surveyed to set and be finished, and the safeguard measure in site is carried out for difference control, prevents human factor from influencing later period stake Body set after position deviation;
(2) it is in place to hang stake, corrects: before H profile steel stake is set, pile body being hung according to the pile cutoff that plant design makes rise just first Position, and the plan-position in site is checked, it waits pile body to set, the stake site for occurring more than design and code requirement is rectified in time Overgauge;
(3) H profile steel stake is set: the H profile steel stake of use makes in factory's centralized production, when live H profile steel stake is set, uses Static piling construction, pile body set often set that 2m checks pile body set plane and perpendicularity deviation, wherein verticality Deviation controls within 1%, is corrected to there is the pile body that perpendicularity deviation is more than 1%, the pile pulling grout weight if being difficult to correct It beats;
Under the premise of meeting foundation pit bearing capacity calculation, the edge of a wing board width of H profile steel stake cannot be less than 350mm, flange plate Thickness is not less than 20mm, and the web height of H profile steel stake is 60mm bigger than the thickness of the prefabricated board wall of use, in order to prefabricated board wall Piecewise lifting construction, while the web thickness of H profile steel stake is not less than 30mm.Pile cutoff connection is using welded connecting.
(4) layer and section excavates, and pile body processing: H profile steel stake, which is set, to be finished, layer and section excavation pit soil layer, every layer of digging Native depth is 2-3m, and sand biggish for moisture content, silt, every layer of excavation thickness control is within 2m, soil layer stage excavation In the process, pile body is reinforced anchor pole and is also set immediately, and side is cut the earth, while anchor pole is set, to reinforce the entirety between pile body and soil layer Property;On the other hand, anchor pole need to clean out in time the attached soil of pile body, with cutting the earth before pile body is set to ala lateralis in H profile steel stake The soil body in reserved bolthole on listrium is removed completely, in the case where there is boulder subcase, need to be removed completely, be used when necessary Drilling machine auxiliary cleaning;
(5) " successively, paragraph by paragraph, by root " sets anchor pole from top to bottom: anchor pole set follow from top to bottom " successively, paragraph by paragraph, by Root " is set, and in work progress, soil layer, which is excavated, sets two good harmony of work holding, strict control soil with pile body anchor pole The depth that layer excavates, there is not allowed that phenomenon of backbreaking;
For the construction convenient for anchor pole, anchor pole replaces conventional anchor using steel strand wires, and bolt diameter is at least than on the inside of H profile steel stake The small 10mm of preformed hole on flange plate, or anchor bolt construction is set using staying at outer side wing edge plate relative position in H profile steel stake Preformed hole, facilitate setting for later period anchor pole, the preformed hole on interior outer side wing edge plate is also at least 10mm bigger than bolt diameter;Its In, bolt diameter is not less than 12mm, and rock-bolt length is determined according to load capacity calculation, is set in the every side of edge of a wing plate face of H profile steel stake Portion arranges that spacing is no more than 1.5m, at the pile body that every section of prefabricated board wall is vertically connected with place along H profile steel pile length direction Anchor pole encrypts in 2000mm, and encrypted section spacing is no more than 0.6m.
(6) it is in place to hang stake for prefabricated board wall: prefabricated board wall is prefabricated using producing in factory's centrality, effectively realizes assembled Application of the building technology in foundation pit enclosure, the prefabricated board wall lifting of bottom of foundation ditch first segment can be in place from top vertical lifting, under The prefabricated board wall of human assistance is needed to nest into adjacent two H profile steels stake when the prefabricated board wall lifting of other sections of portion;If foundation excavation When depth is less than or equal to 6m, in the case where ensuring to design H profile steel stake earth-retaining bearing capacity, by all sections of prefabricated board wall from top Portion's lifting construction, prefabricated board wall are excavated with soil layer, are sunk paragraph by paragraph in place by self weight and the heavy load set of upper end board wall lifting; Stay the rear pouring concrete section of 250-350mm between the two sections of prefabricated board walls in left and right, after pour the adjacent two prefabricated board wall steel in left and right in section Muscle is fixedly connected;
The design thickness of prefabricated board wall is not less than 100mm, and every section of board wall design width should be than two neighboring H profile steel stake web Between small (0.5 × H profile steel stake edge of a wing board width+50) mm of spacing.
(7) it is inserted into reinforcing rib, and secured with the binding of prefabricated board wall protruding bar: for the globality for enhancing building enclosure, to After prefabricated board wall lifting construction in foundation pit, steel is reinforced in insertion at the connecting node between prefabricated board wall and H profile steel stake Muscle, reinforcing rib and the binding of prefabricated board wall protruding bar are secured;Reinforcing rib diameter is not less than 20mm, and no less than 2.
(8) " layer and section " high-pressure slip-casting is constructed: when construction, high-pressure slip-casting is from the high-pressure slip-casting hole of prefabricated board wall bottom Successively construction paragraph by paragraph, every section of prefabricated board wall slip casting symmetrical two direction to the left and right from the middle part high-pressure slip-casting hole of prefabricated board wall bottom Carry out slip casting work, i.e. the symmetrical slip casting " from middle part to two sides ", grouting pressure is not less than 0.6MPa, and slip casing by pressure is using multiple Method that ftercompction is pressurizeed step by step carries out slip casting, and slurry is closely knit between the prefabricated board wall of final slip casting guarantee and soil layer, makes slurry It can penetrate into soil layer not less than 100mm;
High-pressure slip-casting hole is arranged at every section of prefabricated above 300mm in board wall bottom, and a high-pressure slip-casting hole is arranged in every 1.2m, Every section of prefabricated board wall bottom is no less than 2 high-pressure slip-casting holes, and high-pressure slip-casting hole is made of steel bushing, produces in factory's centralization When be integrated into prefabricated board wall, the diameter in high-pressure slip-casting hole is preferably 20mm.
(9) node slightly expanded concrete is perfused: in work progress, being filled at the node between H profile steel stake and prefabricated board wall Node slightly expanded concrete is infused, node slightly expanded concrete intensity is not less than C40, while at least than prefabricated board wall concrete strength A high grade;
(10) step (4)-(9) construction is repeated;
(11) waist beam steel bar colligation, formwork erection, filling concrete: when the prefabricated board wall construction of two sections finishes, upper One cast-in-situ steel reinforced concrete waist rail is set between lower two sections of prefabricated board walls, and waist rail reinforcing bar is connect with prefabricated board wall protruding bar, waist Beam longitudinal reinforcement uses the above reinforcing bar of second level of diameter 8mm using the above reinforcing bar of three-level for being no less than 4 diameter 20mm, stirrup, Stirrup spacing is not more than 200mm, and in waist rail reinforcing bar process of binding, upper and lower two prefabricated board wall protruding bar anchors into the length in waist rail Not less than 1.5LaE, waist rail reinforcing bar is welded at H profile steel stake using welding method and H profile steel stake web;
After the adjacent two prefabricated board wall in left and right at pouring concrete, waist rail stirrup encryption, encrypted area is not less than 600mm, encryption Area's stirrup spacing is not more than 100mm.Waist rail reinforcing bar is at H profile steel stake using the method for the preformed hole on H profile steel stake web, setting Perforation reinforcing bar of the diameter not less than 16mm is connected and fixed with prefabricated board wall protruding bar, and the radical for reinforcing bar of perforating is according to Practical Project Concrete condition is determined by calculation.
(12) acceptance.
Operation of the present invention is simple and convenient, safe and reliable secured, realizes foundation pit enclosure structure system prefabricated construction, can have Effect saves a certain amount of duration, the double action with earth-retaining and sealing.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, though So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, but anything that does not depart from the technical scheme of the invention content, according to the technical essence of the invention Any simple modification, equivalent change and modification to the above embodiments, all of which are still within the scope of the technical scheme of the invention.

Claims (8)

1. a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method, it is characterised in that: including Following below scheme step:
(1) surveying setting-out fixed pile: accurate to survey the plan-position for setting H profile steel stake, plane error control before foundation pit system construction System within 5mm, survey to set and finish, and carries out the safeguard measure in site by every pile position, prevents human factor from influencing later period pile body and beats Position deviation after if;
(2) it is in place to hang stake, corrects: before H profile steel stake is set, pile body being hung according to the pile cutoff that plant design makes rise in place first, And the plan-position in site is checked, it waits pile body to set, the stake site for occurring more than design and code requirement is corrected in time Deviation;
(3) H profile steel stake is set: the H profile steel stake of use makes in factory's centralized production, when live H profile steel stake is set, using static(al) The construction of piling method, pile body set often set that 2m checks pile body set plane and perpendicularity deviation, wherein perpendicularity deviation Control is corrected, pile pulling grout is beaten again if being difficult to correct within 1% to there is the pile body that perpendicularity deviation is more than 1%;
(4) layer and section excavates, and pile body processing: H profile steel stake, which is set, to be finished, layer and section excavation pit soil layer, and every layer of shoveling is deep Degree is 2-3m, and sand biggish for moisture content, silt, every layer of excavation thickness control is within 2m, soil layer stage excavation process In, pile body is reinforced anchor pole and is also set immediately, and side is cut the earth, while anchor pole is set, to reinforce the globality between pile body and soil layer;Separately On the one hand, anchor pole need to clean out in time the attached soil of pile body, with cutting the earth before pile body is set to outer side wing edge plate in H profile steel stake On reserved bolthole in the soil body remove clean, in the case where there is boulder subcase, need to remove clean, use drilling machine when necessary Auxiliary cleaning;
(5) set anchor pole " successively, paragraph by paragraph, by root " from top to bottom: anchor pole, which is set, to be followed from top to bottom " successively, paragraph by paragraph, by root " It sets, in work progress, soil layer, which is excavated, sets two good harmony of work holding with pile body anchor pole, and strict control soil layer is opened The depth of digging, there is not allowed that phenomenon of backbreaking;
(6) it is in place to hang stake for prefabricated board wall: prefabricated board wall is prefabricated using producing in factory's centrality, effectively realizes assembled construction Application of the technology in foundation pit enclosure, the prefabricated board wall lifting of bottom of foundation ditch first segment can be in place from top vertical lifting, lower part its The prefabricated board wall of human assistance is needed to nest into adjacent two H profile steels stake when the prefabricated board wall lifting of his section;If foundation excavation depth When less than or equal to 6m, in the case where ensuring to design H profile steel stake earth-retaining bearing capacity, all sections of prefabricated board wall is hung from top Dress construction, prefabricated board wall are excavated with soil layer, are sunk paragraph by paragraph in place by self weight and the heavy load set of upper end board wall lifting;Left and right The rear pouring concrete section of 250-350mm is stayed between two sections of prefabricated board walls, after to pour the adjacent two prefabricated board wall reinforcing bar in left and right in section solid Fixed connection;
(7) it is inserted into reinforcing rib, and secured with the binding of prefabricated board wall protruding bar: for the globality for enhancing building enclosure, to foundation pit After interior prefabricated board wall lifting construction, it is inserted into stiffener at the connecting node between prefabricated board wall and H profile steel stake, adds Strengthening tendons and the binding of prefabricated board wall protruding bar are secured;
(8) " layer and section " high-pressure slip-casting is constructed: when construction, high-pressure slip-casting is layer-by-layer from the high-pressure slip-casting hole of prefabricated board wall bottom Construction paragraph by paragraph, symmetrically two directions are carried out to the left and right from the middle part high-pressure slip-casting hole of prefabricated board wall bottom for every section of prefabricated board wall slip casting Slip casting work, the i.e. symmetrical slip casting " from middle part to two sides ", grouting pressure are not less than 0.6MPa, and slip casing by pressure uses multiple ftercompction The method pressurizeed step by step carries out slip casting, and slurry is closely knit between the prefabricated board wall of final slip casting guarantee and soil layer, makes slurry can be with It penetrates into soil layer not less than 100mm;
(9) node slightly expanded concrete is perfused: in work progress, section being perfused at the node between H profile steel stake and prefabricated board wall Point slightly expanded concrete, node slightly expanded concrete intensity are not less than C40, while at least higher by one than prefabricated board wall concrete strength A grade;
(10) step (4)-(9) construction is repeated;
(11) waist beam steel bar colligation, formwork erection, filling concrete: when the prefabricated board wall construction of two sections finishes, upper and lower two A cast-in-situ steel reinforced concrete waist rail is set between the prefabricated board wall of section, waist rail reinforcing bar is connect with prefabricated board wall protruding bar, and waist rail is vertical To reinforcing bar using the above reinforcing bar of three-level for being no less than 4 diameter 20mm, stirrup uses the above reinforcing bar of second level of diameter 8mm, stirrup Spacing is not more than 200mm, and in waist rail reinforcing bar process of binding, it is not small that upper and lower two prefabricated board wall protruding bar anchors into the length in waist rail In 1.5LaE, waist rail reinforcing bar is welded at H profile steel stake using welding method and H profile steel stake web;
(12) acceptance.
2. a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure structure construction side according to claim 1 Method, it is characterised in that: in the step (3) under the premise of meeting foundation pit bearing capacity calculation, the edge of a wing board width of H profile steel stake is not It obtains and is less than 350mm, edge of a wing plate thickness is not less than 20mm, and the web height of H profile steel stake is bigger than the thickness of the prefabricated board wall of use 60mm, in order to the piecewise lifting construction of prefabricated board wall, while the web thickness of H profile steel stake is not less than 30mm.
3. a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure structure construction side according to claim 1 Method, it is characterised in that: pile cutoff connection is using welded connecting in the step (3).
4. a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure structure construction side according to claim 1 Method, it is characterised in that: be the construction convenient for anchor pole in the step (5), anchor pole replaces conventional anchor using steel strand wires, and anchor pole is straight Diameter is at least 10mm smaller than the preformed hole on flange plate on the inside of H profile steel stake, or using the opposite position of outer side wing edge plate in H profile steel stake The preformed hole for setting anchor bolt construction is stayed at the place of setting, and facilitates setting for later period anchor pole, and the preformed hole on interior outer side wing edge plate also at least compares The big 10mm of bolt diameter;Wherein, bolt diameter is not less than 12mm, and rock-bolt length is determined according to load capacity calculation, is set to H profile steel stake The every middle side part of edge of a wing plate face, along H profile steel pile length direction arrange, spacing be no more than 1.5m, above and below every section of prefabricated board wall Anchor pole encrypts in 2000mm at the pile body of junction, and encrypted section spacing is no more than 0.6m.
5. a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure structure construction side according to claim 1 Method, it is characterised in that: reinforcing rib diameter is not less than 20mm, and no less than 2 in the step (7).
6. a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure structure construction side according to claim 1 Method, it is characterised in that: step (8) the middle-high pressure grouting hole is arranged at every section of prefabricated above 300mm in board wall bottom, every 1.2m One high-pressure slip-casting hole is set, and every section of prefabricated board wall bottom is no less than 2 high-pressure slip-casting holes, and high-pressure slip-casting hole uses steel bushing system Make, is integrated into factory's centralization production with prefabricated board wall, the diameter in high-pressure slip-casting hole is preferably 20mm.
7. a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure structure construction side according to claim 1 Method, it is characterised in that: in the step (11) after the adjacent two prefabricated board wall in left and right at pouring concrete, the encryption of waist rail stirrup adds Mi Qu is not less than 600mm, and encrypted area stirrup spacing is not more than 100mm.
8. a kind of modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure structure construction side according to claim 1 Method, it is characterised in that: waist rail reinforcing bar is at H profile steel stake using the side of the preformed hole on H profile steel stake web in the step (11) Method, setting diameter are connected and fixed not less than the perforation reinforcing bar of 16mm with prefabricated board wall protruding bar, the radical of reinforcing bar of perforating according to Practical Project concrete condition is determined by calculation.
CN201810104974.2A 2018-02-02 2018-02-02 Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method Active CN108487255B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810104974.2A CN108487255B (en) 2018-02-02 2018-02-02 Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810104974.2A CN108487255B (en) 2018-02-02 2018-02-02 Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method

Publications (2)

Publication Number Publication Date
CN108487255A CN108487255A (en) 2018-09-04
CN108487255B true CN108487255B (en) 2019-11-26

Family

ID=63344415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810104974.2A Active CN108487255B (en) 2018-02-02 2018-02-02 Modified H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method

Country Status (1)

Country Link
CN (1) CN108487255B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11222861A (en) * 1998-02-04 1999-08-17 Shimizu Corp Execution of retaining wall to existing banking and retaining wall executed by the same
CN201228356Y (en) * 2008-06-10 2009-04-29 北京六建集团公司 Pit anchored pile-anchor breast wall concrete middle beam structure
WO2010002076A1 (en) * 2008-07-01 2010-01-07 Dongjin Construction Co., Ltd. Caisson structures for underground soil blocking and manufacturing method of anti-noise non-vibration caisson structures using thereof
CN103266604A (en) * 2013-05-03 2013-08-28 中冶集团武汉勘察研究院有限公司 Hoop-type circular-section anchor-rod slide-resistant pile and construction method thereof
CN106498950A (en) * 2016-12-21 2017-03-15 大连交通大学 Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN206408630U (en) * 2016-12-21 2017-08-15 大连交通大学 Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11222861A (en) * 1998-02-04 1999-08-17 Shimizu Corp Execution of retaining wall to existing banking and retaining wall executed by the same
CN201228356Y (en) * 2008-06-10 2009-04-29 北京六建集团公司 Pit anchored pile-anchor breast wall concrete middle beam structure
WO2010002076A1 (en) * 2008-07-01 2010-01-07 Dongjin Construction Co., Ltd. Caisson structures for underground soil blocking and manufacturing method of anti-noise non-vibration caisson structures using thereof
CN103266604A (en) * 2013-05-03 2013-08-28 中冶集团武汉勘察研究院有限公司 Hoop-type circular-section anchor-rod slide-resistant pile and construction method thereof
CN106498950A (en) * 2016-12-21 2017-03-15 大连交通大学 Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN206408630U (en) * 2016-12-21 2017-08-15 大连交通大学 Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body

Also Published As

Publication number Publication date
CN108487255A (en) 2018-09-04

Similar Documents

Publication Publication Date Title
CN106907161B (en) A kind of tunnel slope caunches special construction method
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN107605489B (en) Three line Large span tunnel inclined shafts are into positive cavity construction method
CN112127900B (en) Construction method for hidden half-wall and half-arch protection structure of exposed arch of shallow-buried bias tunnel penetrating through accumulation body
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
CN106194196B (en) A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method
CN104989425B (en) A kind of tunneling is into hole supporting construction and its method for protecting support
CN110017144B (en) Loess tunnel three-step construction method considering substrate reinforcement treatment
CN106703814A (en) Mined metro station hole pile construction method
CN102606162A (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN102966108A (en) Construction method of deep foundation pit close to building and adopting underground structure as internal support
CN209510334U (en) A kind of soft lower hard large cross-section tunnel bilateral hole core local method constructing structure
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN106121675A (en) Small-sized solution cavity is positioned at tunnel excavation and karst cave treatment method time at the bottom of tunneling inverted arch
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN211144503U (en) High steep topography bridge tunnel meets section open cut tunnel and connects long structure
CN107859523A (en) A kind of asymmetric supporting construction of Unevenly-pressured shallow tunnel and construction method
CN109209389A (en) Hazy tunnel construction method
CN107939415A (en) Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
CN213574100U (en) Pass shallow dark half-wall semi-arch protection structure of making of bias voltage tunnel of burying of accumulation body
CN107191206B (en) A kind of six step construction method of Shallow-buried Large-span Tunnel Unit two
CN206800370U (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove
CN206888994U (en) A kind of inclined shaft two serves as a contrast and pilot tunnel caunches device
CN100473787C (en) Connecting structure for use in piled anchor supporting system and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231010

Address after: 230000 B-2704, wo Yuan Garden, 81 Ganquan Road, Shushan District, Hefei, Anhui.

Patentee after: HEFEI LONGZHI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee before: Dragon totem Technology (Hefei) Co.,Ltd.

Effective date of registration: 20231010

Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee after: Dragon totem Technology (Hefei) Co.,Ltd.

Address before: 226000 No. 87 Youth Middle Road, Nantong City, Jiangsu Province

Patentee before: JIANGSU College OF ENGINEERING AND TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240202

Address after: No. 39, 30 meters east of the intersection of Township Road 007 and East Section of Yinghe North Road, Lidazhuang Township, Xihua County, Zhoukou City, Henan Province, 466000

Patentee after: Henan Ruicai Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 230000 B-2704, wo Yuan Garden, 81 Ganquan Road, Shushan District, Hefei, Anhui.

Patentee before: HEFEI LONGZHI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right