CN108442945A - A kind of self-propelled tunnel lining trolley - Google Patents

A kind of self-propelled tunnel lining trolley Download PDF

Info

Publication number
CN108442945A
CN108442945A CN201810347836.7A CN201810347836A CN108442945A CN 108442945 A CN108442945 A CN 108442945A CN 201810347836 A CN201810347836 A CN 201810347836A CN 108442945 A CN108442945 A CN 108442945A
Authority
CN
China
Prior art keywords
trolley
self
tunnel lining
holder
propelled tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810347836.7A
Other languages
Chinese (zh)
Inventor
陈昂
张慧玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201810347836.7A priority Critical patent/CN108442945A/en
Publication of CN108442945A publication Critical patent/CN108442945A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of self-propelled tunnel lining trolley, to realize the automatic moving of trolley and be accurately positioned, the construction efficiency for improving Tunnel Second Lining structure includes being equipped with the trolley holder of traveling wheel below, circumferentially spaced-apart be arranged is used to support the hydraulic stem of punching block on the trolley holder, on steel form interval setting pour mouth for pour secondary liner structure concrete.The front of the trolley holder is fixedly installed installation component, and circumferentially spaced fixed setting jacking jack on the installation component, each jacking jack acts axially on the front end face for completing secondary liner structure of having constructed, and makes the forward movement of trolley holder.

Description

A kind of self-propelled tunnel lining trolley
Technical field
The present invention relates to Tunnel Engineering field, more particularly to a kind of self-propelled tunnel lining trolley.
Background technology
With the development of the traffic infrastructures such as national highway, railway, traffic tunnel is long with its across Shan Yue ridge shortening circuit Degree improves the advantages such as driving condition, is rapidly developed in recent years.
Currently, the design and construction of mountain tunnel substantially use New Austrian Tunneling Method principle, first gunite concrete shape after tunnel excavation At first lining, secondary lining concrete is poured again after tunnel deformation stabilization.Traditional formwork erection secondary lining concreting Yin Qilao Fatigue resistance is big, speed of application is slow, quality is not easy to control, is gradually replaced by lining trolley.
Lining trolley is mostly made of components such as steel form and respective supports, and length has 6m, 9m, 12m etc..According to tunnel excavation Continuous productive process, after lining trolley has poured one section of secondary lining concrete, need form removal toward excavation face be moved to next section it is secondary Lining construction section.According to the practical investigation situation of tunnel construction site, the movement of trolley at present is wanted also in semi-mechanization state Corresponding driving motor or usage mining machine, bull-dozer etc. are installed in trolley lower part to be pulled, trolley moves operation cost When it is laborious, and movement also need to be adjusted trolley position in place afterwards, delay Tunnel Second Lining coagulation to a certain extent Soil pours operation.
Invention content
Technical problem to be solved by the invention is to provide a kind of self-propelled tunnel lining trolleys, to realize trolley voluntarily It moves and is accurately positioned, improve the construction efficiency of Tunnel Second Lining structure
The technical solution adopted by the present invention to solve the technical problems is as follows:
A kind of self-propelled tunnel lining trolley of the present invention, including the trolley holder of traveling wheel is installed below, this Circumferentially spaced-apart on kickstand that the hydraulic stem for being used to support punching block is arranged, interval is arranged for pouring secondary liner structure on steel form Concrete pours mouth, it is characterized in that:The front of the trolley holder is fixedly installed installation component, on the installation component circumferentially Interval fixed setting jacking jack, each jacking jack, which acts axially on to have constructed, completes the front end face of secondary liner structure On, so that trolley holder is moved forward.
The stroke of each each jacking jack is individually controlled by controller.
The invention has the advantages that installing hydraulic pressure jacking system in the front of trolley, is acted against and poured by jack It builds on secondary liner structure, realize the automatic moving of trolley and is accurately positioned, improve the construction efficiency that the secondary lining in tunnel cuts structure; The stroke of each jacking jack is individually controlled the voluntarily turning, it can be achieved that trolley by controller, and is fitted the song in tunnel well Line profile.
Description of the drawings
This specification includes following three width attached drawing:
Fig. 1 is a kind of cross-sectional view of self-propelled tunnel lining trolley of the present invention;
Fig. 2 is a kind of skiagraph of self-propelled tunnel lining trolley of the present invention;
Fig. 3 is a kind of working state schematic representation of self-propelled tunnel lining trolley of the present invention.
Component and corresponding label are shown in figure:Trolley holder 1, hydraulic stem 3, pours mouth 4, articulated joint 5, support boots at punching block 2 6, traveling wheel 7, circumferential ribbed stiffener 8, jacking jack 9, power transmission backing plate 10, initial stage liner structure 11, secondary liner structure 12.
Specific implementation mode
Present invention will be further explained below with reference to the attached drawings and examples.
Referring to Figures 1 and 2, a kind of self-propelled tunnel lining trolley of the invention, including its lower end are equipped with traveling wheel 7 Trolley holder 1, it is circumferentially spaced-apart on the trolley holder 1 that the hydraulic stem 3 for being used to support steel form 2 is set, on punching block 2 interval setting use Mouth 4 is poured in pour 12 concrete of secondary liner structure.Installation component, the peace is fixedly installed in the front of the trolley holder 1 Fill circumferentially spaced fixed setting jacking jack 9 on component.With reference to Fig. 3, each jacking jack 9, which acts axially on, has constructed On front end face at secondary liner structure 12, trolley holder 1 is made to move forward.
Referring to figs. 1 to Fig. 3, the power transmission backing plate being fixedly connected with 1 front of trolley holder usually can be used in the installation component 10, each jacking jack 9 is mounted on along its circumferential equidistant interval on power transmission backing plate 10.In tunnel straightway, each jacking thousand 9 strokes of jin top are consistent.And in tunnel curved section, by controlling the stroke of each jacking jack 9, it can be achieved that trolley voluntarily turns It is curved, to be fitted the curved profile in tunnel.
Referring to Fig.1, the punching block 2 is made of the modular unit of circumferential direction splicing, by hinged between adjacent two modular unit First 5 formation is hinged, to adapt to the requirement of different tunnel cross-sections.It is cut with scissors respectively with trolley holder 1, punching block 2 at the both ends of the hydraulic stem 3 It connects, the punching block positioning requirements of different tunnel cross-sections can be adapted to very well.To reinforce stability of the punching block 2 under concrete gravity, institute State the circumferential ribbed stiffener of the longitudinally spaced fixed setting in inside 8 of punching block 2.
With reference to 1 and Fig. 3, when constructing tunnel, first excavates hair hole and perform just lining 11, then the good trolley of assembly and adjustment is moved into In hole, hydraulic stem 3 stretches out, and punching block 2 is adjusted to design position, then by pouring 4 casting concrete of mouth and conserving.Two lining concrete After reaching design strength, hydraulic stem 3 is withdrawn, and so that the lining of punching block 2 and two is detached from, is completed striking job.After the completion of form removal, jacking is very heavy Top 9 is stretched out, and is acted against on two linings 12 of completion of having constructed, and is sent on trolley holder 1, is pushed by power is pushed up by power transmission backing plate 10 Trolley moves forward.Particularly, the hydraulic stroke of each jacking jack 9 can be controlled individually.In tunnel straightway, each jacking is very heavy It is consistent to push up 9 strokes, and in tunnel curved section, by control each jacking jack 9 stroke, it can be achieved that trolley voluntarily turning, To be fitted the curved profile in tunnel.
The above is a kind of some principles of self-propelled tunnel lining trolley of the present invention that explain through diagrams, and is not intended to The present invention is confined in shown and described concrete structure and the scope of application, therefore every corresponding modification for being possible to be utilized And equivalent, belong to the apllied the scope of the claims of the present invention.

Claims (6)

1. a kind of self-propelled tunnel lining trolley, including the trolley holder (1) of traveling wheel (7), the trolley branch are installed below Circumferentially spaced-apart on frame (1) that the hydraulic stem (3) for being used to support steel form (2) is arranged, interval setting is secondary for pouring on punching block (2) Liner structure (12) concrete pours mouth (4), it is characterized in that:Installation component is fixedly installed in the front of the trolley holder (1), Circumferentially spaced fixed setting jacking jack (9) on the installation component, each jacking jack (9), which acts axially on, have been constructed On front end face at secondary liner structure (12), trolley holder (1) is made to move forward.
2. a kind of self-propelled tunnel lining trolley as described in claim 1, it is characterized in that:The installation component be and trolley branch The power transmission backing plate (10) that frame (1) front is fixedly connected, each jacking jack (9) are mounted on power transmission along its circumferential equidistant interval On backing plate (10).
3. a kind of self-propelled tunnel lining trolley as described in claim 1, it is characterized in that:Each each jacking jack (9) Stroke individually controlled by controller.
4. a kind of self-propelled tunnel lining trolley as described in claim 1, it is characterized in that:The punching block (2) is spliced by circumferential direction Modular unit constitute, formed by articulated joint (5) between adjacent two modular unit hinged.
5. a kind of self-propelled tunnel lining trolley as described in claim 1, it is characterized in that:The both ends of the hydraulic stem (3) point It is not hinged with trolley holder (1), punching block (2).
6. a kind of self-propelled tunnel lining trolley as described in claim 1, it is characterized in that:The inside of the punching block (2) is longitudinal The circumferential ribbed stiffener (8) of interval fixed setting.
CN201810347836.7A 2018-04-18 2018-04-18 A kind of self-propelled tunnel lining trolley Pending CN108442945A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810347836.7A CN108442945A (en) 2018-04-18 2018-04-18 A kind of self-propelled tunnel lining trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810347836.7A CN108442945A (en) 2018-04-18 2018-04-18 A kind of self-propelled tunnel lining trolley

Publications (1)

Publication Number Publication Date
CN108442945A true CN108442945A (en) 2018-08-24

Family

ID=63200631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810347836.7A Pending CN108442945A (en) 2018-04-18 2018-04-18 A kind of self-propelled tunnel lining trolley

Country Status (1)

Country Link
CN (1) CN108442945A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130939A (en) * 2019-06-20 2019-08-16 中国五冶集团有限公司 A kind of tunnel double-lining section trolley
CN113431603A (en) * 2021-07-30 2021-09-24 贵州路桥集团有限公司 Steel-concrete combined tunnel lining platform
CN113431603B (en) * 2021-07-30 2024-06-04 贵州路桥集团有限公司 Steel-concrete combined tunnel lining table

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3018851A1 (en) * 1979-05-17 1980-11-20 Sp Kt Bjuro Glavtonnelmetrostr FORMWORK FOR INSTALLING CONCRETE PANELING FOR TUNNELS
JPH04182597A (en) * 1990-11-16 1992-06-30 Konoike Constr Ltd Concrete lining equipment in tunnel
JP2001329798A (en) * 2000-05-19 2001-11-30 Nippon Steel Corp Method for assembling segment
JP2005248540A (en) * 2004-03-03 2005-09-15 Okumura Corp Lining material timbering device for tunnel curved section
CN201730626U (en) * 2010-05-27 2011-02-02 中国水利水电第十工程局有限公司 Concrete casting sliding die of flat hole of tunnel
CN102996137A (en) * 2012-12-31 2013-03-27 上海同岩土木工程科技有限公司 S-shaped curve based method for control track of shield tunneling machine
CN203948107U (en) * 2014-07-14 2014-11-19 中铁二局股份有限公司 Whole self-propelled formula hydraulic lining trolley
CN204754941U (en) * 2015-06-17 2015-11-11 安徽奥发建筑制品有限公司 All -hydraulic self -propelled tunnel lining platform truck
CN204780925U (en) * 2015-07-10 2015-11-18 中国水利水电第七工程局有限公司 City gate hole type inclined shaft slipform platform truck pulls removal structure
CN105370298A (en) * 2015-12-15 2016-03-02 中交第四公路工程局有限公司 Loess tunnel one-off lining hydraulic formwork trolley
CN208473882U (en) * 2018-04-18 2019-02-05 中铁二院工程集团有限责任公司 A kind of self-propelled tunnel lining trolley

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3018851A1 (en) * 1979-05-17 1980-11-20 Sp Kt Bjuro Glavtonnelmetrostr FORMWORK FOR INSTALLING CONCRETE PANELING FOR TUNNELS
JPH04182597A (en) * 1990-11-16 1992-06-30 Konoike Constr Ltd Concrete lining equipment in tunnel
JP2001329798A (en) * 2000-05-19 2001-11-30 Nippon Steel Corp Method for assembling segment
JP2005248540A (en) * 2004-03-03 2005-09-15 Okumura Corp Lining material timbering device for tunnel curved section
CN201730626U (en) * 2010-05-27 2011-02-02 中国水利水电第十工程局有限公司 Concrete casting sliding die of flat hole of tunnel
CN102996137A (en) * 2012-12-31 2013-03-27 上海同岩土木工程科技有限公司 S-shaped curve based method for control track of shield tunneling machine
CN203948107U (en) * 2014-07-14 2014-11-19 中铁二局股份有限公司 Whole self-propelled formula hydraulic lining trolley
CN204754941U (en) * 2015-06-17 2015-11-11 安徽奥发建筑制品有限公司 All -hydraulic self -propelled tunnel lining platform truck
CN204780925U (en) * 2015-07-10 2015-11-18 中国水利水电第七工程局有限公司 City gate hole type inclined shaft slipform platform truck pulls removal structure
CN105370298A (en) * 2015-12-15 2016-03-02 中交第四公路工程局有限公司 Loess tunnel one-off lining hydraulic formwork trolley
CN208473882U (en) * 2018-04-18 2019-02-05 中铁二院工程集团有限责任公司 A kind of self-propelled tunnel lining trolley

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胜军;: "新型全液压自行式隧道衬砌台车研制", 石家庄铁道学院学报(自然科学版), no. 03 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130939A (en) * 2019-06-20 2019-08-16 中国五冶集团有限公司 A kind of tunnel double-lining section trolley
CN113431603A (en) * 2021-07-30 2021-09-24 贵州路桥集团有限公司 Steel-concrete combined tunnel lining platform
CN113431603B (en) * 2021-07-30 2024-06-04 贵州路桥集团有限公司 Steel-concrete combined tunnel lining table

Similar Documents

Publication Publication Date Title
CN102966121B (en) Integrally movable mould frame for pipe rack cast-in-site construction
CN108397208B (en) Double-shield TBM
CN207212365U (en) A kind of wall arch is separable can Monolithic lining chassis
CN105386778A (en) Tunnel underground excavation and lining construction trolley and tunnel underground excavation and lining construction method
CN101571045B (en) Top-pulling type construction method for burying box culvert and pipeline underground
CN202690081U (en) Sliding type trolley used for vault lining of tunnel with light section
CN103016029A (en) Grouped second liner construction method for large cross-section tunnel
CN105952482A (en) Self-propelled tunnel invert lining trolley
CN105298111B (en) Open cut tunnel lining construction template and its constructing device, method
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN110454197B (en) Tunnel inverted arch partition and sub-process streamlined construction method
CN103075163A (en) Support change process of second liner construction of large-cross-section tunnel
CN108442948A (en) A kind of two-way traffic inverted arch trestle and construction method
CN110486021A (en) Tunnel of large section is to two jacked piles with small section conversion construction methods
CN109281689A (en) Integral construction method based on tunnel trestle full width inverted arch template
CN107035383A (en) The supporting construction of extra-large cross-section loess tunnel and its excavation method
CN204386615U (en) A kind of self-propelled tunnel invert construction trolley
KR101303448B1 (en) Leading pipe propulsion device and non-open cut pipe installation method of underground structures using the same
CN208473882U (en) A kind of self-propelled tunnel lining trolley
CN108442945A (en) A kind of self-propelled tunnel lining trolley
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN105952480A (en) Box girder through type self-propelled hydraulic invert trestle
CN203035204U (en) Large-section tunnel second lining grouping formwork trolley
CN104832202A (en) Hydraulic telescopic movable lining trolley for one-time lining
CN204002842U (en) In full section, slide rail moves steel form carrier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination