CN108442543A - A kind of the staged reinforcing strip system and construction method of continuous concreting - Google Patents
A kind of the staged reinforcing strip system and construction method of continuous concreting Download PDFInfo
- Publication number
- CN108442543A CN108442543A CN201810270666.7A CN201810270666A CN108442543A CN 108442543 A CN108442543 A CN 108442543A CN 201810270666 A CN201810270666 A CN 201810270666A CN 108442543 A CN108442543 A CN 108442543A
- Authority
- CN
- China
- Prior art keywords
- concrete
- expansion
- band
- reinforcing band
- staged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6807—Expansion elements for parts cast in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B2001/6818—Joints with swellable parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses the staged reinforcing strip systems and construction method of a kind of continuous concreting, including concrete substrate and expansion reinforcing band;The bottom of the concrete substrate is equipped with concrete floor bed course or bed die;The expansion reinforcing band is arranged every 35m in concrete substrate along structures vertical, horizontal respectively;One of staged separation net is respectively set in the both sides of the expansion reinforcing band, and expansion water-stop band is provided at the step inner corner trim of separation net;The upper and lower end of the expansion reinforcing band is all provided with matcoveredn, and protective layer includes top additional bar and lower part additional bar.It is according to the distribution of shrinkage stress, it is principle with " anti-to put combination; based on anti-", it is compensated by with corresponding swelling stress, swelling agent, which is added, at the larger position of shrinkage stress makes expansion reinforcing band, it can be effectively improved the volume stability of concrete material, reduce cracking risk, the whole cracking resistance and endurance quality for improving concrete.
Description
Technical field
The present invention relates to overlength concrete members to pour jointless construction expansion reinforcing band structure design and application technology neck
Domain, the staged reinforcing strip system and construction method of specially a kind of continuous concreting.
Background technology
In recent years, with the diversified development of building trade, Structural Design is more and more novel, overlength knot in city
The building of structure, large chassis multi-tower type structure or body irregular structure continues to bring out.Especially there is particular/special requirement to underground waterproof
Overlarge area hypogee emergence.Most of structure design has Construction Later Casting Zone, and the contraction to solve concrete is opened
Split problem.
But percolating water easily occurs for post-cast strip position, and hidden danger is brought to the normal use of building.In main body construction
Indwelling time is longer, and curing water and construction rubbish are extremely serious to steel bar corrosion during this period, cleaning work before cast and at
Product protect difficulty larger.In construction, due to the dismounting of template, the beam slab of post-cast strip both sides becomes cantilever member, with design
Intention is disagreed.Under entirely, superstructure, place of arrival meets the disconnected beam of beam, meets the disconnected plate of plate, is brought very to construction for post-cast strip
It is mostly inconvenient, influence construction speed.Before post-cast strip fills concrete, both sides concrete dabbing need to be constructed extremely difficult, and had
A little structural concretes and post-cast strip concreting time interval several months, the adhesion strength of New-old concrete it is difficult to ensure that, and by
In pouring the time difference, cause the drying shrinkage of the concrete of these structures is most of to be completed before post-cast strip fills.Therefore, post-cast strip
The drying shrinkage of concrete easily generates crack in the junction of New-old concrete.The original intention that Construction Later Casting Zone is arranged is to prevent concrete
The generation in crack, then pours that tape handling is bad but artificially to cause two through cracks at every post-cast strip, causes leak.
Invention content
The purpose of the present invention is to provide one kind preventing concrete with the larger swelling stress compensation temperature difference, drying shrinkage shrinkage stress
The staged reinforcing strip system and construction method of the continuous concreting of cracking, it is mentioned above in the background art to solve
Problem.
To achieve the above object, the present invention provides the following technical solutions:A kind of staged of continuous concreting adds
Strong band system, including concrete substrate and expansion reinforcing band;The bottom of the concrete substrate is equipped with concrete floor bed course
Or bed die;The expansion reinforcing band is arranged every 35m in concrete substrate along structures vertical, horizontal respectively;The expansion adds
One of staged separation net is respectively set in the both sides of strong band, and expansion water-stop band is provided at the step inner corner trim of separation net;It is described
The upper and lower end of expansion reinforcing band is all provided with matcoveredn;The protective layer includes top additional bar and lower part additional bar, top
Additional bar and lower part additional bar are welded and fixed with stepped vertical reinforced steel, separation net respectively.
Preferably, the cross section that the expansion reinforcing band is contacted with concrete substrate is staircase structural model, and uses steel wire
Material, mesh 5mm × 5mm separation net be isolated.
Preferably, the position of the separation net is respectively equipped with the ladder steel bar of an A16 250mm and is reinforced, ladder
Type structure is two-stage step structure, and subordinate's step width is 350mm.
Preferably, the position larger in shrinkage stress, the cross-sectional width of expansion reinforcing band is arranged in the expansion reinforcing band
For 800mm.
The present invention provides another technical solution:A kind of staged reinforcing strip system of continuous concreting is applied
Work method, includes the following steps:
S1:It is laid with concrete bottom cushion or bed die;
S2:It expands and reinforces every 35m left and right settings along structures vertical, horizontal respectively at the larger position of temperature shrinkage stress
The cross-sectional width of band, expansion reinforcing band is 800mm, and is arranged in concrete substrate;
S3:Since the cross section that expansion reinforcing band is contacted with concrete substrate is staircase structural model, using wire quality
Separation net is isolated, and stepped separation net together, isolation is respectively set in the both sides of staged expansion reinforcing band position
The step steel bar that the position of net is respectively equipped with an A16 250mm is reinforced;
S4:Expansion reinforcing band upper and lower end be arranged protective layer, protective layer be top additional bar and lower part additional bar,
Top additional bar and lower part additional bar are welded and fixed with stepped vertical reinforced steel, separation net respectively;
S5:Installation form, and bolt and preserved pipeline are set in concrete substrate, when the ontology concrete curing poured
After intensity reaches 1.2MP, then pour expansion reinforcing band concrete;
S6:Expansion reinforcing band concrete, and water storage after plastic covering film in time are conserved, conserves 14 days, ensures in water
Concrete hydrating effect water.
Preferably, SY-G composite fibre antimitotic agents are added in the step S5 in the concrete for pouring expansion reinforcing band,
Concrete minimum expansion rate is 0.015, mixes composite fibre toughener, and band part concrete minimum limited expansion rate is reinforced in construction
It is 0.025%.
Compared with prior art, the beneficial effects of the invention are as follows:
The staged reinforcing strip system and construction method of this continuous concreting, according to the distribution of shrinkage stress, with
" anti-to put combination, based on anti-" is principle, is compensated by with corresponding swelling stress, is added at the larger position of shrinkage stress swollen
Swollen dose is made expansion reinforcing band, and other position mixing micro expansive concretes realize continuous casting pound to cancel the late poured band;Its main feature is that
Continuous concreting is carried out with expansion reinforcing band substitution Construction Later Casting Zone, SY-G composite fibre cracking resistances are added in concrete
Agent, concrete minimum expansion rate are 0.015, mix composite fibre toughener, it is swollen that the limitation of band part concrete minimum is reinforced in construction
Swollen rate is 0.025%, and after this cement expansive material incorporation concrete with good expansion sources, expansion energy will become pre-
Stress offsets the shrinkage stress that concrete generates in hardening process by this pressure, using decrement component to concrete
Dry contraction, the reduction of autogenous shrinkage and the release of a variety of expansion sources expansion performances, can be effectively improved the body of concrete material
Product stability reduces cracking risk, the whole cracking resistance and endurance quality for improving concrete.
Description of the drawings
Fig. 1 is the bottom plate or floor reinforcing strip structural schematic diagram of the present invention;
Fig. 2 is the wall reinforcing strip structural schematic diagram of the present invention;
Fig. 3 is the beam reinforcing strip structural schematic diagram of the present invention;
Fig. 4 is the separation net structural schematic diagram of the present invention.
In figure:1 concrete substrate, 2 expansion reinforcing bands, 3 separation nets, 4 protective layers, 5 bolts and preserved pipeline, 6 tops are attached
Add reinforcing bar, 7 lower part additional bars, 8 concrete floor bed courses or bed die, 9 expansion water-stop bands.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment 1:
Please refer to Fig.1-4, a kind of staged reinforcing strip system of continuous concreting, including 1 He of concrete substrate
Expansion reinforcing band 2;The bottom of concrete substrate 1 is equipped with concrete floor bed course or bed die 8;Expansion reinforcing band 2 is respectively along structure
It builds object vertical, horizontal every 35m to be arranged in concrete substrate 1, the position larger in shrinkage stress is arranged in expansion reinforcing band 2, swollen
The cross-sectional width of swollen reinforcing strip 2 is 800mm;One of staged separation net 3 is respectively set in the both sides of expansion reinforcing band 2, every
It is provided with expansion water-stop band 9 at the step inner corner trim of off-network 3;The cross section that expansion reinforcing band 2 is contacted with concrete substrate 1 is step
Formula structure, and be isolated using the separation net 3 of wire quality, mesh 5mm × 5mm, the position of separation net 3 is respectively equipped with one
The ladder steel bar of A16 250mm is reinforced, and forge piece of step type structure is two-stage step structure, and subordinate's step width is 350mm;It is swollen
The upper and lower end of swollen reinforcing strip 2 is all provided with matcoveredn 4;Protective layer 4 includes top additional bar 6 and lower part additional bar 7, top
Additional bar 6 and lower part additional bar 7 are welded and fixed with stepped vertical reinforced steel, separation net 3 respectively.
Embodiment 2:
Based on the staged reinforcing strip system that above-described embodiment 1 describes, the present invention also provides another embodiments to be:One
The construction method of the staged reinforcing strip system of kind continuous concreting, includes the following steps:
The first step:It is laid with concrete bottom cushion or bed die 8;
Second step:It is expanded respectively every 35m left and right settings along structures vertical, horizontal at the larger position of temperature shrinkage stress
The cross-sectional width of reinforcing strip 2, expansion reinforcing band 2 is 800mm, and is arranged in concrete substrate 1;
Third walks:Since the cross section that expansion reinforcing band 2 is contacted with concrete substrate 1 is staircase structural model, using steel wire
The separation net 3 of material is isolated, and stepped isolation together is respectively set in the both sides of 2 position of staged expansion reinforcing band
Net 3, the step steel bar that the position of separation net 3 is respectively equipped with an A16 250mm are reinforced;
4th step:Protective layer 4 is set in 2 upper and lower end of expansion reinforcing band, protective layer 4 is that top additional bar 6 and lower part are attached
Add reinforcing bar 7, top additional bar 6 and lower part additional bar 7 be welded to each other with stepped vertical reinforced steel, separation net 3 respectively,
Binding is secured, avoids being washed open by concrete in casting process;
5th step:Installation form, and bolt and preserved pipeline 5 are set in concrete substrate 1, when the ontology coagulation poured
After native curing strength reaches 1.2MP, then 2 concrete of expansion reinforcing band is poured, avoids generating construction joint;Wherein, expansion is being poured
When the concrete of reinforcing strip 2, SY-G composite fibre antimitotic agents need to be added, concrete minimum expansion rate is 0.015, mixes compound fibre
Toughener is tieed up, it is 0.025% that band part concrete minimum limited expansion rate is reinforced in construction;
6th step:2 concrete of expansion reinforcing band, and water storage after plastic covering film in time are conserved, is conserved 14 days in water,
Ensure concrete hydrating effect water.
Preferably, SY-G composite fibre antimitotic agents are added in the step S5 in the concrete for pouring expansion reinforcing band 2,
Concrete minimum expansion rate is 0.015, mixes composite fibre toughener, and band part concrete minimum limited expansion rate is reinforced in construction
It is 0.025%.
In summary:The staged reinforcing strip system and construction party of a kind of continuous concreting provided by the invention
Method is compensated by with " anti-to put combination, based on anti-" for principle with corresponding swelling stress according to the distribution of shrinkage stress,
The larger position of shrinkage stress adds swelling agent and makes expansion reinforcing band 2, after other position mixing micro expansive concretes are to cancel
Band is poured, realizes continuous casting pound;Its main feature is that replacing Construction Later Casting Zone to carry out continuous concreting with expansion reinforcing band 2, mixed
SY-G composite fibre antimitotic agents are added in solidifying soil, concrete minimum expansion rate is 0.015, mixes composite fibre toughener, construction
It is 0.025% to reinforce band part concrete minimum limited expansion rate, is mixed with this cement expansive material with good expansion sources
After entering concrete, expansion energy will become prestressing force, and the receipts that concrete generates in hardening process are offset by this pressure
Stress under compression, using decrement component to the reduction of concrete drying shrinkage, autogenous shrinkage and the release of a variety of expansion sources expansion performances,
It can be effectively improved the volume stability of concrete material, reduce cracking risk, the whole cracking resistance for improving concrete and resistance to
Long performance.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (6)
1. a kind of staged reinforcing strip system of continuous concreting, which is characterized in that including concrete substrate (1) and swollen
Swollen reinforcing strip (2);The bottom of the concrete substrate (1) is equipped with concrete floor bed course or bed die (8);The expansion is reinforced
Band (2) is arranged every 35m in concrete substrate (1) along structures vertical, horizontal respectively;The both sides of the expansion reinforcing band (2)
One of staged separation net (3) is respectively set, expansion water-stop band (9) is provided at the step inner corner trim of separation net (3);It is described swollen
The upper and lower end of swollen reinforcing strip (2) is all provided with matcoveredn (4);The protective layer (4) includes that top additional bar (6) and lower part are attached
Add reinforcing bar (7), top additional bar (6) and lower part additional bar (7) respectively with stepped vertical reinforced steel, separation net (3)
It is welded and fixed.
2. a kind of staged reinforcing strip system of continuous concreting as described in claim 1, it is characterised in that:It is described
The cross section that expansion reinforcing band (2) is contacted with concrete substrate (1) be staircase structural model, and using wire quality, mesh 5mm ×
The separation net (3) of 5mm is isolated.
3. a kind of staged reinforcing strip system of continuous concreting as described in claim 1, it is characterised in that:It is described
The ladder steel bar that the position of separation net (3) is respectively equipped with an A16 250mm is reinforced, and forge piece of step type structure is two-stage step
Structure, subordinate's step width are 350mm.
4. a kind of staged reinforcing strip system of continuous concreting as described in claim 1, it is characterised in that:It is described
The position larger in shrinkage stress is arranged in expansion reinforcing band (2), and the cross-sectional width of expansion reinforcing band (2) is 800mm.
5. a kind of construction method of the staged reinforcing strip system of continuous concreting as described in claim 1, special
Sign is, includes the following steps:
S1:It is laid with concrete bottom cushion or bed die (8);
S2:At the larger position of temperature shrinkage stress respectively along structures vertical, horizontal every 35m left and right settings expansion reinforcing bands
(2), the cross-sectional width of expansion reinforcing band (2) is 800mm, and is arranged in concrete substrate (1);
S3:Since the cross section that expansion reinforcing band (2) is contacted with concrete substrate (1) is staircase structural model, using wire quality
Separation net (3) be isolated, and the both sides of staged expansion reinforcing band (2) position be respectively set together stepped isolation
Net (3), the step steel bar that the position of separation net (3) is respectively equipped with an A16 250mm are reinforced;
S4:Protective layer 4 is set in expansion reinforcing band (2) upper and lower end, protective layer (4) is that top additional bar (6) and lower part are additional
Reinforcing bar (7), top additional bar (6) and lower part additional bar (7) are welded with stepped vertical reinforced steel, separation net (3) respectively
Connect fixation;
S5:Installation form, and setting bolt and preserved pipeline (5) in concrete substrate (1), when this body concrete poured is supported
After shield intensity reaches 1.2MP, then pour expansion reinforcing band (2) concrete;
S6:Expansion reinforcing band (2) concrete, and water storage after plastic covering film in time are conserved, conserves 14 days, ensures mixed in water
Solidifying soil hydration water.
6. a kind of construction method of the staged reinforcing strip system of continuous concreting as claimed in claim 5, special
Sign is, adds SY-G composite fibre antimitotic agents, concrete in the step S5 in the concrete for pouring expansion reinforcing band (2)
Minimum expansion rate is 0.015, mixes composite fibre toughener, and construction reinforces band part concrete minimum limited expansion rate and is
0.025%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810270666.7A CN108442543A (en) | 2018-03-29 | 2018-03-29 | A kind of the staged reinforcing strip system and construction method of continuous concreting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810270666.7A CN108442543A (en) | 2018-03-29 | 2018-03-29 | A kind of the staged reinforcing strip system and construction method of continuous concreting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108442543A true CN108442543A (en) | 2018-08-24 |
Family
ID=63197664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810270666.7A Pending CN108442543A (en) | 2018-03-29 | 2018-03-29 | A kind of the staged reinforcing strip system and construction method of continuous concreting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108442543A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110173051A (en) * | 2019-05-15 | 2019-08-27 | 中国建筑第八工程局有限公司 | Super-length seamless concrete structure and its construction method |
CN110670638A (en) * | 2019-07-15 | 2020-01-10 | 五冶集团上海有限公司 | Seamless construction method for expansion reinforcing belt of prefabricated house basement structure |
EE201900010A (en) * | 2019-04-05 | 2020-11-16 | Wpmeesti Oü | Rupture element which in concrete constructions |
CN111962877A (en) * | 2020-08-11 | 2020-11-20 | 北京崇建工程有限公司 | Device and method for constructing concrete expansion reinforcing belt |
CN113802528A (en) * | 2021-10-29 | 2021-12-17 | 中国电建集团贵阳勘测设计研究院有限公司 | Stilling pool structure and construction method thereof |
WO2022106913A1 (en) | 2020-11-19 | 2022-05-27 | Wpmestonia Oü | Joint inducer profile for temperature and shrinkage joints in concrete retaining wall |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102030507A (en) * | 2010-11-19 | 2011-04-27 | 天津城市建设学院 | Self-compacting micro-expanded steel tube concrete |
CN102116092A (en) * | 2009-12-30 | 2011-07-06 | 中冶成工上海五冶建设有限公司 | Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks |
CN102351501A (en) * | 2011-07-04 | 2012-02-15 | 武汉理工大学 | Cement-based grouting material and preparation method thereof |
CN203531154U (en) * | 2013-06-18 | 2014-04-09 | 浙江海天建设集团有限公司 | Intermittent reinforcing band system used for continuously pouring concrete |
-
2018
- 2018-03-29 CN CN201810270666.7A patent/CN108442543A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102116092A (en) * | 2009-12-30 | 2011-07-06 | 中冶成工上海五冶建设有限公司 | Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks |
CN102030507A (en) * | 2010-11-19 | 2011-04-27 | 天津城市建设学院 | Self-compacting micro-expanded steel tube concrete |
CN102351501A (en) * | 2011-07-04 | 2012-02-15 | 武汉理工大学 | Cement-based grouting material and preparation method thereof |
CN203531154U (en) * | 2013-06-18 | 2014-04-09 | 浙江海天建设集团有限公司 | Intermittent reinforcing band system used for continuously pouring concrete |
Non-Patent Citations (2)
Title |
---|
石四军: "《污水处理厂施工技术》", 30 June 2010, 中国电力出版社 * |
闫振甲: "《高性能泡沫混凝土保温制品实用技术》", 30 June 2015, 中国建材工业出版社 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EE201900010A (en) * | 2019-04-05 | 2020-11-16 | Wpmeesti Oü | Rupture element which in concrete constructions |
EE05873B1 (en) * | 2019-04-05 | 2024-09-16 | Primostar Tootmine Oü | Rupture element which in concrete constructions |
CN110173051A (en) * | 2019-05-15 | 2019-08-27 | 中国建筑第八工程局有限公司 | Super-length seamless concrete structure and its construction method |
CN110670638A (en) * | 2019-07-15 | 2020-01-10 | 五冶集团上海有限公司 | Seamless construction method for expansion reinforcing belt of prefabricated house basement structure |
CN111962877A (en) * | 2020-08-11 | 2020-11-20 | 北京崇建工程有限公司 | Device and method for constructing concrete expansion reinforcing belt |
CN111962877B (en) * | 2020-08-11 | 2021-11-16 | 北京崇建工程有限公司 | Device and method for constructing concrete expansion reinforcing belt |
WO2022106913A1 (en) | 2020-11-19 | 2022-05-27 | Wpmestonia Oü | Joint inducer profile for temperature and shrinkage joints in concrete retaining wall |
CN113802528A (en) * | 2021-10-29 | 2021-12-17 | 中国电建集团贵阳勘测设计研究院有限公司 | Stilling pool structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108442543A (en) | A kind of the staged reinforcing strip system and construction method of continuous concreting | |
CN105317137B (en) | Precast wall body, wallboard and its construction method and prefabricated panel production method | |
CN107326940B (en) | basement advanced water stop post-cast strip structure and construction method thereof | |
CN103615053B (en) | Monolithic reinforced concrete structure post empiricism engineering method | |
CN111364658B (en) | Environment-friendly construction method for prefabricated assembled concrete floor plate | |
CN102235091A (en) | Construction method for ultralong concrete structure | |
CN207739437U (en) | A kind of prefabricated steel reinforced concrete shear wall structure | |
CN102677795A (en) | Cast-in-place foam concrete energy-saving fire protection wall with built-in core mesh | |
CN106978823A (en) | Outer wall of basement advanced water-stop post-pouring zone construction method | |
CN106088459B (en) | A kind of prefabricated assembled composite heat preserving external wall wall and preparation method thereof, design method and the steel building comprising the wall | |
CN110374254A (en) | The plug-in composite wallboard structure of assembled basalt fibre regeneration concrete and production method | |
CN207110214U (en) | A kind of prefabricated interior fill concrete wallboard | |
CN108775084A (en) | Steel-concrete combines precast beam and prefabricated post connection structure and construction method | |
CN106193340B (en) | The construction method of cast-in-place prestressing without bondn ultralong floor combined type reinforcing strip anti-cracking structure | |
CN105649259B (en) | A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure | |
CN106337443A (en) | Jointless construction structure combining SCC (self-compacting concrete) and common concrete | |
CN209456992U (en) | Low damage unilateral formwork supporting structure under campshed support system | |
CN109024704A (en) | A kind of staged expansion reinforcing band system and construction method | |
CN208472958U (en) | A kind of partial precast assembled steel reinforced concrete giant frame structure | |
CN102936953A (en) | Construction method of bridging-arm stiffened steel structure template | |
CN108086682A (en) | Concrete structure, material and the engineering method that multilayer floor slab can construct simultaneously | |
CN102322022B (en) | Construction method for concrete of decorative housing of cable stayed bridge | |
CN107938845A (en) | A kind of concrete prefabricated assembling combining structures of FRP | |
CN206205144U (en) | Node is poured after the secondary external permanent aluminium sheet external mold of framework | |
CN109318363B (en) | The preparation method and external wall self-insulation system assembly method of assembled architecture outer wall plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |