CN104237697B - A kind of new-energy automobile charging equipment test system - Google Patents

A kind of new-energy automobile charging equipment test system Download PDF

Info

Publication number
CN104237697B
CN104237697B CN201410507432.1A CN201410507432A CN104237697B CN 104237697 B CN104237697 B CN 104237697B CN 201410507432 A CN201410507432 A CN 201410507432A CN 104237697 B CN104237697 B CN 104237697B
Authority
CN
China
Prior art keywords
test
charging equipment
test system
new
energy automobile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410507432.1A
Other languages
Chinese (zh)
Other versions
CN104237697A (en
Inventor
连湛伟
陈志刚
徐怡山
邓建慎
李洪峰
郝战铎
李志超
徐鹏
陈超
付朝学
高玉明
张华栋
任杰
李建祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuji Group Co Ltd
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Xuji Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuji Group Co Ltd
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Xuji Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuji Group Co Ltd, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd, XJ Electric Co Ltd, Xuchang XJ Software Technology Co Ltd, Xuji Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410507432.1A priority Critical patent/CN104237697B/en
Publication of CN104237697A publication Critical patent/CN104237697A/en
Application granted granted Critical
Publication of CN104237697B publication Critical patent/CN104237697B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Secondary Cells (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The present invention relates to a kind of new-energy automobile charging equipment test system, belongs to new-energy automobile charging equipment technical field.New-energy automobile charging equipment test system provided by the present invention includes test system server and industrial computer/front server, test system server is built-in with conventional test event template, the test system server is used to determine test assignment planning and according to Test data generation test report by choosing combined test project system, in industrial computer/front server/execution unit is used to issuing control command to charging equipment and performs the test assignment of test system server formulation and plan.The present invention can formulate test assignment planning and new-energy automobile charging equipment is tested by the test assignment planning of formulation, the intelligent level and test result application level of new-energy automobile charging equipment test are improved, expands the application of test system.

Description

A kind of new-energy automobile charging equipment test system
Technical field
The present invention relates to a kind of new-energy automobile charging equipment test system, belongs to new-energy automobile charging equipment technology neck Domain.
Background technology
At present, with the development of domestic new-energy automobile industry, the construction of the charging station of new-energy automobile is served Accelerating to promote.But the test currently for new-energy automobile charging equipment is also rested in the test of individual event project mostly, Lack and quick, comprehensive, intelligent test system is carried out to charging equipment, efficiency and effect are all bad, and charging station is built If form obvious restriction.
Meanwhile existing equipment also lacks to test result progress deep exploitation and the function of being evaluated charging equipment, The application purpose and use range for making test equipment are subject to certain restrictions.
The content of the invention
It is an object of the invention to provide a kind of new-energy automobile charging equipment test system, to solve current test equipment The problem of application purpose and the scope of application are by a definite limitation.
The present invention provides a kind of new-energy automobile charging equipment test system to solve above-mentioned technical problem, the test system System includes test system server and industrial computer/front server, the test system server and industrial computer/front server Communicate to connect, control/execution unit and data acquisition unit, the test system are provided with the industrial computer/front server System server is built-in with conventional test event template, and the test system server is used for by choosing combined test project system location survey Try mission planning and according to Test data generation test report, the control/execution unit is used to issue control to charging equipment Order and perform the test assignment planning of test system server formulation, the data acquisition unit crosses number of passes for collecting test According to test result and be uploaded to test system server.
The test system can be adjusted to test parameter automatically according to charging equipment state, to ensure to obtain completely may be used Test result.
The test system provides perfect abnormal information when abnormal interrupt occurs in test process and prompts and allow user Make full use of completed test job before interrupting.
The good soft logic module for including being arranged in charging equipment of the test system, the soft logic module are used for as soft Interface is present, and ensures that charging equipment being capable of co-ordination with test system.
The test process data that the data acquisition unit collects are included in test process every certain time interval The voltage relevant with this test, electric current, capacity, temperature and the internal resistance of record.
The instrument of self-defined test report form is provided with the test system server, user in use may be used The form of test report is changed as required, to ensure that the test report user of test system output does not have to carry out any modification just Directly use.
The test system is also provided based on more charging equipment side test results or same charging equipment different time Comparative evaluation's report of test result.
The test system server is also connected with charging monitoring system, for obtaining target charging from charging monitoring system The historical operational information of equipment is simultaneously drawn more accurately comprehensively to the evaluation result of charging equipment with test result synthesis.
The beneficial effects of the invention are as follows:New-energy automobile charging equipment test system provided by the present invention includes test System server and industrial computer/front server, test system server are built-in with conventional test event template, test system clothes Business device is used to determine test assignment planning and according to Test data generation test report, industry control by choosing combined test project system In machine/front server/execution unit be used for issue control command to charging equipment and perform test system server formulation Test assignment planning, the collecting unit in industrial computer/front server is used for collecting test process data and test result simultaneously It is uploaded to test system server.The present invention can formulate test assignment planning and be planned by the test assignment of formulation to new Energy automobile charging equipment is tested, and the intelligent level and test result for improving the test of new-energy automobile charging equipment should With level, the application of test system is expanded.
Brief description of the drawings
Fig. 1 is new-energy automobile charging equipment test system structure figure of the present invention;
Fig. 2 is the workflow diagram of new-energy automobile charging equipment test system of the present invention;
Fig. 3 is comparative evaluation's workflow diagram of new-energy automobile charging equipment test system of the present invention;
Fig. 4 is advanced application function schematic diagram of the present invention.
Embodiment
The embodiment of the present invention is further described below in conjunction with the accompanying drawings.
As shown in figure 1, the new-energy automobile charging equipment test system of the present invention includes test system server, industry control Machine/front server and the soft logic module being arranged in charging equipment, lead between test system server and charging equipment Industrial computer/front server communication connection is crossed, control/execution unit and data acquisition are provided with industrial computer/front server Unit, test system server are built-in with conventional test event template, and test system server is used for by choosing combined test Project system determines test assignment planning, and control/execution unit is used to issue control command to charging equipment and performs test system clothes The test assignment that device is formulated of being engaged in plans that data acquisition unit is used for collecting test process data and test result and is uploaded to Test system server.
Industrial computer/front server, which plays a part of depositing, to be removed, and control is issued to charging equipment by control/execution unit System is ordered to perform the test assignment of test system server configuration center generation, passes through data acquisition unit in test process Test process data and test result are obtained with the communication with charging equipment, and uploads to test system server.Charging is set Soft logic mould in standby, function are completely independent, and as the soft interface between test system and charging equipment, ensure that charging equipment Being capable of co-ordination with test system.Soft logic module also undertakes the Intelligent treatment work that a part is applied to locally carry out, and Offer support is provided in real time for test parameter.Test system server is completed test assignment Plan, test data storage, surveyed Test result analysis, comparative evaluation's analysis and other advanced application functions etc..
Test system storage test process details include:Recorded in test process every certain time interval The amount relevant with this test such as voltage, electric current, capacity, temperature, internal resistance etc.;Record test when each test event test is completed As a result, the realization for being stored as comparative evaluation's function and advanced application function of test process details provides the foundation data.
Above-mentioned test system provides the instrument for facilitating easy-to-use definition test report form, and user can use process In at any time as required change test report form, ensure system output test report user do not have to carry out it is any modification just Directly use, while test report can export to the document of the forms such as EXCEL, PDF.
In addition this provides test result based on more charging equipments or same charging equipment different time is multiple Comparative evaluation's report of test result, user can choose charging equipment according to different conditions and carry out comparative evaluation, such as:It is right Charging equipment, the same charging equipment different times of contrast of charging equipment, contrast Different working years than different manufacturers Test result etc..
System obtains the historical operational information of target charging equipment from charging monitoring system and drawn with test result synthesis It is more accurate comprehensively to the evaluation result of charging equipment.For do not possess substation supervision system or do not need the function when Wait, evaluation result can be set in systems and not consider historical operational information.
The testing process of test system is as shown in Fig. 2 detailed process is as follows:Test system server is built-in with by choosing Conventional test event form assembly test event is planned to formulate test assignment, or transfers the test assignment planning of preservation, surveys Control/execution unit is issued to after trial business plane-generating, control/execution unit performs execution automatically according to test assignment planning Test assignment, i.e., test event therein is performed item by item according to test assignment planning.Such as choose charging engine efficiency and power because Number test event, harmonic current content measuring project, and output current and voltage error test event.Test event is chosen Afterwards, system obtains the setting voltage charged normal, setting electric current from charging monitoring.Test assignment is in the works according to setting electricity Pressure, setting electric current issue charge parameter, according to test event when needing selected charging process and each charging interval, interval Between.Determined to need the data sampled according to test event:Charge power supply voltage, charge power supply electric current, charger output voltage, fill Motor output current, cell voltage, battery current, harmonic current content, charge power supply active power, reactive power, charger Mains side ammeter electricity, charger outlet side ammeter electricity etc..
System can suitably be adjusted to test parameter automatically according to charging equipment state in test process, to ensure to obtain Complete available test result.Test process occurs providing perfect abnormal information prompting during abnormal interrupt, in order to user couple Exception is handled.User is allowed to make full use of completed test job before interruption simultaneously, this includes:User is allowed to exclude After producing abnormal failure, system is allowed to continue to be automatically performed remaining test job according to test assignment planning;Allow user whole Only this is tested, and system stores this test and completed the test result of part and allowed user to use the test result.
System gathers the information of charging equipment, then sentenced according to these information in real time during test is performed It is disconnected, test parameter is adjusted in real time in the case of necessary, guarantee, which is once tested, had both obtained complete test result, avoided Artificial adjusting parameter is needed to repeat the situation of test.This is also one of concrete embodiment of system intelligent.
As shown in figure 3, user can select more charging equipments to carry out comparative evaluation, same charging can also be selected to set The multiple test result of standby different time carries out comparative evaluation, can also be according to the selection pair of the conditions such as manufacturer, length of service Compare evaluation object.User can select when carrying out comparative evaluation whether the historical operational information of reference charge equipment, it is generally comprehensive More accurate comprehensive evaluation result can be drawn with reference to historical operational information by closing.
As shown in figure 4, system is to data such as test result, test process details, charging equipment historical operational informations Processing, there is provided energy utilization efficiency analysis, charging equipment performance evaluation, charging equipment maintenance suggestion, battery performance analysis, electricity The advanced application function such as pond maintenance suggestion, battery life predicting.These advanced application functions can improve test result application water It is flat, extend the use range of test system.
In summary, the present invention can carry out quick, comprehensive, intelligentized test to charging equipment, be customized by user Function ensure that the various demands of user can be flexibly met in system, and embedded soft logic module improves test in charging equipment Automation and intelligent level, exception handling procedure improve system perform test process reliability, based on test result And test data, the charging equipment evaluation information of history run information improve test result application level, test system is extended The use range of system.

Claims (8)

1. a kind of new-energy automobile charging equipment test system, it is characterised in that the test system includes test system server With industrial computer/front server, the test system server communicates to connect with industrial computer/front server, and the industrial computer/ Control/execution unit and data acquisition unit are provided with front server, the test system server is built-in with conventional survey Project templet is tried, the test system server is used to determine test assignment planning and according to test by choosing combined test project system Data generate test report, and the control/execution unit is used to issue control command to charging equipment and performs test system clothes The test assignment that device is formulated of being engaged in plans that the data acquisition unit is used for collecting test process data and test result and will thereon Reach test system server;The setting voltage charged normal is obtained according to system from charging monitoring, set in test assignment planning After determining electric current, charge parameter is issued, needs selected charging process and each charging interval, interval time according to test event, And determined to need the data sampled according to test event;Test event is charging engine efficiency and power factor test event, harmonic wave Electric current content measuring project, and output current and voltage error test event.
2. new-energy automobile charging equipment test system according to claim 1, it is characterised in that the test system meeting Test parameter is adjusted automatically according to charging equipment state, to ensure to obtain complete available test result.
3. new-energy automobile charging equipment test system according to claim 2, it is characterised in that the test system exists Test process occurs providing that perfect abnormal information is prompted and to allow user to make full use of completed before interruption during abnormal interrupt Test job.
4. new-energy automobile charging equipment test system according to claim 3, it is characterised in that the test system is also Including the soft logic module being arranged in charging equipment, the soft logic module is used to exist as soft interface, ensures charging equipment Being capable of co-ordination with test system.
5. new-energy automobile charging equipment test system according to claim 4, it is characterised in that the data acquisition list The test process data that member collects are included in test process every the relevant with this test of certain time interval record Voltage, electric current, capacity, temperature and internal resistance.
6. new-energy automobile charging equipment test system according to claim 4, it is characterised in that the test system clothes The instrument of self-defined test report form is provided with business device, user can change test report as required in use Form, to ensure that the test report user of test system output does not have to carry out any modification with regard to directly using.
7. new-energy automobile charging equipment test system according to claim 6, it is characterised in that the test system is also Comparative evaluation's report based on more charging equipment side test results or same charging equipment different time test result is provided.
8. new-energy automobile charging equipment test system according to claim 7, it is characterised in that the test system clothes Business device also be connected with charging monitoring system, for from charging monitoring system acquirement target charging equipment historical operational information and with Test result synthesis draws more accurate comprehensively to the evaluation result of charging equipment.
CN201410507432.1A 2014-09-28 2014-09-28 A kind of new-energy automobile charging equipment test system Expired - Fee Related CN104237697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410507432.1A CN104237697B (en) 2014-09-28 2014-09-28 A kind of new-energy automobile charging equipment test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410507432.1A CN104237697B (en) 2014-09-28 2014-09-28 A kind of new-energy automobile charging equipment test system

Publications (2)

Publication Number Publication Date
CN104237697A CN104237697A (en) 2014-12-24
CN104237697B true CN104237697B (en) 2018-01-23

Family

ID=52226170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410507432.1A Expired - Fee Related CN104237697B (en) 2014-09-28 2014-09-28 A kind of new-energy automobile charging equipment test system

Country Status (1)

Country Link
CN (1) CN104237697B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113219280B (en) * 2021-04-21 2024-10-15 成都艾默泰克科技有限公司 New energy automobile charging interoperation consistency test system and test method
CN113406514A (en) * 2021-06-15 2021-09-17 深圳市新威尔电子有限公司 Battery test equipment identification system and method
CN114973515A (en) * 2022-01-25 2022-08-30 浙江浩瀚能源科技有限公司 Plug-and-play charging function testing method and device for charging pile and storage medium

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08101713A (en) * 1994-09-30 1996-04-16 Tokai Rubber Ind Ltd Method and unit for operation control over unmanned traveling vehicle
CN201699445U (en) * 2010-05-26 2011-01-05 山东鲁能智能技术有限公司 Charger monitoring device for electric vehicle charging station
CN202066918U (en) * 2010-12-09 2011-12-07 北京市电力公司 Charger characteristic testing device
JP5896599B2 (en) * 2010-12-28 2016-03-30 株式会社豊田自動織機 Vehicle charging device and vehicle charging method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
电动汽车充电站监控管理系统的设计与研究;赵洪蕊;《中国优秀硕士学位论文全文数据库 信息科技辑》;20120415(第04期);正文第1、15-19、37-44、56页 *

Also Published As

Publication number Publication date
CN104237697A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104181430B (en) Off-board charger detection device and method
Maitra et al. Microgrid controllers: expanding their role and evaluating their performance
CN107749629A (en) Charging pile access control method based on charging station load real-time scheduling
CN104198860A (en) Electric automobile charging and discharging facility testing method and system
CN103576025B (en) A kind of detection test system for energy storage power station grid connection
CN101937490B (en) Planning electric network loss analyzing and computing method
Wei et al. Battery management and application for energy-efficient buildings
CN104237697B (en) A kind of new-energy automobile charging equipment test system
CN108802539A (en) A kind of energy storage power station grid connection test verification system and its verification method
CN103201924B (en) Device systems control device
CN102608543A (en) Flow battery testing platform
CN106779095A (en) The method that the soft pressing plate of intelligent substation equipment based on KMP algorithms is checked
CN116317169B (en) Remote intelligent comparison platform and method for wind power prediction system
CN103592531B (en) A kind of parameter detection method of wind energy turbine set static reacance generator and system
CN105574291B (en) A kind of electric power loop method of automatic configuration and system
CN104569691B (en) The parameter detection method and system of polymorphic type energy-storage system
CN106097137A (en) A kind of anti-electricity-theft monitoring system of differentiation based on power information acquisition system
CN103869197A (en) Electric vehicle charging-discharging device double-energy-feeding testing system
CN109270317A (en) A kind of multifunction power measuring instrumentss
CN110308358A (en) A kind of distribution power automation terminal test method and device
CN112285397A (en) Electric energy meter and position information management method, system and storage medium of acquisition terminal
CN106771707A (en) A kind of line loss analyzing service terminal
Vartanian et al. Application of advanced battery energy storage systems for wind integration
CN102818951B (en) Method, system and device for measuring performance index of wind power unit converter on line
CN103064883A (en) Method for generating data automatically for railway signal maintaining system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Lian Zhanwei

Inventor after: Fu Chaoxue

Inventor after: Gao Yuming

Inventor after: Zhang Huadong

Inventor after: Ren Jie

Inventor after: Even Zhan Wei, Chen Zhigang, Xu Yishan, Deng Jianshen, Li Hongfeng, Li Zhichao, Xu Peng, Hao Zhanduo, Chen Chao Fu, Chen Wei, Gao Yuming, Zhang Huadong, Ren Jie, Li Jianxiang

Inventor after: Chen Zhigang

Inventor after: Xu Yishan

Inventor after: Deng Jianshen

Inventor after: Li Hongfeng

Inventor after: Hao Zhanduo

Inventor after: Li Zhichao

Inventor after: Xu Peng

Inventor after: Chen Chao

Inventor before: Lian Zhanwei

Inventor before: Even Wei Wei, Chen Zhigang, Xu Yishan, Deng Jianshen, Hao Zhanduo, Li Zhichao, Xu Peng, Chen Chao, Li Hongfeng, Fu Zhaoxue

Inventor before: Chen Zhigang

Inventor before: Xu Yishan

Inventor before: Deng Jianshen

Inventor before: Li Hongfeng

Inventor before: Hao Zhanduo

Inventor before: Li Zhichao

Inventor before: Xu Peng

Inventor before: Chen Chao

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20150930

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Xuji Group Co., Ltd.

Applicant after: Xuji Electric Co., Ltd.

Applicant after: Xuchang Xuji Software Technology Co., Ltd.

Applicant after: Electric Power Research Institute of State Grid Shandong Electric Power Company

Applicant after: Xuji Electric Power Co., Ltd.

Address before: No. 1298 Xuchang City, Henan province 461000 XJ Avenue

Applicant before: Xuji Electric Co., Ltd.

Applicant before: Xuchang Xuji Software Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123

Termination date: 20200928

CF01 Termination of patent right due to non-payment of annual fee