CN108442693A - Quick-moving installation support system - Google Patents

Quick-moving installation support system Download PDF

Info

Publication number
CN108442693A
CN108442693A CN201810545176.3A CN201810545176A CN108442693A CN 108442693 A CN108442693 A CN 108442693A CN 201810545176 A CN201810545176 A CN 201810545176A CN 108442693 A CN108442693 A CN 108442693A
Authority
CN
China
Prior art keywords
support
supporting
base
rotating
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810545176.3A
Other languages
Chinese (zh)
Other versions
CN108442693B (en
Inventor
王麒铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Genuine Treasure Construction Technology Co ltd
Original Assignee
Genuine Treasure Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Genuine Treasure Construction Technology Co ltd filed Critical Genuine Treasure Construction Technology Co ltd
Priority to JOP/2019/0117A priority Critical patent/JOP20190117A1/en
Priority to CN201810545176.3A priority patent/CN108442693B/en
Publication of CN108442693A publication Critical patent/CN108442693A/en
Priority to HK18115786.6A priority patent/HK1253972A2/en
Priority to AU2019100147A priority patent/AU2019100147B4/en
Priority to EP19158078.6A priority patent/EP3575513A1/en
Priority to CA3036600A priority patent/CA3036600C/en
Priority to NZ753014A priority patent/NZ753014B2/en
Priority to SG10202011542QA priority patent/SG10202011542QA/en
Application granted granted Critical
Publication of CN108442693B publication Critical patent/CN108442693B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48—Supporting structures for shutterings or frames for floors or roofs
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/40—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48—Supporting structures for shutterings or frames for floors or roofs
    • E04G11/483—Supporting heads
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00—Component parts or accessories for scaffolds
    • E04G5/02—Scaffold feet, e.g. with arrangements for adjustment
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00—Forming or shuttering elements for general use
    • E04G9/02—Forming boards or similar elements
    • E04G9/06—Forming boards or similar elements the form surface being of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Instructional Devices (AREA)

Abstract

The invention discloses a fast moving installation supporting system, which comprises a plurality of movable supporting devices, wherein each movable supporting device comprises a supporting device, a moving device, a supporting code device and a nine-ratio frame device; the mobile device is detachably arranged at the bottom of the supporting device; the support stacking device and the nine-frame device are respectively detachably mounted at the top of the support device; wherein the support device includes: the device comprises a supporting structure, a connecting bracket, at least one working platform, at least one skirting board, an aluminum I-shaped board and a mounting transverse board; wherein support yard device includes: the rotary adjusting part, the base, the channel iron, the supporting rod and the supporting part. The quick moving installation supporting system is provided with the height-adjustable supporting code device, the supporting code device can be stretched and contracted by rotating the rotating adjusting piece of the supporting code device, so that the quick moving installation supporting system is suitable for different floor heights and supporting at different heights, and the quick moving installation supporting system is also provided with the moving device, so that the quick moving installation supporting system can be quickly moved, and the construction speed is improved.

Description

一种快速移动安装支撑系统A fast moving installation support system

技术领域technical field

本发明涉及技术领域,具体地,涉及一种快速移动安装支撑系统。The invention relates to the technical field, in particular to a fast-moving installation support system.

背景技术Background technique

建筑模板是在建筑建设过程中常用的一种用于建筑成型以支撑的工具,其主要用于提供一种临时性支护,其需要根据建筑的结构、形状、尺寸进行制作对应形状的建筑模板。Building formwork is a commonly used tool for building shape and support in the process of building construction. It is mainly used to provide a temporary support. It needs to make corresponding shape building formwork according to the structure, shape and size of the building. .

而传统的建筑模板采用的是木质成型模板,同时其利用木板以及木方构成,在楼层之间的楼面支撑一般使用多根木方钉在木板上形成的木板支撑对楼面成型模板的支撑,虽然木板支撑结构简单,但是,需要手工进行打钉以及形状裁切,全程费时费力,且因不同建筑楼面间距不一致,无法使同一楼面木板支撑循环使用,导致施工成本高,造成资源浪费。因此,现有技术中常使用可循环利用的建筑门架替代传统的木板支撑进行支撑。The traditional building formwork uses wooden forming formwork, and it is composed of wooden boards and wooden squares. The floor support between floors generally uses a number of wooden square nails formed on wooden boards to support the floor forming formwork. Although the plank support structure is simple, it requires manual nailing and shape cutting, which is time-consuming and labor-intensive. Moreover, due to the inconsistent floor spacing of different buildings, the plank supports on the same floor cannot be recycled, resulting in high construction costs and waste of resources. Therefore, in the prior art, recyclable building portal frames are often used to replace traditional plank supports for support.

然而,现有建筑门架是根据建筑需求制作,建筑门架支撑在安装后无法进行移动,在完成对一楼面的成型模板支撑后,只能通过重复拆卸安装才能将建筑门架转移至下一待支撑的楼面,并且因支撑的刚性需求以及荷载程度的需要,建筑门架的整体重量较重,工作人员在操作过程中灵活度较低,施工效率低,并且容易引发安全问题。However, the existing building gantry is made according to building requirements, and the building gantry support cannot be moved after installation. After the forming formwork support on the first floor is completed, the building gantry can only be transferred to the next floor by repeated disassembly and installation. A floor to be supported, and due to the rigidity requirements of the support and the requirements of the load level, the overall weight of the building gantry is relatively heavy, the staff have low flexibility in the operation process, the construction efficiency is low, and it is easy to cause safety problems.

发明内容Contents of the invention

针对现有技术的不足,本发明提供一种可移动、适用性强的快速移动安装支撑系统。Aiming at the deficiencies of the prior art, the present invention provides a movable and highly adaptable fast-moving installation support system.

本发明公开的一种快速移动安装支撑系统,其包括多个可移动支撑装置,每个可移动支撑装置包括:支撑装置、移动装置、支撑码装置以及九比架装置;移动装置可拆卸安装于支撑装置的底部;支撑码装置以及九比架装置分别可拆卸安装于支撑装置的顶部;其中支撑装置包括:支撑结构、连接支架、至少一个工作平台、至少一个踢脚板、铝工字板以及安装横板;连接支架设置于支撑结构上;至少一个工作平台安装于连接支架上;至少一个踢脚板安装于至少一个工作平台,并位于支撑结构的一侧,铝工字板设置于支撑结构的顶部;安装横板安装于铝工字板的上方;移动装置安装于支撑结构的底部;九比架装置安装于安装横板上;其中支撑码装置包括:旋转调节件、底座、槽铁、支撑杆以及支撑件;旋转调节件包括:旋转主体;旋转主体中部开设有一旋转孔;旋转孔贯穿旋转主体;旋转孔的内壁设有内螺纹;旋转主体卡设于底座的顶端;底座的底端卡设于槽铁上;槽铁上开设有至少一个固定孔;支撑杆上设有与内螺纹配合的外螺纹;支撑杆的一端依次穿设旋转主体、底座、固定孔以及安装横板,其另一端连接支撑件。A fast moving installation support system disclosed in the present invention includes a plurality of movable support devices, each movable support device includes: a support device, a mobile device, a support code device and a nine-frame device; the mobile device can be detachably installed on The bottom of the support device; the support code device and the nine-frame device are detachably installed on the top of the support device; the support device includes: a support structure, a connecting bracket, at least one working platform, at least one skirting board, an aluminum I-shaped board and a mounting horizontal board; the connecting bracket is arranged on the supporting structure; at least one working platform is installed on the connecting bracket; at least one skirting board is installed on at least one working platform and is located on one side of the supporting structure, and the aluminum I-shaped board is arranged on the top of the supporting structure; The horizontal plate is installed above the aluminum I-shaped plate; the mobile device is installed at the bottom of the support structure; the nine-billion frame device is installed on the horizontal plate; the supporting code device includes: rotating adjustment parts, bases, channel irons, support rods and supports The rotating adjustment part includes: rotating main body; a rotating hole is set in the middle of the rotating main body; the rotating hole runs through the rotating main body; the inner wall of the rotating hole is provided with internal threads; On the iron; at least one fixing hole is provided on the channel iron; the external thread matched with the internal thread is provided on the support rod; one end of the support rod is sequentially pierced with the rotating main body, the base, the fixing hole and the installation horizontal plate, and the other end is connected to the support pieces.

根据本发明的一实施方式,旋转主体还包括:卡接环形槽;卡接环形槽设置于旋转主体的一端,并且环设于旋转孔;旋转主体通过卡接环形槽卡设于底座的顶端。According to an embodiment of the present invention, the rotating body further includes: a clamping ring groove; the clamping ring groove is arranged at one end of the rotating body, and is arranged around the rotation hole; the rotating body is clamped at the top of the base through the clamping ring groove.

根据本发明的一实施方式,旋转调节件还包括:至少一个旋转把手;至少一个旋转把手固定于旋转主体的外壁。According to an embodiment of the present invention, the rotating adjustment member further includes: at least one rotating handle; at least one rotating handle is fixed to the outer wall of the rotating main body.

根据本发明的一实施方式,底座包括:圆通管、底座底板以及两个底座侧板;圆通管依次穿设于底座底板和固定孔;两个底座侧板垂直连接于底座底板;底座底板的底面与两个底座侧板的内侧面形成一底座固定凹槽;支撑杆穿设圆通管。According to an embodiment of the present invention, the base includes: a round through pipe, a base bottom plate and two base side plates; the round through tube is sequentially pierced through the base bottom plate and the fixing hole; the two base side plates are vertically connected to the base bottom plate; the bottom surface of the base bottom plate A base fixing groove is formed with the inner surfaces of the two base side plates; the support rod is passed through a round tube.

根据本发明的一实施方式,底座还包括:至少一个第一加固板;第一加固板分别连接圆通管和底座侧板。According to an embodiment of the present invention, the base further includes: at least one first reinforcement plate; the first reinforcement plate is respectively connected to the round through pipe and the side plate of the base.

根据本发明的一实施方式,支撑件包括:支撑底板及分别与支撑底板垂直连接的两个支撑侧板;支撑底板的顶面与两个支撑侧板的内侧面形成一支撑固定槽;支撑杆的一端连接于支撑底板的底面。According to one embodiment of the present invention, the supporting member includes: a supporting bottom plate and two supporting side plates vertically connected to the supporting bottom plate; a support fixing groove is formed on the top surface of the supporting bottom plate and the inner surfaces of the two supporting side plates; One end is connected to the bottom surface of the support base.

根据本发明的一实施方式,支撑件还包括:至少一个第二加固板;第二加固板分别连接支撑底板与支撑杆。According to an embodiment of the present invention, the supporting member further includes: at least one second reinforcing plate; the second reinforcing plate is respectively connected to the supporting bottom plate and the supporting rod.

根据本发明的一实施方式,支撑侧板上开设有至少一个加固螺孔。According to an embodiment of the present invention, at least one reinforcing screw hole is opened on the supporting side plate.

本发明区别于现有技术的有益效果是:本发明的快速移动安装支撑系统设有可调节高度的支撑码装置,通过旋转支撑码装置的旋转调节件可使其高度进行伸缩,使本发明可适用不同的楼层高度以及进行不同高度的支撑,同时本发明设置有移动装置,使本发明能进行快速移动至待施工区域,提高建设施工速度。The beneficial effect of the present invention that is different from the prior art is: the fast moving installation support system of the present invention is provided with a height-adjustable support code device, and the height can be stretched by rotating the rotary adjustment part of the support code device, so that the present invention can It is suitable for different floor heights and supports at different heights. At the same time, the invention is equipped with a moving device, so that the invention can quickly move to the area to be constructed, and the construction speed is improved.

附图说明Description of drawings

此处所说明的附图用来提供对本申请的进一步理解,构成本申请的一部分,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。在附图中:The drawings described here are used to provide a further understanding of the application and constitute a part of the application. The schematic embodiments and descriptions of the application are used to explain the application and do not constitute an improper limitation to the application. In the attached picture:

图1为实施例中可移动支撑装置的结构示意图;Fig. 1 is the structural representation of movable supporting device in the embodiment;

图2为实施例中安装横板的俯视图;Fig. 2 is the top view of installing horizontal plate among the embodiment;

图3为实施例中支撑码装置的主视图;Fig. 3 is the front view of support code device in the embodiment;

图4为实施例中支撑码装置的侧视图;Fig. 4 is the side view of support code device in the embodiment;

图5为实施例中旋转调节件的俯视图;Fig. 5 is the top view of the rotary regulator in the embodiment;

图6为实施例中槽铁的结构示意图;Fig. 6 is the structural representation of channel iron in the embodiment;

图7为实施例中九比架装置的侧视图;Fig. 7 is the side view of nine ratio frame devices in the embodiment;

图8为实施例中快速移动安装支撑系统使用参考图一;Figure 8 is a reference figure 1 for the use of the fast moving installation support system in the embodiment;

图9为图8中可移动支撑装置的俯视图;Fig. 9 is a top view of the movable supporting device in Fig. 8;

图10为实施例中快速移动安装支撑系统使用参考图二;Figure 10 is the reference figure 2 for the use of the fast moving installation support system in the embodiment;

图11为实施例中支撑结构的结构示意图;Fig. 11 is the structural representation of support structure in the embodiment;

图12为实施例中外铝支顶的结构示意图;Fig. 12 is the structural representation of outer aluminum support in the embodiment;

图13为实施例中内铝支顶的结构示意图;Fig. 13 is a schematic structural view of the inner aluminum support in the embodiment;

图14为一实施例中支撑码装置的主视图。Fig. 14 is a front view of a support code device in an embodiment.

附图标记说明:10、可移动支撑装置;20、成型模板;30、支撑梁;11、支撑装置;12、移动装置;13、支撑码装置;14、九比架装置;111、支撑结构;112、连接支架;113、工作平台;114、踢脚板;115、铝工字板;116、安装横板;1161、安装螺孔;131、旋转调节件;132、底座;133、槽铁;134、支撑杆;135、支撑件;1311、旋转主体;13111、旋转孔;1331、固定孔;141、九比架;1411、九比架固定螺孔;142、九比架加固件;1421、角铁;1422、销钉;1423、调节螺杆;1424、抵接件;1111、铝支顶;1112、调节螺丝;1113、标尺;1111A、外铝支顶;1111B、内铝支顶;117、爬梯;121、移动滚轮;13112、卡接环形槽;1312、旋转把手;1321、圆通管;1322、底座底板;1323、底座侧板;1324、第一加固板;1351、支撑底板;1352、支撑侧板;1353、第二加固板;13521、加固螺孔;1331、固定孔。Explanation of reference signs: 10, movable supporting device; 20, forming template; 30, supporting beam; 11, supporting device; 12, moving device; 13, supporting yard device; 112, connecting bracket; 113, working platform; 114, skirting board; 115, aluminum I-shaped board; 116, installing horizontal plate; 1161, installing screw hole; 131, rotating adjustment piece; 132, base; Support rod; 135, support piece; 1311, rotating main body; 13111, rotating hole; 1331, fixing hole; 141, nine-ratio frame; 1411, nine-ratio frame fixing screw hole; 142, nine-ratio frame reinforcement; 1421, angle iron ; 1422, pin; 1423, adjusting screw; 1424, abutting piece; 1111, aluminum support; 1112, adjusting screw; 1113, ruler; 1111A, outer aluminum support; 1111B, inner aluminum support; , moving roller; 13112, clamping ring groove; 1312, rotating handle; 1321, round tube; 1322, base bottom plate; 1323, base side plate; 1324, first reinforcement plate; 1353, the second reinforcement plate; 13521, the reinforcement screw hole; 1331, the fixing hole.

具体实施方式Detailed ways

以下将以图式揭露本发明的多个实施方式,为明确说明起见,许多实务上的细节将在以下叙述中一并说明。然而,应了解到,这些实务上的细节不应用以限制本发明。也就是说,在本发明的部分实施方式中,这些实务上的细节是非必要的。此外,为简化图式起见,一些习知惯用的结构与组件在图式中将以简单的示意的方式绘示之。A number of embodiments of the present invention will be disclosed in the following figures. For the sake of clarity, many practical details will be described together in the following description. It should be understood, however, that these practical details should not be used to limit the invention. That is, in some embodiments of the invention, these practical details are not necessary. In addition, for the sake of simplifying the drawings, some well-known and commonly used structures and components will be shown in a simple schematic manner in the drawings.

需要说明,本发明实施例中所有方向性指示(诸如上、下、左、右、前、后……)仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that all directional indications (such as up, down, left, right, front, back...) in the embodiments of the present invention are only used to explain the relationship between the components in a certain posture (as shown in the accompanying drawings). Relative positional relationship, movement conditions, etc., if the specific posture changes, the directional indication will also change accordingly.

另外,在本发明中如涉及“第一”、“第二”等的描述仅用于描述目的,并非特别指称次序或顺位的意思,亦非用以限定本发明,其仅仅是为了区别以相同技术用语描述的组件或操作而已,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本发明要求的保护范围之内。In addition, in the present invention, descriptions such as "first", "second" and so on are used for description purposes only, and do not refer to the meaning of order or sequence, nor are they used to limit the present invention, but are only for the purpose of distinguishing the following The components or operations described by the same technical terms are only used, but should not be understood as indicating or implying their relative importance or implying the number of indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include at least one of these features. In addition, the technical solutions of the various embodiments can be combined with each other, but it must be based on the realization of those skilled in the art. When the combination of technical solutions is contradictory or cannot be realized, it should be considered that the combination of technical solutions does not exist , nor within the scope of protection required by the present invention.

实施例:Example:

本实施例提供一种可移动、适用性强的快速移动安装支撑系统,其主要用于对楼面成型模板20的支撑,使楼面完成混泥土浇筑后使其凝固成型。This embodiment provides a movable and adaptable quick-moving installation support system, which is mainly used to support the floor forming formwork 20, so that the floor is solidified and formed after the concrete pouring is completed.

请参考图1所示,其为实施例中可移动支撑装置的结构示意图。Please refer to FIG. 1 , which is a schematic structural diagram of the movable supporting device in the embodiment.

快速移动安装支撑系统包括多个可移动支撑装置10,每个可移动支撑装置10包括:支撑装置11、移动装置12、支撑码装置13以及九比架装置14,其中支撑装置11用于提供支撑并安装移动装置12、支撑码装置13以及九比架装置14,移动装置12使本发明具备移动功能,使本发明在完成支撑定型任务后可快速移动至下个工作区域,支撑码装置13用于支撑建筑楼面的楼面成型模板20,九比架装置14用于支撑固定楼面中应用于粱结构的成型模板20,为了使支撑码装置13以及九比架装置14对成型模板20的作用力更加均匀,支撑码装置13和九比架装置14通过支撑梁30与成型模板20接触。其中移动装置12可拆卸安装于支撑装置11的底部,支撑码装置13以及九比架装置14分别可拆卸安装于支撑装置11的顶部。The fast moving installation support system includes a plurality of movable support devices 10, and each movable support device 10 includes: a support device 11, a mobile device 12, a support code device 13 and a nine-frame device 14, wherein the support device 11 is used to provide support And install mobile device 12, support code device 13 and nine ratio frame device 14, mobile device 12 makes the present invention have mobile function, makes the present invention can move to next working area fast after finishing support setting task, supports code device 13 usefulness In supporting the floor formwork 20 of the building floor, the nine-frame device 14 is used to support the formwork 20 applied to the beam structure in the fixed floor. The force is more uniform, and the support code device 13 and the nine-frame device 14 are in contact with the forming template 20 through the support beam 30 . The moving device 12 is detachably mounted on the bottom of the supporting device 11 , and the supporting code device 13 and the nine-bench device 14 are respectively detachably mounted on the top of the supporting device 11 .

请继续参考图1以及图2所示,其中图2为实施例中安装横板的俯视图。其中支撑装置11包括支撑结构111、连接支架112、至少一个工作平台113、至少一个踢脚板114、铝工字板115以及安装横板116,其中连接支架112设置于支撑结构111上,至少一个工作平台113安装于连接支架112上,至少一个踢脚板114安装于至少一个工作平台113,并位于支撑结构111的一侧,其中工作平台113以及踢脚板114的数量根据现场施工需求进行设定,铝工字板115设置于支撑结构111的顶部,安装横板116安装于铝工字板115的上方,其中安装横板116上具有按间隔排列的多个安装螺孔1161,移动装置安装于支撑结构111的底部,九比架装置利用安装螺孔1161安装于安装横板116上。通过调节支撑结构111可调节支撑装置11的整体高度,使本发明可适用不同高度楼面支撑。Please continue to refer to FIG. 1 and FIG. 2 , wherein FIG. 2 is a top view of the installation horizontal plate in the embodiment. Wherein the supporting device 11 comprises a supporting structure 111, a connecting bracket 112, at least one working platform 113, at least one skirting board 114, an aluminum I-shaped board 115 and a mounting horizontal plate 116, wherein the connecting bracket 112 is arranged on the supporting structure 111, and at least one working platform 113 is installed on the connecting bracket 112, at least one skirting board 114 is installed on at least one working platform 113, and is located on one side of the supporting structure 111, wherein the number of working platforms 113 and skirting boards 114 is set according to the construction requirements on site, aluminum I-shaped board 115 is set on the top of the support structure 111, and the installation horizontal plate 116 is installed above the aluminum I-shaped plate 115, wherein the installation horizontal plate 116 has a plurality of installation screw holes 1161 arranged at intervals, and the mobile device is installed on the bottom of the support structure 111 , The nine-pitch device is installed on the horizontal plate 116 using the mounting screw hole 1161 . The overall height of the supporting device 11 can be adjusted by adjusting the supporting structure 111 , so that the present invention can be applied to floor supports of different heights.

请参考图1、3、4、5以及6所示,其中图3至6分别为实施例中支撑码装置的主视图、支撑码装置的侧视图、旋转调节件的俯视图以及槽铁的结构示意图。其中支撑码装置13包括旋转调节件131、底座132、槽铁133、支撑杆134以及支撑件135,旋转调节件131包括旋转主体1311,旋转主体1311中部开设有一旋转孔13111,旋转孔13111贯穿旋转主体1311,旋转孔13111的内壁设有内螺纹,旋转主体1311卡设于底座132的顶端,底座132的底端卡设于槽铁133上,槽铁133的底端抵接于所述安装横板116上,槽铁133上开设有至少一个固定孔1331,支撑杆134上设有与内螺纹配合的外螺纹,支撑杆134的一端依次穿设旋转主体1311、底座132、固定孔1331并且以及台安装横板116,其中支撑杆134穿设安装横板116的一安装螺孔1161,支撑杆134另一端连接支撑件135。Please refer to Figures 1, 3, 4, 5 and 6, wherein Figures 3 to 6 are the front view of the support code device, the side view of the support code device, the top view of the rotary adjustment member and the structural schematic diagram of the channel iron in the embodiment . Among them, the support code device 13 includes a rotation adjustment member 131, a base 132, a channel iron 133, a support rod 134 and a support member 135. The rotation adjustment member 131 includes a rotation body 1311, and a rotation hole 13111 is provided in the middle of the rotation body 1311, and the rotation hole 13111 runs through the rotation The main body 1311, the inner wall of the rotating hole 13111 is provided with internal threads, the rotating main body 1311 is clamped on the top of the base 132, the bottom end of the base 132 is clamped on the channel iron 133, and the bottom end of the channel iron 133 abuts against the installation rail. On the plate 116, the channel iron 133 is provided with at least one fixing hole 1331, the support rod 134 is provided with an external thread matched with the internal thread, and one end of the support rod 134 passes through the rotating main body 1311, the base 132, the fixing hole 1331 and The platform is installed with the horizontal plate 116 , wherein the support rod 134 passes through a mounting screw hole 1161 of the horizontal plate 116 , and the other end of the support rod 134 is connected to the support member 135 .

请参考图1及图7所示,其中图7为实施例中九比架装置的侧视图。其中九比架装置14包括多个九比架141,每个九比架141的底部设置有多个九比架固定螺孔1411,九比架固定螺孔1411与安装螺孔1161通过螺丝进行连接,如此实现将九比架141可拆卸安装于安装横板116上,利用多个九比架141固定成型模板20中对应粱结构的侧板。在另一实施例中,为了加固九比架141对成型模板20的固定,九比架装置14还包括与九比架141对应的多个九比架加固件142,每个九比架加固件142包括:角铁1421、销钉1422、调节螺杆1423以及抵接件1424,其中销钉1422的顶端通过焊接固定于角铁1421上,销钉1422的底端穿设于安装横板116的上对应安装螺孔1161上并通过插片进行固定,使角铁1421固定于对应九比架141远离成型模板20的一侧,调节螺杆1423通过螺纹穿设于角铁1421上,其一端固定有抵接件1424,抵接件1424具有一平面,旋转调节螺杆1423使其相对角铁1421朝九比架141移动,最后使抵接件1424的平面抵接于九比架141的侧面上,如此,加固九比架141对成型模板20中对应粱结构的侧板的固定。Please refer to Fig. 1 and Fig. 7, wherein Fig. 7 is a side view of the nine-bench device in the embodiment. Wherein the nine ratio frame device 14 comprises a plurality of nine ratio frames 141, and the bottom of each nine ratio frame 141 is provided with a plurality of nine ratio frame fixing screw holes 1411, and the nine ratio frame fixing screw holes 1411 are connected with the mounting screw holes 1161 by screws In this way, the nine-pitch frame 141 can be detachably installed on the installation horizontal plate 116, and a plurality of nine-pitch frames 141 can be used to fix the side plates corresponding to the beam structure in the forming template 20. In another embodiment, in order to strengthen the fixing of the nine-frame 141 to the forming template 20, the nine-frame device 14 also includes a plurality of nine-frame reinforcements 142 corresponding to the nine-frame 141, each nine-frame reinforcement 142 includes: an angle iron 1421, a pin 1422, an adjusting screw 1423 and an abutment 1424, wherein the top end of the pin 1422 is fixed on the angle iron 1421 by welding, and the bottom end of the pin 1422 is passed through the upper corresponding mounting screw of the mounting horizontal plate 116. On the hole 1161 and fixed by inserting pieces, the angle iron 1421 is fixed on the side of the corresponding nine-frame 141 away from the forming template 20, the adjusting screw 1423 is threaded on the angle iron 1421, and one end is fixed with an abutment 1424 , the abutting piece 1424 has a flat surface, and the rotating adjusting screw 1423 makes it move toward the nine-pitch frame 141 relative to the angle iron 1421, and finally the plane of the abutting piece 1424 abuts against the side of the nine-pitch frame 141, thus strengthening the nine-pitch frame The fixing of the frame 141 to the side plate of the corresponding beam structure in the forming template 20.

请一并参考图8至10所示,分别为实施例中快速移动安装支撑系统使用参考图一、图8中可移动支撑装置的俯视图以及实施例中快速移动安装支撑系统使用参考图二。Please refer to Fig. 8 to Fig. 10 together, which respectively refer to Fig. 1 for the use of the fast moving installation support system in the embodiment, the top view of the movable support device in Fig. 8, and refer to Fig. 2 for the use of the fast moving installation support system in the embodiment.

使用快速移动安装支撑系统时,根据待浇灌楼面的楼面成型模板20设置可移动支撑装置10的数量,以及支撑码装置13和九比架装置14的数量以及两者在可移动支撑装置10上的位置。安装楼面成型模板20时,不需安装移动装置12,对应粱结构部分的成型模板20的底板由安装横板116支撑,利用九比架装置14固定对应粱结构部分的成型模板20的侧板,利用支撑码装置13固定对应楼面的成型模板20,其中支撑码装置13调节时,通过旋转旋转主体1311,支撑杆134在其与旋转孔13111螺纹连接作用下,沿其中心轴方向旋转伸缩,最后使支撑件135顶住楼面对应楼面的成型模板20,如此,完成将楼面成型模板20安装于快速移动安装支撑系统上,并且根据建筑需求,调节支撑结构111的高度,使楼面成型模板20的整体高度满足建筑设计需求。然后,进行混泥土浇灌后,待混泥土凝固成型后,拆卸支撑码装置13、九比架装置14以及成型模板20后,同样通过调节支撑结构111的高度,使本发明与成型的混泥土楼面脱离,然后将移动装置12安装于支撑结构111的底部,通过移动装置12将本发明移动至下一待浇灌的位置,然后,拆卸移动装置12后,重复前面所述步骤,重新进行楼面的支撑。When using the fast-moving installation support system, the number of movable support devices 10 is set according to the floor forming formwork 20 of the floor to be poured, and the number of support code devices 13 and nine ratio frame devices 14 and the number of the two on the movable support device 10 position on the When the floor formwork 20 is installed, it is not necessary to install the mobile device 12, the bottom plate of the formwork 20 corresponding to the beam structure part is supported by the installation horizontal plate 116, and the side plate of the formwork 20 corresponding to the beam structure part is fixed by using the nine ratio frame device 14 , use the support code device 13 to fix the forming formwork 20 corresponding to the floor, wherein when the support code device 13 is adjusted, by rotating the rotating body 1311, the support rod 134 rotates and expands along its central axis under the action of the screw connection between the support rod 134 and the rotation hole 13111 , and finally make the supporting member 135 withstand the forming formwork 20 corresponding to the floor. In this way, the floor forming formwork 20 is installed on the fast moving installation support system, and the height of the support structure 111 is adjusted according to the building requirements, so that the floor The overall height of the surface forming formwork 20 meets architectural design requirements. Then, after pouring the concrete, after the concrete is solidified and formed, after the support code device 13, the nine-ratio device 14 and the forming formwork 20 are dismantled, the height of the support structure 111 is also adjusted to make the present invention compatible with the formed concrete building Then the mobile device 12 is installed on the bottom of the support structure 111, and the present invention is moved to the next position to be poured through the mobile device 12, and then, after the mobile device 12 is disassembled, repeat the above-mentioned steps to carry out the floor construction again. support.

进一步地,请参考图1、11、12以及13所示,其中图11、12以及13分别为实施例中支撑结构的结构示意图、外铝支顶的结构示意图、内铝支顶的结构示意图。支撑结构111包括多个铝支顶1111、多个调节螺丝1112及多个标尺1113,多个调节螺丝1112设置于多个铝支顶1111。多个标尺1113设置于多个铝支顶1111,并位于多个调节螺丝1112的一侧。每相邻的两个铝支顶1111之间通过连接支架112连接,如此,使多个铝支顶1111固定在一起。具体应用时,单个铝支顶1111包括外铝支顶1111A及内铝支顶1111B,内铝支顶1111B镶套于外铝支顶1111A的内部。如此,支撑装置11调节高度的方式可为:首先,松开多个调节螺丝1112,其次,根据多个标尺1113的尺寸调节内铝支顶1111B镶套于外铝支顶1111A的长度,内铝支顶1111B镶套于外铝支顶1111A的长度达到预定长度后,拧紧多个调节螺丝1112,从而达到调节可移动支撑装置10高度的目的。Further, please refer to Figures 1, 11, 12 and 13, wherein Figures 11, 12 and 13 are the structural schematic diagrams of the supporting structure, the structural schematic diagram of the outer aluminum support, and the structural schematic diagram of the inner aluminum support in the embodiment. The support structure 111 includes a plurality of aluminum supports 1111 , a plurality of adjustment screws 1112 and a plurality of scales 1113 , and the plurality of adjustment screws 1112 are disposed on the plurality of aluminum supports 1111 . A plurality of scales 1113 are disposed on the plurality of aluminum supports 1111 and located on one side of the plurality of adjusting screws 1112 . Every two adjacent aluminum supports 1111 are connected by connecting brackets 112 , so that multiple aluminum supports 1111 are fixed together. In a specific application, the single aluminum support 1111 includes an outer aluminum support 1111A and an inner aluminum support 1111B, and the inner aluminum support 1111B is nested inside the outer aluminum support 1111A. In this way, the way to adjust the height of the supporting device 11 can be: firstly, loosen a plurality of adjustment screws 1112, and secondly, adjust the length of the inner aluminum support 1111B nested on the outer aluminum support 1111A according to the size of the plurality of scales 1113, and the inner aluminum support 1111A After the length of the supporting top 1111B nested on the outer aluminum supporting top 1111A reaches a predetermined length, a plurality of adjusting screws 1112 are tightened, so as to achieve the purpose of adjusting the height of the movable supporting device 10 .

进一步地,请继续参考图1所示,支撑装置11还包括爬梯117,爬梯117设置于支撑结构111的一侧,并连接至少一个工作平台113及地面。通过爬梯117方便工作人员及物料上下工作平台113,加快工作效率,同时降低工作人员上下工作平台113的危险。可移动支撑装置10需要移动位置时,爬梯117可收起,方便工作人员移动可移动支撑装置10。Further, please continue to refer to FIG. 1 , the supporting device 11 further includes a ladder 117, which is arranged on one side of the supporting structure 111 and connects at least one working platform 113 and the ground. The climbing ladder 117 is convenient for staff and materials to get on and off the working platform 113, so as to speed up the work efficiency and reduce the danger of the staff getting on and off the working platform 113 at the same time. When the movable supporting device 10 needs to be moved, the ladder 117 can be retracted, which is convenient for the staff to move the movable supporting device 10 .

进一步地,请继续参考图1所示,移动装置12包括多个移动滚轮121,多个移动滚轮121通过螺丝可拆卸安装于多个铝支顶1111的底部,多个移动滚轮121的数量对应多个铝支顶1111的数量。可移动支撑装置10需要移动时,工作人员将多个移动滚轮121分别对应安装于多个铝支顶1111的底部,工作人员只需较小的力即可快速推动建可移动支撑装置10至预定位置,待可移动支撑装置10移动至预定位置后,工作人员将移动装置12拆除,可移动支撑装置10即可投入使用,提高整体的施工效率。Further, please continue to refer to FIG. 1, the moving device 12 includes a plurality of moving rollers 121, and the plurality of moving rollers 121 are detachably mounted on the bottom of a plurality of aluminum support tops 1111 through screws, and the number of the plurality of moving rollers 121 corresponds to more The number of aluminum support 1111. When the movable support device 10 needs to be moved, the staff will respectively install a plurality of mobile rollers 121 on the bottom of the plurality of aluminum supports 1111, and the staff can quickly push the movable support device 10 to the predetermined position with only a small force. position, after the movable supporting device 10 has moved to a predetermined position, the staff removes the moving device 12, and the movable supporting device 10 can be put into use, thereby improving the overall construction efficiency.

进一步地,请继续参考图5所示,为了使旋转主体1311在底座132顶端上固定更加稳定和使其旋转过程更加顺畅,旋转主体1311还包括:卡接环形槽13112,卡接环形槽13112设置于旋转主体1311的一端,并且环设于旋转孔13111,其中卡接环形槽13112的最小内径大于旋转孔13111的孔径,旋转主体1311通过卡接环形槽13112卡设于底座132的顶端。另外值得注意的是,为了进一步加固旋转主体1311与底座132之间的连接,将卡接环形槽13112设计成横截面为阶梯状,将底座132顶端亦设计成相匹配的阶梯状。Further, please continue to refer to FIG. 5 , in order to make the rotating body 1311 fixed on the top of the base 132 more stably and to make the rotation process smoother, the rotating body 1311 also includes: snap ring groove 13112, the snap ring groove 13112 is set It is located at one end of the rotating body 1311 and is arranged around the rotating hole 13111, wherein the minimum inner diameter of the locking ring groove 13112 is larger than the diameter of the rotating hole 13111, and the rotating body 1311 is fixed on the top of the base 132 through the locking ring groove 13112. It is also worth noting that, in order to further strengthen the connection between the rotating body 1311 and the base 132 , the locking ring groove 13112 is designed to have a stepped cross section, and the top of the base 132 is also designed to match the stepped shape.

进一步地,请继续参考图5所示,为了使旋转旋转主体1311时更加简便省力,旋转调节件131还包括至少一个旋转把手1312,将至少一个旋转把手1312固定于旋转主体1311的外壁,工作人员通过旋转把手1312进行旋转更加省力快速。Further, please continue to refer to FIG. 5 , in order to make the rotation of the rotating main body 1311 more convenient and labor-saving, the rotating adjustment member 131 also includes at least one rotating handle 1312, and the at least one rotating handle 1312 is fixed on the outer wall of the rotating main body 1311. Rotating by rotating the handle 1312 is more labor-saving and faster.

进一步地,请继续参考图3及图4所示,底座132包括圆通管1321、底座底板1322以及两个底座侧板1323,圆通管1321依次穿设于底座底板1322和固定孔1331,两个底座侧板1323垂直连接于底座底板1322,即将底座132底部设计成U型结构,使其更加贴合槽铁133的整体形状,底座底板1322的底面与两个底座侧板1323的内侧面形成一底座固定凹槽,支撑杆134穿设圆通管1321。利用圆通管1321穿过固定孔1331的方式加固底座132与槽铁133之间的固定,同时圆通管1321本身为长条形状,支撑杆134穿设于长条形状的圆通管1321更加牢固。具体地,底座132还包括至少一个第一加固板1324,第一加固板1324分别连接圆通管1321和底座132底板,通过第一加固板1324增加底座132的支撑强度。Further, please continue to refer to Fig. 3 and Fig. 4, the base 132 includes a round tube 1321, a base bottom plate 1322 and two base side plates 1323, the round tube 1321 is sequentially penetrated through the base bottom plate 1322 and the fixing hole 1331, the two bases The side plate 1323 is vertically connected to the base bottom plate 1322, that is, the bottom of the base 132 is designed as a U-shaped structure, so that it fits the overall shape of the channel iron 133 more closely. The bottom surface of the base bottom plate 1322 and the inner surfaces of the two base side plates 1323 form a base The groove is fixed, and the support rod 134 passes through the round tube 1321 . The fixation between the base 132 and the channel iron 133 is reinforced by means of the round tube 1321 passing through the fixing hole 1331, while the round tube 1321 itself is in the shape of a strip, and the support rod 134 penetrates the strip-shaped round tube 1321 to be more firm. Specifically, the base 132 also includes at least one first reinforcement plate 1324 , the first reinforcement plate 1324 is respectively connected to the round tube 1321 and the bottom plate of the base 132 , and the support strength of the base 132 is increased through the first reinforcement plate 1324 .

进一步地,请继续参考图3及图4所示,支撑件135包括支撑底板1351及分别与支撑底板1351垂直连接的两个支撑侧板1352,支撑底板1351的顶面与两个支撑侧板1352的内侧面形成一支撑固定槽,即将支撑件135设计成一U型结构,支撑杆134的一端连接于支撑底板1351的底面。将支撑件135设计成一U型结构,使其更加贴合支撑梁的形状,利用这种U型结构的支撑固定槽顶住支撑梁,有效的加强其固定效果,使其不易松动移位。具体地,支撑件135还包括至少一个第二加固板1353,第二加固板1353分别连接支撑底板1351与支撑件135,通过第二加固板1353增加支撑件135的支撑强度。另外在本实施例中,支撑侧板1352上还开设有至少一个加固螺孔13521,支撑件135顶住上楼板的支撑梁30后,可使用螺丝通过加固螺孔13521固定在支撑梁30上,进一步加固本发明与支撑梁30之间的固定。Further, please continue to refer to FIG. 3 and FIG. 4, the support member 135 includes a support base plate 1351 and two support side plates 1352 vertically connected to the support base plate 1351, the top surface of the support base plate 1351 and the two support side plates 1352 A support fixing groove is formed on the inner surface of the support member 135, that is, the support member 135 is designed as a U-shaped structure, and one end of the support rod 134 is connected to the bottom surface of the support base plate 1351. The support member 135 is designed as a U-shaped structure to make it more suitable for the shape of the supporting beam, and the supporting fixing groove of this U-shaped structure is used to withstand the supporting beam, effectively strengthening its fixing effect, making it difficult to loosen and shift. Specifically, the supporting member 135 further includes at least one second reinforcing plate 1353 , the second reinforcing plate 1353 respectively connects the supporting bottom plate 1351 and the supporting member 135 , and the supporting strength of the supporting member 135 is increased through the second reinforcing plate 1353 . In addition, in this embodiment, at least one reinforcing screw hole 13521 is provided on the supporting side plate 1352. After the supporting member 135 withstands the supporting beam 30 of the upper floor, it can be fixed on the supporting beam 30 through the reinforcing screw hole 13521 with screws. The fixing between the present invention and the support beam 30 is further strengthened.

请继续参考图8至10所示,将槽铁133垂直于安装横板116设置,让底座132固定凹槽卡设于槽铁133上,并且使圆通管1321穿设固定孔1331,通过旋转把手1312旋转旋转主体1311,使支撑杆134延其轴心方向朝上伸长,直至支撑固定槽卡设在对应上楼板成型模板20的支撑梁30上,完成定位支撑过程。在本实施例中,同一槽铁133上开设有多个固定孔1331,每个固定孔1331对应一组旋转调节件131、底座132、支撑杆134以及支撑件135,可节省设计成本。Please continue to refer to Figures 8 to 10, set the channel iron 133 perpendicular to the installation horizontal plate 116, let the fixing groove of the base 132 be clamped on the channel iron 133, and make the round tube 1321 pass through the fixing hole 1331, by rotating the handle 1312 Rotate the main body 1311 to make the support rod 134 extend upward along its axis until the support fixing groove is clamped on the support beam 30 corresponding to the upper floor forming template 20, and the positioning support process is completed. In this embodiment, a plurality of fixing holes 1331 are opened on the same channel iron 133 , and each fixing hole 1331 corresponds to a set of rotating adjusting member 131 , base 132 , supporting rod 134 and supporting member 135 , which can save design cost.

更进一步地,请参考图14所示,其为一实施例中支撑码装置的主视图。支撑件135可采用圆台结构,其中,其顶面面积大于底面面积。当本发明在需支撑上成型模板20时不需要通过支撑梁30进行支撑时,利用圆台结构的支撑件135能有效的加强支撑码装置13支撑以及固定效果。Further, please refer to FIG. 14 , which is a front view of the supporting code device in an embodiment. The supporting member 135 may adopt a circular frustum structure, wherein the area of the top surface is larger than the area of the bottom surface. When the present invention does not need to be supported by the support beam 30 when the upper molding formwork 20 needs to be supported, the support and fixation effect of the support code device 13 can be effectively strengthened by using the support member 135 of the circular frustum structure.

综上所述,本发明的快速移动安装支撑系统设有可调节高度的支撑码装置13,通过旋转支撑码装置13的旋转调节件131可使其高度进行伸缩,使本发明可适用不同的楼层高度以及进行不同高度的支撑,同时本发明设置有移动装置,使本发明能进行快速移动,提高建设施工速度。In summary, the fast moving installation support system of the present invention is provided with a height-adjustable support code device 13, and the height can be stretched by rotating the rotary adjustment member 131 of the support code device 13, so that the present invention can be applied to different floors height and support at different heights, and at the same time, the invention is provided with a moving device, so that the invention can move quickly and improve the construction speed.

上所述仅为本发明的实施方式而已,并不用于限制本发明。对于本领域技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原理内所作的任何修改、等同替换、改进等,均应包括在本发明的权利要求范围之内。The above description is only an embodiment of the present invention, and is not intended to limit the present invention. Various modifications and variations of the present invention will occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the scope of the claims of the present invention.

Claims (9)

1.一种快速移动安装支撑系统,其包括多个可移动支撑装置(10),其特征在于,每个可移动支撑装置(10)包括:支撑装置(11)、移动装置(12)、支撑码装置(13)以及九比架装置(14);所述移动装置(12)可拆卸安装于所述支撑装置(11)的底部;所述支撑码装置(13)以及九比架装置(14)分别可拆卸安装于所述支撑装置(11)的顶部;1. A fast mobile installation support system, which comprises a plurality of movable support devices (10), is characterized in that each movable support device (10) comprises: support device (11), mobile device (12), support A code device (13) and a nine-frame device (14); the mobile device (12) is detachably mounted on the bottom of the support device (11); the support code device (13) and the nine-frame device (14 ) are respectively detachably mounted on the top of the supporting device (11); 其中所述支撑装置(11)包括:支撑结构(111)、连接支架(112)、至少一个工作平台(113)、至少一个踢脚板(114)、铝工字板(115)以及安装横板(116);所述连接支架(112)设置于所述支撑结构(111)上;至少一个所述工作平台(113)安装于所述连接支架(112)上;至少一个所述踢脚板(114)安装于至少一个所述工作平台(113)并位于所述支撑结构(111)的一侧,所述铝工字板(115)设置于所述支撑结构(111)的顶部;所述安装横板(116)安装于所述铝工字板(115)的上方;所述移动装置(12)安装于所述支撑结构(111)的底部;所述九比架装置(14)安装于所述安装横板(116)上;Wherein the supporting device (11) includes: a supporting structure (111), a connecting bracket (112), at least one working platform (113), at least one skirting board (114), an aluminum I-shaped board (115) and an installation horizontal board (116 ); the connecting bracket (112) is arranged on the support structure (111); at least one of the working platforms (113) is installed on the connecting bracket (112); at least one of the skirting boards (114) is installed on At least one of the working platforms (113) is located on one side of the support structure (111), the aluminum I-shaped plate (115) is arranged on the top of the support structure (111); the installation horizontal plate (116 ) is installed above the aluminum I-shaped plate (115); the moving device (12) is installed on the bottom of the support structure (111); (116) on; 其中所述支撑码装置(13)包括:旋转调节件(131)、底座(132)、槽铁(133)、支撑杆(134)以及支撑件(135);所述旋转调节件(131)包括:旋转主体(1311);所述旋转主体(1311)中部开设有一旋转孔(13111);所述旋转孔(13111)贯穿所述旋转主体(1311);所述旋转孔(13111)的内壁设有内螺纹;所述旋转主体(1311)卡设于所述底座(132)的顶端;所述底座(132)的底端卡设于所述槽铁(133)上;所述槽铁(133)上开设有至少一个固定孔(1331);所述支撑杆(134)上设有与所述内螺纹配合的外螺纹;所述支撑杆(134)的一端依次穿设所述旋转主体(1311)、底座(132)、固定孔(1331)以及安装横板(116),其另一端连接支撑件(135)。Wherein said support code device (13) comprises: rotation adjusting member (131), base (132), channel iron (133), support bar (134) and support member (135); Described rotating adjusting member (131) comprises : rotating main body (1311); the middle part of the rotating main body (1311) is provided with a rotating hole (13111); the rotating hole (13111) runs through the rotating main body (1311); the inner wall of the rotating hole (13111) is provided with internal thread; the rotating main body (1311) is clamped on the top of the base (132); the bottom end of the base (132) is clamped on the channel iron (133); the channel iron (133) At least one fixing hole (1331) is opened on the upper part; the external thread matched with the internal thread is provided on the support rod (134); one end of the support rod (134) passes through the rotating main body (1311) in sequence , a base (132), a fixing hole (1331) and a horizontal plate (116), the other end of which is connected to a support (135). 2.根据权利要求1所述的快速移动安装支撑系统,其特征在于,所述旋转主体(1311)还包括:卡接环形槽(13112);所述卡接环形槽(13112)设置于所述旋转主体(1311)的一端并环设于所述旋转孔(13111);所述旋转主体(1311)通过所述卡接环形槽(13112)卡设于所述底座(132)的顶端。2. The fast-moving installation support system according to claim 1, characterized in that, the rotating body (1311) further comprises: a clamping ring groove (13112); the clamping ring groove (13112) is set on the One end of the rotating main body (1311) is arranged around the rotating hole (13111); the rotating main body (1311) is fixed on the top end of the base (132) through the engaging annular groove (13112). 3.根据权利要求1所述的快速移动安装支撑系统,其特征在于,所述旋转调节件(131)还包括:至少一个旋转把手(1312);至少一个所述旋转把手(1312)固定于所述旋转主体(1311)的外壁。3. The fast-moving installation support system according to claim 1, characterized in that, the rotating adjustment member (131) further comprises: at least one rotating handle (1312); at least one rotating handle (1312) is fixed to the The outer wall of the rotating main body (1311). 4.根据权利要求1所述的快速移动安装支撑系统,其特征在于,所述底座(132)包括:圆通管(1321)、底座底板(1322)以及两个底座侧板(1323);所述圆通管(1321)依次穿设于所述底座底板(1322)和固定孔(1331);两个所述底座侧板(1323)垂直连接于所述底座底板(1322);所述底座底板(1322)的底面与两个所述底座侧板(1323)的内侧面形成一底座固定凹槽;所述支撑杆(134)穿设所述圆通管(1321)。4. The fast moving installation support system according to claim 1, characterized in that, the base (132) comprises: a round tube (1321), a base bottom plate (1322) and two base side plates (1323); The round tube (1321) is sequentially set through the base bottom plate (1322) and the fixing hole (1331); the two base side plates (1323) are vertically connected to the base bottom plate (1322); the base bottom plate (1322 ) and the inner surfaces of the two base side plates (1323) form a base fixing groove; the support rod (134) passes through the round tube (1321). 5.根据权利要求4所述的快速移动安装支撑系统,其特征在于,所述底座(132)还包括:至少一个第一加固板(1324);所述第一加固板(1324)分别连接圆通管(1321)和底座侧板(1322)。5. The fast-moving installation support system according to claim 4, characterized in that, the base (132) further comprises: at least one first reinforcing plate (1324); the first reinforcing plate (1324) is respectively connected to the tube (1321) and base side panels (1322). 6.根据权利要求1所述的快速移动安装支撑系统,其特征在于,所述支撑件(135)包括:支撑底板(1351)及分别与所述支撑底板(1351)垂直连接的两个支撑侧板(1352);所述支撑底板(1351)的顶面与两个支撑侧板(1352)的内侧面形成一支撑固定槽;所述支撑杆(134)的一端连接于所述支撑底板(1351)的底面。6. The fast moving installation support system according to claim 1, characterized in that, the support (135) comprises: a support base (1351) and two support sides respectively vertically connected to the support base (1351) plate (1352); the top surface of the support base plate (1351) and the inner surfaces of the two support side plates (1352) form a support fixing groove; one end of the support rod (134) is connected to the support base plate (1351 ) bottom surface. 7.根据权利要求6所述的快速移动安装支撑系统,其特征在于,所述支撑件(135)还包括:至少一个第二加固板(1353);所述第二加固板(1353)分别连接所述支撑底板(1351)与支撑杆(134)。7. The fast moving installation support system according to claim 6, characterized in that, the support (135) further comprises: at least one second reinforcing plate (1353); the second reinforcing plates (1353) are respectively connected The supporting bottom plate (1351) and the supporting rod (134). 8.根据权利要求6所述的快速移动安装支撑系统,其特征在于,所述支撑侧板(1352)上开设有至少一个加固螺孔(13521)。8. The fast moving installation support system according to claim 6, characterized in that at least one reinforcing screw hole (13521) is opened on the support side plate (1352). 9.根据权利要求1所述的快速移动安装支撑系统,其特征在于,所述支撑件(135)为圆台结构。9. The fast moving installation support system according to claim 1, characterized in that, the support member (135) is a circular frustum structure.
CN201810545176.3A 2018-05-18 2018-05-31 A fast moving installation support system Active CN108442693B (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
JOP/2019/0117A JOP20190117A1 (en) 2018-05-31 2018-05-31 Fast Moving Installation Supporting System
CN201810545176.3A CN108442693B (en) 2018-05-31 2018-05-31 A fast moving installation support system
HK18115786.6A HK1253972A2 (en) 2018-05-31 2018-12-10 Fast moving installation supporting system
AU2019100147A AU2019100147B4 (en) 2018-05-31 2019-02-13 Fast Moving Installation Supporting System
EP19158078.6A EP3575513A1 (en) 2018-05-31 2019-02-19 Supporting system
CA3036600A CA3036600C (en) 2018-05-18 2019-03-13 Fast moving installation supporting system
NZ753014A NZ753014B2 (en) 2018-05-31 2019-04-30 Installation Supporting System
SG10202011542QA SG10202011542QA (en) 2018-05-31 2019-05-15 Fast moving installation support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810545176.3A CN108442693B (en) 2018-05-31 2018-05-31 A fast moving installation support system

Publications (2)

Publication Number Publication Date
CN108442693A true CN108442693A (en) 2018-08-24
CN108442693B CN108442693B (en) 2021-07-09

Family

ID=63205919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810545176.3A Active CN108442693B (en) 2018-05-18 2018-05-31 A fast moving installation support system

Country Status (7)

Country Link
EP (1) EP3575513A1 (en)
CN (1) CN108442693B (en)
AU (1) AU2019100147B4 (en)
CA (1) CA3036600C (en)
HK (1) HK1253972A2 (en)
JO (1) JOP20190117A1 (en)
SG (1) SG10202011542QA (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158950A (en) * 2019-06-19 2019-08-23 俊川建筑科技有限公司 A kind of support device

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930857A (en) * 2019-04-23 2019-06-25 中国人民解放军陆军工程大学 A combined helical bracing system for supporting collapsed building structures
CN110778106A (en) * 2019-12-05 2020-02-11 湖北大成空间科技股份有限公司 Scalable turnover mould for assembly type structure
CN112693577A (en) * 2020-04-30 2021-04-23 沪东中华造船(集团)有限公司 Manufacturing method for carbon steel channel part of ship
CN112854712A (en) * 2021-01-07 2021-05-28 中惺有限公司 Electric power engineering construction safety protection system
CN113293993B (en) * 2021-05-21 2024-08-16 中冶天工集团有限公司 Supporting device for cantilever plate construction
CN113550568A (en) * 2021-06-30 2021-10-26 重庆建工第三建设有限责任公司 Aluminum-wood combined template with reinforcing structure
CN114250747B (en) * 2021-12-28 2023-04-07 中交二航局第一工程有限公司 Kong Koushi damper simply supported beam combined supporting device
CN114319870A (en) * 2022-01-10 2022-04-12 成都建工装饰装修有限公司 Roof layer beam dismantling support structure and dismantling method
CN114482518B (en) * 2022-03-31 2023-10-13 中航天建设工程集团有限公司 Side tilting protection device for building construction
CN116025179A (en) * 2022-07-08 2023-04-28 深圳市华与科工集团有限公司 A kind of prefabricated laminated plate support mechanism for construction engineering
CN115839165B (en) * 2022-12-15 2024-10-25 中铁五局集团机械化工程有限责任公司 An expandable construction platform for high-altitude operations
CN115788104B (en) * 2022-12-19 2023-09-19 江苏零界科技集团有限公司 Preventive protection device for wooden structure of ancient building
CN116181113B (en) * 2023-03-01 2024-08-09 安徽省鸿玮建设有限公司 Support system for mounting assembly type building and construction method
CN116696118B (en) * 2023-06-26 2025-09-23 福建理工大学 Adjustable support device for assembled floor and support method thereof
CN116816124A (en) * 2023-07-19 2023-09-29 中交一公局西北工程有限公司 A movable narrow groove rapid support device and method
CN117702765B (en) * 2023-11-24 2026-04-14 中国五冶集团有限公司 Support replacing construction device and construction method for support structure
CN118390861B (en) * 2024-05-17 2024-10-29 临沂城发建工集团有限公司 Prefabricated member installation supporting device for assembled building
CN120273516B (en) * 2025-06-10 2025-09-23 福建建工集团有限责任公司 Auxiliary supporting device for magnesium mould construction of high-rise building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2965286A1 (en) * 2010-09-23 2012-03-30 Jacky Habich Consultant Safety fork for use in top of post of safety shoring tower, has assembly space assembling column of barrier at support height to assure void front protection, where assembly space is laterally formed with respect to support surface
CN206530056U (en) * 2017-03-07 2017-09-29 中建二局第二建筑工程有限公司 Construction beam adjustable supporting device
CN107724708A (en) * 2017-10-11 2018-02-23 惠州市晋锋建筑材料有限公司 A kind of retractable supports code device
CN107780653A (en) * 2017-10-28 2018-03-09 温州威泰建设有限公司 A kind of template supporting tool and construction method for steel structure floor system
CN107842193A (en) * 2016-09-18 2018-03-27 俊川建筑科技有限公司 Building aluminum bench formwork
CN208363598U (en) * 2018-05-31 2019-01-11 俊川建筑科技有限公司 A fast moving installation support system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2109088C3 (en) * 1971-02-25 1978-03-09 Philipp Holzmann Ag, 6000 Frankfurt Spatial component for the formation of loadbearing structures and supporting structures that are multiple times the largest edge length of the component with regard to their extension
US4693449A (en) * 1985-10-24 1987-09-15 Cunningham Arthur L Beam form and slab form adjustment structure
GB2193286B (en) * 1986-07-11 1990-05-30 Scaffolding Improvements in or relating to a frame for a falsework support system
GB8915693D0 (en) * 1989-07-08 1989-08-31 Kwikform Ltd Gkn Formwork system
KR101691525B1 (en) * 2016-04-22 2017-01-09 신성구조이엔지 주식회사 Lego Type Cart Supporting Post

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2965286A1 (en) * 2010-09-23 2012-03-30 Jacky Habich Consultant Safety fork for use in top of post of safety shoring tower, has assembly space assembling column of barrier at support height to assure void front protection, where assembly space is laterally formed with respect to support surface
CN107842193A (en) * 2016-09-18 2018-03-27 俊川建筑科技有限公司 Building aluminum bench formwork
CN206530056U (en) * 2017-03-07 2017-09-29 中建二局第二建筑工程有限公司 Construction beam adjustable supporting device
CN107724708A (en) * 2017-10-11 2018-02-23 惠州市晋锋建筑材料有限公司 A kind of retractable supports code device
CN107780653A (en) * 2017-10-28 2018-03-09 温州威泰建设有限公司 A kind of template supporting tool and construction method for steel structure floor system
CN208363598U (en) * 2018-05-31 2019-01-11 俊川建筑科技有限公司 A fast moving installation support system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158950A (en) * 2019-06-19 2019-08-23 俊川建筑科技有限公司 A kind of support device

Also Published As

Publication number Publication date
CN108442693B (en) 2021-07-09
CA3036600A1 (en) 2019-11-18
EP3575513A1 (en) 2019-12-04
JOP20190117A1 (en) 2019-11-30
AU2019100147B4 (en) 2019-07-04
CA3036600C (en) 2021-06-15
HK1253972A2 (en) 2019-07-05
AU2019100147A4 (en) 2019-03-28
SG10202011542QA (en) 2020-12-30
NZ753014A (en) 2021-02-26

Similar Documents

Publication Publication Date Title
AU2019100147A4 (en) Fast Moving Installation Supporting System
KR102144434B1 (en) Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
CN204326548U (en) A kind of building floor leveling unit
CN107975251B (en) Assembled building wallboard joint support device
CN106337559A (en) Early dismantling support system of mold plate support frame and application method of early dismantling support system
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN112696012A (en) Wall column template device capable of being spliced
CN111622501A (en) Scissor type stair shaping steel mold construction method
CN202627214U (en) Beam-column connecting structure for steel reinforced concrete composite structure of high-rise building
CN210887278U (en) Fixing device for cup mouth type concrete foundation pit stand column
CN103758342A (en) Tool-type top form for buildings
CN104018655B (en) A kind of assembly type monomer bracing frame
CN204590614U (en) A kind of bean column node pattern carrier
CN215803185U (en) Auxiliary steel structure silo wall of quick pre-buried silo structure
CN211037864U (en) Reinforcing steel bar binding rack
CN215254596U (en) Wall column template device capable of being spliced
CN210195235U (en) A new type of concrete column formwork device
CN208363598U (en) A fast moving installation support system
CN104947836B (en) Construction method of cast-in-place floor slab without support in high-rise steel structure residence
CN210767763U (en) Steel split heads and supporting beam demolish device
RU109775U1 (en) FLOOR FORMWORK
CN207048311U (en) One kind support Quick release
CN206655474U (en) Fixative composition pin-connected panel stair template
CN106065713B (en) The template frame without scaffold cast-in-place concrete can be achieved
CN209976018U (en) Mobile supports for construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant