CN108448577A - Power distribution network power failure plan scheduling optimization method and device - Google Patents

Power distribution network power failure plan scheduling optimization method and device Download PDF

Info

Publication number
CN108448577A
CN108448577A CN201810321801.6A CN201810321801A CN108448577A CN 108448577 A CN108448577 A CN 108448577A CN 201810321801 A CN201810321801 A CN 201810321801A CN 108448577 A CN108448577 A CN 108448577A
Authority
CN
China
Prior art keywords
power failure
plan
power
failure plan
merging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810321801.6A
Other languages
Chinese (zh)
Inventor
李瑾
董旭柱
俞小勇
陆峰
吴争荣
李弘�
陈敏
陈立明
刘志文
禤亮
杨满天
余瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSG Electric Power Research Institute
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Nanning Power Supply Bureau of Guangxi Power Grid Co Ltd
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Nanning Power Supply Bureau of Guangxi Power Grid Co Ltd
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangxi Power Grid Co Ltd, Nanning Power Supply Bureau of Guangxi Power Grid Co Ltd, Power Grid Technology Research Center of China Southern Power Grid Co Ltd, Research Institute of Southern Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority to CN201810321801.6A priority Critical patent/CN108448577A/en
Publication of CN108448577A publication Critical patent/CN108448577A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application involves a kind of power distribution network power failure plan scheduling optimization method and devices.Wherein, power distribution network power failure plan scheduling optimization method includes:The power failure impact evaluation of each power failure plan is obtained as a result, and carrying out as merging condition the merging of each power failure plan using the customer interrupted of overlapping and power failure line segment that is identical or intersecting;Security reliability inspection is carried out to each power failure plan after merging, the power failure plan to not meeting preset condition carries out safe early warning;According to the assessment result and security reliability inspection influenced that have a power failure of each plan that has a power failure as a result, carrying out scheduling optimization to each power failure plan after merging.Power distribution network method for optimizing power-failure plan provided by the invention utilizes power distribution network topological structure, realizes that the automatic arrangement program to the plan that has a power failure optimizes, and has broken away from the mode for relying on hand inspection in traditional technology, has substantially increased power failure plan scheduling efficiency and reliability.

Description

Power distribution network power failure plan scheduling optimization method and device
Technical field
It is excellent more particularly to a kind of power distribution network power failure plan scheduling this application involves the technical field that power distribution network power failure arranges Change method and device.
Background technology
Power distribution network is a part indispensable in entire electric system, it is connected directly with transmission line of electricity and user, is made It is the tie that electric system is connect with user for the end section of electric system, is directly related to the reliability of customer power supply.Match Electric system is undergoing quick development, and not only the scale of power grid constantly expands, but also to power supply reliability and power supply quality Requirement be also continuously improved, to power failure planning management it is horizontal more stringent requirements are proposed, in terms of power failure planning optimization It is required that more and more urgent.
Major part Utilities Electric Co. establishes scheduled outage workflow management module in Production MIS at present, But power failure planning work is main or is carried out by the modes such as manually working out, sitting on, the frequency that have a power failure to equipment and The control of power off time is not very accurate, and amount is exceeded when leading to problems such as to repeat to have a power failure or have a power failure, and power failure reliability obtains not To guarantee;Lack timely and effectively Informational support and safety analysis tool simultaneously, need repeatedly to sit on even to scene into Row confirms, changes established power failure plan repeatedly, workload is heavy, inefficiency.
Invention content
Based on this, it is necessary to for the problem of power supply reliability difference caused by above-mentioned power failure, provide a kind of power distribution network power failure Plan scheduling optimization method and device.
On the one hand the embodiment of the present invention provides a kind of power distribution network power failure plan scheduling optimization method, method includes:
The assessment result that the power failure of each power failure plan in power failure plan set to be optimized influences is obtained, and is stopped with overlapping Electric user and power failure line segment that is identical or intersecting are the merging that merging condition carries out each power failure plan, are formed after merging adjustment and are stopped Electricity plan set;
Security reliability inspection is carried out to merging each power failure plan in the power failure plan set after adjusting, it is pre- to not meeting If the power failure plan of condition carries out safe early warning;
According to the assessment result and security reliability inspection influenced that have a power failure of each power failure plan as a result, after to merging adjustment Power failure plan set in each powers failure plan progress scheduling optimization.
Commenting for the power failure influence of each power failure plan in power failure plan set to be optimized is obtained in one of the embodiments, Estimate as a result, and carrying out as merging condition the merging of each power failure plan using the customer interrupted of overlapping and power failure line segment that is identical or intersecting The step of include:
The completely overlapped power failure plan of each power failure line segment having a power failure in the works and influence user is merged;
On each power failure line segment having a power failure in the works and influence user, there are the power failure plans of juxtaposition to merge;
By recursive analysis, the scope of power outage of the power failure plan after merging is merged.
Planning progress safety to each power failure in the power failure plan set after merging adjustment in one of the embodiments, can By property inspection, the step of power failure plan to not meeting preset condition carries out safe early warning, includes:
It is important that each power failure plan in power failure plan set after being adjusted to merging carries out the inspection of guarantor's electrical conflict, merging has a power failure User checks, stops inspection and power failure marginal testing again;
To protect electrical conflict inspection, merge power failure responsible consumer inspection, stop to check again and power failure marginal testing in one Or power failure plan of the multiple inspection result beyond preset condition carries out early warning.
In one of the embodiments, according to the assessment result of the power failure influence of each plan that has a power failure and security reliability inspection As a result, to merge adjust after power failure plan set in each power failure plan carry out scheduling optimization the step of include:
The result of the assessment result and security reliability inspection that are influenced according to the power failure of each power failure plan establishes scheduling optimization Model;
Obtain the power failure plan information of each plan that has a power failure in the power failure plan set after merging adjustment;
Power failure plan information is updated in the scheduling Optimized model pre-established, obtains constrained objective parameter;
Assessment result, the result of security reliability inspection and the constrained objective ginseng influenced according to the power failure of each plan that has a power failure Number carries out the optimization scheduling of each plan that has a power failure.
Power failure plan information includes power distribution network average electricity price, equipment power failure, additional damage in one of the embodiments, Consumption, increased customer outage hours;
The scheduling Optimized model pre-established includes minimum interruption cost load model, minimum additional network loss model and most Small reliability effect model;Constrained objective parameter includes:Loss of outage load, additional network loss, average power off time of user;
The step of outage information being updated in the scheduling Optimized model pre-established, obtaining the optimization scheduling for the plan that has a power failure Including:
Power distribution network average electricity price and equipment power failure are updated to minimum interruption cost load model, obtain the damage that has a power failure Lose load;
Equipment power failure and added losses are updated to minimum additional network loss model, obtains and adds network loss;
Increased customer outage hours, which are updated to minimum reliability, influences model, obtains average power off time of user;
It is influenced according to loss of outage load, additional network loss, average power off time of user and the power failure of each plan that has a power failure Assessment result and security reliability inspection as a result, carrying out the optimization scheduling of each plan that has a power failure.
Minimum interruption cost load model is in one of the embodiments,:
Wherein, Xi, i=1,2 ..., m is indicated involved by same power off time section t needs while the power failure plan having a power failure The set of power failure equipments, m are the sum of power failure equipments, and T is the period sum divided by specified duration in optimization cycle, and ε is Power distribution network average electricity price, L (Xi, t) and it is power failure equipments X in power off time section tiLoad, u are lost caused by power failureitIt indicates to have a power failure Power failure equipments X in time period tiPower failure, F1Indicate total loss of outage load.
Minimum additional network loss model is in one of the embodiments,:
Wherein, r is load transfer path, Δ P (Xi, t, r) and it is the power failure meter that same power off time section t needs while having a power failure Draw involved power failure equipments XiThe added losses brought using transfer path r when power failure, F2Indicate that load transition zone comes total attached Add loss.
Minimum reliability influence model is in one of the embodiments,:
Wherein, Δ T (Xi, t) and it is that same power off time section t needs power failure equipments involved by the power failure plan of power failure simultaneously XiThe increased customer outage hours of institute, F when power failure3Indicate average power off time of user.
On the other hand, the present invention also provides a kind of power distribution network power failure plan schedulings to optimize device, and device includes:
Have a power failure plan merging module, what the power failure for obtaining each power failure plan in power failure plan set to be optimized influenced Assessment result, and carry out as merging condition using the customer interrupted of overlapping and power failure line segment that is identical or intersecting the conjunction of each power failure plan And form the power failure plan set after merging adjustment;
Safe early warning module, for being carried out securely and reliably to merging each power failure plan in the plan set that has a power failure after adjusting Property inspection, to do not meet preset condition power failure plan carry out safe early warning;
Scheduling optimization module, for according to each assessment result and security reliability inspection influenced that have a power failure for having a power failure and planning As a result, carrying out scheduling optimization to merging each power failure plan in the power failure plan set after adjusting.
A kind of computer equipment, including memory and processor, memory are stored with computer program, and processor executes meter The step of above-mentioned power distribution network power failure plan scheduling optimization method is realized when calculation machine program.
Above-mentioned power distribution network power failure plan scheduling optimization method and device, it is each in the plan set to be optimized that has a power failure by obtaining The assessment result that the power failure of plan that has a power failure influences, and be to merge item with the customer interrupted of overlapping and power failure line segment that is identical or intersecting Part carries out the merging of each power failure plan, and each power failure in the plan set that has a power failure after then being adjusted to merging is planned to carry out safe and reliable Property inspection, to do not meet preset condition power failure plan carry out safe early warning, finally, according to it is each have a power failure plan power failure influence Assessment result and security reliability inspection as a result, carrying out scheduling optimization to each power failure plan after merging.The embodiment of the present invention The power distribution network power failure plan scheduling optimization method of offer utilizes power distribution network topological structure, realizes excellent to the automatic arrangement program for the plan that has a power failure Change, has broken away from the mode for relying on hand inspection in traditional technology, substantially increased power failure plan scheduling efficiency and reliability.
Description of the drawings
Fig. 1 is the flow diagram of power distribution network power failure plan scheduling optimization method in one embodiment;
Fig. 2 be one embodiment in respectively have a power failure plan power failure impact evaluation result obtaining step flow diagram;
Fig. 3 is the step flow diagram assessed each power failure project impact in one embodiment;
Fig. 4 is to carry out security reliability inspection to each power failure plan after merging in one embodiment, default to not meeting The power failure plan of condition carries out the flow diagram of safe early warning step;
Fig. 5 be customer interrupted in one embodiment and using overlapping and the identical or power failure line segment that intersects as merging condition into The step flow diagram of the merging of each plan that has a power failure of row;
Fig. 6 is the assessment result influenced according to the power failure of each plan that has a power failure in one embodiment and security reliability inspection As a result, the flow diagram for the step of carrying out scheduling optimization to each plan that has a power failure after merging;
Fig. 7 is to be updated to outage information in the scheduling Optimized model pre-established in one embodiment, obtains the meter that has a power failure The flow diagram of the step of optimization scheduling drawn;
Fig. 8 is the structural schematic diagram that power distribution network power failure plan scheduling optimizes device in one embodiment.
Specific implementation mode
It is with reference to the accompanying drawings and embodiments, right in order to make the object, technical solution and advantage of the application be more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
On the one hand the embodiment of the present invention provides a kind of power distribution network power failure plan scheduling optimization method, as shown in Figure 1, distribution Net power failure plan scheduling optimization method includes:
S120:The power failure impact evaluation of each power failure plan in power failure plan set to be optimized is obtained as a result, and with overlapping Customer interrupted and power failure line segment that is identical or intersecting be that merging condition carries out the merging of each power failure plan, formed after merging adjustment Power failure plan set;
S140:Security reliability inspection is carried out to merging each power failure plan in the power failure plan set after adjusting, to not The power failure plan for meeting preset condition carries out safe early warning;
S160:According to the assessment result and security reliability inspection influenced that have a power failure of each plan that has a power failure as a result, according to pre- Determine each power failure after optimization aim adjusts merging in power failure plan set to plan to carry out scheduling optimization.
Wherein, power failure impact evaluation result can be obtained by the existing automated system of power distribution network, refer to utilizing distribution The functions such as power load acquisition, the topological analysis in existing automated system are netted, are stopped involved by each power failure plan of acquisition The assessment result of the information such as electric time, power failure coverage/dead line.The customer interrupted of overlapping refers to multiple has a power failure in the works The case where there are the same customer interrupteds.Power failure line segment that is identical or intersecting refers to that two or more power failure plan institutes are right The power distribution network supply line answered is identical or has the part of path of intersection.Merging refers to that counterweight deactivates family and identical or intersection Power failure plan corresponding to power failure line segment carries out normalizing or binding, establishes the incidence relation between the related plan that has a power failure.Safety can Refer to that whether disclosure satisfy that the requirement of safe and reasonable power failure to the power failure plan after merging by property inspection, for example, power failure plan is Whether the no circuit being related to involved by responsible consumer or power failure plan has with the electric task of guarantor conflicts.Preset condition refers to Some when pre-set power distribution network has a power failure ensure index, such as having a power failure in the works cannot be with the electric task conflict of guarantor, and have a power failure meter The power failure load loss arrived involved in drawing is no more than the peak load loss amount of definition, and have a power failure responsible consumer list involved in plan It returns or double back power outage needs early warning etc..Scheduling optimization refers to being optimized to power failure plan arrangement, forms rational plan peace Arrange the process of sequential and amount of plan.
Specifically, obtaining the power failure impact evaluation of each power failure plan in power failure plan set to be optimized as a result, according to respectively stopping Electricity plan power failure impact evaluation as a result, and using the customer interrupted of overlapping and it is identical or intersect power failure line segment as merging condition into The merging of each plan that has a power failure of row, normalizing is merged for the identical power failure plan of dead line, and dead line is complete A power failure plan is merged into identical power failure plan.There is the power failure plan of intersection to carry out binding merging treatment dead line, There are two power failure plans of intersection to bundle dead line, for example, the power off time of this two plans that have a power failure can be pacified It is discharged to the same period, to reduce the frequency of power cut of cross link.After carrying out power failure plan merging, further to respectively stopping after merging Electricity plan carries out security reliability inspection, and the power failure plan to not meeting preset condition carries out safe early warning, for example, to each power failure It is contemplated that it is no with protect electric task conflict, whether be related to responsible consumer, whether there is also stop again, whether beyond reliability index etc. Situation is checked, provides analysis condition for the scheduling optimization of power failure plan, and to being related to protecting electric task conflict, being related to weight Customer impact is wanted, stops again, alerted beyond the case where reliability index.The assessment knot influenced according to the power failure of each plan that has a power failure Fruit and security reliability inspection as a result, carrying out scheduling optimization to each power failure plan after merging.
In one of the embodiments, as shown in Fig. 2, power failure impact evaluation result includes power supply reliability, each meter that has a power failure The power failure impact evaluation result drawn is obtained by following steps:
S111:Obtain the corresponding power failure plan information of each power failure plan in power failure plan set to be optimized;
S112:By Topology Analysis of Power Distribution Network system, and power load information and controller switching equipment status information are combined, to each Power failure project impact is assessed.
Wherein, power failure plan information refers to including information such as power off time, customer interrupteds.Topology Analysis of Power Distribution Network system is main Refer to utilizing computer networking technology and the communication technology, by the means such as data sharing and technology calculating, to the one of distribution management A little main performance index carry out the conglomerate of electronic system automation collection and the software of analysis, for example, distribution net analytic al software (DPAS):Network topology, Analysis of Short-Circuit Current, Load flow calculation, state of electric distribution network estimation, load prediction, fail-safe analysis, network The softwares such as optimal reconfiguration, voltage adjusting and optimizing, idle work optimization.Specifically, corresponding to the power failure plan optimized to needs Power failure plan information is obtained, and then, in conjunction with power load information and controller switching equipment status information, utilizes distribution net topology point Analysis system assesses each power failure project impact.Include mainly:The analysis of scheduled outage coverage, the important use of scheduled outage Family analysis can turn for capacity analysis, power failure planning data statistics.By analysis, the loss total load of each plan that has a power failure is calculated Data, as the foundation that plan merges and scheduling optimizes that has a power failure.
In one of the embodiments, as shown in figure 3, the step of assessing each power failure project impact includes:
S1121:According to each corresponding supply district of power failure equipments for having a power failure and being related in the works, to the meter of each plan that has a power failure Power failure coverage is drawn to be analyzed;
S1122:Carry out scheduled outage responsible consumer analysis;
S1123:According to network topological information, analyzes the power failure amount of each power failure plan, can turn for capacity;
S1124:According to load prediction data, obtains each power failure and plan corresponding power failure load loss.
Wherein, network topological information, load prediction can be obtained by the response software in Topology Analysis of Power Distribution Network system It takes.Specifically, to needing each power failure plan for optimizing scheduling to be collected, the power failure being related to each power failure plan is set Standby supply district is counted, and so as to learn scope of power outage that each power failure plan is influenced, can carry out power failure meter When drawing layout, the responsible consumer involved by power failure plan is analyzed, is obtained important involved by each power failure in the works The information of user, in case the later stage can be avoided when scheduling optimization the double circuit feeding power supply to responsible consumer, all power failure is pacified Row, ensures the electricity consumption reliability of responsible consumer.
The specific implementation for carrying out scheduled outage responsible consumer analysis can also be client's important level information according to storage, Automatic screening and the different grades of Very Important Person for marking each power failure plan to be related to are related to power failure plan to realize The screening of the responsible consumer arrived ensures the electric power thus supplied of responsible consumer.According to network topological information, the power failure to each plan that has a power failure It amount and can turn to be analyzed for capacity, so that the later stage is when carrying out the optimization of power failure plan scheduling, can ensure each power failure plan It disclosure satisfy that power reguirements, there is enough reliabilities.For example, can be in conjunction with the established network topology letter of automated system Breath according to the looped network relationship of each circuit, circuit normal off point in distribution network and turns to turn for capacity situation for circuit, and analysis stops Electricity in the works other than power failure line segment to the power supply line segment between circuit normal off point in automated system collected power load Summation, if meet to close and turn for capacity requirement when normal off point turn power supply, statistics can not fully meet stopping of turning to supply The power supply reliability situation of change of electricity plan carried out to ensure the power failure line that power failure plan is related to when scheduling optimization for the later stage The reliability on road provides data foundation.Plan for each power failure, in conjunction with load prediction data, according to the influence amount that has a power failure, stops Corresponding power failure load loss is planned in each power failures of statistics such as electric time, loss electricity, and reference is provided for the optimization of power failure plan scheduling Information.
Optionally, power failure coverage includes:Power supply distribution transforming, client's number and loss of outage load, plan each power failure Scheduled outage coverage the step of being analyzed may include:
In conjunction with the power distribution network topological system, power supply distribution transforming, client's number and power failure to each power failure project impact Loss load is analyzed.
In one of the embodiments, as shown in figure 4, planning to merging each power failure in the power failure plan set after adjusting Carry out security reliability inspection, to do not meet preset condition power failure plan carry out safe early warning the step of include:
S141:It carries out protecting electrical conflict inspection to merging each power failure plan in the power failure plan set after adjusting, merge and stop Electric responsible consumer inspection stops inspection and power failure marginal testing again;
S142:To protecting electrical conflict inspection, the inspection of merging power failure responsible consumer, stopping in inspection and power failure marginal testing again Power failure plan of one or more inspection results beyond preset condition carries out early warning.
Wherein, preset condition is identical as the paraphrase in above-described embodiment, and this will not be repeated here.Specifically, after to merging Power failure plan protect electrical conflict inspection, i.e., whether the dead line being related to each power failure plan has punching protecting between electric line Whether the influence user of prominent or each power failure plan relates to protect electric user, if being related to protecting electric line or protecting electric user When, whether execution time and its period of the protection of electricity for reexamining power failure plan limit and have overlapping, avoid the later stage from carrying out power failure plan scheduling excellent When change, occur to protect electrical conflict.Responsible consumer inspection is carried out to the power failure plan after merging, i.e., scheduled outage responsible consumer is analyzed Obtained responsible consumer information is compared with the user that power failure plan is related to, and checks that the power failure plan after merging whether there is The case where responsible consumer, if there is then providing early warning, in case the power failure project impact arranged when later stage progress scheduling optimization is important The power supply reliability of user.Check have a power failure number that the user that influences in the works has been had a power failure at the appointed time whether be more than The permission frequency of power cut of user in the stipulated time being arranged in system configuration, if alreading exceed the frequency of power cut of permission, Think to carry out power failure arrangement to the user again, when later stage scheduling optimizes, arranged power failure plan should avoid being related to The user.It checks to have a power failure and plans whether amount when having a power failure total of set is more than that the maximum power failure allowed is gathered in the plan that has a power failure of setting When amount, if amount is more than amount when setting maximum has a power failure when the plan set that has a power failure is total, then it is assumed that the power failure plan set pair Power supply reliability influences greatly, and carrying out scheduling optimization for the later stage provides data foundation.
In one of the embodiments, as shown in figure 5, obtaining stopping for each power failure plan in power failure plan set to be optimized The assessment result that film is rung, and each power failure is carried out as merging condition using the customer interrupted of overlapping and power failure line segment that is identical or intersecting The step of merging of plan includes:
S121:The completely overlapped power failure plan of each power failure line segment having a power failure in the works and influence user is merged;
S122:On each power failure line segment having a power failure in the works and influence user, there are the power failure plans of juxtaposition to close And;
S123:By recursive analysis, the scope of power outage of the power failure plan after merging is merged.
Specifically, checking all power failure plans, by power failure line segment and influencing user has completely overlapped power failure plan to merge Together, a unified power failure plan is formed.There are juxtapositions by the power failure line segment that power failure plan is related to and influence user Power failure plan merge, merging here refer to being related to establishing bundle relation between the power failure plan of juxtaposition, It puts together when scheduling consideration, for example, can be arranged in, to reduce the power failure of cross section the same period on the same day Number.Then, by recursive analysis, the scope of power outage of this group power failure plan is taken to having already passed through power failure plan after merging Union then terminates when no any annexable situation.To reduce power failure plan that is completely overlapped or having juxtaposition Involved in customer interrupted or the frequency of power cut that is undergone of dead line.
In one of the embodiments, as shown in fig. 6, the assessment result and safety that are influenced according to the power failure of each plan that has a power failure Marginal testing as a result, in the power failure plan set after merging each power failure plan carry out scheduling optimization the step of include:
S161:The result of the assessment result and security reliability inspection that are influenced according to the power failure of each power failure plan establishes scheduling Optimized model;
S162:Obtain the power failure plan information of each plan that has a power failure in the power failure plan set after merging adjustment;
S163:Power failure plan information is updated in the scheduling Optimized model pre-established, obtains constrained objective parameter;
S164:Assessment result, the result of security reliability inspection and the constraint mesh influenced according to the power failure of each plan that has a power failure Parameter is marked, the optimization scheduling of power failure plan is carried out.
Wherein, constrained objective parameter refers to overhauling period and overhaul of the equipments load transfer path in order to control with Distribution Network Equipment The parameter arrived involved in the multiple target multiconstraint optimization scheme of variable.Specifically, obtaining the power failure meter of the power failure plan after merging Information is drawn, power failure plan information is updated in the scheduling Optimized model pre-established, is obtained constrained objective parameter, then integrate Consider constrained objective parameter, the assessment result that the power failure of each power failure plan influences and security reliability inspection as a result, avoiding Protect electrical conflict, stop again, responsible consumer conflict situations such as occur in the case of carry out the optimization scheduling of power failure plan.Wherein, optional , the staffing situation that each department is can be combined in the scheduling optimization process of power failure plan carries out task distribution.
In one of the embodiments, as shown in fig. 7, power failure plan information includes power distribution network average electricity price, equipment power failure State, added losses, increased customer outage hours;Constrained objective parameter includes:Loss of outage load, is used additional network loss Family is averaged power off time;The scheduling Optimized model pre-established includes minimum interruption cost load model, minimum additional network loss Model and minimum reliability influence model;Outage information is updated in the scheduling Optimized model pre-established, obtains the meter that has a power failure Draw optimization scheduling the step of include:
S1611:Power distribution network average electricity price and equipment power failure are updated to minimum interruption cost load model, obtained Loss of outage load;
S1612:Equipment power failure and added losses are updated to minimum additional network loss model, obtains and adds network loss;
S1613:Increased customer outage hours, which are updated to minimum reliability, influences model, when acquisition user averagely has a power failure Between;
S1614:According to the power failure of loss of outage load, additional network loss, average power off time of user and each plan that has a power failure The assessment result of influence and security reliability inspection as a result, carrying out the optimization scheduling of each plan that has a power failure.
Specifically, power distribution network average electricity price and added losses are updated to minimum additional network loss model, obtain and adds network loss, Equipment power failure and added losses are updated to minimum additional network loss model, obtains and adds network loss, increased user is had a power failure Time, which is updated to minimum reliability, influences model, obtains average power off time of user, then according to obtained loss of outage load Amount adds network loss, average power off time of user, the assessment result of each power failure influence planned that has a power failure and security reliability inspection As a result, carrying out the scheduling optimization of each plan that has a power failure.
Minimum interruption cost load model is in one of the embodiments,:
Wherein, Xi, i=1,2 ..., m is indicated involved by same power off time section t needs while the power failure plan having a power failure The set of power failure equipments, m are the sum of power failure equipments, and T is the period sum divided by specified duration in optimization cycle, and ε is Power distribution network average electricity price, L (Xi, t) and it is power failure equipments X in power off time section tiLoad, u are lost caused by power failureitIt indicates to have a power failure Power failure equipments X in time period tiPower failure, F1Indicate loss of outage load.
Specifically, may cause some loads that cannot be shifted completely by network reconfiguration means due to having a power failure, not With arrangement of time power failure intended user electricity consumption different from, the sale of electricity loss of power grid may be produced a very large impact, it can To reduce sale of electricity loss by optimizing power off time, i.e. power failure planning optimization needs to realize the mesh of loss of outage load minimum Mark.Want to realize the target, same time period t (time interval can be arranged, such as 15 minutes or 30 minutes) can be needed simultaneously The power failure equipments involved by each power failure plan having a power failure are set as power failure equipments set, indicate that power failure equipments collection sum, T are excellent with m Change the period sum divided by specified duration in the period, loss of outage load can be expressed as:
The average electricity price of the power failure and power grid of each power failure plan, and being averaged power grid are obtained using automated system Electricity price, different moments corresponding power failure are updated in model, obtain loss of outage load.It can be according to obtained power failure Loss load obtains power failure possessed by the corresponding power failure plan of minimum interruption cost load.
Minimum additional network loss model is in one of the embodiments,:
Wherein, r is load transfer path, Δ P (Xi, t, r) and it is the power failure meter that same power off time section t needs while having a power failure Draw involved power failure equipments XiThe added losses brought using transfer path r when power failure, F2Indicate that load transition zone comes total attached Add loss.
Specifically, when the equipment for being related to power failure plan has a power failure, need to carry out load transfer using network reconstruction method, To reduce power failure load, but reconstruct can change the via net loss of system, may bring additional network loss to increase to system The sale of electricity cost of power grid, power failure planning optimization are considered as reducing the target of additional network loss.The meter that has a power failure is obtained using automated system It draws and adds damage caused by the power failure of power failure equipments being related to and the load transfer path involved by each power failure plan Consumption, is updated in minimum added losses model, obtains total added losses.
Minimum reliability influence model is in one of the embodiments,:
Wherein, Δ T (Xi, t) and it is that same power off time section t needs power failure equipments involved by the power failure plan of power failure simultaneously XiThe increased customer outage hours of institute, F when power failure3Indicate average power off time of user.
Specifically, can plan to merge optimization power off time reduction customer outage hours by having a power failure, reliability shadow is realized Ring minimum target, when can be by having a power failure increased customer outage hours minimum to realize reliability effect most Small target.When the increased user of institute has a power failure when obtaining the power failure of the power failure equipments involved by each power failure plan using automated system Between, obtain the average power off time of user of the power failure plan in same power off time section.According to average power off time of user function, The power failure equipments number in same power off time section t can be optimized, to reduce average power off time of user in this period, improved Have a power failure plan reliability.
A kind of power distribution network power failure plan scheduling optimization device, as shown in figure 8, power distribution network power failure plan scheduling optimizes device packet It includes:
Have a power failure plan merging module 100, the power failure shadow for obtaining each power failure plan in power failure plan set to be optimized Assessment result is rung, and each power failure plan is carried out as merging condition using the customer interrupted of overlapping and power failure line segment that is identical or intersecting Merge, forms the power failure plan set after merging adjustment;
Safe early warning module 200, for carrying out safety to merging each power failure plan in the power failure plan set after adjusting Marginal testing, the power failure plan to not meeting preset condition carry out safe early warning;
Scheduling optimization module 300, assessment result and security reliability for being influenced according to the power failure of each plan that has a power failure are examined It is looking into as a result, to merge adjust after power failure plan set in each power failure plan carry out scheduling optimization.
Specifically, power failure plan merging module 100 obtains the power failure impact evaluation of each power failure plan as a result, and with overlapping Customer interrupted and power failure line segment that is identical or intersecting are the merging that merging condition carries out each power failure plan, safe early warning module 200 Security reliability inspection is carried out to each power failure plan after merging, it is pre- that the power failure plan to not meeting preset condition carries out safety Alert, scheduling optimization module 300 is according to each assessment result and security reliability inspection influenced that have a power failure for having a power failure and planning as a result, right Each power failure plan after merging carries out scheduling optimization.
It should be noted that about power distribution network power failure plan scheduling optimize device it is specific limit may refer to it is above right In the restriction of power distribution network power failure plan scheduling optimization method, details are not described herein.Above-mentioned power distribution network power failure plan scheduling optimization dress Modules in setting can be realized fully or partially through software, hardware and combinations thereof.Above-mentioned each module can be in the form of hardware It is embedded in or independently of the storage that in the processor in computer equipment, can also be stored in a software form in computer equipment In device, the corresponding operation of the above modules is executed in order to which processor calls.
A kind of computer equipment, including memory and processor, memory are stored with computer program, and processor executes meter Following methods step is realized when calculation machine program:
S120:The power failure impact evaluation of each power failure plan in power failure plan set to be optimized is obtained as a result, and with overlapping Customer interrupted and power failure line segment that is identical or intersecting be that merging condition carries out the merging of each power failure plan, formed after merging adjustment Power failure plan set;
S140:Each power failure in the plan set that has a power failure after being adjusted to merging is planned to carry out security reliability inspection, to not being inconsistent The power failure plan for closing preset condition carries out safe early warning;
S160:According to the assessment result and security reliability inspection influenced that have a power failure of each plan that has a power failure as a result, to merging Each power failure plan in the plan set that has a power failure after adjustment carries out scheduling optimization.
The computer equipment provided through this embodiment, the power failure impact evaluation obtained according to distribution automation system As a result, the merging of each power failure plan is carried out using the customer interrupted of overlapping and identical or intersection power failure line segment as merging condition, and Further the security reliability of the power failure plan after merging is checked, the power failure plan to not meeting preset condition is pacified Full early warning, finally according to the assessment result and security reliability inspection result of the power failure influence of each plan that has a power failure, after merging The plan that has a power failure carries out scheduling optimization.Based on the computer equipment that this is built by method, when work, which can be realized, stops power distribution network The automatic arrangement program optimization of electricity plan, has broken away from the operating type that hand inspection is relied in traditional technology, to improve scheduling efficiency And reliability.It should be noted that computer equipment can also realize any method step in above method embodiment, herein It does not repeat.
The embodiment of the present invention additionally provides a kind of computer readable storage medium, is stored thereon with computer program, calculates Machine program realizes following steps when being executed by processor:
S120:The power failure impact evaluation of each power failure plan in power failure plan set to be optimized is obtained as a result, and with overlapping Customer interrupted and power failure line segment that is identical or intersecting be that merging condition carries out the merging of each power failure plan, formed after merging adjustment Power failure plan set;
S140:Each power failure in the plan set that has a power failure after being adjusted to merging is planned to carry out security reliability inspection, to not being inconsistent The power failure plan for closing preset condition carries out safe early warning;
S160:According to the assessment result and security reliability inspection influenced that have a power failure of each plan that has a power failure as a result, to merging Each power failure plan in the plan set that has a power failure after adjustment carries out scheduling optimization.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, Any reference to memory, storage, database or other media used in each embodiment provided herein, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above example can be combined arbitrarily, to keep description succinct, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield is all considered to be the range of this specification record.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, under the premise of not departing from the application design, various modifications and improvements can be made, these belong to the protection of the application Range.Therefore, the protection domain of the application patent should be determined by the appended claims.

Claims (10)

1. a kind of power distribution network power failure plan scheduling optimization method, which is characterized in that the method includes:
The assessment result that the power failure of each power failure plan in power failure plan set to be optimized influences is obtained, and is used with the power failure of overlapping Family and power failure line segment that is identical or intersecting are the merging that merging condition carries out each power failure plan, are formed after merging adjustment and are stopped Electricity plan set;
It is pre- to not meeting to each power failure plan progress security reliability inspection in the power failure plan set merged after adjusting If the power failure plan of condition carries out safe early warning;
According to the assessment result and the security reliability inspection influenced that have a power failure of each plan that has a power failure as a result, to the conjunction And each power failure plan in the power failure plan set after adjusting carries out scheduling optimization.
2. power distribution network power failure plan scheduling optimization method according to claim 1, which is characterized in that the acquisition is to be optimized The assessment result that the power failure of the plan that respectively has a power failure in the plan set that has a power failure influences, and with the customer interrupted of overlapping and identical or intersection Power failure line segment be merging condition the step of carrying out the merging of each power failure plan to include:
The completely overlapped power failure plan of each power failure line segment having a power failure in the works and influence user is merged;
On each power failure line segment having a power failure in the works and influence user, there are the power failure plans of juxtaposition to merge;
By recursive analysis, the scope of power outage of the power failure plan after merging is merged.
3. power distribution network power failure plan scheduling optimization method according to claim 1, which is characterized in that described pair merges adjustment Afterwards power failure plan set in each powers failure plan progress security reliability inspection, the power failure to not meeting preset condition plan into The step of row safe early warning includes:
It is important that each power failure plan in power failure plan set after being adjusted to the merging carries out the inspection of guarantor's electrical conflict, merging has a power failure User checks, stops inspection and power failure marginal testing again;
To protect electrical conflict inspection, merge power failure responsible consumer inspection, stop to check again and power failure marginal testing in one or more Power failure plan of the item inspection result beyond preset condition carries out early warning.
4. power distribution network power failure plan scheduling optimization method as claimed in any of claims 1 to 3, which is characterized in that It is described according to it is each it is described have a power failure plan power failure influence assessment result and the security reliability inspection as a result, to the conjunction And adjust after power failure plan set in each power failure plan carry out scheduling optimization the step of include:
The result of the assessment result and the security reliability inspection that are influenced according to the power failure of each power failure plan establishes scheduling Optimized model;
Obtain the power failure plan information of each power failure plan in the power failure plan set merged after adjusting;
The power failure plan information is updated in the scheduling Optimized model pre-established, constrained objective parameter is obtained;
Assessment result, the result of the security reliability inspection and the constraint influenced according to the power failure of each plan that has a power failure Target component carries out the optimization scheduling of each plan that has a power failure.
5. power distribution network power failure plan scheduling optimization method according to claim 4, which is characterized in that the power failure plan letter Breath includes power distribution network average electricity price, equipment power failure, added losses, increased customer outage hours;
The scheduling Optimized model pre-established includes minimum interruption cost load model, minimum additional network loss model and most Small reliability effect model;The constrained objective parameter includes:When loss of outage load, additional network loss, user averagely have a power failure Between;
It is described to be updated to the outage information in the scheduling Optimized model pre-established, obtain the optimization scheduling for the plan that has a power failure Step includes:
The power distribution network average electricity price and the equipment power failure are updated to the minimum interruption cost load model, obtained Obtain loss of outage load;
The equipment power failure and the added losses are updated to the minimum additional network loss model, obtains and adds network loss;
The increased customer outage hours, which are updated to the minimum reliability, influences model, when acquisition user averagely has a power failure Between;
According to the loss of outage load, the additional network loss, the average power off time of user and each power failure plan Power failure influence assessment result and the security reliability inspection as a result, carry out it is each it is described have a power failure plan optimization scheduling.
6. power distribution network power failure plan scheduling optimization method according to claim 5, which is characterized in that the minimum damage that has a power failure Losing load model is:
Wherein, Xi, i=1,2 ..., m is indicated involved by same power off time section t needs while the power failure plan having a power failure The set of power failure equipments, m are the sum of the power failure equipments, and T is the period sum divided by specified duration in optimization cycle, ε is the power distribution network average electricity price, L (Xi, t) and it is power failure equipments X in power off time section tiLoad, u are lost caused by power failureitTable Show the power failure equipments X in power off time section tiPower failure, F1Indicate total loss of outage load.
7. power distribution network power failure plan scheduling optimization method according to claim 5, which is characterized in that the minimum additional net Damaging model is:
Wherein, r is load transfer path, Δ P (Xi, t, r) and it is the power failure meter that same power off time section t needs while having a power failure Draw involved power failure equipments XiThe added losses brought using transfer path r when power failure, F2Indicate that load transition zone comes total attached Add loss.
8. power distribution network power failure plan scheduling optimization method according to claim 5, which is characterized in that the minimum reliability Influencing model is:
Wherein, Δ T (Xi, t) and it is that same power off time section t needs power failure equipments involved by the power failure plan of power failure simultaneously XiThe increased customer outage hours of institute, F when power failure3Indicate average power off time of user.
9. a kind of power distribution network power failure plan scheduling optimizes device, which is characterized in that described device includes:
Have a power failure plan merging module, the assessment that the power failure for obtaining each power failure plan in power failure plan set to be optimized influences As a result, and carrying out as merging condition the conjunction of each power failure plan using the customer interrupted of overlapping and power failure line segment that is identical or intersecting And form the power failure plan set after merging adjustment;
Safe early warning module, for safe and reliable to each power failure plan progress in the power failure plan set merged after adjusting Property inspection, to do not meet preset condition the power failure plan carry out safe early warning;
Scheduling optimization module, assessment result and the security reliability for being influenced according to the power failure of each plan that has a power failure are examined It is looking into as a result, to it is described merge adjustment after power failure plan set in each power failure plan carry out scheduling optimization.
10. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the processor realizes power distribution network power failure plan described in any item of the claim 1 to 8 when executing the computer program The step of scheduling optimization method.
CN201810321801.6A 2018-04-11 2018-04-11 Power distribution network power failure plan scheduling optimization method and device Pending CN108448577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810321801.6A CN108448577A (en) 2018-04-11 2018-04-11 Power distribution network power failure plan scheduling optimization method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810321801.6A CN108448577A (en) 2018-04-11 2018-04-11 Power distribution network power failure plan scheduling optimization method and device

Publications (1)

Publication Number Publication Date
CN108448577A true CN108448577A (en) 2018-08-24

Family

ID=63199254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810321801.6A Pending CN108448577A (en) 2018-04-11 2018-04-11 Power distribution network power failure plan scheduling optimization method and device

Country Status (1)

Country Link
CN (1) CN108448577A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109377116A (en) * 2018-12-21 2019-02-22 云南电网有限责任公司电力科学研究院 Power supply reliability calculation method based on the analysis of middle voltage distribution networks O&M feature mining
CN109657987A (en) * 2018-12-21 2019-04-19 云南电网有限责任公司电力科学研究院 Power supply reliability calculation method based on middle voltage distribution networks engineering characteristics mining analysis
CN110705922A (en) * 2019-11-08 2020-01-17 国网河南省电力公司新乡供电公司 Power distribution network power failure management system
CN110929903A (en) * 2019-11-06 2020-03-27 深圳供电局有限公司 Power failure reservation method, device, computer equipment and medium
CN111030103A (en) * 2019-12-20 2020-04-17 广东电网有限责任公司 Main and distribution network linkage power failure analysis method and system
CN111047188A (en) * 2019-12-12 2020-04-21 深圳供电局有限公司 Power failure plan generation method and system, computer equipment and storage medium
CN111143751A (en) * 2019-12-23 2020-05-12 国网浙江海盐县供电有限公司 Power distribution network power failure plan optimization analysis method
CN111210117A (en) * 2019-12-23 2020-05-29 国网浙江海盐县供电有限公司 Intelligent analysis system for power failure plan
CN111325360A (en) * 2020-03-05 2020-06-23 黄雄军 Power distribution network power failure management and control method
CN111652313A (en) * 2020-06-04 2020-09-11 重庆东电通信技术有限公司 Multi-source heterogeneous data mining method based on cluster analysis
CN111709632A (en) * 2020-06-09 2020-09-25 国网安徽省电力有限公司安庆供电公司 Power failure plan automatic arrangement method based on artificial intelligence and multi-target constraint
CN112364210A (en) * 2020-10-13 2021-02-12 国网江苏省电力有限公司江阴市供电分公司 Power distribution network power failure plan duplicate checking method
CN112418634A (en) * 2020-11-17 2021-02-26 广东电网有限责任公司广州供电局 Autonomous cruise system for distribution network dispatching power failure plan
CN112446614A (en) * 2020-11-26 2021-03-05 深圳供电局有限公司 Uninterrupted power operation priority evaluation method based on user power failure loss
CN113627732A (en) * 2021-07-13 2021-11-09 广西电网有限责任公司 Power failure maintenance automatic identification overlapping maintenance pre-estimation risk method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521673A (en) * 2011-12-01 2012-06-27 嘉兴电力局 Method for optimizing power-failure plan based on genetic algorithm
CN103489062A (en) * 2013-09-04 2014-01-01 广东电网公司佛山供电局 Scheduled outage method and device based on CIM model
CN104156790A (en) * 2014-08-22 2014-11-19 国家电网公司 Method for optimizing and balancing power-cut schemes
CN106157174A (en) * 2016-07-21 2016-11-23 中国南方电网有限责任公司电网技术研究中心 To reduce power off time and the electricity power failure planning optimization decision method as target
CN206294207U (en) * 2016-12-30 2017-06-30 国网山西省电力公司 Grid power blackout proposed figures for the plan Optimization Platform based on " big operation " multi-constraint condition

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521673A (en) * 2011-12-01 2012-06-27 嘉兴电力局 Method for optimizing power-failure plan based on genetic algorithm
CN103489062A (en) * 2013-09-04 2014-01-01 广东电网公司佛山供电局 Scheduled outage method and device based on CIM model
CN104156790A (en) * 2014-08-22 2014-11-19 国家电网公司 Method for optimizing and balancing power-cut schemes
CN106157174A (en) * 2016-07-21 2016-11-23 中国南方电网有限责任公司电网技术研究中心 To reduce power off time and the electricity power failure planning optimization decision method as target
CN206294207U (en) * 2016-12-30 2017-06-30 国网山西省电力公司 Grid power blackout proposed figures for the plan Optimization Platform based on " big operation " multi-constraint condition

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109657987A (en) * 2018-12-21 2019-04-19 云南电网有限责任公司电力科学研究院 Power supply reliability calculation method based on middle voltage distribution networks engineering characteristics mining analysis
CN109377116A (en) * 2018-12-21 2019-02-22 云南电网有限责任公司电力科学研究院 Power supply reliability calculation method based on the analysis of middle voltage distribution networks O&M feature mining
CN110929903A (en) * 2019-11-06 2020-03-27 深圳供电局有限公司 Power failure reservation method, device, computer equipment and medium
CN110705922A (en) * 2019-11-08 2020-01-17 国网河南省电力公司新乡供电公司 Power distribution network power failure management system
CN111047188A (en) * 2019-12-12 2020-04-21 深圳供电局有限公司 Power failure plan generation method and system, computer equipment and storage medium
CN111030103B (en) * 2019-12-20 2021-09-17 广东电网有限责任公司 Main and distribution network linkage power failure analysis method and system
CN111030103A (en) * 2019-12-20 2020-04-17 广东电网有限责任公司 Main and distribution network linkage power failure analysis method and system
CN111143751A (en) * 2019-12-23 2020-05-12 国网浙江海盐县供电有限公司 Power distribution network power failure plan optimization analysis method
CN111210117A (en) * 2019-12-23 2020-05-29 国网浙江海盐县供电有限公司 Intelligent analysis system for power failure plan
CN111325360A (en) * 2020-03-05 2020-06-23 黄雄军 Power distribution network power failure management and control method
CN111652313A (en) * 2020-06-04 2020-09-11 重庆东电通信技术有限公司 Multi-source heterogeneous data mining method based on cluster analysis
CN111709632A (en) * 2020-06-09 2020-09-25 国网安徽省电力有限公司安庆供电公司 Power failure plan automatic arrangement method based on artificial intelligence and multi-target constraint
CN112364210A (en) * 2020-10-13 2021-02-12 国网江苏省电力有限公司江阴市供电分公司 Power distribution network power failure plan duplicate checking method
CN112364210B (en) * 2020-10-13 2024-03-01 国网江苏省电力有限公司江阴市供电分公司 Power distribution network power outage plan duplicate checking method
CN112418634A (en) * 2020-11-17 2021-02-26 广东电网有限责任公司广州供电局 Autonomous cruise system for distribution network dispatching power failure plan
CN112418634B (en) * 2020-11-17 2023-07-14 广东电网有限责任公司广州供电局 Distribution network dispatching power failure planning autonomous cruising system
CN112446614A (en) * 2020-11-26 2021-03-05 深圳供电局有限公司 Uninterrupted power operation priority evaluation method based on user power failure loss
CN113627732A (en) * 2021-07-13 2021-11-09 广西电网有限责任公司 Power failure maintenance automatic identification overlapping maintenance pre-estimation risk method

Similar Documents

Publication Publication Date Title
CN108448577A (en) Power distribution network power failure plan scheduling optimization method and device
Heylen et al. Review and classification of reliability indicators for power systems with a high share of renewable energy sources
Li et al. A reliability-constrained expansion planning model for mesh distribution networks
Mirsaeedi et al. Long-term maintenance scheduling and budgeting in electricity distribution systems equipped with automatic switches
CN110690697B (en) System and method for managing power quality events in an electrical system
CN110687366A (en) System and method for managing voltage time alarms in an electrical system
CN106157174B (en) To reduce the power failure planning optimization decision-making technique of power off time and electricity as target
Khushiev et al. Development of intelligent energy systems: The concept of smart grids in Uzbekistan
Shittu et al. Meta-analysis of the strategies for self-healing and resilience in power systems
CN102368316A (en) Real-time topology based precontrol method for reliability of distribution network
Menasché et al. Assessing survivability of smart grid distribution network designs accounting for multiple failures
CN106779442A (en) Have a power failure the generation method and device planned
CN108549945A (en) Production equipment maintaining method, system, computer equipment and storage medium
CN103559580A (en) Power distribution network analysis system and method
CN111340257B (en) Optimization method and system for maintenance plan of power transmission equipment based on risk analysis
CN101609987B (en) Joint coordination method for master-station automatic voltage control and plant-station voltage reactive power control
CN111582744A (en) Fault disposal plan on-line checking parallel computing method and system
Ding et al. Automatic distribution network reconfiguration: An event-driven approach
CN103345222A (en) Control method and system for power grid operation
Cong et al. Optimal allocation of soft open points in distribution networks based on candidate location opitimization
Bilgen et al. An Overview on reliability analysis and evaluation methods applied to smart grids
CN114841627B (en) Maintenance plan checking method, device, equipment and storage medium
CN108599233B (en) Method and device for determining admission capacity of power distribution network with distributed power supply
CN104237697A (en) Testing system for new energy automobile charging equipment
Vadlamudi et al. Reliability-based appraisal of Smart Grid challenges and realization

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180824

RJ01 Rejection of invention patent application after publication