CN108425674A - A kind of coal-mining method of open coal mine end side coal - Google Patents

A kind of coal-mining method of open coal mine end side coal Download PDF

Info

Publication number
CN108425674A
CN108425674A CN201810260700.2A CN201810260700A CN108425674A CN 108425674 A CN108425674 A CN 108425674A CN 201810260700 A CN201810260700 A CN 201810260700A CN 108425674 A CN108425674 A CN 108425674A
Authority
CN
China
Prior art keywords
coal
head
tail
end side
coalcutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810260700.2A
Other languages
Chinese (zh)
Other versions
CN108425674B (en
Inventor
马成溪
汪有刚
贾光胜
付天光
张雷
杨雪成
马少翀
李凌峰
池津维
刘瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG ENERGY INVESTMENT Co.,Ltd.
CHINA COAL SCIENCE AND TECHNOLOGY ENERGY TECHNOLOGY DEVELOPMENT Co.,Ltd.
Original Assignee
CCTEG ENERGY INVESTMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG ENERGY INVESTMENT Co Ltd filed Critical CCTEG ENERGY INVESTMENT Co Ltd
Priority to CN201810260700.2A priority Critical patent/CN108425674B/en
Publication of CN108425674A publication Critical patent/CN108425674A/en
Priority to PCT/CN2018/104672 priority patent/WO2019184257A1/en
Application granted granted Critical
Publication of CN108425674B publication Critical patent/CN108425674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • E21C41/28Methods of surface mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/24Remote control specially adapted for machines for slitting or completely freeing the mineral

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses the coal-mining methods that coal is helped at a kind of open coal mine end, use comprehensive mechanical coal mining complete equipment for the first time, and the end for exploiting open coal mine helps coal, the coal-mining method to include the following steps:Opposite end side has carried out region division first, and the end side of stope is divided into and holds side rotation to drive into end, end side main paragraph coal and side rotation is held to be driven out to end;Then using comprehensive mechanical coal mining complete equipment carry out successively after arriving first end side rotation drive into end end coal mining, end side main paragraph coal mining and end side rotation be driven out to end end coal mining.The coal-mining method of open coal mine end side of the present invention coal, process has very strong continuity in the time, to irregularly holding side adaptable; comprehensive high stoping rate; the length of service of open coal mine is improved, surrounding enviroment are also protected and improve, realizes the environmentally protective exploitation of coal mine and sustainable development.

Description

A kind of coal-mining method of open coal mine end side coal
Technical field
The present invention relates to coal mining technology fields, and in particular to a kind of coal-mining method of open coal mine end side coal, especially The exploitation of end side coal suitable for Waste Dump inside Open Pit Mine periphery.
Background technology
The Coal Mine Coal Reserve of northern China is abundant, especially the ground such as Shanxi, the Inner Mongol and Shaanxi, and small-sized open coal mine quantity is many More, coal annual output is between 600,000 tons to 3,000,000 tons.However, the highwall (being commonly called as end side) positioned at field of opencast mining end, no Weary good coal resource, for various reasons, most end side has to be abandoned in coal seam.Only a small number of end side coals are adopted at present It the methods of is adopted with lane and is simply recycled, or by adjacent pit mining after opencut closes hole.
Due to being limited by Mining technology condition, traditional pit mining mode cannot effectively, fully recycle these Resource, strip mining transformation mode have increased considerably cost of winning again, thus cause a large amount of wastes of first front end side coal resource.Especially For nearly horizontal or semi-steep open coal mine bed, the exposure in the regular period between mining work side and In-pit dumping working pit edge In the highwall of the both sides Cai Keng (mining work is helped and In-pit dumping working pit edge is dynamic mobile during coal mining), in outdoor coal The bottom that end side exposure coal seam is cheated in ore mining arranges that coal excavation apparatus, coal excavation apparatus are dug into highwall along coal seam and establish end helper work Face helps coal using certain recovery method back production end and is transported to coal to adopt other than the boundary of hole, and this mining way is known as holding Side mines.Since high wall mining need not individually carry out the stripping of rock stratum or the capital construction of coal face, the exploitation of end side coal Advantage of lower cost.Not only recyclable end side presses coal, improves the coal resource rate of extraction high wall mining, can also reduce the coal of open coal mine Pollution, improves mining area ecological environment, has significant economic benefit and social benefit.
Current high wall mining method adopts common end side pressure coal method including combining stripping, helps row pressure footwork in back production suddenly, outdoor Twist bit back production method, well work footrill formula back production method, outdoor high wall mining machine back production method etc..The method of these high wall minings is universal The features such as discontinuous, stripping and cost of winning are high in the presence of production, and in the prevalence of the low problem of coal mining rate, comprehensive mechanization is adopted Coal technique has very high continuous production and coal mining efficiency, has been applied to the digging in the main body coal seam of conventional coal mine at present, but It is not applied in high wall mining also.
Fully mechanized coal winning technology (referred to as " fully mechanized mining ") refers to brokenly coal, coalings, transporting coal, the main production process such as supporting The coal winning technology for all realizing mechanization, is the coal winning technology the most advanced being widely used at present, the equipment of use is referred to as comprehensive Mechanical coal mining complete equipment is closed, comprehensive mechanical coal mining complete equipment mainly (is commonly called as slipping including coalcutter, drag conveyor Son), multiple hydraulic supports (referred to as " three machines ").Drag conveyor is set to the coal seam antetheca of fully-mechanized mining working, commonly referred to as before Portion's transporter is made of head, fuselage and tail, guide rail is provided on the conveyer of front, chute is for falling coalcutter cutting Under coal body conveyed, flexible flightconveyor is the prevailing traffic equipment of fully-mechanized coalface, in addition to fortune Except delivering coal, it is alternatively arranged as the running track of coal-cutting machinery, the fulcrum of hydraulic support movement.Coalcutter is installed on guide rail, is adopted Coal machine is usually double-ended shearer, including cutting means and draft gear, and cutting means includes being set to coalcutter both ends Left and right roller, helical blade is provided on roller, cutting means to coal wall for carrying out brokenly coal and coal cutting, draft gear both sides Piston shoes are provided with, the piston shoes of coalcutter two bottom sides are set on the guide rail of drag conveyor both sides so that coalcutter is along scraper plate Conveyer longitudinal direction left and right back and forth movement.The rear side in drag conveyor is arranged side by side in multiple hydraulic supports, and common supporting forms work Make face, hydraulic support is self-advancing hydraulic support, top plate, the isolation goaf of working face is used to support and controls, to prevent cash Stone enters stope and drag conveyor, while can also move forward and propulsioning face drag conveyor, with coalcutter, scraper plate Conveyer matches, and realizes coal breakage, coalings, transporting coal, the full mechanization of supporting and caving process for stoping process.Integrated machine Tool coal mining complete equipment further includes crusher and loading machine.The fully mechanized mining step in current end side coal seam includes mainly:Coalcutter Coal cutting → moving hydraulic support → pushes away front conveyer.
It can be seen that existing high wall mining has the following problems:(1) existing high wall mining equipment production is discontinuous, It is frequently necessary to equipment removal of home shifting face, causes side coal resources in end that cannot be completely extracted, reduces the rate of extraction of coal resource.(2) Fully mechanized coal winning technology has been applied to the digging in the main body coal seam of conventional coal mine at present, but is not applied to end side also and adopts In coal, the advantage of the high exploitation rate of fully mechanized mining, which stays in end side coal mining, to be played.
Invention content
The purpose of the present invention is to provide the coal-mining methods that coal is helped at a kind of open coal mine end, to solve existing open coal mine The low problem low with the rate of extraction of end side coal mining efficiency on the middle peripheries Cai Keng.
To achieve the above object, the technical scheme is that, a kind of coal-mining method of open coal mine end side coal is provided, is carried For the end side of open coal mine stope, end side includes holding side rotation to drive into end, end side main paragraph coal and side rotation being held to be driven out to end, end side End is driven into rotation and side rotation in end is driven out to the both ends that end is located at end side main paragraph coal, using comprehensive mechanical coal mining complete equipment letter Claim fully-mechanized mining equipment, which includes drag conveyor, coalcutter and hydraulic support, and coalcutter is double-ended shearer, Roller of the middle coalcutter close to head end is head drum, and coalcutter is aircraft tail cylinder close to the roller of machine tail end, for exploiting Coal, the coal-mining method is helped to include the following steps in the end of open coal mine:
A. by the carry out region division of end side, the end side of stope is divided into the rotation of end side and drives into end, end side main paragraph coal Rotation is helped to be driven out to end with end, wherein the end, which is helped to rotate to drive into end and end side and rotate to be driven out to hold, is located at the end head of a secret society body The both ends of section coal;
B. use comprehensive mechanical coal mining complete equipment from arrive first rear order carry out successively end side rotation drive into end end coal open It adopts, side main paragraph coal mining and the rotation of end side is held to be driven out to end end coal mining, wherein the geometry at end is driven into end side rotation The a quarter cylinder to be formed is rotated by 90 ° around rotary shaft for Plane of rotation, the geometry of end side main paragraph coal is One cuboid.
Further, the method that end end coal mining is driven into end side rotation includes the following steps:
Step S101:Fully-mechanized mining equipment is arranged in the seat earth upper edge end of stope side coal wall, and voluntarily cutting goes out branch to coalcutter Protect section;
Step S102:Aircraft tail cylinder is raised, head drum is reduced, coalcutter drives into the first head starting point of end from the rotation of end side Xiang Duanbang rotations drive into the first tail terminal of end along straight line coal cutting, while mobile hydraulic support, by the head of drag conveyor and Fuselage slave head end pushes coal wall to successively to machine tail end, and after coalcutter reaches machine tail end, aircraft tail cylinder continues coal cutting, until cutting Then coal wall near machine tail end reduces the ground coal of aircraft tail cylinder cutting mill tail end;
Step S103:Head drum is raised, deviating angular coal wall towards head end with gradually increased head chamfers feed Coal cutting, gradually the first chamfered section end of end, while movable hydraulic are driven into side rotation in increased head offset distance arrival end for conduct Holder pushes the tail of drag conveyor and fuselage to coal wall;
Step S104:Head drum is reduced, aircraft tail cylinder is raised, the head that coalcutter is gradually reduced away from head end is carried on the back Digression to coal wall chamfer feed coal cutting, conduct gradually increased head deviate from distance reach end side rotation drive into end the second chamfered section To coal wall is pushed the tail of drag conveyor and fuselage in end, while mobile hydraulic support;
Step S105:Step S103 and step 104 are repeated, until coalcutter drives into end from the rotation of end side terminates tail vertex cut Coal returns to the rotation of end side and drives into the first head starting point of end, while mobile hydraulic support, by the tail of drag conveyor and fuselage from Machine tail end pushes coal wall to successively to head end, and the cycle of a closure is completed in the coal cutting path of coalcutter;
Step S106:Step S102 to step S105 is repeated, until the tail rotation of drag conveyor deviates original position 90 degree, drag conveyor vertical end help peeling direction, drag conveyor reach exactly to end side main paragraph coal.
Further, the method for end side main paragraph coal mining includes the following steps:
Step S201:Raise aircraft tail cylinder, reduce head drum, coalcutter from end side main paragraph coal the first head starting point to End side main paragraph the first tail of coal terminal is along perpendicular to coal seam peeling direction straight line coal cutting, while mobile hydraulic support, by scraper plate The head and fuselage slave head end of conveyer push coal wall to successively to machine tail end, after coalcutter reaches machine tail end, aircraft tail cylinder after Then continuous coal cutting reduces the ground coal of aircraft tail cylinder cutting mill tail end until cutting the coal wall near machine tail end;
Step S202:Raise head drum, at tail 25m to 40m utilize head drum towards head end chamfer Feed coal cutting, until reaching end side main paragraph the first chamfered section of coal end;
Step S203:Head drum is reduced, aircraft tail cylinder is raised, aircraft tail cylinder cuts the coal wall near machine tail end, reaches Side main paragraph coal the second tail terminal in end reduces the ground coal of aircraft tail cylinder cutting mill tail end, while mobile hydraulic support, and scraper plate is defeated The tail of machine is sent to push coal wall to;
Step S204:Head drum is raised, aircraft tail cylinder is reduced, coalcutter drives towards the coal cutting of head end from machine tail end, simultaneously Mobile hydraulic support pushes the tail of drag conveyor and fuselage to coal wall successively from machine tail end to head end, until coalcutter Reach end side main paragraph the second head of coal end;
Step S205:It raises aircraft tail cylinder, reduces head drum, in utilizing aircraft tail cylinder court apart from head 25m to 40m at Feed coal cutting is chamfer to machine tail end, until reaching end side main paragraph the second chamfered section of coal end;
Step S206:Head drum is raised, aircraft tail cylinder is reduced, head drum cuts the coal wall near head end, reaches Side main paragraph coal third head terminal in end reduces the ground coal of head drum cutting mill head end, while mobile hydraulic support, and scraper plate is defeated It send the head of machine to push coal wall to, completes a process cycles;
Step S207:Step S201 to step S206 is repeated, until drag conveyor reaches the rotation of end side and is driven out to end.
Further, end side rotation is driven out to end end coal mining method and includes the following steps:
Step S301:Aircraft tail cylinder is raised, head drum is reduced, coalcutter is driven out to the first head starting point of end from the rotation of end side Xiang Duanbang rotations are driven out to the first tail terminal of end along perpendicular to coal seam peeling direction straight line coal cutting, while mobile hydraulic support, will The head and fuselage slave head end of drag conveyor push coal wall to successively to machine tail end, after coalcutter reaches machine tail end, tail rolling Cylinder continues coal cutting, until cutting the coal wall near machine tail end, then reduces the ground coal of aircraft tail cylinder cutting mill tail end;
Step S302:Head drum is raised, head drum deviates angular coal wall towards head end with gradually increased head Feed coal cutting is chamfer, gradually side rotation in increased head offset distance arrival end is driven out to the first chamfered section end of end for conduct, simultaneously Mobile hydraulic support pushes the tail of drag conveyor and fuselage to coal wall successively from machine tail end to head end;
Step S303:Head drum is reduced, aircraft tail cylinder is raised, the head that coalcutter is gradually reduced away from head end is carried on the back Digression to coal wall chamfer feed coal cutting, conduct gradually increased head deviate from distance reach end side rotation be driven out to end the second chamfered section To coal wall is pushed the fuselage of drag conveyor and tail slave head end in end, while mobile hydraulic support successively to machine tail end;
Step S304:Step S302 and step 303 are repeated, until coalcutter is driven out to end from the rotation of end side terminates tail vertex cut Coal returns to the rotation of end side and is driven out to the first head starting point of end, while mobile hydraulic support, by the tail of drag conveyor and fuselage from Machine tail end pushes coal wall to successively to head end, and the cycle of a closure is completed in the coal cutting path of coalcutter;
Step S305:Step S301 to step S304 is repeated, until the tail rotation of drag conveyor is driven out to the rotation of end side It is driven out to end.
Preferably, end end coal mining, end side main paragraph coal mining and the rotation of end side are driven into end side rotation End end coal mining is driven out to be continuous in sequential.
Preferably, the geometry that end side rotation is driven out to end is that Plane of rotation is rotated by 90 ° to be formed around rotary shaft A quarter cylinder, and the rotary shaft that the rotary shaft at end is driven into side rotation in the end and side rotation in the end is driven out to end is located at institute State the homonymy of end side main paragraph coal.
Preferably, the step S102 to the step S106, the head holding are not moved, and the tail surrounds head Rotation.
Preferably, the step S301 to the step S305, the head holding are not moved, and the tail surrounds head Rotation.
Preferably, coalcutter the end side rotation drive into end and the end side rotation be driven out to end coal mining conduct path it is equal For zigzag.
The invention has the advantages that:
(1) coal-mining method of open coal mine end side of the present invention coal, after coal excavation apparatus drives into end side, due to the rotation of end side It is continuity in sequential to turn to drive into end end coal mining, end side main paragraph coal mining and the rotation of end side to be driven out to end end coal mining, After without interrupting coal mining activity, the sequential continuity of coal mining is strong, therefore complete equipment machine tail end travels in end is helped into U-shaped path It is driven out to, avoids the support time of well work fully mechanized mining end, mine efficient, the production capacity of coal is big.
(2) coal-mining method of open coal mine end side of the present invention coal, since head holding is not moved, only tail encloses Small to the mobile space requirement of the coal seam antetheca of fully-mechanized mining working around head rotating, coal excavation apparatus is installed along coal wall, is just had Standby propulsioning condition arbitrarily can to flexible rotation avoid, need not move shifting face, can edge when encountering to irregularly holding side Irregular end side carries out continuing propulsion, to irregularly holding side adaptable.
(3) coal-mining method of open coal mine end side of the present invention coal, is greatly improved production efficiency and integrates back Rate is adopted, the length of service of open coal mine is improved, resource recovery, protection and improvement environment is improved, realizes coal mine green ring Protect exploitation and sustainable development.
Description of the drawings
Fig. 1 is the region division schematic diagram for the end side that embodiment 1 provides.
Fig. 2 is the coalcutter coal mining path schematic diagram that embodiment 1 provides.
Fig. 3 is that end coalcutter coal mining circulating path detail drawing is driven into the end side rotation that embodiment 1 provides.
Fig. 4 is that main paragraph coal coalcutter coal mining circulating path detail drawing is helped at the end that embodiment 1 provides.
Fig. 5 is that the end side rotation that embodiment 1 provides is driven out to end coal mining circulating path detail drawing.
Reference sign:It helps at the end of 500- stopes;End is driven into side rotation in the ends 100-;Help main paragraph coal in the ends 200-;300- Side rotation in end is driven out to end;The seat earth of 400- stopes;A- handpiece of scraper conveyer end;B, B '-scraper conveyor tails end;α- Head deviation angle;β-head deviates from angle;S- head offset distances;D- heads deviate from distance.
Specific implementation mode
The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention..
Embodiment 1
The present embodiment 1 provides a kind of coal-mining method of open coal mine end side coal, provides the end side of open coal mine stope, end side End, end side main paragraph coal and the rotation of end side are driven into including the rotation of end side and is driven out to end, and end is driven into side rotation in end and side rotation in end is driven out to End is located at the both ends of end side main paragraph coal, using comprehensive mechanical coal mining complete equipment abbreviation fully-mechanized mining equipment, the fully-mechanized mining equipment packet Include SGZ1000/1050 types drag conveyor, MG300/700-WD types double-ended shearer and ZY7200/20/40 type hydraulic pressure branch Frame, roller of the coalcutter close to head end are head drum, and coalcutter is aircraft tail cylinder, the coal mining side close to the roller of machine tail end Method includes the following steps:
One, the region division of end side:
The end side 500 of stope is divided into the rotation of end side according to geometric properties and drives into end 100,200 and of end side main paragraph coal Side rotation in end is driven out to end 300, and end 100 is driven into side rotation in end and side rotation in end is driven out to end 300 is located at end side main paragraph coal 200 two End;
Two, the exploitation of end coal is driven into side rotation in end:
Step S101:Fully-mechanized mining equipment is arranged in the 400 upper edge end of seat earth of stope side coal wall, and voluntarily cutting goes out coalcutter Supporting section;
Step S102:Aircraft tail cylinder is raised, head drum is reduced, coalcutter drives into the first head starting point of end from the rotation of end side 1 drives into the first tail terminal 2 of end along straight line coal cutting to the rotation of end side, while mobile hydraulic support, by the head of drag conveyor Push coal wall to successively to machine tail end with fuselage slave head end, coalcutter reaches machine tail end thickness, and aircraft tail cylinder continues coal cutting, until cutting Coal wall near saturating machine tail end, then reduces the ground coal of aircraft tail cylinder cutting mill tail end;
Step S103:Head drum is raised, feed is chamfer to coal wall with gradual increased head offset angle towards head end Coal cutting, gradually the first chamfered section end 3 of end, while mobile liquid are driven into side rotation in increased head offset distance s arrival end for conduct Holder is pressed, pushes the tail of drag conveyor and fuselage to coal wall;
Step S104:Head drum is reduced, aircraft tail cylinder is raised, the head that coalcutter is gradually reduced away from head end is carried on the back Digression β chamfers feed coal cutting to coal wall, and gradually increased head drives into the second beveling of end away from the rotation of distance d arrival end side for conduct Section end 4, while mobile hydraulic support, push the tail of drag conveyor and fuselage to coal wall;
Step S105:Step S103 and step 104 are repeated, until coalcutter drives into end from the rotation of end side terminates tail point 5 Coal cutting returns to the rotation of end side and drives into the first head starting point 1 of end, while mobile hydraulic support, by the tail and fuselage of drag conveyor Push coal wall to successively from machine tail end to head end, the cycle of a closure is completed in the coal cutting path of coalcutter;
Step S106:Step S102 to step S105 is repeated, until the tail rotation of drag conveyor deviates original position 90 degree, drag conveyor vertical end help peeling direction, drag conveyor reach exactly to end side main paragraph coal.
Three, the exploitation of end side main paragraph coal
Step S201:Aircraft tail cylinder is raised, head drum is reduced, coalcutter helps main paragraph the first head of coal starting point 6 from end To end side main paragraph the first tail of coal terminal 7 along the straight line coal cutting perpendicular to coal seam peeling direction, while mobile hydraulic support, it will The head and fuselage slave head end of drag conveyor push coal wall to successively to machine tail end, after coalcutter reaches machine tail end, tail rolling Cylinder continues coal cutting, until cutting the coal wall near machine tail end, then reduces the ground coal of aircraft tail cylinder cutting mill tail end;
Step S202:Raise head drum, at tail 15m to 25m utilize head drum towards head end chamfer Feed coal cutting, until reaching end side main paragraph the first chamfered section of coal end 8;
Step S203:Head drum is reduced, aircraft tail cylinder is raised, aircraft tail cylinder cuts the coal wall near machine tail end, reaches End side main paragraph the second tail of coal terminal 9, reduces the ground coal of aircraft tail cylinder cutting mill tail end, while mobile hydraulic support, by scraper plate The tail of conveyer pushes coal wall to;
Step S204:Head drum is raised, aircraft tail cylinder is reduced, coalcutter drives towards the coal cutting of head end from machine tail end, simultaneously Mobile hydraulic support pushes the tail of drag conveyor and fuselage to coal wall successively from machine tail end to head end, until coalcutter Reach end side main paragraph the second head of coal end 10;
Step S205:Raise aircraft tail cylinder, reduce head drum, at tail 15m to 25m aircraft tail cylinder towards machine Tail end chamfers feed coal cutting, until reaching end side main paragraph the second chamfered section of coal end 11;
Step S206:Head drum is raised, aircraft tail cylinder is reduced, head drum cuts the coal wall near head end, reaches End side main paragraph coal third head terminal 12, reduces the ground coal of head drum cutting mill head end, while mobile hydraulic support, by scraper plate The head of conveyer pushes coal wall to, completes a process cycles;
Step S207:Step S201 to step S206 is repeated, until drag conveyor reaches the rotation of end side and is driven out to end.
Four, side rotation in end is driven out to the exploitation of the coal at end
Step S301:Aircraft tail cylinder is raised, head drum is reduced, coalcutter is driven out to the first head starting point of end from the rotation of end side 14 are driven out to the first tail terminal 15 of end along the straight line coal cutting perpendicular to coal seam peeling direction to the rotation of end side, while movable hydraulic branch Frame pushes the head of drag conveyor and fuselage slave head end to coal wall successively to machine tail end, after coalcutter reaches machine tail end, machine Stern barrel continues coal cutting, until cutting the coal wall near machine tail end, then reduces the ground coal of aircraft tail cylinder cutting mill tail end;
Step S302:Raise head drum, head drum is towards head end with gradual increased head offset angle to coal wall Feed coal cutting is chamfer, gradually side rotation in increased head offset distance s arrival end is driven out to the first chamfered section end 16 of end for conduct, together When mobile hydraulic support, push the tail of drag conveyor and fuselage to coal wall successively from machine tail end to head end;
Step S303:Head drum is reduced, aircraft tail cylinder is raised, the head that coalcutter is gradually reduced away from head end is carried on the back Digression β chamfers feed coal cutting to coal wall, and gradually increased head is driven out to the second beveling of end away from the rotation of distance d arrival end side for conduct Section end 17, while mobile hydraulic support, push the fuselage of drag conveyor and tail slave head end to coal successively to machine tail end Wall;
Step S304:Step S302 and step 303 are repeated, until coalcutter is driven out to end from the rotation of end side terminates tail point 18 Coal cutting returns to the rotation of end side and is driven out to the first head starting point 14 of end, while mobile hydraulic support, by the tail and machine of drag conveyor Body pushes coal wall to successively from machine tail end to head end, and the cycle of a closure is completed in the coal cutting path of coalcutter;
Step S305:Step S301 to step S304 is repeated, until the tail rotation of drag conveyor is driven out to the rotation of end side It is driven out to end 300.
Preferably, side rotation in end drives into end end coal mining, side main paragraph coal mining and the rotation of end side is held to be driven out to and end coal is held to open It adopts and is continuous in sequential.
Preferably, the geometry that side rotation in end is driven out to end 300 is that Plane of rotation is rotated by 90 ° to be formed around rotary shaft A quarter cylinder, and hold the rotary shaft that the rotary shaft at end 100 is driven into side rotation and side rotation in end is driven out to end 300 to be located at end and help The homonymy of main paragraph coal 200.
Preferably, step S102 to step S106, head holding are not moved, and tail surrounds head rotating.
Preferably, step S301 to step S305, head holding are not moved, and tail surrounds head rotating.
Preferably, coalcutter is in the coal mining conduct path for holding side rotation to drive into end 100 and side rotation is held to be driven out to end 300 Zigzag.
It should be noted that the head offset angle that above example refers to refer to the beveling direction of feed of coalcutter with The angle of end side peeling direction;Head refers to the beveling direction of feed of coalcutter and the angle for holding side peeling direction away from angle beta. According to coal mining industry slang, head offset angle and head also referred to as (are also known as removed for working face cyclic advance away from angle beta Depth or cutting depth) angle between feed distance;Head offset distance s and head are referred to as feed distance away from distance d.
The present embodiment 1 also provides a kind of technical efficiency, and the coal-mining method of coal is helped based on above-mentioned open coal mine end, below to this The technical efficiency of embodiment is described in detail.
Assuming that face length is 100m, propulsion length is 500m, and coal thickness is hm, then the comprehensive recovery of the coal-mining method Φ=(100*100* π * 1/4*h*2+100*300*h)/(100*500*h)=
91.4%.
It can be seen that the high stoping rate of the coal-mining method.And it is proportionate with the increase rate of recovery of face advanced distance. Although above having used general explanation and specific embodiment, the present invention is described in detail, on basis of the invention On, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, without departing from These modifications or improvements on the basis of spirit of that invention, belong to the scope of protection of present invention.

Claims (9)

1. the coal-mining method of a kind of open coal mine end side coal, using comprehensive mechanical coal mining complete equipment, for exploiting outdoor coal Coal is helped at the end of mine, which includes drag conveyor, coalcutter and hydraulic support, which is characterized in that the coal-mining method Include the following steps:
A. the end of stope side (500) is divided into the rotation of end side and drives into end (100), end side main paragraph coal (200) and the rotation of end side It is driven out to end (300), wherein end (300) is driven into end side rotation and side rotation in the end is driven out to end (300) and is located at end side The both ends of main paragraph coal (200);
B. side rotation in end after arriving first is carried out using comprehensive mechanical coal mining complete equipment successively and drives into end end coal mining, end head of a secret society Body section coal mining and the rotation of end side are driven out to end end coal mining, wherein the geometry that end (100) is driven into end side rotation is rotation Turn plane and is rotated by 90 ° a quarter cylinder to be formed, the geometry of the end side main paragraph coal (200) around rotary shaft For a cuboid.
2. the coal-mining method of open coal mine end side as described in claim 1 coal, which is characterized in that the coalcutter is twin-roll The roller of coalcutter, wherein coalcutter close to head end is head drum, and coalcutter is aircraft tail cylinder close to the roller of machine tail end, The method that end end coal mining is driven into end side rotation includes the following steps:
Step S101:Fully-mechanized mining equipment is arranged in seat earth (400) upper edge end of stope side coal wall, and voluntarily cutting goes out branch to coalcutter Protect section;
Step S102:Aircraft tail cylinder is raised, head drum is reduced, coalcutter drives into the first head starting point (1) of end from the rotation of end side Xiang Duanbang rotations drive into the first tail terminal (2) of end along straight line coal cutting, while mobile hydraulic support, by the head of drag conveyor Push coal wall to successively to machine tail end with fuselage slave head end, after coalcutter reaches machine tail end, aircraft tail cylinder continues coal cutting, until cutting Coal wall near saturating machine tail end, then reduces the ground coal of aircraft tail cylinder cutting mill tail end;
Step S103:Head drum is raised, deviating angular coal wall towards head end with gradually increased head chamfers feed coal cutting, Gradually the first chamfered section end (3) of end, while movable hydraulic branch are driven into side rotation in increased head offset distance arrival end for conduct Frame pushes the tail of drag conveyor and fuselage to coal wall;
Step S104:Head drum is reduced, aircraft tail cylinder is raised, the head that coalcutter is gradually reduced away from head end deviates from angle To coal wall chamfer feed coal cutting, conduct gradually increased head deviate from distance reach end side rotation drive into end the second chamfered section end (4), while mobile hydraulic support, push the tail of drag conveyor and fuselage to coal wall;
Step S105:Step S103 and step 104 are repeated, is cut up to coalcutter drives into end end tail point (5) from the rotation of end side Coal returns to the rotation of end side and drives into the first head starting point (1) of end, while mobile hydraulic support, by the tail and fuselage of drag conveyor Push coal wall to successively from machine tail end to head end, the cycle of a closure is completed in the coal cutting path of coalcutter;
Step S106:Step S102 to step S105 is repeated, until the tail rotation of drag conveyor deviates the 90 of original position Degree, drag conveyor vertical end help peeling direction, drag conveyor to reach exactly to end side main paragraph coal.
3. the coal-mining method of open coal mine end side as described in claim 1 coal, which is characterized in that the coalcutter is twin-roll The roller of coalcutter, wherein coalcutter close to head end is head drum, and coalcutter is aircraft tail cylinder close to the roller of machine tail end, The method of end side main paragraph coal mining includes the following steps:
Step S201:Raise aircraft tail cylinder, reduce head drum, coalcutter from end side main paragraph coal the first head starting point (6) to End side main paragraph coal the first tail terminal (7) is along perpendicular to coal seam peeling direction straight line coal cutting, while mobile hydraulic support, will scrape The head and fuselage slave head end of plate conveyer push coal wall to successively to machine tail end, after coalcutter reaches machine tail end, aircraft tail cylinder Continue coal cutting, until cutting the coal wall near machine tail end, then reduces the ground coal of aircraft tail cylinder cutting mill tail end;
Step S202:Raise head drum, at tail 25m to 40m utilize head drum towards head end chamfer feed Coal cutting, until reaching end side main paragraph the first chamfered section of coal end (8);
Step S203:Head drum is reduced, aircraft tail cylinder is raised, aircraft tail cylinder cuts the coal wall near machine tail end, reaches end side Main paragraph coal the second tail terminal (9) reduces the ground coal of aircraft tail cylinder cutting mill tail end, while mobile hydraulic support, and scraper plate is defeated The tail of machine is sent to push coal wall to;
Step S204:Head drum is raised, aircraft tail cylinder is reduced, coalcutter drives towards the coal cutting of head end from machine tail end, mobile simultaneously Hydraulic support pushes the tail of drag conveyor and fuselage to coal wall successively from machine tail end to head end, until coalcutter reaches End side main paragraph the second head of coal end (10);
Step S205:Raise aircraft tail cylinder, reduce head drum, in apart from head 25m to 40m at using aircraft tail cylinder towards machine Tail end chamfers feed coal cutting, until reaching end side main paragraph the second chamfered section of coal end (11);
Step S206:Head drum is raised, aircraft tail cylinder is reduced, head drum cuts the coal wall near head end, reaches end side Main paragraph coal third head terminal (12) reduces the ground coal of head drum cutting mill head end, while mobile hydraulic support, and scraper plate is defeated It send the head of machine to push coal wall to, completes a process cycles;
Step S207:Step S201 to step S206 is repeated, until drag conveyor reaches the rotation of end side and is driven out to end.
4. the coal-mining method of open coal mine end side as described in claim 1 coal, which is characterized in that the coalcutter is twin-roll The roller of coalcutter, wherein coalcutter close to head end is head drum, and coalcutter is aircraft tail cylinder close to the roller of machine tail end, End side rotation is driven out to end end coal mining method and includes the following steps:
Step S301:Aircraft tail cylinder is raised, head drum is reduced, coalcutter is driven out to the first head starting point (14) of end from the rotation of end side Xiang Duanbang rotations are driven out to the first tail terminal (15) of end along perpendicular to coal seam peeling direction straight line coal cutting, while movable hydraulic branch Frame pushes the head of drag conveyor and fuselage slave head end to coal wall successively to machine tail end, after coalcutter reaches machine tail end, machine Stern barrel continues coal cutting, until cutting the coal wall near machine tail end, then reduces the ground coal of aircraft tail cylinder cutting mill tail end;
Step S302:Head drum is raised, head drum deviates angular coal wall with gradually increased head towards head end and chamfers Feed coal cutting, gradually side rotation in increased head offset distance arrival end is driven out to the first chamfered section end (16) of end for conduct, simultaneously Mobile hydraulic support pushes the tail of drag conveyor and fuselage to coal wall successively from machine tail end to head end;
Step S303:Head drum is reduced, aircraft tail cylinder is raised, the head that coalcutter is gradually reduced away from head end deviates from angle To coal wall chamfer feed coal cutting, conduct gradually increased head deviate from distance reach end side rotation be driven out to end the second chamfered section end (17), while mobile hydraulic support, push the fuselage of drag conveyor and tail slave head end to coal wall successively to machine tail end;
Step S304:Step S302 and step 303 are repeated, is cut up to coalcutter is driven out to end end tail point (18) from the rotation of end side Coal returns to the rotation of end side and is driven out to the first head starting point (14) of end, while mobile hydraulic support, by the tail and machine of drag conveyor Body pushes coal wall to successively from machine tail end to head end, and the cycle of a closure is completed in the coal cutting path of coalcutter;
Step S305:Step S301 to step S304 is repeated, until the tail rotation of drag conveyor is driven out to the rotation of end side and is driven out to It holds (300).
5. the coal-mining method of open coal mine end side as described in claim 1 coal, which is characterized in that end is driven into end side rotation End coal mining, end side main paragraph coal mining and the rotation of end side are driven out to end end coal mining and are continuous in sequential.
6. the coal-mining method of open coal mine end side as described in claim 1 or 4 coal, which is characterized in that end side rotation is sailed The geometry of outlet (300) is that Plane of rotation is rotated by 90 ° a quarter cylinder to be formed, and the end around rotary shaft The rotary shaft that the rotary shaft at end is driven into side rotation and side rotation in the end is driven out to end is located at the homonymy of end side main paragraph coal.
7. the coal-mining method of open coal mine end as claimed in claim 2 side coal, which is characterized in that the step S102 is to described Step S106, the head holding are not moved, and the tail surrounds head rotating.
8. the coal-mining method of open coal mine end as claimed in claim 4 side coal, which is characterized in that the step S301 is to described Step S305, the head holding are not moved, and the tail surrounds head rotating.
9. the coal-mining method of the open coal mine end side coal as described in claim 2 or 4, which is characterized in that coalcutter is at the end Side rotation drives into end (100) and the end and helps to rotate that be driven out to the coal mining conduct path at end (300) be zigzag.
CN201810260700.2A 2018-03-27 2018-03-27 A kind of coal-mining method of open coal mine end side coal Active CN108425674B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810260700.2A CN108425674B (en) 2018-03-27 2018-03-27 A kind of coal-mining method of open coal mine end side coal
PCT/CN2018/104672 WO2019184257A1 (en) 2018-03-27 2018-09-07 Coal mining method for rotatably mining coal on an open pit slope using fully-mechanized coal mining equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810260700.2A CN108425674B (en) 2018-03-27 2018-03-27 A kind of coal-mining method of open coal mine end side coal

Publications (2)

Publication Number Publication Date
CN108425674A true CN108425674A (en) 2018-08-21
CN108425674B CN108425674B (en) 2019-11-19

Family

ID=63159231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810260700.2A Active CN108425674B (en) 2018-03-27 2018-03-27 A kind of coal-mining method of open coal mine end side coal

Country Status (2)

Country Link
CN (1) CN108425674B (en)
WO (1) WO2019184257A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296369A (en) * 2018-10-12 2019-02-01 太原科技大学 A kind of outdoor successive coal-mining face highwall coal recovery process
WO2019184257A1 (en) * 2018-03-27 2019-10-03 中煤科工能源投资有限公司 Coal mining method for rotatably mining coal on an open pit slope using fully-mechanized coal mining equipment
CN113420457A (en) * 2021-07-08 2021-09-21 辽宁工程技术大学 End slope stability analysis method for open pit coal mine steep wall mining

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU966235A1 (en) * 1980-02-22 1982-10-15 Gubin Gennadij K Method of winning thin gently-sloping mineral seams
CN1311385A (en) * 2001-02-09 2001-09-05 煤炭科学研究总院太原分院 Self moving apparatus for remote control bridge elevating conveyor
CN101418690A (en) * 2008-11-21 2009-04-29 平朔煤炭工业公司 Flat coal deposit large open pit mine end-slope transport technological process
CN104389606A (en) * 2014-09-23 2015-03-04 海西博奥工程有限公司 Novel mine mining technical scheme based on environment protection
CN104832130A (en) * 2015-04-28 2015-08-12 中国矿业大学 Gasification recovery method for residual coal at end slope of strip mine
CN106958445A (en) * 2015-12-02 2017-07-18 乔伊·姆·特拉华公司 Longwell optimal control

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4150853A (en) * 1977-05-18 1979-04-24 Mccoy Charles M Method of strip mining
CN102644464B (en) * 2012-04-12 2014-01-01 东北大学 Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine
CN103758568A (en) * 2014-02-14 2014-04-30 中国矿业大学 Opencast coal mine end slope filling mining method
CN104074521B (en) * 2014-06-20 2016-05-04 中国矿业大学 A kind of end is helped coal seam Long-distance Control driving recovery method
CN104790956B (en) * 2015-03-13 2018-08-14 余绍泽 It is remotely controlled roadway formula exploitation end and helps coal technique
CN107313804B (en) * 2017-06-29 2019-05-17 中国矿业大学 A kind of open coal mine end side pressure coal filling fully mechanized mining recovery method
CN108425674B (en) * 2018-03-27 2019-11-19 中煤科工能源投资有限公司 A kind of coal-mining method of open coal mine end side coal

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU966235A1 (en) * 1980-02-22 1982-10-15 Gubin Gennadij K Method of winning thin gently-sloping mineral seams
CN1311385A (en) * 2001-02-09 2001-09-05 煤炭科学研究总院太原分院 Self moving apparatus for remote control bridge elevating conveyor
CN101418690A (en) * 2008-11-21 2009-04-29 平朔煤炭工业公司 Flat coal deposit large open pit mine end-slope transport technological process
CN104389606A (en) * 2014-09-23 2015-03-04 海西博奥工程有限公司 Novel mine mining technical scheme based on environment protection
CN104832130A (en) * 2015-04-28 2015-08-12 中国矿业大学 Gasification recovery method for residual coal at end slope of strip mine
CN106958445A (en) * 2015-12-02 2017-07-18 乔伊·姆·特拉华公司 Longwell optimal control

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019184257A1 (en) * 2018-03-27 2019-10-03 中煤科工能源投资有限公司 Coal mining method for rotatably mining coal on an open pit slope using fully-mechanized coal mining equipment
CN109296369A (en) * 2018-10-12 2019-02-01 太原科技大学 A kind of outdoor successive coal-mining face highwall coal recovery process
CN113420457A (en) * 2021-07-08 2021-09-21 辽宁工程技术大学 End slope stability analysis method for open pit coal mine steep wall mining
CN113420457B (en) * 2021-07-08 2024-03-19 辽宁工程技术大学 End slope stability analysis method for steep slope mining of open pit coal mine

Also Published As

Publication number Publication date
CN108425674B (en) 2019-11-19
WO2019184257A1 (en) 2019-10-03

Similar Documents

Publication Publication Date Title
CN104405437B (en) A kind of solid filling with combine the hybrid working face mining method of adopting
EP3998394B1 (en) Method for coal mining without reserving coal pillar and tunneling roadway in whole mining area
CN103527196B (en) Method for recovery of room-type coal pillar through loess filling
CN109139012B (en) Mining chain arm saw continuous top cutting and seam forming method
CN104612693B (en) Continuous coal-mining technology for strip mine
CN108425674B (en) A kind of coal-mining method of open coal mine end side coal
CN103527195A (en) Method for separately mining and transporting thick coal seam with gangue and backfilling goaf
CN102996131A (en) Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN103939102A (en) Coal mining method for recovering coal briquettes under open-pit mine final coal through solid filling
CN109869150B (en) Mine resource subsection full-mining local-charging mining method
CN111946345A (en) Fully-mechanized caving mining method for layering under ultra-thick hard coal
CN110424966A (en) A kind of pumping of ultrahigh water material filling working face spoil stays lane without pillar mining method
CN103104260A (en) Comprehensive-conventional mechanical mining double-unit face coal mining method under complicated geological conditions
US11578597B2 (en) Underground longwall mining method
CN101737051A (en) Covering layer forming method of blind ore bodies
CN111022065B (en) Pressure moving roadway rapid tunneling equipment
GB2073806A (en) Mining Thick Coal Seams
CN101338675A (en) Open-cast side shrouded beneficial mineral open well combined mining method
CN106703809A (en) Method for forming cover layer through induced falling of open-pit-to-underground multi-branched orebody
CN101201004B (en) Coal mining method
CN106014411B (en) Deep fractures, which are cut to split, adopts integrated process for stoping
CN109139015B (en) Strip cutting type open stoping method
CN107882562B (en) Method for realizing recovery of coal pillars arranged on opposite-pulling working face
CN111411963A (en) Rotary coal mining method under coal mine
CN112211636A (en) Comprehensive mechanized coal mining method for irregular block sections

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210222

Address after: 100013 room 2201, building 35, Coal Science Park community, District 13, Heping Street, Chaoyang District, Beijing

Patentee after: CCTEG ENERGY INVESTMENT Co.,Ltd.

Patentee after: CHINA COAL SCIENCE AND TECHNOLOGY ENERGY TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 100020 2201, coal building, building 35, District 13, Heping Street, Chaoyang District, Beijing

Patentee before: CCTEG ENERGY INVESTMENT Co.,Ltd.

TR01 Transfer of patent right