CN202690081U - Sliding type trolley used for vault lining of tunnel with light section - Google Patents

Sliding type trolley used for vault lining of tunnel with light section Download PDF

Info

Publication number
CN202690081U
CN202690081U CN201220355922.0U CN201220355922U CN202690081U CN 202690081 U CN202690081 U CN 202690081U CN 201220355922 U CN201220355922 U CN 201220355922U CN 202690081 U CN202690081 U CN 202690081U
Authority
CN
China
Prior art keywords
template
formwork
support
light section
lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220355922.0U
Other languages
Chinese (zh)
Inventor
辛自洋
谢飞龙
辜诗纯
孟永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Rail Transit Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201220355922.0U priority Critical patent/CN202690081U/en
Application granted granted Critical
Publication of CN202690081U publication Critical patent/CN202690081U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/20—Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a sliding type trolley used for a vault lining of a tunnel with light section. The trolley comprises a template (1), a template back bracket (2), a support (8) and a walking mechanism arranged at the bottom of the support (8), wherein the template is fixedly installed on the template back bracket (2); the overall outline of the template (1) is determined by the shape of the upper part of the template back bracket (2) and is accordant with the structure of the lining; preserved holes (14) are formed and vibrators (3) are installed at the contact plane of the template (1) and the template back bracket (2); the template back bracket (2) is composed of back bracket steel tubes (4) and reinforced steel bar mold bracket (5); the support (8) comprises a top support (6) and support steel tubes (7); the support (8) is erected below the template back bracket (2) through the top support (6); and the walking mechanism comprises foot wheels (11), I-shaped steel (10) and a cross beam (9). The trolley is simple in structure, convenient to operate and low in manufacturing cost.

Description

用于小断面隧洞拱顶衬砌滑动式台车Sliding trolley for vault lining of small-section tunnels

技术领域 technical field

本实用新型属于隧洞施工设备技术领域,具体说,是一种用于小断面隧洞拱顶衬砌的滑动式台车。 The utility model belongs to the technical field of tunnel construction equipment, in particular to a sliding trolley used for lining the vault of small-section tunnels.

背景技术 Background technique

近年来,随着我国能源战略的大力调整,小断面的山岭隧道穿越工程在输气、输油、引水管线中运用越来越多,且对工期、质量的要求也越来越高。在这些净断面小于20m2的小断面隧洞施工中,拱顶衬砌施工最为困难,由于受到空间限制,搭设支架和浇筑混凝土都极为不便,不仅进度缓慢,且质量难以保证。因此隧洞顶板施工,宜采用整体拼装、周转使用的衬砌台车,如中国专利申请号为CN200820103730.4公开了一种隧道掘进同步衬砌模板台车,涉及掘进机TBM施工掘进同时与二次衬砌工序协同跟进衔接的施工设备,沿隧道方向底纵梁及垂直隧道轴线的门架横梁固定连接;行走机构固定于底纵梁下;上纵横移梁总成和上纵梁通过门架立柱二和门架立柱一固定于底纵梁上方;顶模横梁固定于上纵横移梁总成和上纵梁上;顶模立柱下部固定与顶模横梁上,上部向上顶托短模板和长模板;一端固定在门架立柱一、立柱二上或底纵梁外侧的丝杆向外侧顶紧边模。中国专利申请号为CN03117190.7公开了一种隧道全环整体模筑衬砌模板台车,其构成包括具有可伸缩的前后支座和前后抗浮平台的框架梁,安装在框架梁上的车架,安装在车架上的各种模板油缸和对应连接在各油缸上的不同模板和安装在框架梁与车架之间的导轮导轨结构,所述的框架梁为一个空腹式框架梁,在框架梁的底部铺有运输轨道,两端设有与该运输轨道相接的坡轨。 In recent years, with the vigorous adjustment of my country's energy strategy, small-section mountain tunnel crossing projects have been used more and more in gas transmission, oil transmission, and water diversion pipelines, and the requirements for construction period and quality are also getting higher and higher. In the construction of these small-section tunnels with a net section less than 20m2 , the construction of the vault lining is the most difficult. Due to space constraints, it is extremely inconvenient to erect supports and pour concrete. Not only is the progress slow, but the quality is difficult to guarantee. Therefore, the construction of the tunnel roof should adopt a lining trolley that is integrally assembled and used for turnover. For example, the Chinese patent application number CN200820103730.4 discloses a synchronous lining formwork trolley for tunnel excavation, which involves the simultaneous excavation and secondary lining process of the tunnel boring machine TBM construction. Coordinated follow-up of the construction equipment, the bottom longitudinal beam along the tunnel direction and the portal frame beam perpendicular to the tunnel axis are fixedly connected; the traveling mechanism is fixed under the bottom longitudinal beam; The gantry column one is fixed above the bottom longitudinal beam; the top form beam is fixed on the upper vertical and horizontal beam assembly and the upper longitudinal beam; the lower part of the top form column is fixed on the top form beam, and the upper part supports the short formwork and the long formwork upward; Screw rods fixed on the first and second columns of the gantry frame or on the outside of the bottom longitudinal beam press the side molds outwardly. Chinese patent application No. CN03117190.7 discloses a tunnel full-ring integral molded lining formwork trolley, which consists of frame beams with retractable front and rear supports and front and rear anti-floating platforms, and a vehicle frame installed on the frame beams. , various formwork oil cylinders installed on the vehicle frame and correspondingly connected to different formwork on each oil cylinder and the guide wheel guide rail structure installed between the frame beam and the vehicle frame, the frame beam is an open-web type frame beam, The bottom of the frame beam is paved with transport tracks, and the two ends are provided with slope rails connected with the transport tracks.

但是目前市场上销售的成品台车动辄数十万,对于很多工程量不大的衬砌工程而言,极不经济;而且在施工现场一般都会有大量钢制材料闲置;因此,市场上急需设计一种可以就地取材、现场制作、操作简便、造价低廉的滑动式衬砌台车。 However, the finished trolleys currently sold in the market cost hundreds of thousands, which is extremely uneconomical for many lining projects with small engineering quantities; moreover, there are usually a large amount of steel materials idle at the construction site; therefore, there is an urgent need to design a The invention discloses a sliding lining trolley which can be obtained locally, manufactured on site, is easy to operate and low in cost.

发明内容 Contents of the invention

本实用新型的目的在于针对解决小量衬砌施工与昂贵的市场成品台车投入之间的矛盾,提供了一种可以就地取材、现场制作、操作简便、造价低廉的适用于小断面隧洞拱顶衬砌滑动式台车。 The purpose of this utility model is to solve the contradiction between a small amount of lining construction and the investment of expensive finished trolleys in the market, and to provide a kind of arch roof that can be obtained locally, made on site, easy to operate, and low in cost, and is suitable for small-section tunnel vaults. Lining sliding trolley.

为了实现上述目的,本实用新型采用了以下技术方案:一种用于小断面隧洞拱顶衬砌滑动式台车,包括模板、模板背架、支撑架和设在支撑架底部的行走机构;所述模板固定安装在模板背架,模板的整体线形通过模板背架的上部形状确定,与衬砌结构一致;在模板与模板背架的接触面设有预留孔,并安装有振动器;所述模板背架由背架钢管和钢筋模架构成。 In order to achieve the above object, the utility model adopts the following technical solutions: a sliding trolley for tunnel vault lining with a small section, including a formwork, a formwork back frame, a support frame and a walking mechanism arranged at the bottom of the support frame; The formwork is fixedly installed on the formwork back frame, and the overall line shape of the formwork is determined by the upper shape of the formwork back frame, which is consistent with the lining structure; a reserved hole is provided on the contact surface between the formwork and the formwork back frame, and a vibrator is installed; the formwork The back frame is made of back frame steel pipe and steel bar formwork.

所述支撑架包括顶托和支撑架钢管,支撑架通过顶托架设在模板背架下方。 The supporting frame includes a jacking bracket and a supporting frame steel pipe, and the supporting frame is arranged under the formwork back frame through the jacking bracket.

所述行走机构包括脚轮、工字钢和横梁,脚轮安装在工字钢上,工字钢与横梁固定安装。 The walking mechanism includes casters, I-beams and beams, the casters are installed on the I-beams, and the I-beams and the beams are fixedly installed.

所述的横梁由若干条工字钢或槽钢组成。 The beam is composed of several I-beams or channel steels.

所述的振动器为吸附式振捣器。 The vibrator is an adsorption vibrator.

所述的模板背架由若干条钢筋及钢管组成。 The template back frame is composed of several steel bars and steel pipes.

本实用新型的各个部件通过螺栓或焊接或铰接等的方式组装在一起,构成成品台车。 Each part of the utility model is assembled together by means of bolts or welding or hinged joints to form a finished trolley.

本实用新型的台车在滑动时,可以通过顶托的伸缩功能,调节顶部模板的高度,确保一定的上部空间,同时由于衬砌顶部多为马蹄形或弧形等上窄下宽的设计,这样在模板下降形成上部空间的同时,左右侧也与衬砌侧墙拉开了一定的距离,避免台车移动时,擦碰顶部和侧墙。当台车滑动至目标位置后,再通过顶托调节模板至相应高度,此时模板两侧正好与侧墙衬砌结构相切,在封闭端头模板后,形成前后闭合、左右搭接平顺的拱顶砼仓,最后通过模板顶部的入仓预留孔进行砼浇筑;拆模时,通过旋转顶托卡环,卸掉支撑对模板背架的作用力,模板及背架在自重作用下,脱离砼面,实现脱模。 When the trolley of the utility model slides, the height of the top formwork can be adjusted through the telescopic function of the jacking bracket to ensure a certain upper space. While the formwork is lowered to form the upper space, the left and right sides are also separated from the lining side walls by a certain distance, so as to prevent the trolley from rubbing against the top and side walls when moving. When the trolley slides to the target position, adjust the formwork to the corresponding height through the jacking support. At this time, the two sides of the formwork are just tangent to the lining structure of the side wall. After closing the formwork at the end, an arch with closed front and rear and smooth left and right laps is formed. The concrete warehouse is topped, and finally the concrete is poured through the reserved hole on the top of the formwork; when the formwork is removed, the supporting force on the formwork back frame is removed by rotating the jacking ring, and the formwork and the back frame are separated under the action of their own weight. Concrete surface to achieve demoulding.

本实用新型的具体使用方法: Concrete method of use of the utility model:

a.预先浇筑台车行进轨道,浇筑时应精确放线,确保轨道宽度、平整度及走向满足台车行进要求及就位后位置偏差在允许范围; a. The trolley track is pre-cast, and the line should be accurately laid out during pouring to ensure that the track width, flatness and direction meet the trolley travel requirements and the position deviation after being in place is within the allowable range;

b. 通过调节顶托的卡环降低模板高度,形成上部空间的同时,可以让台车左右两侧与衬砌侧墙保持一定的距离; b. Lower the height of the formwork by adjusting the snap ring of the jacking bracket to form the upper space while keeping a certain distance between the left and right sides of the trolley and the lining side wall;

c.利用杠杆原理用撬棍实现台车移动; c. Using the principle of leverage to move the trolley with a crowbar;

d. 台车移动到位后,利用千斤顶对支撑体系进行预支撑,千斤顶型号及数量应满足砼浇筑时荷载要求; d. After the trolley is moved in place, use jacks to pre-support the support system. The type and quantity of jacks should meet the load requirements during concrete pouring;

e.调节顶托的卡环,提升模板背架高度,使得模板调整到衬砌砼设计的结构位置,此时模板两侧正好与衬砌侧墙砼相切、闭合; e. Adjust the snap ring of the jacking and raise the height of the back frame of the formwork so that the formwork can be adjusted to the structural position of the lining concrete design. At this time, both sides of the formwork are just tangent and closed to the lining side wall concrete;

f.进行端头模板支立,端头模版处预留砼入仓孔,完成仓面模板施工; f. Support the formwork at the end, reserve a hole for concrete entry at the formwork at the end, and complete the construction of the formwork on the surface of the warehouse;

g.从模板预留孔注入砼,开启附着在模板上振动器,将混凝土振捣密实; g. Inject concrete from the reserved hole of the template, open the vibrator attached to the template, and vibrate the concrete compactly;

h.到达拆模龄期,调节顶托的卡环,降低模板高度实现脱模,清理模板并涂抹脱模剂,然后便可以继续下一衬砌段施工。 h. When the mold removal age is reached, adjust the snap ring of the jacking, lower the height of the formwork to achieve demoulding, clean the formwork and apply the release agent, and then continue the construction of the next lining section.

与现有技术相比,本实用新型具备的有益效果: Compared with the prior art, the utility model has the beneficial effects:

就地取材、现场制作、操作简便、造价低廉。由于本实用新型采用的是整体拼装、周转使用的方式,使用时效率较高且容易操作,而且所用主要材料如槽钢、钢筋、钢模等,均可从施工现场直接获得,使用后易于回收,避免了市场成品台车折旧、资金占用及闲置时无形磨损等因素,经济效益高。 Local materials, on-site production, easy operation and low cost. Since the utility model adopts the method of overall assembly and turnover, it is highly efficient and easy to operate during use, and the main materials used, such as channel steel, steel bars, steel molds, etc., can be obtained directly from the construction site, and are easy to recycle after use. , to avoid factors such as depreciation of finished trolleys in the market, capital occupation and invisible wear when idle, and high economic benefits.

附图说明 Description of drawings

图1是本实用新型一实施例的结构示意图。 Fig. 1 is a schematic structural view of an embodiment of the utility model.

图2是本实用新型一实施例中模板与模板背架的结构示意图。 Fig. 2 is a schematic structural view of the template and the template back frame in an embodiment of the utility model.

图3是本实用新型一实施例中行走机构的示意图。 Fig. 3 is a schematic diagram of the traveling mechanism in an embodiment of the present invention.

附图标记:模板1,模板背架2,振动器3,背架钢管4,钢筋模架5,顶托6,支撑架钢管7,支撑架8,横梁9,工字钢10,脚轮11,拱顶衬砌砼12,初期支护砼13,预留孔14,千斤顶15。 Reference signs: formwork 1, formwork back frame 2, vibrator 3, back frame steel pipe 4, steel bar formwork 5, jacking 6, support frame steel pipe 7, support frame 8, beam 9, I-beam 10, caster 11, Vault lining concrete 12, primary support concrete 13, reserved hole 14, jack 15.

具体实施方式 Detailed ways

下面结合附图对本实用新型进一步说明。 Below in conjunction with accompanying drawing, the utility model is further described.

实施例1: Example 1:

如附图所示,一台用于用于小断面隧洞拱顶衬砌滑动式台车,包括模板1、模板背架2、支撑架8和设在支撑架8底部的行走机构;所述模板1固定安装在模板背架2,模板1的整体线形通过模板背架2的上部形状确定,与衬砌结构一致;在模板1与模板背架2的接触面设有预留孔14,并安装有吸附式振捣器3;所述模板背架2由背架钢管4和钢筋模架5构成;所述支撑架8包括顶托6和支撑架钢管7,支撑架8通过顶托6架设在模板背架2下边;所述行走机构包括脚轮11、工字钢10和由数条槽钢组成横梁9,脚轮11安装在工字钢10上,工字钢10与横梁9固定安装。 As shown in the accompanying drawings, a sliding trolley used for lining the vault of small-section tunnels includes a formwork 1, a formwork back frame 2, a support frame 8 and a walking mechanism located at the bottom of the support frame 8; the formwork 1 Fixedly installed on the formwork back frame 2, the overall linear shape of the formwork 1 is determined by the upper shape of the formwork back frame 2, which is consistent with the lining structure; a reserved hole 14 is provided on the contact surface between the formwork 1 and the formwork back frame 2, and an adsorption device is installed type vibrator 3; the formwork back frame 2 is composed of a back frame steel pipe 4 and a steel bar formwork 5; the support frame 8 includes a jack 6 and a support frame steel pipe 7, and the support frame 8 is erected on the formwork back through the jack 6 Frame 2 bottoms; Described walking mechanism comprises caster 11, I-beam 10 and is formed crossbeam 9 by several channel steels, and caster 11 is installed on I-beam 10, and I-beam 10 and crossbeam 9 are fixedly installed.

实施例2: Example 2:

如附图所示,一台用于用于小断面隧洞拱顶衬砌滑动式台车,包括模板1、模板背架2、支撑架8和设在支撑架8底部的行走机构;所述模板1固定安装在模板背架2,模板1的整体线形通过模板背架2的上部形状确定,与衬砌结构一致;在模板1与模板背架2的接触面设有预留孔14,并安装有吸附式振捣器3;所述模板背架2由背架钢管4和钢筋模架5构成;所述支撑架8包括顶托6和支撑架钢管7,支撑架8通过顶托6架设在模板背架2下边;所述行走机构包括脚轮11、工字钢10和由数条工字钢组成横梁9,脚轮11安装在工字钢10上,工字钢10与横梁9固定安装。 As shown in the accompanying drawings, a sliding trolley used for lining the vault of small-section tunnels includes a formwork 1, a formwork back frame 2, a support frame 8 and a walking mechanism located at the bottom of the support frame 8; the formwork 1 Fixedly installed on the formwork back frame 2, the overall linear shape of the formwork 1 is determined by the upper shape of the formwork back frame 2, which is consistent with the lining structure; a reserved hole 14 is provided on the contact surface between the formwork 1 and the formwork back frame 2, and an adsorption device is installed type vibrator 3; the formwork back frame 2 is composed of a back frame steel pipe 4 and a steel bar formwork 5; the support frame 8 includes a jack 6 and a support frame steel pipe 7, and the support frame 8 is erected on the formwork back through the jack 6 Frame 2 bottoms; Described walking mechanism comprises caster 11, I-beam 10 and is formed crossbeam 9 by several I-beams, and caster 11 is installed on I-beam 10, and I-beam 10 and crossbeam 9 are fixedly installed.

上述实施例1和实施例2的滑动式台车的组装流程为:先进行行走机构的搭设,将脚轮11通过螺栓或焊接方式,固定于工字钢10上,按计算间距垂直布置数条槽钢(或工字钢)作为横梁9,并通过与工字钢10固接,形成行走机构平台。在行走机构上搭设支撑架8,并通过剪刀撑等方式使其成为超静定体系。竖向支撑架钢管7的上端放置脚手架顶托6,旋转顶托6的卡环使可调螺距大致位于居中位置。顶托6上布置工字钢后,架设钢筋模架5,利用背架钢管4进行固定。从中间到两侧,依次铺设槽钢或其他模板,模板1间通过U形或焊接方式拼装成整体,并采用铰接方式,固定于模板背架2上。 The assembly process of the sliding trolley in the above-mentioned embodiment 1 and embodiment 2 is as follows: first, the running mechanism is erected, the caster 11 is fixed on the I-beam 10 by bolts or welding, and several grooves are vertically arranged according to the calculated spacing Steel (or I-beam) is used as the beam 9, and is fixedly connected with the I-beam 10 to form a running mechanism platform. Set up a support frame 8 on the walking mechanism, and make it a statically indeterminate system by means of scissors bracing or the like. The upper end of the vertical support frame steel pipe 7 places the scaffold jacking 6, and the snap ring of the rotating jacking 6 makes the adjustable pitch approximately in the center. After the I-beam is arranged on the jacking 6, the reinforcement formwork 5 is erected, and the back frame steel pipe 4 is used to fix it. From the middle to both sides, channel steel or other templates are laid sequentially, and the templates are assembled into a whole by U-shape or welding, and are fixed on the template back frame 2 by means of hinges.

上述实施例1和实施例2的滑动式台车的使用方法:预先浇筑台车行进轨道,浇筑时应精确放线,确保轨道宽度、平整度及走向满足台车行进要求及就位后位置偏差在允许范围;钢筋制安,在台车上安放、埋设注浆管、排水管等工作完成后,先通过调节顶托6的卡环降低模板1高度,确保台车滑动时,有足够的上部空间;利用杠杆原理通过撬棍将台车推移滑动至目标位置;利用千斤顶15对支撑体系进行预支撑,千斤顶型号及数量应满足砼浇筑时荷载要求;重新调节顶托6的卡环,均匀缓慢提升模板背架2高度,使得模板1位置与设计拱顶衬砌砼12或初期支护砼13的表面位置一致;连接安装泵送管,泵送管出口对准预留孔14,并插入模板约5cm深,封堵预留孔14与泵送钢管间的多余缝隙,用常规立模方法加固端头模板1;开启泵送设备,浇筑混凝土,开启附着在模板1上振动器3,确保混凝土密实;到达拆模龄期,拆除端头模板1,调节顶托6的卡环,降低模板1高度实现脱模,清理模板1并涂抹脱模剂,继续下一衬砌段施工。 The method of using the sliding trolley in the above-mentioned embodiment 1 and embodiment 2: pre-cast the trolley traveling track, and lay out the line accurately during pouring to ensure that the width, flatness and direction of the track meet the traveling requirements of the trolley and the position deviation after being in place Within the allowable range; steel reinforcement installation, placement on the trolley, burial of grouting pipes, drainage pipes and other work is completed, first lower the height of the formwork 1 by adjusting the snap ring of the jacking 6 to ensure that there is enough upper part when the trolley slides. space; use the principle of leverage to push and slide the trolley to the target position through the crowbar; use the jack 15 to pre-support the support system, the type and quantity of the jack should meet the load requirements during concrete pouring; readjust the snap ring of the jacking 6, evenly and slowly Raise the height of the formwork back frame 2 so that the position of the formwork 1 is consistent with the surface position of the designed vault lining concrete 12 or the initial support concrete 13; connect and install the pumping pipe, align the outlet of the pumping pipe with the reserved hole 14, and insert the formwork for about 5cm deep, plug the excess gap between the reserved hole 14 and the pumping steel pipe, and reinforce the end formwork 1 with a conventional formwork method; turn on the pumping equipment, pour concrete, and open the vibrator 3 attached to the formwork 1 to ensure that the concrete is compact ; Reach the mold removal age, remove the end formwork 1, adjust the snap ring of the jacking 6, lower the height of the formwork 1 to achieve demoulding, clean the formwork 1 and apply a release agent, and continue the construction of the next lining section.

Claims (5)

1. one kind is used for light section tunnel vault lining cutting slidingtype chassis, comprises template (1), template backrest (2), bracing frame (8) and is located at walking mechanism bottom the bracing frame (8); It is characterized in that: described template (1) is fixedly mounted on template backrest (2), and the integral linear of template (1) is determined by the shaped upper part of template backrest (2), and is consistent with liner structure; Contact surface in template (1) and template backrest (2) is provided with preformed hole (14), and vibrator (3) is installed; Described template backrest (2) is made of backrest steel pipe (4) and reinforcing bar mould bases (5).
2. according to claim 1 for light section tunnel vault lining cutting slidingtype chassis, it is characterized in that: support frame as described above (8) comprises jacking (6) and bracing frame steel pipe (7), and bracing frame (8) is erected at template backrest (2) below by jacking (6).
3. according to claim 2 for light section tunnel vault lining cutting slidingtype chassis, it is characterized in that: described walking mechanism comprises castor (11), i iron (10) and crossbeam (9), castor (11) is installed on the i iron (10), i iron (10) and crossbeam (9) fixed installation.
4. according to claim 3 for light section tunnel vault lining cutting slidingtype chassis, it is characterized in that: described crossbeam (9) is comprised of some i iron or channel-section steel.
5. arbitrary described for light section tunnel vault lining cutting slidingtype chassis according to claim 1-3, it is characterized in that: described vibrator (3) is the absorption type vibrator.
CN201220355922.0U 2012-07-21 2012-07-21 Sliding type trolley used for vault lining of tunnel with light section Expired - Fee Related CN202690081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220355922.0U CN202690081U (en) 2012-07-21 2012-07-21 Sliding type trolley used for vault lining of tunnel with light section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220355922.0U CN202690081U (en) 2012-07-21 2012-07-21 Sliding type trolley used for vault lining of tunnel with light section

Publications (1)

Publication Number Publication Date
CN202690081U true CN202690081U (en) 2013-01-23

Family

ID=47545711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220355922.0U Expired - Fee Related CN202690081U (en) 2012-07-21 2012-07-21 Sliding type trolley used for vault lining of tunnel with light section

Country Status (1)

Country Link
CN (1) CN202690081U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178986A (en) * 2015-10-30 2015-12-23 郑州大学 Variable curve mold for lining positioning of earth-sheltered dwelling and construction technology of variable-curve mold
CN106013014A (en) * 2016-06-07 2016-10-12 中国葛洲坝集团国际工程有限公司 Small-section tunnel side wall lining formwork erecting construction device
CN106050255A (en) * 2016-05-31 2016-10-26 中铁工程装备集团有限公司 Support of open type small-diameter TBM railless rear matched trolley
CN106246203A (en) * 2016-08-03 2016-12-21 中国十七冶集团有限公司 A kind of form concrete falsework for Tunnel
CN107054388A (en) * 2017-03-31 2017-08-18 中国水利水电第十三工程局有限公司 Track chassis and its application method in the construction of major diameter penstock
CN108104838A (en) * 2017-11-01 2018-06-01 中铁隧道勘察设计研究院有限公司 A kind of automation control method of lining construction
CN109441501A (en) * 2018-12-08 2019-03-08 成都鑫都建设工程有限公司 A kind of subway tunnel anti-collapse construction method
CN109538242A (en) * 2018-10-23 2019-03-29 中建局集团第建筑有限公司 Building method of tunnel construction formwork support
CN110030003A (en) * 2019-04-03 2019-07-19 中船第九设计研究院工程有限公司 A kind of the anti-collapse excavating device and its technique of tunnel construction
CN110107314A (en) * 2019-04-30 2019-08-09 中国葛洲坝集团第二工程有限公司 Transition region of tunnel lining construction method
CN110905574A (en) * 2019-12-05 2020-03-24 张信学 Loess tunnel construction strutting arrangement
CN111501570A (en) * 2020-05-08 2020-08-07 黑龙江省龙建路桥第三工程有限公司 Automatic adjusting and supporting die frame for small-span arch bridge
CN119353000A (en) * 2024-12-26 2025-01-24 中铁十一局集团有限公司 A second lining trolley walking mechanism and a second lining trolley using the same

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178986A (en) * 2015-10-30 2015-12-23 郑州大学 Variable curve mold for lining positioning of earth-sheltered dwelling and construction technology of variable-curve mold
CN106050255A (en) * 2016-05-31 2016-10-26 中铁工程装备集团有限公司 Support of open type small-diameter TBM railless rear matched trolley
CN106013014A (en) * 2016-06-07 2016-10-12 中国葛洲坝集团国际工程有限公司 Small-section tunnel side wall lining formwork erecting construction device
CN106013014B (en) * 2016-06-07 2018-07-20 中国葛洲坝集团国际工程有限公司 A kind of jacked piles with small section side wall lining formwork erection constructing device
CN106246203A (en) * 2016-08-03 2016-12-21 中国十七冶集团有限公司 A kind of form concrete falsework for Tunnel
CN107054388A (en) * 2017-03-31 2017-08-18 中国水利水电第十三工程局有限公司 Track chassis and its application method in the construction of major diameter penstock
CN107054388B (en) * 2017-03-31 2023-10-20 中国电建市政建设集团有限公司 Rail trolley and application method thereof in construction of large-diameter pressure steel pipe
CN108104838B (en) * 2017-11-01 2019-03-22 中铁隧道勘察设计研究院有限公司 A kind of automation control method of lining construction
CN108104838A (en) * 2017-11-01 2018-06-01 中铁隧道勘察设计研究院有限公司 A kind of automation control method of lining construction
CN109538242A (en) * 2018-10-23 2019-03-29 中建局集团第建筑有限公司 Building method of tunnel construction formwork support
CN109538242B (en) * 2018-10-23 2020-09-29 中建一局集团第一建筑有限公司 A kind of construction method of tunnel construction formwork support
CN109441501A (en) * 2018-12-08 2019-03-08 成都鑫都建设工程有限公司 A kind of subway tunnel anti-collapse construction method
CN110030003A (en) * 2019-04-03 2019-07-19 中船第九设计研究院工程有限公司 A kind of the anti-collapse excavating device and its technique of tunnel construction
CN110030003B (en) * 2019-04-03 2021-05-07 中船第九设计研究院工程有限公司 A kind of anti-collapse excavation device for tunnel construction and its technology
CN110107314A (en) * 2019-04-30 2019-08-09 中国葛洲坝集团第二工程有限公司 Transition region of tunnel lining construction method
CN110905574A (en) * 2019-12-05 2020-03-24 张信学 Loess tunnel construction strutting arrangement
CN110905574B (en) * 2019-12-05 2021-10-22 合肥宝妈机械设计有限公司 Loess tunnel construction strutting arrangement
CN111501570A (en) * 2020-05-08 2020-08-07 黑龙江省龙建路桥第三工程有限公司 Automatic adjusting and supporting die frame for small-span arch bridge
CN119353000A (en) * 2024-12-26 2025-01-24 中铁十一局集团有限公司 A second lining trolley walking mechanism and a second lining trolley using the same

Similar Documents

Publication Publication Date Title
CN109538238B (en) Tunnel arch prefabricated segment construction device and control method
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN201982108U (en) Single-track railway tunnel integral type full-hydraulic lining trolley
CN113235472B (en) A trolley for pouring concrete for slab culvert
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN103867215B (en) The overall lining trolley of a kind of freeway tunnel groove
CN104632251A (en) Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage
CN102230381B (en) Hollow needle beam lining trolley
CN103541744A (en) Tire walking full-hydraulic lining trolley
CN102146796A (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN102140779A (en) Movable cast-in-situ support and movable construction method of box girder cast-in-situ support
CN206092022U (en) Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling
CN101363224A (en) Mobile Foundation Pit Support System and Construction Method
CN109371851B (en) Multi-bottom die head cover support frame trough making machine
CN207944955U (en) Tunnel widening section second lining trolley
CN110468748B (en) Culvert trolley
CN114575892B (en) Off-wall vault lining trolley and construction method thereof
CN204662952U (en) A kind of self-propelled tool single side formwork formwork system
CN111809660A (en) Rectangular trolley for integrated pipe gallery and construction method
CN116378711B (en) A separated trolley device and construction method for a shallow buried tunnel
CN110410109A (en) A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method
CN104533460A (en) Construction method for concrete pouring of support-changing type formwork trolley and underground channel
CN115305952A (en) Self-propelled steel formwork trolley for construction of comprehensive pipe gallery
CN214887105U (en) A retractable formwork trolley for tunnel widening section
CN202991063U (en) Large-section tunnel hydraulic trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130123

Termination date: 20140721

EXPY Termination of patent right or utility model