CN104237697A CN201410507432.1A CN201410507432A CN104237697A CN 104237697 A CN104237697 A CN 104237697A CN 201410507432 A CN201410507432 A CN 201410507432A CN 104237697 A CN104237697 A CN 104237697A
Authority
CN
China
Prior art keywords
test
charging equipment
test macro
server
energy automobile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410507432.1A
Other languages
Chinese (zh)
Other versions
CN104237697B (en
Inventor
连湛伟
陈志刚
徐怡山
邓建慎
李洪峰
郝战铎
李志超
徐鹏
陈超
付朝学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuji Group Co Ltd
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Xuji Power Co Ltd
Original Assignee
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XJ Electric Co Ltd, Xuchang XJ Software Technology Co Ltd filed Critical XJ Electric Co Ltd
Priority to CN201410507432.1A priority Critical patent/CN104237697B/en
Publication of CN104237697A publication Critical patent/CN104237697A/en
Application granted granted Critical
Publication of CN104237697B publication Critical patent/CN104237697B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Secondary Cells (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention relates to a testing system for new energy automobile charging equipment and belongs to the technical field of the new energy automobile charging equipment. The testing system comprises a testing system server and an industrial personal computer/front-end server. Common test item templates are built in the testing system server which is used for making test task planning by selecting and combining test items and generating test reports according to test data. An execution unit of the industrial personal computer/front-end server is used for sending a control instruction to the charging equipment and executing the test task planning made by the testing system server. The testing system can make the test task planning and test the new energy automobile charging equipment according to the test task planning, thereby improving intelligentization level and test result application level of test of the new energy automobile charging equipment and having wider application range.

Description

A kind of new-energy automobile charging equipment test macro
Technical field
The present invention relates to a kind of new-energy automobile charging equipment test macro, belong to new-energy automobile charging equipment technical field.
Background technology
At present, along with the development of domestic new-energy automobile industry, the construction of serving the charging website of new-energy automobile also advances in quickening.But the test at present for new-energy automobile charging equipment also rests in the test of individual event project mostly, lack charging equipment is carried out fast, comprehensively, the system of intelligent test, efficiency and effect are all bad, define obvious restriction to the construction of charging website.
Meanwhile, existing equipment also lacks and carries out deep exploitation to test result and to the function that charging equipment is evaluated, the application purpose of testing apparatus and usable range are all subject to certain restrictions.
Summary of the invention
The object of this invention is to provide a kind of new-energy automobile charging equipment test macro, be subject to the problem of a definite limitation with the application purpose and the scope of application that solve current testing apparatus.
The present invention is for solving the problems of the technologies described above and providing a kind of new-energy automobile charging equipment test macro, this test macro comprises test macro server and industrial computer/front server, described test macro server and industrial computer/front server communicate to connect, control/performance element and data acquisition unit is provided with in described industrial computer/front server, described test macro server is built-in with conventional test event template, this test macro server be used for by choose combined test project system determine test assignment plan and according to Test data generation test report, described control/performance element is used for issuing control command to charging equipment and performing the test assignment planning of test macro server formulation, described data acquisition unit is used for collecting test process data and test result and is uploaded to test macro server.
Described test macro can adjust test parameter automatically according to charging equipment state, to ensure to obtain complete available test result.
Described test macro provides perfect abnormal information to point out when abnormal interruption appears in test process and allows user to make full use of and interrupts front completed test job.
Described test macro comprises well the soft logic module be arranged in charging equipment, and this soft logic module is used for, as soft interface existence, ensureing that charging equipment and test macro can co-ordinations.
Described data acquisition unit acquires to test process data comprise and test relevant voltage, electric current, capacity, temperature and internal resistance every certain time interval record in test process with this.
Be provided with the instrument of self-defined test report form in described test macro server, user in use can revise the form of test report as required, to ensure that the test report user that test macro exports need not carry out any amendment just directly use.
Described test macro also provides the comparative evaluation's report based on multiple stage charging equipment side test result or same charging equipment different time test result.
Described test macro server is also connected with charging monitoring system, for obtaining the historical operational information of target charging equipment from charging monitoring system and comprehensively drawing the more accurately comprehensive evaluation result to charging equipment with test result.
The invention has the beneficial effects as follows: new-energy automobile charging equipment test macro provided by the present invention comprises test macro server and industrial computer/front server, test macro server is built-in with conventional test event template, this test macro server be used for by choose combined test project system determine test assignment plan and according to Test data generation test report, in industrial computer/front server/performance element be used for charging equipment issue control command and perform test macro server formulate test assignment planning, collecting unit in industrial computer/front server is used for collecting test process data and test result and is uploaded to test macro server.The present invention can formulate test assignment planning and test new-energy automobile charging equipment by the test assignment planning of formulating, improve intelligent level and the test result application level of the test of new-energy automobile charging equipment, expand the range of application of test macro.
Accompanying drawing explanation
Fig. 1 is new-energy automobile charging equipment test system structure figure of the present invention;
Fig. 2 is the workflow diagram of new-energy automobile charging equipment test macro of the present invention;
Fig. 3 is comparative evaluation's workflow diagram of new-energy automobile charging equipment test macro of the present invention;
Fig. 4 is senior application function schematic diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is further described.
As shown in Figure 1, new-energy automobile charging equipment test macro of the present invention comprises test macro server, industrial computer/front server and the soft logic module be arranged in charging equipment, communicated to connect by industrial computer/front server between test macro server and charging equipment, control/performance element and data acquisition unit is provided with in industrial computer/front server, test macro server is built-in with conventional test event template, test macro server is used for determining test assignment planning by choosing combined test project system, control/performance element is used for issuing control command to charging equipment and performing the test assignment planning of test macro server formulation, data acquisition unit is used for collecting test process data and test result and is uploaded to test macro server.
Industrial computer/front server plays a part to deposit and removes, issue to charging equipment the test assignment that control command performs the generation of test macro server configuration center by control/performance element, in test process, obtain test process data and test result by data acquisition unit with the communication of charging equipment, and upload to test macro server.Soft logic mould in charging equipment, function is completely independent, as the soft interface between test macro and charging equipment, ensure that charging equipment and test macro can co-ordinations.Soft logic module also bears the Intelligent treatment work that a part is applicable to carry out this locality, and provides support for test parameter adjusts in real time.Test macro server completes test assignment Plan, test data storage, test result analysis, comparative evaluation's analysis and other senior application function etc.
These test macro On-board test process details comprise: record every certain time interval in test process and test relevant amount as voltage, electric current, capacity, temperature, internal resistance etc. with this; Logging test results when each test event has been tested, the realization being stored as comparative evaluation's function and senior application function of test process details provides the foundation data.
Above-mentioned test macro provides the instrument facilitating easy-to-use definition test report form, user in use can revise the form of test report at any time as required, the test report user that guarantee system exports need not carry out any amendment and just directly use, and test report can export to the document of the forms such as EXCEL, PDF simultaneously.
In addition this provides the comparative evaluation's report based on the test result of multiple stage charging equipment or same charging equipment different time repeatedly test result, user can choose charging equipment and carry out comparative evaluation according to different conditions, such as: contrast the charging equipment of different manufacturer, contrast the charging equipment of Different working years, contrast the test result etc. of same charging equipment different times.
System obtains the historical operational information of target charging equipment from charging monitoring system and comprehensively draws the more accurately comprehensive evaluation result to charging equipment with test result.For when not possessing substation supervision system or do not need this function, evaluation result can be set in systems in which and not consider historical operational information.
The testing process of test macro as shown in Figure 2, detailed process is as follows: test macro server by choose be built-in with conventional test event form assembly test event formulate test assignment planning, or transfer the test assignment planning of preservation, control/performance element is issued to after test assignment plane-generating, control/performance element automatically performs execution test assignment according to test assignment planning, namely plans the test event performed item by item wherein according to test assignment.Such as, choose charging set efficiency and power factor test event, harmonic current content measuring project, and output current and voltage error test event.After having chosen test event, system obtains the setting voltage, the setting electric current that charge normal from charging monitoring.Test assignment issues charge parameter according to this setting voltage, setting electric current in the works, needs selected charging process and each duration of charging, interval time according to test event.The data needing sampling are determined: charge power supply voltage, charge power supply electric current, charging set output voltage, charging set output current, cell voltage, battery current, harmonic current content, charge power supply active power, reactive power, charging set mains side ammeter electricity, charging set outgoing side ammeter electricity etc. according to test event.
In test process, system suitably can adjust test parameter automatically according to charging equipment state, to ensure to obtain complete available test result.Test process provides perfect abnormal information prompting when there is abnormal interruption, so that user processes abnormal.Allow user to make full use of simultaneously and interrupt front completed test job, this comprises: allow user after eliminating produces abnormal fault, allows system plan the test job continuing automatically to complete remainder according to test assignment; Allow user to stop this test, this test of system storage has completed the test result of part and has allowed user to use this test result.
System is in the process performing test, the information of Real-time Collection charging equipment, then judge according to these information, real-time in the case of necessary test parameter to be adjusted, ensure once to test both to have obtained complete test result, avoid needing artificially to adjust the situation that parameter repeats test.This is also one of imbody of system intelligent.
As shown in Figure 3, user can select multiple stage charging equipment to carry out comparative evaluation, the repeatedly test result of same charging equipment different time also can be selected to carry out comparative evaluation, can also choose comparative evaluation's object according to the condition such as manufacturer, length of service.User can to select when carrying out comparative evaluation the historical operational information of whether reference charge equipment, and usual comprehensive reference historical operational information can draw more accurately comprehensively evaluation result.
As shown in Figure 4, system is to the process of the data such as test result, test process details, charging equipment historical operational information, there is provided energy utilization efficiency analysis, charging equipment performance evaluation, the senior application functions such as charging equipment maintenance suggestion, battery performance analysis, battery maintenance suggestion, battery life predicting.These senior application functions can improve test result application level, the usable range of extend testing system.
In sum, the present invention can carry out quick, comprehensive, intelligentized test to charging equipment, ensure that system can meet the various demands of user flexibly by customization function, robotization and intelligent level that soft logic module improves test is embedded in charging equipment, exception handling procedure improves the reliability that system performs test process, based on test result and test data, the charging equipment evaluation information of history run information improves test result application level, extends the usable range of test macro.

Claims (8)

1. a new-energy automobile charging equipment test macro, it is characterized in that, this test macro comprises test macro server and industrial computer/front server, described test macro server and industrial computer/front server communicate to connect, control/performance element and data acquisition unit is provided with in described industrial computer/front server, described test macro server is built-in with conventional test event template, this test macro server be used for by choose combined test project system determine test assignment plan and according to Test data generation test report, described control/performance element is used for issuing control command to charging equipment and performing the test assignment planning of test macro server formulation, described data acquisition unit is used for collecting test process data and test result and is uploaded to test macro server.
2. new-energy automobile charging equipment test macro according to claim 1, is characterized in that, described test macro can adjust test parameter automatically according to charging equipment state, to ensure to obtain complete available test result.
3. new-energy automobile charging equipment test macro according to claim 2, is characterized in that, described test macro provides perfect abnormal information to point out when abnormal interruption appears in test process and allows user to make full use of and interrupts front completed test job.
4. new-energy automobile charging equipment test macro according to claim 3, it is characterized in that, described test macro comprises well the soft logic module be arranged in charging equipment, and this soft logic module is used for, as soft interface existence, ensureing that charging equipment and test macro can co-ordinations.
5. new-energy automobile charging equipment test macro according to claim 4, it is characterized in that, described data acquisition unit acquires to test process data comprise and test relevant voltage, electric current, capacity, temperature and internal resistance every certain time interval record in test process with this.
6. new-energy automobile charging equipment test macro according to claim 4, it is characterized in that, the instrument of self-defined test report form is provided with in described test macro server, user in use can revise the form of test report as required, to ensure that the test report user that test macro exports need not carry out any amendment just directly use.
7. new-energy automobile charging equipment test macro according to claim 6, is characterized in that, described test macro also provides the comparative evaluation's report based on multiple stage charging equipment side test result or same charging equipment different time test result.
8. new-energy automobile charging equipment test macro according to claim 7, it is characterized in that, described test macro server is also connected with charging monitoring system, for obtaining the historical operational information of target charging equipment from charging monitoring system and comprehensively drawing the more accurately comprehensive evaluation result to charging equipment with test result.
CN201410507432.1A 2014-09-28 2014-09-28 A kind of new-energy automobile charging equipment test system Expired - Fee Related CN104237697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410507432.1A CN104237697B (en) 2014-09-28 2014-09-28 A kind of new-energy automobile charging equipment test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410507432.1A CN104237697B (en) 2014-09-28 2014-09-28 A kind of new-energy automobile charging equipment test system

Publications (2)

Publication Number Publication Date
CN104237697A true CN104237697A (en) 2014-12-24
CN104237697B CN104237697B (en) 2018-01-23

Family

ID=52226170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410507432.1A Expired - Fee Related CN104237697B (en) 2014-09-28 2014-09-28 A kind of new-energy automobile charging equipment test system

Country Status (1)

Country Link
CN (1) CN104237697B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113219280A (en) * 2021-04-21 2021-08-06 成都艾默泰克科技有限公司 New energy automobile charging interoperation consistency test system and test method
CN113406514A (en) * 2021-06-15 2021-09-17 深圳市新威尔电子有限公司 Battery test equipment identification system and method
CN114973515A (en) * 2022-01-25 2022-08-30 浙江浩瀚能源科技有限公司 Plug-and-play charging function testing method and device for charging pile and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08101713A (en) * 1994-09-30 1996-04-16 Tokai Rubber Ind Ltd Method and unit for operation control over unmanned traveling vehicle
CN201699445U (en) * 2010-05-26 2011-01-05 山东鲁能智能技术有限公司 Charger monitoring device for electric vehicle charging station
CN202066918U (en) * 2010-12-09 2011-12-07 北京市电力公司 Charger characteristic testing device
JP2012143016A (en) * 2010-12-28 2012-07-26 Toyota Industries Corp Vehicle charger, vehicle charging method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08101713A (en) * 1994-09-30 1996-04-16 Tokai Rubber Ind Ltd Method and unit for operation control over unmanned traveling vehicle
CN201699445U (en) * 2010-05-26 2011-01-05 山东鲁能智能技术有限公司 Charger monitoring device for electric vehicle charging station
CN202066918U (en) * 2010-12-09 2011-12-07 北京市电力公司 Charger characteristic testing device
JP2012143016A (en) * 2010-12-28 2012-07-26 Toyota Industries Corp Vehicle charger, vehicle charging method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵洪蕊: "电动汽车充电站监控管理系统的设计与研究", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113219280A (en) * 2021-04-21 2021-08-06 成都艾默泰克科技有限公司 New energy automobile charging interoperation consistency test system and test method
CN113406514A (en) * 2021-06-15 2021-09-17 深圳市新威尔电子有限公司 Battery test equipment identification system and method
CN114973515A (en) * 2022-01-25 2022-08-30 浙江浩瀚能源科技有限公司 Plug-and-play charging function testing method and device for charging pile and storage medium

Also Published As

Publication number Publication date
CN104237697B (en) 2018-01-23

Similar Documents

Publication Publication Date Title
Sutikno et al. Internet of things-based photovoltaics parameter monitoring system using NodeMCU ESP8266
CN109444566A (en) A kind of electric car electrically-charging equipment detection device and method
KR101539395B1 (en) Demand Management Performance Test Simulator of Energy Management System for Energy Storage System and Test Method thereof
CN104181430A (en) Off-board charger detection device and method
CN104714175A (en) Battery system fault diagnosis method and system
CN206311674U (en) A kind of electric energy metrical and analysis and early warning device
CN103187735A (en) Bidirectional intelligent gateway device for distributed new energy grid connection
CN104297577A (en) Super capacitor-based aging state estimation detection system and method
CN103592531B (en) A kind of parameter detection method of wind energy turbine set static reacance generator and system
CN106779095A (en) The method that the soft pressing plate of intelligent substation equipment based on KMP algorithms is checked
CN109884537A (en) A kind of Intelligent power distribution terminal backup battery state evaluating method and system
CN104237697A (en) Testing system for new energy automobile charging equipment
Zhang et al. Cycle-life-aware optimal sizing of grid-side battery energy storage
CN106771707A (en) A kind of line loss analyzing service terminal
CN105335824B (en) Distribution network failure repairing command methods and system based on data center
Vartanian et al. Application of advanced battery energy storage systems for wind integration
Das et al. Electric Energy Meter System Integrated with Machine Learning and Conducted by Artificial Intelligence of Things–AioT
CN207456493U (en) A kind of intelligence vibratory string harvester
CN102818951B (en) Method, system and device for measuring performance index of wind power unit converter on line
CN112630556B (en) Equipment monitoring method, system, device, equipment and storage medium
CN103592532B (en) A kind of parameter detection method of wind energy turbine set Static Var Compensator and system
CN103578043A (en) Device, method and system for processing power grid data
CN103064883A (en) Method for generating data automatically for railway signal maintaining system
CN211086436U (en) Non-invasive load decomposition and power quality analysis system
Bae et al. The CAN communication application on the BMS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Lian Zhanwei

Inventor after: Fu Chaoxue

Inventor after: Gao Yuming

Inventor after: Zhang Huadong

Inventor after: Ren Jie

Inventor after: Even Zhan Wei, Chen Zhigang, Xu Yishan, Deng Jianshen, Li Hongfeng, Li Zhichao, Xu Peng, Hao Zhanduo, Chen Chao Fu, Chen Wei, Gao Yuming, Zhang Huadong, Ren Jie, Li Jianxiang

Inventor after: Chen Zhigang

Inventor after: Xu Yishan

Inventor after: Deng Jianshen

Inventor after: Li Hongfeng

Inventor after: Hao Zhanduo

Inventor after: Li Zhichao

Inventor after: Xu Peng

Inventor after: Chen Chao

Inventor before: Lian Zhanwei

Inventor before: Even Wei Wei, Chen Zhigang, Xu Yishan, Deng Jianshen, Hao Zhanduo, Li Zhichao, Xu Peng, Chen Chao, Li Hongfeng, Fu Zhaoxue

Inventor before: Chen Zhigang

Inventor before: Xu Yishan

Inventor before: Deng Jianshen

Inventor before: Li Hongfeng

Inventor before: Hao Zhanduo

Inventor before: Li Zhichao

Inventor before: Xu Peng

Inventor before: Chen Chao

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20150930

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Xuji Group Co., Ltd.

Applicant after: Xuji Electric Co., Ltd.

Applicant after: Xuchang Xuji Software Technology Co., Ltd.

Applicant after: Electric Power Research Institute of State Grid Shandong Electric Power Company

Applicant after: Xuji Electric Power Co., Ltd.

Address before: No. 1298 Xuchang City, Henan province 461000 XJ Avenue

Applicant before: Xuji Electric Co., Ltd.

Applicant before: Xuchang Xuji Software Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123

Termination date: 20200928