CN108427817A - Method and device is determined based on the entrucking sequence of BIM assembled architecture components - Google Patents

Method and device is determined based on the entrucking sequence of BIM assembled architecture components Download PDF

Info

Publication number
CN108427817A
CN108427817A CN201710688299.8A CN201710688299A CN108427817A CN 108427817 A CN108427817 A CN 108427817A CN 201710688299 A CN201710688299 A CN 201710688299A CN 108427817 A CN108427817 A CN 108427817A
Authority
CN
China
Prior art keywords
sequence
component
entrucking
lifting
layout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710688299.8A
Other languages
Chinese (zh)
Inventor
李江滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201710688299.8A priority Critical patent/CN108427817A/en
Publication of CN108427817A publication Critical patent/CN108427817A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of entrucking sequences based on BIM assembled architecture components to determine method and device, by obtaining the three-dimensional building model established based on BIM;Three-dimensional building model is split as single component, generates components pattern information, unique coding information is assigned to each component;It determines lifting erection sequence when each component is assembled, generates lifting sequence file;Wherein, two components being separated by before and after lifting erection sequence are reserved with the space interval more than 1 in establishment between corresponding lifting serial number;It receives layout component input by user for the treatment of and carries out selected instruction;According to lifting erection sequence and preset rules of arrangement, layout component is treated automatically and carries out layout, to determine the entrucking position and the entrucking sequence that wait for layout component.The application can realize the automatic editing of component truck-loading scheme, without carrying out lifting work again after taking out whole entrucking components, substantially increase the efficiency of assembly.

Description

Method and device is determined based on the entrucking sequence of BIM assembled architecture components
Technical field
The present invention relates to assembled architecture technical fields, suitable more particularly to the entrucking based on BIM assembled architecture components Sequence determines method and device.
Background technology
The maximum distinctive points of assembled architecture and traditional architecture are the construction method in house, and traditional architecture is generally using existing Pour mode.I.e. with wallboard power, then live formwork supporting plate forms in space in template and pours into flowing concrete, wait for that concrete is solidifying Admittedly after reaching some strength, then form removal forms a face wall.The shortcomings that cast-in-place mode, is that there are many situ wet operation, formwork form removal Process bothers, and the artificial demand in scene is larger, and managerial confusion is wasted water, and airborne dust is more, and noise is big, and the duration is longer, and construction quality can not Control, live being susceptible to use inferior materials and turn out substandard goods or because experience and sense of responsibility are short of, quality problems, such as waterproof, hollowing occur Deng.
Assembled architecture increases manufacture link between design and construction, and factory is according to the design of design department, manufacture To on-site consolidation, i.e., various required prefabricated components, including wallboard, floor, beam, column, balcony, bay window and stair, are then transported Design-manufacture-assembly.Assembled architecture is advantageous in that erecting yard does not need or seldom use wet construction, prefabricated component matter Amount is controllable, is made by factory industry, and human factor is controllable, short time limit, water-saving and environmental protection, and formwork form removal is seldom used in scene, greatly The big waste for reducing template.
In the prior art, each component needs component being encased in transport lorry, lead to after completing or purchasing Freight Transport is crossed to erecting yard, to carry out on-site hoisting assembly.But it is existing during entrucking, it is substantially pure artificial Operation can not ensure the reasonability of entrucking, i.e., can not since carrying personnel is not hoisting personnel when being responsible for component installation the later stage The entrucking sequence of control component.In this way after reaching erecting yard, needs all to take out entrucking component, hanging for component could be carried out Work is filled, the working efficiency of assembled architecture technology is leveraged.
Invention content
The object of the present invention is to provide a kind of entrucking sequences based on BIM assembled architecture components to determine method and device, It could carry out lifting work to solve the problems, such as that the prior art needs all to take out entrucking components, cause efficiency of assembling relatively low.
In order to solve the above technical problems, the present invention provides a kind of entrucking sequence determination based on BIM assembled architecture components Method, including:
Obtain the three-dimensional building model established based on BIM;
The three-dimensional building model is split as single component, generates components pattern information, each component is assigned unique Coding information;
It determines lifting erection sequence when each component is assembled, generates lifting sequence file;Wherein, lifting peace Two components being separated by before and after dress sequence are reserved with the space interval more than 1 in establishment between corresponding lifting serial number;
It receives layout component input by user for the treatment of and carries out selected instruction;
According to the lifting erection sequence and preset rules of arrangement, wait for that layout component carries out layout to described automatically, To wait for entrucking position and the entrucking sequence of layout component described in determination.
Optionally, the lifting sequence file is the individual files detached with IFC files.
Optionally, lifting erection sequence when each component of the determination is assembled generates lifting sequence file Including:
When the lifting erection sequence of first component changes, front and back the be separated by after first component change is determined The corresponding second lifting serial number of two components and the corresponding third of third component lift serial number;
The corresponding first lifting serial number of the first component is changed to the second lifting serial number and the third is hung The number between serial number is filled, the lifting sequence file after change is generated.
Optionally, described according to the lifting erection sequence and preset rules of arrangement, automatically layout structure is waited for described Part carry out layout, with waited for described in determination layout component entrucking position and entrucking sequence include:
For stay, layout component is waited for described in arrangement respectively to the left and right sides on the basis of shelf center, and point Set on waited for described in the right and left layout component ensure lorry center of gravity do not shift;
For cross member, according to the inverted sequence placement in heaps of lifting erection sequence, carried out on the basis of shelf center line pair Claim to place, and the described of each heap placement waits for that layout component is placed according to the inverted sequence of the lifting erection sequence.
Optionally, layout is waited for described according to the lifting erection sequence and preset rules of arrangement automatically described Component carry out layout, with waited for described in determination layout component entrucking position and entrucking sequence after further include:
Calculate the position of centre of gravity of lorry after waiting for layout component described in placing;
When the position of centre of gravity shifts, the prompt message of centre-of gravity shift is generated.
Optionally, described according to the lifting erection sequence and preset rules of arrangement, automatically layout structure is waited for described Part carry out layout, with waited for described in determination layout component entrucking position and entrucking sequence include:
When described when layout component is cross member, lateral structure is determined according to the capacity of the entrucking load of lorry, shelf The restriction number of plies of part;
According to the restriction number of plies, the lifting erection sequence and preset rules of arrangement, layout is waited for described automatically Component carries out layout, to wait for entrucking position and the entrucking sequence of layout component described in determination.
Optionally, layout is waited for described according to the lifting erection sequence and preset rules of arrangement automatically described Component carry out layout, with waited for described in determination layout component entrucking position and entrucking sequence after further include:
Obtain the dimensional rack model of each shelf on the lorry of loading component;
The components pattern information is read, the components pattern is shown in the corresponding entrucking position of the dimensional rack model Information.
Optionally, layout is waited for described according to the lifting erection sequence and preset rules of arrangement automatically described Component carry out layout, with waited for described in determination layout component entrucking position and entrucking sequence after further include:
Calculate geometric center of gravity position and the total weight of the shelf institute loading component being arranged on lorry;
Judge whether the geometric center of gravity position meets preset condition, and judges whether the total weight carries less than default Lotus;
When the geometric center of gravity position does not meet the preset condition or the total weight not less than the predetermined load When, generate the prompt message for not meeting traffic condition.
Optionally, layout is waited for described according to the lifting erection sequence and preset rules of arrangement automatically described Component carry out layout, with waited for described in determination layout component entrucking position and entrucking sequence after further include:
Between component, geometry collision calculation is carried out between component and shelf;
Between detect component, there are the prompts that geometry collides between component and shelf there are when geometry collision, generating Information.
The present invention also provides a kind of entrucking sequence determining devices based on BIM assembled architecture components, including:
Three-dimensional building model acquisition module, for obtaining the three-dimensional building model established based on BIM;
Component splits module, and for the three-dimensional building model to be split as single component, generation components pattern information is right Each component assigns unique coding information;
Lifting sequence file generating module, lifting erection sequence when for determining that each component is assembled are raw At lifting sequence file;Wherein, two components being separated by before and after lifting erection sequence are in establishment between corresponding lifting serial number It is reserved with the space interval more than 1;
Command reception module carries out selected instruction for receiving layout component input by user for the treatment of;
Entrucking sequence determining module is used for according to the lifting erection sequence and preset rules of arrangement, automatically to institute It states and waits for that layout component carries out layout, to wait for entrucking position and the entrucking sequence of layout component described in determination.
Entrucking sequence provided by the present invention based on BIM assembled architecture components determines method and device, passes through acquisition The three-dimensional building model established based on BIM;Three-dimensional building model is split as single component, components pattern information is generated, to each A component assigns unique coding information;It determines lifting erection sequence when each component is assembled, generates lifting sequence text Part;Wherein, two components being separated by before and after erection sequence are lifted to be reserved with more than 1 between corresponding lifting serial number in establishment Space interval;It receives layout component input by user for the treatment of and carries out selected instruction;According to lifting erection sequence and preset Rules of arrangement treats layout component and carries out layout automatically, to determine the entrucking position and the entrucking sequence that wait for layout component.This Shen Please can realize the automatic editing of component truck-loading scheme, can lifting erection sequence of the combination member when being assembled, in structure Entrucking is carried out according to the inverted sequence of lifting erection sequence when part carries out entrucking, in this way after reaching erecting yard, you can according to Erection sequence hanged component from lorry is lifted, component assembly is directly carried out, without being carried out again after taking out whole entrucking components Work is lifted, the efficiency of assembly is substantially increased.
Also, the application reserves certain space in the establishment of carry out sequence, is needing in this way to sequentially changing When, it is only necessary to the starting point of selected member imparting sequence, you can according to the lifting sequence in database, be automatically performed subsequent order Change, for collaboration provide convenience, further improve the efficiency of assembled technology.
Description of the drawings
It, below will be to embodiment or existing for the clearer technical solution for illustrating the embodiment of the present invention or the prior art Attached drawing is briefly described needed in technology description, it should be apparent that, the accompanying drawings in the following description is only this hair Some bright embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is that the entrucking sequence provided by the present invention based on BIM assembled architecture components determines that one kind of method is specific The flow chart of embodiment;
Fig. 2 is to carry out center of gravity in the entrucking sequence determining method provided by the present invention based on BIM assembled architecture components The process schematic of offset hints;
Fig. 3 is to carry out component in the entrucking sequence determining method provided by the present invention based on BIM assembled architecture components The process schematic that graphical information is shown;
Fig. 4 is to be transported in the entrucking sequence determining method provided by the present invention based on BIM assembled architecture components The process schematic of review;
Fig. 5 is to carry out geometry in the entrucking sequence determining method provided by the present invention based on BIM assembled architecture components The process schematic of collision detection;
Fig. 6 is the structure of the entrucking sequence determining device provided in an embodiment of the present invention based on BIM assembled architecture components Block diagram.
Specific implementation mode
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, shall fall within the protection scope of the present invention.
A kind of specific embodiment party provided by the present invention that method is determined based on the entrucking sequence of BIM assembled architecture components The flow chart of formula is as shown in Figure 1, this method includes:
Step S101:Obtain the three-dimensional building model established based on BIM;
Three-dimensional building model is the building figure that designer is designed based on BIM design platforms in the embodiment of the present invention.
Step S102:The three-dimensional building model is split as single component, components pattern information is generated, to each component Assign unique coding information;
Component is can specifically to be divided the division of preset building unit in assembled architecture according to actual conditions, Such as one block of wallboard, beam or column.Design department carries out architectural design according to selected architectural structure system, including house type, appearance, Hot-water heating Electromechanical Design etc., but factory cannot whole house disposable production, it is necessary to the production of one component of a component, example Such as, a face wall in a house, several meters to tens meters long to differ, factory can not possibly disposably produce super big wallboard again, transport Defeated and lifting is too difficult, and too small wallboard manufacture and efficiency of assembling are again too low, and assembly also bothers, and need to do the splicing node of water-proofing treatment Too much, it is the extremely crucial of contact design, manufacture and assembly so how building splits into reasonable, suitable prefabricated components A ring, be known as tearing plate open in industry, tear that plate is more reasonable, and manufacture is simpler, and production efficiency is also higher open, assembly is simple, efficiency of assembling Also higher.
The embodiment of the present invention carries out component to the three-dimensional building model that step S101 is got and splits to get entire to composition The component one by one of building.Specifically can three-dimensional building model be first subjected to layer fractionation, then carry out component again to each layer and tear open Point.
The present embodiment can be that unique coding information is arranged in each component, which can specifically include project letter Breath, building information etc..The form of expression of unique identification code can be number.
The coding information of component can be specifically made of information such as project, Lou Dong, floor, component, product informations.General feelings Under condition, project and Lou Dongjun have had unique code, can directly invoke herein.Floor, element type can give birth to according to serial number At, such as floor 01, element type 02, then the coding generated can be 0102.Further, it is also conceivable in coding Product coding, the common mode component in same project, same type assign identical product coding.By product code and other only One coded combination generates the unique encodings of PC components.Sequence between the serial number of each information can be carried out according to set sequence, Can also voluntarily it be arranged by user, this does not influence the realization of the present invention.For example, project-Lou Dong-floor-structure may be used The sequence of part type-product coding is arranged, and final unique coding information is generated.
Step S103:It determines lifting erection sequence when each component is assembled, generates lifting sequence file;Its In, two components being separated by before and after lifting erection sequence are reserved with the space more than 1 in establishment between corresponding lifting serial number Interval;
It should be pointed out that it is that component is lifted and filled in erecting yard to lift assemble sequence in the embodiment of the present invention The sequence of timing.For this step on the basis of above-mentioned steps, basis, determines each structure as unit of splitting obtained single component Lifting erection sequence when part is assembled.
In the existing setting to lifting sequence, original IFC assigns lifting as an attribute, but IFC includes very again The mostly attribute unrelated with lifting, attribute setting step sequence is more, inefficiency.And it is difficult to change when malfunctioning, when design document occurs When change, due to needing to remake design document, original attribute all cancels, former configuration successful failure.Therefore the present embodiment Lifting sequence file be the individual files detached with IFC files.By will lift the unique encodings of erection sequence and component into Row association forms lifting erection sequence file.And this document is unrelated with design document, and opening time is faster.And when pair setting When meter file is modified, lifting erection sequence file is not interfered with.
After assigning unique coding information to component, coded combination is formed.The lifting sequence of component is determined, Lifting sequence storage is logged in database based on coding, forms individual lifting sequence file, while dividing with IFC files From.Also, it lifts two components being separated by before and after erection sequence to be reserved with more than 1 between corresponding lifting serial number in establishment Space interval.
Specifically change process can be:When the lifting erection sequence of first component changes, first structure is determined The front and back second component being separated by corresponding second lifts serial number and the corresponding third lifting serial number of third component after part change;It will The first component corresponding first lifts serial number and is changed between the second lifting serial number and third lifting serial number Number, generate change after lifting sequence file.
The establishment of sequence is reserved with certain space, such as existing chronological order is:1,2,3,4,5, existing sequence serial number It is 1,11,21,31,41,51.In this way when the sequence of component needs change, due to being reserved with space, after being inserted into change Front and back serial number between, the serial number of other components need not be modified.For example, position of the component after change should be between Between 21-31, then as serial number, such as 26, the serial number of other components does not change any number during selecting.
Step S104:It receives layout component input by user for the treatment of and carries out selected instruction;
In this step, user can carry out multiple components individualized selection, and selected component is used as and waits for layout component, with Continue after an action of the bowels and carries out automatic editing.
Step S105:According to the lifting erection sequence and preset rules of arrangement, layout component is waited for described automatically Layout is carried out, to wait for entrucking position and the entrucking sequence of layout component described in determination.
As a kind of specific implementation mode, the embodiment of the present invention can respectively correspond to stay and cross member setting Placement regulation, treat layout component carry out automatic editing detailed process can be:
Wherein, for stay, on the basis of shelf center to the left and right sides respectively arrangement described in wait for layout component, and And it is divided into the described of the right and left and waits for that layout component ensures that the center of gravity of lorry does not shift.It can first be opened from one end of lorry Begin to arrange, then arrange by the same way to other end continuation again.For cross member, according to lifting erection sequence Inverted sequence placement in heaps, carried out on the basis of shelf center line it is symmetrically placed, and each heap place it is described wait for layout component according to The inverted sequence of the lifting erection sequence is placed.Equally, it can also first arrange from one end of lorry, after the completion again to another Continue to arrange by the same way in one end.In addition, putting for vertical and horizontal hybrid component, it can be from above two method Selection one is arranged.
In addition, further, when described when layout component is cross member, according to the entrucking load of lorry, shelf Capacity determines the restriction number of plies of cross member;It is advised according to the restriction number of plies, the lifting erection sequence and preset layout Then, wait for that layout component carries out layout to described automatically, to wait for entrucking position and the entrucking sequence of layout component described in determination.
The embodiment of the present invention can also obtain the location information of each shelf on the lorry of loading component;According to the lifting The inverted sequence of erection sequence generates corresponding entrucking position entrucking sequence and be positioned on the shelf of each component.Pass through Above-mentioned setting can make full use of the transport space of vehicle, and can realize the automatic editing of component truck-loading scheme.
Entrucking sequence provided by the present invention based on BIM assembled architecture components determines method, and BIM is based on by acquisition The three-dimensional building model of foundation;Three-dimensional building model is split as single component, generates components pattern information, each component is assigned Give unique coding information;It determines lifting erection sequence when each component is assembled, generates lifting sequence file;Wherein, Two components being separated by before and after lifting erection sequence are reserved between corresponding lifting serial number between the space more than 1 in establishment Every;It receives layout component input by user for the treatment of and carries out selected instruction;According to lifting erection sequence and preset layout rule Then, layout component is treated automatically and carries out layout, to determine the entrucking position and the entrucking sequence that wait for layout component.The application can Realize component truck-loading scheme automatic editing, can lifting erection sequence of the combination member when being assembled, component carry out Entrucking is carried out according to the inverted sequence of lifting erection sequence when entrucking, in this way after reaching erecting yard, you can pacify according to lifting Dress sequence hanged component from lorry, directly carries out component assembly, without carrying out slinger again after taking out whole entrucking components Make, substantially increases the efficiency of assembly.
Also, the application reserves certain space in the establishment of carry out sequence, is needing in this way to sequentially changing When, it is only necessary to the starting point of selected member imparting sequence, you can according to the lifting sequence in database, be automatically performed subsequent order Change, for collaboration provide convenience, further improve the efficiency of assembled technology.
As shown in Fig. 2, on the basis of the above embodiments, the entrucking provided by the present invention based on BIM building elements is suitable Sequence determines method, described according to the lifting erection sequence and preset rules of arrangement, waits for layout component to described automatically Carry out layout, with waited for described in determination layout component entrucking position and entrucking sequence after further include:
Step S201:Calculate the position of centre of gravity of lorry after waiting for layout component described in placing;
Step S202:When the position of centre of gravity shifts, the prompt message of centre-of gravity shift is generated.
After receiving prompt message, the placement location that relevant staff can treat layout component is adjusted, with Final position of centre of gravity is set not shift, to meet traffic condition.
As shown in figure 3, on the basis of the above embodiments, the entrucking provided by the present invention based on BIM building elements is suitable Sequence determines method, described according to the lifting erection sequence and preset rules of arrangement, waits for layout component to described automatically Layout is carried out, can further include later with the entrucking position and entrucking sequence of waiting for layout component described in determination:
Step S301:Obtain the dimensional rack model of each shelf on the lorry of loading component;
The dimensional rack model of each shelf on lorry is pre-established, can be preferentially full scale model.
Step S302:The components pattern information is read, institute is shown in the corresponding entrucking position of the dimensional rack model State components pattern information.
Specifically, the inverted sequence according to lifting in sequence, under the support of graphics engine, the graphic file of reading element, Geometry entity is formed, is placed on corresponding shelf, and the corresponding position in dimensional rack model shows components pattern Information.
The embodiment of the present invention can intuitively meet to carrying personnel's displaying and hang by being modeled to dimensional rack model The truck-loading scheme of dress sequence further improves the efficiency of assembly.
Further, the embodiment of the present invention described according to the lifting erection sequence and preset rules of arrangement, from It is dynamic to wait for that layout component carries out layout to described, after entrucking position and the entrucking sequence to wait for layout component described in determination, also Review operation can be carried out to the transport capacity of lorry.As shown in figure 4, the process can specifically include:
Step S401:It calculates shelf and loads the geometric center of gravity position of lorry and total weight after the component;
Step S402:Judge whether the geometric center of gravity position meets preset condition, and judges whether the total weight is low In predetermined load;
Step S403:When the geometric center of gravity position does not meet the preset condition or the total weight not less than described When predetermined load, the prompt message for not meeting traffic condition is generated.
The embodiment of the present invention is further calculated by the total weight to geometric center of gravity, component, can be according to lorry Transport capacity carries out review operation, to determine whether current truck-loading scheme meets the transport requirement of lorry, if be reasonable Truck-loading scheme.Whether it can be specially the offset of geometric center of gravity position pre- that whether geometric center of gravity position meets preset condition If within threshold range.Whether total weight is less than predetermined load, refers to whether the weight of current institute's mount components has been more than lorry original This load value, only when current truck-loading scheme is satisfied by the two conditions, which is the scheme of reasonable.
Preset condition is not met in geometric center of gravity position, such as when the offset of geometric center of gravity is more than preset threshold range, Or total weight judges that current truck-loading scheme does not meet traffic condition, generates prompt message when being more than the predetermined load of lorry, So that carrying personnel is adjusted correspondingly.Review operation is carried out again after the adjustment, until meeting traffic condition.
With reference to Fig. 5, based on any of the above embodiments, the entrucking provided by the present invention based on BIM building elements Sequence determines that method waits for layout structure to described automatically described according to the lifting erection sequence and preset rules of arrangement Part carry out layout, with waited for described in determination layout component entrucking position and entrucking sequence after further include:
Step S501:Between component, geometry collision calculation is carried out between component and shelf;
Step S502:Between detect component, there are geometry to touch between component and shelf there are when geometry collision, generating The prompt message hit.
The present embodiment between component, between component and shelf carry out geometry collision calculation, touched detecting the presence of geometry When hitting, corresponding prompt message is generated, so that user is adjusted.Carry out geometry collision calculation again after the adjustment, until Until being collided there is no geometry.The embodiment of the present invention by geometry collision calculation, can prevent in transportational process each component it Between interfere, lead to damage or other exceptions of component, and make full use of the loading space of lorry.
After carrying out review operation and geometry collision detection, truck-loading scheme can be formed, which can have Body includes the corresponding entrucking sequence result of personal share component and the position result that is positioned on the shelf.The entrucking side of generation Case can be preserved, and be shown when carrying personnel carries out entrucking.And when showing again, only need to directly it transfer corresponding Truck-loading scheme, you can repeat to show.
It is situated between below to the entrucking sequence determining device provided in an embodiment of the present invention based on BIM assembled architecture components It continues, the entrucking sequence determining device described below based on BIM assembled architecture components is based on BIM assembleds with above-described The entrucking sequence of building element determines that method can correspond reference.
Fig. 6 is the structure of the entrucking sequence determining device provided in an embodiment of the present invention based on BIM assembled architecture components Block diagram may include with reference to entrucking sequence determining devices of the Fig. 6 based on BIM assembled architecture components:
Three-dimensional building model acquisition module 100, for obtaining the three-dimensional building model established based on BIM;
Component splits module 200, for the three-dimensional building model to be split as single component, generates components pattern letter Breath assigns unique coding information to each component;
Lifting sequence file generating module 300, lifting erection sequence when for determining that each component is assembled, Generate lifting sequence file;Wherein, lift before and after erection sequence two components being separated by establishment corresponding lifting serial number it Between be reserved with space interval more than 1;
Command reception module 400 carries out selected instruction for receiving layout component input by user for the treatment of;
Entrucking sequence determining module 500 is used for according to the lifting erection sequence and preset rules of arrangement, automatic right It is described to wait for that layout component carries out layout, to wait for entrucking position and the entrucking sequence of layout component described in determination.
The entrucking sequence determining device based on BIM assembled architecture components of the present embodiment is based on for realizing above-mentioned The entrucking sequence of BIM assembled architecture components determines method, therefore is determined and filled based on the entrucking of BIM assembled architecture components sequence The visible embodiment that method is determined based on the entrucking sequence of BIM assembled architecture components hereinbefore of specific implementation mode in setting Part, for example, three-dimensional building model acquisition module 100, component splits module 200, and lifting sequence file generating module 300 refers to Receiving module 400, entrucking sequence determining module 500 is enabled to be respectively used to realize the above-mentioned entrucking based on BIM assembled architecture components Sequence determines step S101, S102, S103, S104 and S105 in method, so, specific implementation mode is referred to accordingly The description of various pieces embodiment, details are not described herein.
Entrucking sequence determining device provided by the present invention based on BIM assembled architecture components is based on BIM by acquisition The three-dimensional building model of foundation;Three-dimensional building model is split as single component, generates components pattern information, each component is assigned Give unique coding information;It determines lifting erection sequence when each component is assembled, generates lifting sequence file;Wherein, Two components being separated by before and after lifting erection sequence are reserved between corresponding lifting serial number between the space more than 1 in establishment Every;It receives layout component input by user for the treatment of and carries out selected instruction;According to lifting erection sequence and preset layout rule Then, layout component is treated automatically and carries out layout, to determine the entrucking position and the entrucking sequence that wait for layout component.The application can Realize component truck-loading scheme automatic editing, can lifting erection sequence of the combination member when being assembled, component carry out Entrucking is carried out according to the inverted sequence of lifting erection sequence when entrucking, in this way after reaching erecting yard, you can pacify according to lifting Dress sequence hanged component from lorry, directly carries out component assembly, without carrying out slinger again after taking out whole entrucking components Make, substantially increases the efficiency of assembly.
Also, the application reserves certain space in the establishment of carry out sequence, is needing in this way to sequentially changing When, it is only necessary to the starting point of selected member imparting sequence, you can according to the lifting sequence in database, be automatically performed subsequent order Change, for collaboration provide convenience, further improve the efficiency of assembled technology.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with it is other The difference of embodiment, just to refer each other for same or similar part between each embodiment.For being filled disclosed in embodiment For setting, since it is corresponded to the methods disclosed in the examples, so description is fairly simple, related place is referring to method part Explanation.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These Function is implemented in hardware or software actually, depends on the specific application and design constraint of technical solution.Profession Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
Above the entrucking sequence to provided by the present invention based on BIM assembled architecture components determine method and device into It has gone and has been discussed in detail.Principle and implementation of the present invention are described for specific case used herein, the above implementation The explanation of example is merely used to help understand the method and its core concept of the present invention.It should be pointed out that for the general of the art , without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention for logical technical staff, this A little improvement and modification are also fallen within the protection scope of the claims of the present invention.

Claims (10)

1. a kind of entrucking sequence based on BIM assembled architecture components determines method, which is characterized in that including:
Obtain the three-dimensional building model established based on BIM;
The three-dimensional building model is split as single component, generates components pattern information, unique compile is assigned to each component Code information;
It determines lifting erection sequence when each component is assembled, generates lifting sequence file;Wherein, lifting installation is suitable Two components being separated by before and after sequence are reserved with the space interval more than 1 in establishment between corresponding lifting serial number;
It receives layout component input by user for the treatment of and carries out selected instruction;
According to the lifting erection sequence and preset rules of arrangement, wait for that layout component carries out layout to described automatically, with true The fixed entrucking position for waiting for layout component and entrucking sequence.
2. determining method based on the entrucking of BIM assembled architecture components sequence as described in claim 1, which is characterized in that institute It is the individual files detached with IFC files to state lifting sequence file.
3. determining method based on the entrucking of BIM assembled architecture components sequence as claimed in claim 1 or 2, which is characterized in that Lifting erection sequence when each component of determination is assembled, generating lifting sequence file includes:
When the lifting erection sequence of first component changes, front and back the second structure being separated by after the first component change is determined The corresponding second lifting serial number of part and the corresponding third of third component lift serial number;
The corresponding first lifting serial number of the first component is changed to the second lifting serial number and the third lifts sequence Number between number generates the lifting sequence file after change.
4. determining method based on the entrucking of BIM assembled architecture components sequence as claimed in claim 3, which is characterized in that institute It states according to the lifting erection sequence and preset rules of arrangement, waits for that layout component carries out layout to described automatically, with determination The entrucking position for waiting for layout component and entrucking sequence include:
For stay, layout component is waited for described in arrangement respectively to the left and right sides on the basis of shelf center, and is divided into The described of the right and left waits for that layout component ensures that the center of gravity of lorry does not shift;
Cross member is symmetrically put according to the inverted sequence placement in heaps of lifting erection sequence on the basis of shelf center line It sets, and the described of each heap placement waits for that layout component is placed according to the inverted sequence of the lifting erection sequence.
5. determining method based on the entrucking of BIM assembled architecture components sequence as claimed in claim 4, which is characterized in that It is described according to the lifting erection sequence and preset rules of arrangement, automatically to it is described wait for layout component carry out layout, with true Further include after the fixed entrucking position for waiting for layout component and entrucking sequence:
Calculate the position of centre of gravity of lorry after waiting for layout component described in placing;
When the position of centre of gravity shifts, the prompt message of centre-of gravity shift is generated.
6. determining method based on the entrucking of BIM assembled architecture components sequence as claimed in claim 5, which is characterized in that institute It states according to the lifting erection sequence and preset rules of arrangement, waits for that layout component carries out layout to described automatically, with determination The entrucking position for waiting for layout component and entrucking sequence include:
When described when layout component is cross member, cross member is determined according to the capacity of the entrucking load of lorry, shelf Limit the number of plies;
According to the restriction number of plies, the lifting erection sequence and preset rules of arrangement, layout component is waited for described automatically Layout is carried out, to wait for entrucking position and the entrucking sequence of layout component described in determination.
7. determining method based on the entrucking of BIM assembled architecture components sequence as claimed in claim 6, which is characterized in that It is described according to the lifting erection sequence and preset rules of arrangement, automatically to it is described wait for layout component carry out layout, with true Further include after the fixed entrucking position for waiting for layout component and entrucking sequence:
Obtain the dimensional rack model of each shelf on the lorry of loading component;
The components pattern information is read, the components pattern letter is shown in the corresponding entrucking position of the dimensional rack model Breath.
8. determining method based on the entrucking of BIM assembled architecture components sequence as claimed in claim 7, which is characterized in that It is described according to the lifting erection sequence and preset rules of arrangement, automatically to it is described wait for layout component carry out layout, with true Further include after the fixed entrucking position for waiting for layout component and entrucking sequence:
Calculate geometric center of gravity position and the total weight of the shelf institute loading component being arranged on lorry;
Judge whether the geometric center of gravity position meets preset condition, and judges whether the total weight is less than predetermined load;
It is raw when the geometric center of gravity position does not meet the preset condition or the total weight is not less than the predetermined load At the prompt message for not meeting traffic condition.
9. determining method based on the entrucking of BIM assembled architecture components sequence as claimed in claim 8, which is characterized in that It is described according to the lifting erection sequence and preset rules of arrangement, automatically to it is described wait for layout component carry out layout, with true Further include after the fixed entrucking position for waiting for layout component and entrucking sequence:
Between component, geometry collision calculation is carried out between component and shelf;
Between detect component, there are the prompt messages that geometry collides between component and shelf there are when geometry collision, generating.
10. a kind of entrucking sequence determining device based on BIM assembled architecture components, which is characterized in that including:
Three-dimensional building model acquisition module, for obtaining the three-dimensional building model established based on BIM;
Component splits module, for the three-dimensional building model to be split as single component, components pattern information is generated, to each Component assigns unique coding information;
Lifting sequence file generating module, lifting erection sequence when for determining that each component is assembled, generation are hung Fill sequential file;Wherein, two components being separated by before and after erection sequence are lifted to reserve between corresponding lifting serial number in establishment There is the space interval more than 1;
Command reception module carries out selected instruction for receiving layout component input by user for the treatment of;
Entrucking sequence determining module, for according to the lifting erection sequence and preset rules of arrangement, waiting for automatically described Layout component carries out layout, to wait for entrucking position and the entrucking sequence of layout component described in determination.
CN201710688299.8A 2017-08-12 2017-08-12 Method and device is determined based on the entrucking sequence of BIM assembled architecture components Pending CN108427817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710688299.8A CN108427817A (en) 2017-08-12 2017-08-12 Method and device is determined based on the entrucking sequence of BIM assembled architecture components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710688299.8A CN108427817A (en) 2017-08-12 2017-08-12 Method and device is determined based on the entrucking sequence of BIM assembled architecture components

Publications (1)

Publication Number Publication Date
CN108427817A true CN108427817A (en) 2018-08-21

Family

ID=63155587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710688299.8A Pending CN108427817A (en) 2017-08-12 2017-08-12 Method and device is determined based on the entrucking sequence of BIM assembled architecture components

Country Status (1)

Country Link
CN (1) CN108427817A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109388879A (en) * 2018-09-30 2019-02-26 河北建设集团股份有限公司 Component handling technigue based on BIM technology
CN112031149A (en) * 2020-08-31 2020-12-04 天津泰明加德低碳住宅科技发展有限公司 Assembly type building design method based on biological geometric DNA
CN112215728A (en) * 2020-09-29 2021-01-12 中民筑友建筑设计有限公司 Production management method, device, equipment and storage medium for assembly type building components
CN112418568A (en) * 2021-01-25 2021-02-26 苏州澳昆智能机器人技术有限公司 Semi-online stack type planning method and robot
CN113392459A (en) * 2021-06-22 2021-09-14 中国建筑第八工程局有限公司 Prefabricated frame beam hoisting sequence coding system and method based on BIM

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
KR101396795B1 (en) * 2013-10-14 2014-05-21 한국건설기술연구원 Bim system and modeling method
CN105023201A (en) * 2015-07-24 2015-11-04 中建三局第一建设工程有限责任公司 Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform
CN105825335A (en) * 2016-03-15 2016-08-03 杭州睿兴栋宇工程咨询有限公司 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN106600239A (en) * 2016-12-28 2017-04-26 中建科技有限公司 Assembly type building construction full process data cooperation management system based on BIM

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
KR101396795B1 (en) * 2013-10-14 2014-05-21 한국건설기술연구원 Bim system and modeling method
CN105023201A (en) * 2015-07-24 2015-11-04 中建三局第一建设工程有限责任公司 Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform
CN105825335A (en) * 2016-03-15 2016-08-03 杭州睿兴栋宇工程咨询有限公司 BIM (Building Information Modeling) based construction onsite vehicle and device management system and method
CN106600239A (en) * 2016-12-28 2017-04-26 中建科技有限公司 Assembly type building construction full process data cooperation management system based on BIM

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周冲 等: "应用BIM技术建造装配式建筑全过程的信息化管理方法", 《建设科技》 *
杨之恬 等: "预制构件生产与装配一体化跟踪方法研究", 《第二届全国BIM学术会议论文集》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109388879A (en) * 2018-09-30 2019-02-26 河北建设集团股份有限公司 Component handling technigue based on BIM technology
CN109388879B (en) * 2018-09-30 2023-02-28 河北建设集团股份有限公司 Component loading and transporting method based on BIM technology
CN112031149A (en) * 2020-08-31 2020-12-04 天津泰明加德低碳住宅科技发展有限公司 Assembly type building design method based on biological geometric DNA
CN112215728A (en) * 2020-09-29 2021-01-12 中民筑友建筑设计有限公司 Production management method, device, equipment and storage medium for assembly type building components
CN112418568A (en) * 2021-01-25 2021-02-26 苏州澳昆智能机器人技术有限公司 Semi-online stack type planning method and robot
CN113392459A (en) * 2021-06-22 2021-09-14 中国建筑第八工程局有限公司 Prefabricated frame beam hoisting sequence coding system and method based on BIM
CN113392459B (en) * 2021-06-22 2024-01-23 中国建筑第八工程局有限公司 Prefabricated frame beam hoisting sequence coding system and method based on BIM

Similar Documents

Publication Publication Date Title
CN108427817A (en) Method and device is determined based on the entrucking sequence of BIM assembled architecture components
CN108428196A (en) Method and device is determined based on the entrucking sequence of BIM assembled architecture components
CN108427798A (en) A kind of entrucking sequence based on BIM building elements determines method and device
Benros et al. An integrated system for providing mass customized housing
CN108427794A (en) A kind of three-dimensional building model method for dividing and processing and device based on BIM
CN108319741A (en) Tower crane arrangement methods of comparison and selection based on BIM and system
CN109466691A (en) A kind of ship's equipment pre-drilled cavity method
CN108427696A (en) A kind of acquisition methods and device of the design document based on BIM
CN107730583A (en) A kind of terrain tile data dynamic dispatching method and device based on three-dimensional scenic
CN109242969A (en) A kind of outer profile model generating method, device and the equipment of assembled architecture
CN108427781A (en) Assembled technological design data processing method based on BIM and device
CN107239352A (en) The communication optimization method and its system of a kind of dynamics Monte Carlo Parallel Simulation
CN104318030B (en) Computational methods are automated based on equivalent Method of Arch Dam Foundation overall deformation modulus is deformed
CN108427807A (en) A kind of entrucking sequence based on BIM building elements determines method and device
CN108427786A (en) A kind of BIM buildings models generation method and device
Jung et al. A study of optimal design process for complex-shaped skyscrapers’ structural systems in United Arab Emirates
CN102677635A (en) Method for simulating interference between hoisting of steel lining of cable crane and concrete pouring in concrete construction process of high arch dam
JP2006201979A (en) Program for supporting construction planning of building
CN108425501A (en) A kind of component based on BIM hangs nail location determining method and device
CN115455554B (en) Building auxiliary design method, building auxiliary design device, storage medium and design auxiliary equipment
CN103489217A (en) Modeling method of building based on column system
CN109472084A (en) Assembled architecture design method and system, computer equipment and storage medium
CN109670469A (en) A kind of axis net generation method, electronic equipment and storage medium
CN109711059A (en) Guiding gutter automatic generation method, device and equipment based on assembled architecture
JP5179084B2 (en) Building structural margin setting support system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180821